CEMENT ROAD CONSTRUCTION 1
Transcript
Page 1: cc road

1

CEMENT ROAD CONSTRUCTION

Page 2: cc road

Construction of Cement Concrete Road

Page 3: cc road

3

Page 4: cc road

4

Using mix Concrete , there are some steps to construct the road-

1. Preparation of base2. Form working3. Preparation of subgrade4. Watering of base5. Joints6. Material mix & placing7. Compaction

Page 5: cc road

5

8. Finishing of surface8A. Floating8B. Belting8C. Brooming9. Curing10. Joint filling11. Edging12. Open to traffic

Page 6: cc road

6

1. Preparation of subgrade

1. Rolling on sub grade by roller2. Filling the granular soil in the weak part and pot

holes3. Correct the soil coat , Camber , longitudinal

slope When concrete direct laid on subgrade, For preventing the water-seepaging into the soil , use water proof material on entire length

Page 7: cc road

7

Page 8: cc road

8

2. Preparation of base

Choose any one type of base1. W.B.M. base As base material of W.B.M. Road; stone ballast, concrete 10-15cm layer are used. For bonding between concrete slab & W.B.M. used 1:2 cement wash on W.B.M.2. Concrete base On the road used 10cm Cement concrete(1:2:4) or lime concrete(16:32:64)

Page 9: cc road

9

3. Form work Material for form work- Wooden sheets, battens, plywood, fibre hard board, steel plates, angles, rope, minerals.

1. before using form work, it should free from all type material like as dust ,cement. 2. To place the concrete in appropriate depth use 2.5-5cm thick and 3mtr long wooden sheeting.

Page 10: cc road

10

3. The depth of wooden block must be same as level of slab thick. 4. After 24hrs form work displace next length of road.

Page 11: cc road

11

4. Watering of base

If base is dryThan using the sprinkling process on it properly after that placing the concrete.

Page 12: cc road

12

5. JOINTS

Wherever it is necessary to provide transverse, Longitudinal joints; there wedge of woods, metals to be fixed on level of concrete. After setting of concrete it should be pull out. If provided the dowel bar in joints, bars should be fit at right position.

Page 13: cc road

13

6. Material mix & placing

Mixer is equipment that mix the concrete using distinct amount of cement , concrete, sand and water. Concrete slab should have more than 5-10cm thick cause of drying.Used two type mixer-1. Batch mixer- at site, used for small road construction2. Continuous mixer- Continuous mixer used for large construction . if distance is more from site , mix concrete transported at site within setting time.

Page 14: cc road

14

Page 15: cc road

15

Two methods generally used in placing of concrete-1. Alternate bay method- Placed the concrete on both side of road alternatively like as1,3,5… part at one side and 2,4,6… part other side . 1st side 2nd sideThis method have slow process due to road traffic problems.

Page 16: cc road

16

2. Continuous bay method- construct one side of road regularly, if completed some part of first side than construct other side. this method have fast process without no obstruction of traffic

Page 17: cc road

17

7. Compaction

Purpose of compaction is that to pull out air from void and make concrete harden. Compaction done by- 1.mechanically surface vibrator 2. manually hand tempers

Page 18: cc road

18

8. Finishing of surface

1.Floating- For levelling the surface use floating, scree-ding , power trowel. So that there is no acceptable more than 3mm variation in concrete level surface.2.Belting- For making surface clean used belting process. Belt is nothing but a 15-30cm thick sheets of canvass which have more length than road.

Page 19: cc road

19

Page 20: cc road

20

3. Brooming- Brooming is the process in which we made rough surface parallel to road by brush. It useful in avoiding slip & comfortable travelling on road . the depth of line on road no more than 1.5mm.

Page 21: cc road

21

9. Curing

Curing is the name of increasing the hydration process of cement. after setting the concrete , curing process done till 14-28days.

Page 22: cc road

22

Some method of curing are-1.Shading concrete works2. Covering with hessian & gunny bags3. Sprinkling of water4.By ponding5. Membrane curing6. Steam curing

Page 23: cc road

23

Page 24: cc road

24

10. Filling joint

After drying road, clean the joints and fill the shelling compound or hot bitumen . also bitumen fill road bank.

Page 25: cc road

25

11. Edging

To protect damaging the sides of concrete pavements use kerb of pre mix concrete and carefully finshing done by edging tool.

Page 26: cc road

26

12. OPEN TO TRAFFIC

Generally after a month, road should be open to traffic. If used rapid hardening cement it take 7 days to open traffic.

Page 27: cc road

27

Thank you