5.5.2014 1 Long Range Planning Committee Meeting May 5, 2014 CCBP – M -1 (the Crystal Plaza Block)
Transcript
Page 1: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

1Long Range Planning Committee Meeting May 5, 2014

CCBP – M -1

(the Crystal Plaza Block)

Page 2: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

Block Plan Purpose

2

• Purpose - To facilitate coordinated and incremental

redevelopment that arrives at sector plan vision, does not

preclude future achievement of planned improvements for

surrounding sites, and considers interests of all parties on the

block

• Relationship to Sector Plan - An updated long-range

planning vision for specific blocks in Crystal City, over

time. Intent of block plan is to confirm that proposed site

plan advances or does not preclude sector plan goals.

• Opportunities to Amend - block plan updates will be required

for all future site plan submissions and will be evaluated

against most recently adopted block plan where refinements to

the vision have been made. The sector plan will otherwise

apply.

Page 3: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

Meeting Purpose

• LRPC #2 - review proposed Crystal City Block Plan, Block M

• Work towards determining whether there is:

A) General LRPC consensus that one or more of the block

plan scenarios meets sector plan goals and is ready to inform

the SPRC review of final site plan

or

B) General LRPC consensus that major issues are

outstanding with the proposed Block Plan and should be

addressed before SPRC commences

• Next steps going forward to be informed by outcome of this

meeting

3

Page 4: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

Submission

of Final Site

Plan and

Block Plan

LRPC review of Block

Plan (& CC Community

Amenities Inventory)

Conclusion of

LRPC review

of Block Plan

SPRC review

of Final Site

Plan

Block Plan, Site Plan,

and Rezoning to

Planning Commission

hearing

Block Plan, Site

Plan, + Rezoning

to County Board

for action

Next Site Plan on Block4

Context – CCBP Review Process

LRPC Chair

Memo to

SPRC (based on

general

consensus of

LRPC)

Major issues with

Block Plan persist

Block Plan ready

to inform SPRC

OR

PC/County Board

RTA on block plan

Block Plan

revised

OR

START

FINISH

Page 5: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

5

Response to LRPC #1 Comments

Page 6: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

6

Response to LRPC #1 Comments

LRPC Requests for Additional Information and Analysis

• Relationship of Block Plan to Progress/Status of Sector Plan

Goals for Crystal City

– Staff to Address

• Proposed Block M Open Space Function & Form

– Applicant to Address

• Additional Information on Current and Proposed Block M Retail

– Applicant to Address

Page 7: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

7

Response to LRPC #1 Comments

Information Requests from LRPC Discussion in 2/18/2014 Meeting

• Use Mix Knowing current use-mix balance in Crystal City to

help inform LRPC input on use mix proposed in Block Plan

Scenarios

• Public Space Knowing existing status of parks and open space system in

in Crystal City would help inform LRPC input on proposed

open space in Block Plan Scenarios, in light of goal of 14 to

15 total acres of publicly-available open space east of

Jefferson Davis Blvd

• Connectivity Seeking clarity on Crystal City Sector Plan plans and policies

as they relate to increasing connectivity

Page 8: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

8

Response to LRPC #1 CommentsUse Mix

Office45.5%

Retail3.9%

0.1%

Residential36.3%

Hotel14.3%

Existing Crystal City Development

Notes:

-As of January 1, 2014

-Includes Study Area of Crystal City Sector Plan only

Compiled by CPHD - Planning Division: Urban

Design and Research Section

ESTIMATED

SQUARE FEET

OFFICE 10,609,208

RESIDENTIAL 8,486,279

HOTEL 3,340,075

RETAIL 899,561

OTHER 12,945

TOTAL 23,348,068

Page 9: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

9

Page 10: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

10

Response to LRPC #1 CommentsPublic Open Space Areas

Existing

Public Open

Space Areas

(in acres)

Planned

Public Open

Space Areas

(in acres)

Aspiration per

Board

Guidance in

CCSP

Appendix 3

East of Route 1 10.3 9.8 14-15 acres

West of Route 1 0.3 2.0 N/A

TOTAL 10.6 11.8 N/A

NOTE: Existing Public Open Space Areas include those spaces that are identified as being

Clearly accessible outdoor space that is either publicly or privately owned

Page 11: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

11

Response to LRPC #1 Comments

• Retention and/or reestablishment

of the interior pedestrian

concourse (or “Underground” is

key element of adopted Sector

Plan

• Keeping an Underground

between 12th and 23rd Streets

poses challenges to creating

new east-west streets on certain

blocks

• Where new streets cannot be

achieved, policies aim to add

through-block pedestrian

connectivity

ILLUSTRATIVE CONCEPT PLAN

Connectivity

Page 12: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

12

Applicant Presentation of Updated,

Proposed Crystal City Block Plan Scenarios

transition

Page 13: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

13

Staff Assessment of Proposed

Crystal City Block Plan

Page 14: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

14

Scenario 1: Min Residential

Key Distinguishing Characteristics

• Generally retains existing Crystal

Plaza Apartments

• Primarily office fronting on Jefferson

Davis Hwy

• 45% Residential/Hotel

Page 15: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

15

Scenario 2: Mid Range A

Key Distinguishing Characteristics

• Reconfiguration of Crystal Plaza

Apartments

• Office and Residential fronting on

Jefferson Davis Hwy

• 50% Residential/Hotel

Page 16: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

16

Scenario 3: Mid Range B

Key Distinguishing Characteristics

• Reconfiguration of Crystal Plaza

Apartments

• Office and Residential fronting on

Jefferson Davis Hwy; additional

residential on 20th St

• 60% Residential/Hotel

Page 17: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

17

Scenario 4: Max Residential

Key Distinguishing Characteristics

• Redevelopment of Crystal Plaza

Apartments

• Straightening of Clark-Bell

• Smaller 23rd/Clark-Bell Plaza

• Primarily residential fronting on

Jefferson Davis Hwy

• 67% Residential/Hotel

Page 18: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

18

For context: WeLive proposal

Pending SP amendment proposal

for Crystal Plaza 6

• Adaptive re-use of vacant office building

for the WeLive concept

• Proposed residential use as a

temporary/interim condition (exact

period of time TBD); goal of ultimate

redevelopment of Crystal Plaza 6 is

unchanged

• For purposes of Crystal City Block Plan

review for Block M, maintain long term

vision of redeveloped Plaza 6,

realignment of Clark-Bell, and creation

of 23rd Street/Clark-Bell plaza

Page 19: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

19

Initial Staff Observations of CCBP

Review Criteria Block Plan Scenarios

1 2 3 4

Building Heights

Bulk Plane Angles

Build-To Lines

Street Network and Typology

Tower Coverage

Land Use Mix

Public Open Space * * * *

Retail Frontage + Underground Connections * * * *

Architectural features * * * *

Surface Transitway

Service and Loading * * * *

* = Potential conflict with sector plan goals

Page 20: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

20

Public Open Space Issues

• Open Space #10 does not

adhere to location and

configuration within build-to-

lines recommended in Sector

Plan – lacks features to

activate and encourage use

(all scenarios)

• Open Space #10 lacks

building wall along northern

edge to help define space (all

scenarios)

• In Scenario 4, 23rd St/Clark-

Bell plaza smaller than

recommended size

Initial Staff Observations of CCBP

Sector Plan Public Open Space map

Block Plan Scenario 1

Page 21: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

21

Retail Frontage &Underground Issues

• Zero retail frontage

provided along 23rd

Street/Clark Bell Market

Plaza* (all scenarios)

(*Updated concepts for north

edge retail liner would reduce

plaza size)

• Limited retail frontage

along 23rd Street due to

length of office lobby

frontage (all scenarios)

Initial Staff Observations of CCBP

Sector Plan Retail Frontage map

Block Plan Scenario 1-4

(w/ retail frontages noted)

= required retail frontage

Page 22: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

22

Architectural Feature IssuesInitial Staff Observations of CCBP

• Lack of building at

northern edge of 23rd and

Clark-Bell plaza precludes

opportunity for

coordinated frontage (all

scenarios)

= coordinated frontage

Sector Plan Architectural Features map

Page 23: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

23

Service and Loading IssuesInitial Staff Observations of CCBP

• Proposed garage

access location along

23rd Street is not

preferred location (all

scenarios);

• However, proper

amount and locations of

access points should

be informed by detailed

traffic studies

associated with the site

plan

= preferred street frontage locations for garage and

loading access points

Sector Plan Service and Loading map

Page 24: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

5.5.2014

24

Next Steps

Discussion

Page 25: CCBP M -1 · 2014-05-05 · 5.5.2014 Long Range Planning Committee Meeting May 5, 2014 1 CCBP –M -1 (the Crystal Plaza Block) Block Plan Purpose 5.5.2014 2 • Purpose - To facilitate

25


Recommended