CE 515 Railroad Engineering. Operations of Railways. “Transportation exists to conquer space and time -”. Safety. FRA responsible for safety Safety never deregulated All accidents reported Safety and Loss Control Department. Tracks. - PowerPoint PPT Presentation
15
CE 515 Railroad Engineering Operations of Railways “Transportation exists to conquer space and tim
Transcript
Page 1: CE 515 Railroad Engineering

CE 515 Railroad Engineering

Operations of Railways

“Transportation exists to conquer space and time -”

Page 2: CE 515 Railroad Engineering

Safety

• FRA responsible for safety

• Safety never deregulated

• All accidents reported

• Safety and Loss Control Department

Page 3: CE 515 Railroad Engineering

Tracks

• Main tracks: governed by one or more methods of control.

Should not be occupied without permission or authority

• Other than main tracks: occupancy without authority, the

locomotive engineer should look for other movements,

usually max 20mph

Page 4: CE 515 Railroad Engineering

Speed

• Higher speed: improve capacity and productivity but

also risk and maintenance cost

• Separate speed according to the type of train

• Temporary Speed Restrictions (TSR) and Permanent

Speed Restrictions (PSR)

Page 5: CE 515 Railroad Engineering

Rail Traffic Control Systems

• Track Warrant Control (TWC)

• Direct Traffic Control (DTC)

• Automatic Block Signal (ABS)

• Centralized Traffic Control (CTC)

Page 6: CE 515 Railroad Engineering

Rail Traffic Control Systems

• TWC, DTC: Non-signalized systems

• Use radio communication and computers

• Rail Traffic Controller (RTC): order transferred

by radio and written by crew

Page 7: CE 515 Railroad Engineering

Automatic Block Signal (ABS)

• Series of consecutive blocks governed by block signals, cab signals, or both. Signals activated by a train moving through the block, or by certain conditions that affect the block use.

• Developed in 1872, Dr. William Robinson

• Divide “tracks” into blocks, only one train per block

• Directional operations, two or more tracks

• Designated current of traffic, low-density single tracks

Page 8: CE 515 Railroad Engineering

Automatic Block Signal (ABS)

• Track circuit• Fail-safe design• Length of block: equal to longest normal

stopping distance • “Two-block, three-indication”, “Three-block,

four-indication”• Remained ABS systems: operated by TWC

rules

Page 9: CE 515 Railroad Engineering

Automatic Block Signal (ABS)

http://www.youtube.com/watch?v=U8yGNKH2t3g

Page 10: CE 515 Railroad Engineering

Centralized Traffic Control (CTC)

• Track territories, double track sections: crossing

over is allowed.

• Rail Traffic Control Center: all track circuits

connected, controlled together

• Panel: showing position of each train

Page 11: CE 515 Railroad Engineering

Centralized Traffic Control (CTC)

http://mysite.du.edu/~jcalvert/railway/ctc.htm

Page 12: CE 515 Railroad Engineering

Centralized Traffic Control (CTC)

Page 13: CE 515 Railroad Engineering

Centralized Traffic Control (CTC)

• Authority to enter a CTC main track: by signal.

• Crew requests for permission by radio

• Opposing movements: not allowed, only following

train movements

• “Intermediate signals”: facilitate fleeting of trains

Page 14: CE 515 Railroad Engineering

Centralized Traffic Control (CTC)

• Single track: 70% of capacity of double track

with ABS

• Railways: shift to CTC: excess capacity

Page 15: CE 515 Railroad Engineering

Questions?