Flash Report CE UL Congestion 031108_Anduring_3G Pekanbaru, June 30 th 2015
Transcript
  • Flash Report CE UL Congestion

    031108_Anduring_3G

    Pekanbaru, June 30th 2015

  • Finding & Analysis :

    Found high RRC rejection due to UL CE congestion since 06 June 2015 at 031108_Anduring_3G all sectors. Its impact to CSSR CS/PS degradation.

    CE UL utilization still normal, need to check utilization per board for make sure all WBBP board still works.

    No site surrounding down which inline with increasing RRC rejection due to UL CE congestion.

    Action plan:

    Checking WBBP board will be performed.

    Problem Review

    Availability of surrounding sites:

    Details availability:

  • Utilization Checking per WBBP Board

    Finding & Analysis :

    Found unbalance CE UL due to degradation at Cabinet No.=0, Subrack No.=0, Slot No.=0 in 3rd June morning and caused increasing rejection due to CE UL cong in busy hour.

    Action plan:

    Need trial to reset board while performance keep monitored.

    If WBBP at Cabinet No.=0, Subrack No.=0, Slot No.=0 still degrade, need trial to swap this WBBP in slot 0 to slot no.2 or to slot no. 3.

    If still degrade, need to replace WBBP slot 0.

  • Troubleshoot # Resetting Board

    Remark:

    After reset WBBP board performed, WBBP board slot no. 0 still degrade. Need to take the next action plan.

    Next action will be performed: Trial to swap this WBBP with slot WBBP slot no. 2 or slot no.3. (Swap WBBP will not be performed for this case due to urgent condition customers too long suffering bad experiences).

    So we direct to replace WBBP slot 0.

  • Troubleshoot # Replacing WBBP

    Prediction & Analysis:

    Need review candidate sites that will be donor site. CE utilization this site must be safe after donor CE performed.

    Surrounding sites of 031108_Anduring_3G are highest priority, but if exact donor in surrounding not found. We need donor from others place.

    After CE utilization prediction calculated and coordinated with capacity team, site 030805_Payakumbuh_Barat_3G as exact donor for improve this problem.

    Average CE UL utilization before (3WBBP*384=1152) is 21.7259%. If 1 WBBP substracted (2WBBP*384=768). CE UL utilization after is 32.58889819% (prediction). Regarding on the same method, CE DL utilization prediction is 15.84976438%.

    CE UL/DL utilization site 030805_Payakumbuh_Barat_3G seems safe after donor WBBP.

    Before:

    NodeB

    Average of

    VS.LC.ULCreditAvaila

    ble.Shared (number)

    Average of

    VS.LC.DLCreditAvail

    able.Shared

    (number)

    Average of

    VS.LC.ULMax.LicenseGr

    oup.Shared (number)

    Average of

    VS.LC.DLMax.LicenseGr

    oup.Shared (number)

    Average of

    Ul_CE_Utilization (%)

    by Measurement

    Average of

    Dl_CE_Utilization (%)

    by Measurement

    UL CE

    Utilization_by

    Formula

    DL CE

    Utilization_by

    Formula

    030805_Payakumbuh_Barat_3G 1152 1152 250.2827 121.7262 21.7259 10.5665 21.7259 10.5665

    Prediction (After Donor CE):

    NodeB

    Average of

    VS.LC.ULCreditAvaila

    ble.Shared (number)

    Average of

    VS.LC.DLCreditAvail

    able.Shared

    (number)

    Average of

    VS.LC.ULMax.LicenseGr

    oup.Shared (number)

    Average of

    VS.LC.DLMax.LicenseGr

    oup.Shared (number)

    UL CE Utilization

    Prediction_by

    Formula (%)

    DL CE Utilization

    Prediction_by

    Formula (%)

    Remark

    030805_Payakumbuh_Barat_3G 768 768 250.2827381 121.7261905 32.58889819 15.84976438 Utilization safe after down grade/donor CE

    CE UL Utilization (%) = [VS.LC.ULMax.LicenseGroup.Shared (number)/VS.LC.ULCreditAvailable.Shared (number)]*100

    CE DL Utilization (%) = [VS.LC.DLMax.LicenseGroup.Shared (number)/VS.LC.DLCreditAvailable.Shared (number)]*100

    Utilization Formula:

  • NodeB

    Nam

    e

    RN

    C

    WB

    BP

    befo

    re S

    lot

    (0,1

    ,2,3

    ,4)

    WB

    BP

    Aft

    er

    Slo

    t (0

    ,1,2

    ,3,4

    )

    Configure

    d D

    L C

    E b

    efo

    re

    Configure

    d U

    L C

    E b

    efo

    re

    Configure

    d D

    L C

    E a

    fter

    Configure

    d U

    L C

    E a

    fter

    CE

    Rem

    ark

    Board

    positio

    n t

    o u

    nplu

    g/p

    lug

    CE

    Board

    Accepto

    r S

    ite R

    em

    ark

    Serial num

    ber

    of

    CE

    Board

    Donor

    Rem

    ark

    030805_Payakumbuh_Barat_3G Huawei_BukitTinggi 3 Board (384,384,-,384,-) 2 Board (384,-,-,384,-) 1152 1152 768 768 Downgrade CE unplug slot 1 031108_Anduring_3G 020QYR10C3001379Need replace WBBP slot

    no.0 due to faulty

    Utilization of NodeB Donor (030805_Payakumbuh_Barat_3G)

    Remark:

    After WBBP donored, CE utilization of 030805_Payakumbuh_Barat_3G seems increased.

    Increasing CE utilization (especially CE UL utilization) slightly swerve as prediction. But utilization still safe.

  • Utilization & Performance of NodeB Acceptor (031108_Anduring_3G)

    Remark:

    After replacing WBBP slot 0, accessibility perfomance already improved.

    RRC rejection due to CE UL congestion decreased after WBBP slot 0 replaced.

    Its inline with improvement CSSR CS & PS (>98.5%) after WBBP slot no 0 replaced.

  • Summary

    Found CSSR CS & PS degradation in 031108_Anduring_3G due to high RRC Reject due CE UL congestion.

    It caused by WBBP slot 0 faulty, trouble shoot was performed to improve this case. After replace WBBP slot 0 replaced, CSSR CS & PS performance already improved and

    back to normal.

  • Thank you