03/11/2002 USC-CSE 2
Outline
Affiliates Update FCS as Trend-Setter System of Systems FCS Software Challenges CeBASE and SEI Support of FCS
Software Risk Management
8/12/2019 CeBase 1
3/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 USC-CSE 3
Commercial Industry (15) Daimler Chrysler, Freshwater Partners, Galorath, Group
Systems.Com, Hughes, IBM, Cost Xpert Group, Microsoft,Motorola, Price Systems, Rational, Reuters Consulting, Sun,Telcordia, Xerox
Aerospace Industry (6) Boeing, Lockheed Martin, Northrop Grumman, Raytheon, SAIC,
TRW
Government (8) DARPA, DISA, FAA, NASA-Ames, NSF, OSD/ARA/SIS, US Army
Research Labs, US Army TACOM FFRDCs and Consortia (4)
Aerospace, JPL, SEI, SPC
International (1) Chung-Ang U. (Korea )
USC-CSE Affiliates (34)
8/12/2019 CeBase 1
4/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 USC-CSE 4
USC-CSE 2001 Highlights New Affiliates: Daimler Chrysler, DISA, Freshwater Partners,
OSD/SIS, Reuters Consulting New Research and Applications Contracts: DARPA/Army FCS;
FAA; NASA/CMU High Dependability Computing Tools and Methods Collaborations: Freshwater Partners;
GroupSystems.com; Rational; COSYSMO (many) CrossTalk Series of Articles (www.stsc.hill.af.mil/crosstalk)
5/01: Spiral Development and Evolutionary Acquisition 12/01: MBASE Approach and Usage 1/02: Schedule/Cost/Quality as Independent Variable 5/02: CeBASE Method and CMMI
Software Engineering Certificate Program
8/12/2019 CeBase 1
5/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 USC-CSE 5
Certificate Program Courses- 3 units each; 6 course offerings/year
CS 510 Software Management and Economics (Fall) CS 578 Software Architectures; Object Oriented
Design (Spring) CS 591ab Software Engineering (Fall-Spring)
- 3 unit version of CS 577ab- Project verification & validation vs. development
CS 592 Emerging Best Practices in SoftwareEngineering (Spring & Summer)
8/12/2019 CeBase 1
6/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 USC-CSE 6
USC SWE Certificate Program Provides Key
Software Talent Strategy Enablers Infusion of latest SWE knowledge and trends Tailorable framework of best practices Continuing education for existing staff
- Including education on doing their own lifelonglearning
Package of career-enhancing perks for new
recruits- Career reward for earning Certificate- Option to continue for MS degree- Many CS BA grads want both income and
advanced degree
8/12/2019 CeBase 1
7/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 USC-CSE 7
USC-CSE 2002 Calendar Feb. 4-6. COTS Based Systems Conference (with
SEI, NRC Canada) Mar. 11-14. Annual Research Review, Agile Methods
Workshop Mar. 13-15. Ground Systems Architectures Workshop
(with Aerospace, USAF, SEI) May. Affiliates membership renewal May-Aug. Students available for employment,
internships August. Certificate Program begins Oct. 22-25. COCOMO/Cost Modeling Forum and
Workshop
8/12/2019 CeBase 1
8/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 USC-CSE 8
Outline
Affiliates Update FCS as Trend-Setter System of Systems FCS Software Challenges CeBASE and SEI Support of FCS
Software Risk Management
8/12/2019 CeBase 1
9/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 USC-CSE 9
From This...
Small Unit UAV
OtherLayeredSensors
NetworkCentricForce
Distributed FireMechanisms
Robotic Direct Fire
Robotic NLOS Fire
Robotic Sensor
Manned C2/Infantry Squad
To This...
Exploit Battlefield Non-Linearities using Technologyto Reduce the Size of Platforms and the Force
Network Centric Distributed Platforms
Futu re Com bat Sys tem s:
A Network-Centric Example
8/12/2019 CeBase 1
10/17
FY00 FY01 FY02 FY03 FY04
Robot ics
ManeuverC3
Maneuver B LOSNetworked Fires Weapon*
Organic All -WeatherTargetin g Vehicle
FY05
T & E
S h a
k e o u
tPreliminaryDesign
PDR CDR
DetailedDesign
Build D e s i g n
C o m p e
t i t i o n
Concept Development /Modeling and Simulation
AUTONOMY
VISION
COMMAND & CONTROLCOMMS
SOGreview
Government-Run Experiments
SOGreview
SOGreview
3D PLATFORM
NEAR ALL WEATHER
Unmanned GroundVehicle
MOBILITYDESIGN
IOR 1 IOR 2
B r e a
d b o a r d
B r a s s b o a r d
All-Weather Surveillan ceand Target ing Sensor PRECISION SENSING
ALL WEATHER
R e
d e s
i g n
/ T e s
t
LOITER ATTACK
PRECISION ATTACK
BLOS Survei l lance &Target ing System
Robotic UnmannedGround Vehicle
FY06
CHPS
SUO
AFSS
A160($5.0M)
D e s
i g n
C o m p e
t i t i o n
Total Collaborative Effortto Support FCS
8/12/2019 CeBase 1
11/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 USC-CSE 11
FCS Product/Process Interoperability Challenge
8/12/2019 CeBase 1
12/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 CeBASE 12
Frequent Major SIS ProblemsLikely to Confront FCS
Rapid change COTS Distribution, mobility Scalability Semiautonomy, HCI Architectural evolution Technology readiness Compound risks
Legacy transition Acquisition practices Systems of systems Process synchronizing Interoperability Emergent requirements Budget and schedule In-house expertise Culture change
A so f tware sys tem th is large has never been bu i l t before
8/12/2019 CeBase 1
13/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 USC-CSE 13
CeBASE and SEI Support of FCSSoftware Risk Management
FCS is trading 70 tons of armor for software protection by sensing, anticipating, and negating threats
FCS PM Office recognizes software challenges for FCS based on PM-initiated
reviews is actively addressing the software risks has formed an SEI/CeBASE team to assist the PM in managing
SW risk OSD co-funding CeBASE participation ($500K from ARA/SIS)
Building acquisition experience factory for next-gen systems-of-systems
Current SEI/CeBASE approach Risk-driven spiral (biggest risks first) Use USC, SEI risk management techniques Use UMD/CeBASE Experience Factory approach
8/12/2019 CeBase 1
14/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 USC-CSE 14
Spiral Approach to Risk Management SEI/CeBASE review of selected FCS approach
Initial top-criticality risk assessments iterated withcontractor
Top-level risk management plans Including next-level risk assessments Identification of success-critical software IPT members
Preparation, monitoring of detailed riskmanagement plans
Contractor initiatives Software IPT initiatives based on win-win Coordination with DARPA IT programs Risk tracking, experience-base building
8/12/2019 CeBase 1
15/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 CeBASE 15
Org. Improvement Goals Goal-related questions, metrics
Org. Improvement Strategies Goal achievement models
Org. Shared Vision &Improvement Strategy
Experience Factory Framework - I
8/12/2019 CeBase 1
16/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 CeBASE 16
Planning context
Progress/Plan/ GoalMismatches
Experience Base
Analyzedexperience,Updated models
Achievables,Opportunities
Org. Improvement Goals Goal-related questions, metrics
Org. Improvement Strategies Goal achievement models
Org. Improvement InitiativePlanning & Control
Initiative Plans Initiative-related
questions, metrics Initiative Monitoring and
Control Experience-Base Analysis
Org. Shared Vision &Improvement Strategy
Experience Factory Framework - II
8/12/2019 CeBase 1
17/17
University of Southern CaliforniaCenter for Software EngineeringC S E
USC
03/11/2002 CeBASE 17
Planning context
Progress/Plan/ GoalMismatches
Experience Base
Analyzedexperience,Updated models
Achievables,Opportunities
SW Improvement Goals Goal-related questions, metrics
SW Improvement Strategies Goal achievement models
FCS SW ImprovementInitiative Planning & Control
Initiative Plans Initiative-related
questions, metrics Initiative Monitoring and
Control Experience-Base Analysis
FCS SW Shared Vision &Improvement Strategy
Experience Factory Framework - FCS
Project SharedVision and Strategy
Planning Context
SelectiveModels and data
Projectexperience
Org.
Goals
Project Planningand Control
SelectiveModels anddata