Description:
CECD Capability Discussion with BPA. April 9, 2008. CECD Overview. Formed in as Duke Energy Control Area Services LLC (DECA) in 1999 Built to optimize Duke generation asset based on a fleet management philosophy 3 rd party generators and Load Serving Entities began to request CECD services - PowerPoint PPT Presentation
Popular Tags:
25
CECD Capability Discussion with BPA April 9, 2008
Transcript
Page 1: CECD Capability Discussion with BPA

CECD Capability Discussion with BPA

April 9, 2008

Page 2: CECD Capability Discussion with BPA

CECD Overview• Formed in as Duke Energy Control Area Services LLC (DECA) in 1999

• Built to optimize Duke generation asset based on a fleet management philosophy

• 3rd party generators and Load Serving Entities began to request CECD services

• In February 2005 became Constellation Energy Control and Dispatch (CECD) after an unsolicited offer was made to purchase the DECA LLC Operations.

• Successfully certified and currently manage all-requirements for 5 separate cities and over 11,400 MW of generation in 5 regions including WECC

• Highly experienced Staff focused on EMS and NERC/Regional policies

• Successfully completed 10 NERC Compliance reviews in October of 2007

• Successfully completed 10 Readiness Audits in October of 2007

• 7 to 9 man Certification Team onsite review of facilities and Staff

• Utilize multiple dynamic and/or pseudo ties to and from load and generation

Page 3: CECD Capability Discussion with BPA

• National control center operates throughout North America

• Secure client web access to performance data activity 24/7 in real time, historically and forward schedule requirements

• Provide continuous asset management and oversight, power tagging, ancillary services management, data access and dynamic scheduling

• Enable clients to manage power supplies and sales to maximize profitability while reducing physical and financial risk

• Employs multiple high-speed data connection to regional authorities, reliability authorities, RTOs to maintain data integrity

• Energy Integration, regulation, balancing, and demand response

• Implement and coordinate operation of A.G.C., pseudo ties, dynamic schedules

• Compliance management and reporting (GADS, FERC 714 and EIA 411)

• Energy shadow settlements, reporting and dispute resolution

• Emergency and planned outage response and coordination

• Reserve pool management and energy-replacement services

CECD Services

Page 4: CECD Capability Discussion with BPA

Optimization and Management Tools – Software Systems

• Integrated EMS, Planning, Accounting and Reporting System

• Generation Management System Customized for Wind

• Full Disaster Recovery Operations Infrastructure

• Web-based Performance Reports• Simplifies communication of Real-

time EMS and Other Pertinent Data

• Determine and Monitor Asset Value

• Assess and Optimize Unit Performance

• Energy- Settlements Tracking and Reconciliation (E-Star)

Performance and Optimization

Plan and Schedule(Energy Allocation)

Real-time Operations and Control

Energy Accounting, Reconciliation and Settlement

Page 5: CECD Capability Discussion with BPA

Current CECD Customer Base

North Littlerock, Ark 300 MW Peak

Ruston, La. 90 MW Peak

Conway, Ark 210 MW Peak

West Memphis, Ark 80 MW Peak

Benton, Ark 75 MW Peak

Total Load 755 MW & growing

All Requirements Load Served

Facility Name Facility Owner Facility Capacity Facility Trading Group

Union/El Dorado Entegra 2,200 MWs Entegra

Gila River Entegra 2,200 MWs Entegra

APEX LS Power 640 MWs Fortis

Batesville La. Power 650 MWs Goldman Sachs/JARON

Arlington Valley Dynegy 640 MWs Dynegy

Griffith Dynegy 550 MWs Dynegy

Fayette Duke Energy 640 MWs Duke Energy

Hanging Rock Duke Energy 1,240 MWs Duke Energy

Washington Duke Energy 640 MWs Duke Energy

Lee Duke Energy 640 MWs Duke Energy

Harquahala LS Power 1,200 MWs Fortis

Tatanka Acciona Wind Energy 200 MWs Acciona

Total 11,440 MWs

Generating Facilities Served

Page 6: CECD Capability Discussion with BPA

CECD Web

Page 7: CECD Capability Discussion with BPA

The MW Dashboard assesses plant performance in terms of MW produced and settled against plan.

Page 8: CECD Capability Discussion with BPA

Data Drill Down • Display node Detail, Average, Statistics, Frequency, Correlation• Chart display and tabular data result formats• Data filtered according to search criteria• Customize graphs and results on-the-fly

Re-chart:

•Add moving averages

•Add Footprint level

•See impact of Load/Control

Tab through data for additional information

Export current view to Excel

Tabular display of detail data presented in chart

Page 9: CECD Capability Discussion with BPA

Real-Time monitoring reports real-time EMS and other pertinent data through a series of web-based user reports

Page 10: CECD Capability Discussion with BPA

Search Features• Standard across reports• Flexible multi-selection• Save frequent searches to build a portfolio

Filter results over/under input thresholds.

Rank results by: •Delta•Stand Dev•Day-ahead•Real Time•Loss •CongestionQuickly find any ISO

node

Filter set by days, hours or product

Memorize selections as “Preferences”.

Set as default or recall saved reports with one-click

Page 11: CECD Capability Discussion with BPA

Chart Analysis• Choose any point, any ISO and chart results• Compare nodes results against each other• Add in ISO footprint and zone data• Hover over points for detail information

Page 12: CECD Capability Discussion with BPA

Dispatch LogAuditable Dispatch Log event data supports back office tie out activities.

Page 13: CECD Capability Discussion with BPA

Tie Line Meter

SMP Data SERVER can retain 8 days history in case of com. failure

“Raw” Meter Freeze reading at end of hour

CECD Houston Energy Management System (EMS)

EMS calculates a 32 bit meter reading to match LSE's and Trans. Operator

MV90 reading. Also calculated are the integration values, tie line losses and

raw delta values

Raw Real Time Meter PulsesRaw Meter Freeze Reading

Raw Meter reading delta values

Calculated Rollover Meter Accounting Values

Integration of Real Time meter pulses with losses calculated

Energy Provider(s)

ICCP DATA FEED – Multiple data points and reports

Web Data Screen Values

RTU / DCS – Remote Terminal Unit

Real Time Data to RTU Four sec update of meter data and hourly updates in buffer

DA

TA

TO

OT

HE

R C

OM

PA

NY

CECD E-STAR Energy

Accounting System

CUSTOMIZED REPORTS

Redundant SMP Data Server in Houston maintains additional

history and critical values

Data To CECD SMP Server

Page 14: CECD Capability Discussion with BPA

IPP GeneratorInterconnection

Meter

Incumbent Control Area

Energy Flow – Gen. Control Area Supplying AGC MW to 3rd party(Transmission Provider indicated as Intermediary Control Area)

Dynamic or Pseudo Tie

(AGC MW)

Receiving Control Area or

Load Center

Tie MeterM

Dynamic or Pseudo Tie

(Reg. Request MW * factor for losses)

Dynamic Signal

( Reg. Request MW + X% Loss factor)

M

Heavy arrow denotes actual energy flow

Light arrow denotes pseudo ties for ACE calculation

Legend:

CECD

AGC Set Point(Block Schedule

+Reg. MW request

+ X% Loss factor)

Dotted arrow denotes 4 second data flow

Page 15: CECD Capability Discussion with BPA

AGC Incremental/decremental Signal from BPA to IPP(Data Flow Example)

ICCPGateway

BPAEMS

MBPA System

Load

AGC MW desired from IPP

CECDICCP

Gateway

CECDEMS

Gen(s)

AGC (Total MW)

Data CircuitM

AuxBPA

IPP Generating Station

AGC MWSignal

IPPDCS

CECDSiteSMP

OATIE-tag

Schedules

IPPBlock Schedules

IPP Tie Meters

BPA Metering

Data Circuit

Actual MW

RTU BPA Pseudo Tie or Dynamic Tie Value to BPA Transmission Control

RTU

SwitchyardRTU

IPP Dynamic or Pseudo Tie

Value to BPA Transmission

Total MW ( Block + BPA Inc/dec MW

Request)

IPP Pseudo Tie Value to BPA Transmission

NOTE: The RTU Link To BPA is One method of passing data

We may use only the ICCP Link

Page 16: CECD Capability Discussion with BPA

IPP / CECD

BPA Transmission Control Area

BPA Load/ System

ManagementLegend:

ICCP / RTU Data Flow

1. Daily Contract MW (between BPA and IPP)2. BPA Regulation Request. BPA Pseudo Tie3. Hourly Integrated Pseudo Tie & Rounded MWH4. Hourly Integrated Pseudo Tie & Rounded MWH delivered from IPP5. Echo BPA Regulation Request6. IPP Regulation Flag, IPP Pseudo Tie7. Regulation Invalid Flag, Adjusted BPA Regulation Request

RTU also

Page 17: CECD Capability Discussion with BPA
Page 18: CECD Capability Discussion with BPA
Page 19: CECD Capability Discussion with BPA
Page 20: CECD Capability Discussion with BPA

CITY METER LOG COMPARISONS FOR RECEIVING COMPANY

METER: Tie 1 Loss Factor: 1.036600 (ex. 3% loss, enter 1.03)

DATE TIME Meter Reading Meter Flow Meter Flow Acc. Acctg. Accounting Meter Previous Accumulated Corr. Off On CommentsScaled Log Meter Log Flow Log Diff Difference Difference Peak Peak

1/1/2007 0:002/1/2007 0:00 0.000 0.000 0.000 0.000 0.000 0.000 0 03/1/2007 0:00 0.000 0.000 0.000 0.000 0.000 0.000 0 04/1/2007 0:00 3373.000 0.000 0.000 0.000 0.000 0.000 0.000 0 05/1/2007 0:00 9629.000 -6256.000 -6484.970 -6323.000 -6323.000 -161.970 0.000 -161.970 -162 -53 -1096/1/2007 0:00 17684.000 -8055.000 -8349.813 -14816.000 -8493.000 143.187 -161.970 -18.783 -19 -6 -137/1/2007 0:00 27472.000 -9788.000 -10146.241 -25003.000 -10187.000 40.759 -18.783 21.977 22 7 158/1/2007 0:00 38243.000 -10771.000 -11165.219 -36147.000 -11144.000 -21.219 21.977 0.758 0 09/1/2007 0:00 51624.000 -13381.000 -13870.745 -50017.000 -13870.000 -0.745 0.758 0.013 0 0

10/1/2007 0:00 60973.000 -9349.000 -9691.173 -59699.000 -9682.000 -9.173 0.013 -9.160 0 011/1/2007 0:00 0.000 0.000 0.000 0.000 0.000 0.000 0 012/1/2007 0:00 0.000 0.000 0.000 0.000 0.000 0.000 0 01/1/2008 0:00 0.000 0.000 0.000 0.000 0.000 0.000 0 0

NOTE: Loss factor in column H3 must be correct for each tie. Corrections in column K should be entered with the same sign as the accumulated difference in Column J. (ie. If Column J shows -9.181 then you would enter -9 in Column K, while if Column J shows 12.121 then you would enter 12 in Column K.)

With

ou

t L

oss

es

With

Lo

sse

s

Lo

ss F

act

or

Page 21: CECD Capability Discussion with BPA

PIX525 PIX525

CCD Firewall

6500A

CCDPDS-MSW-01 CCDWTS-MSW-01CCDPDS-MSW-02 CCDLSMP-MSW-01 CCDSMPT-MSW-01

CCDSQLP-MSW-01 CCDSQLP-MSW-02 CCDAPP-MSW-01CCDPI-MSW-01

6500B

6500C

6500D

CCDDSV-MSW-01 CCDDSV-MSW-02 CCDOAG-MSW-01 CCDOAG-MSW-02

CDN

3750A

CCDWEBP-OMF-01

PIX525

ISP

3750B

CCDWEBP-OMF-02 CCDWEBT-OMF-01

TITLE:

CONSTELLATION CONTROL AND DISPATCHCOMPANY:

CONSTELLATION ENERGY

DATE:SEPT 30, 2005

DRAWN BY:

RICK WILKERSON

REVISION:

8.0

SHEET:

2

LEGEND:

OF 2

Notes:

Ethernet

GigE

Router

Network LAN

SwitchInternal use onlyCONFIDENTIAL

S iS i

Raid Array

CCDSQLP-CLUSTER

File Storage

Web Page Access From CCD Customers

Windows Term Serv

DEV

MSW EMS LAN

MSW Data Service LAN

Web Services LAN

MSW BusinessPartner LAN

serial serial

serial serial

PDS01 PDS02 LSMP01(Local SMP)

SMPT01(Test SMP)

WEB01 WEB02 WEBT01

SQL01 SQL02 APP01Application Svr

DSV01(Data Server)

PI01(PI Server)

Session Switch

OAG01(ICCP)

OAG02(ICCP)

DSV02(Data Server)

CCDSQLP-01

CCDWTS-MSW-02

MISO CADE

OMF

TAG01CCDTAG-MSW-01

CCDAPPT-MSW-01APPT01

CCDEMS-MSW-02EMS02

CCDEMS-MSW-01EMS01

CCDSQLT-MSW-01SQLT01

Page 22: CECD Capability Discussion with BPA

TITLE:

GENERATION CONTROL CENTERCOMPANY:

CONSTELLATION ENERGY

DATE:

APRIL 27 2005

DRAWN BY:

KYLE HARBAUGH /RICK WILKERSON

REVISION:

4

SHEET:

1

LEGEND:

OF 2

Notes:

Ethernet

GigE

Router

Network LAN

SwitchInternal use onlyCONFIDENTIAL

S iS i

`

PIX525

CDN

CCD Servers

6500

6500

MCIMPLS

7206

7206

7206

7206

One Allen

4 Houston

DS3

2600MCI

Frame RelayOption 2

2600

PIX525

3840Business Partner

Router

Entergy

Southwest Power Pool /SRSG

`

`

PJMNet MISO

Server 1

Server 2

Server 3

Server 4

Server 5

Server 6

Server 7

Server 8

Server 9

Server 10

Server 11

Server 12

CCD Firewall

Generation Only Area

Load/Gen Area

Citrix Servers

Operator Workstations

DS3

10 Mbs

10 Mbs

6500

3750

450

0

inside

cdn

bpz

WAN

128 Kbs

128 Kbs

Verizon

10 Mbs

MCIFrame Relay

Option 1

64 Kbs

64 Kbs

T1

T1

T1 T1

`

MSW

OMF

ISP

dmz

DR 2

DR 3

DR 4

DR 1 DR Citrix

6500

ISP’s arelocated at OMF

and MSW

6500

Server 14 Server 15 Server 16Server 13

OATI

PIX525

Conway

Ruston Arlington

WECC

WAPA/WECCNet

` ` `

`

SRSG Terminals

Harquhala Gila River

`

`

W.Mephis

NLR

Page 23: CECD Capability Discussion with BPA
Page 24: CECD Capability Discussion with BPA
Page 25: CECD Capability Discussion with BPA