Cellar Ceiling Draught Proofing & Insulaon Rothwell & Lawrence - January 2016
Transcript
Page 1: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Cellar Ceiling Draught Proofing &

Insulation

Rothwell & Lawrence - January 2016

Page 2: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Preparation – removal of existing ceiling, remove nails, brush down joists

Re-instate missing noggins

3 of 22

Page 3: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Preparation – removal of old/new plaster from walls

4 of 22

Page 4: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Preparation – bringing down the wiring OUT of the insulated envelope

Page 5: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT
Page 6: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Apply draught-proof / breathable membrane

Page 7: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Apply draught-proof / breathable membrane

Page 8: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Wiring goes through taped grommets

Page 9: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Before…

Page 10: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

After

Page 11: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Taping the seams

Page 12: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Placing loft roll insulation & mesh to hold in place

Page 13: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Placing the loft roll insulation & mesh to hold in place

Page 14: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Placing the loft roll insulation & mesh to hold in place

Page 15: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

T&G Wood fibre board is delivered

Page 16: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Wood fibre board attached to joists

Page 17: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Wood fibre board attached to joists

Page 18: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

…almost done

Page 19: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Airbrick – ventilation strategy

Page 20: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

LED flat panel lighting & draught-proof insulated wooden door

Page 21: Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of old/new plaster from walls 4 of 22. Preparation – bringing down the wiring OUT

Light at the end of the tunnel…

The End