Cellar Ceiling Draught Proofing &
Insulation
Rothwell & Lawrence - January 2016
Preparation – removal of existing ceiling, remove nails, brush down joists
Re-instate missing noggins
3 of 22
Preparation – removal of old/new plaster from walls
4 of 22
Preparation – bringing down the wiring OUT of the insulated envelope
Apply draught-proof / breathable membrane
Apply draught-proof / breathable membrane
Wiring goes through taped grommets
Before…
After
Taping the seams
Placing loft roll insulation & mesh to hold in place
Placing the loft roll insulation & mesh to hold in place
Placing the loft roll insulation & mesh to hold in place
T&G Wood fibre board is delivered
Wood fibre board attached to joists
Wood fibre board attached to joists
…almost done
Airbrick – ventilation strategy
LED flat panel lighting & draught-proof insulated wooden door
Light at the end of the tunnel…
The End