CELL/MODEL NAME DESCRIPTION DATEBSD-1 Mechanical Splicer / Bar Splicer Details 1/1/2020DS-11 Drainage Scupper, DS-11 1/1/2020DS-12 Drainage Scupper, DS-12 1/1/2020
DS-12M10 Drainage Scupper, DS-12M10 1/1/2020DS-33 Drainage Scupper, DS-33 1/1/2020E-AS Top of approach slab elevations 2/17/2017E-AS1 Top of approach slab elevations adjusted for grinding 2/17/2017
E-S Top of slab elevations 2/17/2017E-S1 Top of slab elevations adjusted for grinding 1/14/2019
EJ-SS Preformed joint strip seal 1/1/2020EJ-SS-S (1 of 3) Preformed joint strip seal, with sidewalkEJ-SS-S (2 of 3) Preformed joint strip seal, with sidewalkEJ-SS-S (3 of 3) Preformed joint strip seal, with sidewalk
SB-1 Cantilever forming brackets (W27 and smaller) 2/17/2017SFP 39-44 Slip-formed parapet; Constant-slope (39" or 44") 1/1/2020
1/1/2020
Base Sheets-General Page 1 of 2 1/1/2020
DATE REVISION HISTORY8/11/2017 ● Performed a complete overhaul of our performed joint strip seal base sheet EJ-SSJ including:
1) Removed deeper locking edge rails and replaced with shallow version. 2) Added sliding plates for sidewalks to meet ADA requirements. 3) Changed the configuration of locking edge rails under sidewalks and medians to remain at the deck level. 4) Created two base sheet versions one with sidewalks and medians (EJ-SS-S) and one without (EJ-SS).
1/14/2019 ● Clarified note about deck grinding on E-S1.● Removed and archived base sheet SFP 34-42.● Added base sheet SFP 39-44 due to the introduction of constant-slope parapets.
1/1/2020 ● Updated bar splicer sheet for clarity.● Fixed errors on various scupper sheets including revised notes.● Replaced DS-33 scupper with a new improved version.● Revised strip seal base sheets for constant slope parapets.● General drafting revisions.
Base Sheets-General Page 2 of 2 1/1/2020
STRUCTURE NO.
BAR SPLICER ASSEMBLY AND MECHANICAL SPLICER DETAILS
Stage construction line
Stage I construction Stage II construction
"B" :
"A" :
(E) : Indicates epoxy coating.
cementing to steel forms.
Set bar splicer assembly by nailing to wood forms or
Set bar splicer assembly by means of a template bolt.
bar
Reinforcement
bar
Reinforcementbar (E)
Threaded splicer
bolt
Template
Form
Form
bar (E)
Threaded splicer
bar (E)
Threaded splicerLocation
coupler (E)
Threaded
coupler (E)
Threaded
coupler (E)
Threaded
Location
Positive stop
splicer (E)
Mechanical
Reinforcement bar Reinforcement bar
Minimum lap length
size
Bar
required
No. assemblies
size
Bar
required
No. assemblies
or end of approach slab
Stage construction line
Stage I construction Stage II construction
lap length
Minimum
BSD-1
INSTALLATION AND SETTING METHODS
STANDARD MECHANICAL SPLICER
"A"
"B"
conjunction with black bars.
* Epoxy not required on Bar Splicer Assembly components used in
" + thread length21 Threaded splicer bar length = min. lap length + 1
if applicable
Stage line
bar (E)
Threaded splicer
Minimum lap length
(All components shall be provided from one supplier)
* Bar splicer assembly
1-1-2020
typ.
" cl.211
alternatives.
See approved list of bar splicer assemblies and mechanical splicers for
for reinforcement bars. See Section 508 of the Standard Specifications.
Bar splicer assemblies shall be epoxy coated according to the requirements
All reinforcement shall be lapped and tied to the splicer bars.
yield strength.
Splicer bars shall be deformed with threaded ends and have a minimum 60 ksi
Notes:
STANDARD BAR SPLICER ASSEMBLY PLAN
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
STRUCTURE NO.
DRAINAGE SCUPPER, DS-11
typ.
3"
typ."
21
3
typ.
" min.,211
typ.
5° Draft
Drainage Scupper, DS-11 Each
ITEM UNIT QUANTITY
2" "1632
"1613
" R43 " R8
12 " R41
3" R
5° Draft
"87
"21 10° Draft
5° Draft
"4
11
"211
"411
"2
1" R typ.81
"85
1'-2"
6"
3"
"21
"217
"1671 "8
71
"2
14
"167
"81
1"
"811'-5
"411'-4
1'-4"
1'-2"
1'-0"
"2
17
"4
11
3"
"167
"81
1" "43
"81
2"
"419
"437
"217
"43
"81
"4
11"
43
2
"167
"43 6" "4
3
"859 "2
17
1'-
9"
6"
"2
11
"43 "4
3
"217
"2
11
"21 "2
1
" Ø bolts, typ.21for
" Ø holes169Drill
AA
B
B
PLAN
SECTION A-A
ANCHOR ROD DETAIL
VANE GRATE DETAIL
SECTION B-B BILL OF MATERIAL
DS-11
DOWNSPOUT
" OD858
" ID857
6"
contract unit price for Drainage Scupper, DS-11.
including complete installation of the scupper shall be paid for at the
Cost of the grate, frame, downspout, anchor rods, nuts and washers
Protective Coat is not applied to the scupper.
The Contractor shall take appropriate measures to assure that
sheet of .
of the scupper frame below deck shall be treated as specified on
Exterior surfaces of downspouts and exterior exposed surfaces
of 30,000 psi min. in lieu of the cast iron or structural steel.
to ASTM D2996 with a short-time rupture strength hoop tensile stress
As an alternate, fiberglass may be used for downspouts according
shall be galvanized according to AASHTO M111.
Structural steel scupper frames and downspouts, when utilized,
Details shall be submitted to the Engineer for approval.
Fillet or full penetration welds shall be used for the weldments.
and downspouts; however, the scupper grates shall remain cast iron.
configuration may be substituted for the cast iron scupper frames
Structural steel weldments of equal sections and of the same
of the Standard Specifications.
Stainless steel hardware shall be according to Article 1006.29(d)
As an alternate stainless steel may be used.
ASTM A307 and shall be galvanized according to AASHTO M232.
Bolts, anchor rods, nuts and washers shall be according to
requirements of AASHTO M105, Class 35B and AASHTO M306.
All cast iron parts shall be gray iron conforming to the
Notes:
4 locations
steel bolts with lock washers
" Ø-13 UNC stainless21for
Drill and tap scupper frame
GRATE BOLT HOLE DETAIL
Anchor rods 4 locations
" Ø-13 UNC threaded 21for
Drill and tap scupper frame
location relative to parapet.
See sheet of for scupper
" Ø-13 UNC bolts.21for
" deep21Drill and tap 4 holes
1-1-2020
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
STRUCTURE NO.
DRAINAGE SCUPPER, DS-12
typ.
5° Draft
"329
"329
"411"4
11
"211
"411
" R812
"1632
"4
11
5° Draft 10° Draft
5° Draft
ITEM UNIT QUANTITY
Drainage Scupper, DS-12 Each
"2
14
6" I.D.
6" I.D.
"217
"1671 "8
71
6" I.D.
7" O.D.
"419
"437
"217
"2
12
"4
11
2'-0"
"811'-11
"1691'-10
"4
32
"4
12
"2
13
11"
"4
31
"4
11
"4
31
"212 "2
12
"212"2
12
"21
"21
"81"8
1
"167
"167
" R167
"2
1
"85
"1613
" R43 " R4
1
"87
"21
"1611'-8
"21
"8
5
"43 "4
3
"1611'-8
"851'-5
"1611'-3
"1612'-2
"4
31'-
1
"4
3
"4
3 "21 "2
1
C C
AA
B
B
DOWNSPOUT
VIEW C-C
ANCHOR ROD DETAIL
VANE GRATE DETAIL
SECTION A-A SECTION B-B
PLAN
BILL OF MATERIAL
DS-12
2"
3" R
11" O.D.
11" O.D.
3"
1"
6"
7"
2"
6"
" R typ.81
3"
" Ø bolt circle219
contract unit price for Drainage Scupper, DS-12.
including complete installation of the scupper shall be paid for at the
Cost of the grate, frame, downspout, anchor rods, nuts and washers
Protective Coat is not applied to the scupper.
The Contractor shall take appropriate measures to assure that
sheet of .
of the scupper frame below deck shall be treated as specified on
Exterior surfaces of downspouts and exterior exposed surfaces
of 30,000 psi min. in lieu of the cast iron or structural steel.
to ASTM D2996 with a short-time rupture strength hoop tensile stress
As an alternate, fiberglass may be used for downspouts according
shall be galvanized according to AASHTO M111.
Structural steel scupper frames and downspouts, when utilized,
Details shall be submitted to the Engineer for approval.
Fillet or full penetration welds shall be used for the weldments.
and downspouts; however, the scupper grates shall remain cast iron.
configuration may be substituted for the cast iron scupper frames
Structural steel weldments of equal sections and of the same
of the Standard Specifications.
Stainless steel hardware shall be according to Article 1006.29(d)
As an alternate stainless steel may be used.
ASTM A307 and shall be galvanized according to AASHTO M232.
Bolts, anchor rods, nuts and washers shall be according to
requirements of AASHTO M105, Class 35B and AASHTO M306.
All cast iron parts shall be gray iron conforming to the
Notes:
GRATE BOLT HOLE DETAIL
4 locations
steel bolts with lock washers
" Ø-13 UNC stainless21for
Drill and tap scupper frame Anchor rods 8 locations
" Ø-13 UNC threaded 21for
Drill and tap scupper frame
" Ø holes on16138-
location relative to parapet.
See sheet of for scupper
1-1-2020
" deep, 6 thru holes)41are 1
bolt circle. (2 blind holes
" Ø21" Ø-13 UNC bolts on 94
3
Drill and tap 8 holes for
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
STRUCTURE NO.
DRAINAGE SCUPPER, DS-12M10
FLOW
ITEM UNIT QUANTITY
Each
1'-4"
"21 "2
1
"21
"8
5
"871
"431
"2
1"
21
1
"85
Drainage Scupper, DS-12M10
"4
11'-
7
2'-0"
"211'-10
10"
1'-4"
"4
31'-
0
"21
"4
11
"4
32
"4
33
typ."
21
3
"811'-8
"211'-8
"21
"41
"1631
"21
"41
"1631
"16
51
"87
2'-0"
"211'-10
"4
11
"4
32
"21
"41
"21
"41
"4
32
"4
33
typ."
21
3
"87 "
43
1'-
0
1'-4"
"211'-10
"851"8
72
"411
" rad. typ.16132
"811'-8
1" min.
"8
72
"2
13
"167
" rad. typ.81
"87
DS-12M10
BILL OF MATERIAL
DOWNSPOUT
ANCHOR ROD DETAIL
A
B
B
PLAN
A
SECTION A-A
C C
SECTION B-B
VIEW C-C
VANE GRATE DETAIL
10" I.D.3" 3"
11" O.D.
10" I.D.
3"
6"
typ.
" rad.81
typ.
7"
1'-11"
2"
1'-11"
2"
3" 10" I.D. 3"
" rad.41
2"
typ.
3"
2"5" rad. typ.
typ.
5"
Anchor rods 12 locations
" Ø-13 UNC threaded 21for
Drill and tap scupper frame
4 locations
steel bolts with lock washers
" Ø-13 UNC stainless21for
Drill and tap scupper frame
contract unit price for Drainage Scupper, DS-12M10.
including complete installation of the scupper shall be paid for at the
Cost of the grate, frame, downspout, anchor rods, nuts and washers
Protective Coat is not applied to the scupper.
The Contractor shall take appropriate measures to assure that
sheet of .
of the scupper frame below deck shall be treated as specified on
Exterior surfaces of downspouts and exterior exposed surfaces
of 30,000 psi min. in lieu of the cast iron or structural steel.
to ASTM D2996 with a short-time rupture strength hoop tensile stress
As an alternate, fiberglass may be used for downspouts according
shall be galvanized according to AASHTO M111.
Structural steel scupper frames and downspouts, when utilized,
Details shall be submitted to the Engineer for approval.
Fillet or full penetration welds shall be used for the weldments.
and downspouts; however, the scupper grates shall remain cast iron.
configuration may be substituted for the cast iron scupper frames
Structural steel weldments of equal sections and of the same
of the Standard Specifications.
Stainless steel hardware shall be according to Article 1006.29(d)
As an alternate stainless steel may be used.
ASTM A307 and shall be galvanized according to AASHTO M232.
Bolts, anchor rods, nuts and washers shall be according to
requirements of AASHTO M105, Class 35B and AASHTO M306.
All cast iron parts shall be gray iron conforming to the
Notes:
" Ø bolt circle411'-2
" Ø-9 UNC bolts on87for
Drill and tap 12 holes
GRATE BOLT HOLE DETAIL
location relative to parapet.
See sheet of for scupper
1-1-2020
bolt circle
" Ø41on 1'-2
" Ø Holes161512-
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
"21
"21
"212
11" O.D.
6" I.D. "212
"8
5
6" I.D.
7" O.D.
DOWNSPOUT
BILL OF MATERIAL
Each
UNIT QUANTITYITEM
Drainage Scupper, DS-33
"1632 "2
13 3""431
1'-10""1657
"1674
"2
14
11"
Dia
meter
A A
BB
3'-2"
3'-1""21 "2
1
"16113'-0
"1613 "2
1
"43
"433
"211
"431
"4
31"
21
3"
41
4
"2
1
6" Diameter
11" Diameter
3'-4"
2'-5"
"4
3
"4
11 2"
1'-
0"
"4
14"
43
"419
"437"4
3 "43
"837
"413 1"
"4
3
3"
"4
11
"4
14"
43
2"
"21
6" Diameter
11" Diameter
"212 "2
12
"1652
"81"8
7" Rad.2
12
" Rad.212
"4
31
"4
1
"4
11
"2
1
"8
3
"4
11
1"
"852
"81
4" Rad.
" Rad.213
PLAN
SECTION A-A
SECTION B-B
FLANGE ONLY
BOTTOM VIEW OF
FIRST VANE DETAIL SECOND VANE DETAIL
STRUCTURE NO.
DRAINAGE SCUPPER, DS - 33M
DS-33
" R typ.81
"211
"411
"85
"2
1
"4
3
"4
11
GRATE BOLT HOLE DETAIL
4 locations
steel bolts with lock washers
" Ø-13 UNC stainless21for
Drill and tap scupper frame
" Ø bolt circle219
" Ø holes on16138-
location relative to parapet.
See sheet of for scupper
unit price for Drainage Scupper, DS-33.
complete installation of the scupper shall be paid for at the contract
Cost of the grate, frame, downspout, nuts and washers including
Protective Coat is not applied to the scupper.
The Contractor shall take appropriate measures to assure that
sheet of .
of the scupper frame below deck shall be treated as specified on
Exterior surfaces of downspouts and exterior exposed surfaces
of 30,000 psi min. in lieu of the cast iron or structural steel.
to ASTM D2996 with a short-time rupture strength hoop tensile stress
As an alternate, fiberglass may be used for downspouts according
shall be galvanized according to AASHTO M111.
Structural steel scupper frames and downspouts, when utilized,
Details shall be submitted to the Engineer for approval.
Fillet or full penetration welds shall be used for the weldments.
and downspouts; however, the scupper grates shall remain cast iron.
configuration may be substituted for the cast iron scupper frames
Structural steel weldments of equal sections and of the same
of the Standard Specifications.
Stainless steel hardware shall be according to Article 1006.29(d)
alternate stainless steel may be used.
and shall be galvanized according to AASHTO M232. As an
Bolts, nuts and washers shall be according to ASTM A307
requirements of AASHTO M105, Class 35B and AASHTO M306.
All cast iron parts shall be gray iron conforming to the
Notes:
1-1-2020
" Ø bolt circle.219
" Ø-13 UNC bolts on43
Drill and tap 8 holes for
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
STRUCTURE NO.
TOP OF APPROACH SLAB ELEVATIONS
Location Station Offset
Elevations
Grade
Theoretical
Location Station Offset
Elevations
Grade
Theoretical
Location Station Offset
Elevations
Grade
Theoretical
Location Station Offset
Elevations
Grade
Theoretical
Location Station Offset
Elevations
Grade
Theoretical
2-17-2017
PLAN
E-AS
- - -
-
-
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
STRUCTURE NO.
TOP OF APPROACH SLAB ELEVATIONS
Elevations
Grade
Theoretical
Station Offset
Grinding
Adjusted For
Elevations
Theoretical Grade
Elevations
Grade
Theoretical
Station Offset
Grinding
Adjusted For
Elevations
Theoretical Grade
Elevations
Grade
Theoretical
Station Offset
Grinding
Adjusted For
Elevations
Theoretical Grade
Elevations
Grade
Theoretical
Station Offset
Grinding
Adjusted For
Elevations
Theoretical Grade
Elevations
Grade
Theoretical
Station Offset
Grinding
Adjusted For
Elevations
Theoretical Grade
2-17-2017
PLAN
E-AS1
- - -
-
-
Location Location Location
Location
Location
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
STRUCTURE NO.
TOP OF SLAB ELEVATIONS
adjusted for dead load deflections as shown below.
field if the engineer is working from the grade elevations
The above deflections are not to be used in the
Note:
¡
Symm. about
beams.
shown below, minus slab thickness, equals the fillet heights "t" above top flange of
subtracted from the "Theoretical Grade Elevations Adjusted for Dead Load Deflection"
flanges of the beams shall be taken at intervals shown below. These elevations
To determine "t": After all structural steel has been erected, elevations of the top
¡ Brg. Abut. ¡ Brg. Pier
(Includes weight of concrete only.)
"t"
At Minimum Fillet
" Chamfer43
" Chamfer43
"t"
At Maximum Fillet
Elevations
Grade
Theoretical
Load Deflection
Adjusted For Dead
Elevations
Theoretical Grade
2-17-2017E-S
DEAD LOAD DEFLECTION DIAGRAM
FILLET HEIGHTS
-
" Min.41
Location Station Offset
Elevations
Grade
Theoretical
Load Deflection
Adjusted For Dead
Elevations
Theoretical Grade
-
Location Station Offset
Elevations
Grade
Theoretical
Load Deflection
Adjusted For Dead
Elevations
Theoretical Grade
-
Location Station Offset
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
STRUCTURE NO.
TOP OF SLAB ELEVATIONS
Elevations
Grade
Theoretical
and Grinding
Load Deflection
Adjusted For Dead
Elevations
Theoretical Grade
¡
Symm. about¡ Brg. Abut. ¡ Brg. Pier
(Includes weight of concrete only.)
"t"
At Minimum Fillet
" Chamfer43
" Chamfer43
"t"
At Maximum Fillet
for dead load deflections and grinding as shown below.
the engineer is working from the grade elevations adjusted
The above deflections are not to be used in the field if
Note:
1-14-2019E-S1
DEAD LOAD DEFLECTION DIAGRAM
FILLET HEIGHTS
-
" Min.41
Location Station Offset
Elevations
Grade
Theoretical
and Grinding
Load Deflection
Adjusted For Dead
Elevations
Theoretical Grade
-
Location Station Offset
Elevations
Grade
Theoretical
and Grinding
Load Deflection
Adjusted For Dead
Elevations
Theoretical Grade
-
Location Station Offset
grinding the deck, see Special Provisions.
be ground to elevations below the "Theoretical Grade Elevations" shown below. For
The slab is to be ground after curing to achieve smoothness, but the slab is not to
fillet heights "t" above top flange of beams.
and Grinding" shown below, minus the initial slab thickness prior to grinding, equals the
subtracted from the "Theoretical Grade Elevations Adjusted for Dead Load Deflection
flanges of the beams shall be taken at intervals shown below. These elevations
To determine "t": After all structural steel has been erected, elevations of the top
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
EJ-SS
STRUCTURE NO.
PREFORMED JOINT STRIP SEAL
1-1-2020
Item Unit Total
FootPreformed Joint Strip Seal
of parapet
Inside face Strip seal joint
"8
3
1'-0"
1'-0"
" Parapet sliding plate21
Direction of traffic
Locking edge rail
at 50° F
-
Strip seal
"411
"83
flush
Grind
"167 "4
3
min.
"83
(EXTRUDED) RAIL
ROLLEDWELDED RAIL
seal
openin
g
Omit
weld at
penetration is verified by mock-up.
** Back gouge not required if complete joint
Rolled rail shown, welded rail similar.
groove shall be free of weld residue.
The inside of the locking edge rail
" m
ax.
21
4
" min.
21
3
Locking edge rail
at 50° F
-
Strip seal
" m
ax.
21
4
min."
43
2 min."
41
2
"811
**
**
Specs., automatically end welded.
conforming to Article 1006.32 of the Std.
* Granular or solid flux filled headed studs
" m
ax.
21
4
4"
min.
BILL OF MATERIAL
TRIMETRIC VIEW
A
SECTION B-B
LOCKING EDGE RAIL SPLICE
LOCKING EDGE RAILS
full depth
" Embedded plate43
6" 3"3"
Min. lap
6"
full depth
" Embedded plate83
Top of concrete Top of concrete
"4
1
SECTION A-A
SHOWING ROLLED RAIL JOINT
"4
1
angled/bent studs with horizontal studs)
" Ø x 6" studs @ 6" cts. (alternate 85*
PLAN AT PARAPET
FOR SKEWS ≤ 30° FOR SKEWS > 30°
A
min.
¾"
DETAIL A
except as shown in plan view.)
(Skews > 30° shown. Skews ≤ 30° similar
(Showing embedded plates only)
SHOWING WELDED RAIL JOINToff flush with the plates after concrete is set.
miss studs. All rods shall be burned, or sawed
the temperature during the deck pour. Place to
for holding the proper joint opening based on
Ƅ" ϕ threaded rods in Ɗ" ϕ holes at ±4'-0" cts.
at 50° F
-
at 50° F
-
min.
1"
" plate83face of
Concrete flush with back
" Plate83
2" Chamfer" Plate4
3
" plate43face of
Concrete flush with back
typ.
4"
Point Block Detail
plate
Parapet sliding
Strip seal joint
A
Aof parapet
Inside face
1'-0"3"
30°
typ.6" cts.,
ƅ" Ø x 6" Studs
"4
1
of Parapet
Inside Face
Top of deck
edge rail
Top of locking
plate
Parapet sliding
BB
Detail A
2" Max.
SECTION AT PARAPET
(10 per side 44" parapet)
(8 per side 39" parapet)
" Ø x 6" Studs43*
(12 per side 44" parapet)
(10 per side 39" parapet)
" Ø Countersunk bolts83
"212
length of the bridge approach slab.
cases the pavement connector length shall be adjusted, not the
joint at the end of the precast bridge approach slab. For these
may be required. One exception to this would be the strip seal
a different locking edge rail, dimensional adjustments
on the rolled locking edge rail. If the Contractor elects to use
to the concrete opening, not the joint opening, and are based
parapet lengths shown elsewhere in the plans are dimensioned
on the locking edge rail chosen by the Contractor. Deck and
The concrete opening below the strip seal will vary based
similar as noted.
39" constant slope barrier shown, 44" constant slope barrier
anchorage studs included with Preformed Joint Strip Seal.
Cost of parapet sliding plates, embedded plates, and
rail splice detail.
curb or parapet shall be welded as shown in the locking edge
rail joint within 10' measured perpendicular to the face of the
shall be ƈ" and sealed with a suitable sealant; however, any
The Maximum space between locking edge rail segments
according to Article 520.03 of the Standard Specifications.
All steel components shall be galvanized after fabrication
shall be followed.
The manufacturer's recommended installation methods
according to the manufacturer's recommendation.
" maximum depth provided the anchorage system is revised214
however, will not be allowed. Locking edge rails may exceed the
and meet the minimum anchorage shown. Flanged edge rails,
manufacturer to manufacturer provided they fit the application
of the locking edge rails and matching strip seal may vary from
applications and are conceptual only. The actual configuration
The locking edge rails depicted are configured for typical
rated movement of 4 inches.
are not permitted. The gland shall be sized for a maximum
rails. Open or "webbed" strip seal gland configurations
seal shall match the configuration of the locking edge
". The configuration of the strip41a minimum thickness of
The strip seal shall be made continuous and shall have
Notes:
min."
41
3
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
Item Unit Total
FootPreformed Joint Strip Seal
of parapet
Inside face Strip seal joint
(Sheet 1 of 3)
"8
3
1'-0"
1'-0"
" Parapet sliding plate21
Direction of traffic
Locking edge rail
at 50° F
-
Strip seal
"411
"83
flush
Grind
"167 "4
3
min.
"83
(EXTRUDED) RAIL
ROLLEDWELDED RAIL
seal
openin
g
Omit
weld at
penetration is verified by mock-up.
** Back gouge not required if complete joint
Rolled rail shown, welded rail similar.
groove shall be free of weld residue.
The inside of the locking edge rail
" m
ax.
21
4
" min.
21
3
Locking edge rail
at 50° F
-
Strip seal
" m
ax.
21
4
min."
43
2 min."
41
2
"811
**
**
Specs., automatically end welded.
conforming to Article 1006.32 of the Std.
* Granular or solid flux filled headed studs
" m
ax.
21
4
4"
min.
BILL OF MATERIAL
TRIMETRIC VIEW
A
SECTION B-B
LOCKING EDGE RAIL SPLICE
LOCKING EDGE RAILS
full depth
" Embedded plate43
6" 3"3"
Min. lap
6"
full depth
" Embedded plate83
Top of concrete Top of concrete
"4
1
SECTION A-A
SHOWING ROLLED RAIL JOINT
"4
1
angled/bent studs with horizontal studs)
" Ø x 6" studs @ 6" cts. (alternate 85*
PLAN AT PARAPET
FOR SKEWS ≤ 30° FOR SKEWS > 30°
A
min.
¾"
DETAIL A
except as shown in plan view.)
(Skews > 30° shown. Skews ≤ 30° similar
(Showing embedded plates only)
EJ-SS-S
SHOWING WELDED RAIL JOINToff flush with the plates after concrete is set.
miss studs. All rods shall be burned, or sawed
the temperature during the deck pour. Place to
for holding the proper joint opening based on
Ƅ" ϕ threaded rods in Ɗ" ϕ holes at ±4'-0" cts.
STRUCTURE NO.
PREFORMED JOINT STRIP SEAL - SIDEWALK
at 50° F
-
at 50° F
-
min.
1"
" plate83face of
Concrete flush with back
" Plate83
2" Chamfer" Plate4
3
" plate43face of
Concrete flush with back
typ.
4"
Point Block Detail
plate
Parapet sliding
Strip seal joint
A
Aof parapet
Inside face
1'-0"3"
30°
typ.6" cts.,
ƅ" Ø x 6" Studs
"4
1
of Parapet
Inside Face
Top of deck
edge rail
Top of locking
plate
Parapet sliding
BB
Detail A
2" Max.
SECTION AT PARAPET
length of the bridge approach slab.
cases the pavement connector length shall be adjusted, not the
joint at the end of the precast bridge approach slab. For these
may be required. One exception to this would be the strip seal
a different locking edge rail, dimensional adjustments
on the rolled locking edge rail. If the Contractor elects to use
to the concrete opening, not the joint opening, and are based
parapet lengths shown elsewhere in the plans are dimensioned
on the locking edge rail chosen by the Contractor. Deck and
The concrete opening below the strip seal will vary based
similar as noted.
39" constant slope barrier shown, 44" constant slope barrier
included with Preformed Joint Strip Seal.
embedded plates, anchorage studs, and expansion anchors
Cost of parapet sliding plates, sidewalk sliding plates,
raised pattern according to ASTM A786.
The top surface of sidewalk sliding plates shall have a
rail splice detail.
curb or parapet shall be welded as shown in the locking edge
rail joint within 10' measured perpendicular to the face of the
shall be ƈ" and sealed with a suitable sealant; however, any
The Maximum space between locking edge rail segments
according to Article 520.03 of the Standard Specifications.
All steel components shall be galvanized after fabrication
shall be followed.
The manufacturer's recommended installation methods
according to the manufacturer's recommendation.
" maximum depth provided the anchorage system is revised214
however, will not be allowed. Locking edge rails may exceed the
and meet the minimum anchorage shown. Flanged edge rails,
manufacturer to manufacturer provided they fit the application
of the locking edge rails and matching strip seal may vary from
applications and are conceptual only. The actual configuration
The locking edge rails depicted are configured for typical
rated movement of 4 inches.
are not permitted. The gland shall be sized for a maximum
rails. Open or "webbed" strip seal gland configurations
seal shall match the configuration of the locking edge
". The configuration of the strip41a minimum thickness of
The strip seal shall be made continuous and shall have
Notes:
(10 per side 44" parapet)
(8 per side 39" parapet)
" Ø x 6" Studs43*
(12 per side 44" parapet)
(10 per side 39" parapet)
" Ø Countersunk bolts83
1-1-2020
"212
min."
41
3
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
(Sheet 2 of 3)
1'-0"1'-0"
1'-0"
" Sidewalk Sliding Plate21
" Sidewalk Sliding Plate21
anchors at ±9" cts.
countersunk expansion
" Ø x 4" Stainless steel83
" Sidewalk Sliding Plate21
countersunk expansion anchors
" Ø x 4" Stainless steel83
"41
1"
"41
"41
Min. lap
6" 3" 6" 3"
TRIMETRIC VIEW
SECTION C-C
Top of Median
"41
D
SECTION D-D
2" Chamfer
PLAN AT RAISED SIDEWALK
corners 2" similar to sidewalk.
For skews > 30°, chamfer acute
1"
ƅ" Ø x 6" Studs
(at Rt. �'s)
Dtyp.6" cts.,
(FOR SKEWS > 30°)(FOR SKEWS ≤ 30°)
C
C
C
C
typ.6" cts.,
plate to top of deck
¼" gap from sidewalk sliding
Top of deck
edge rail
Top of locking
"4
1
Top of deck
edge rail
Top of locking
"4
1
Top of deck
Top of sidewalk
Top of deck
Top of median
ƅ" Ø x 6" Studs
vertical face
optional on
Raised pattern
EJ-SS-S
STRUCTURE NO.
PREFORMED JOINT STRIP SEAL - SIDEWALK
1-1-2020
SECTION AT RAISED SIDEWALK
SECTION AT MEDIAN
typ.
1"
typ.
1"
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
(Sheet 3 of 3)
1'-0" 1'-0"
" Sliding Plate21
30°
SECTION F-F
5"
2"
3" 3"6"
Min. lap
6"
DETAIL B
30°
1"
¼"
¼"
"4
1
Top of deck
edge rail
Top of locking
of Parapet
Inside Face
edge rail
Top of locking
E
" Sidewalk Sliding Plate21
8"
See Detail B
plate
" Parapet sliding21
8"
sliding plate
" Parapet 21
"8
3
1'-0"
" Parapet sliding plate21
Direction of traffic
SECTION E-E
full depth
" Embedded plate43
6" 3"
Min. lap
6"
full depth
" Embedded plate83
1'-0" 1'-3"
" Sliding Plate21
6" 3"6"
Min. lap
6"
ƅ" Ø x 6" Studsƅ" Ø x 6" Studs
1"
2" Chamfer
except as shown in plan view.)
(Skews > 30° shown. Skews ≤ 30° similar
(FOR SKEWS ≤ 30°) (FOR SKEWS > 30°)
PLAN AT DECK LEVEL SIDEWALK
anchors at ±9" cts.
Countersunk expansion
" Ø x 4" Stainless steel 83
F
F
F
F
Parapet sliding plate
Parapet sliding plateof parapet
Inside face
2"
of parapet
Inside face
typ.
6" cts.,
typ.
6" cts.,
EJ-SS-S
3"
1'-0"
STRUCTURE NO.
PREFORMED JOINT STRIP SEAL - SIDEWALK
2" Max.
E
11"
(12 per side 44" parapet)
(10 per side 39" parapet)
Countersunk expansion anchors
" Ø x 4" Stainless steel83
(10 per side 44" parapet)
(8 per side 39" parapet)
" Ø x 6" Studs, typ.43*
(12 per side 44" parapet)
(10 per side 39" parapet)
" Ø Countersunk bolts83
1-1-2020
SECTION AT DECK LEVEL SIDEWALK
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
W27 BEAMS AND SMALLER STRUCTURE NO.
CANTILEVER FORMING BRACKETS FOR SUPERSTRUCTURES WITH
Stage Construction Joint Finishing machine rail
Finishing machine rail¡ Bridge
Symmetrical about
materials shall be placed as shown between webs of beams in each bay.
For Standard construction, or Stage Construction the Hardwood bracing
be tied together at 4 foot intervals.
The beams or girders, supporting cantilever forming brackets, shall
exterior beams.
The finishing machine rails shall be placed on the top flange of the
as modified below and in the details shown on this sheet.
according to Article 503.06(b) of the Standard Specifications, except
When cantilever forming brackets are used, the work shall be done
2-17-2017SB-1
STAGE CONSTRUCTION
FORM BRACES FOR
STANDARD CONSTRUCTION
FORM BRACES FOR
Ties at 4'-0" cts.
Ties at 4'-0" cts.
at 4'-0" cts.
Hardwood 4" x 4" blocks
at 4'-0" cts.
Hardwood 4" x 4" blocks
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
STRUCTURE NO.
CONCRETE PARAPET SLIPFORMING OPTION
saw cut
¡ Full thickness
4'-6" long.
" Ø GFRP rebar,21
ex (E)
at each parapet joint location.)
(Place as shown in parapet section
d(E)
*See Superstructure Details.
GFRP REBAR STIFFENING DETAIL
SFP 39-44
4"
PARAPET SECTION
39" CONSTANT-SLOPE
" Ø GFRP rebar)21(Showing dimensions, d(E), and " Ø GFRP rebar)2
1(Showing dimensions, d(E), and
PARAPET SECTION
44" CONSTANT-SLOPE
1'-5"
"219 "2
17
superstructure details)
Face of parapet (as per
Constant throughout
(Limits of sa
w cut)
2'-
5"
")2
1(+
0,-
"2
18
* ")2
1(±1"
")2
1(+
0,-
10"
")2
1(+
0,-
3'-
3"
Sla
b
8"
4"
" A21*Plan dimension + 1
"211
notch full length
" ¬ Drip43
(mandatory)
Construction joint
")4
1le
ss than
Varie
s (n
ot
saw cut locations)
with #4 ex(E) bars (at
" GFRP rebar lapped21
1'-5"
"218 "2
18
superstructure details)
Face of parapet (as per
saw cut locations)
with #4 ex(E) bars (at
" GFRP rebar lapped21
Constant throughout
(Limits of sa
w cut)
2'-
10"
")2
1(+
0,-
"2
18
"211
*
Level
per plans
End of deck
notch full length
" ¬ Drip43
(mandatory)
Construction joint
4"
" A21*Plan dimension + 1
")4
1le
ss than
Varie
s (n
ot
Sla
b
8"")
21
(±1"
")2
1(+
0,-
10"
")2
1(+
0,-
3'-
8"
per plans
End of deck
Level
1'-0"
#3 (E) BAR
6"
at 8" cts.
#3 SF(E) bar
at 8" cts.
#3 SF(E) bar
b2(E) bar b2(E) bar
1-1-2020
types similar.
Steel superstructure shown. Other superstructure
thickness saw cut.
Replace all cork joint filler locations with a full
superstructure details.
Place full depth aluminum sheets as shown on
for 39" and 44" parapets.
needed to revise dimension A = 0.00348 cu. yds./ft.
to be revised as shown. Additional concrete
superstructure details, except dimension A which is
All dimensions shall remain the same as shown on
Notes:
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$