  • 8/9/2019 Cementitious PFP (1).pptx

    1/32

    Cementitious PFP

  • 8/9/2019 Cementitious PFP (1).pptx

    2/32

  • 8/9/2019 Cementitious PFP (1).pptx

    3/32

  • 8/9/2019 Cementitious PFP (1).pptx

    4/32

  • 8/9/2019 Cementitious PFP (1).pptx

    5/32

    • !ar"et is dominated by

    Fendolite and !andolite manufactured by

    Cafco# now Promat.

  • 8/9/2019 Cementitious PFP (1).pptx

    6/32

  • 8/9/2019 Cementitious PFP (1).pptx

    7/32

    $torage

    • %agged material &e't dry stored o(the ground.

    • )ater basedcoatings 'rotect f rom frost and tem'

    eratures *+,-

    C

  • 8/9/2019 Cementitious PFP (1).pptx

    8/32

  • 8/9/2019 Cementitious PFP (1).pptx

    9/32

  • 8/9/2019 Cementitious PFP (1).pptx

    10/32

  • 8/9/2019 Cementitious PFP (1).pptx

    11/32

    ''lication conditions

    • Do not a''ly if air tem'erature is /+-C and falling.

    • $urface should be dry and at least0-C above dew'oint tem'erature.

    • $hield from strong winds and strongradiant sunlight.

    • !aximum surface tem'erature +,-C

  • 8/9/2019 Cementitious PFP (1).pptx

    12/32

  • 8/9/2019 Cementitious PFP (1).pptx

    13/32

    1uality Control

    )eather Conditions.

    • Do not a''ly if air tem'erature is /+-Cand falling.

    • $urface should be dry and at least 0-Cabove dew'oint tem'erature.

    • $hield from strong winds and strongradiant sunlight.

    • !aximum surface tem'erature +,-C

  • 8/9/2019 Cementitious PFP (1).pptx

    14/32

    $lum'2Density

    • ''aratus

    Flat board2'late

    $traight edge

     3a'e measure $lum' tube

    456+mm D x 506mm long7

    )eighing scales Plastic sheet2bag

  • 8/9/2019 Cementitious PFP (1).pptx

    15/32

    $lum'2Density

    • Fill tube and levelo( the to'.

    • Do not agitate or

    com'ress the mixture.

    • !easure distance

    from to' of tube toto' of concave of the slum'.

  • 8/9/2019 Cementitious PFP (1).pptx

    16/32

    $lum'2Density

    • Place slum'material in bag

    • )eigh sam'le

    • Calculate density

  • 8/9/2019 Cementitious PFP (1).pptx

    17/32

    $urface nish and watershedding.

    • trowel nish recommended.

    • )here there is a ris" of water 'ooling

    chec" the material has been slo'edto shed water.

  • 8/9/2019 Cementitious PFP (1).pptx

    18/32

    Dried Film 3hic"ness

    • !easurements to be ta"en at leastevery 8m on each face of steel section

    • Coating should not ta'er o( towards9ange edge

     3olerance on thic"nesses :6 : ;8mm

  • 8/9/2019 Cementitious PFP (1).pptx

    19/32

    1C !esh ty'e and tting

    • Chec" one of the following ty'es arebeing used<

    Plastic coated hexagonal mesh

    =alvanised hexagonal mesh

    • Chec" mesh will lie in the middlethird.

    • Overla''ed correctly and no morethan 8 layers thic" in any situation

  • 8/9/2019 Cementitious PFP (1).pptx

    20/32

  • 8/9/2019 Cementitious PFP (1).pptx

    21/32

    1uality Control

    )eather Conditions.

    • Do not a''ly if air tem'erature is / +-Cand falling.

    • $urface should be dry and at least 0-Cabove dew'oint tem'erature.

    • $hield from strong winds and strong

    radiant sunlight.

    • !aximun surface tem'erature +,-C

  • 8/9/2019 Cementitious PFP (1).pptx

    22/32

  • 8/9/2019 Cementitious PFP (1).pptx

    23/32

    $lum'2Density

    • ''aratus Flat board2'late

    $traight edge

     3a'e measure $lum' tube

    456+mm D x 506mm long7

    )eighing scales Plastic sheet2bag

  • 8/9/2019 Cementitious PFP (1).pptx

    24/32

  • 8/9/2019 Cementitious PFP (1).pptx

    25/32

    $lum'2Density

    • Fill tube and levelo( the to'.

    • Do not agitate or

    com'ress the mixture.

    • !easure distance

    from to' of tube toto' of concave of the slum'.

  • 8/9/2019 Cementitious PFP (1).pptx

    26/32

  • 8/9/2019 Cementitious PFP (1).pptx

    27/32

    $lum'2Density

    • Place slum'material in bag

    • )eigh sam'le

    • Calculate density

  • 8/9/2019 Cementitious PFP (1).pptx

    28/32

  • 8/9/2019 Cementitious PFP (1).pptx

    29/32

  • 8/9/2019 Cementitious PFP (1).pptx

    30/32

  • 8/9/2019 Cementitious PFP (1).pptx

    31/32

    Dried Film 3hic"ness

    • !easurements to be ta"en at leastevery 8m on each face of steel section

    • Coating should not ta'er o( towards9ange edge

     3olerance on thic"nesses :6 : ;8mm

  • 8/9/2019 Cementitious PFP (1).pptx

    32/32