Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 1
Transcript
Page 1: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

1

Page 2: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

• Introduction

2

SCP – (2) 2500 ton each Chiller

SSP – (4) 150k lb/hr each Steam Boilers WCCUP – (2) 2500 tons

each chiller & (2) 250k lb/hr Steam Boilers

Central Utility Plant Optimization

Page 3: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

• Energy Optimization

Reliability

Energy Efficiency

“Running a utility plant vs. running a utility plant efficiently.”

Benchmarking – IFMA 2009 Central plant

3

Central Utility Plant Optimization

Page 4: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

• Pilot Project – University of Chicago Grad students initiative to

develop central plant optimization based on Stanford algorithm

– Forecast load (10 days look ahead)…weather data

– Equipment performance (Part load)

– Energy Costs calculations & tracking

– Develop optimum equipment dispatch schedule

– Track energy & costs (real-time dashboard)

4

Central Utility Plant Optimization

Page 5: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

• Results – System Deficiencies (Operational)

• Boilers capacity (max) at operations ~ 75% of full capacity

• Boilers doesn’t have 10:1 turndown ratio

• Chiller surges at low load conditions (low refrigerant)

• Chiller operation & Free cooling switch over is not automatic

• Condensate water reset program was not installed

• Utility meters are not accurate

5

Central Utility Plant Optimization

Page 6: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

• Results

6

Central Utility Plant Optimization

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

System Load (kpounds of steam)

boiler1 boiler2 boiler3 boiler4

0.0%

20.0%

40.0%

60.0%

80.0%

100.0%

System Load (kpounds of steam)

boiler1 boiler2 boiler3 boiler4

Pre-Pilot Pilot

Efficiency Ranking Boiler #

1 Boiler 3

2 Boiler 4

3 Boiler 2

4 Boiler 1

Page 7: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

• Results – Savings Verifications (Energy Savings)

7

Central Utility Plant Optimization

Hours Plant

Efficiency Total Production

(lbs of steam) Gas

(kscfh)

PREPILOT 330 75.7% 41,231,648 54706

PILOT 510 81.6% 58,369,670 64046

These are initial savings; we are in

process of validating savings numbers

Page 8: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

• Next Steps – Validate all meters at the plant

(Calibrate / Repair / Replace)

– Install the software for operational efficiency

– Fix system deficiencies

– Provide real-time (every 1 min) system data

– Track actual costs vs. optimum costs (Variance)

– Validate savings over time (at-least one year)

8

Central Utility Plant Optimization

Page 9: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

Dashboard

9

Central Utility Plant Optimization

Page 10: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

Equipment Schedule

10

Central Utility Plant Optimization

Page 11: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

Equipment Status

11

Central Utility Plant Optimization

Page 12: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

Plant Performance

12

Central Utility Plant Optimization

Page 13: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

LIVE DEMO

13

Central Utility Plant Optimization

Page 14: Central Utility Plant Optimization · 2012. 10. 16. · Central Utility Plant – Optimization Sumit Ray, PE, CEM, LEED Director, Engineering & Utilities Oct 15, 2012 •Energy Optimization

Central Utility Plant – Optimization

Sumit Ray, PE, CEM, LEED

Director, Engineering & Utilities Oct 15, 2012

Questions ??

Contact Information:

Sumit Ray

[email protected]

773-230-1987

773-834-3029

14

Central Utility Plant Optimization


Recommended