+ All Categories
Home > Documents > CERN Computer Centre Consolidation Project

CERN Computer Centre Consolidation Project

Date post: 06-Feb-2016
Category:
Upload: nasnan
View: 46 times
Download: 0 times
Share this document with a friend
Description:
CERN Computer Centre Consolidation Project. Vincent Doré IT Technical Forum - 10 th June 2011. Overview. Current configuration of the CC (excluding B613) Current issues Consolidation project Goals Technical choices Plans and views New IT room Main dates - PowerPoint PPT Presentation
Popular Tags:
25
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/ CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical Forum - 10 th June 2011
Transcript
Page 1: CERN Computer Centre  Consolidation Project

Computing Facilities

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF

CERN Computer Centre Consolidation Project

Vincent Doré

IT Technical Forum - 10th June 2011

Page 2: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Overview

• Current configuration of the CC (excluding B613)• Current issues• Consolidation project

– Goals– Technical choices– Plans and views– New IT room– Main dates

• On-going work outside the project• Questions

Computer Center Consolidation – VD - 100611 - 2

Page 3: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Current configuration - 1

• Designed and built in early 1970s• Fully refurbished around 2000 • 2 types of equipment both on UPS:

– Physics (single power feed, no diesel backup) – Critical (dual power feed and diesel backup)

• Power capacity:– Nominal current capacity: 2.5MW (including 240kW of critical

power)– Extended (usable) capacity: 2.9MW (including 340kW of

critical power) forfeiting redundancy for all UPS systems• 2 main IT rooms (R-050 -1400m² & Vault - 1200m²).

Several dedicated labs (telecom)

Computer Center Consolidation – VD - 100611 - 3

Page 4: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Current configuration - 2

• 3 physics UPS, each with 4*400kvA modules• 1 critical UPS with 2*300kVA modules• Air cooling installations: for IT equipment including telecoms

(capacity up to ~2.5MW), technical areas... and offices– (3+1) Chillers not secured by UPS nor diesel (water at ~5C)– Pumps and ventilation units secured by diesel – Water-tank for stored cooling capacity

• Water cooling installations: for IT physics equipment (capacity up to 800kW)– (1+1) Chillers not secured by UPS nor diesel (water at ~14C)– Pumps secured by (physics) UPS– 80 water-cooled racks secured by physics UPS– Water-tank for stored cooling capacity

Computer Center Consolidation – VD - 100611 - 4

Page 5: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Current issues - 1

• Cooling:– Insufficient cooling for critical UPS room – Impossible to improve the cooling in critical UPS

room– CC not cooled when running on UPS without diesel– Insufficient cooling when running on diesel

• IT critical equipment running• Pumps & Ventilation Units running• No chiller and insufficient stored cold water

– Offices in B31 cooled by the CC

Computer Center Consolidation – VD - 100611 - 5

Page 6: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Current issues - 2

• Power– Insufficient critical power available – No redundancy for critical UPS (> 240 kW)– No redundancy for physics UPS (> 2.7 MW)

• Other– Limited fire protection in B513– Critical areas and physics areas strongly coupled

• Share the same locations, cooling infrastructure and fire risks)

• Improving critical infrastructure implies improving physics one... at an expensive price

Computer Center Consolidation – VD - 100611 - 6

Page 7: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Consolidation Project

• Main goals– Secure the cooling and fire-protection of Critical IT

equipment... Which should be able to run as long as power is available (for ever on diesel)

– Increase the available critical power for IT equipment– Restore N+1 redundancy for both critical and physics

UPS– Decouple the cooling of B31 from the CC

• Main points on the wish list– Increase the physics power (if cost-effective)– Secure the cooling of physics equipment

Computer Center Consolidation – VD - 100611 - 7

Page 8: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Technical choices - 1

• Upgrade of the electrical infrastructure– Total capacity 3.5 MW of IT equipment including 600kW of

critical equipment– N+1 redundancy for critical and physics UPS

• Separation of the critical and physics infrastructure– 3 critical areas :

• new IT room (450kW)• extended telecom labs (50kW)• legacy network area in R-050 (100kW)

– New dedicated cooling installation for the critical areas (dual power feed, diesel)

Computer Center Consolidation – VD - 100611 - 8

Page 9: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Technical choices - 2

• Construction of a new partially sunken building dedicated to the cooling of the critical areas– (2+1) new chillers– 1 new storage tank– Pumps – New ventilation system for the critical UPS room

• Conversion of the Barn area to house– 2 Electrical rooms (batteries, UPS and switchboards)– An IT room with water cooled racks for IT critical equipment

(up to 480kW)– New ventilation system for the legacy critical network area

in R-050 and for new electrical rooms

Computer Center Consolidation – VD - 100611 - 9

Page 10: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Technical choices - 3

• Modification of the telecom area– Extension into adjacent labs– Fire protected walls– New ventilation systems

• Modification of the technical rooms (basement)– Move of the critical UPS (from S-435 to S-437)– New cooling control (in S-400, S-401 and S-402)

• Addition of 2 new electrical transformers (adjacent to the existing ones)

• Addition of 1 new water tank for physics equipment (adjacent to the existing one)

Computer Center Consolidation – VD - 100611 - 10

Page 11: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF 3D view from the car park

Computer Center Consolidation – VD - 100611 - 11

Page 12: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF 3D view of the ground floor

Computer Center Consolidation – VD - 100611 - 12

Page 13: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Ventilation in the Barn

Computer Center Consolidation – VD - 100611 - 13

Page 14: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Telecom critical area

Computer Center Consolidation – VD - 100611 - 14

Page 15: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF 3D view of the basement

Computer Center Consolidation – VD - 100611 - 15

Page 16: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF The new IT room

• Critical IT equipment only (450kW, room designed for 480kW)

• Cooling of IT equipment still being discussed, most likely water-cooled racks with passive heat exchangers– No power consumption– Cheap (compared to other cooling solutions)– No fan problems– No cold/hot corridors, cold room– Cooling issues for heterogeneous equipment???

• Very likely 90 racks (70cm*110cm*47u), average power density 5kW/rack

Computer Center Consolidation – VD - 100611 - 16

Page 17: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Views of a passive rack

Computer Center Consolidation – VD - 100611 - 17

Page 18: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Plan of the new IT room (draft)

Computer Center Consolidation – VD - 100611 - 18

Page 19: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Important dates

• Autumn 2009 : serious discussions with EN• May 2010 : approval of the project• October 2010 : barn ready for dismantling• January 2011 : preliminary electrical works• May 2011 : start of the main civil engineering works • Summer 2011 : MS and IT for the water-cooled racks• November 2011 : end of the main civil engineering works • November 2011 : start of the main cooling works• November 2011 : start of the main electrical works• May 2012 : start of the works for the additional water tank• July 2012 : end of the main cooling works• July 2012 : end of the works for the additional water tank• August 2012 : end of the main electrical works• October 2012 : end of the works

Computer Center Consolidation – VD - 100611 - 19

Page 20: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Work outside the project - 1

• Problematic cooling of the Physics equipment– When running on UPS without diesel power : IT

physics servers up... without cooling– No easy solution. We need power (500kW) for the

pumps and ventilation in R-050 and the Vault (>500kW)

– No agreement reached when the consolidation project was approved

– However... on-going discussions/investigations and a good chance to power the ventilation units from the UPS

Computer Center Consolidation – VD - 100611 - 20

Page 21: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Work outside the project - 2

• Improvement of the cooling efficiency– To be able to cool more IT equipment and to save on

cooling power– Main steps already achieved

• Cold corridors (from 2008)• Temperature increase of blown air in R-050 from 14C to 16C

(September 2010)• (More) use of outside fresh air (February 2011, net

immediate gain 200kW)• Blown air in R-050 from 16C to 18C (2 May 2011)• Blown air in R-050 from 18C to 19C (11 May 2011)

Computer Center Consolidation – VD - 100611 - 21

Page 22: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Work outside the project - 3

• Improvement of the cooling efficiency– Future steps

• Continue to increase the temperature of the air blown in R-050 (up to 22? While ensuring air < or = 27C for all IT equipment)

• Increase the temperature of the Vault and possibly of some UPS rooms. Discussion starting with EN/CV

• Better understand and improve the air flow from the main ventilation units to the servers in R-050

• Continue to improve cold air confinement where relevant• Increase the temperature of the chilled water?

Computer Center Consolidation – VD - 100611 - 22

Page 23: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Work outside the project - 4

• Improvement of the monitoring of the infrastructure of the Computer Centre– Important work already done to better understand

the power flows in the CC and store/display them in Lemon. .. Still some work to do, in particular on the alarms

– Work to be done to include temperatures and related alarms in Lemon

– Progressive implementation of intelligent power bars in IT racks (end-2011 installations & new IT room)

Computer Center Consolidation – VD - 100611 - 23

Page 24: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF Video on the outside work

• To upload

Computer Center Consolidation – VD - 100611 - 24

Page 25: CERN Computer Centre  Consolidation Project

CERN IT Department

CH-1211 Geneva 23

Switzerlandwww.cern.ch/

it

CF

Questions?

See also http://cern.ch/it/cc2012

Computer Center Consolidation – VD - 100611 - 25


Recommended