+ All Categories
Home > Documents > CERN IT Department CH-1211 Genève 23 Switzerland t The Wigner Data Centre An Extension to the CERN...

CERN IT Department CH-1211 Genève 23 Switzerland t The Wigner Data Centre An Extension to the CERN...

Date post: 14-Dec-2015
Category:
Upload: zachery-winwood
View: 216 times
Download: 0 times
Share this document with a friend
Popular Tags:
12
CERN IT Department CH-1211 Genève 23 Switzerland www.cern.ch/ The Wigner Data Centre An Extension to the CERN Data Centre
Transcript
  • Slide 1

Slide 2 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t The Wigner Data Centre An Extension to the CERN Data Centre Slide 3 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t CERN Open Days 2013 - 2 Why is an Extension Needed? To meet the ever increasing needs of the experiments, CERN needs to augment the resources available in its own Data Centre. Furthermore, the addition of a remote centre allows CERN to implement critical services at both sites, allowing to provide these services even in the case of a major incident at one or other of the sites. Slide 4 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t Where is it Located? CERN Open Days 2013 - 3 At the Wigner Research Centre for Physics in Budapest, Hungary. Budapest airport Central Budapest Budapest Slide 5 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t Why was Wigner Chosen? The Wigner Data Centre was chosen after a tender open to all 20 CERN Member States. 17 responses were received from 9 different countries. The Wigner Data Centre bid was evaluated to be the most competitive compliant offer. The contract was adjudicated by CERN in favour of the Wigner Data Centre in March 2012. CERN Open Days 2013 - 4 Slide 6 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t How is it Operated? The Wigner Data Centre is being operated as a logical extension of the CERN Data Centre. The servers belong to CERN and are being operated by CERN. All software installation, configuration and monitoring is being done remotely from CERN. The Data Centre facilities are being operated by Wigner. The Wigner Data Centre staff are responsible for physical installation and repairs. CERN Open Days 2013 - 5 Slide 7 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t How are the 2 sites connected? The sites are connected by 2 independent 100 Gbps circuits. CERN Open Days 2013 - 6 Slide 8 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t What is its Capacity? Currently the installed capacity at the Wigner Data Centre is a bit less than 10% of that installed at CERN. Over the potential 7 year contract, the installed capacity at the Wigner Data Centre will be gradually increased to a level similar to that of the CERN Data Centre. The majority of the capacity will be used for physics data processing with about 15% of the capacity used for critical services and business continuity purposes. CERN Open Days 2013 - 7 Slide 9 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t Brief History Contract signed in early May 2012. Construction started in late May 2012. First IT equipment installed in January 2013. Wigner Data Centre officially inaugurated in June 2013 by the Prime Minister of Hungary in the presence of the Director General of CERN. CERN Open Days 2013 - 8 Slide 10 Construction Video CERN Open Days 2013 - 9 Slide 11 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t The Completed Wigner Data Centre CERN Open Days 2013 - 10 Slide 12 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t The Completed Wigner Data Centre CERN Open Days 2013 - 11 Slide 13 CERN IT Department CH-1211 Genve 23 Switzerland www.cern.ch/i t Acknowledgements CERN IT would like to thank: The Wigner Research Centre for Physics and Persecutor Systems for their help in producing this presentation. CERN Open Days 2013 - 12


Recommended