CERTIFICAT
Certified that the undersigned have proposed the appropriate and need based activities
required in the watershed project area with active participation of beneficiaries along with
consultation of Watershed Committees(WCs). Approval of watershed project plan and DPR as been
obtained from WC, Gram Sabha. The plan and DPR document of IWMP 52 project, at P.S Dhorimanna
District Barmer is technically sound, viable and appropriate for implementation during the period
2011-12 to 2016-17
We recommend that this plan be sanctioned and put to implementation.
Chairman Chairman Chairman
Dhorimanna Lukhu Udasar
Secretary Secretary Secretary
Dhorimanna Lukhu Udasar
WDT WDT WDT WDT AGG SOCIAL LIVESTOCK ENGINEERING
JUNIOR ENGINEER ASSISTANT ENGINEER
W.D. & S.C., P.S. – DHORIMANNA W.D. & S.C., P.S. - DHORIMANNA
W.D. & S.C., DISTRICT -BARMER
PROJECT MANAGER, WCDC
GOVERNMENT OF RAJASTHAN RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT
(WATERSHED DEVELOPMENT & SOIL CONSERVATION)
NAME OF PROJECT : BARMER (IWMP) 52 EFFECTIVE AREA OF PROJECT :8200 Ha
COST /HA - 15000 COST OF PROJECT : 1230.00 lakh
BLOCK : DHORIMANNA DISTRICT: BARMER
PIA – ASSISTANT ENGINEER W.D. & S.C., P.S. - DHORIMANNA
PROJECT MANAGER, WCDC W.D. & S.C., DISTRICT -BARMER
Detail of Project
1. Name of Project : Barmer (IWMP)-52
2. Sanction No. & date of Project : F18(I-51)DWDSC/IWMP/2011-12/4800-5087 Dated 05.08.2011
3. Macro & Micro Nos : Cluster
4. Deviation from Project Sanctioned :
Items As per Project Sanctioned As proposed in DPR
Project Area 8200 8200
Macro/Micro No - -
Name of Gram Panchayats DHORIMANNA, LUKHU, UDASAR DHORIMANNA, LUKHU, UDASAR
Name of Villages DHORIMANNA, AJANIYON KI DHANI,
KHARD, GUNESANIYON KI DHANI,
LUKHU, ADARSH LUKHU, BHEELON
KI BASTI, RAVON KI BERI, MISHRI KI
BERI, MEGWALON KI BASTI,
UDASAR, BHEELON KI DHANI,
ALAMSARIYA
DHORIMANNA, AJANIYON KI
DHANI, KHARD, GUNESANIYON KI
DHANI, LUKHU, ADARSH LUKHU,
BHEELON KI BASTI, RAVON KI
BERI, MISHRI KI BERI,
MEGWALON KI BASTI, UDASAR,
BHEELON KI DHANI,
ALAMSARIYA
Project Cost (Rs in Lakhs) 1230.00 LACS 1230.00 LACS
DPR TEMPLATE
Index
S.No Topics Page no.
1 Chapter
Location General Features of watershed (Cost and Area details) Climatic and Hydrological information Other Development Schemes in the project area Details of infrastructure in the project areas Institutional arrangements (WCDC,PIA,WDT,WC) Base line Survey Format for IWMP MIS Website
2 Chapter Basic Data ,Analysis and Scope
2.1 Demography Details 2.2 Development Indicators 2.3 Land use 2.4 Agriculture status and Productivity Gap Analysis 2.5 Horticulture/Vegetable/Floriculture status 2.6 Land holding pattern 2.7 Livestock status With Per Capita Production 2.8 Fodder status 2.9 Farm Implements 2.10 NREGS Status 2.11 Migration details 2.12 Livelihood Details. 2.13 Existing SHG 2.14 Ground Water details 2.15 Drinking Water Status 2.16 Water use efficiency 2.17 Slope details 2.18 Water Budgeting 2.19 Soil Details 2.20 Soil erosion status
3 Chapter Proposed Development Plan
4 Chapter Activity wise Total Abstract of cost
5 Chapter Annual Action Plan
5.1 Project fund 5.2 Convergence Plan
6 Chapter Project outcomes
7 Technical designs and estimates for proposed activities
8 Enclosures
8 .1 Maps b. Location –District, block, village, watershed location map c. Map of Project with Watershed Boundary demarcation in cadastral map d. Land Use Land Cover map e. Existing water bodies, DLT f. PRA Map (along with photos & paper drawing)
g. GIS based intervention map h. Treatment map ie proposed works on revenue map
8.2 Documents of Agreements:
Proceedings of gram sabha for EPA approval
Proceedings of gram sabha Resolution for committee constitution
Documents related to PRA exercise
Proceedings of gram sabha for DPR approval
Proceedings of Panchayat Samiti General body for DPR approval
Proceedings of Zila Parishad Standing Committee for DPR approval
CHAPTER – I
INTRODUCTION
Location.
IWMP-52 Project is located in Dhorimanna Block, of Barmer district. The project area is between
the latitudes 25° 11’ 59.72’’ to 25° 19’ 26.57’’ N & longitudes 71° 25’ 59.13’’ to 71° 32’ 20.31’’ E.
It is at a distance of 30 km from its Block head quarters and 70 Kms from the district head quarters.
There are 13 no. of habitations in the Project area and other details are given below.
General features of watershed
S.No. Name of Project(as per GOI) Barmer (IWMP)-52
(a) Name of Catchment -
(b) Name of watershed area(local name) -
© Project Area 8200 Ha
(d) Net treatable Area 8200 Ha
e) Cost of Project 1230.00 Lac
f) Cost/hectare 15000
g) Year of Sanction 2011-2012
h) Watershed Code -
i) No. of Gram Panchayats in project area 3
j) No. of villages in project area 13
k) Type of Project Desert
l) Elevation (metres) 130-170
m) Major streams -
n) Slope range (%) 1-15%
Name of Gram Panchayat Name of Villages
Covered
Census code
of villages
Area
1. Dhorimanna 1. Dhorimanna 02176800 1055Ha
2. Ajaniyon ki
dhani
02176500 544Ha
3. Khard 02177000 1629Ha
4. Gunesaniyon ki
dhani
02176900 798Ha
2. Lukhu 5. Lukhu 02177400 1272Ha
6. Adarsh Lukhu 02178700 657Ha
The watershed falls in Agroclimatic Zone 14 The soil texture is sandy loam to sandy The
average rainfall is 34.94 cm . The temperatures in the area are in the range between 30 to 49 degree
centigrade during summer and 10 to 25 degree centigrade during winter. The major crops in the area
are Bajara, Guar , Moong, Moth, Jeera, Isabgol etc.58.87% land is under cultivation ,3.48% land fallow,
1% land is wasteland. 36.65% land is irrigated through Tubewells.
759 No of households are BPL(27.97% households) 157 are landless households(5.78 %
households) and 2461 household are small and marginal farmers(90.71%household) .Average land
holding in the area is 0.408 ha. 85.90% area is single cropped area and 6.74% is double cropped. The
main source of irrigation is Tubewells . The average annual rainfall (5 years) in the area is 349.40 mm.
The major festivals in the village are Deepawali,Holi,Raksha bandhan & Eid etc. At present this
villages is having 20077 population with Communities like Bheel, Meghwal,Muslman,Jat,
Soni,Kumhar and Suthar etc.
Climatic and Hydrological information
1
Average Annual Rainfall(mm)
Year Average Annual Rainfall(mm)
2003 635
2004 159
2005 187
2006 547
2007 330
2008 196
2009 161
2010 517
2011 345
2012 410
7. Bheelon ki basti 02177100 1085Ha
8. Ravon ki beri 02177500 1127Ha
9. Mishri ki beri 02177399 820Ha
10. Megwalon ki
basti
02177200 650Ha
3. Udasar 11. Udasar 02178100 1769Ha
12. Bheelon ki
dhani
02178600 525Ha
13. Alamsariya 02178400 488Ha
2
Average Monthly rainfall (last ten years)
Month Rainfall(mm)
i) June 56 ii) July 122 iii) August 140 iv) September 38
3
Maximum rainfall intensity (mm)
Duration rainfall intensity(mm)
i) 15 minute duration 8 ii) 30 minute duration 21 iii) 60 minute duration 34
4
Temperature (Degree C)
Season Max Min
i) Summer Season 49 30 ii) Winter Season 25 10 iii) Rainy Season 41 29
5 Potential Evaporation Transpiration (PET) (mm/day)
Season PET
i) Summer 4.70 ii) Winter 1.50 iii) Rainy 6.40
6 Runoff i) Peak Rate (cum/hr) - ii) Total run off volume of rainy season
(ha.m.) -
iii) Time of return of maximum flood
5 years 10 years
In-Year
iv)Periodicity of Drought in village area
Out of 4 year 3 year of draught
Other Development Schemes in the project area
S.No Scheme
Name of the department
Key interventions under the Scheme
Targeted Beneficiaries
Provisions under the Scheme
1 MGNREG
S
RD Construction of Tanka. Beri .
Gravel Road. Nadi etc
SC.ST.BPL
& Others
100 DAYS
Gurranted
employment
2 BRGF RD Construction of Anganwadi
.School
building.Subcenter.Communit
y center etc
Community Gap filling of
infrastructure
s for proper
use.
3 TFC RD Construction of tanka for
drinking water.
pipelines.Toilets etc
Community Drinking
water &
Sanitation
4 SFC RD Construction of Tanka for
drinking water.
pipelines.Toilets etc
Community Drinking
water &
Sanitation
Details of infrastructure in the project areas
Parameters Status (i) No. of villages connected to the main road by an all-
weather road 13
(ii) No. of villages provided with electricity 1 3
(iii) No. of households without access to drinking water
(iv) No. of educational institutions : (P) (S) (HS) (VI)
Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI) 20 5 4 2
(v) No. of villages with access to Primary Health Centre 03
(vi) No. of villages with access to Veterinary Dispensary 03 (vii) No. of villages with access to Post Office 04
(viii) No. of villages with access to Banks 03
(ix) No. of villages with access to Markets/ mandis 01
(x) No. of villages with access to Agro-industries 01
(xi) Total quantity of surplus milk Nill
(xii) No. of milk collection centres (U) (S) (PA) (O)
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O)) 0 0 02 Self
owenership
(xiii) No. of villages with access to Anganwadi Centre 13 (xiv) Any other facilities with no. of villages (please specify) 0
(xv) Nearest KVK Barmer (xvi) cooperative society 01
(xvii) NGOs 01 (xviii) Credit institutions
(i) Bank 01 (ii) Cooperative Society 01
(xix) Agro Service Centre's 0
Institutional arrangements (SLNA,WCDC,PIA,WDT,WC, Secretary)
WCDC Details
PIA Particulars
WDT Particulars:
1 2 3
S.No Particulars Details of WCDC
1. PM ,WCDC Balveer Singh
2. Address with contact no., website Zila Parishad (RDC)-Barmer
+919414106072
3. Telephone 02982220292
4. Fax 02982222041
5. E-mail [email protected]
1 2 3
S.No Particulars Details of PIA
6. Name of PIA Bhagwana Ram Khoja
7. Designation Assistant Engineer
8. Address with contact no., website WD & SC .Panchayat Samiti Dhorimanna
+919414531442
9. Telephone 02986-264060
10. Fax
11. E-mail [email protected]
1 2 3 4 5 6
7 8
S.No Name of WDT
member
M/
F Age
Qualificati
on
Experience in
watershed(Yrs)
Description of
professional
training
Role/ Function
1 Naga ram M 33
years
Diploma
in LSA
4 years WDT(vet)
2
3
4
Details of Watershed Committees (WC)
S.N. Name of
WCs
Date of Gram Sabha for
WC Designation Name M/F
SC/ST/OBC/Gene
ral
Landless/MF/SF/ BF
Name of UG/SHG
Educational qualification
1. Dhorimanna
16.12.2011 President Sh. Sukh ram M OBC SF UG 8th
Secretary Kishna ram M OBC SF UG 12th
Member Kamala ram M ST SF UG illitrate Member Puran mal M SC Landless UG 12th Member Chandramukhi F SC Landless SHG 12th Member Basanta F SC Landless SHG 5th Member Seeta devi F SC Landless SHG illitrate Member Rampyari F OBC MF SHG illitrate Member Sujana ram M OBC MF UG 5th Member Jasa ram M Gen. SF UG 5th Member Anada ram M SC SF UG 5th Member Mala ram M OBC Landless UG 5th Member Jagdish Prasad M OBC Landless UG 10th
Member Bhani devi F SC SF SHG 5th
Member Bhagchand M OBC MF UG 8th
S.N. Name of
WCs
Date of Gram Sabha for
WC Designation Name M/F
SC/ST/OBC/Gene
ral
Landless/MF/SF/ BF
Name of UG/SHG
Educational qualification
2. Lukhu 29.12.2011 President Sh.Maga ram M OBC BF UG litrate
Secretary Sh.Bhvnesh M OBC SF - BA
Member Sh. Idon ram M OBC BF SHG litrate Member Sh. Deva ram M OBC BF UG litrate Member Sh. Surta ram M OBC BF UG litrate Member Sh. Chatan ram M SC SF UG 5th Member Sh. Mana ram M ST SF UG illitrate Member Mrs. Puspa F Gen SF SHG litrate Member Sh. Hari ram M OBC BF UG litrate Member Mrs. Chani devi F OBC SF SHG illitrate Member Mrs. Emarti devi F OBC SF SHG 8th Member Sh. Kishna ram M OBC MF UG litrate
S.N. Name of
WCs
Date of Gram Sabha for
WC Designation Name M/F
SC/ST/OBC/Gene
ral
Landless/MF/SF/ BF
Name of UG/SHG
Educational qualification
3. Udasar 15.12.2011 President Sh.Hadumana ram M OBC LF UG 8th
Secretary Rawta ram M OBC MF - 12th
Member Taja ram M OBC LF UG litrate Member Tipu devi F OBC MF SHG litrate Member Pancha ram M OBC LF UG litrate Member Veeron F OBC SF SHG 8 th Member Sukh ram M OBC LF UG litrate Member Amra ram M SC SF UG litrate Member Joga ram M ST SF UG litrate Member Bharu ram M ST SF UG illitrate Member Achala ram M OBC SF UG 8th Member Babu devi F OBC MF SHG litrate Member Achala ram M OBC SF - litrate Member Rekha ram M OBC SF UG 5th Member Madhu F OBC MF SHG illitrate
Socio economic Features. Problems and Scope
The socio economic conditions of the area can be improved through
increased production which can be achieved through expansion in cultivated area and
productivity enhancement. 285 ha is fallow can be brought under cultivation.3006 ha is only
irrigated and with efforts this can be increased to 3500 The productivity gap of major crops in
the area as compared with district and with areas in the same agro climatic zones indicate
potential to increase the productivity. The demonstration of improved package of practices,
improved varieties, increased irrigation facilities and soil conservation measures under the
project can bridge this gap. Due to small land holdings in the area focus of the project would
be on diversification in agriculture (horticulture, vegetables, Agro forestry, fodder crops) and
diversification in Livelihoods ( Agriculture, Animal husbandry, self employment )
100267.05 Quintal fodder scarcity can be met out through Pasture development .Improved
animal Husbandry practices can increase the productivity of livestock. 1817 no of persons
migrate due to job this migration can be checked through creation of employment
opportunities in the project area through increase in production and diversification in
agriculture and Livelihoods as mentioned above.
The wind erosion is the main problem in the watershed area. The wind velocity
reaches upto more than 50 m/sec during summer. As the soil of watershed area is mainly
sandy therefore soil erosion occurs mainly due to wind & leading to land degradation. In
watershed area due to scare rainfall . runoff is very less resulting in lesser soil erosion due to
runoff. Agriculture in the watershed area is almost rainfed . although there are some tubewells
for irrigation. The runoff of the area will be harvested in Khet talai /Farm pond and will be
used for horticulture plantation to increase the income of households. In watershed area
animals rearing is the main occupation and the need of breed improvement.vaccination
medical camps are the key works to be looked into. People have large livestock holding but
there is problem of drinking water and fodder. To solve the drinking water problem . existing
nadi . Tankas (traditional rain water harvesting structures) are to be constructed and
rennovated. About 25 ha of pasture development will be done in the project area to meet
defficiency of fodder.
Natural Resource Management :
The watershed area located in western Rajasthan desert . The ground water
depth is 76.2 meter. Ground water mostly contains florid and is saline. The water is not
potable for drinking. The people has to travel 4-5 KM for drinking water. As per need and
suggestions given by the beneficiaries/ public representative. the tanka . Talai have been
proposed to drinking water.
While socially surveying the area. it was realized that various water
harvesting structures mostly Tanka . Talai/Nadi. Khadin have been constructed in the area for
storing the water. But due to non availability of pucca agore of Tanka . outlets/ waste weirs
the water was released by cutting the banks. The main problem of the area is availability of
stored water. For further development. it has been planned that all the water harvesting
structures like Tanka will be constructed with pucca catchment . The existing Tankas will be
renovated by pucca cathment so that rain water can be stored. To reduce infiltration of water
existing Nadies will be renovated so that water can be stored for longer time
The agriculture land of the area is affected by wind erosion. The problem can be
solved by vegetation . plantation on sand dunes. Therefore to protect the land. the main thrust
is given on sand dune stabilization & vegetative barriers.
Agriculture and Horticulture Productivity :
In the watershed area the production of Agriculture and Horticulture Plants are
not to that extent due to lack of improved variety and techniques. The Agriculture production
of different crops grown in Kharif/ Rabi seasons of the proposed watershed area is shown in
Table 13. The production will be increased by introduction of new varieties of different crop.
The existing horticulture area is shown above. The horticulture Plants will be provided to
farmers . Rain water harvested in farm pond will be used to horticulture plantation.
Live Stock –gap of fodder Availability :
The existing fodder area in the villages of proposed area is shown above. The
availability of fodder in the proposed watershed area is less. To meet the requirement. the
farmers of the area have to purchase from other places. The pasture development will be meet
out the fodder deficiency of the project area.
Livelihood and Micro enterprises :
The people of the area are dependent on Agriculture. In the proposed area the
landless families are fully dependent on work. After introduction of NREGA. these families are
getting job in the area. But it is not to the extent to increase the livelihood. For development of
their livelihood. the various meetings were organized to know their interest and skills.
According to social survey conducted in different villages of the project area. different
individual and group works/ activities like Kasidakari . Ker-sagari Udhyog.Bhjan Mandal.
Carpentry. Mobile Repairing. Motor Cycle Repairing. Compute Hardware/ Software work and
Compost Pit were identified. According to their interest homogeneous groups have been
made. The main thrust was given for land less persons.
Base Line Survey Format for IWMP MIS website
Project Name IWMP -52 Total Geographical Area of Project (Lakh Hectares)- 0.08473 Treatable Area Wasteland (Lakh Hectares) 0.00082 Rainfed Agricultural
Land (Lakh Hectares) 0.05239
Total Cropped Area (Lakh Hectares)
0.06940 Net Sown Area (Lakh Hactares)
0.06544
Total no. of Water Storage Structure
337 Total no. of Water Extracting Units
NADI 08
Total storage capacity of water storage structures (cubic meters)
66740 Total storage capacity of water storage structures (cubic meters)
55000
No. of Household SC 592 ST 261
Others 1860
Total Population of the project Area
20077 No. of Household of Landless people
157
Total no. of BPL Household 759 No. of Smal Farmer’s Household
1680
No. of person-days of Seasonal Migration
363400 No. of Marginal Farmer’s Household
781
Depth of Ground Water (meters) below Ground level Pre- monsoon meters Post-monsoon Meters
76.20 76.00
CHAPTER – II Socio economic Features, Problems and Scope
Table 2.1 Population & Household Details:
Total Population Male Female Total SC ST
10325 9752 20077 4894 1972
Household Details
BPL household L. Less
Small Farmer
M. Farmer
Total household
SC household
ST household
759 157 1680 781 2713 592 261
Table 2.2 Development indicators
S. No. Development Indicators State Project Area
1 Per capita income (Rs.) 33731 24784 2 Poverty ratio 22.80 27.97 3 Literacy (%) 60.4 52.64 4 Sex Ratio Per 1000 male 921 945 5 Infant mortality rate Per 1000 63 57 6 Maternal mortality ratio Per
100000 388 356
The above table indicates poor socio economic conditions.
Table 2.3 Land Use
Land Use Total area in Ha.
Private Panchayat Government Community Total Agriculture Land 8060 0 0 0 8060 Temporary fallow 874 0 0 0 874 Permanent Fallow 285 0 0 0 285 Cultivated Rainfed 5239 0 0 00 5239 Cultivated irrigated 3006 0 0 00 3006 Net Sown Area 6544 0 0 0 6544 Net Area sown more than once
1305 0 0 0 1305
Forest Land 0 0 273 0 273 Waste Land 0 0 82 0 82 Pastures 0 0 0 0 0 Others 0 58 0 0 58 Total 8060 58 355 0 8473
The project area has no cultivable wasteland , 285 ha of fallow land (total 285 ha) can be
brought under cultivation if some irrigation source can be provided through Construction of WHS like
Khadin, Tanka, Farm ponds etc. and also through demonstration of rainfed varieties of crops.
Construction of WHS can also increase in area under irrigation which is only 36.65%
82 ha. (1 % of the project area)is under wastelands and can be brought under vegetative cover, with
reasonable effort. Activities like WHS (Johad) Afforestation of wastelands and Pasture development
will be taken up on these lands.
Pasture development the land use table shows that there is 58 hectare pasture land (0.71%). This
emphasizes the need for taking up pastureland development works through sowing of promising
species of grasses and plantation
Table 2.4 .a Agriculture and Horticulture status and fuel availability. Cropping Status S No
season Crop sown
Rain Fed Irrigated Total
Varieties
Area ( ha)
Production (Ton)
Productivity (Kg/ha)
Varieties
Areaha
Production (Ton)
Productivity (Kg/ha)
Area(ha) Production (Ton)
1 Kharif Bajara Desi 2965 444.75 150 Desi 905 316.75 350 3870 761.5
Gaur Desi 904 142.832 158 904 142.832
Moong Desi 1370 134.26 98 1370 134.26
2 Rabi Jeera Desi Desi 1399 629.55 450 1399 629.55
Isabgol Desi Desi 467 233.50 500 467 233.50
Arandi Desi Desi 235 152.75 650 235 152.75
3 Zaid
Total 721.84 1332.55 2054.392
Bajara: The farmers are using Desi varieties of Bajra, whereas varieties like RH67, can increase the production. Guar: The Farmers are using Desi variety of Guar whereas varieties like RGC1017 can increase the production. Moong: The Farmers are using Desi variety of Moong whereas varieties like RAMG 268 can increase the production. Moth: The Farmers are using Desi variety of Moth whereas varieties like RMO 40 can increase the production. Jeera: The Farmers are using Desi variety of Jeera whereas varieties like GC4 can increase the production. Isabgol: The Farmers are using Desi variety of Isabgol whereas varieties like GI 2 can increase the production. Arandi: The Farmers are using Desi variety of Arandi whereas varieties like RSC 2( 2002) can increase the production.
Table 2.4.b Abstract of cropped Area(ha)
Area under Single crop 5239
Area under Double crop 1305
Area under Multiple crop
Crop Rotation
Bajra - Jeera Guar - Isabgol Arandi - Isabgol Moth - Fallow
The table 2.4.b shows that only 1305 ha is (15.91%) is double cropped area. Also the crop
rotation shows that fallow lands are there. This indicates that there is scope for change in crop
rotation in fields where there are fallow lands through Soil and Water conservation measures, crop
demonstration and diversification in agriculture.
Soil and Water conservation measures besides putting fallow lands under cultivation can
change the area under single cropping to double and multiple cropping.
Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)
Analysis of the above table indicate that besides national gap there is wide gap in
productivity within state and even within same agro climatic zones.
The reasons for this variation are
The farmers are using Desi varieties whereas the recommended varieties like RH67of Bajra
provide 200 kg/ha yield.
Lack of Availability of good quality seeds of desired crop and variety in adequate quantities and
time to the farmers.
Availability of water for cultivation(36.65% is irrigated table2.4.a)
The productivity gap and reasons of it indicate potential to increase the productivity
through crop demonstration. Crop demonstrations would be carried out on improved crops/
varieties, improved agronomic practices. INM, IPM, Mixed cropping, distribution of fodder seed mini
kit. Demonstration of improved methods and economics of fodder crops cultivation and also
distribution foundation seeds of Forage Crops for further multiplication, introduction of fodder crops
in the existing crop rotations.
Name of the crop
Productivity kg/ha India Highest
Average in Rajasthan
Highest Average of Agro climatic zone
District Project Area
Bajra 738 645 525 173 150 Moong 410 338 305 107 100 Moth 315 198 195 194 175 Guar 465 305 295 207 180 Jeera 738 645 525 475 450 Isabgol 775 675 650 525 500 Arandi 815 760 710 675 650
Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)
Activity Area Species Varieties Recommended varieties Production
Horticulture 0 0 0 Ber –Shev/gola 40 kg per plant
Vegetables 0 0 0
Floriculture
Medicinal Plants 467 ha
Jeera /Isabgol Desi GC-4 . avani-19 3.60qtl/ha
Table 2.6 Land holding Pattern in project area
Type of Farmer Total Households
Land holding (ha) irrigation source wise
Land holding (ha)Social group wise
Irrigated (source)
Rainfed Total General SC ST OBC BPL
(i)Large farmer 95 336 433 769 93 86 49 541 34
(ii) Small farmer 1680 2153 3381 5534
138 1274 716 3406 1325
(iii) Marginal farmer 781 517 1240 1757
114 637 387 619 686
(iv) Landless person 157
(V)No. of BPL households 759
Total 2713 3006 5054 8060 345 1997 1152 4566 2045
91% land holdings belong to small and marginal farmers who own 90.45% of total cultivated area.
Horticulture/vegetables could be more economical to Small and Marginal farmers with irrigation
source. For Large farmers with no irrigation facility Horticulture/vegetables will be promoted in a
part of land with farm pond/Tanka construction.
The following activities will be more beneficial for small land holdings and for diversification and
income for large farmers.
Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed earlier .
Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation
source. Also the project area has good potential for medicinal & aromatic crops like Sonamukhi,
Isabgol, Ashwagandha, Khus, Mehandi etc.
Agro forestry plantation: To increase the income of farmers and also for shelter belt plantation as
wind velocity is high in the project area.
Setting of Compost Units - Keeping in view the side effect of residues of chemicals and fertilizers on
human health the emphasis would be on cultivation of organic produce through motivating farmers
and providing assistance for production of organic input, vermi compost.
Production and distribution of quality seed – There is need to ensure that good quality seed is
available for cultivators for which adequate seed production would be initiated in watershed areas
with the assistance of private sector and agriculture department technologies
Sprinklers and pipelines for efficient water management practices emphasis on demonstration of
sprinklers with adequate financial support and convergence/private partnership.
Establishment of Green House - For growing off season vegetables seedlings and other horticultural
crops under controlled atmospheric conditions of green house.
Establishment of nurseries: Most of the planting material is procured from other parts of the State/
country. The procurement of planting material from distant places causes damage to the planting
material and often results in untimely supply. Hence nursery development activity can be promoted in
the area.
Innovative hi-tech/ export oriented activities: innovative hi-tech/ export oriented projects like
mushroom cultivation, floriculture, etc which are in negligible existence at present, can be
implemented by individual farmers / private companies.
Drip irrigation Drip irrigation will be promoted in all horticulture plantations, vegetables, green
houses and in nurseries for rational use of irrigation higher yields and quality produce.
Table 2.7 Livestock Status - animals/milk production / average yield.
S.No. Description of animals
Population in No.
Yield(milk/mutton/Wool)
Equ. cow units
Dry matter requirement
per year (7Kg per animal.)
Total requirement
in M.T.
1 Cows - Indigenous 3165 Milk 3165 8086575 8086.575 Crossbreed - - - -
2 Buffaloes 1221 Milk 1221 3119655 3119.655 3 Goat 12166 Milk,meat 6083 15542065 15542.065 4 Sheep 5546 Milk ,wool 2773 7085015 7085.015 5 Camel 89 Milk ,wool 89 227395 227.395 6 Poultry - - - - - 7 Piggery - - - - -
Total 22187 - 13331 34060705 34060.705 In spite of the large number of livestock, production is less hence increase in productivity across
all species, is a major challenge. To enhance production of unproductive cattle and improve the
productivity following activities will be taken up:-
,Demonstration of improved methods of conservation and utilization of Forage crops are proposed.
Table 2.8 Existing area under fodder (ha) S.No Item Unit Area/Quantity
1 Existing Cultivable area under Fodder
Ha 80
2 Production of Green fodder Tonns/year 840
3 Production of Dry fodder Tonns/ Year 5130
4 Area under Pastures Ha 214
5 Production of fodder Tonns/year 4618
6 Existing area under Fuel wood Ha 110
7 Supplementary feed Kgs/ day 7100
8 Silage Pits No -
9 Availability of fodder Quintals 240340
10 Deficiency/excess of fodder
Quintals 100267.05
The table above shows there is fodder deficiency (Requirement is 34060.705 Tons and
availability 24034 Tons)
To minimize the large and expanding gap between feed and fodder resource availability and
demand there is need for
Increase in area under fodder crops
Increase in productivity of fodder crops
Development of pastures
And reduction in large number of livestock production through replacement by few but productive
animals
Table 2.9 Agriculture implements
Farm mechanization and seed banks: As discussed earlier 91% land holdings belong to small
and marginal farmers who own only 90.45% of total cultivated area so owning of big farm
implements by individual farmers is not economical so SHG would be promoted to buy farm
implements and rent to farmer
S. No Implements Nos.
1 Tractor 284
2 Sprayers-manual/ power 0
3 Cultivators/Harrows 252
4 Seed drill 252
5 Any Other 40
Table 2.10 NREGA Status - No. of Card Holder, activities taken so far, employment
status.
Sr. no. Name of village Total No .of job cards Employment Status
Activity taken up so far
1
Dhorimanna 462 462 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3.Constraction of Tanka
2
Ajaniyon ki
dhani
132 132 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
3
Khard 244 244 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
4
Gunesaniyon ki
dhani
231 231 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
5
Lukhu 323 323 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
6
Adarsh Lukhu 120 120 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
7
Bheelon ki basti 192 192 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
8
Ravon ki beri 249 249 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
9
Mishri ki beri 201 201 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
10
Megwalon ki
basti
222 222 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
11
Udasar 438 438 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
12
Bheelon ki dhani 196 196 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
13
Alamsariya 144 144 1.Excavation of Talab / Nadi 2.Constraction of Gravel Road 3. Constraction of Tanka
Total 3154 3154
Table 2.11 Migration Details
Name of village
No. of persons migratin
g
No. of days per year of migration
Major reason(s) for migrating
Distance of destination of
migration from the
village (km)
Occupation during
migration
Income from such occupation (Rs. in lakh)
Dhoriman
na
279 200 Scarcity of labour&fodder
500 Labour 0.80
Ajaniyon
ki dhani
106 200 Scarcity of labour&fodder
500 Labour 0.80
Khard 184 200 Scarcity of labour&fodder
500 Labour 0.80
Gunesani
yon ki
dhani
148 200 Scarcity of labour&fodder
500 Labour 0.80
Lukhu 174 200 Scarcity of labour&fodder
500 Labour 0.80
Adarsh
Lukhu
68 200 Scarcity of labour&fodder
500 Labour 0.80
Bheelon
ki basti
123 200 Scarcity of labour&fodder
500 Labour 0.80
Ravon ki
beri
149 200 Scarcity of labour&fodder
500 Labour 0.80
Mishri ki
beri
127 200 Scarcity of labour&fodder
500 Labour 0.80
Megwalon
ki basti
140 200 Scarcity of labour&fodder
500 Labour 0.80
Udasar 156 200 Scarcity of labour&fodder
500 Labour 0.80
Bheelon
ki dhani
86 200 Scarcity of labour&fodder
500 Labour 0.80
Alamsariy
a
77 200 Scarcity of labour&fodder
500 Labour 0.80
The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income of the people engaged in animal husbandry by dairy, poultry and marketing and value addition. (As discussed earlier) and diversification in livelihoods .
The existing livelihoods activities are given below
Table 2.12 (a)Major activities (On Farm)
Name of activity No of House holds Average annual income Rs.in
lakh
Cultivators 2170 0.50 Dairying 0 0 Poultry 0 0 Piggery 0 0 Goatry 274 0.12 Landless Agri. Labourers
500 0.18
Others 58 0.90
Table 2.12(b)Major activities (Off Farm)
Name of activity Households/individuals Average annual income Rs.in
lakh Artisans 56 0.24 Carpenter 51 0.96 Blacksmith 15 0.38 Leather Craft 21 0.36 Porter 11 0.44 Mason 122 0.96 Others specify (Cycle Repair ,STD,Craft etc)
189 0.48
Others(Tent) 13 0.42 The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals
Table 2.13( a ) Status of Existing SHG
S.No Name of
SHG Members
Activity involved
Monthly income
Fund available
Assistance available
Source of assistance
Training received
1 Samrathal SHG 10 Pasupalan 0 3000 - - -
2 Ramdev SHG 10 Pasupalan 0 5000 - - -
3 Mahadev SHG 06 Pasupalan 0 6000 - - -
4 Janani SHG 06 Pasupalan 0 6000 - - -
5 Deval SHG 05 Pasupalan 0 5000 - - -
6 Mataji SHG 05 Pasupalan 0 5000 - - -
7 Karani SHG 05 Pasupalan 0 4000 - - -
8 Thakari ma SHG 05 Pasupalan 0 5000 - - -
9 Rohida SHG Ravon ki beri
10 Pasupalan 0 7430 - - -
10 Virat SHG Ambedkar 10 Pasupalan 0 4000 - - -
The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance
II. Technical Features Table 2.14 Ground Water
S.No Source No. Functional depth
Dry Area irrigated
Water availability(days)
i) Dug wells - - - - -
ii) Shallow tube wells - - - - -
iii) Pumping sets 125 380 ft 2680 365
iv) Deep Tube Wells 16 700 ft 326 365
Total 141 3006
Table 2.15 Availability of drinking water
S.N.
Name of the
village
Drinking water requirement Ltrs/day
Present availability of drinking water Ltrs/day
No. of drinking water sources available
No. functional
No. requires repairs
No. defunct
1 Dhorima
nna
347400 277900 3 3 0 0
2 Ajaniyon
ki dhani
88000 70000 1 1 0 0
3 Khard 145000 105000 0 0 0 0
4 Gunesani
yon ki
dhani
120000 86000 1 1 0 0
5 Lukhu 90000 75000 6 2 0 4
6 Adarsh
Lukhu
80000 68000 1 1 0 0
7 Bheelon
ki basti
100000 77000 3 1 0 2
8 Ravon ki
beri
60000 45000 2 2 0 0
9 Mishri ki
beri
90000 65000 0 0 0 0
10 Megwalo
n ki basti
80000 60000 1 1 0 0
11 Udasar 140000 110000 0 0 0 0
12 Bheelon
ki dhani
90000 64000 2 2 0 0
13 Alamsari
ya
75000 54000 1 1 0 0
Table 2.16 Water Use efficiency
Name of major crop
Area (Hectare)
through water saving
devices(Drip/Sprinklers)
through water
conserving agronomic practices#
Any other (pl. specify)
Total
Bajara 905 0 0 905
Jeera 1399 0 0 1399
Isabgol 467 0 0 467
Aradi 235 0 0 235
The tables above indicate need for judicious use of available Water. Encouraging optimum use of water through installation of sprinklers on every operational wells
Table 2.17 Slope details.
Slope of Watershed
S.No. Slope percentage
Area in hectares
1 0 to 3% 4592 2 3 to 8% 2296 3 8 to 25% 738 4 > 25% 574
As most of the area sandy and the problem of wind erosion in agriculture fields and
vegetative barriers are proposed to protect top soil and manures/fertilisers.
Table 2.19 Soil details
A Major Soil Classes Area in hectares 1 sandy 4166 2 Sandy loam 4034 3 Rocky 0 Soil Depth :
B. Depth (Cms.) Area in hectares
1 0.00 to 7.50 3648 2 7.50 to 45.00 4382 3 > 45.00 170 C Soil fertility Status Kg/ha Recommended N 60 120 P 12 80 K 1.50 40 Micronutrients PPM
The analysis of table shows need to improve and maintain soil fertility. Soil health card to
every farmer every crop season will be provided, which will include the recommendation for
Application micro nutrient and fertilizers
Table 2.20 Erosion details
Erosion status in project Area
Cause Type of erosion
Area affected
(ha)
Run off(mm/
year)
Average soil loss
(Tonnes/ ha/ year)
Total Soil loss per
year Water erosion
a Sheet - 1.25
b Rill - 1.50
c Gully - 2.50 00
Sub-Total - 00
Wind erosion 8200 1.75 14350.00
Total for project 8200 14350.00
The need is:
To check land degradation To reduce excessive biotic pressure by containing the number and increase of livestock To check cultivation on sloping lands without adequate precautions of soil and water conservation
measures To discourage cultivation along susceptible nallah beds To check Faulty agriculture techniques To check Uncontrolled grazing and developed cattle tracks To check Deforestation of steep slopes
CHAPTER - III
Proposed Development Plan: The Activities are indicative addition /deletion in activities will be as per local conditions
A) Preparatory phase activities Capacity Building Trainings and EPA
The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and wall
writings etc. were carried out in all the habitations of Villages. A series of meetings were
conducted with GP members, community and discussed about the implementation of IWMP
programme. User groups were also formed.
Grama Sabhas were conducted for approval of EPA (Village), for selecting the watershed
committee and approval of DPR.
S.no Name of the Gram Panchayat Date on which Grama
Sabha approved EPA
1 Dhorimanna 16/12/2011
2 Lukhu 29/12/2011
3 Udasar 15/12/2011
1 4 5 6 7 8 9 10 11
S. No.
Names of village
Amount earmarked for
EPA
Entry Point Activities planned
Estimated cost
Expenditure incurred
Balance Expected outcome
Actual outcome
1 Dhorimanna 0.60 Water harvesting Tanka for Drinking
0.60 0.60 0 Drinking water for 5
Family
Drinking water for 5 Family
2 Ajaniyon ki
dhani
3.00 CWT & Water
harvesting Tanka for Drinking
3.00 2.62 0.38 Drinking water for 35 Family & 500 Cattles
Drinking water for 35 Family & 500 Cattles
3 Khard 6.00 Water harvesting Tanka for Drinking
6.00 5.25 0.75 Drinking water for 75 Family
Drinking water for 75 Family
4 Gunesaniyon
ki dhani
4.50 Water harvesting Tanka for Drinking
4.50 3.08
1.42 Drinking water for 25 Family
Drinking water for 25 Family
5 Lukhu 7.578 Pipe line & 7.578 7.52 0.058 Drinking Drinking
Water harvesting Tanka for Drinking
water for 85 Family
water for 85 Family
6 Adarsh
Lukhu
1.854 Pipe line & Water
harvesting Tanka for Drinking
1.854 1.84 0.014 Drinking water for 9 Family
Drinking water for 9 Family
7 Bheelon ki
basti
2.472 Pipe line & Water
harvesting Tanka for Drinking
2.472 2.31 0.162 Drinking water for 18 Family
Drinking water for 18 Family
8 Ravon ki
beri
2.592 Pipe line & Water
harvesting Tanka for Drinking
2.592 2.40 0.192 Drinking water for 23 Family
Drinking water for 23 Family
9 Mishri ki
beri
4.896 Pipe line & Water
harvesting Tanka for Drinking
4.896 4.70 0.196 Drinking water for 45 Family
Drinking water for 45 Family
10 Megwalon ki
basti
3.828 Pipe line & Water
harvesting Tanka for Drinking
3.828 3.60 0.228 Drinking water for 33 Family
Drinking water for 33 Family
11 Udasar 6.18 Water harvesting Tanka for Drinking
6.18 3.72 2.46 Drinking water for 35 Family
Drinking water for 35 Family
12 Bheelon ki
dhani
3.00 Water harvesting Tanka for Drinking
3.00 2.46 0.54 Drinking water for 25 Family
Drinking water for 25 Family
13 Alamsariya 2.70 Water harvesting Tanka for Drinking
2.70 2.96 -0.26 Drinking water for 16 Family
Drinking water for 16 Family
49.20 49.20 43.06 6.14
The PRA exercise was carried out in all the villages on the dates shown below:
S.no Name of the
village/Habitation
Date on which PRA
conducted
1 Dhorimanna 24/10/2012 to25/10/2012
2 Ajaniyon ki dhani 22/10/2012 to23/10/2012
3 Khard 27/10/2012 to28/10/2012
4 Gunesaniyon ki dhani 29/10/2012 to30/10/2012
5 Lukhu 2/11/2012 to3/11/2012
6 Adarsh Lukhu 5/11/2012 to6/11/2012
7 Bheelon ki basti 8/11/2012 to9/11/2012
8 Ravon ki beri 12/11/2012 to13/11/2012
9 Mishri ki beri 14/11/2012 to15/11/2012
10 Megwalon ki basti 17/11/2012 to18/11/2012
11 Udasar 20/11/2012 to22/11/2012
12 Bheelon ki dhani 23/11/2012 to25/11/2012
13 Alamsariya 27/11/2012 to29/11/2012
Transact walk were carried out involving the community for Social mapping, Resource mapping. Detailed discussions and
deliberations with all the primary stakeholders were carried out. Socio-economic survey was carried out during march 2012 to Augst 2012 (dates)
period covering all the households and primary data on demography, Land holdings, Employment status, Community activities etc. was collected
as mentioned in chapter 2.
. CAPACITY BUILDING Table- List of approved Training Institutes@ for Capacity Building in the project area
1 2 3 4 5 6 7 8
S. No.
Name of Stakehold
ers Name of the Training Institute
Full Address with contact no., website
Name & Designation of the Head of Institute
Type of Institute#
Area(s) of speciali-zation$
Accredita-tion details
1 PIAs IGPRS Jaipur Indira Gandhi Panchayatiraj sansthan , Tonk Road Jodhpur
Dr. Vimlesh Choudhary
Goverment Capacity Building for Panchayatiraj Elected Persons & employees
2 WDTs IGPRS Jaipur Indira Gandhi Panchayatiraj sansthan , Tonk Road Jodhpur
Dr. Vimlesh Choudhary
Goverment Capacity Building for Panchayatiraj Elected Persons & employees
3 UGs Rural agriculture & water development organization Sikar, Raj.
Sikar, [email protected] Mobile No. 09461941649
Mani Ram Sevda
NGO Capacity Building, Agriculture, Horticulture,Animal Husbandry,livelihoods, Education & Women welfare , Child labour,
4 SHGs
5 WCs
6 GPs
7 Community
8 PM/SLNA
# Central govt. Dept./ State govt. Dept./ Autonomous Body/ Research Institutes/ Universities/ Others (pl. specify)
$ Capacity Building/ Agriculture/ Horticulture/ Animal Husbandry/ Pisciculture/ Remote Sensing/ Water conservation/ Ground water/ Forestry/ livelihoods/ entrepreneurship development/ others (pl. specify)
@ The training institutes must fulfill the conditions mentioned in the operations guidelines.
Table- Capacity Building activities in the project (PHYSICAL & FINANCIAL) *4% OF TOTAL PROJECT COST. 1 2 3 5 6 7
S. No.
Project Stakeholders
Total no. of
persons
No. of persons to be trained during project period
No. of Training to be organized during project period
No. of person days to be trained during project period
I year II
year III
year IV
year V year
Total I
year II
year III
year IV
year V year
Total I
year II
year III
year IV
year V year
Total
1 PIAs 2 2 0 0 0 0 2 1 1 0 0 0 2 6 0 0 0 6 2 WDTs 4 2 2 0 0 0 4 1 1 0 0 0 2 6 6 0 0 12 3 UGs 1885 380 400 500 605 0 1885 2 20 5 3 0 30 300 3000 750 450 4500 4 SHGs 2047 380 450 550 667 0 2047 2 22 5 1 0 30 300 3300 750 150 4500 5 WCs 36 15 21 0 0 0 36 2 1 0 0 0 3 120 60 0 0 180 6 GPs 30 5 10 5 10 0 30 1 1 5 4 0 11 10 20 50 80 160 7 Community 2495 420 560 690 825 0 2495 2 2 4 1 0 9 200 200 400 100 900 8 EXPOSURE
TOUR (INTER STATE)
150 50 100 0 0 0 150 1 1 1 0 0 3 300 600 0 0 900
9 EXPOSURE TOUR (INTRA STATE)
50 0 50 0 0 0 50 0 1 0 0 0 1 0 750 0 0 750
10 PM/SLNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 TOTAL
PHYSICAL 6699 1254 1593 1745 2107 0 6699 12 50 20 9 0 91 1242 7936 1950 750 11908
12 TOTAL FINANCIAL
49.20 5.12 35.24 5.60 3.24 0 49.20 5.12 35.24 5.60 3.24 0 49.20 5.12 35.24 5.60 3.24 0 49.20
Table-, Education & Communication (IEC) activities in the project area (1% of total Project cost.)
1
2 3 4 5 6
S. No. Activity Executing
agency Allocation
out of 1%
of total
Project
cost
Allocation in lacs Expected Outcome (may quantify, wherever
possible)
I year II year III
year vI year V year Total
1 ekWMy #QVkWi okVj
gkjosZfVx LVªDplZ ¼iapk;r
lfefr, jktho xkW/kh lsok
dsUnz ;k vU; iapk;r lfefr
Lrjh; utnhdh ljdkjh
Hkou ½A
PIA 0.20% 1.23 1.23 0 0 0 2.46
2 tyxzg.k {ks= xfrfof/k;kas dks
n’kkZrk gqvk POP / CLAY /
WOOD / PLASTIC ls cuk gqvk
ekWMyA
PIA
0.10%
1.23 0
0
0
0
1.23
3 MhLiys cksMZs@IysxDlh
cksMZ@
4 okWy isfUVax&tyxzg.k
xfrfof/k;ksa] y{;ks o izkfIr
vkfn dks n’kkZrh gqbZ A
PIA 0.25% 0.615 0.615 0.615 0.615 0.615 3.075
5 tyxzg.k fodkl laca/kh
eqfnzr iEiysVl@fyQ
ysVl@pkVZ@iksLVj@vkfnA
PIA
6 Ukkjk ys[ku PIA
7 lQyrk dh dgkuh;ksa dh
ohfM;ksaxzkQh@QksVksxzkQh@
y?kqfQYe ,oa d̀"kdks ls
lk{kjkrdkj @ okrkZ A
PIA
0.15%
0.615 0.615 0.615 1.845
8 fucU/k o okn&fookn
izfr;ksfxrk
PIA
9 jsfM;ksa@nwjn’kZu ij okrkZ o
foKkiu
PIA
10 lkaLdf̀rd R;kSgkj @ esys
vkfn ds volj ij iznZ’kuh
PIA 0.10 0.615 0.615 1.23
11 uqDdM+ ukVd
PIA
12 dViqryh izn’kZu PIA
13 jkf= xks"Bh PIA 0.20% 0.615 0.615 0.615 0.615 2.46
14 Hkw laj{k.k lIrkg PIA
15 psruk jSyh PIA
16 tyxzg.k fodkl dk lans’k
nsus okys lkaLdf̀rd dk;ZØe
PIA
17 d"̀kd fnol dk vk;kstu
,oa {ks= Hkze.k fnol dk
vk;kstu bR;kfn
PIA
18 dqy 1.00% 4.92 3.69 1.845 1.23 0.615 12.30
State Remote Sensing Application Centre was assigned the work of preparing various
thematic layers using Cartosat-1 and LISS-3 imageries for Creation, development and management
of geo-spatial database depicting present conditions of land (terrain), water and vegetation with
respect to watershed under different ownerships at village level
Various thematic layers provided by SRSAC are :
Digitised Khasara maps of the villages falling in project area. Network of Drainage lines, existing water bodies, falling in the project area. Base maps (transport network, village/boundaries, and settlements). Land Use / Land cover map.
Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as
discussed in chapter 2) final Treatment plan on revenue map for implementation has been
framed. Thus each intervention identified has been marked on revenue map. PRA based
intervention map are annexed .
B)Livelihood Action Plan (LAP):
An awareness programme has been undertaken at Gram Sabha for communication &
sensitization of the target beneficiaries. Livelihood Action Plan is a pre requisite for availing the funds
under the livelihood component. LAP has been prepared by the PIA in consultation with WDT, WC &
the members of SHG,SC/ST, women, landless/ assetless households. Details of funds available & their
utilisation is as under :
(i) Total project cost Rs.1230.0Lacs.
(ii) Funds available under livelihood component is 9% of total project cost= Rs.110.70 Lacs.
(a) Seed money for SHGs as revolving fund = Rs.69.63 Lacs.
(minimum 60% of livelihood component)
No. Of SHG to be formed 281 Nos.
(b) Seed money for enterprising individuals = Rs.11.07 Lacs.
persons enterprising individuals 45 Nos.
(maximum 10% of livelihood component)
(c) Seed money for SHG Fedration = Rs.30.00 Lacs
(maximum 30% of livelihood component)
SHG Fedration 15 Nos.
S.
N Item Numbers
Revolving
fund/Seed
money % of LAP
1 SHG
63%
a Existing 10 2.50
b New 271 67.13
Sub Total 281 69.63
2 Enterprising individuals 45 11.07 10%
3
Enterprising SHG/Federations
of SHG 15 30.00 27%
Total 281 110.70 100
Proposed Activities (On Farm)*
Name of activity* No of SHGs Revolving fund
Dairying 65 16.25
Poultry - 0
Goatry 45 11.25
Maize dehusker - 0
Ata Mill 10 2.50
Total 120 30.00
Proposed Major activities (Off Farm)**
Name of activity* No of SHGs Revolving fund
Artisans 12 3.00
Mason 33 8.25
Sewing / Knitting 21 5.25
General Store 31 7.75
Mobile repair 20 5.00
Embrodary Handicraft - 0
Black smith 21 5.25
Carpenter 23 5.75
Total 161 40.25
List of persons & Proposed Activities. ( 10% of (9%)
S. No. Activity
Proposed
Name of Person viillage Category
SC /ST
/Others
Project
fund
Revolving
Contri
bution
1 MOBILE REPAIRING Shanti w/o Heera ram vishnoi Khard others 25000 25000
2 MOBILE REPAIRING Anju w/o Kishna ram vishnoi Khard others 25000 25000
3 GOATRY Tulsa ram s/o Raichand ram vishnoi
Khard others 25000 25000
4 GOATRY Hanuman s/o Kachhaba ram vishnoi
Khard others 25000 25000
5 GOATRY Veerma ram s/o Ghamanda ram
vishnoi
Khard others 25000 25000
6 MOBILE REPAIRING Elchi w/o Vishna ram vishnoi Gunesaniyon ki dhani
others 25000 25000
7 GOATRY Madu w/o Satya prakash vishnoi Khard others 25000 25000
8 GOATRY Bhanwara ram s/o Ghamanda ram vishnoi
Khard others 17300 17300
9 Mechnic Jagdish s/o Sukh ram vishnoi Ajaniyon ki dhani others 25000 25000
10 Mechanic Omprakash s/o Bhamal ram vishnoi
Ajaniyon ki dhani others 25000 25000
11 Tailoring Prema ram s/oHemdas sad Dhorimanna SC 25000 25000
12 Tailoring Seva ram s/oHemdas sad Dhorimanna SC 25000 25000
13 Carpenter Koja ram s/o Chutra ram suthar Khard others 25000 25000
14 GOATRY Chotha ram s/o karna ram Bheelon ki dhani others 25000 25000
15 BUFFALOW Devu ram s/o Likhma ram Udasar others 25000 25000
16 GENERAL STORE Lalit kumar s/o Bheema ram Bheelon ki dhani ST 25000 25000
17 GENERAL STORE Cheema ram s/o Joga ram Udasar others 25000 25000
18 BUFFALOW Amara ram s/o Padama ram Alamsaria SC 25000 25000
19 BUFFALOW Lala ram s/o Jesa ram Alamsaria others 25000 25000
20 GOATRY Dalu ram s/o Rekha ram Udasar others 25000 25000
21 BUFFALOW Vishna ram s/o Bhinyan ram Udasar others 25000 25000
22 GOATRY Sagarkhan s/o Nalukhan Umedkhan s/o Nalukhan
Udasar others 25000 25000
23 BUFFALOW Ramaram s/o Mota ram Udasar others 17300 17300
24 GOATRY Punma ram s/o Uma ram Udasar others 25000 25000
25 LATHER WORK Maga ram s/o Deda ram Ravon ki beri SC 25000 25000
26 DAIRYING Idan ram s/o Teja ram Adarsh Lukhu others 25000 25000
27 MASON Chetan ram s/o Dama ram Megwalon ki basti
SC 25000 25000
28 MASON Vala ram s/o Dama ram Megwalon ki basti
SC 25000 25000
29 GOATRY Ramchand ram s/o Sata ram Ravon ki beri others 25000 25000
30 DAIRYING Ramchand s/o Hari ram Ravon ki beri others 25000 25000
31 DAIRYING Mohan ram s/o Jetha ram Ravon ki beri others 25000 25000
32 GOATRY Jetha ram s/o Maga ram Adarsh Lukhu others 25000 25000
33 MOBILE REPAIRING Praveen s/o Ugra ram Adarsh Lukhu others 25000 25000
34 COW Deepa ram s/o Ramjeevan Bheelon ki basti ST 25000 25000
35 BUFFALLOW Puspa w/o Durga ram Lukhu others 25000 25000
36 SHEEP Nimba ram s/o Achala ram Lukhu others 25000 25000
37 BUFFALLOW Sujana ram s/o Choga ram Ravon ki beri others 25000 25000
38 GOATRY Mana ram s/o Chimna ram Bheelon ki basti ST 25000 25000
39 BUFFALLOW Chena ram s/o Durga ram Adarsh Lukhu others 25000 25000
40 SHEEP Rama ram s/o Chena ram Adarsh Lukhu others 25000 25000
41 BUFFALLOW Naresh s/o Dungra ram Ravon ki beri others 25000 25000
42 GENERAL STORE & HOTEL
Hanuman s/o Surta ram Mishri ki beri others 25000 25000
43 GENERAL STORE Mohan lal s/o Rikab das Lukhu others 25000 25000
44 GOATRY Lala ram s/o Moda ram Lukhu others 25000 25000
45 SHEEP Vagta ram s/o Ganga ram Ravon ki beri others 22500 22500
TOTAL 1107100 1107100
(c) Funds for Enterprising SHG/Federations of SHG
(Maximum 27 % of livelihood activities)= Rs. 30.0 Lacs
The funding for major livelihood activities will enable the enterprising SHGs/SHG federation to
avail a composite loan for undertaking major livelihood activities or to upscale activities as
recommended by the WC & approved by WCDC in consultation with line departments.
Details of enterprising SHG/federation is given below :
S.No. Name of SHG/ SHG
federation
Project Name Project
Cost in lacs
Grant in aid 50%
of project cost or
2 lacs whichever
is less
Bank loan
1 SHG fedration Dhorimanna Embrodary 4.00 2.00 2.00
2 SHG fedration Ajaniyon ki
dhani
Embrodary 4.00 2.00 2.00
3 SHG fedration Khard Embrodary 4.00 2.00 2.00
4 SHG fedration Gunashniyon
ki dhani
Embrodary 4.00 2.00 2.00
5 SHG fedration Lukhu Embrodary 4.00 2.00 2.00
6 SHG fedration Adarsh
Lukhu
Embrodary 4.00 2.00 2.00
7 SHG fedration Ravon ki
beri
Embrodary 4.00 2.00 2.00
8 SHG fedration Bheelon ki
basti
Embrodary 4.00 2.00 2.00
9 SHG fedration Mishri ki
beri
Embrodary 4.00 2.00 2.00
10 SHG fedration Megwalon ki
basti
Embrodary 4.00 2.00 2.00
11 SHG fedration Amedkar
nagar
Embrodary 4.00 2.00 2.00
12 SHG fedration Udasar 1 Embrodary 4.00 2.00 2.00
13 SHG fedration Udasar 2 Embrodary 4.00 2.00 2.00
14 SHG fedration Alamsariya Embrodary 4.00 2.00 2.00
15 SHG fedration Bheelon ki
dhani
Embrodary 4.00 2.00 2.00
Total 60.0 30.0 30.0
* Details of project activities can be prepared in coming years after formation of SHG federation or as
the case may be.
C) Production Plan:
An awareness programme has been undertaken at Gram Sabha for communication & sensitization of
the target beneficiaries. Production System & micro enterprises Action Plan is pre-requisite for
availing the funds under the Production System & micro enterprises component. Production plan has
been prepared by the PIA in consultation with WDT, WC & the members of Users Group. Details of
funds available & their utilisation is as under :
(iii) Total project cost Rs.1230.0 Lacs.
(iv) Funds available under Production System & Micro enterprises component is 10% of total
project cost= Rs.123.0 Lacs.
Proposed Activities for production system & Micro enterprises
s.no. Name of activity* No. of
households
Cost of
activity
Total
Cost in
Lacs
WDF
A Production System
B Others
1 Crop Demontration
Kharif crop 1040 5000 52.00
Rabi crop 299 8000 22.92
2 Fodder production 26 2000 0.52
3 Agro Horticulture 35 15000 5.25
4 Organic farming (Green
Manuaring, Nadep Compost)
40 10000 4.00
5 Home stead kitchen graden 60 500 0.30
C Para Vetnery services
1 Demo. Urea Molasis 23 1000 0.23
2 Live Stock Development
Activities
2% 24.60
3 Manger 135 5200 7.02
4 Animal Shed 43 12000 5.16
Total 1701 - 123.00
Awareness Programme
-Slogan Wall Painting,
Scientific Animal Husbandry Practices ; Seminars / Debates / Pamphlet distribution/ Stickers/ Chetana Rally
Broadcasting / Telecasting Film Show
Visit- intra/ inter/ out of State/ Abroad
Fortnightly Meetings with Livestock keeper to discuss and decide all breedable females to be covered.
Creation Of Disease Free Zone: Livestock’s health coverage
Establishment of Pashudhan Seva Kendra (PSK) (Convergence with peer department)
Deworming to reduce worm load and enhance disease resistance. (Convergence with peer department)
Distribution of mineral mixture. (Convergence with peer department)
Free of Cost Vaccination in IWMP area Livestock for H.S., B.Q., F.M.D., PPR, ETV and Sheep Pox.
Ensure Hygenic measures to check Zonosis.(DAH/ IWMP)
Construction of Animal Sheds with Manger and Portable Manger With accessories
Provision of Cattle Water Troughs.
Infertility Management: To ensure Livestock’s Productivity
Expansion of AI Coverage/ reduction in no.of infertile females.
PCPD+ COMBAT INFERTILITY+ CAMPS INFERTILITY RLDB+ CAMPS INFERTILITY SC COMPONENT
Breed Improvment: To ensure Livestock’s Productivity enhancement
A.I. (Convergence with peer department)
Incentive based Mass Castration at Door Step of Scrub Bulls to Check ND Recycling.
Registration of bulls (Convergence with peer department)
Bull / Buck Distribution for NS-.Gir, Murrah And Sirohi /Jamunapari Breed Bulls/ Bucks Should Be Distributed For 3yrs 6 (3 In Each Iwmp Area, Where Ever A.I. Facility Is Not Available Round’s O Clock. On 100% Subsidized Rate To WC.
Financial Incentive to the Inseminator for Calf Borns.
Convergence with peer Department/DAH/Agriculture/ATMA/ Board/ Trust/ Goseva
An Assistance to control Malnutrition: Protein Supplementation
Feed & fodder production enhancement.
ANNUAL ACTION PLAN : PIA will prepare annual action plan in the month of January indicating
outgoing liabilities as well as new projects which they wish to take during next financial years & will
submit to PM(WCDC). These plans will be placed for approval at P.S. (Standing Committee of
Production and Agriculture) & Z.P. (Standing Committee of Production) level every year. While
preparing Annual Action Plan (AAP) if rates of labour or material in DPR increased or decreased
changed rates will be applicable for preparing AAP & the effect of same can be met by converging the
remaining works with other schemes.
CHAPTER – III
PROPOSED DEVELOPMENT PLAN
Name of the project BARMER(IWMP)-52
Block DHORIMANNA
District. BARMER
ACTIVITYWISE ABSTRACT OF COST S.
N.
NAME OF ACTIVITY Unit
Unit
cost
GP-DHORIMANNA
2350 352.50
Beneficiary Contribution
Quantity Total Cost
Cost from Project Fund Convergence Fund
Quantity Labour Material Amt. Quantity Amt.
I. Administration - 10% - 35.25 - 35.25 - - 0.00
II Monitoring - 1% - 3.53 - 3.53 - - 0.00
III Evaluation - 1% - 3.53 - 3.53 - - 0.00
IV Entry point activity - 4% - 14.10 - 14.10 - - 0.00
V Inst. & Capacity Building - 5% - 17.63 - 17.63 - - 0.00
VI DPR Preparation - 1% - 3.53 - 3.53 - - 0.00
TOTAL (A) - 22% - 77.55 - 77.55 - 0.00
W/S WORK PHASE
VII NRM 56% 197.40 0.00 0.00
1 Conservation measures for areable land
(private land)
(i) Farm Pond Nos 261000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(ii) Khadeen Nos 233000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iii) Repair of existing Khadeen Nos 200000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iv) Tanka Nos 162000 140 226.80 105 42.00 128.10 170.10 35 56.70 12.76
(v) Earthen Bund m 256 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(vi) Vegetative Barrier (Thor) m 183 1100 2.01 1083 0.00 1.98 1.98 17 0.03 0.15
(vii) Agro Forestry 20 1100 0.22 1050 0.00 0.21 0.21 50 0.01 0.02
2 Conservation measures for non areable
land 0 0.00 0.00
(i) Silvi Pasture development Ha 102160 5 5.11 5 3.23 1.88 5.11 0 0.00 0.00
(ii) Waterharvesting st.(Nadi) Nos 2000000 4 80.00 1 6.60 13.40 20.00 3 60.00 0.00
(iii) stangle Trenches Nos 0 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iv) Tanka Nos 150000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
3 Drainage line treatment 0 0.00 0.00
(ii) LSCD Nos 13300 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
TOTAL (B) 314.14 51.83 145.57 197.40 0 116.74 12.92
VIII Production System and micro
enterprise 10% 35.25 0 2.64
1 Crop Demonstration 0 0.00
i Single Crop No. 5000 280 14.00 270 13.50 10 0.50 2.03
ii Enter Cropping No. 8000 100 8.00 100 8.00 0 0.00 1.20
2 Dry land Horticulture No. 15000 10 1.50 10 1.50 0 0.00 0.23
3 Homestead Kitchen Garden No. 500 20 0.10 20 0.10 0 0.00 0.02
4 Compost Pit No. 10000 9 0.90 9 0.90 0 0.00 0.14
5 Sprinklers and Drip irrigation No. 30000 2 0.60 0 0.00 2 0.60 0.00
6 Live Stock Management No. 0 0.00 0.00
(i) Fodder Demonstration No. 2000 10 0.20 10 0.20 0 0.00 0.03
(ii) Mangers Distribution No. 5200 50 2.60 50 2.60 0 0.00 0.39
(iii) Live Stock Development Activities No. 2% 7.05 7.05 0 0.00 1.06
(iv) Cattel shed No. 12000 15 1.80 11 1.32 4 0.48 0.20
(v) Urea Molasis No. 1000 10 0.10 8 0.08 2 0.02 0.01
TOTAL (C) 506 36.85 488 35.25 18 1.60 5.288
IX Household Production System (For
Marginal Farmer and landless Labour ) 9% 31.73 0 0.00 2.38
1 Seed moeney to SHG No. 25000 85 21.25 83 20.55 2 0.70 3.08
2 Seed moeney to Microenterprise No. 25000 15 3.75 13 3.17 2 0.58 0.48
3 Grant in aid to Federation of SHG individual (10
% maximum of 9% amount) No. 200000 4 8.00 4 8.00 0 0.00 1.20
Total 104 33.00 100 31.73 4 1.28 7.14
X CONSOLIDATED PHASE 3% 10.58 10.58 0.00 0.00
GRAND TOTAL 472.12 51.83 145.57 352.50 119.62 25.35
S.
N.
NAME OF ACTIVITY Unit
Unit
cost
GP-LUKHU 3870 580.50 Beneficiary Contribution Quantity Total
Cost Cost from Project Fund Convergence Fund
Quantity Labour Material Amt. Quantity Amt.
I. Administration - 10% - 58.05 - 58.05 - - 0.00
II Monitoring - 1% - 5.81 - 5.81 - - 0.00
III Evaluation - 1% - 5.81 - 5.81 - - 0.00
IV Entry point activity - 4% - 23.22 - 23.22 - - 0.00
V Inst. & Capacity Building - 5% - 29.03 - 29.03 - - 0.00
VI DPR Preparation - 1% - 5.81 - 5.81 - - 0.00
TOTAL (A) - 22% - 127.71 - 127.71 - 0.00
W/S WORK PHASE
VII NRM 56% 325.08 0.00 0.00
1 Conservation measures for areable land
(private land)
(i) Farm Pond Nos 261000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(ii) Khadeen Nos 233000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iii) Repair of existing Khadeen Nos 200000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iv) Tanka Nos 162000 213 345.06 187 74.80 228.14 302.94 26 42.12 22.72
(v) Earthen Bund m 256 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(vi) Vegetative Barrier (Thor) m 183 800 1.46 729 0.00 1.33 1.33 71 0.13 0.10
(vii) Agro Forestry Nos 20 1900 0.38 1870 0.00 0.37 0.37 30 0.01 0.03
2 Conservation measures for non areable
land
(i) Silvi Pasture development Ha 102160 20 20.43 20 12.90 7.53 20.43 0 0.00 0.00
(ii) Waterharvesting st.(Nadi) Nos 2000000 5 100.00 0 0.00 0.00 0.00 5 100.00 0.00
(iii) stangle Trenches Nos 0 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iv) Tanka Nos 150000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
3 Drainage line treatment 0 0.00 0.00
(ii) LSCD Nos 13300 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
TOTAL (B) 2938 467.34 2806 87.70 237.38 325.08 132 142.26 22.85
VIII Production System and micro
enterprise 10% 58.05 4.35
1 Crop Demonstration 0.00
i Single Crop No. 5000 510 25.50 500 25.00 10 0.50 3.75
ii Enter Cropping No. 8000 149 11.92 149 11.92 0 0.00 1.79
2 Dry land Horticulture No. 15000 20 3.00 20 3.00 0 0.00 0.45
3 Homestead Kitchen Garden No. 500 20 0.10 20 0.10 0 0.00 0.02
4 Compost Pit No. 10000 20 2.00 20 2.00 0 0.00 0.30
5 Sprinklers and Drip irrigation No. 30000 5 1.50 0 0.00 5 1.50 0.00
6 Live Stock Management
(i) Fodder Demonstration 2000 6 0.12 6 0.12 0 0.00 0.02
(ii) Mangers Distribution 5200 40 2.08 35 1.82 5 0.26 0.27
(iii) Live Stock Development Activities 2% 11.61 11.61 0 0.00 1.74
(iv) Cattel shed No. 12000 25 3.00 20 2.40 5 0.60 0.36
(v) Urea Molasis No. 1000 8 0.08 8 0.08 0 0.00 0.01
TOTAL (C) 803 60.91 81 58.05 2.86 8.71
IX Household Production System (For
Marginal Farmer and landless Labour ) 9% 52.25 0 0.00 3.92
1 Seed moeney to SHG No. 25000 135 33.75 133 33.02 2 0.73 4.95
2 Seed moeney to Microenterprise No. 25000 23 5.75 21 5.22 2 0.53 0.78
3 Grant in aid to Federation of SHG individual (10
% maximum of 9% amount) 200000 7 14.00 7 14.00 0 0.00 2.10
Total 165 53.50 161 52.25 4 1.26 7.84
X CONSOLIDATED PHASE 3% 17.42 17.42 0.00 0.00
GRAND TOTAL 726.87 87.70 237.38 580.50 146.37 39.39
S.
N.
NAME OF ACTIVITY Unit
Unit
cost
GP-UDASAR 1980 297.00 Beneficiary Contribution Quantity Total
Cost Cost from Project Fund Convergence Fund
Quantity Labour Material Amt. Quantity Amt.
I. Administration - 10% - 29.70 - 29.70 - - 0.00
II Monitoring - 1% - 2.97 - 2.97 - - 0.00
III Evaluation - 1% - 2.97 - 2.97 - - 0.00
IV Entry point activity - 4% - 11.88 - 11.88 - - 0.00
V Inst. & Capacity Building - 5% - 14.85 - 14.85 - - 0.00
VI DPR Preparation - 1% - 2.97 - 2.97 - - 0.00
TOTAL (A) - 22% - 65.34 - 65.34 - 0.00
W/S WORK PHASE
VII NRM 56% 166.32 0.00 0.00
1 Conservation measures for areable land
(private land)
(i) Farm Pond Nos 261000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(ii) Khadeen Nos 233000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iii) Repair of existing Khadeen Nos 200000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iv) Tanka Nos 162000 135 218.70 102 40.80 124.44 165.24 33 53.46 12.39
(v) Earthen Bund m 256 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(vi) Vegetative Barrier (Thor) m 183 500 0.92 479 0.00 0.88 0.88 21 0.04 0.07
(vii) Agro Forestry Nos 20 1050 0.21 1020 0.00 0.20 0.20 30 0.01 0.02
2 Conservation measures for non areable
land 0 0.00 0.00
(i) Silvi Pasture development Ha 102160 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(ii) Waterharvesting st.(Nadi) Nos 2000000 2 40.00 0 0.00 0.00 0.00 2 40.00 0.00
(iii) stangle Trenches Nos 0 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iv) Tanka Nos 150000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
3 Drainage line treatment 0 0 0.00 0.00
(ii) LSCD Nos 13300 100 13.30 0 0.00 0.00 0.00 100 13.30 0.00
TOTAL (B) 273.13 40.80 125.52 166.32 0 106.81 12.47
VIII Production System and micro
enterprise 10% 29.70 2.23
1 Crop Demonstration 0 0.00
i Single Crop No. 5000 280 14.00 270 13.50 10 0.50 2.03
ii Enter Cropping No. 8000 50 4.00 50 4.00 0 0.00 0.60
2 Dry land Horticulture No. 15000 5 0.75 5 0.75 0 0.00 0.11
3 Homestead Kitchen Garden No. 500 20 0.10 20 0.10 0 0.00 0.02
4 Compost Pit No. 10000 11 1.10 11 1.10 0 0.00 0.17
5 Sprinklers and Drip irrigation No. 30000 5 1.50 0 0.00 5 1.50 0.00
6 Live Stock Management
(i) Fodder Demonstration 2000 10 0.20 10 0.20 0 0.00 0.03
(ii) Mangers Distribution 5200 50 2.60 50 2.60 0 0.00 0.39
(iii) Live Stock Development Activities 2% 5.94 5.94 0 0.00 0.89
(iv) Cattel shed No. 12000 14 1.68 12 1.44 2 0.24 0.22
(v) Urea Molasis No. 1000 7 0.07 7 0.07 0 0.00 0.01
TOTAL (C) 452 31.94 435 29.70 17 2.24 4.46
IX Household Production System (For
Marginal Farmer and landless Labour ) 9% 26.73
1 Seed moeney to SHG No. 25000 67 16.75 65 16.06 2 0.69 2.41
2 Seed moeney to Microenterprise No. 25000 12 3.00 11 2.67 1 0.33 0.40
3 Grant in aid to Federation of SHG individual (10
% maximum of 9% amount) 200000 4 8.00 4 8.00 0 0.00 1.20
Total 83 27.75 80 26.73 3 1.02 4.01
X CONSOLIDATED PHASE 3% 8.91 8.91 0.00 0.00
GRAND TOTAL 407.07 40.80 125.52 297.00 110.07 20.94
S.
N.
NAME OF ACTIVITY Unit
Unit
cost
TOTAL 8200 1230.00 Beneficiary Contribution Quantity Total
Cost Cost from Project Fund Convergence Fund
Quantity Labour Material Amt. Quantity Amt.
I. Administration - 10% - 123.00 - 123.00 - - 0.00
II Monitoring - 1% - 12.30 - 12.30 - - 0.00
III Evaluation - 1% - 12.30 - 12.30 - - 0.00
IV Entry point activity - 4% - 49.20 - 49.20 - - 0.00
V Inst. & Capacity Building - 5% - 61.50 - 61.50 - - 0.00
VI DPR Preparation - 1% - 12.30 - 12.30 - - 0.00
TOTAL (A) - 22% - 270.60 - 270.60 - 0.00
W/S WORK PHASE
VII NRM 56% 688.80 0.00 0.00
1 Conservation measures for areable land
(private land)
(i) Farm Pond Nos 261000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(ii) Khadeen Nos 233000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iii) Repair of existing Khadeen Nos 200000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iv) Tanka Nos 162000 488 790.56 394 157.60 480.68 638.28 94 152.28 47.87
(v) Earthen Bund m 256 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(vi) Vegetative Barrier (Thor) m 183 2400 4.39 2291 0.00 4.19 4.19 109 0.20 0.31
(vii) Agro Forestry Nos 20 4050 0.81 3940 0.00 0.79 0.79 110 0.02 0.06
2 Conservation measures for non areable
land
(i) Silvi Pasture development Ha 102160 25 25.54 25 16.13 9.42 25.54 0 0.00 0.00
(ii) Waterharvesting st.(Nadi) Nos 2000000 11 220.00 1 6.60 13.40 20.00 10 200.00 0.00
(iii) stangle Trenches Nos 0 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iv) Tanka Nos 150000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
3 Drainage line treatment
(ii) LSCD Nos 13300 100 13.30 0 0.00 0.00 0.00 100 13.30 0.00
TOTAL (B) 1054.60 180.33 508.47 688.80 0 365.80 48.24
VIII Production System and micro
enterprise 10% 233.70 17.53
1 Crop Demonstration
i Single Crop No. 5000 1070 53.50 1040 52.00 30 1.50 7.80
ii Enter Cropping No. 8000 299 23.92 299 23.92 0 0.00 3.59
2 Dry land Horticulture No. 15000 35 5.25 35 5.25 0 0.00 0.79
3 Homestead Kitchen Garden No. 500 60 0.30 60 0.30 0 0.00 0.05
4 Compost Pit No. 10000 40 4.00 40 4.00 0 0.00 0.60
5 Sprinklers and Drip irrigation No. 30000 12 3.60 0 0.00 12 3.60 0.00
6 Live Stock Management 0 0 0.00 0.00
(i) Fodder Demonstration 2000 26 0.52 26 0.52 0 0.00 0.08
(ii) Mangers Distribution 5200 140 7.28 135 7.02 5 0.26 1.05
(iii) Live Stock Development Activities 10000 0 24.60 0 24.60 0 0.00 3.69
(iv) Cattel shed No. 12000 54 6.48 43 5.16 11 1.32 0.77
(v) Urea Molasis No. 1000 25 0.25 23 0.23 2 0.02 0.03
TOTAL (C) 1761 129.70 1701 123.00 60 6.70 18.45
IX Household Production System (For
Marginal Farmer and landless Labour )
1 Seed moeney to SHG No. 25000 287 71.75 281 69.63 6 2.12 10.44
2 Seed moeney to Microenterprise No. 25000 50 12.50 45 11.07 5 1.43 1.66
3 Grant in aid to Federation of SHG individual (10
% maximum of 9% amount) 200000 15 30.00 15 30.00 0 0.00 4.50
Total 352 114.25 341 110.70 11 3.55 16.61
X CONSOLIDATED PHASE 3% 36.90 36.90 0.00 0.00
GRAND TOTAL 1606.05 180.33 508.47 1230.00 376.05 83.30
CHAPTER – IV
ACTIVITYWISE ABSTRACT OF COST
Name of the project BARMER(IWMP)-52
Block DHORIMANNA
District. BARMER
ACTIVITYWISE ABSTRACT OF COST S.
N.
NAME OF ACTIVITY Unit
Unit
cost
TOTAL
8200 1230.0
Beneficiary Contribution
Quantity Total Cost
Cost from Project Fund Convergence Fund
Quantity Labour Material Amt. Quantity Amt.
I. Administration - 10% - 123.00 - 123.00 - - 0.00
II Monitoring - 1% - 12.30 - 12.30 - - 0.00
III Evaluation - 1% - 12.30 - 12.30 - - 0.00
IV Entry point activity - 4% - 49.20 - 49.20 - - 0.00
V Inst. & Capacity Building - 5% - 61.50 - 61.50 - - 0.00
VI DPR Preparation - 1% - 12.30 - 12.30 - - 0.00
TOTAL (A) - 22% - 270.60 - 270.60 - 0.00
W/S WORK PHASE
VII NRM 56% 0.00 688.80 0.00 0.00
1 Conservation measures for areable land (private
land)
(i) Farm Pond Nos 261000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(ii) Khadeen Nos 233000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iii) Repair of existing Khadeen Nos 200000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iv) Waterharvesting st.(tanka) Nos 162000 488 790.56 394 157.60 480.68 638.28 94 152.28 47.87
(v) Earthen Bund m 256 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(vi) Vegetative Barrier (Thor) Nos 183 2400 4.39 2291 0.00 4.19 4.19 109 0.20 0.31
(vii) Agro Forestry No. 20 4050 0.81 3940 0.00 0.79 0.79 110 0.02 0.06
2 Conservation measures for non areable land 0 0.00 0.00
(i) Pasture development Ha 102160 25 25.54 25 16.13 9.42 25.54 0 0.00 0.00
(ii) Waterharvesting st.(Nadi) Nos 2000000 11 220.00 1 6.60 13.40 20.00 10 200.00 0.00
(iii) stangle Trenches Nos 0 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
(iv) Waterharvesting st.(tanka) Nos 150000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
3 Drainage line treatment 0 0.00 0.00
(i) LSCD Nos 13300 100 13.30 0 0.00 0.00 0.00 100 13.30 0.00
TOTAL (B) 1054.60 180.33 508.47 688.80 0 365.80 48.24
VIII Production System 10% 10% 233.70 0 17.53
(1) Crop Demonstration 0 0.00
i Single Crop No. 5000 1070 53.50 1040 52.00 30 1.50 7.80
ii Enter Cropping No. 8000 299 23.92 299 23.92 0 0.00 3.59
(2) Dry land Horticulture No. 15000 35 5.25 35 5.25 0 0.00 0.79
(3) Homestead Kitchen Garden No. 500 60 0.30 60 0.30 0 0.00 0.05
(4) Compost Pit No. 10000 40 4.00 40 4.00 0 0.00 0.60
(5) Sprinklers and Drip irrigation No. 30000 12 3.60 0 0.00 12 3.60 0.00
(6) Live Stock Management 0 0 0.00 0.00 (i) Fodder Demonstration No. 2000 26 0.52 26 0.52 0 0.00 0.08 (ii) Mangers Distribution No. 5200 140 7.28 135 7.02 5 0.26 1.05 (iii) Live Stock Development Activities No. 10000 0 24.60 0 24.60 0 0.00 3.69 (iv) Cattel shed No. 12000 54 6.48 43 5.16 11 1.32 0.77 (v) Urea Molasis No. 1000 25 0.25 23 0.23 2 0.02 0.03
TOTAL (C) 1761 129.70 123.00 6.70 18.45
IX lielyhood and micro enterprise 9% 0.00 0 0.00 0.00 (1) Seed moeney to SHG 25000 287 71.75 281 69.63 6 2.12 10.44 (2) Seed moeney to Microenterprise individuals 25000 50 12.50 45 11.07 5 1.43 1.66 (3) Grant in aid to Federation of SHG individual (10 %
maximum of 9% amount) 200000 15 30.00 15 30.00 0 0.00 4.50
TOTAL (D) 114.25 2027 110.70 71 3.55 16.61
X CONSOLIDATED PHASE 3% 3% 36.90 36.90 0.00 0.00
GRAND TOTAL 1606.05 180.33 508.47 1230.00 376.05 83.30
CHAPTER – V
CHAPTER-5.1
Name of the Project
BARMER (IWMP)-52 Macro/Micro CLSTER
Geographical Area 4026 Ha
G.P.
DHORIMANNA
Scheme
IWMP
Effective Area 2350 Ha
Block
DHORIMANNA
Date of Sanction 05.08.2011
Total Arable land 2332 Ha
District.
BARMER
Date of Appoval of the
work plan
1. Irrigated 1118 Ha
Village Covered
4 NO.
2. Unirrigated 1214 Ha
Project outlay
352.50 LAC
No. of SHG's formed 6
Total Nonarable land 18 Ha
Total Area
2350 Hactare
No. of UG's formed 6
1. Pasture 0 Ha
No. of WC's formed
1
2. Govt. / waste /OTHER
LAND 18 Ha
ANNUAL ACTION PLAN THROUGH PROJECT
S.
N. NAME OF ACTIVITY Unit QTY.
Unit
cost AMOUNT
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
TOTAL ZERO
YEAR FIRST YEAR
SECOND
YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 35.25 7.050 7.050 7.050 7.050 7.050 10% 35.25
II Monitoring 1% 3.525 0.705 0.705 0.705 0.705 0.705 1% 3.53
III Evaluation 1% 3.525 1.763 1.763 1% 3.53
IV Entry point activity 4% 14.100 11 14.100 4% 14.10
V Inst. & Capacity Building 5% 17.625 6.169 5.288 4.406 0.881 0.881 5% 17.63
VI DPR Preparation 1% 3.525 1 2.115 1 1.410 1% 3.53
TOTAL (A) 77.55 2.115 29.434 13.043 13.924 8.636 ##### 77.55
W/S WORK PHASE
VII NRM 56% 197.40 0.00 0.00 26.44 99.93 71.03 0.52
1 Conservation measures for
areable land (private land)
(i) Farm Pond/Khet talai Nos 0 261000 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(ii) Khadeen Nos 0 233000 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(iii) Waterharvesting st.(Nadi) Nos 0 200000 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(iv) Waterharvesting st.(tanka) Nos 105 162000 170.10 0 0.00 0.00 0.00 15 24.30 60 97.20 30 48.60 0.00 0.00 105 170.10
(v) Earthen Bund m 0 256 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(vi) Vegetative Barrier (Thor) m 1083 183 1.98 0 0.00 0.00 0.00 300 0.55 300 0.55 483 0.88 0.00 0.00 1083 1.98
(vii) Agro Forestry No. 1050 20 0.21 0 0.000 0 0.000 0 0.00 300 0.060 750 0.15 0.00 0.000 1050 0.21
2 Conservation measures for non
areable land
0 0.00
(i) Silvi Pasture development Ha 5 102160.0 5.11 0 0.00 0.00 0.00 5.00 3.15 0 0.90 0 0.54 0.52 5 5.11
(ii) Renovation of nadi Nos 1 2000000 20.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 1 20.00 0.00 1 20.00
(iii) stangle Trenches Nos 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0 0.00
(iv) Waterharvesting st.(tanka) Nos 0 150000 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
3 Drainage line treatment 0 0.00
(i) LSCD Nos 0 13300 0.00 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0 0.00
TOTAL (B) 2244 197.400 0.00 0.00 320.00 28.00 660 98.71 1264 70.17 0.00 0.52 2244 197.40
VIII Production System 10% 35.25 3.53 24.68 7.05 0 35.25
(1) Crop Demonstration
i Single Crop No. 270 5000 13.50 0 0.000 0 0.000 50 2.50 120 6.000 100 5.000 0 0.000 270 13.50
ii Enter Cropping No. 100 8000 8.00 0 0.000 0 0.000 30 2.40 40 3.200 30 2.400 0 0.000 100 8.00
(2) Dry land Horticulture No. 10 15000 1.50 0 0.000 0 0.000 5 0.75 3 0.450 2 0.300 0 0.000 10 1.50
(3) Homestead Kitchen Garden No. 20 500 0.10 0 0.000 0 0.000 0 0.00 10 0.050 10 0.050 0 0.000 20 0.10
(4) Compost Pit No. 9 10000 0.90 0 0.000 0 0.000 2 0.20 4 0.400 3 0.300 0 0.000 9 0.90
(5) Sprinklers and Drip irrigation No. 0 30000 0.00 0 0.000 0 0.000 0 0.00 0 0.000 0 0.000 0 0.000 0 0.00
(6) Live Stock Management
(i) Fodder Demonstration No. 10 2000 0.20 0 0.000 0 0.000 4 0.08 3 0.060 3 0.060 0 0.000 10 0.20
(ii) Mangers Distribution No. 50 5200 2.60 0 0.000 0 0.000 20 1.04 15 0.780 15 0.780 0 0.000 50 2.60
(iii) Live Stock Development
Activities No. 2% 7.05 0 0.000 0 0.000 2.12 2.820 2.115 0 0.000 0 7.05
(iv) Cattel shed No. 11 12000 1.32 0 0.000 0 0.000 4 0.48 3 0.360 4 0.480 0 0.000 11 1.32
(v) Urea Molasis No. 8 1000 0.08 0 0.000 0 0.000 2 0.02 4 0.040 2 0.020 0 0.000 8 0.08
TOTAL (C) 89 35.25 0.00 0.00 0.00 0.00 117.00 9.59 202.00 14.16 169.00 11.51 0.00 0.00 488.00 35.25
IX lielyhood and micro enterprise 9% 31.73 3.53 17.63 10.58
(1) Seed moeney to SHG 83 25000 20.553 0 0.000 0 0.000 10 2.500 54 13.500 19 4.553 0 0.000 83 20.55
(2) Seed moeney to
Microenterprise individuals 13 25000 3.173 0 0.000 0 0.000 4 1.000 8 2.000 1 0.173 0 0.000 13 3.17
(3) Grant in aid to Federation of
SHG individual (10 %
maximum of 9% amount) 4 200000 8.000 0.000 0 0.000 0 0.000 1 2.000 3 6.000 0 0.000 4 8.00
TOTAL (D) 100 31.725 0 0.000 0 0.000 14 3.500 63 17.500 23 10.725 0.000 0.000 100.0 31.725
X CONSOLIDATED PHASE 3% 10.575 0.000 0.000 0.000 0.000 6.345 4.230 3% 10.575
GRAND TOTAL 352.50 0.00 2.12 0.00 29.43 451.00 54.13 925 144.29 1456 107.38 0.00 15.15 2832 352.50
CHAPTER-5.1
Name of the Project BARMER (IWMP)-52 Macro/Micro CLSTER Geographical Area 5611 Ha
G.P.
LUKHU
Scheme IWMP
Effective Area 3870 Ha
Block
DHORIMANNA
Date of Sanction 05.08.2011
Total Arable land 3749 Ha
District.
BARMER
Date of Appoval of the
work plan
1. Irrigated 1258 Ha
Village Covered
6 NO.
2. Unirrigated 2491 Ha
Project outlay
580.50 LAC
No. of SHG's formed 4
Total Nonarable land 121 Ha
Total Area
3870 Hactare
No. of UG's formed 5
1. Pasture 0 Ha
No. of WC's formed
1
2. Govt. / waste /OTHER
LAND 121 Ha
ANNUAL ACTION PLAN THROUGH PROJECT
S.
N. NAME OF ACTIVITY Unit QTY.
Unit
cost AMOUNT
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
TOTAL ZERO
YEAR FIRST YEAR
SECOND
YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 58.05 11.610 11.610 11.610 11.610 ##### 10% 58.05
II Monitoring 1% 5.805 1.161 1.161 1.161 1.161 1.161 1% 5.81
III Evaluation 1% 5.805 2.903 2.903 1% 5.81
IV Entry point activity 4% 23.220 26 23.220 4% 23.22
V Inst. & Capacity Building 5% 29.025 10.159 8.708 7.256 1.451 1.451 5% 29.03
VI DPR Preparation 1% 5.805 1 3.483 1 2.322 1% 5.81
TOTAL (A) 127.71 3.483 48.472 21.479 22.930 14.222 ##### 127.71
W/S WORK PHASE
VII NRM 56% 325.080 0.00 0.00 43.54 164.57 114.91 2.06 325.08
1 Conservation measures for
areable land (private land)
(i) Farm Pond/Khet talai Nos 0 261000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(ii) Khadeen Nos 0 233000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(iii) Repair of existing Khadeen Nos 0 200000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(iv) Waterharvesting st.(tanka) Nos 187 162000 302.94 0 0.00 0 0.00 20 32.40 99 160.38 68 110.16 0.00 0.00 187 302.94
(v) Earthen Bund m 0 256 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(vi) Vegetative Barrier (Thor) m 729 183 1.33 0 0.00 0 0.00 100 0.18 300 0.55 329 0.60 0.00 0.00 729 1.33
(vii) Agro Forestry No. 1870 20 0.37 0 0.000 0 0.000 200 0.04 990 0.198 680 0.14 0.00 0.000 1870 0.37
2 Conservation measures for non
areable land
(i) Silvi Pasture development Ha 20 102160 20.43 0 0.00 0 0.00 20 12.32 0 3.80 0 2.25 2.06 20 20.43
(ii) Waterharvesting st.(Nadi) Nos 0 2000000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0 0.00
(iii) stangle Trenches Nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0 0.00
(iv) Waterharvesting st.(tanka) Nos 0 150000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
3 Drainage line treatment 0 0.00
(i) LSCD Nos 0 13300 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.00 0 0.00
TOTAL (B) 2806 325.080 0 0.00 340 44.94 1389 164.93 1077 113.15 0.00 2.06 2806 325.08
VIII Production System 10% 58.050 5.81 40.64 11.61
(1) Crop Demonstration
i Single Crop No. 500 5000 25.00 0 0.000 0 0.000 100 5.00 200 10.000 200 10.000 0 0.000 500 25.00
ii Enter Cropping No. 149 8000 11.92 0 0.000 0 0.000 20 1.60 20 1.600 109 8.720 0 0.000 149 11.92
(2) Dry land Horticulture No. 20 15000 3.00 0 0.000 0 0.000 10 1.50 6 0.900 4 0.600 0 0.000 20 3.00
(3) Homestead Kitchen Garden No. 20 500 0.10 0 0.000 0 0.000 0 0.00 10 0.050 10 0.050 0 0.000 20 0.10
(4) Compost Pit No. 20 10000 2.00 0 0.000 0 0.000 4 0.40 10 1.000 6 0.600 0 0.000 20 2.00
(5) Sprinklers and Drip irrigation No. 0 30000 0.00 0 0.000 0 0.000 0 0.00 0 0.000 0 0.000 0 0.000 0 0.00
(6) Live Stock Management 0 0.00
(i) Fodder Demonstration No. 6 2000 0.12 0 0.000 0 0.000 2 0.04 2 0.040 2 0.040 0 0.000 6 0.12
(ii) Mangers Distribution No. 35 5200 1.82 0 0.000 0 0.000 10 0.52 10 0.520 15 0.780 0 0.000 35 1.82
(iii) Live Stock Development
Activities No. 2% 11.61 0 0.000 0 0.000 3.48 4.644 3.483 0 0.000 0 11.61
(iv) Cattel shed No. 20 12000 2.40 0 0.000 0 0.000 4 0.48 3 0.360 13 1.560 0 0.000 20 2.40
(v) Urea Molasis No. 8 1000 0.08 0 0.000 0 0.000 2 0.02 3 0.030 3 0.030 0 0.000 8 0.08
TOTAL (C) 81 58.050 0.00 0.00 0.00 0.00 152.00 13.04 264.00 19.14 362.00 25.86 0.00 0.00 778.00 58.05
IX lielyhood and micro enterprise 9% 52.25 5.81 29.03 17.42
(1) Seed moeney to SHG 133 25000 33.021 0 0.000 0 0.000 14 3.500 92 23.000 27 6.521 0 0.000 133 33.02
(2) Seed moeney to
Microenterprise individuals 21 25000 5.225 0 0.000 0 0.000 10 2.500 8 2.000 3 0.725 0 0.000 21 5.22
(3) Grant in aid to Federation of
SHG individual (10 %
maximum of 9% amount) 7 200000 14.000 0.000 0 0.000 0 0.000 2 4.000 5 10.000 0 0.000 7 14.00
TOTAL (D) 161 52.245 0.000 0.000 0.000 0.000 24.000 6.000 102.000 29.000 35.000 17.245 0.000 0.000 161.0 52.245
X CONSOLIDATED PHASE 3% 17.415 0.000 0.000 0.000 0.000 10.449 6.966 3% 17.42
GRAND TOTAL 580.50 0.00 3.48 0.00 48.47 516.00 85.46 1755 236.00 1474 180.93 0.00 26.15 3745 580.50
CHAPTER-5.1
Name of the Project
BARMER (IWMP)-52 Macro/Micro
CLSTER Geographical Area
2782 Ha
G.P.
UDASAR
Scheme
IWMP
Effective Area 1980 Ha
Block
DHORIMANNA
Date of Sanction 05.08.2011
Total Arable land 1979 Ha
District.
BARMER
Date of Appoval of the
work plan
1. Irrigated 630 Ha
Village Covered
3 NO.
2. Unirrigated 1349 Ha
Project outlay
297.00 LAC
No. of SHG's formed 2
Total Nonarable land 1 Ha
Total Area
1980 Hactare
No. of UG's formed 5
1. Pasture 0 Ha
No. of WC's formed
1
2. Govt. / waste /OTHER
LAND 1 Ha
ANNUAL ACTION PLAN THROUGH PROJECT
S.
N. NAME OF ACTIVITY Unit QTY.
Unit
cost AMOUNT
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
TOTAL ZEROT
YEAR FIRST YEAR
SECOND
YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 29.70 5.940 5.940 5.940 5.940 5.940 10% 29.70
II Monitoring 1% 2.970 0.594 0.594 0.594 0.594 0.594 1% 2.97
III Evaluation 1% 2.970 1.485 1.485 1% 2.97
IV Entry point activity 4% 11.880 12 11.880 4% 11.88
V Inst. & Capacity Building 5% 14.850 5.198 4.455 3.713 0.743 0.743 5% 14.85
VI DPR Preparation 1% 2.970 1 1.782 1 1.188 1% 2.97
TOTAL (A) 65.34 1.782 24.800 10.989 11.732 7.277 8.762 65.34
W/S WORK PHASE
VII NRM 56% 166.320 0.00 0.00 22.28 84.20 59.85 0.00 166.32
1 Conservation measures for
areable land (private land)
(i) Farm Pond/Khet talai Nos 0 261000 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(ii) Khadeen Nos 0 233000 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(iii) Repair of existing Khadeen Nos 0 200000 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(iv) Waterharvesting st.(tanka) Nos 102 162000 165.24 0 0.00 0.00 0.00 14 22.68 52 84.24 36 58.32 0.00 0.00 102 165.24
(v) Earthen Bund m 0 256 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(vi) Vegetative Barrier (Thor) m 479 183 0.88 0 0.00 0.00 0.00 0 0.00 100 0.18 379 0.69 0.00 0.00 479 0.88
(vii) Agro Forestry No. 1020 20 0.20 0 0.000 0 0.000 140 0.03 520 0.104 360 0.07 0.00 0.000 1020 0.20
2 Conservation measures for non
areable land
(i) Silvi Pasture development Ha 0 102160.0 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0 0.00
(ii) Waterharvesting st.(Nadi) Nos 0 2000000 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0 0.00
(iii) stangle Trenches Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0 0.00
(iv) Waterharvesting st.(tanka) Nos 0 150000 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
3 Drainage line treatment
(i) LSCD Nos 0 13300 0.00 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0.00 0 0.00
TOTAL (B) 1601 166.320 0.00 0.00 154 22.71 672 84.53 775 59.08 0.00 0.00 1601 166.32
VIII Production System 10% 29.70 2.97 20.79 5.94
(1) Crop Demonstration
i Single Crop No. 270 5000 13.50 0 0.000 0 0.000 20 1.00 150 7.500 100 5.000 0 0.000 270 13.50
ii Enter Cropping No. 50 8000 4.00 0 0.000 0 0.000 10 0.80 20 1.600 20 1.600 0 0.000 50 4.00
(2) Dry land Horticulture No. 5 15000 0.75 0 0.000 0 0.000 2 0.30 2 0.300 1 0.150 0 0.000 5 0.75
(3) Homestead Kitchen Garden No. 20 500 0.10 0 0.000 0 0.000 0 0.00 10 0.050 10 0.050 0 0.000 20 0.10
(4) Compost Pit No. 11 10000 1.10 0 0.000 0 0.000 1 0.10 4 0.400 6 0.600 0 0.000 11 1.10
(5) Sprinklers and Drip irrigation No. 0 30000 0.00 0 0.000 0 0.000 0 0.00 0 0.000 0 0.000 0 0.000 0 0.00
(6) Live Stock Management 0 0.00
(i) Fodder Demonstration No. 10 2000 0.20 0 0.000 0 0.000 3 0.06 3 0.060 4 0.080 0 0.000 10 0.20
(ii) Mangers Distribution No. 50 5200 2.60 0 0.000 0 0.000 10 0.52 30 1.560 10 0.520 0 0.000 50 2.60
(iii) Live Stock Development
Activities No. 2% 5.94 0 0.000 0 0.000 1.78 2.376 1.782 0 0.000 0 5.94
(iv) Cattel shed No. 12 12000 1.44 0 0.000 0 0.000 2 0.24 6 0.720 4 0.480 0 0.000 12 1.44
(v) Urea Molasis No. 7 1000 0.07 0 0.000 0 0.000 2 0.02 2 0.020 3 0.030 0 0.000 7 0.07
TOTAL (C) 91 29.70 0.00 0.00 0.00 0.00 50.00 4.82 227.00 14.59 158.00 10.29 0.00 0.00 435.00 29.70
IX lielyhood and micro enterprise 9% 26.73 2.97 14.85 8.91
(1) Seed moeney to SHG 65 25000 16.057 0 0.000 0 0.000 7 1.750 47 11.750 11 2.557 0 0.000 65 16.06
(2) Seed moeney to
Microenterprise individuals 11 25000 2.673 0 0.000 0 0.000 5 1.250 4 1.000 2 0.423 0 0.000 11 2.67
(3) Grant in aid to Federation of
SHG individual (10 %
maximum of 9% amount) 4 200000 8.000 0.000 0 0.000 0 0.000 1 2.000 3 6.000 0 0.000 4 8.00
TOTAL (D) 80 26.730 0 0.000 0 0.000 12 3.000 52 14.750 16 8.980 0 0.000 80.0 26.730
X CONSOLIDATED PHASE 3% 8.910 0.000 0.000 0.000 0.000 5.346 3.564 3% 8.91
GRAND TOTAL 297.00 0.00 1.78 0.00 24.80 216.00 41.52 951 125.59 949 90.98 0.00 12.33 2116 297.00
CHAPTER-V
Name of the Project BARMER (IWMP)-52 Macro/Micro
CLUSTER Geographical Area
12419 Ha
G.P.
DHORIMANNA,LUKHU,UDASAR Scheme IWMP
Effective Area 8200 Ha
Block
DHORIMANNA
Date of Sanction 05.08.2011
Total Arable land 8060 Ha
District.
BARMER
Date of Appoval of the
work plan
1. Irrigated 3006 Ha
Village Covered
13 NO.
2. Unirrigated 5054 Ha
Project outlay
1230 LAC
No. of SHG's formed 12
Total Nonarable land 140 Ha
Total Area
8200 Hactare
No. of UG's formed 16
1. Pasture 0 Ha
No. of WC's formed 3
2. Govt. / waste /OTHER
LAND 140 Ha
ANNUAL ACTION PLAN THROUGH PROJECT
S.
N. NAME OF ACTIVITY Unit QTY.
Unit
cost AMOUNT
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
TOTAL ZERO
YEAR FIRST YEAR
SECOND
YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 123.00 24.60 24.60 24.60 24.60 24.60 10% 123.00
II Monitoring 1% 12.30 2.46 2.46 2.46 2.46 2.46 1% 12.30
III Evaluation 1% 12.30 6.15 6.15 1% 12.30
IV Entry point activity 4% 49.20 49 49.20 4% 49.20
V Inst. & Capacity Building 5% 61.50 21.53 18.45 15.38 3.08 3.08 5% 61.50
VI DPR Preparation 1% 12.30 1 7.380 1 4.92 1% 12.30
TOTAL (A) 270.60 7.380 102.71 45.51 48.59 30.14 36.29 270.60
W/S WORK PHASE
VII NRM 60% 688.80 0.00 0.00 92.25 348.71 247.85 2.58 691.38
1 Conservation measures for
areable land (private land)
(i) Farm Pond Nos 0 261000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
(ii) Khadeen Nos 0 233000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
(iii) Repair of existing Khadeen Nos 0 200000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
(iv) Waterharvesting st.(tanka) Nos 394 162000 638.28 0 0.00 0 0.00 49 79.38 211 341.82 134 217.08 0 0.00 394 638.28
(v) Earthen Bund m 0 256 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
(vi) Vegetative Barrier (Thor) m 2291 183 4.19 0 0.00 0 0.00 400 0.73 700 1.28 1191 2.18 0 0.00 2291 4.19
(vii) Agro Forestry No. 3940 20 0.79 0 0.00 0 0.00 340 0.07 1810 0.36 1790 0.36 0 0.00 3940 0.79
2 Conservation measures for non
areable land
(i) Silvi Pasture development Ha 25 102160.0 25.54 0 0.00 0 0.00 25 15.47 0 4.70 0 2.79 0 2.58 25 25.54
(ii) Waterharvesting st.(Nadi) Nos 1 2000000 20.00 0 0.00 0 0.00 0 0.00 0 0.00 1 20.00 0 0.00 1 20.00
(iii) stangle Trenches Nos 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
(iv) Waterharvesting st.(tanka) Nos 0 150000 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
3 Drainage line treatment
(i) LSCD Nos 0 13300 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
TOTAL (B) 6651 688.80 0 0.00 0 0.00 814 95.65 2721 348.16 3116 242.41 0 2.58 6651 688.80
VIII Production System 10% 123.00 12.30 86.10 24.60
(1) Crop Demonstration
i Single Crop No. 1040 5000 52.00 0 0.000 0 0.000 170 8.500 470 23.500 400 20.000 0 0.000 1040 52.00
ii Enter Cropping No. 299 8000 23.92 0 0.000 0 0.000 60 4.800 80 6.400 159 12.720 0 0.000 299 23.92
(2) Dry land Horticulture No. 35 15000 5.25 0 0.000 0 0.000 17 2.550 11 1.650 7 1.050 0 0.000 35 5.25
(3) Homestead Kitchen Garden No. 60 500 0.30 0 0.000 0 0.000 0 0.000 30 0.150 30 0.150 0 0.000 60 0.30
(4) Compost Pit No. 40 10000 4.00 0 0.000 0 0.000 7 0.700 18 1.800 15 1.500 0 0.000 40 4.00
(5) Sprinklers and Drip irrigation No. 0 30000 0.00 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.00
(6) Live Stock Management 0 0.00 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.00
(i) Fodder Demonstration No. 26 2000 0.52 0 0.000 0 0.000 9 0.180 8 0.160 9 0.180 0 0.000 26 0.52
(ii) Mangers Distribution No. 135 5200 7.02 0 0.000 0 0.000 40 2.080 55 2.860 40 2.080 0 0.000 135 7.02
(iii) Live Stock Development
Activities No. 0 2% 24.60 0 0.000 0 0.000 0 7.380 0 9.840 0 7.380 0 0.000 0 24.60
(iv) Cattel shed No. 43 12000 5.16 0 0.000 0 0.000 10 1.200 12 1.440 21 2.520 0 0.000 43 5.16
(v) Urea Molasis No. 23 1000 0.23 0 0.000 0 0.000 6 0.060 9 0.090 8 0.080 0 0.000 23 0.23
TOTAL (C) 1701 123.00 0 0.00 0 0.00 319 27.45 693 47.89 689 47.66 0 0.00 1701.00 123.00
IX lielyhood and micro enterprise 9% 110.70 10 6.03 8 19.63 7 11.30
(1) Seed moeney to SHG 281 25000 69.63 0 0.000 0 0.000 31 7.750 193 48.250 57 13.630 0 0.000 281 69.630
(2) Seed moeney to
Microenterprise individuals 45 25000 11.07 0 0.000 0 0.000 19 4.750 20 5.000 6 1.320 0 0.000 45 11.070
(3) Grant in aid to Federation of
SHG individual (10 %
maximum of 9% amount) 15 200000 30.00 0 0.000 0 0.000 0 0.000 4 8.000 11 22.000 0 0.000 15 30.000
TOTAL (D) 2254 110.70 0 0.000 0 0.000 50 12.500 217.00 61.250 74 36.950 0.00 0.00 341.00 110.70
X CONSOLIDATED PHASE 3% 36.90 0.000 0.000 0.000 0.000 22.14 14.76 3% 36.900
GRAND TOTAL 1230.00 0 7.38 0 102.71 1183 181.11 3631 505.89 3879 379.29 0.00 53.63 8693 #####
CHAPTER – VI EXPECTED OUT COMES 1 2 3 4 5 6
S. No. Item Unit of
measurement Pre-project
Status Expected Post-project Status
Remarks
1 Status of water table (Depth to Ground water level)
Meters 76.20 76.00
2 Ground water structures repaired/ rejuvenated
No. - 13
3 Quality of drinking water Description saline good 4 Availability of drinking water Description 140000 lt/day 200000 lt/day 5 Change in irrigated Area Ha 1305 3006 6 Change in cropping/ land use pattern Description 7 Area under agricultural crop Ha
I Area under single crop 5239 6000 Ii Area under double crop 1305 3006 Iii Area under multiple crop 0 500
8 Change in cultivated Area Ha 5239 6000 9 yield of major crops of area
Yield of Bajra q/ha 1.50 2.00 Yield of Jeera q/ha 4.50 5.00 Yield of Isabgol q/ha 5.00 5.50 Yield of Arandi q/ha 6.50 7.00
10 production of major crops of area
Production of Bajra ton 444.75 593.00 Production of Jeera ton 629.55 699.50 Production of Isabgol ton 233.50 256.85 Production of Arandi ton 152.75 164.50
11 Area under vegetation Ha 0 25 12 Area under horticulture Ha 0 17.50 13 Area under fuel Ha 0 10 14 Area under Fodder Ha 0 82 15 Fodder production Q 240340 340607.05 16 Milk production Litres/day 6900 10000 17 SHGs Active No. 10 281 18 No. of enterprising individuals No. 0 45 19 Income Rs.in la 24784 36000 20 Migration No. 1817 950 21 SHG Federations formed No. 0 15
Critical Assumption
No severe droughts/ unexpected floods/ natural disasters
Adequate funds are allocated for the same and released on time.
There is no significant pest/ disease attack, and if so, then it will have been contained before
irreversible damage is done.
Adverse market conditions do not persist long.
Sound macro-economic and growth conditions continue and the benefits are widely distributed
particularly in the rural areas.
Facilitating agencies and resource providers have the required competent staff so that timely and
appropriate technical advice and services are provided to farmers whenever required.
The Capacity Building Plan is implemented, monitored and modified to address evolving needs and
feedback from participants.
Means of Verification of indicators
Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning,
mid-term and end of the project period
Annual participatory assessment by communities during project period.
Regular project monitoring reports prepared by project monitoring teams/ agencies.
Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/ Individual
beneficiaries/project-related village and local bodies/PRIs.
External review missions
Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation,
Animal Husbandry
CHAPTER VII TECHNICAL DESIGNS AND ESTIMATES
Estimate of Pasture Development GKN + FOREST BSR 1.4.2013 1. Plantation Unit&
5. Periferi Length -1400 m
2. Plantation - Per Ha 400
6. Periferi Lenth per Ha -140 m
3. Planting Distance - 5 m X 5 m
7. Labor Rate- 147 Per day
4. Model Calculation - 10 Ha
8. Total -Five Year
Forest Year & 0 Year
10 Ha
No of Angles/Blocks 311
1400 RM
S.NO Work Particulars Unit Qty Labour Total Labour Total
1 Survey of the area by chain and compass, demarcation, layout and lien cutting and making kachhi muddis
Ha 10 121.04 121.04 1210.4 1210.40
2 Jungle clearance, removing of local bushes stone pebbles etc. Sqm 50000 1.50 1.50 75000 75000.00
3 Jungle clearance, removing of useless tress of 30 cm girth completely from root etc.
Sqm 50000 1.80 1.90 90000 95000.00
4
Making cement, Bajri, Concrete block of size ((25*25)+(15*15))/2x30 cubic cm near water wource and curing 6 times in three days. (Cement, Bajri, Concret mixture 1:4:8) with 20 mm agg size
NO. 311 4.56 29.04 1418.16 9031.44
5 Suply of iron angle 35x35x5 mm of 1.5 m Kg 1400 0.00 46 0.00 64377.00
6 Drilling of holes in the angles NO. 1244 0.82 0.82 1020.08 1020.08
7
Cutting of lower 10 cm of angle iron post and bent it in shape of fork or welding 10-15 cm long angle piece on lower portion of prepared angle
NO. 311 2.53 2.53 786.83 786.83
8 Suply of Barbed wire Kg 840 0.00 65 0 54600.00
9 Suply of Binding wire Kg 8.40 0.00 65 0 546.00
10 Cement, Bajri, concrete block transport by camel cart 0 to 5 km NO. 311 0 9.25 0 2876.75
11 Loading and unloading of cement concrete block in vehicle NO. 311 1.85 1.85 575 575.35
12 Fixing of cement concrete block in a pit of size 30cm x 30cm x 40cm. ( Including local transport and pit digging)
NO. 311 11.00 11.00 3421 3421.00
13 Strenching of barbed wire and fixing it with the post with thin wire NO. 5600 1.24 1.24 6944 6944.00
14 Interlacing the barbed wire with
(a) Locally available bushy material at 15 cm spacing Rm 1610 7.40 7.40 11914 11914.00
(b) Barbed wire at 15 cm spacing Rm 0 10.07 10.07 0 0.00
15
Mulching on shifting sand dunes usig locally available material against the wind direction in parallel lines (including cutting and trasnport of local shrubs upto a distance of 500 meters). Height of mulching should not be less than 30cms.
Rm 467 7.40 7.40 3455.8 3455.80
16 Digging of pits of size (0.50+0.40)/2m x (0.50+0.40)/2m x 0.45m including alignment for plants
NO. 4000 6.60 6.60 26400 26400.00
17 Cost of Plant NO. 4000 0 8.00 0 32000.00
18 Loading of plants from beds to vehical or unloading of plants from vehicle and arranging them in beds. 12.5x30 cm size
NO. 4000 0.18 0.18 720 720.00
19 Transportation of plants from nursery to plantation site by camel cart ( as per bill)
NO. 4000 0 2.52 0 10080.00
20 Treatment of plants in nurseries using insectcides NO. 4000 0.28 0.28 1120 1120.00
21 Cost of insecticide ( as per bill) NO. 4000 0 0.50 0 2000.00
22 Planting of plants on normal land NO. 4000 3.20 3.20 12800 12800.00
23 Construction of thawala of 50 cm semicircle on normal land NO. 4000 1.92 1.92 7680 7680.00
24 Watering to plants ( 15 ltrs per plant) just after watering NO. 4000 2.00 2.00 8000 8000.00
25 Water transportation from upto 2km NO. 4000 0.00 1.57 0 6280.00
26 Suply/ Collection of sewan Grass @ 6kg/Ha kg 60 0 67.5 0 4050.00
27 Construction of cattle hut NO. 1 3000 5000 3000 5000.00
28 Construction of pillars of RR Stone masonry in cement mortar (1:6) NO. 2 750 2500 1500 5000.00
29 Plantation Board NO. 1 500 3000 500 3000.00
30 Plantation Gate kg 100 11.9 62.10 1190 6210.00
31 Construction of Tanka NO. 1 37500 150000 37500 150000.00
32 Providing & laying of enamel paint on pillar & gate on new surface Sqm 11.25 32.20 82.00 362.25 922.50
;ksx%& 295798 603021
Forest Plantation- First year 10 Ha
32 Digging of pits of size (0.50+0.40)/2m x (0.50+0.40)/2m x 0.45m including alignment for plants
NO. 800 3.30 3.30 2640 2640
33 Making of Thawala and first watering to gap filled plants NO. 800 2.96 2.96 2368 2368
34 Cost of gap filled Plants 80 Plants per ha NO. 800 0 8.00 0 6400
35 Planting of gap filled plants NO. 800 3.20 3.20 2560 2560
36 Loading of plants from beds to vehical or unloading of plants from vehicle and arranging them in beds. 12.5x30 cm bag size
NO. 800 0.18 0.18 144 144
37 Transportation of plants from nursery to plantation site by camel cart ( as per bill)
NO. 800 0.00 2.52 0 2016
38 Treatment of plants with insecticide NO. 800 0.28 0.78 224 624
39 Seed sowing By tractor Ha 10 456 869 4560 8690
40 Watering to( 400 plants per ha) four times in a year. NO. 16000 2.00 2.00 32000 32000
41 Water transportation from upto 2km NO. 16000 0.00 1.57 0 25120
42 One Hoeing and weeding after rain and 3 times hoeing after watering
NO. 4000 6.84 6.84 27360 27360
43 Afterlook and Protection Month 12 4471.25 4471.25 53655 53655
Total 125511 163577
Forest Platation- second year 10 Ha
32 Digging of pits of size (0.50+0.40)/2m x (0.50+0.40)/2m x 0.45m including alignment for plants
NO. 800 3.30 3.30 2640 2640
33 Making of Thawala and first watering to gap filled plants NO. 800 2.96 2.96 2368 2368
34 Cost of gap filled Plants 80 Plants per ha NO. 800 0 8.00 0 6400
35 Planting of gap filled plants NO. 800 3.20 3.20 2560 2560
36 Loading of plants from beds to vehical or unloading of plants from vehicle and arranging them in beds. 12.5x30 cm bag size
NO. 800 0.18 0.18 144 144
37 Transportation of plants from nursery to plantation site by camel cart ( as per bill)
NO. 800 0.00 2.52 0 2016
38 Treatment of plants with insecticide NO. 800 0.28 0.78 224 624
39 Watering to( 400 plants per ha) four times in a year ONLY 70% NO. 11200 2.00 2.00 22400 22400
40 Water transportation from upto 2km NO. 11200 0.00 1.57 0 17584
41 One Hoeing and weeding after rain and 3 times hoeing after watering
NO. 2800 6.84 6.84 19152 19152
42 Afterlook and Protection Month 12 4471.25 4471.25 53655 53655
Total 103143 129543
Forest Platation- third year 10 Ha
43 Water transportation from upto 2km NO. 2800 0 1.57 0 4396
44 70 percent watering of Plants NO. 2800 2.00 2.00 5600 5600
45 Hoeing and weeding of 70 percent plants NO. 2800 2.4 2.4 6720 6720
46 Prooning of 20 percent Plants NO. 800 1.20 1.20 960 960
47 Afterlook and Protection Month 12 4471.25 4471.25 53655 53655
Total 66935 71331
Forest Platation- four year 10 Ha
48 Repair of fencing Rm 1400 0.22 0.33 308 462
49 Afterlook and Protection
Month 12 4471.25 4471.25 53655 53655
Total 53963 54117
Grant Total 645350 1021589
eksMy foLrr̀ ykxr vuqeku
1 dk;Z dk uke & Vkadk fuekZ.k
2 xzke iapk;r & Dhorimanna
xkao dk uke
& Dhorimanna 3 ;kstuk dk uke & IWMP (2011-12)
iapk;r lfefr & /kksjheUuk
Hkkx ¼ v ½ ek=kvksa dk fooj.k
dz-
la- xfrfo/kh dk fooj.k
eki dk fooj.k ¼ QhV esa ½ ek=k nj jkf'k
?kVd yEckbZ pkSM+kbZ ÅWapkbZ ?ku ehVj@
oxZ ehVj Je dqy Je dqy
1 uhao [kqnkbZ 1-5 eh- xgjkbZ rd feV~Vh dh [kqnkbZ
djuk ry dks dqVuk] ikuh Mkyuk] caxy dks
laokjuk] [kqnh feV~Vh dks fudkyuk uhao Hkjus ds
ckn [kkyh LFkkuksa dks iqu% feV~Vh ls Hkjuk rFkk
cph gqbZ feV~Vh dks 50 eh dh nwjh rd fuLrkj.k
djuk l[r feV~Vh es
/4 X 3.80 X 3.80 X 3.95 = 44.82 Cum 100 100 4482 4482
iSjkisV nhokj X 14.15 X 0.35 X 0.30 = 4.67 Cum 100 100 467 467
2 feV~Vh dk vfrfjDr mBku 1-5 ehVj ds ckn /4 X 3.80 X 3.80 X 1.50 = 17.02 Cum 12 12 204 204
3 feV~Vh dk vfrfjDr mBku 3-0 ehVj ds ckn /4 X 3.80 X 3.80 X 0.95 = 10.78 Cum 24 24 259 259
4 lhesUV dkaØhV Q'kZ esa 40 fe- eh- ukeh; eki dh
iRFkj fxÍh @ bZV dh fxÍh lhesUV&jsr elkyk]
1 lhesUV % 4 jsr % 8 fxÍh vuqikr esa feykdj
Mkyuk rFkk dqVkbZ djuk] rjkbZ lesrA /4 X 3.80 X 3.80 X 0.25 = 2.84 Cum 358 1964 1015 5571
5 lhesaV dkØhaV 1 lhesaV] 3 ctjh rFkk 6 fxêh
iRFkj dh 20 fe-eh- ukeh; eki dh uhao es Mkyuk X 3.65 X 0.15 X 3.70 = 6.37 Cum 358 2498 2279 15904
6 lsUVfjax&'kVfjax dk dk;Z oØ lrg ds fy;s
yxkuk 4-5 ehVj ÅapkbZ rd ds fy, rFkk gVkuk
vkfn X 3.50 X 3.70 = 40.70 Sqm 78.1 126 3179 5128
7 uhao rFkk dqlhZ es iRFkj dh os j)k&<+ksdk fpukbZ
lhesaV&ctjh 1 % 6 elkys es] e; cxy dh f>jh
cUn djuk rFkk rjkbZ vkfnA
X 3.85 X 0.35 X 0.45 = 1.91
X 0.3 X 0.35 X 0.3 = -0.09
X 0.6 X 0.35 X 0.10 = -0.06
dqy ek=k 1.75 Cum 525 2338 918 4087
8 uhao rFkk dqlhZ es iRFkj dh os j)k&<+ksdk fpukbZ
lhesaV&ctjh 1 % 8 elkys es] e; cxy dh f>jh
cUn djuk rFkk rjkbZ vkfnA
X 14.15 X 0.35 X 0.75 = 11.67
X 0.75 X 0.35 X 0.38 = -0.10
dqy ek=k 11.58 Cum 525 2240 6077 25929
9 Vkadks ¼dq.Mksa½ ds Åij ifV~V;ksa dh Nr Mkyuk]
lhesaV elkyk 1%3 ls tksM+ Hkjuk] 50 feeh eksVkbZ
esa lhesaV dzadzhV 1%2%4 dk Q'kZ dk dk;Z laiwfrZ
lfgr] iw.kZ dk;Z
/4 X 4.20 X 4.20 = 13.86 Sqm 201 1002 2786 13888
10 50 eh- eh- eksVkbZ esa lhesaV dadzhV Q'kZ 1%2%4
feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh 12
feeh fxVV̀h ds lkFk feykdj Mkyuk] dwVuk]
nckuk rFkk rjkbZ vkfn lesr A iRFkj dh fxV~Vh
/4 X 3.50 X 3.50 = 9.63
dqy ek=k 9.63 Sqm 101 243 972 2339
11 lhesaV IykLVj nhokj ij 1%4 vuqikr es
lhesaV&ctjh feykdj tksMksa dks dqjsnus rFkk
rjkbZ lesrA 20 feeh
X 3.5 X 4.15 = 45.65
X 4.2 X 0.45
= 5.94
X 14.15 X 0.80 = 35.58
X 0.3 X 0.30
= -0.27
dqy ek=k 86.90 Sqm 52 116 4519 10080
12 iRFkj ds fljny ¼fyVay½ dh vkiwfrZ dj] fpukbZ
es mi;ksx dh xbZ elkys es mls yxkukA
4 X 3.35 X 0.08 X 0.25 = 0.27
3 X 0.6 X 0.35 X 0.1 = 0.06
dqy ek=k 0.33 Cum 2292.2 10232 759 3387
13 dSpesaV ,jh;s ds fy;s Dosjh jfcl ftlesa 40
izfr'kr iRFkj ds Liky gks ;k dadzj ;k ?kkaMyk
dks fcNkuk rFkk vkiwfÙkZ djuk] ikuh fNM+duk
rFkk nqjeV ls dwVukA
X 9 X 4.8 X 0.15 = 20.37 Cum 102 461 2077 9389
14 s 50 eh- eh- eksVkbZ esa lhesaV dadzhV Q'kZ 1%2%4
feJ.k ftlesa 1 lhesaV 2 ctjh 4 iRFkj dh 12
feeh fxVV̀h ds lkFk feykdj Mkyuk] dwVuk]
nckuk rFkk rjkbZ vkfn lesr A iRFkj dh fxV~Vh X 9 X 4.8 = 135.77 Sqm 101 243 13713 32992
15 yksgs ds ,saxy 40X40X5mm yxkus dk dk;Z X 1.5
@ 3.5kg/m
= 94.50 Kg 2.9 62.1 274 5868
16 ckjcsM+ ok;j vkiwfrZ djuk o yxkus dk dk;Z X 17.15 X 4 = 41.46 Kg 68 0 2819
17 Vkads esa tkyh yxkus dk dk;Z] ftlesa ,saxy Qzse
25]25]3 ds mij ok;jes'k 14eS'kX 24xSt rFkk
piVh @xksy NM+ksa 10eheh O;kl o Lisflax 10
lseh- dks oSYM djuk lhesaV elkyk 1%4 esa yxkus
dk lEiw.kZ dk;Z A
X 0.3 X 0.3 = 0.27 Sqm 332 1322 90 357
18 ,sY;wfefu;e dk <+Ddu e; Qzse vkiwfrZ djuk ,oa
yxkus dk dk;Z
0.6 X 0.6
= 1 Nos 750 0 750
19 njoktk fxzy@xzsV vkfn esa ykSgs dk dk;Z ftlesa
likV] dksfu;k] Vh rFkk ukyhnkj psuy dks
dkVuk] p<+kuk rFkk yxkuk 0.75 X 1.2 = 13.50 Kg 2.9 62.1 39 838
20 iRFkj ds dke ij likV ;k #YM Vhi 1%3
vuqikr esa lhesaV ctjh elkys esa e; rjkbZ ds A X 14.5 X 0.45 = 20.51 Sqm 51 62.4 1046 1280
22 vksojQyks ikbZi ihohlh 63@3 = 6.00 Mt 60 0 360
23 bukfey isUV dk ysi djuk u;s dk;Z@iqjkus dk;Z
ij le ljQsl cukukA vLrj ysi lfgr 18 X 0.26 + 1 X 1.0
=
12.58 Sqm 32.20 88 405 1107
24 uke ifVV̀dk vkiwfrZ djuk o yxkuk = 1 Nos 500 0 500
25 vfrfjDr 20 fdeh ls vf/kd nwjh gsrw 9263
;ksx 45559 157247
dUVhtsUlh 4717
egk;ksx 45559 161965
SAY 162000.00
lhesUV 115 Bags Rate Distance Km Amount
Ctjh 13.66 Cum. 6.30 20 70 4303
fxV~Vh 20eh-eh- 12.64 Cum. 6.80 20 68 4126
fxV~Vh 40eh-eh- 2.55 Cum. 6.80 20 68 833
LVksu Lysc 1.22 Cum. 6.80 20 20 0
iRFkj 14.66 Cum. 6.80 20 20 0
Total
9263
DESIGN OF AGOR FOR TANKA IN BARMER DISTRICT
(For watershed projects)
Capacity of Tanka = 40000 Lit. (Aprox.)
Average rainfall of Distt. = 270mm (Annual)
Capacity of Tanka = Area of Agor x Av. Rainfall
450.00= /4 x( D x D x 0.27 )
D x D = (40.0x4) / ( x0.27)
D = 13.731 Mtrs.
Say D = 13.80 Mtrs.
Model Estimate of Vegetative Barrier
Name of work
Vegetative Barrier Name of watershed
project
Barmer (IWMP) -52
Lenth 100 Mtrs.
S. NO. Particular UNIT Qty
Rate Amount
Labour Total Labour Total
1 Cutting and clearing at ordinary jungl including bushes,shurbs grasses on field boundry.
1 X 100.00 X 1.00 Sq.Mtr. 100 4.00 4.00 400 400
2 Transportation of thor sticks from nursery to plantation site by vehical including cost of thor stick.
@ 12 sticks per Mtr. No. 1200 11 0 13200
3 Loading of planting sticks from beds to vehiclae or unloading of planting sticks from vehicle No.
1200 0.31 0.31 372 372
4 Planting of thor sticks in plain or undulating fields. No.
1200 3.20 3.20 3840 3840
5 Contigency 3 percent 534
Total 400 18346
Labour 400
Material 17900
Total 18300
Material Thor sticks 1200 Nos.
Cost per running Mtr. 183
MODEL ESTIMATE OF COMPOST PIT
SNo Item No Length Width Depth/Height Qnty FPS
Qnty MKS
Unit RATE AMOUNT
LAB Rate
Total Rate
Lab Amnt
Total Amnt
1 Excavation of earthwork in foundation in ordinary soil
LW 2 11 0.75 1 16.5
SW 2 4 0.75 1 6
22.5 0.64 CUM 82 82 52.21 52.21
2
Cement Brick masonry in cement mortar (1:3) including cement plaster in cement mortar (1:3) for foundation & plinth
LW 2 11 0.5 1 11
SW 2 4 0.5 1 4
15 0.42 CUM 993 3961 421.53 1681.44
3
Cement Brick masonry in cement mortar (1:3) including cement plaster in cement mortar (1:3) for super structure
LW 1 11 0.5 4 22
SW 2 4 0.5 4 16
38 1.08 CUM 993 3961 1067.87 4259.66
5 12 mm thick cement plaster in cement mortar (1:6).
LW 2 11 - 4 88
LW 2 9 - 4 72
SW 2 4 - 4 160
SW 2 3 - 4 232
552 51.3 SQM 52 80 2668 4104
4209 10097
4209 10000
LABOUR 4300
MATERIAL 5700
TOTAL 10000
MODEL ESTIMATE OF MANGER ( FOR TWO ANIMALS)
SNo Item No Length Width Depth/Height Qnty FPS
Qnty MKS
Unit RATE AMOUNT
LAB Rate
Total Rate
Lab Amnt
Total Amnt
1 Excavation of earthwork in foundation in ordinary soil
Pillar 4 1 1 0.75 3
LW 2 5 1 0.75 7.5
SW 2 1 1 0.75 1.5
12 0.34 CUM 82 82 27.85 27.85
2 RRStone masonry in cement mortar (1:6) for foundation & plinth
Pillar 4 1 1 0.75 3
LW 2 5 1 0.75 7.5
SW 2 1 1 0.75 1.5
12 0.34 CUM 525 2166 178.29 735.57
3
RR Cement Brick masonry in cement mortar (1:3) including cement plaster in cement mortar (1:3) for foundation & plinth
Pillar Back 2 1 1 2.75 5.5
Front 2 1 1 2.25 4.5
LW Back 1 6 0.5 2.75 8.25
Front 1 6 0.5 2.25 6.75
SW 2 2 0.5 2.5 5
30 0.85 CUM 993 3961 843.06 3362.89
4 Cement Concrete in cement mortar (1:4:8) with 40 mm Agg size 1 6 2 0.25 3 0.08 CUM 358 1918 30.39 162.84
5 12 mm thick cement plaster in cement mortar (1:6).
Pillar 8 1 - 2.75 22
8 1 - 2.25 18
LW 2 6 - 2.75 33
2 6 - 2.25 27
SW 4 2 - 2.5 20
120 11.15 sqm 52 80 579.93 892.19
1660 5181
1660 5181
SAY 1660 5200
LABOUR 1700
MATERIAL 3500
TOTAL 5200
NAME OF WORK-: Modal estimate of Guar crop demonstration (kharif)
Farmers 1 No
DAP 90 KG
UREA 25 KG
Seed Qnty 10 KG
DETAILED ESTIMATE FOR (1 Ha)
S No
Item NO QUANTITY UNIT RATE AMOUNT
1 Supply of Guar seed of variety RGC-1070.
1 10 kg 280 2800
2 Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
3 Supply of fertilizer
DAP 1 90 kg 18 1620
UREA 1 25 kg 6 150
4 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 125 kg 4 500
5 Supply of Weedicides 500
6 Supply of Weedicides 600
7 Transportation of material 1000
TOTAL 7215
NAME OF WORK-: Modal estimate of Moong crop demonstration (kharif)
Farmers 1 No
DAP 25 KG
UREA 50 KG
Seed Qnty 10 KG
DETAILED ESTIMATE FOR (1 Ha)
S No
Item NO QUANTITY UNIT RATE AMOUNT
1 Supply of Moong seed of variety RMAG-268.
1 10 kg 140 1400
2 Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
3 Supply of fertilizer
DAP 1 25 kg 18 450
UREA 1 50 kg 6 300
4 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 125 kg 4 500
5 Supply of Weedicides 500
6 Supply of Weedicides 600
7 Transportation of material 1000
TOTAL 4795
NAME OF WORK-: Modal estimate of Moth crop demonstration (kharif)
Farmers 1 No
DAP 0 KG
UREA 50 KG
Seed Qnty 10 KG
DETAILED ESTIMATE FOR (1 Ha)
S No
Item NO QUANTITY UNIT RATE AMOUNT
1 Supply of Moong seed of variety RMAG-268.
1 10 kg 100 1000
2 Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
3 Supply of fertilizer
DAP 1 0 kg 18 0
UREA 1 50 kg 6 300
4 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 250 kg 4 1000
5 Supply of Weedicides 700
6 Supply of Pesticides 1000
7 Transportation of material 1000
TOTAL 5045
NAME OF WORK-: Modal estimate of Bazara crop demonstration (kharif)
Farmers 1 No
DAP 90 KG
UREA 0 KG
Seed Qnty 4 KG
DETAILED ESTIMATE FOR (1 Ha)
S No
Item NO QUANTITY UNIT RATE AMOUNT
1 Supply of Moong seed of variety RMAG-268.
1 4 kg 100 400
2 Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
3 Supply of fertilizer
DAP 1 90 kg 18 1620
UREA 1 0 kg 6 0
4 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 125 kg 4 500
5 Supply of Weedicides 700
6 Supply of Pesticides 700
7 Transportation of material 1000
TOTAL 4965
NAME OF WORK-: Modal estimate of Jeera crop demonstration
(Rabi) Farmers 1 No
DAP 50 KG
UREA 50 KG
Seed Qnty 10 KG
DETAILED ESTIMATE FOR (1 Ha) Item NO QUANTITY UNIT RATE AMOUNT
Supply of Guar seed of variety GC-4. 1 10 kg 280 2800
Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
Supply of fertilizer
DAP 1 50 kg 18 900
SULPHUR 1 10 kg 30 300
UREA 1 50 kg 6 300
Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 250 kg 4 1000
Supply of Weedicides 700
Supply of Pesticide 900
Transportation of material 1000
TOTAL 7945
NAME OF WORK-: Modal estimate of Isabgol crop demonstration (Rabi)
Farmers 1 No
DAP 50 KG
UREA 50 KG
Seed Qnty 6 KG
DETAILED ESTIMATE FOR (1 Ha) Item NO QUANTITY UNIT RATE AMOUNT
Supply of Guar seed of variety GI-2. 1 6 kg 120 720
Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
Supply of fertilizer
DAP 1 50 kg 18 900
UREA 1 50 kg 6 300
Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 250 kg 4 1000
Supply of Weedicides 1000
Supply of Pesticide 1000
Transportation of material 1000
TOTAL 5965
NAME OF WORK-: Modal estimate of Jeera crop demonstration
(Rabi) Farmers 1 No
DAP 50 KG
UREA 50 KG
Seed Qnty 10 KG
DETAILED ESTIMATE FOR (1 Ha) Item NO QUANTITY UNIT RATE AMOUNT
Supply of Guar seed of variety GC-4. 1 10 kg 280 2800
Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
Supply of fertilizer
DAP 1 50 kg 18 900
SULPHUR 1 10 kg 30 300
UREA 1 50 kg 6 300
Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 250 kg 4 1000
Supply of Weedicides 700
Supply of Pesticide 900
Transportation of material 1000
TOTAL 7945
NAME OF WORK-: Modal estimate of Isabgol crop demonstration (Rabi)
Farmers 1 No
DAP 50 KG
UREA 50 KG
Seed Qnty 6 KG
DETAILED ESTIMATE FOR (1 Ha) Item NO QUANTITY UNIT RATE AMOUNT
Supply of Guar seed of variety GI-2. 1 6 kg 120 720
Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
Supply of fertilizer
DAP 1 50 kg 18 900
UREA 1 50 kg 6 300
Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 250 kg 4 1000
Supply of Weedicides 1000
Supply of Pesticide 1000
Transportation of material 1000
TOTAL 5965
CHAPTER - VIII Enclosures –
Community Tanka Ran Singh rajpoot ki dhani ke pas Alamsariya
Community Tanka Sata ram ki dhani ke pas Udasar
Community Tanka Ruga ram ki dhani ke pas Udasar
Community Tanka Sobha ram jandu ki dhani ke pas Bheelon ki dhani
Community Tanka Go Seva Sansthan Ajaniyon ki dhani
Community Tanka Goga ji ka Than Khard
Community Tanka Jambeswar mandir Ajaniyon ki dhani
Format for IWMP MIS website
Format -1
Physical Target (Watershed Works)
Name of Project : Barmer- 52 Block: Dhorimanna
Distt.: Barmer
Name of Head Name of Activity Name of Subactivity Total
Target (Quantity)
Unit (ha/nos/Rmt/Cubic
meter)
Financial yearwise Physical Target
2012-13 2013-14 2014-15 2015-16 2016-17
1.Watershed Development Works
1.1 Land Development
(Productive use)
1.1.1 Afforestation (on wasteland)
25 ha
0 25
1.1.2 Afforestation (on
total land including wasteland) ha
1.1.3 Horticulture(on
wasteland) ha
1.1.4 Horticulture(on total
land including wasteland) 17.5 ha
0 8.5 5.5 3.5 0
1.1.5 Agriculture (on
wasteland) ha
1.1.6 Agriculture(on total
land including wasteland) 9.85 ha
0 0.85 4.525 4.475 0
1.1.7 Pasture (on
wasteland) ha
1.1.8 Pasture(on total land
including wasteland) ha
1.1.9 Others (on
wasteland) ha
1.1.10 Others (on total
land including wasteland) 5.73 ha
0 1 1.75 2.98 0
1.2 Soil & Moisture
Conservation 1.2.1 Staggered trenching ha
1.2.2 Countour Bunding ha
1.2.3 Graded Bunding ha
1.2.4 Bench Terracing ha
1.2.5 Others ha
1.3 Vegetative and
Engineering Structure 1.3.1 Earthen Checks Cubic meter
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cubic meter
1.3.4 Loose bolder Cubic meter
1.3.5 Gabion structure Cubic meter
1.3.6 Others nos
1.4 Water
Harvesting Structure (New created)
1.4.1 Farm ponds 0 nos
0 0 0 0 0
1.4.2 Check dams nos
1.4.3 Nallah Bunds nos
1.4.4 Percolation tanks nos
1.4.5 Ground Water
recharge structure nos
1.4.6 Others 394 nos 0 49 211 134 0
1.5 Water
Harvesting Structure
(Renovated)
1.5.1 Farm ponds nos
1.5.2 Check dams nos
1.5.3 Nallah Bunds nos
1.5.4 Percolation tanks nos
1.5.5 Ground Water
recharge structure nos
1.5.6 Others 1 nos 0 0 0 1 0
1.6 Water
Harvesting Structure ( Storage capacity of New structures)
1.6.1 Farm ponds Cubic meter
1.6.2 Check dams Cubic meter
1.6.3 Nallah Bunds Cubic meter
1.6.4 Percolation tanks Cubic meter
1.6.5 Ground Water
recharge structure Cubic meter
1.6.6 Others Cubic meter
1.7 Water
Harvesting Structure ( Storage capacity of Renovated structures)
1.7.1 Farm ponds Cubic meter
1.7.2 Check dams Cubic meter
1.7.3 Nallah Bunds Cubic meter
1.7.4 Percolation tanks Cubic meter
1.7.5 Ground Water
recharge structure Cubic meter
1.7.6 Others Cubic meter
2.EPA 2.1 No. of EPA
activities 49 nos
49 0 0 0 0
2.2 No. of water
extracting unit created nos
3.Institution & Capacity Building
3.1 SHG
Formation (Newly created)
3.1.1 No. of SHG 281 nos 0 31 193 57 0
3.1.2 Total No. of SHGs
members 1060 nos
155 965 285 0
3.2.1 No. of SHG assisted 3 nos 3
3.2.2 Total No. of SHGs
members 30 nos
30
3.3 UG Formation 3.3.1 No. of UG 30 nos 6 6 6 6 6
3.3.2 Total No. of
members of UGs 150 nos
30 30 30 30 30
3.4 Formation of
Federation 3.4.1 No. of Federation 15 nos
0 0 4 11 0
3.4.2 Total No. of
members of Federation 200 nos
0 0 100 275 0
3.5 Capacity
building 3.5.1 No. of Training nos
3.5.2 No. of Persons
trained nos
4.Livelihood activities for
the asset-less persons 4.1 No. of activities 7 nos
0 7 7 4 0
4.2 No. of
Beneficiaries 45 nos
0 19 20 6 0
5.Production system µ-enterprises
5.1 Sericulture 5.1.1 No. of activities nos
5.1.2 No. of Beneficiaries nos
5.2 Beekeeping 5.2.1 No. of activities nos
5.2.2 No. of Beneficiaries nos
5.3 Poultry 5.3.1 No. of activities nos
5.3.2 No. of Beneficiaries nos
5.4 Fisheries 5.4.1 No. of activities nos
5.4.2 No. of Beneficiaries nos
5.5 Bio-fuel
Plantation 5.5.1 Area Covered ha
5.5.2 No. of Beneficiaries nos
5.6 Others 5.6.1 No. of activities 10 nos 0 9 9 9 0
5.6.2 No. of Beneficiaries 1701 nos 0 319 693 689 0
Format -2
Financial Target (Watershed works)
Name of Project : Barmer- 52 Block: Dhorimanna
Distt.: Barmer
Name of Head
Name of Activity Name of Subactivity Total
Target
Amount (Rs. In lakh)
Financial year 2012-13 2013-14 2014-15 2015-16 2016-17
1.Watershed Development Works
1.1 Land Development (Productive use)
1.1.1 Afforestation
25.54 0.00 15.47 4.700 2.79 2.58
1.1.2 Horticulture 5.25 0.00 2.55 1.65 1.05 0
1.1.3 Agriculture 0.
79 0.00 0.07 0.36 0.36 0.00
1.1.4 Pasture
1.1.5 Others 4.
19 0.00 0.73 1.28 2.18 0.00
1.2 Soil & Moisture
Conservation
1.2.1 Staggered
trenching
1.2.2 Countour
Bunding
1.2.3 Graded
Bunding
1.2.4 Bench
Terracing
1.2.5 Others
1.3 Vegetative and
Engineering Structure 1.3.1 Earthen
Checks
1.3.2 Brushwood
Checks
1.3.3 Gully plugs
1.3.4 Loose
bolder
1.3.5 Gabion
structure
1.3.6 Others
1.4 Water Harvesting
Structure (New Created) 1.4.1 Farm
ponds 0.00
0.00 0.00 0.00 0.00 0.00
1.4.2 Check
dams
1.4.3 Nallah
Bunds
1.4.4 Percolation
tanks
1.4.5 Ground
Water recharge structure
1.4.6 Others 638.28 0.00 79.38 341.82 217.08 0.00
1.5 Water Harvesting
Structure (Renovated) 1.5.1 Farm
ponds
1.5.2 Check
dams
1.5.3 Nallah
Bunds
1.5.4 Percolation
tanks
1.5.5 Ground
Water recharge structure
1.5.6 Others 20.00 0.00 0.00 0.00 20.00 0.00
2.Administrative
Cost 2.1 Salary
2.2 Others 36.90 7.38 7.38 7.38 7.38 7.38
3.Monitoring 3.1 Monitoring of
Projects
4.Entry Point Activity
4.1 Plan for EPA 49.20 49.20
5.Institution & Capacity Building
5.1 SHG Formation
5.2 UG Formation
5.3 Formation of
Federation
5.4 Capacity building
5.5 Others
6.DPR 6.1 Preparation Of
DPR
7.Livelihood activities for the asset-less persons
7.1 Plan for Livelihood activities
110.70 0.00 12.50 61.25 36.95 0.00
8.Production system & micro-
enterprises
8.1 Sericulture
8.2 Beekeeping
8.3 Poultry
8.4 Fisheries
8.5 Bio-fuel
Plantation
8.6 Others 117.75 0.00 24.90 46.24 46.61 0.00
Format-3
FINANCIAL PIA
To be entered at PIA Level Financial Target
Projectwise Barmer-52
No. Head
Amount (Rs. in Lakh)
Financial year
2012-13 2013-14 2014-15 2015-16 2016-17
1 Administrative 17.220 17.220 17.220 17.220 17.220
2 Capacity building 15.713 13.469 11.224 2.245 2.245
3 Monitoring 1.476 1.476 1.476 1.476 1.476
4 Preparation Of
DPR 12.30 0 0 0 0
5 EPA 0.00 0 0 0 0
6 Any Other 0 0 0 0 0
Format-4
FINANCIAL WCDC
To be entered at WCDC Level Financial Target
Projectwise Barmer-52
No. Head
Amount (Rs. in Lakh)
Financial year
2012-13 2013-14 2014-15 2015-16 2016-17
1 Administrative
2 Capacity building 5.597 4.797 3.998 0.800 0.800
3 Monitoring 0.492 0.492 0.492 0.492 0.492
4 Preparation Of
DPR
5 Any Other
Format-5
Capacity building plan (PIA level) Name of Project : Barmer-52 Block: Dhorimanna District : Barmer
No. Head Financial year
2012-13 2013-14 2014-15 2015-16 2016-17
1 No of trainings planned 43 37 31 6 6
2 No of persons to be
trained 2150 1850 1550 300 300
Format-6
Capacity building plan (WCDC)
Projectwise Barmer-52
No. Head
Amount (Rs. in Lakh)
Financial year
2012-13 2013-14 2014-15 2015-16 2016-17
1 No of trainings planned 15 13 11 2 2
2 No of persons to be
trained 450 390 330 60 60