Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010
Transcript
Page 1: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

Certified Business Process Professional (CBPP®)

Exam OverviewPart II

August 18, 2010

Page 2: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

2

How to PrepareCBOK

Through ABPMP’s eStore at https://www.createspace.com/3376044

Download a PDF copy through ABPMP’s member section at http://www.abpmp.org/displaycommon.cfm?an=1&subarticlenbr=139

Study Guide (available at participating Chapters)

Page 3: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

3

BPM CBOK® Knowledge Areas

Knowledge Areas

Enterprise Process ManagementEnterprise Process Management

Process Management OrganizationProcess Management Organization

Business Process ManagementBusiness Process Management

Business Process Management TechnologiesBusiness Process Management Technologies

Page 4: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

4

PART II4.0 Process Transformation

Process Design

Aligns to Chapter 5-7 of the BPM CBOK®

Page 5: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 5

ABPMP

Key DefinitionsKey Definitions• Process

Cross functional Delivers a significant “end” product Broken apart organizationally

• Workflow Group of activities and their applications that perform a specific function The organization and flow of these activities to produce a sub assembly or part of a final

“end” product

• Reengineering Fundamental rethinking of the business operation around new strategy – conceptual Radical change of the business design and it’s processes to achieve dramatic improvements

in cost, quality, service, and speed Holistic approach rather than focusing on incremental changes

• Redesign End-to-end rethinking of what the process is currently doing – tactical or physical operation Redesign changes are still based on the fundamental concepts of existing process Included the business operation, the systems, the rules, the infrastructure, the people’s

jobs

Page 6: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 6

ABPMP

Improvement DisciplinesImprovement Disciplines• Six Sigma

Data driven approach for eliminating defects

• Lean Management philosophy focused on reducing waste

• Total Quality Management (TQM) Forerunner to Six Sigma focusing on process measurement and controls

• Activity Based Costing/management ABC – measures the cost and performance of cost objects (outputs), activities, and

resources ABM – management based on ABC and performance measurements

• Performance Improvement Model 3 layer process alignment framework: Organization, Process, & Activity.

Page 7: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 7

ABPMPProcess Improvement and Business Process Improvement and Business

TransformationTransformation• Difference between Improvement and Transformation• Difference between process and workflow improvement• Process improvement

Big wins fast Tactical Composite teams

• Workflow improvement Fast improvement Tactical Specialized teams

• Business Transformation BPR with enabling BPMS technology: the new world Strategic Cross functional teams

• To do either Transformation or Improvement, you must redesign

Page 8: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 8

ABPMP

Process Transformation

Page 9: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 9

ABPMP

What is Process Transformation?What is Process Transformation?

• The radical redesign of a significant part of the business operation at the fundamental level - broad scope

• Strategic in nature but moves to tactical when viewed at low levels of detail

• Changes through initiatives and their associated projects

• Long term – may be 3 to 4 years in length

• Foundation for a move to operational flexibility and continuous improvement

Page 10: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 10

ABPMP

• Requires a cross functional team of experts – BPM, Business, IT, Business Architecture, Outsourcing

• Requires a high level business design to form a picture of the business so each part can be built separately but fit into the vision

• Requires an end to end view of the company and all it’s processes• Requires Business Architects to define changes to business capability

models and business functions• Align organizational workflow models to process and then to function

and business capability• Align to technical capabilities and data groups• Define what process and workflow needs to change to deliver the

changes in the business functions and capabilities• Determine the IT support that is needed – infrastructure• Question EVERYTHING• Redesign in improvement project following Process Improvement

Design techniques• Test at the process level for continuity and quality

Process Transformation in actionProcess Transformation in action

Page 11: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 11

ABPMP

Critical Success FactorsCritical Success Factors• Executive Leadership

Executive leadership not only agree to the change but is visibly seen as the promoter, leader and champion of such change

• Commitment to Investment Make the necessary investment to ensure the process improvement is successful before the return

on the investment is achieved BPMS

• Process Ownership and Responsibility Assign ownership of the process change initiative to the resource who has final authority for

delivering process performance and results

• Incentives and Rewards Incentive programs built into place and encourage the adoption of the new process and changed

roles and behaviors Must engage staff and get their acceptance

• Cross-Functional Teams Seamlessly tie together all of the functions to meet the needs of the customer

• CoE / BPM standards / terminology standardization• Focus on specific improvement

Page 12: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 12

ABPMP

Implementation - Key ConceptsImplementation - Key Concepts• Business Process implementation must be considered as a critical set of

activities even though all the analysis and design has been completed. Execution is the key to successful strategy.

• Perform risk analysis and management to reduce unpleasant surprises and provide business executives and process owners some degree of comfort.

• Continue vigorous change management activities—people, in cross-functional relations, are the weakest link in People, Process and Technology. Use multiple channels to communicate frequently with senior management, process owners, and process performers. Reinforce process/management changes with appropriate modifications to incentives and organizational culture.

• Business Process outsourcing is a challenging process to manage. Appoint trained relationship managers to improve the chance for success.

Page 13: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 13

ABPMPImplementation - Key Concepts Implementation - Key Concepts (cont’d)(cont’d)• Business Process design changes must be minimized during

implementation. Yet, the business environmental factors merit continued scanning for changes that could impact the current Business Process implementation actions.

• Senior management and business process owners, and business process management must remain active and visible to lead successful change.

• Business Process conversion is meticulous, but an easy trap for implementation failure.

• The scope and rate of Business Process change should not exceed the capacity of business process owners and performers to absorb change.

• Evaluate realized vs. expected benefits. Share the wins. Learn from the losses.

• Inadequate training will lead to business process/management loss of productivity and probable project failure.

• Choose Business Process implementation techniques to match the scope and complexity of the project requirements.

Page 14: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 14

ABPMP

Process Design

Page 15: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 15

ABPMP

Process Design Principles Process Design Principles

Foundation• Assuming your “As Is” models are good and that you have captured the

right information for each activity, you are ready to redesign the operation• Recommend a BPMS tool suite – at least a process modeler• Understand the who, what, why, when, where, how, and cost, volume,

problems and opportunities for improvement of each workflowProcess Redesign/design• Define success – what will an optimal solution look like – its characteristics• Build composite teams with focused BPM methodologies• Redesign, then Automate

Don’t automate a broken, ineffective process Eliminate white space Be creative – understand how the business works and think of different ways to do things Simulate the new design - optimize

• Ensure Quality at the Beginning – define standards, techniques, tools

Page 16: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 16

ABPMP

Process DesignProcess DesignRedesign – remember problem resolution, quality and cost improvement • Identify and define the activities that will be needed• Identify activities to be eliminated or automated/eliminated• Identify and define all the rules that will be needed to control the activity and where• Define and eliminate handoffs, redundant work, non-value add work, holds, approvals

(empower)• Redesign the business operation in the process modeler noting application needs• Determine break points, risk points, problems points and design performance monitoring to

mitigate• Define business rules and enter into the rules engine (if you don’t have one, create a rules

matrix)• Define data use, build interfaces/adaptors, build applets, build web interfaces/applications• Simulate the operation of the new design – generate the BPMS applications and operating

environment – iterate until acceptable and then continue to improve• Create final design and test the business/IT BPMS based environment• Modify the IT infrastructure as needed• Implement• Move to continuous monitoring and improvement

Page 17: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 17

ABPMP

ImplementationImplementation• Plan – BPMS, IT, business user• Test, test, test and iterate• Train and mentor staff• Implement in interrelated projects according to the vision and how each

project supports others• Monitor performance• Improve

Page 18: Certified Business Process Professional (CBPP®) Exam Overview Part II August 18, 2010.

© ABPMP 18

ABPMP

Thank You

Questions????

For follow-up questions Dan Morris can be reached through ABPMP or at [email protected]


Recommended