CFM Radiolink Installation Manual Rev. 2.0 © SAF Tehnika A/S 2006
Transcript
Page 1: CFM Radiolink Installation Manual SAF.pdf

CFM Radiolink

Installation Manual

Rev. 2.0 • © SAF Tehnika A/S 2006

Page 2: CFM Radiolink Installation Manual SAF.pdf

2

The information presented in this guide is the property of SAF Tehnika, A/S. No part of this document may be reproduced or transmitted without proper permission from SAF Tehnika, A/S. The information and specifications contained in this document are subject to change without notice due to continuing introduction of software and/or design improvements. SAF Tehnika A/S has no liability for typing errors in this document or damages of any kind that result from the use of this document. Copyright Notice Copyright © 2004 SAF Tehnika, A/S. All rights reserved.

Table of Contents Table of Contents ......................................................................................... 2 1 Introduction ........................................................................................... 4

1.1.1 Revision history..........................................................................................4 1.1.2 Safety Precautions ......................................................................................4 1.1.3 Electrical Safety..........................................................................................4 1.1.4 Microwave Radiation ...................................................................................4

2 Getting Started....................................................................................... 5 2.1 Unpacking and Inventory ..................................................................... 5

2.1.1 Contents of Transportation Package for IDU-ODU link ......................................5 2.1.2 Contents of Transportation Package for FODU link ...........................................5 2.1.3 Package Weight and Dimensions ...................................................................5

2.2 Required Installation Tools ................................................................... 5 2.2.1 IDU Installation Tools ..................................................................................5 2.2.2 ODU Installation Tools .................................................................................5 2.2.3 FODU Installation Tools ...............................................................................5 2.2.4 Antenna Installation Tools............................................................................5

2.3 Labels ............................................................................................... 6 2.3.1 IDU Label ..................................................................................................6 2.3.2 ODU Label .................................................................................................6 2.3.3 FODU Label................................................................................................7

3 Installing IDU/ODU Radiolink ................................................................ 8 3.1 Preparing Radiolink Hop....................................................................... 8

3.1.1 Required Equipment....................................................................................8 3.1.2 Connecting IDU to ODU ...............................................................................8 3.1.3 Interconnecting ODUs .................................................................................9

3.2 Configuring ODU Parameters ................................................................ 9 3.2.1 Setting Transmitter Power............................................................................9 3.2.2 Setting ODU Frequency Channel ...................................................................9

3.3 Connecting PC to RS-232 Management Port............................................ 9 3.3.1 Connecting Directly to RS-232 Port................................................................9 3.3.2 Connecting to RS-232 Port via Dial-up Modems............................................. 10

3.4 Configuring IP Settings .......................................................................10 3.5 Connecting PC to 10Base-T Management Port ........................................11

3.5.1 Connecting Telnet Client ............................................................................ 11 3.5.2 Connecting Web Terminal .......................................................................... 11

3.6 Configuring Management Service Channel .............................................11 3.6.1 Adding routes........................................................................................... 11 3.6.2 Pinging Far-end IDU.................................................................................. 11

Page 3: CFM Radiolink Installation Manual SAF.pdf

3

3.6.3 IP Configuration Examples ......................................................................... 12 3.7 System Reboot ..................................................................................14 3.8 IDU Installation .................................................................................14

3.8.1 Space Requirements ................................................................................. 14 3.8.2 IDU Rack Mounting ................................................................................... 15 3.8.3 IDU Module Installation ............................................................................. 15

4 Installing Full Outdoor Unit (FODU) Radiolink...................................... 17 5 Outdoor Unit and Antenna Installation................................................. 18

5.1 Polarization Considerations..................................................................18 5.2 Attaching Outdoor Unit to Antenna .......................................................18 5.3 Grounding the Outdoor Unit ................................................................19 5.4 Antenna Alignment.............................................................................19

5.4.1 Calculating Expected Receive Signal Level (RSL) ........................................... 19 5.4.2 Alignment Procedure ................................................................................. 19 5.4.3 RSSI Readings ......................................................................................... 20

6 Performing Software Update ................................................................ 21 7 References ........................................................................................... 25

Page 4: CFM Radiolink Installation Manual SAF.pdf

Chapter 1. Introduction

4

1 Introduction This manual describes how to install SAF CFM series microwave radio link consisting of Indoor Units (IDUs) and Outdoor Units (ODUs or Radios). This manual also covers the installation of Full Outdoor Units (2E1, 4E1, and Eth+2E1 FODUs).

1.1.1 Revision history

Revision Date Comments

1.0 July, 2004 2.0 March, 2006 Information about FODU installation added

1.1.2 Safety Precautions

− Installation and service must be done by personnel having appropriate technical training and experience necessary to be aware of hazards during installation and/or service. The installation and/or service must be done under measures to minimize any danger to the involved person or any other person.

− Use the necessary safety devices when working on or around the mast. Be aware of the risk of falling objects. Consider the safety catch when hoisting the antenna and radio.

− Do not use any components (screws, nuts, etc.) other than those delivered together with the SAF Tehnika microwave radio equipment or recommended by SAF Tehnika.

1.1.3 Electrical Safety

− The equipment meets the requirements for class I EN 60950 (protection against electric shock). − All external circuits are TNV-1 (as defined in EN 60950). − All equipment must be grounded before the power cable is connected. − For electrical safety the DC power supply shall have reinforced insulation to the mains supply.

1.1.4 Microwave Radiation

− The transmitter should be switched off before disassembling the equipment to avoid microwave radiation.

No dangerous levels of microwave radiation exist outside the antenna while in operation when the antenna is connected to the radio, yet any part of the body shall not be exposed to the radiation in front of the open radio waveguide output closer than 20 cm while radio transmitter is turned on.

20 cm

Restrictedarea

Page 5: CFM Radiolink Installation Manual SAF.pdf

Chapter 2. Getting Started

5

2 Getting Started 2.1 Unpacking and Inventory

There are two types of packages, - the box for transportation and the commercial package. IDUs, ODUs and 25 cm Lens-Horn antennas are packed in commercial packages whereas commercial boxes are packed in transportation boxes. There are two types of transportation packages included: − Transportation package for two 25 cm LH antennas – contains two trading packages for lens-horn

antenna; − Transportation package for two IDUs and two ODUs – contains two trading packages for IDU and two

trading packages for ODU;

2.1.1 Contents of Transportation Package for IDU-ODU link

− Outdoor Unit, 2 pcs. − Indoor Unit, 2 pcs. − N-type coax cable connectors, 4pcs. − Power connector for IDU, 1 pcs. − Documentation CD, 2 pcs.

2.1.2 Contents of Transportation Package for FODU link

− Full Outdoor Unit, 2 pcs. − 18-pin twisted-pair cable connector, 2pcs. − Documentation CD, 2 pcs. − Twin-BNC connector, 2 pcs. − Hermetical RJ-45 cable connector (with 4E1 FODU and Eth+2E1 FODU only), 2 pcs.

2.1.3 Package Weight and Dimensions

The following table lists all the included packages and their weight and dimensions.

Package type Weight of empty package [g] Dimensions [mm] Commercial package for IDU 755 352x270x113 Commercial package for ODU 486 532x365x75 Commercial package for FODU 486 532x365x75 Commercial package for 25 cm LH antenna 1070 375x300x286 Transporting package for 25 cm LH antennas 787 618x395x300 Transporting package for IDUs and ODUs 700 562x385x283

2.2 Required Installation Tools

2.2.1 IDU Installation Tools

− Pozidrive screwdriver PZ2 or PH2, − Necessary tools for assembling the cables and connectors.

2.2.2 ODU Installation Tools

− 10 mm nut wrench to mount ODU to antenna, − Necessary tools for assembling the cables and connectors.

2.2.3 FODU Installation Tools

− 10 mm nut wrench to mount ODU to antenna, − Necessary tools for assembling the cables and connectors.

2.2.4 Antenna Installation Tools

− 8 mm and 10 mm nut wrench for 0.25 m lens-horn antenna installation, − 17 mm nut wrench for 0.3 and 0.6 m parabolic antenna installation, − 18 and 24 mm nut wrench for 1.2 and larger parabolic antenna installation.

Page 6: CFM Radiolink Installation Manual SAF.pdf

2.3 Labels

2.3.1 IDU Label

The IDU label can be found on the rear side of the chassis. The IDU label contains the following information: − Product model name. − Product number (P/N). − Serial number (S/N); the Serial Number has the following information:

− 4-digit product code,

− Consecutive number of the product; the 5-digit consecutive numbering for IDU label is separate for each IDU type (e.g. MUX IDU, REB IDU, E1 IDU, etc.), for ODU label – separate for each frequency band.

− Product type and hardware version.

The Serial Number uniquely identifies the unit.

6

Figure 1. IDU label

2.3.2 ODU Label

The ODU label can be found on the front side (flange-side) of the ODU chassis. The information about subband (L or H) and band side (A, B or C) are displayed by Product number. Just like the IDU label, the ODU label contains: − Model name, − Product number (P/N), − Serial number (S/N).

Product number

Product type (internal use only) Hardware version\ specification

Product model name (internal use only)

Consecutive number

4-digit Product code assigned to Product Number

Page 7: CFM Radiolink Installation Manual SAF.pdf

7

Product model name

Product number

Serial number

Notified body number for CE marking

Figure 2. ODU label

2.3.3 FODU Label

The FODU label can be found on the front side of the unit chassis; the FODU label is similar to ODU label, it contains the following information: - Model name (“CFM-18-FR34”). The FODU model name is

- CFM-xx-F2E1 for 4 Mbps 2xE1 FODU, - CFM-xx-F4E1 for 8 Mbps 4xE1 FODU, - CFM-xx-FR34 for 34 Mbps Ethernet+2xE1 FODU, xx - frequency band of the FODU.

- Product Number (“F18R3401HB”): product number contains information in which band side (L, H) and subband (A, B or C) the FODU operates.

- Unit Serial Number (“3057501 00014”); the serial number uniquely identifies the FODU.

Figure 3. FODU label

Page 8: CFM Radiolink Installation Manual SAF.pdf

Chapter 4. Installing Full Outdoor Unit radiolink

8

3 Installing IDU/ODU Radiolink The installation of non-full outdoor link involves the following steps:

1) Initial equipment set up at the customer’s premises; At first it is recommended to configure each unit of the radiolink by setting up the radiolink in domestic circumstances rather than installing it in the actual locations, - this may ease the configuration of the hop, especially management service channel configuration since all the units are conveniently nearby. In order to properly configure the equipment, the hop should be set up in domestic circumstances by interconnecting ODUs using waveguide-coaxial adapters, and coaxial cable. The use of attenuators is preferable, but in case they are not available, the proper measures should be taken into consideration to avoid damage to the receiver of the ODU, see next chapter for more information. This step includes the following: − Unpack all equipment, − Prepare IDU-ODU cables, − Interconnect IDUs and ODUs with IDU-ODU cables for each hop; − Interconnect ODUs: - turn ODUs of one hop against ceiling (with flanges facing upward), or

use attenuators and waveguide to interconnect ODUs. 2) Connecting ASCII terminal to IDU in order to configure the equipment.

Notes: − You can also connect Telnet console, the default IP address of Eth management port is

192.168.205.10 (mask 255.255.255.0) − Use straight through (modem) serial cable to connect ASCII console to IDU (serial port),

use Ethernet patch cable to connect Telnet terminal (PC) to Ethernet management port; − Some parameters mentioned further can not be configured from IDU front panel, but

only from ASCII or Telnet terminals. 3) Configuration of equipment;

• Radio frequency channel and transmitter power: by default the transmitter power is switched off.

• IP settings: − IP address and netmask of the 10Base-T management port, − SLIP port addresses − Routes to all subsequent IDUs in the radiolink

• SNMP settings: − Specify SNMP trap manager IP address − Specify SNMP read and write community names − Specify SNMP NMS hosts

• Multiplexer slot speeds. • Traffic port settings of installed modules.

Complete steps 2 and 3 for each IDU. 4) IDU mechanical installation (rack mounting, module installation), this is discussed in chapter

3.8. 5) ODU and Antenna mechanical installation: this is discussed in chapter 5. Follow further chapters to perform the installation by the plan described above.

3.1 Preparing Radiolink Hop

3.1.1 Required Equipment

In order to simulate one radiolink hop, the following equipment is required: − IDUs (2 pcs.) − ODUs (2 pcs.) − Waveguide-coaxial adapter (2 pcs.) − Attenuator(s), total recommendable attenuation is 80 dB.

Important note: In case if not using attenuators, the transmitter power must be set to -10 dBm to avoid damage to the receiver, - the maximum permissible receiver input level is 0 dBm.

− Coaxial cable to connect both ODUs of the hop. The following cables are recommended: • RG-213, • LMR-400.

− Power supply unit 20-60 VDC of any polarity with: − 24 W or higher output power for each site of 1+0 hop.

3.1.2 Connecting IDU to ODU

Interconnect IDU with ODU at each site performing the following steps: − Connect the cable type-N connector to the type-N connector on the IDU and rotate the collar of the

coaxial connector clockwise to tighten. − Similarly connect the cable type-N connector to the type-N connector on the ODU. − Check to make sure the connectors are still secured.

Page 9: CFM Radiolink Installation Manual SAF.pdf

3.1.3 Interconnecting ODUs

Connect both ODUs as shown in the picture below.

9

Figure 4. FODU label

3.2 Configuring ODU Parameters The primary parameters for the link to operate properly are frequency channel and transmitter power.

3.2.1 Setting Transmitter Power

The transmitter power of the new equipment is switched off. For both sites of a hop, proceed as follows: − From IDU LCD, using arrow buttons, select Outdoor unit -> Power -> press ENTER − Select required transmitter power using up/down arrow buttons and press ENTER − Select “Yes” and press ENTER to confirm. Normally the IDU LCD displays basic configuration, radio data and alarm status, remaining in the status display mode. To make changes in configuration from IDU LCD, the LCD must be switched from status display mode to setup mode. This can be done by pressing ENTER key. To return to status display mode, press CLEAR key; the LCD will automatically resume to status display mode after a few seconds.

3.2.2 Setting ODU Frequency Channel

For both sites of a hop, proceed as follows: − From IDU LCD, select Outdoor unit -> Chan ## -> press ENTER − Select required frequency channel using up/down arrow buttons and press ENTER − Select “Yes” and press ENTER to confirm.

3.3 Connecting PC to RS-232 Management Port

3.3.1 Connecting Directly to RS-232 Port

In order to interconnect the IDU and the PC directly through serial ports, a straight through modem cable is needed. The serial port of the PC should be configured as follows:

Bits per second - 19200 Data bits - 8 Parity - None Stop bits - 1 Data flow control - None.

In order to connect the PC to the RS232 management port using Hyper Terminal program, which is included in any Windows version, the following steps must be performed. Similar steps can be performed using other terminal emulators. 1. Connect PC to the RS232 serial port with “straight-through” (modem) serial cable. 2. Run “Hyper Terminal” program. 3. Make a New connection, enter connection name.

Coaxial cable

Attenuators

Waveguide-coaxial adapter

Page 10: CFM Radiolink Installation Manual SAF.pdf

4. Select an open COM port from the “Connect using” drop-down list (COM1 or COM2). The COM Properties window is displayed.

5. Select port settings (bits per second: 19200, data bits: 8, parity: none, stop bits: 1, no data flow control). Press OK.

6. The connection to the radio terminal should now be established. Press Enter and the login prompt is displayed if user name and password is set up. The factory default username and password for ASCII console is “” (disabled), and the login prompt will not appear. For complete list of console commands please refer to the appropriate IDU management system technical description and configuration guide.

3.3.2 Connecting to RS-232 Port via Dial-up Modems

If using modems, the management terminal is connected with the IDU remotely through a telephone line as shown in the picture below.

Modem PCModemIDU

Must be set to autoanswer mode

Phone line

Figure 5.

1. Interconnect the equipment as shown in the Figure 5. 2. Configure the modem, which is connected to the IDU as stated below:

- Auto answer on first ring ON

- Echo offline commands OFF

- Suppress result codes

- DTR override

- 19200 baud rate

3. Save the modem configuration (typically with AT&W string).

Please refer to the documentation accompanied with the dial-up modem for information about configuration of modem.

3.4 Configuring IP Settings The following IP settings must be properly configured at each site in order to connect Web, Telnet or SNMP terminals as well as to be able to access far-end IDU(s) via radio channel. 1. IP address of 10Base-T port, it can be configured from an ASCII console, or from IDU front panel

using keypad; Using IDU keypad: − using arrow buttons, select Ethernet -> Select IP -> press ENTER − select required IP address using up/down arrow buttons and press ENTER − select “Yes” and press ENTER to confirm. Using ASCII console, enter command: IP addr <IPaddress> Example: IP addr 192.168.200.1

2. Set the IP netmask for 10Base-T port;

Using IDU keypad: − select Ethernet -> Select NETMASK -> press ENTER − select netmask using up/down arrow buttons and press ENTER − select “Yes” and press ENTER to confirm. Using ASCII console, enter command: IP mask <IPnetmask> Example: IP mask 255.255.255.0

3. Default gateway; Using IDU keypad: − select Ethernet -> Select Gateway -> press ENTER − select required IP address using up/down arrow buttons and press ENTER − select “Yes” and press ENTER to confirm. Using ASCII console, enter command: IP gw <IPaddress> Example: IP gw 192.168.210.1

4. Set the SLIP address for the serial port of the local IDU: Using IDU keypad: − select Service line -> Select local IP -> press ENTER − select required IP address using up/down arrow buttons and press ENTER − select “Yes” and press ENTER to confirm. Using ASCII console, enter command: IP seraddr <IPaddress> Example: IP seraddr 192.168.100.1

5. Specify the far-end SLIP port IP address:

Using IDU keypad: − select Service line -> Select remote IP -> press ENTER

10

Page 11: CFM Radiolink Installation Manual SAF.pdf

11

− select required IP address using up/down arrow buttons and press ENTER − select “Yes” and press ENTER to confirm. Using ASCII console, enter command: IP remaddr <IPaddress> Example: IP remaddr 192.168.100.2

The management traffic in CFM radiolinks is IP-based. The management controller of the IDU operates as a router (2-port), which implies that standard IP routing principles must be taken into consideration.

3.5 Connecting PC to 10Base-T Management Port

3.5.1 Connecting Telnet Client

− Connect a PC to the 10Base-T port of the IDU; if connecting PC directly to the IDU, use crossover patch cable.

− Open telnet client program. − Open Telnet session to the address of IDU 10Base-T port; − Enter login and password if prompted; default (factory) Telnet username is “telnet”, password “saf”

(login name and password is case sensitive). Note: it may be necessary to configure IP address of the PC.

3.5.2 Connecting Web Terminal

− Connect a PC to the IDU 10Base-T management port, using Cat 5 UTP or better patch cable, Note: if connecting a PC directly to the IDU, then crossover patch cable must be used.

− Open Web browser. − In address bar enter the IP address of 10Base-T management port.

This should open the login/password dialog box, default (factory) login name is “SAF” and password “test” (login name and password is case sensitive) If server can not be found then:

− if PC is connected directly to the IDU (not via Ethernet network) then make sure the PC and IDU are in one subnet;

− if PC is connected to the IDU via Ethernet network then make sure the routing of packets addressed to IDU, are properly configured through the network.

Note: it may be necessary to configure IP address of the PC.

3.6 Configuring Management Service Channel The configuration of the management service channel should be done preferably before the IDU is installed at the actual location, in future to avoid necessities to attend each site locally. To configure the service channel, please proceed in the order of the following chapters.

3.6.1 Adding routes

− Connect a PC to the 10Base-T port of the IDU and open Telnet session as described in chapter Connecting Telnet Client, or connect a PC to the RS232 port and make a connection.

− Configure routing using the following command: Route add <destinationIPaddr> Mask <netmask> <gateway> [metric] where <destinationIPaddr> - destination IP address <netmask> - net mask (if the route is related to a single host, the mask can be skipped) <gateway> - gateway [metric] - optional Examples: Route add 192.168.205.010 Mask 255.255.255.0 155.13.79.13 Route add 192.168.205.010 155.13.79.14

− Save the configuration using write command and restart the management controller using restartcpu command. After the restartcpu command is entered, the Telnet session will terminate.

Please refer to chapter IP Configuration Examples for detailed examples.

3.6.2 Pinging Far-end IDU

In order to test if the management service channel is properly configured over the radiolink, use ping command to ping via all hops. Ping in step by step each port along the IP channel between management station (PC) and far-end IDU, starting from 10Base-T port of the local IDU down to the 10-Base-T port of the far-end IDU, correct routes as necessary.

Page 12: CFM Radiolink Installation Manual SAF.pdf

3.6.3 IP Configuration Examples

service channel

Eth

VirtualSerialPort

ManagementModule

RIP = ON

Eth

VirtualSerialPort

ManagementModule

RIP = ON

Telnet console/Web client

IP Addr 192.168.205.10IP mask 255.255.255.0IP GW 192.168.205.1

Local Site (Terminal A) Remote Site (Terminal B)

IP Seraddr 192.168.0.10IP Remaddr 192.168.0.11

IP Seraddr 192.168.0.11IP Remaddr 192.168.0.10

IP Addr 192.168.206.10IP mask 255.255.255.0

Console IP address: 192.168.205.1, 255.255.255.0Route Add 192.168.206.0 Mask 255.255.255.0 192.168.205.10

service channel

Eth

VirtualSerialPort

ManagementModule

RIP = ON

Eth

VirtualSerialPort

ManagementModule

RIP = ON

Telnet console/Web client

IP Addr 192.168.205.10IP mask 255.255.255.0IP GW 192.168.205.1

Local Site (Terminal A) Remote Site (Terminal B)

IP Seraddr 192.168.0.10IP Remaddr 192.168.0.11

IP Seraddr 192.168.0.11IP Remaddr 192.168.0.10

IP Addr 192.168.206.10IP mask 255.255.255.0IP GW 192.168.0.10

Router port IP address: 192.168.205.1, 255.255.255.0Route Add 192.168.206.0 Mask 255.255.255.0 192.168.205.10

Router(RIP=OFF)

Ethernet

12

Page 13: CFM Radiolink Installation Manual SAF.pdf

Ethernet

service channel

Eth

VirtualSerialPort

ManagementModule

RIP = ON

Telnet console/Web clientIP address: 192.168.204.2

IP Addr 192.168.205.2IP mask 255.255.255.252IP GW 192.168.205.1

IP Seraddr 192.168.0.1IP Remaddr 192.168.0.2

IP Seraddr 192.168.0.2IP Remaddr 192.168.0.1

IP Addr 192.168.205.5IP mask 255.255.255.252IP GW 192.168.0.1

Port IP address: 192.168.204.1

Router(RIP = OFF)

Eth

VirtualSerialPort

ManagementModule

RIP = ON

Eth

VirtualSerialPort

ManagementModule

RIP = ON

IP Addr 192.168.205.6IP mask 255.255.255.252IP GW 192.168.205.5

IP Seraddr 192.168.0.3IP Remaddr 192.168.0.4

service channel

Eth

VirtualSerialPort

ManagementModule

RIP = ON

IP Seraddr 192.168.0.4IP Remaddr 192.168.0.3

IP Addr 192.168.205.9IP mask 255.255.255.252IP GW 192.168.0.3

Hop 1

Hop 2

Port IP address: 192.168.205.1Route Add 192.168.205.0 Mask 255.255.255.240 192.168.205.2

Eth

VirtualSerialPort

ManagementModule

RIP = ON

IP Addr 192.168.205.13IP mask 255.255.255.252IP GW 192.168.0.5

IP Seraddr 192.168.0.6IP Remaddr 192.168.0.5

service channel

Eth

VirtualSerialPort

IP Seraddr 192.168.0.5IP Remaddr 192.168.0.6

IP Addr 192.168.205.10IP mask 255.255.255.252IP GW 192.168.205.9

Hop 3

ManagementModule

RIP = ON

Figure 6

13

Page 14: CFM Radiolink Installation Manual SAF.pdf

Ethernet

service channel

Eth

VirtualSerialPort

ManagementModule

RIP = OFF

Telnet console/Web client

IP Addr 192.168.205.2IP mask 255.255.255.252

IP Seraddr 192.168.0.1IP Remaddr 192.168.0.2

IP Seraddr 192.168.0.2IP Remaddr 192.168.0.1

IP Addr 192.168.205.5IP mask 255.255.255.252

Port IP address: 192.168.204.1

Router(RIP = OFF)

Eth

VirtualSerialPort

ManagementModule

RIP = OFF

Eth

VirtualSerialPort

ManagementModule

RIP = OFF

IP Addr 192.168.205.6IP mask 255.255.255.252

IP Seraddr 192.168.0.3IP Remaddr 192.168.0.4

service channel

Eth

VirtualSerialPort

ManagementModule

RIP = OFF

IP Seraddr 192.168.0.4IP Remaddr 192.168.0.3

IP Addr 192.168.205.9IP mask 255.255.255.252

Hop 1

Hop 2

Port IP address: 192.168.205.1Route Add 192.168.205.0 Mask 255.255.255.240 192.168.205.2

Eth

VirtualSerialPort

ManagementModule

RIP = OFF

IP Addr 192.168.205.13IP mask 255.255.255.252

IP Seraddr 192.168.0.6IP Remaddr 192.168.0.5

service channel

Eth

VirtualSerialPort

IP Seraddr 192.168.0.5IP Remaddr 192.168.0.6

IP Addr 192.168.205.10IP mask 255.255.255.252

Hop 3

ManagementModule

RIP = OFF

IP GW 192.168.205.1Route add 192.168.205.12 Mask 255.255.255.252 192.168.0.2Route add 192.168.205.4 Mask 255.255.255.252 192.168.0.2Route add 192.168.205.8 Mask 255.255.255.248 192.168.0.2

IP GW 192.168.0.1Route add 192.168.205.8 Mask 255.255.255.248 192.168.205.6Route add 192.168.205.13 Mask 255.255.255.255 192.168.205.6

IP GW 192.168.0.3Route add 192.168.205.13 Mask 255.255.255.255 192.168.205.10

IP GW 192.168.205.9Route add 192.168.205.13 Mask 255.255.255.255 192.168.0.6

IP GW 192.168.205.5Route add 192.168.205.8 Mask 255.255.255.248 192.168.0.4Route add 192.168.205.13 Mask 255.255.255.255 192.168.0.4

Route add 192.168.205.0 Mask 255.255.255.240 192.168.204.1

IP GW 192.168.0.5

Figure 7

3.7 System Reboot The whole terminal (IDU and ODU) can be rebooted in one way only – by switching the power supply off and on. This will restart all individual modules in IDU and ODU, and will reset all counters, such as up-time and down-time counter. If the restartcpu command is entered from the Telnet or ASCII terminal, or if ‘Restart CPU’ option is performed from IDU panel, the IDU management controller is restarted, but this will not reboot the entire site. Thereby rebooting the management controller does not affect the payload traffic.

3.8 IDU Installation

3.8.1 Space Requirements

IDU is intended for installation in 19’’ communications rack.

14

Page 15: CFM Radiolink Installation Manual SAF.pdf

482 mm

1U(4

4 m

m)

284

mm

50 m

m

120

mm

Figure 8.

3.8.2 IDU Rack Mounting

− Position the IDU in the communications rack at the desired height. Secure the IDU brackets to the communication rack.

− Connect the site ground to the grounding screw provided on the rear panel of the IDU chassis

IDU grounding screw

Figure 9.

3.8.3 IDU Module Installation

− Switch off the power to the IDU. − Remove the protective cover plate from the IDU slot where the new module will be inserted, use torx-

head screwdriver (torx M3x6 screws).

15

Page 16: CFM Radiolink Installation Manual SAF.pdf

Blank module slots

− Slide the module into the slot rail until the faceplate of the module is close to the IDU chassis − Secure the module into the IDU chassis with the locking screws

16

Page 17: CFM Radiolink Installation Manual SAF.pdf

Chapter 4. Installing Full Outdoor Unit radiolink

17

4 Installing Full Outdoor Unit (FODU) Radiolink

The installation of FODU link involves the following steps: 1) Initial equipment set up at the customer’s premises

− Unpack all equipment, − Prepare necessary cables, − Interconnect FODU with Interface Termination Unit (CFM-8-TU4E1) or other appropriate

interface terminating device; − Interconnect FODUs: - turn FODUs of one hop against ceiling (with flanges facing upward),

or use attenuators and waveguide to interconnect FODUs. 2) Connecting ASCII terminal to serial management port in order to configure the equipment.

Notes: − You can also connect Telnet console, the default IP address of Eth management port is

192.168.205.10 (mask 255.255.255.0). − Use straight through (modem) serial cable to connect ASCII console to interface

termination device, use Ethernet patch cable to connect Telnet terminal (PC) to Ethernet management port;

3) Configuration of equipment: perform basic configuration for each FODU; • Radio frequency channel and transmitter power: by default the transmitter power is

switched off. • IP settings:

− IP address and netmask of the 10Base-T management port, − SLIP port addresses − Routes to all subsequent IDUs in the radiolink

• SNMP settings: − Specify SNMP trap manager IP address − Specify SNMP read and write community names − Specify SNMP NMS hosts.

Complete steps 2 and 3 for each FODU. 4) FODU and Antenna mechanical installation; this is discussed in chapter 5.

Page 18: CFM Radiolink Installation Manual SAF.pdf

Chapter 5. Outdoor Unit and Antenna Installation

18

5 Outdoor Unit and Antenna Installation 5.1 Polarization Considerations

The position of the ODU determines the polarization of the radio signal. The waveguide flange can be used as the indicator, see picture below.

horizontal polarizationvertical polarization

Figure 10. Position of ODU waveguide flange for vertical polarization and for horizontal polarization

When attaching ODU to the antenna, the antenna waveguide transition polarization must match with the ODU polarization.

5.2 Attaching Outdoor Unit to Antenna

Use M10 nut and washer, whichis screwed on each of two ODUbolts

For further information how to attach ODU to antenna, please refer to the documentation found in ODU delivery package.

Page 19: CFM Radiolink Installation Manual SAF.pdf

5.3 Grounding the Outdoor Unit Attach the site ground to the ODU using the grounding screw provided on the ODU housing, the location of the grounding screw is depicted in the picture below.

Groundingscrew

Figure 11.

5.4 Antenna Alignment

5.4.1 Calculating Expected Receive Signal Level (RSL)

The expected RSL (receive signal level) can be calculated using “path calculator” provided by SAF Tehnika.

5.4.2 Alignment Procedure

The antenna alignment procedure can be made easier by placing one person at each antenna location during alignment process. However, alignment should be performed on one antenna at a time, each person alternatively turns antenna until the RSL is optimized. The following steps are required to properly align the antennas: 1. Start at one end of the link, connect a voltmeter to the RSSI port on the ODU. Ensure the voltmeter

is set to DC voltage and set on a range 0 – 2 volts. 2. Loosen the antenna hardware that is used for securing the antenna movement in the azimuth

directions. 3. Roughly aim the antenna directing the main lobe to the far-end antenna. 4. Slowly sweep the antenna while observing the readings on the voltmeter. The higher is the voltage,

the higher is the RSL. 5. Secure the azimuth adjustment hardware once main lobe is found and the highest signal level is

achieved. 6. Loosen the antenna hardware that is used for securing the antenna movement in the elevation

direction. Slowly sweep the antenna while observing the voltmeter. Once the signal is peaked, the elevation adjustment hardware can be secured.

7. Perform steps 1 through 6 on the opposite end of the link until the signal level is peaked for both azimuth and elevation.

After the AGC voltages have been peaked on both ends of the link, observe the RSL indicated on IDU LCD. Ensure that the RSL is within +/- 5dB of calculated RSL.

19

Page 20: CFM Radiolink Installation Manual SAF.pdf

5.4.3 RSSI Readings

To aid in the antenna alignment process, the following chart and table shows typical relationship of the RSL (Rx level) vs. RSSI port output voltage (RSSI – Received Signal Strength Indicator). The evaluated Rx level has the error +/-2 dBm.

Typical RSSI=f(RSL) chart

0,0

0,1

0,2

0,3

0,4

0,5

0,6

0,7

0,8

0,9

1,0

1,1

1,2

1,3

1,4

1,5

1,6

1,7

-90 -85 -80 -75 -70 -65 -60 -55 -50 -45 -40 -35 -30 -25 -20 -15 -10 -5

Displayed RSL, dBm

RSS

I por

t out

put,

V-90 0-85 0,1-80 0,2-75 0,3-70 0,4-65 0,5-60 0,6-55 0,7-50 0,8-45 0,9-40 1-35 1,1-30 1,2-25 1,3-20 1,4-15 1,5-10 1,6

Displayed RSL, dBm

RSSI,V

Important note:

The RSSI port is typically labelled with RSSI . The ODUs which does not have such label, does not correspond to the table and graph given above, the maximum level of RSSI voltage (at peak RSL) for these ODUs may vary from 1.2 up to 2 volts.

20

Page 21: CFM Radiolink Installation Manual SAF.pdf

Chapter 6. Performing Software Update

21

6 Performing Software Update The software update is performed by loading the newer version of management software in the EPROM. The management software file (with extension .hex, or .txt) can be obtained by contacting local SAF Tehnika reseller. The software is uploaded from the ASCII terminal to IDU management controller, which stores it in the Flash memory (Flash EPROM). Prior to upload the new management software, the current content of management software in the Flash memory must be erased. The update is performed through the following steps: 1. Connect a PC to the RS232 management port, 2. Run the MS Hyper Terminal program, and configure the corresponding COM port as follows:

− 115200 baud, − 8 data bits, − no parity, − 1 stop bit, − no flow control.

3. Configure terminal emulation parameters to values shown in the following picture

Page 22: CFM Radiolink Installation Manual SAF.pdf

4. Unplug power supply or use the reset button (on the rear side) to restart the IDU and press “A” key several times (over 10 times) until the message appears as shown in the picture below. While pressing the “A” key (holding the key down won’t work) the EPROM monitor program stored in the Flash EPROM is executed and the port speed auto-detection is carried out.

When message appears press Enter (on the keyboard) two times.

5. Enter the command “xa” to erase the current contents of management software from Flash EPROM. Note that this command will not erase the EPROM monitor program (which currently runs to perform the upload) but only the section of management software. Note: While the new software will not be loaded, the management system will not work!

22

Page 23: CFM Radiolink Installation Manual SAF.pdf

6. On the Transfer menu, click Send Text File…, choose and open the file (it may have “txt” or “hex” extension).

After about 10 minutes the following notification “Device programmed successfully” should appear (see the following picture), otherwise an error message will be returned.

23

Page 24: CFM Radiolink Installation Manual SAF.pdf

7. Restart the IDU. Notes

For the software upload to Flash EPROM the 115200 bit/s speed should be selected, although in case of certain problems the upload can also be done at 19200 or less bit rate but will take more time to accomplish.

In case if encounter error during the upload, repeat steps 4 - 7.

24

Page 25: CFM Radiolink Installation Manual SAF.pdf

Chapter 7. References

SAF Tehnika Technical support: Phone: +371 7046840 www.saftehnika.com Fax: +371 7046809 Email: [email protected]

7 References All the documents comprised in this chapter can be ordered from SAF Tehnika or its sales representatives.

• Technical Descriptions There are two technical descriptions available:

• SAF CFM-LM Product Family Technical Description - a generic technical description of the CFM-LM series products, it comprises the installation and commissioning issues and accessories, functional description, technical data, a.o.

• SAF CFM-L4 Product Family Technical Description - a generic technical description of the CFM-L4 series products.

• Management System Technical description and Configuration Guide

The following configuration guides are available: • CFM Series E1 Indoor Units • CFM Modular Multiplexer Indoor Units • CFM-4-REB and CFM-8-REB Ethernet Bridge • CFM-34-E3 Indoor Unit • Modular Fast Ethernet Bridge Indoor Units • 2xE1 Full Outdoor Unit • 4xE1 Full Outdoor Unit


Recommended