HYDERABAD,INDIA CASE HISTORY Rev: 00, Issue Data 07.01.08 ENVIRONMENTAL/ / SLOPE PROTECTION/ Product: Paraweb FLY OVER AT PANJAGUTTA JUNCTION Problem There was traffic congestion near Rajiv Gandhi Statue to Jubilee Hills at Panjagutta Junction (Nagarjuna Circle), Hyderabad. So, Mu- nicipal Corporation Of Hyderabad decided to construct flyovers. There were 2 Flyovers comprising of 5 ramps . Each ramp consisted of 2 approach walls and 1 cross wall. The maximum height of ap- proach walls was 6.4m. In order to avoid extensive foundation improvement schemes , Rein- forced soil wall was selected as the solution in stead of conventional Reinforced concrete solutions. The cost of the conventional solution considered was high and the authorities wanted to have a system which is very flexible and simple to construct and to achieve overall economy. Solution Reinforced Soil Wall with concrete panels as facia and Paraweb as reinforcement was selected as the best solution for the above problem. Paraweb is a flat strip version of a high strength, low weight ,non corrodible cable called Parafil. It is one of the first ever soil reinforc- ing material used in the world market and came into use from 1977. It comprises polyester yarn encased in tough and durable polyethylene sheath. Paraweb is available in different grades of strength varying from 30 KN to 100 KN and the roll lengths are of 100m. T shaped panels with corrugations were mainly used as facia panels and bottom panels were half panels. Some special end panels and corner panels were also used. The connection between the panels & facia was done by galvanized toggles and loops. Polypropylene dow- els were used to connect different types of panels. Pure frictional soil with angle of internal friction 32 degrees were used as structural fill. Client name: MUNICIPAL CORPORATION OF HYDERABAD Main contractor name: GAMMON INDIA LTD PARAWEB (WALL AREA-3510 SQM) Construction info Consultant: Product used: Construction date: TANDON CONSULTANTS PVT LTD 2006 Construction in Progress ONGOING CONSTRUCTION Construction info: Starting Phase Of the Construction
Transcript

HYDERABAD,INDIA

CASE HISTORY Rev: 00, Issue Data 07.01.08

ENVIRONMENTAL/ / SLOPE PROTECTION/

Product: Paraweb

FLY OVER AT PANJAGUTTA JUNCTION

Problem There was traffic congestion near Rajiv Gandhi Statue to Jubilee

Hills at Panjagutta Junction (Nagarjuna Circle), Hyderabad. So, Mu-

nicipal Corporation Of Hyderabad decided to construct flyovers.

There were 2 Flyovers comprising of 5 ramps . Each ramp consisted

of 2 approach walls and 1 cross wall. The maximum height of ap-

proach walls was 6.4m.

In order to avoid extensive foundation improvement schemes , Rein-

forced soil wall was selected as the solution in stead of conventional

Reinforced concrete solutions. The cost of the conventional solution

considered was high and the authorities wanted to have a system

which is very flexible and simple to construct and to achieve overall

economy.

Solution

Reinforced Soil Wall with concrete panels as facia and Paraweb as

reinforcement was selected as the best solution for the above problem.

Paraweb is a flat strip version of a high strength, low weight ,non

corrodible cable called Parafil. It is one of the first ever soil reinforc-

ing material used in the world market and came into use from 1977. It

comprises polyester yarn encased in tough and durable polyethylene

sheath. Paraweb is available in different grades of strength varying

from 30 KN to 100 KN and the roll lengths are of 100m.

T shaped panels with corrugations were mainly used as facia panels

and bottom panels were half panels. Some special end panels and

corner panels were also used. The connection between the panels &

facia was done by galvanized toggles and loops. Polypropylene dow-

els were used to connect different types of panels. Pure frictional soil

with angle of internal friction 32 degrees were used as structural fill.

Client name:

MUNICIPAL CORPORATION OF HYDERABAD

Main contractor name:

GAMMON INDIA LTD

PARAWEB (WALL AREA-3510 SQM)

Construction info

Consultant:

Product used:

Construction date:

TANDON CONSULTANTS PVT LTD

2006

Construction in Progress

ONGOING CONSTRUCTION Construction info:

Starting Phase Of the Construction

Construction in progress

Project section drawing

PRESENT STATUS

The construction of 3 ramps has been completed and the remaining 2 ramps is in progress.

,During the construction of flyover, one of the bridge span had collapsed. which is at a distance of over 200m away from the RS wall .An

excavation made near to the staging ,led to the collapse of the structure .The heavy rain also triggered this failure.

It is worthwhile to mention that ,the Reinforced Soil Wall is staying intact , without even a slightest sign of distress.

The performance of the completed structures are as per the expected high quality standards.

.

Maccaferri Environmental Solutions Pvt. 1003 ,10th Floor,Casablanca,Plot No.45,Sector-11,CBD Belapur,Navi Mumbai-400614

Tel. 91-22– 27580475/27565451/ 27565906/27580931/ 27580932 - Fax (022) 27580488

E-mail: [email protected], [email protected] - Web site: www.maccaferri.com

Construction in Progress

Construction in Progress


Recommended