Challenging to implement: Existing linac is ancient and very crowded. Space for polarized gun is limited. Need to preserve current operations capability for existing CHESS light source. Positives: Space available for polarimetry in linac at full energy. Space (5 m) may be available in “North Area” straight section of synchrotron or in injection lines after synchrotron. Dedicated run for machine studies is a viable (and perhaps preferred) option.
Transcript
Page 1: Challenging to implement...PowerPoint Presentation Author Karl Smolenski Created Date 10/11/2017 5:37:57 PM ...

Challenging to implement:

Existing linac is ancient and very crowded.

Space for polarized gun is limited.

Need to preserve current operations capability for existing CHESS light source.

Positives:

Space available for polarimetry in linac at full energy.

Space (5 m) may be available in “North Area” straight section of synchrotron or in injection lines after synchrotron.

Dedicated run for machine studies is a viable (and perhaps preferred) option.

Page 2: Challenging to implement...PowerPoint Presentation Author Karl Smolenski Created Date 10/11/2017 5:37:57 PM ...

Existing 150kV Thermionic Gun

Page 3: Challenging to implement...PowerPoint Presentation Author Karl Smolenski Created Date 10/11/2017 5:37:57 PM ...

Space for Polarimeter at end of Linac (3-4m)