Changing Your Work Process to a Preferred Work Method. Speakers: Steve Hallmark – SMUD Scott Hommel - FCS. 4/17/2007. Overview of Presentation. The Issues Work Consistency Safety Skills and Knowledge Gaps/Inconsistencies Existing Culture Pending Loss of Experienced People - PowerPoint PPT Presentation
25
1 Changing Your Work Process to a Preferred Work Method Speakers: Steve Hallmark – SMUD Scott Hommel - FCS 4/17/200 7
Transcript
Page 1: Changing Your Work Process to a Preferred Work Method

1

Changing Your Work Process to a Preferred Work Method

Speakers:

Steve Hallmark – SMUD

Scott Hommel - FCS

4/17/2007

Page 2: Changing Your Work Process to a Preferred Work Method

2

• The Issues Work Consistency Safety Skills and Knowledge Gaps/Inconsistencies Existing Culture Pending Loss of Experienced People

• Defining the Job Skill and Knowledge Assessment Risk Assessment Gap Analysis

• Preferred Work Methods Definition: PWM versus Procedures Worker Buy-in Development Process Rolling Out into Training & Work Culture

• Results/Summary

Overview of Presentation

Page 3: Changing Your Work Process to a Preferred Work Method

3

• A comprehensive assessment of SMUD’s work procedures and training programs, conducted by Tri-Tech/FCS, found strong training programs but some gaps and inconsistencies in written procedures.

• SMUD decided to:“Fill” procedures gaps quicklyUse them to provide accurate, consistent, and

safe guidance for both field forces and for trainees

“Build” them in a way that encourages broad buy-in, understanding, and use of PWM's

The Issues

Page 4: Changing Your Work Process to a Preferred Work Method

4

• SMUD needed consistency - after an accident investigation, they no longer want to hear:

“The method used was O.K., but I wouldn’t have done it that way.”

• At the same time, SMUD needed to capture the knowledge of their best subject matter experts (SME) before they retired.

• Factors driving this project included:Work ConsistencySafetySkills and Knowledge CaptureCompany Culture

The Issues (Cont.)

Page 5: Changing Your Work Process to a Preferred Work Method

5

• Develop a Task List and Skills & Knowledge List for each job position.

• Provide a Training Roadmap and a Gap Analysis to identify discrepancies between the roadmap and existing training programs.

• Provide a Gap Analysis identifying discrepancies between existing and best industry preferred work practices.

• Prioritize and list the most urgent tasks for each job position for which Preferred Work Methods should immediately be developed.

• Coordinate all of the above.

Goals for the Project

Page 6: Changing Your Work Process to a Preferred Work Method

6

• Procedures, in the classical sense, do not work for Distribution Services due to the variety of scenarios faced in the field and the existing culture of the workers.

• A Preferred Work Method (PWM) is a high level “description” of the things that should usually never vary while performing a high risk task, including safety equipment requirements and the basic steps to take. The focus is on consistency and safety.

• Due to variances in real-world application, the Foreman has the authority to apply the PWM as necessary to fit the circumstance.

• A PWM is structured enough to satisfy management that real gains will be made and loose enough to satisfy the work force so they are not “handcuffed.”

Definition of a Preferred Work Method

Page 7: Changing Your Work Process to a Preferred Work Method

7

• PWM’s are discussed with the crew during the Tailboard session.

• It is the Foreman’s judgment call if field conditions indicate that the PWM will not to be followed; risk should be acceptable and documented on Tailboard.

• Crew members should understand why a PWM is not being followed.

• If the PWM can’t be followed and the risk of an alternative method is not acceptable, the Foreman will defer action on the task.

Guidelines for Using PWM’s

Page 8: Changing Your Work Process to a Preferred Work Method

8

Defining the Job• Defining each job to identify the tasks for which to

develop Preferred Work methods involved three major phases:

• Skill and Knowledge Assessment to identify all tasks performed by each job position.

• Risk Assessment to prioritize the tasks so that we could focus on the most critical with regards to job safety.

• Gap Analysis to further prioritize the tasks in order to focus on those that had the largest gaps in existing knowledge or ability.

Page 9: Changing Your Work Process to a Preferred Work Method

9

Training Assessment Methodology

Page 10: Changing Your Work Process to a Preferred Work Method

10

• Based on an objective approach that is the standard for

training assessments.

• Training can be considered a cycle with interrelated

phases• Evaluation phase provides feedback to each of the five

phases

EvaluateImplement Develop DesignAnalyzeEffective

Training

Project Plan

Page 11: Changing Your Work Process to a Preferred Work Method

11

• Site and system familiarization

• Review of existing training and documentation

• Personnel interviews and observations

• Training Assessment Instrument

• Work Groups and Table-Top Analysis

Skill and Knowledge Assessment

Page 12: Changing Your Work Process to a Preferred Work Method

12

• Created preliminary Task Lists and Skill & Knowledge Lists.

• Revised them based on interviews and observations.• Based on approved task lists, constructed assessment

instruments for each job discipline:– Organized by domain– Identified knowledge and skills needed to succeed in the

job• Compiled data was validated and refined at table-top work

group sessions (discussed shortly).

Training Assessment Instrument

Page 13: Changing Your Work Process to a Preferred Work Method

13

Training Assessment Example: Task ListSMUD Distribution Services – Lineman/Linewoman Job Task List

General Overhead Construction and Maintenance (Duty Area A1)

Task ID

Task/Job Responsibility D I F P Risk Apprentice Training Issues/Comments

A1.3 Conductors

A1.3.1 String line conductors.           

A1.3.2 Sag line conductors.           

A1.3.3 Dead end line conductors.           

A1.3.4 “Bump on” double dead ends.           

A1.3.5Tie and untie conductors utilizing top ties, side ties, preformed ties and conventional ties.

           

A1.3.6Install pigtails and hot ropes for the purpose of relocating and securing energized conductors.

           

A1.3.7 Join/splice overhead conductors.         

Bump sleeves

A1.3.8 Install midspan taps using ladders.           

A1.3.9 Install hot taps.           

A1.3.10 Perform phasing on overhead conductors.           

A1.3.11Lift and relocate conductors from a permanent to a temporary position and back.

         Hot gins

A1.3.12 Maintain distribution lines.           

DIF Definitions

Page 14: Changing Your Work Process to a Preferred Work Method

14

For each competency, please circle the appropriate answer to each question.

Competency Is the skill or knowledge area required for your

job?

Rate your current mastery of the skill or knowledge area.

Do you think you need training in this skill or knowledge

area?

Maintenance of Electrical/Electronic Control Systems

Be able to describe electrical principles and safety; voltage, current, resistance, power and Ohm’s law.

No Yes None Basic Int Adv No Yes Within 1 year

Be able to describe motor controller and contactor components and their functions.

No Yes None Basic Int Adv No Yes Within 1 year

Troubleshoot and repair AC and DC control circuits for 480 volt devices; for example, determine why a motor won’t auto start and correct the problem.

No Yes None Basic Int Adv No Yes Within 1 year

Note: Related to Mastery of the skill or knowledge area, the choices are:

        None

        Basic - indicates can perform with assistance

        Intermediate (Int) - indicates you can perform without assistance

        Advanced (Adv) - indicates you can coach/teach others

Training Assessment Example: S&K List

Page 15: Changing Your Work Process to a Preferred Work Method

15

• Sampling of employees from each job classification.• 5-10 employees per group.• Group meetings lasted 1-2 days for each job

classification.• Reviewed questionnaires together, item-by-item.• Supervision presented with the results for final

validation.• Compiled data became basis for training and PWM

recommendations.

Work Group Meetings/Table-Top Analysis

Page 16: Changing Your Work Process to a Preferred Work Method

16

Risk = Consequences x Exposure x Probability• Consequences = Damage/injuries caused when accident occurs

• Exposure = Amount of time a person is within a hazardous area

• Probability = Likelihood of making contact with a hazard

Risk Assessment

Tasks grouped by Risk Assessment

Page 17: Changing Your Work Process to a Preferred Work Method

17

• Based on the Skill and Knowledge Assessment, a database was developed identifying the levels of difficulty, importance, frequency (“DIF”) and risk level for each task.

• The rated DIF results were averaged and used in a training database algorithm to determine whether each task should be trained Initially (Apprenticeship), Continuously (Journeyman refresher training), or not at all.

• The results were cross-referenced with the existing training to identify any gaps and to also identify any current training that may be unnecessary.

• The Skills and Knowledge that are linked in the database to each task requiring training became learning objectives.

• Using the database, we logically grouped the required Skills and Knowledge into appropriate groups to form “learning units.”

Gap Analysis

Page 18: Changing Your Work Process to a Preferred Work Method

18

• A Preferred Work Method is a high level “procedure” that defines the things that should usually never vary.

• The Foreman has the authority to apply the PWM as necessary to fit the circumstance.

• The use of PWM’s should establish a company “standard” method of performing work tasks, but also allow leeway in adapting the methods to various situations and obstacles.

Preferred Work Methods (Review)

Page 19: Changing Your Work Process to a Preferred Work Method

19

• Achieving the “buy-in” of the workforce was critical to ensuring success.

• Buy-in was achieved by including the workforce in every step, including initial informational meetings, interviews, job observations, table-top work groups, etc.

• The workers also participated in the development of the PWM’s.

• Finally, all PWM’s were rolled into the SMUD training program, ensuring that future Apprentices all receive standard training on the PWM’s, a move that will continue to gain worker buy-in and also begin to change the work culture.

Worker Buy-In

Page 20: Changing Your Work Process to a Preferred Work Method

20

• Started with a list of the highest risk tasks for each position.

• PWM Oversight Committee was established to oversee the process and to approve tasks, from the assessment recommendations, for PWM development.

• Individual sessions were held, with several groups of 5-7 SME’s per group. Each group also had a recorder and a facilitator.

• Worked in half-day increments, 1-to-2 tasks at a time.

• Work sessions were followed by group presentations and critique.

• Lunch was provided to make it fun.

• The overall positive attitude of all participants ensured quality output and the all-important worker buy-in.

Development Process

Page 21: Changing Your Work Process to a Preferred Work Method

21

• The work is not considered complete with the completion of the PWM’s. Nothing will change without a complete integration into the training curriculum and a changing of the work culture.

• It takes time, but with the positive contributions to date, and the continuous use of the PWM’s in the training, it is expected that the workforce will integrate PWM’s into the SMUD culture resulting in improved safety, work consistency, and quality.

Integration into Training/Work Culture

Page 22: Changing Your Work Process to a Preferred Work Method

22

• Mitigates SMUD’s risk.• Captures expertise of SMUD’s highly experienced, most respected

SME’s.• Documents safe and consistent ways to work; Enhances safety and work

consistency.• Provides guidance to Foremen in the field.• Integrated into all facets of field training for consistency with actual

practice in the field.• Provides a way to capture technical expertise, applicable elsewhere at

SMUD where many retirements are expected.• Field ownership is “built in” to the PWM development process through

participation; this assures understanding and buy-in.

What are the Benefits of PWM’s?

Sample PWM

Page 23: Changing Your Work Process to a Preferred Work Method

23

• PWM Oversight Committee:– Approves PWM after field testing

– Monitors necessary updates and revisions

– Identifies additional high risk tasks requiring documented Preferred Work methods

How are PWM’s Approved, Maintained, & Updated?

Cut & Kick a Pole

Page 24: Changing Your Work Process to a Preferred Work Method

24

Questions

Page 25: Changing Your Work Process to a Preferred Work Method

25

Contact Information

Steve Hallmark: 916-732-6251 [email protected]

Scott Hommel: 410-312-6240 [email protected]


Recommended