Production Control
Chapter 21
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 2/24
IT 208 Chapter 21 2
Competencies Describe the difference between Jigs and Fixtures
Describe the difference between CAD/CAM
Define c!puter integrated !anufacturing
"ist essentia# c!pnents f rbtics and describetheir functin
Describe the disad$antage f Just%in%ti!e schedu#ing
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 3/24
IT 208 Chapter 21 &
CHARACTERISTICS OF
DIFFERENT TYPES OF FACILITIES
The !st i!prtant factr in !anufacturing is the rate fprductin' because it deter!ines which !anufacturing
prcesses wi## be the !st efficient fr an( gi$enprduct) This s(ste! is dri$en b( the cust!ers*de!and +,u## s(ste!-
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 4/24
IT 208 Chapter 21 .
Characteristics O
Dierent T!pes O Facilities
,iecewr ,rductin
!a## atch ,rductin +1%20 ,arts/r)-
"arge atch 3r Cntinuus ,rcesses +20%200,arts/r)-
Mass ,rductin +3$er 200 ,arts/r-
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 5/24
IT 208 Chapter 21 4
Piece"or# Production Defined as the fabricatin f ne c!p#ete unit at a
ti!e)
5ti#i6atin f e7uip!ent is nt a great cncern since
the e7uip!ent is nt usua##( shared r tied upcntinuus#( fr the prductin run)
,iecewr faci#ities are ften batch prcesses inwhich prducts are !ade indi$idua##()
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 6/24
IT 208 Chapter 21
Piece"or# Production1) Jigs and Fixtures
a- A fixture is a de$ice that is indi$idua##( designed t h#d aspecific wrpiece in p#ace) Its specific 9b is t faci#itatesetup r t !ae h#ding easier)
: ;x) % 5se a fixture t h#d a particu#ar p#ug at an ang#e freasier s#dering)
b- A jig is a fixture that estab#ishes certain critica# #catindi!ensins n the wrpiece)
: ;x) < 5sing a 9ig fr the h#ding and dri##ing precise h#es
+int a casting- fr the shafts f a three di!ensina#!echanis!)
c) Work holder is the genera# ter! fr either a 9ig r afixture) A !iter bx r a bench $ise !ight be a wrh#der)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 7/24IT 208 Chapter 21 =
Piece"or# Production2. Inspection is the act f deter!ining whether r nt
the si6e' shape' and #catin f a## features f thewrpiece are cnsistent with the drawings r
ther specificatins) Inspectins are perfr!ed b(!achinists r peratrs)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 8/24IT 208 Chapter 21 8
Small $atch Production
%&'() Parts*Hr+, At this rate f prductin' c!p#eted parts begin t
tae up a significant a!unt f space befre the(can be shipped and raw !ateria#s are needed at a
faster rate than the( are with piecewr) red! bec!es a cncern and nt n#( affects
the 7ua#it( f the prduct' but safet( is a#saffected)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 9/24IT 208 Chapter 21 >
Small $atch Production
%&'() Parts*Hr+,?u!erica# Cntr# is a wa( f cntr##ing the actin f
!achines b( gi$ing the! a set f instructins innu!erica# fr!)
C!puteri6ed ?u!erica# Cntr#: Can be prgra!!ed t cntr# se$era# prductin
!achines
: Can stre prgra!s and data that wu#d a##w it ttrac the wear f the cutting t#s and aut!atica##(
c!pensate fr that wear): Machines were designed with a t# carrier s that
t#s cu#d be changed b( c!puter cntr#)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 10/24
IT 208 Chapter 21 10
Small $atch Production
%&'() Parts*Hr+,!e ,rb#e!s f C?C
: ?ew !achines are $er( expensi$e and n#( 4@ fthe part*s tta# !anufacturing ti!e is it actua##( n
the !achine): 3n#( prfitab#e if it frees up ti!e t super$ise !re
!achines r t spend ti!e with the hu!an acti$ities
that c!puters cannt d we##
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 11/24
IT 208 Chapter 21 11
Lar-e $atch Or Continuous Processes
%()'()) parts*hr+, ? #nger des ne persn see the part fr! start
t finish)
chedu#ing is an i!prtant part f this t(pe f
!anufacturing) Inspect the parts fre7uent#( t detect trends in
parts nt !eeting standards and tae crrecti$eactin befre the parts are s far fr! the
specificatins that the( are scrap)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 12/24
IT 208 Chapter 21 12
Lar-e $atch Or Continuous Processes
%()'()) parts*hr+,
&) C!puter%Aided Drafting/ C!puter%Aut!atedManufacturing
a- C!puter%Aided Drafting is a !ethd f drafting that uses
a c!puter t draw n the screen as instructed b( an peratr)The c!puter acts n#( as an e#ectrnic drafting bardB it desnt d an(thing n its wn)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 13/24
IT 208 Chapter 21 1&
Lar-e $atch Or Continuous Processes
%()'()) parts*hr+,
b- C!puter Aut!ated ;ngineering +CA;- is a s(ste!that uses a c!puter t !ae design drawings' but additina##( iscapab#e f ding engineering ana#(sis f the designed b9ect)
: Deter!ine the $#u!e and weight f the part and #cate itscenter f !ass)
: D a c!p#ete structura# ana#(sis f the prduct)
: Deter!ine c#earances and a##wances between !atchingparts)
: De$ise the pti!u! steps fr the !anufacture f the prduct)
: Create the c!!ands fr the c!puter cntr##ed !achines
that !ae the prduct): eep the in$entr( recrds and ther dcu!entatin fr the
prduct
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 14/24
IT 208 Chapter 21 1.
Lar-e $atch Or Continuous Processes
%()'()) parts*hr+,
c- C!puter%Aut!ated Manufacturing is an appracht rgani6ing a !anufacturing p#ant s that a## pssib#eana#(ses' decisins' and actins are assigned t a !asterc!puter)
d-T(pica# C!puter 3peratins in CAM : Cntr# the in$entr()
: Direct the transprtatin f raw !ateria#s' c!p#etedprducts' and parts at different stages during!anufacture)
:Create !achine !aintenance schedu#es)
: Cntr# the aut!atic inspectin
: Maintain dcu!entatin
: Cntr# the actins f rbts)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 15/24
IT 208 Chapter 21 14
Lar-e $atch Or Continuous Processes
%()'()) parts*hr+,
EbticsEbts ha$e fi$e essentia# c!pnents
1) Manipulator % the part f the !achine that actua##(
hand#es the t#' !ateria#' r part)2) Actuators % respnd t the signa#s fr! the cntr##er'causing the !anipu#atr t perfr! its assigned functin)
3) Sensors % detect the psitins f the $arius c!pnentsf the ar! and hand and feed data bac t the cntr##er)
) !ontrollers % c!puters that send cntr# signa#s t the
!anipu#atrs and respnd t the data fed bac t the! b(the sensrs)") #o$er supplies % pr$ide the energ( that dri$es the
cntr##ers' sensrs' !anipu#atrs' and actuatrs)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 16/24
IT 208 Chapter 21 1
Lar-e $atch Or Continuous Processes
%()'()) parts*hr+,
5se f Ebts
Manipu#atrs
: The rbt !anipu#atr !ust dup#icate essentia##( e$er(
!$e!ent f the hu!an ar! and hand) Actuatrs
: The !usc#esB f the rbt !echanis!) These !a( bepwered b( air' h(drau#ic f#uid' e#ectricit(' !agnetis!' r a
$acuu!)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 17/24
IT 208 Chapter 21 1=
Lar-e $atch Or Continuous Processes
%()'()) parts*hr+,
: Air%perated and $acuu!%perated +pneu!atic-!echanis!s are usua##( s!a## and #i!ited b( thea!unt f frce the( can exert' but the( are inexpensi$et cnstruct and perate)
: (drau#ic !echanis!s are capab#e f exerting #argefrces' are high pwered' and are a!a6ing#( 7uic frtheir si6e) The( d tend t be !ess( due t theine$itab#e #eaage f h(drau#ic f#uid)
: ;#ectrica##( dri$en !echanis!s are apprpriate fr #ight
dut() The( are $er( accurate' precise' and c#ean): Magnetica##( dri$en actuatrs such as s#enids are$er( 7uic but are #i!ited b( the a!unt f frce the(can exert n the wrpiece)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 18/24
IT 208 Chapter 21 18
Lar-e $atch Or Continuous Processes
%()'()) parts*hr+,
C!puter Functins
: The brainB f the rbt is the c!puter that cntr#s therbt)
Cntr# (ste! Functins: If the c!puter is the GbrainB f the rbtics s(ste!' then
the cntr# s(ste! is its ner$us s(ste!)B
Ebt Functins
: Thrugh its end%f%ar! de$ice +handB-' the rbt eitherpics up the wrpiece r des s!ething with it)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 19/24
IT 208 Chapter 21 1>
.ualit! Assurance Throu-h
Automated Inspection
%ualit& !ontrol +HC-: Cncerned with ensuring that the prducts !eet their
design standards
: Causes f ,rduct ariatin
: Inherent 'ariation is the una$idab#e $ariatin in thedi!ensins f a part due t such causes as f#exure f thecutting t#' etc)
: Assignable !ause is an act r acti$it( that can be identifiedas the reasn wh( a wrpiece de$iates)
: A !anufacturing prcess is said t be in controlB when the
assignab#e causes ha$e been detected and crrected s thatn#( the inherent $ariatin is #eft)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 20/24
IT 208 Chapter 21 20
.ualit! Assurance Throu-h
Automated Inspection
Statistical %ualit& !ontrol
: the cntr# f the 7ua#it( f the parts prduced b( anana#(sis f the nu!erica# data deri$ed fr!
!easure!ents taen n thse parts) Meeting (ra$ing olerances
: If the designer ass fr t#erances that are s!a##erthan can be achie$ed with a !achine' then either the
t#erances need t be #senedB r e#se the prcessneeds t be dne n a different !achine)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 21/24
IT 208 Chapter 21 21
/ust'in'Time Sche ulin-
A t(pe f prductin rgani6atin in which the !ateria# fra part r asse!b#( is de#i$ered 9ust in ti!e t beused)
: hifts respnsibi#it( fr 7ua#it( t the supp#iers: Eeduce prductin csts b( 20@ t .0@)
: The drawbac t JIT is that the prductin #ine is shutdwn if e$en ne part des nt c!e in 9ust in ti!e)B
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 22/24
IT 208 Chapter 21 22
0ass Production %o1er ()) parts*hr,
Cnstant#( fcused n reducing fractina# csts)+a$ing )20/pc K &00 pcs)/hr) L 00'000/(r)
1) Adapti$e Cntr#: A t(pe f feedbac cntr# that senses changes utside f
the feedbac #p +te!perature' pressure' $ibratin' etc)-and changes the instructins +t the actuatrs- s that thedesired resu#t is sti## acc!p#ished in spite f the exterir
change)
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 23/24
IT 208 Chapter 21 2&
0ass Production %o1er ()) parts*hr,
2) Ce##u#ar 3rgani6atin
: is a wa( f rgani6ing a !anufacturing faci#it( s that!st f the prcesses are carried ut b( a s!a## grup f
!achines +the ce##B-) ;x) < C!bining turning' !i##ing'and dri##ing peratins in a !achining center)
&) F#exib#e Manufacturing (ste!s +FM-
: sa!e cncept as that f the !achining ce## except thatthe e#e!ents f the FM are !achining ce##s rather than
!achining centers) Fig) 21%&.
7/23/2019 Chapter 21 Production Control
http://slidepdf.com/reader/full/chapter-21-production-control 24/24
IT 208 Chapter 21 2.
0ass Production %o1er ()) parts*hr,
.) C!puter%Integrated Manufacturing
: CIM is a !ethd#g( and a ga# it is nt a c##ectin fe7uip!ent and sftware)
: Its !ethd is t integrate a## aspects f design' p#anning'!anufacturing' distributin' and !anage!ent)
: Its ga# is t transfr! prduct designs and !ateria#s intsa#eab#e gds at a !ini!u! cst in the shrtest pssib#eti!e)
: CIM treats !anufacturing prcesses and p#ant peratinsand their !anage!ent as a sing#e s(ste!' nt ase7uentia# acti$it()