57 CHAPTER 7 FINAL TIP PROJECT LIST Table 7.2 in this chapter and Appendix A present the listings of projects officially included in the “FY 2006-2009 TIP.” In addition to the official federal four-year TIP program, this chapter also documents the TMACOG area “Pipeline Projects” and “Other Needs Projects” (i.e. Ranked Projects Not Funded). Pipeline projects have a local TMACOG commitment that they will be funded if and when funds are available over the next four years or included in the next TIP before any newly ranked projects are included (see TMACOG Policies in Chapter 1). The “Other Needs” list represents projects that are being pursued by the local jurisdictions in anticipation of identifying funding through some other source or at some later date. Other Needs and Pipeline projects are not evaluated for air quality conformance or impact. The final project lists and the results of the analyses of the program are then reviewed by the Transportation Council and Executive Committee of TMACOG. Their approval of the TIP is documented in a TMACOG Resolution passed by the two groups on May 4 and May 18, 2005 respectively. A copy of the resolution is included in Appendix F. The TIP list (Table 7.2) includes all federally assisted projects in our area and lists the type of program funding involved in the project. These federal programs are administered by different agencies and are designed to meet different needs in the area. A brief description of these federal aid transportation programs is included in the next section of this chapter to aid in understanding the overall TIP listing in Table 7.2. DESCRIPTION OF FEDERAL AID PROGRAM FUNDS Under the Transportation Efficiency Act for the Twenty-First Century (TEA-21), the federal aid highway program has six basic funding components (I, IM, NH, STP, BR and CMAQ), plus demonstration project funding. Additionally, the State of Ohio received separate Donor State Bonus (DSB) and Minimum Guarantee (MA) equity adjustment apportionments. These are received since Ohio taxpayers contribute more to the Highway Trust Fund than they would receive through normal distribution formulae and federal law guaranteed a minimum return of contributions to the fund. The Interstate (I), Interstate Maintenance (IM), National Highway (NH), and the Bridge (BR) programs are under the control of the Ohio Department of Transportation (ODOT). Projects funded with these fund types are selected by ODOT in cooperation with TMACOG. In addition, Surface Transportation Program (STP) funds are divided into a portion under the control of ODOT (OSTP) and a portion for this area controlled by TMACOG. The Surface Transportation Program (STP) essentially combines the old federal aid secondary and urban system programs and a portion of the former Primary Program into a flexible, intermodal program. TMACOG has programming control over the allocated STP funded projects. These projects are selected by TMACOG in consultation with ODOT. Projects using
Transcript

57

CHAPTER 7

FINAL TIP PROJECT LIST Table 7.2 in this chapter and Appendix A present the listings of projects officially included in the “FY 2006-2009 TIP.” In addition to the official federal four-year TIP program, this chapter also documents the TMACOG area “Pipeline Projects” and “Other Needs Projects” (i.e. Ranked Projects Not Funded). Pipeline projects have a local TMACOG commitment that they will be funded if and when funds are available over the next four years or included in the next TIP before any newly ranked projects are included (see TMACOG Policies in Chapter 1). The “Other Needs” list represents projects that are being pursued by the local jurisdictions in anticipation of identifying funding through some other source or at some later date. Other Needs and Pipeline projects are not evaluated for air quality conformance or impact. The final project lists and the results of the analyses of the program are then reviewed by the Transportation Council and Executive Committee of TMACOG. Their approval of the TIP is documented in a TMACOG Resolution passed by the two groups on May 4 and May 18, 2005 respectively. A copy of the resolution is included in Appendix F. The TIP list (Table 7.2) includes all federally assisted projects in our area and lists the type of program funding involved in the project. These federal programs are administered by different agencies and are designed to meet different needs in the area. A brief description of these federal aid transportation programs is included in the next section of this chapter to aid in understanding the overall TIP listing in Table 7.2. DESCRIPTION OF FEDERAL AID PROGRAM FUNDS Under the Transportation Efficiency Act for the Twenty-First Century (TEA-21), the federal aid highway program has six basic funding components (I, IM, NH, STP, BR and CMAQ), plus demonstration project funding. Additionally, the State of Ohio received separate Donor State Bonus (DSB) and Minimum Guarantee (MA) equity adjustment apportionments. These are received since Ohio taxpayers contribute more to the Highway Trust Fund than they would receive through normal distribution formulae and federal law guaranteed a minimum return of contributions to the fund. The Interstate (I), Interstate Maintenance (IM), National Highway (NH), and the Bridge (BR) programs are under the control of the Ohio Department of Transportation (ODOT). Projects funded with these fund types are selected by ODOT in cooperation with TMACOG. In addition, Surface Transportation Program (STP) funds are divided into a portion under the control of ODOT (OSTP) and a portion for this area controlled by TMACOG. The Surface Transportation Program (STP) essentially combines the old federal aid secondary and urban system programs and a portion of the former Primary Program into a flexible, intermodal program. TMACOG has programming control over the allocated STP funded projects. These projects are selected by TMACOG in consultation with ODOT. Projects using

58

OSTP funds, which are primarily on the NHS System, are selected by ODOT in cooperation with TMACOG. Lucas and Wood counties also have access to STP funds made available to counties by ODOT. These funds are categorized as CSTP (County STP) within this report. As established under the Intermodal Surface Transportation Efficiency Act (ISTEA) and continued under TEA-21, the CMAQ Program was designed to substantially expand the focus and purpose of Federal transportation funding assistance to include air quality improvement as a specific objective. These funds are to assist areas designated as non-attainment and maintenance under the Clean Air Act Amendments (CAAA) of 1990 to develop improvement projects and programs that will reduce transportation emissions to achieve healthful levels of air quality. These funds are not for projects that expand or maintain existing transportation networks. Transportation projects and programs are eligible for CMAQ program funds only if they meet certain criteria spelled out in the TEA-21 as amended. In determining project eligibility under these criteria, priority is given to implementing those projects and programs that are included in an approved State Implementation Plan (SIP), or as a transportation control measure (TCM), and which will have air quality benefits. The activity must be eligible under the law and this guidance, even if it is included as a TCM in the SIP, before CMAQ funds may be used for it. Any reference to improving air quality contained in this guidance means reducing ozone precursors in ozone areas, Carbon Monoxide (CO) emissions in CO areas or, if applicable, transportation-related Particulate Matter (PM) pollution in PM areas. In general, most projects and programs eligible for CMAQ funds must also come from a conforming transportation plan and transportation improvement program (TIP), and be consistent with the conformity provisions contained in Section 176 of the Clean Air Act. Projects also need to complete the National Environment Policy Act (NEPA) requirements, and be included in the appropriate statewide program, and meet basic eligibility requirements for funding under titles 23 and 49 of the United States Code.

Table 7.1 Fund Source Designations and Abbreviations

TIP Designation

Federal Program Name

Programmed

By

Federal Transit Funds

5307 Urbanized Area Formula funds TARTA

5309 Capital Investment Program TARTA

5310 Elderly and Disabled Persons Program TMACOG

5311 Rural Transit Assistance Program ODOT

(table continues)

59

Table 7.1 (continued) Fund Source Designations and Abbreviations

TIP Designation

Federal Program Name

Programmed

By

Highway Funds Programmed By ODOT

I, IR, IM Interstate Funds ODOT

NH National Highway System ODOT

DEMO Special federal demonstration funds ODOT

ESTP Enhancement Surface Transportation Program ODOT

OSTP State of Ohio Surface Transportation Program ODOT BRx

Bridge Replacement funds, for projects on the federal aid system

ODOT

Highway Funds Programmed By TMACOG CMAQ

Congestion Management Air Quality funds

TMACOG

ENH

Transportation Enhancement Funds

TMACOG

STP

Urban Surface Transportation Program incl. MA

TMACOG

MA

Minimum Allocation

TMACOG

Highway Funds Programmed By Others MSTP

Michigan STP Funds

MDOT

BRO

Bridge Replacement funds for projects off the federal aid system

County

Engineers Assoc.

CSTP

County Surface Transportation Program

County

Engineers Assoc.

THE FINAL 2006-2009 TIP PROGRAM Table 7.2 includes all four-year TIP projects with funding and development phase. The table presents the overall program of projects in listings sorted by project sponsor (the last column). The first four columns present identifying information on the project – its TMACOG Map Number (unique number assigned at time of project request), the PID (Project Identification Number assigned by ODOT at time of programming), and State ID (name in ODOT databases). The next column is a description of the project, the type of work and air quality status. Air quality status relates whether the project was included in the pollution estimating model networks. The next five columns show cost and schedule information. The total project cost

60

inclusive of all local, state and federal funds is shown first. Then the federal cost and type of funding, the year and phase of the project are shown. Appendix G shows the exact same projects and same basic information about the projects but is sorted as required by ODOT by the “State ID” code. Appendix A shows the transit projects presented using forms required by ODOT. Map 7.1, at the end of this section, shows the location of all four-year TIP projects. OTHER SIGNIFICANT PROJECTS NOT FUNDED Table 7.3 includes the “Pipeline” and Table 7.4 includes the “Other Needs - Ranked Projects Not Funded” list. These are other significant projects for which federal funding has not been identified during the four-year TIP period. It is sorted by sponsoring jurisdiction and project name. OTHER SIGNIFICANT PROJECTS FUNDED BY NON-FEDERAL FUNDS Section 450.324(f)(3-5) requires the listing of regionally significant projects that are not otherwise included in the TIP. This may include projects that are not currently proposed to use federal funds, or projects that are beyond the time frames of the constrained TIP. Projects of this nature are included in Appendix H for review and information purposes.

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

Table 7.3

Pipeline Projects For TMACOG-Managed STP and CMAQ Federal Funding (local commitment after 2009 or as additional funds are available)

TMACOG # Project: Project Limits: Sponsor: Type Work:

TMACOG Funds ($ 000’s)

Pipeline (Local Commitment) 04.29 US 20A (MAUM.-WEST) Coder to Briarfield LUCAS COUNTY Widen & Reconstruct $2,284 966 SECOR - 3 LN. CONST. Alexis to State Line TOLEDO Widen & Rehabilitate $2,000 948 WHEELING STREET Navarre to Pickle OREGON Bridge & Road Improve. $3,825

04.34 IR 75 INTER. & CONNECT. Location to be selected WOOD COUNTY New Interchange & Connec. $7,683 06.28 HEATHERDOWNS PH 1 Reynolds to Cass TOLEDO Mill and Resurface $300 06.35 AWT INTERSECTIONS South, Farnsworth, Mech. WATERVILLE Improve Intersections $18806.19 SECOR PH 1 Central to Monroe TOLEDO Reconstruction $3,27200.04 NORTH MAIN STREET S of Poe to S of Newton B G Widen & Reconst-5Ln $7,233 06.24 MICHIGAN (SR 25) PH 2 Washington to Madison TOLEDO Reconstruction $690 02.16 ROACHTON ROAD - WEST W of Ft. Meigs to SR 25 PERRYSBURG Reconstruct $2,160 06.01 MCCORD ROAD PH 2 Central to Sylvania LUCAS CO Widen & Reconst-3Ln $2,190 04.32 SR 25 CLOSED LOOP SIGNAL Roachton to Front (US20) PERRYSBURG Closed Loop Signals $444 06.18 CHERRY (SR 120) Central to Greenbelt TOLEDO Reconstruction $2,89906.22 COLLINGWOOD Erie to Nebraska TOLEDO Reconstruction $2,923 04.12 FRONT Main to I-280 TOLEDO Reconstruction $2,705 06.02 MCCORD RD (C.R. #73) PH 1 N of Regents Pk Blvd to S of Central LUCAS CO Widen & Resurface-3Ln $805 06.11 OREGON TARTA SERVICE Transit System to Oregon TARTA Service to Oregon $800

77

Table 7-4

Other TMACOG Area Needs (STP and CMAQ Ranked Projects not funded) TMACOG

Map # SPONSOR PROJECT Project Limits Total Project Cost Const. Cost TMACOG's

TIP Dollars

04.24 TOLEDO MONROE STREET PH 6 Central to Crary $4,680,000 $4,280,000 $2,559,000 04.04 TOLEDO SECOR PH 2 Monroe to Laskey $2,890,000 $2,740,000 $2,139,000 04.17 TOLEDO MICHIGAN (SR 25) PH 1 Collingwood to Washington $1,230,000 $1,130,000 $658,000 06.17 TOLEDO JEFFERSON Collingwood to Summit $3,187,422 $3,037,422 $2,358,692 06.16 TOLEDO SUMMIT PH 2 Buckeye to Adrian $5,229,626 $4,879,626 $3,869,923 04.05 TOLEDO SECOR PH 3 Laskey to Alexis $3,218,764 $3,068,764 $2,381,885 04.08 TOLEDO MONROE STREET PH 5 Detroit to Oatis $5,362,894 $4,887,894 $3,910,315 06.27 TOLEDO SOUTHWYCK Reynolds to Reynolds $3,476,724 $3,326,724 $2,572,776 06.26 TOLEDO GLENDALE PH 2 AWT to RR Tracks $932,113 $857,113 $685,691 04.33 WOOD CO TRACY ROAD - 3 LANES Latcha to SR 795 $4,562,000 $4,105,000 $3,284,000 06.21 TOLEDO HILL AVENUE PH 2 Byrne to Westwood $3,341,871 $3,216,870 $2,472,984 06.08 OTTAWA HILLS BANCROFT Evergreen to Secor $1,496,000 $1,407,000 $692,700 06.13 TOLEDO REHAB ALEXIS RD BRIDGES Bridges over Detroit & Stickney $5,350,000 $5,200,000 $4,128,000 06.15 TOLEDO SUMMIT (SR 65) PH 1 Cherry to I-280 $4,165,011 $3,940,010 $3,067,091 06.23 TOLEDO CENTRAL (SR 120) Detroit to Cherry $1,226,938 $1,126,938 $528,635 06.30 TOLEDO HEATHERDOWNS PH 3 Key to Byrne $1,312,846 $1,212,847 $970,277 06.14 TOLEDO JACKMAN RD BR REPLACE Brim Rd to Brooke Park Dr $1,130,000 $1,040,000 $832,000 04.02 TOLEDO NAVARRE (SR 2) Woodville Road to City Limit $2,114,803 $1,814,802 $1,451,842 06.31 TOLEDO N DETROIT (US 24) PH 1 Lagrange to Crawford $4,258,375 $3,883,374 $2,634,105 06.20 TOLEDO HILL AVENUE PH 1 Reynolds to Byrne $2,432,824 $2,357,824 $1,800,290 06.33 TOLEDO CITY PARK AWT to Indiana $1,775,030 $1,650,430 $1,313,818 06.34 TOLEDO LASKEY Jackman to Lewis $698,267 $623,267 $498,613 06.32 TOLEDO N DETROIT PH 2 Shantee Creek to Alexis $3,498,794 $3,248,794 $2,589,108 06.12 TARTA NEW VEHICLES Transit System Wide $1,000,000 $800,000

$59,770,302 $54,884,699 $42,842,745 78

79


Recommended