14
 Virtual System in Change Request Management Based on SAP Solution Manager 7.0 SP24 Woody Wu 10/21/2011
Transcript
  • 5/21/2018 ChaRM ST400 Virtual System-1

    1/14

    Virtual System in

    Change Request

    ManagementBased on SAP Solution Manager 7.0 SP24

    Woody Wu

    10/21/2011

  • 5/21/2018 ChaRM ST400 Virtual System-1

    2/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 2of 14

    Table of Contents

    1 Introduction................................................................................................................................3

    2 STMS Configuration for Managed Systems ...................... ........... ............................ .......................5

    2.1 Create Virtual System................................................................................. ..........................5

    2.2 Adjust transport parameters for Virtual System ...................... ...................................... .........5

    2.3 Configure transport routes and transport layers for Virtual System................................ .........6

    3 Configuration on SAP Solution Manager System ................................................................ ............8

    3.1 Create Virtual System in SMSY ............................................. ............................................... ..8

    3.2 Adjust Product Assignment for Virtual System ...................................................... .................8

    3.3 Assign Installation Number to Virtual System ................. ...................................... .................9

    3.4 Create Logical Systems for ABAP Virtual System.................................................................9

    3.5 Create Logical Components for Virtual System.....................................................................10

    4 Usage in ChaRM .......................................... .................................................. ............................12

    4.1 Generate Project Cycle with Virtual System ........... ...................................... ........................12

    4.2 Replace Virtual System with Physical System ...................................... .................................13

  • 5/21/2018 ChaRM ST400 Virtual System-1

    3/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 3of 14

    1 Introduction

    This document is created as an introduction for the usage of Virtual Systemin Change Request

    Management (ChaRM) of SAP Solution Manager.

    Virtual Systemis a type of SAP Systems which can be used to solve the problem that you may not want

    to install all the systems you have planned for your system landscape at the same time, e.g., when the

    project is just started. In basis Transport Management System (TMS), you can configure SAP Systems as

    Virtual Systemsin the transport domain so that you can model the transport routes of your whole

    system landscape. More importantly, in ChaRM those Virtual Systemscan be used as place holders in

    the task list, which means the project cycle can be generated and change processes can be started

    without any delay even if some physical systems are not yet ready1. Most of the TMS display functions

    can be used for Virtual Systems, but no real transport can be performed in them.

    The following systems/clients are used as demo landscape in this document:

    SMI(SAP Solution Manager ST 400 SP24)

    o Client 100 (productive client of ChaRM)

    ERP(SAP ERP 6.0 - simulate managed system level)

    o Client 100 (simulate development system)

    VSQ(Virtual System- simulate managed system level)

    o Client 100 (simulate quality assurance system)

    VSP(Virtual System- simulate managed system level)

    o Client 100 (simulate production system)

    The whole landscape is looking like:

    Before using this document you need to make sure:

    1Pl ease be aware that the development sys tems (source systems) must not be Virtual System, otherwise the

    project task list in ChaRM cannot be generated succ essfully because we need a real IMG project and CTS project

    here.

    ERP/100 TransportRoute VSQ/100TransportRoute VSP/100

    SMI/100

    ChaRM

    RFC Destinations

  • 5/21/2018 ChaRM ST400 Virtual System-1

    4/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 4of 14

    ChaRM basic configurations have been correctly performed

    All your end users have been assigned to the appropriate authorization profiles

    In the following chapters we will explain the basic configuration steps to use Virtual Systemin ChaRM.

    Based on distinct system landscapes and specific requirements there might be some adjustments

    needed for different customers. Therefore we suggest you only use itfor reference.

    In case you have further questions and need more assistance to setup and utilize Virtual Systemon your

    systems, please create a consulting request to SAP. For more information, you may have a look at SAP

    note83020.

    https://service.sap.com/sap/support/notes/83020https://service.sap.com/sap/support/notes/83020https://service.sap.com/sap/support/notes/83020https://service.sap.com/sap/support/notes/83020
  • 5/21/2018 ChaRM ST400 Virtual System-1

    5/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 5of 14

    2 STMS Configuration for Managed Systems

    2.1 Create Virtual System2

    Logon to domain controller system client 000 -> Transaction STMS -> System Overview -> Menu bar SAP

    System -> Create -> Virtual System -> Enter System ID3and description -> Save and distribute the

    configuration change

    2.2 Adjust transport parameters for Virtual System

    Logon to domain controller system client 000 -> Transaction STMS -> System Overview -> Double click on

    the Virtual System entry -> Go to tab Transport Tool -> Adjust/insert parameters with correct value ->

    Save and distribute the configuration change

    2Please also have a look atConfiguring Virtual SAP Systems .

    3We recommend that the system ID should be identical with the future physical system which will replace this

    virtual system; this will reduce the foll ow up effort to adjust the transport groups a nd directories.

    http://help.sap.com/saphelp_smehp1/helpdata/en/44/b4a0db7acc11d1899e0000e829fbbd/frameset.htmhttp://help.sap.com/saphelp_smehp1/helpdata/en/44/b4a0db7acc11d1899e0000e829fbbd/frameset.htmhttp://help.sap.com/saphelp_smehp1/helpdata/en/44/b4a0db7acc11d1899e0000e829fbbd/frameset.htmhttp://help.sap.com/saphelp_smehp1/helpdata/en/44/b4a0db7acc11d1899e0000e829fbbd/frameset.htm
  • 5/21/2018 ChaRM ST400 Virtual System-1

    6/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 6of 14

    The following parameters are recommended for all managed systems, including Virtual System

    Parameters Value

    CTC 14

    IMPORT_SINGLE_ONLY 1

    IMPORT_SINGLE_STRATEGY 1NO_IMPORT_ALL 1

    WORKFLOW_STRATEGY 0

    2.3 Configure transport routes and transport layers for Virtual System

    Logon to domain controller system client 000 -> Transaction STMS -> Transport Routes -> Go to Change

    mode -> Configure transport routes and transport layers for the transport tracks which have the Virtual

    System5-> Save and distribute the configuration change

    When creating transport routes with Virtual Systemas the target system, there are two different

    situations:

    1. The Virtual Systemrepresents a real system which has ABAP stack. In this case even if there is no

    real client in for the Virtual Systemat this moment, you still need to enter the target client by

    using a working client which is planned in future. Otherwise the transport route will not be

    4I f your planed physical system is purely non-ABAP, then for the Virtual Systemthe CTC parameter shoul d be set

    as 0.5For detail steps please checkConfiguring Transport Routes.

    http://help.sap.com/saphelp_nw70ehp1/helpdata/en/44/b4a1df7acc11d1899e0000e829fbbd/content.htmhttp://help.sap.com/saphelp_nw70ehp1/helpdata/en/44/b4a1df7acc11d1899e0000e829fbbd/content.htmhttp://help.sap.com/saphelp_nw70ehp1/helpdata/en/44/b4a1df7acc11d1899e0000e829fbbd/content.htmhttp://help.sap.com/saphelp_nw70ehp1/helpdata/en/44/b4a1df7acc11d1899e0000e829fbbd/content.htm
  • 5/21/2018 ChaRM ST400 Virtual System-1

    7/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 7of 14

    recognized correctly and hence the STMS setting will be inconsistent when checked from ChaRM

    side.

    2. The Virtual Systemrepresents a purely non-ABAP system in future. In this case there is no need

    to specify the target client for the transport routes because they should be client independent.

  • 5/21/2018 ChaRM ST400 Virtual System-1

    8/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 8of 14

    3 Configuration on SAP Solution Manager System

    3.1 Create Virtual System in SMSY

    Logon to your SAP Solution Manager system -> Transaction SMSY -> Select Other Object -> Enter your

    domain controller system ID into Prod. System -> Go to tab Product Instance Selection -> Double click on

    the relevant ABAP instance -> Go to Change mode -> Select Read System Data Remote -> Go back and re-

    enter Transaction SMSY -> The Virtual System will be listed as Product Systems without Product

    Assignment

    3.2 Adjust Product Assignment for Virtual System

    Logon to your SAP Solution Manager system -> Transaction SMSY -> Select Other Object -> Enter your

    Virtual System ID into Prod. System -> Select Product in the popup of warning about no product

    assignment -> Choose the product and product version with refer to the future physical system -> Select

    Copy and mark relevant product as active -> Select Continue -> Enter Yes in case of confirmation popup ->

    Go to Change mode -> Mark relevant product instances -> Save

  • 5/21/2018 ChaRM ST400 Virtual System-1

    9/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 9of 14

    3.3 Assign Installation Number to Virtual System

    Logon to your SAP Solution Manager system -> Transaction SMSY -> Select Other Object -> Enter your

    Virtual System ID into Prod. System -> Go to tab Header Data -> Go to Change mode -> Enter the

    Installation Number which will be used for the future physical system -> Save

    The IBase/Component6for Virtual Systemwill be generated automatically after the Installation Number

    is entered and saved. If there are some errors during this process, then you can regenerate the

    IBase/Component by using transaction IB_GEN.

    3.4 Create Logical Systems for ABAP Virtual System7

    Logon to your SAP Solution Manager system -> Transaction SMSY -> Select Other Object -> Enter your

    Virtual System ID into Prod. System -> Go to tab Product Instance Selection -> Double click on the

    relevant ABAP instance8-> Go to Change Mode -> Select Read System Data Remote -> Go back to the

    Clients tab -> The clients of the communication system9will be filled here as temporary data

    6This I Base/Component wil l be used to create Change Requests a nd Change Documents i f the Virtual Systemhas

    the role of quality ass urance system or production system in the whole transport landscape.7This s tep is onl y necessary for ABAP stack systems. I f your virtual systemi s representing a purely non-ABAP one,

    then please DO NOTp erform it. In case there are al ready some clients existing for it, please delete the system

    entry i n SMSY manuall y and then recreate it, otherwise i t is not possible to i nclude the correct non-ABAP system

    entry i nto the logical component.8In the Header Data tab the Virtual Product System (TMS) flag s hould be checked.

    9By the default the communica tion system should be the domain controller system itself, but it ca n als o be

    specified differently when creating the Virtual Systemin s ection2.1.

  • 5/21/2018 ChaRM ST400 Virtual System-1

    10/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 10of 14

    Since for ABAP stack systems ChaRM is based on the logical systems, those clients are mandatory in

    order to use the Virtual Systemhere. If your planned client for Virtual Systemdoes not exist on the

    communication system, you need to choose another one or create a new client for the communication

    system before reading the system data.

    3.5

    Create Logical Components for Virtual System

    Logon to your SAP Solution Manager system -> Transaction SMSY -> System Groups and Logical

    Components -> Right click on Logical Components -> Create New Logical Components -> Enter name and

    product information -> Continue and put relevant systems into their corresponding system roles

  • 5/21/2018 ChaRM ST400 Virtual System-1

    11/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 11of 14

    The logical system positions and roles must be consistent with the transport route configuration

    performed in section2.3.

  • 5/21/2018 ChaRM ST400 Virtual System-1

    12/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 12of 14

    4 Usage in ChaRM

    4.1 Generate Project Cycle with Virtual System

    Logon to your SAP Solution Manager system -> Transaction SOLAR_PROJECT_ADMIN -> Create a project ->

    Include Logical Components -> Create IMG Projects -> Activate Change Request Management -> Perform

    ChaRM Check -> Create Task List10

    10During the creation CTS project status switches will not be created for Virtual System.

  • 5/21/2018 ChaRM ST400 Virtual System-1

    13/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 13of 14

    In the task list Virtual Systemis marked differently with other systems in the System Reachability column,

    and no actions can be executed for this type of systems.

    All Change Requests and Change Document types can also be used in projects with Virtual System. The

    only difference comparing to the normal projects is: no actions can be executed for Virtual System. So if

    the QAS system and PRD system are both virtual, then only the development task (i.e., create and

    release transport requests) can be performed in this project.

    4.2 Replace Virtual System with Physical System

    Basically there are three steps to replace a Virtual Systemin ChaRM. They are:

    1. Delete Virtual Systemin STMS

    Go to client 000 of the domain controller system, enter transaction STMS and delete the

    relevant Virtual System. Note that this action will only delete the system from the list, the

    transport buffer and directory on the operation system level will not be touched. So when the

    new physical system is created with the same system ID it can inherit all those old transport

    data automatically.

  • 5/21/2018 ChaRM ST400 Virtual System-1

    14/14

    SAP Solution Manager 7.0 Virtual System in ChaRM

    Page 14of 14

    2. Create Physical System in STMS with the same SID

    Include the new physical system to this domain11

    and approve it in the domain controller. After

    that you need to re-configure all those transport parameters12

    and make sure the transport

    route settings are still correct and consistent.

    3. Refresh System Data in SMSY

    The steps are the similar to those actions in section3.1.What you need to do is to press the

    Read System Data Remotebutton from both domain controller system and the Virtual System

    itself. After that the Virtual Product System flag should be removed in the Header Data tab of

    the Virtual Systementry in SMSY, which means it is already a physical system from now on. For

    ABAP stack systems then you will also need to generate the RFC destinations in client 000 and

    the working clients of ChaRM. In the end by opening the project cycle task list again the

    systems Reachablity status will be changed to Active. We suggest that at this stage you

    should perform a ChaRM check to ensure that all the configurations are correct and consistent.

    As long as there is no error in it then you may continue to work in this landscape. All those old

    change documents can be used without any issue and those transport requests which are

    already in the import buffer for the new physical system can now be transported directly

    without any other manual activities or adjustments.

    11Please also have a look a t Including SAP Systems i n the Transport Domain.

    12Especially for purely non-ABAP s ystems you need to ensure the para meters COMMUNICATION_SYSTEM and

    NON_ABAP_SYSTEM are ent ered correctly.

    http://help.sap.com/saphelp_smehp1/helpdata/en/44/b4a0c17acc11d1899e0000e829fbbd/frameset.htmhttp://help.sap.com/saphelp_smehp1/helpdata/en/44/b4a0c17acc11d1899e0000e829fbbd/frameset.htmhttp://help.sap.com/saphelp_smehp1/helpdata/en/44/b4a0c17acc11d1899e0000e829fbbd/frameset.htm