watch your step 05.2018 Michelle Goland Highway 7 West Community Liaison Specialist cell: 416.797.5653 email: michelle.goland@york.ca vivanext.com Follow us on Twitter. Like us on Facebook. Read our blog. Go to vivanext.com. Diana Kakamousias Bathurst & Centre Community Liaison Specialist cell: 905.251.7587 email: diana.kakamousias@york.ca checks and balance for safety On each project, an engineering firm monitors and reports on the safety and environmental measures in place on work sites. Every week, the team meets to discuss all aspects of upcoming construction activity. Emergency services—police, fire and ambulance—are informed about impactful work activity so alternative route options can be considered. On occasion, night work is scheduled on busy roads to avoid traffic congestion during the higher-traffic daytime hours. The Community Liaisons proactively notify businesses and residents directly impacted by work activity. There are many checks and balances in place on each of the vivaNext projects to ensure safety and compliance on the part of everyone on the project team. Who can I contact if I have a question? Keeping the public informed and engaged with our project is key. Our Community Liaisons work with property owners, tenants, local businesses and the general public. Construction bulletins are emailed regularly to people who have subscribed to updates, typically those who live, work and commute through the project areas. This is to ensure that the public is aware of major construction activities such as lane closures. You can sign-up for email updates for the project you’re most interested in at vivanext.com/subscribe. getting more information this week >> overnight storm sewer installations and median removals on Hwy 7 West To accommodate storm sewer installations, crews will be working nights to cross Pine Valley Drive at Highway 7 West. This work will be completed in stages and will require a traffic shift on Wednesday night and Thursday night. In addition, there will be eastbound and westbound curb lane closures on Highway 7 over the Highway 400 bridge for median removals. Please see below for details. storm sewer installations at Pine Valley: work dates*: Wednesday, April 4 to Friday, April 6 work hours*: 7pm–6:30am [overnight] As crews work to install storm sewers across Pine Valley, there will be two traffic shifts. On the first night, traffic will be shifted toward to east side of Pine Valley to accommodate work in the west lanes. On the second night, traffic will be shifted to the west side of the road to accommodate work in the east lanes. To accommodate this work, northbound and southbound traffic on Pine Valley [within the work area] will be reduced to one lane in each direction. Traffic control staff and paid duty police officers will be on site to direct traffic as required. overnight median removals on the Hwy 400 bridge: work dates*: Wednesday, April 4 to Wednesday, April 18 work hours*: 8pm–6am [overnight] To accommodate median removals on Hwy 7 W in the area of the Highway 400 bridge, eastbound and westbound curb lanes will be closed overnight. general impacts: Sidewalks and bus stops will remain open wherever possible. If a sidewalk or bus stop is temporarily closed, directional signs will guide pedestrians to the nearest open sidewalk or bus stop. Please give yourself enough time to get to your destination, and remember to reduce your speed through construction zones. Cross at the designated crosswalk. It can be tempting to cross in the middle of the road, but this can be very dangerous. Instead, cross at a designated crosswalk. Look both ways and be aware of your surroundings. April 3, 2018 » highway 7 west construction bulletin your community liaison Michelle Goland cell: 416.797.5653 email: [email protected] how to subscribe for email updates 1. Visit vivanext.com 2. Click on ‘subscribe’ on left side 3. Under ‘email notices’ select the ‘Highway 7 West/ Vaughan’ box and any others of interest 4. Provide your contact info 5. Click on ‘Submit’ Pine Valley Dr Highway 7 N Pine Valley Dr Highway 7 NIGHT 1 NIGHT 2 night work >> storm sewer installations on Hwy 7 West from Aberdeen to Pine Valley To accommodate storm sewer installations, crews will be working nights to cross the south side of Pine Valley Drive and Highway 7 West. During the day the westbound curb lane will be closed from Aberdeen Avenue to west of Pine Valley. In addition, the westbound curb lane on Highway 7 over the Highway 400 bridge will be closed Thursday night for light pole removals. Please see below for details. storm sewer installations at Pine Valley: work dates*: Thursday, March 22 to Friday, March 23, and Monday, March 26 to Wednesday, March 28 work hours*: 8pm–6:30am [overnight] As crews cross the south side of Pine Valley and Hwy 7 W intersection starting from west to east for storm sewer work, Pine Valley southbound [at Hwy 7] will be closed. storm sewer installations at Aberdeen: work dates*: Thursday, March 22 to end of April work hours*: 7am–5pm To accommodate storm sewer work on Hwy7 W, the westbound curb lane will be closed from Aberdeen to just west of Pine Valley. March 22, 2018 » highway 7 west construction bulletin your community liaison Michelle Goland cell: 416.797.5653 email: [email protected] how to subscribe for email updates 1. Visit vivanext.com 2. Click on ‘subscribe’ on left side 3. Under ‘email notices’ select the ‘Highway 7 West/ Vaughan’ box and any others of interest 4. Provide your contact info 5. Click on ‘Submit’ r D y e l l a V e n i P r D y e l l a V e n i P Aberdeen Ave Marycroft Ave N
Transcript
Page 1: checks and balance for safety watch your step · 4/13/2018  · watch your step 05.2018 Michelle Goland Highway 7 West Community Liaison Specialist cell: 416.797.5653 email: michelle.goland@york.ca

watch your step

05.2

018

Michelle Goland Highway 7 WestCommunity Liaison Specialist

cell: 416.797.5653email: [email protected]

vivanext.com Follow us on Twitter. Like us on Facebook. Read our blog. Go to vivanext.com.

Diana Kakamousias Bathurst & CentreCommunity Liaison Specialist

cell: 905.251.7587email: [email protected]

checks and balance for safety

On each project, an engineering firm monitors and reports on the safety and environmental measures in place on work sites.

Every week, the team meets to discuss all aspects of upcoming construction activity.

Emergency services —police, fire and ambulance—are informed about impactful work activity so alternative route options can be considered.

On occasion, night work is scheduled on busy roads to avoid traffic congestion during the higher-traffic daytime hours.

The Community Liaisons proactively notify businesses and residents directly impacted by work activity.

There are many checks and balances in place on each of the vivaNext projects to ensure safety and compliance on the part of everyone on the project team.

Who can I contact if I have a question? Keeping the public informed and engaged with our project is key. Our Community Liaisons work with property owners, tenants, local businesses and the general public.

Construction bulletins are emailed regularly to people who have subscribed to updates, typically those who live, work and commute through the project areas. This is to ensure that the public is aware of major construction activities such as lane closures. You can sign-up for email updates for the project you’re most interested in at vivanext.com/subscribe.

getting more information

Follow us on twitter. Like us on facebook.

Read our blog. Go to vivanext.com.

this week >> overnight storm sewer installations and median

removals on Hwy 7 West

To accommodate storm sewer installations, crews will be working nights to cross Pine

Valley Drive at Highway 7 West. This work will be completed in stages and will require a

traffic shift on Wednesday night and Thursday night. In addition, there will be eastbound

and westbound curb lane closures on Highway 7 over the Highway 400 bridge for median

removals. Please see below for details.

storm sewer installations at Pine Valley:

work dates*: Wednesday, April 4 to

Friday, April 6

work hours*: 7pm–6:30am [overnight]

• As crews work to install storm sewers

across Pine Valley, there will be two traffic

shifts.

• On the first night, traffic will be shifted

toward to east side of Pine Valley to

accommodate work in the west lanes.

• On the second night, traffic will be

shifted to the west side of the road to

accommodate work in the east lanes.

• To accommodate this work, northbound

and southbound traffic on Pine Valley

[within the work area] will be reduced to

one lane in each direction.

• Traffic control staff and paid duty police

officers will be on site to direct traffic as required.

overnight median removals on the Hwy 400 bridge:

work dates*: Wednesday, April 4 to Wednesday, April 18

work hours*: 8pm–6am [overnight]

• To accommodate median removals on Hwy 7 W in the area of the Highway 400 bridge,

eastbound and westbound curb lanes will be closed overnight.

general impacts:

• Sidewalks and bus stops will remain open wherever possible. If a sidewalk or bus stop is

temporarily closed, directional signs will guide pedestrians to the nearest open sidewalk

or bus stop.

• Please give yourself enough time to get to your destination, and remember to reduce

your speed through construction zones.

• Cross at the designated crosswalk. It can be tempting to cross in the middle of the road,

but this can be very dangerous. Instead, cross at a designated crosswalk. Look both ways

and be aware of your surroundings.

April 3, 2018

» highway 7 westconstruction bulletin

your community liaison

Michelle Goland

cell: 416.797.5653

email: [email protected]

how to subscribe

for email updates

1. Visit vivanext.com

2. Click on ‘subscribe’

on left side

3. Under ‘email notices’ select

the ‘Highway 7 West/ Vaughan’

box and any others of interest

4. Provide your contact info

5. Click on ‘Submit’Maps not to scale

Cos

ta R

d

Portage Pkwy

McCleary CtApple Mill Road

Mill

way

Ave

Com

merce St

Doughton Rd

Colossus Dr

Co

loss

us D

r

Hillside Ave

Portage Pkwy

Interchange Way

Chrislea Rd

evA lli

mettuB

Pennsylvania Ave Maclntosh Blvd

doowel pp

A

Hig

hway

400

Map

lecr

ete

Rd

Barnes Ct

Kee

le S

t

Centre St

Cre

dits

tone

Rd

Jane

Str

eet

Highway 7

Highway 407 ETRHighway 407 ETR

Hig

hway

407

ETR

Highway 7

Bat

hurs

t St

Bat

hurs

t St

Atkinson Ave

Yong

e St

reet

Duf

feri

n St

Beverley Glen Blvd

CN Bridge

7777Keele St

2220Hwy 7

2180Hwy 7

2160Hwy 7

2006Hwy 7 1970

Hwy 7

1950Hwy 7

2104Hwy 7

2030Hwy 7

7733Keele St

N R

iver

med

e R

d

Ray

ette

Rd

Oster Lane

Highway 7

Rivermede Rd

Bowes R

d

21371983 1965 1931

Flamingo Rd

Worth Blvd

Westmount Blvd

North Park Rd

Beverley Glen Blvd

N

ew W

estm

inst

er D

r

Dis

era

Dr

Bat

hurs

t St

Con

cord

Rd

Vaug

han

Blv

dC

arl

Ten

nen

St

Wad

e G

ate

VMCWorkArea

Edgeley Blvd

no left turns

no north-south

N

NN

Hwy 7 Connector Ramp

Hwy 7 Connector Ramp

Hwy 7 connector road

Highway 7

Highway 7 evA ni

wdlaB

Aberdeen A

ve

Nova Star D

r

Ansley Grove Rd

Whi

tmor

e R

d

Marycroft A

ve

t S nel eH

rD sso

wgiW

t S ecurB

Wes

ton

Rd

Walmart

784Centre

1137Centre

1470

PetroCanada

1450 1438 1416

HomeOutfitters

WalmartLowe’s

3300Hwy 7

2800Hwy 7

7810Keele St

7700Keele St

Walmart

ChabadFlamingo

WestmountCollegiate

531Atkinson

PromenadeTerminal

PromenadeVillage Shoppes

Promenade Cir

1200Centre

lanes slightlynarrowed

N. P

rom

enad

eCentre St

Centre St

work area

driveways willremain openFam

ous

Ave

Highway 7

weivhtroN

dvlB

Pin

e Va

lley

Dr

Highway 7

N

N

Cos

ta R

d

Portage Pkwy

McCleary CtApple Mill Road

Mill

way

Ave

Com

merce St

Doughton Rd

Colossus Dr

Co

loss

us D

r

Hillside Ave

Portage Pkwy

Interchange Way

Chrislea Rd

evA lli

mettuB

Pennsylvania Ave Maclntosh Blvd

doowel pp

A

Hig

hway

400

Map

lecr

ete

Rd

Barnes Ct

Kee

le S

t

Centre St

Cre

dits

tone

Rd

Jane

Str

eet

Highway 7

Highway 407 ETRHighway 407 ETR

Hig

hway

407

ETR

Highway 7

Bat

hurs

t St

Bat

hurs

t St

Atkinson Ave

Yong

e St

reet

Duf

feri

n St

Beverley Glen Blvd

CN Bridge

7777Keele St

2220Hwy 7

2180Hwy 7

2160Hwy 7

2006Hwy 7 1970

Hwy 7

1950Hwy 7

2104Hwy 7

2030Hwy 7

7733Keele St

N R

iver

med

e R

d

Ray

ette

Rd

Oster Lane

Highway 7

Rivermede Rd

Bowes R

d

21371983 1965 1931

Flamingo Rd

Worth Blvd

Westmount Blvd

North Park Rd

Beverley Glen Blvd

N

ew W

estm

inst

er D

r

Dis

era

Dr

Bat

hurs

t St

Con

cord

Rd

Vaug

han

Blv

dC

arl

Ten

nen

St

Wad

e G

ate

VMCWorkArea

Edgeley Blvd

no left turns

no north-south

N

NN

Hwy 7 Connector Ramp

Hwy 7 Connector Ramp

Hwy 7 connector road

Highway 7

Highway 7 evA ni

wdlaB

Aberdeen A

ve

Nova Star D

r

Ansley Grove Rd

Whi

tmor

e R

d

Marycroft A

ve

t S nel eH

rD sso

wgiW

t S ecurB

Wes

ton

Rd

Walmart

784Centre

1137Centre

1470

PetroCanada

1450 1438 1416

HomeOutfitters

WalmartLowe’s

3300Hwy 7

2800Hwy 7

7810Keele St

7700Keele St

Walmart

ChabadFlamingo

WestmountCollegiate

531Atkinson

PromenadeTerminal

PromenadeVillage Shoppes

Promenade Cir

1200Centre

lanes slightlynarrowed

N. P

rom

enad

eCentre St

Centre St

work area

driveways willremain openFam

ous

Ave

Highway 7

weivhtroN

dvlB

Pin

e Va

lley

Dr

N

Highway 7

NIGHT 1NIGHT 2

Follow us on twitter. Like us on facebook. Read our blog. Go to vivanext.com.

night work >> storm sewer installations on Hwy 7 West from

Aberdeen to Pine Valley To accommodate storm sewer installations, crews will be working nights to cross the south

side of Pine Valley Drive and Highway 7 West. During the day the westbound curb lane will

be closed from Aberdeen Avenue to west of Pine Valley. In addition, the westbound curb

lane on Highway 7 over the Highway 400 bridge will be closed Thursday night for light pole

removals. Please see below for details.

storm sewer installations at Pine Valley: work dates*: Thursday, March 22 to Friday, March 23, and Monday, March 26 to Wednesday, March 28

work hours*: 8pm–6:30am [overnight]• As crews cross the south side of Pine Valley and Hwy 7 W intersection starting from west

to east for storm sewer work, Pine Valley southbound [at Hwy 7] will be closed. storm sewer installations at Aberdeen:work dates*: Thursday, March 22 to end of April

work hours*: 7am–5pm• To accommodate storm sewer work on Hwy7 W, the westbound curb lane will be closed

from Aberdeen to just west of Pine Valley.

March 22, 2018

» highway 7 west

construction bulletin

your community liaisonMichelle Goland cell: 416.797.5653 email: [email protected]

how to subscribe for email updates

1. Visit vivanext.com2. Click on ‘subscribe’ on left side

3. Under ‘email notices’ select the ‘Highway 7 West/ Vaughan’ box and any others of interest4. Provide your contact info 5. Click on ‘Submit’

Cos

ta R

d

Portage Pkwy

rD yellaV eni

Pr

D yellaV

eniP

McCleary Ct

Apple Mill Road

Mill

way

Ave

Commerce St

Doughton Rd

Colossus Dr

Col

ossu

s D

r

Hillside Ave

Portage Pkwy

Interchange Way

Chrislea Rd

evA lli

mettuB

Pennsylvania Ave

Maclntosh Blvd

doowelpp

A

Hig

hway

400

Map

lecr

ete

Rd

Barnes Ct

Kee

le S

t

Centre St

Cre

dits

tone

Rd

Jane

Str

eet

Highway 7

Highway 407 ETR

Highway 407 ETR

Hig

hway

407

ETR

Highway 7

Bat

hurs

t St

Bat

hurs

t St

Atkinson Ave

Yong

e St

reet

Duf

feri

n St

Beverley Glen BlvdCN Bridge7777

Keele St2220

Hwy 72180

Hwy 72160

Hwy 7

2006Hwy 7

1970Hwy 7

1950Hwy 7

2104Hwy 7

2030Hwy 7

7733Keele St

N R

iver

med

e Rd

Ray

ette

Rd

Oster Lane

Highway 7

Rivermede Rd

Bow

es Rd

21371983 1965 1931

Flamingo RdWorth Blvd

Westmount Blvd

North Park Rd

Beverley Glen Blvd

New

Wes

tmin

ster

Dr

Dis

era

Dr

Bat

hurs

t St

Con

cord

Rd

Vaug

han

Blv

d

Car

l T

enne

n St

Wad

e G

ate

VMCWorkArea

Edgeley Blvd

no left turnsno north-south

N

N

N

Hwy 7 Connector Ramp

Hwy 7 Connector Ramp

Hwy 7 connector road

Highway 7

Highway 7

evA ni

wdlaB

Aberdeen A

ve

Nova Star D

r

Ansley Grove Rd

Whi

tmor

e R

d

Marycroft A

ve

tS neleH

rD sso

wgiW

tS ecurB Wes

ton

Rd

Walmart784

Centre

1137Centre

1470

PetroCanada

1450 1438 1416

HomeOutfitters

Walmart

Lowe’s

3300Hwy 7

2800Hwy 7

7810Keele St

7700Keele St

Walmart

ChabadFlamingo

WestmountCollegiate531

Atkinson

PromenadeTerminal PromenadeVillage Shoppes

Promenade Cir

1200Centre

lanes slightlynarrowed

N. P

rom

enad

e

Centre St

Centre St

work area driveways willremain open

Famous Ave

N

Highway 7Highway 7Highway 7

weivhtroN

dvlB

N

Map not to scale

Page 2: checks and balance for safety watch your step · 4/13/2018  · watch your step 05.2018 Michelle Goland Highway 7 West Community Liaison Specialist cell: 416.797.5653 email: michelle.goland@york.ca

Pay attention to posted signs in and around construction zones. Because construction zones change as work progresses, it’s especially important for everyone – pedestrians, cyclists and drivers – to pay attention to posted signs. Watch for signs and traffic barrels that indicate lane closures and shifts, as well as relocated sidewalks and bus stops.

In addition to existing legislation and local bylaws, our contractors receive certification from industry associations, and have their own safety and quality assurance processes, including:

• Daily safety meetings before work starts, including a Pre-Safety Assessment—contractor and subcontractor crews each receive a list of tasks for the day, potential hazards, and safety measures are reviewed and then put in place.

• Traffic Control Plans and Traffic Protection Plans, which adhere to lane closures and safety measures outlined in the Ontario Traffic Manual – Book 7, such as using signs and barrier placement to protect workers, motorists, pedestrians and others in the area.

• Pedestrian Control Plans to protect and direct pedestrians when the work impacts sidewalks, crosswalks and bus stops.

• Health and safety manuals outlining safety policies, plans and procedures, and codes of practice which crews operate under.

• Daily site inspections, for which reports are filled out and recorded by supervisors.

Cross at the designated crosswalk. It can be tempting to cross in the middle of the road, but this can be very dangerous. Instead, cross at a designated crosswalk. Look both ways and be aware of your surroundings.

Obey the posted speed limit in construction zones. Active construction zones often have reduced speed limits for good reason. To protect construction workers and pedestrians, it’s crucial for drivers to slow down and follow the posted speed limit, and pay close attention to construction signs and road markings.

safety during rapidway construction is crucial

40km/h

SAFETYFIRST

Patience

40km/h

SAFETYFIRST

Patience

40km/h

SAFETYFIRST

Patience

The value of patience. While construction can often be messy and look chaotic, we’re working hard to transform the corridor to a complete street with sidewalks, bike lanes and rapid transit. Your patience is appreciated.

40km/h

SAFETYFIRST

Patience

Safety is a shared responsibility. Safety of the site and the construction workers is very important on any job to make sure at the end of every day, everyone gets home to their families.

40km/h

SAFETYFIRST

Patience

watch your step safe contractors and crews

We follow current legislation, provincial guidelines and strict safety practices to ensure everyone stays safe

When setting up work sites, our contractors abide by legislation, safety guidelines and local bylaws, including:

• Ontario Ministry of Labour, Occupational Health and Safety Act

• Ontario Regulations for Construction Projects, Ontario Regulations 213/91

• Ontario Traffic Council, Ontario Traffic Manual – Book 7

• Bylaws of York Region and local municipalities

safety legislation and local bylaws


Recommended