CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 CHIANG MAI HEALTH CARE CENTER Chiangmai Municipality Energy-Efficiency Study [GIZ – Urban Nexus]
Transcript
Page 1: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

CHIANG MAI HEALTH CARE

CENTER

Chiangmai Municipality

Energy-Efficiency Study

[GIZ – Urban Nexus]

Page 2: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

BUILDING ORIENTATION PROJECT LOCATION 18°45'47.2"N / 99°00'40.9"E

Page 3: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

PROJECT LOCATION 18°45'47.2"N / 99°00'40.9"E

Chiang Mai Provincial National Housing Authority

Page 4: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

SIMULATION OPTIONS

Options Description

Option 1 Improve lighting system (from fluorescent to LED lighting)

Option 2.1 Improve window glazing (from clear single to tinted glazing)

Option 2.2 Improve window glazing (from clear single to Low-E glazing)

Option 3 Adding roof insulation (fiberglass)

Option 4 Additional shading and openings

Option 5 Better AC System: Inverter

Option 6 Photovoltaic

Option 7 Set operative temperature at 26 ºC in Non-Active Room

ENERGY SIMULATION MODEL

Page 5: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

OPTION 1: IMPROVED LIGHTING SYSTEM

OPTION 2.1: IMPROVE WINDOW GLAZING: TINTED GLAZING

Page 6: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

OPTION 2.2: IMPROVE WINDOW GLAZING: DOUBLE GLAZING WITH LOW-E COATING

OPTION 3: ROOF INSULATION

Page 7: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

OPTION 4 : ADDITIONAL WINDOWS

AND SHADING Option 5 : Replace single speed split

unites by inverter type split units

Page 8: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

Option 6 : Photovoltaic Option 7 : set operative temperature at 26 ºC in non-active room

Page 9: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

Pre-simulation and comparison of options

OPTIONS FOR FURTHER ASSESSMENT

Page 10: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

Additional investment costs Annual energy cost savings

Page 11: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

SUMMARY • Proper cooling load calculation will reduce investment costs for air-conditioning system

• Tinted glazing and double glazing with low-e coating do not lead to significant energy saving due to efficient shading, however reduce daylight use

• Increased number of openings with more efficient shading leads to a slightly higher energy demand, but improves daylight use and view to ambience

• LED lighting and thermal insulation lead to additional investment costs of less than 200,000 THB each and significantly reduce the energy demand

• Inverter type split units and PV lead to additional investment costs of about 1,000,000 THB each and also lead to significant energy savings with a payback time of 6 (Inverter) and 11 (PV) years

• Combination option 1 (LED + roof insulation) is the most economically effective combination option and reduces the energy demand around 30% compared to baseline

• Combination option 2 (LED + roof insulation + inverter) reduces the energy demand by up to 40%

• Combination option 3 (LED + roof insulation + inverter + solar PV) leads to the highest additional investment costs, however reduces the energy demand by up to 58% compared to baseline

Page 12: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

RECOMMENDATION FOR IMPLEMENTATION

Make a proper cooling load calculation!

Combination option 1 (LED + roof insulation) is economically the most efficient option

Combination option 2 (LED + roof insulation + inverter) leads to the highest energy savings, without sacrificing economic aspects

Decision has to be made depending on the available budget

Changes of building Facade

Changes of building Facade

Page 13: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

- Provision of elderly health care center to delivery

services at home

- Energy saving plan for building

Law policy

Page 14: CHIANG MAI HEALTH CARE Energy-Efficiency CENTER · CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017 Unexpected Co., Ltd. - Provision of elderly health

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study Chiang Mai, January 19, 2017

Unexpected Co., Ltd.

thank you