Chief Joseph Fish Hatchery - Phase II Location: Bridgeport, Washington Pipe Used: 12- to 42-inch HDPE Quantity of Pipe: 2 miles Type of Project: New project that employs seamless HDPE to bring groundwater to connecting wells and to release water flowing out of the hatchery. Duration of Project and Pipe Installation: Phase II began in January 2011. Project Profile
Transcript
Page 1: Chief Joseph Fish Hatchery - Phase II

Chief Joseph Fish Hatchery - Phase IILocation:Bridgeport, Washington

Pipe Used:12- to 42-inch HDPE

Quantity of Pipe:

2 miles

Type of Project:New project that employs seamless HDPE to bring groundwater to connecting wells and to release water flowing out of the hatchery.

Duration of Project and Pipe Installation:Phase II began in January 2011.