Task order - TO 675 Pictures that highlight the activities/ condition of the components- before & after the job done Repair of Chillers 6 & 7 at Combined Utilities Building (CUB) , Bldg 753 NSA II
Transcript
Page 1: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

Task order - TO 675

Pictures that highlight the activities/ condition of the components-before & after the job done

Repair of Chillers 6 & 7 at Combined Utilities Building (CUB) , Bldg 753 NSA II

Page 2: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop

Scope of Work 1:

1) Contractor shall open condenser bell caps ( water boxes ) and examine the condition of the condenser tubes and piping with a camera probe. Copy of the finding and video footage are to be reported and submitted to the Government

Action Taken :

• Opened Condenser bell caps ( water boxes ) and examined the condition of the condenser tubes and piping with a camera probe( Video scope)

• The resultant pictures are shown in the following pages of this Presentation. The video scope recordings are separately given in the CD

• The condenser loop piping were found with loose and hard scale, the strainers were found clogged fully with contamination. The condenser water boxes / bell caps were found coated with slurry and other loose scales. The condenser tubes were examined with video scope and found deposits of loose particles and sediments

Page 3: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Condenser Tube Sheet

Page 4: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Condenser Bell Cap

Page 5: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Condenser Tube sheet

Page 6: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Condenser Tube sheet & Water Boxes

Page 7: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Condenser water box

Page 8: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Condenser water box with outlet pipe view

Page 9: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Condenser tube sheet

Page 10: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Page 11: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Page 12: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Page 13: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Condenser Bell Cap / water boxes pictures ( Before cleaning )

Page 14: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Tube examination with vedioscope

Page 15: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop1. Tube Internal View- video scope

Tube internal view – video scope ( shown in the link is of a single tubeThe balance video scope movies are saved in the CD)

Double-click on AVI

Page 16: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop

Scope of Work 2:

2. Contractor shall perform brush cleaning of the condenser tubes

Action Taken :

• Brush cleaned the condenser tubes of Chiller 6 & 7.

• Cleaned the bell caps / water boxes by mechanical means .

• Painted the bell caps / water boxes with epoxy paint

• The following Pictures shows the process

Page 17: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop 2. Brush Cleaning of the condenser tubes – Chiller 6

Page 18: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop 2. Brush Cleaning of the condenser tubes –Chiller 6

Page 19: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop 2. Brush Cleaning of the condenser tubes –Chiller 6

Page 20: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop 2. Brush Cleaning of the condenser tubes – Chiller 7

Page 21: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop 2. Brush Cleaning of the condenser tubes – Chiller 7

Page 22: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop 2. Brush Cleaning of the condenser tubes

Page 23: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop 2. Brush Cleaning of the condenser tubes- contamination passing out of the tubes

Page 24: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop 2. Brush Cleaning of the condenser tubes- contamination passing out of the tubes

Page 25: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop 2. Brush Cleaning of the condenser tubes- contamination collected at the tray

Page 26: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop

Scope of Work 3:

1) Contractor shall perform chemical flushing and circulate the chemical thru’ condenser loop and Cooling Towers on units 6&7

Action Taken :

• Condenser loops of Chiller 6 & 7 were chemical flushed and chemical circulated until the pipes and accessories were fully cleaned of all contaminations. The cooling tower sump, nozzles , screen of Unit 6 & 7 were cleaned to remove the contaminations .

• The chemical used were NSF approved chemicals . MSDS of chemicals were submitted for approval

• Disposal of the waste chemical were done as per the Bahrain Environmental regulation.

• Cleaned and Painted the Water Boxes/ Bell Caps with Eoxy Paint

• The following Pictures shows the pipe internal coating / deposits prior to the cleaning and after the chemical cleaning .

Page 27: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning )

Page 28: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 29: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 30: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 31: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 32: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 33: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before cleaning)

Page 34: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 35: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 36: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 37: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 38: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 39: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 40: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Strainer Chiller 7– fully clogged ( Before cleaning)

Page 41: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Bucket Strainer Chiller 6 – fully clogged ( Before cleaning)

Page 42: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 43: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Pipe pictures ( Before chemical cleaning)

Page 44: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Condenser Tube Sheet pictures ( Before cleaning)

Page 45: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser LoopCooling Tower # 6 before cleaning

Page 46: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser LoopCooling Tower # 6 before cleaning

Page 47: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser LoopCooling Tower # 7 before cleaning

Page 48: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser LoopCooling Tower # 7 before cleaning

Page 49: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser LoopCooling Tower # 6 before cleaning

Page 50: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Chemical flushing & Cleaning

Chemical Circulation

Page 51: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Chemical flushing & Cleaning

Chemical Circulation

Page 52: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Chemical flushing & Cleaning

Chemical Circulation

Page 53: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Chemical flushing & Cleaning

Chemical Circulation

Tank

Page 54: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Chemical flushing & Cleaning

Chemical Circulation

Page 55: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Piping after chemical cleaning

Page 56: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Piping after chemical cleaning

Page 57: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Pipe Interior after Chemical cleaning

Page 58: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Pump Strainer after chemical cleaning

Page 59: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Bucket Strainer Housing after chemical cleaning

Page 60: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Piping after chemical cleaning

Page 61: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3. Bucket Strainer Housing after chemical cleaning- Chiller 6

Page 62: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Piping after chemical cleaning

Page 63: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Piping after chemical cleaning

Page 64: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Bucket Strainer Housing after chemical cleaning - Chiller 7

Page 65: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Bucket Strainer after chemical cleaning- Chiller 7

Page 66: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Cooling Tower screen after chemical cleaning

Page 67: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.expansion joint after chemical cleaning

Page 68: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.cooling tower 6 after cleaning

Page 69: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Cooling Tower 6 after cleaning

Page 70: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Cooling Tower 7 after cleaning

Page 71: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Cooling Tower after chemical cleaning

Page 72: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser water box after cleaning –Chiller 6

Page 73: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser Water Box /Bell caps after cleaning – Chiller 7

Page 74: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser end bell cap after cleaning – chiller 6

Page 75: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser Tube sheet after cleaning – chiller 6

Page 76: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser Bell Cap painted with epoxy paint – chiller 6

Page 77: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser Tube Sheet painted with epoxy paint – chiller 6

Page 78: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser Water Box painted with epoxy paint – chiller 6

Page 79: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser Bell Cap painted with epoxy paint – chiller 7

Page 80: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser Water Box painted with epoxy paint – chiller 7

Page 81: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser Water Box painted with epoxy paint – chiller 7

Page 82: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop3.Condenser Tube Sheet painted with epoxy paint – chiller 7

Page 83: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop

Scope of Work 8:

2. Contractor shall properly connect Cooling Tower Fan Motor Gear Box Lubrication piping fittings to rectify Oil leakages on Cooling Tower 6 & 7

Action Taken :

• Drain the oil , disconnected and removed the lube oil piping fittings , connected back by piping thread sealant.

• Replaced the flexible hose with hydraulic flexible hose and with hydraulic fittings

• The above job done for both 6 & 7 cooling towers

• The following Pictures shows the new fittings that are leak free

Page 84: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop8. Renewed Lube Oil Piping fittings

Page 85: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop8. Renewed Lube Oil Piping fittings

Page 86: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop8. Renewed Lube Oil Piping fittings

Page 87: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop8. Renewed Lube Oil Piping fittings

Page 88: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

. Condenser Loop8. Renewed Lube Oil Piping fittings

Page 89: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop8. Renewed Lube Oil Piping fittings

Page 90: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop

Scope of Work 9:

Contractor shall repair the Cooling Tower Pumps CTP-D-2 so that it will not make any abnormal noise

Action Taken :

• Test run the pump, identified bearing noise for the motor. Disconnected the motor from the drive coupling , dismantled and replaced both side bearing with new bearings

• Assembled the motor, connected the motor to the drive coupling , carried out alignment checks , test run and found no abnormal noise.

• The following Pictures shows the bearing replacement for the pump motor

Page 91: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop9. Cooling Tower Pump CTP-D-2 with abnormal noise

Replacement of Motor Bearing with new Bearing

Page 92: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop9. Cooling Tower Pump CTP-D-2 with abnormal noise

Replacement of Motor Bearing with new Bearing

Page 93: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop9. Cooling Tower Pump CTP-D-2 with abnormal noise

Replacement of Motor Bearing with new Bearing

Page 94: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop9. Cooling Tower Pump CTP-D-2 with abnormal noise

Replacement of Motor Bearing with new Bearing

Page 95: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop9. Cooling Tower Pump CTP-D-2 with abnormal noise

Vibration check for motor

Page 96: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop

Scope of Work 10:

2. Contractor shall supply and Install Magnetic Sensors ( Vibration Sensors) on Cooling Tower Pumps CTP-D-2 and CTP-D-3

Action Taken :

• Procured i-Alert ( Brand ITT Bell & Gosset Pump) magnetic vibration sensors and installed on the Pumps

• Tested the function of the i-Alert sensors and found normal functioning

• The following Pictures shows the sensors installed

Page 97: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop10. Missing Magnetic Sensor/ Vibration sensor on CHW Pump CWP-D3

Page 98: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop10. Magnetic Sensor/ Vibration sensor installed on CHW Pump CWP-D3

Page 99: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop10. Missing Magnetic Sensor/ Vibration sensor on CHW Pump CWP-D2

Page 100: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop10. Magnetic Sensor/ Vibration sensor installed on CHW Pump CWP-D2

Page 101: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop

Scope of Work 11:

Contractor shall perform laser alignment on all pumps related to the Chiller unit 6 & 7 ( 4 pumps)

Action Taken :

• Conducted Alignment Checks on the pumps of Chiller 6 & 7 .

• Corrected the alignment of Cooling Tower Pump CTP- D-2

• The following Pictures shows the alignment check procedures

Page 102: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop11. Pump Alignment Test

Page 103: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop11. Pump Alignment Test

Page 104: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop11. Pump Alignment Test

Page 105: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop11. Pump Alignment Test

Page 106: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

A. Condenser Loop

Scope of Job 12.

• Contractor shall supply a Chemical Cleaning Skid which shall be used to chemically clean all chillers as necessary

Action Taken :

• Supplied Chemical Cleaning Skid

• Delivered to the CUB

Page 107: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop

Scope of Job 1.

• Contractor shall recover and recycle the Refrigerant on Chillers 6 & 7 to get rid of the contamination

Action Taken :

• Recovered the refrigerant from the Chiller 6 & 7

• Flushed the refrigerant loop with nitrogen, removed trapped debris / contaminations from the loop

• Vacuum the loop

• Recycled the refrigerant thru’ filter driers for further removal of contaminations

• The following pictures show the procedures

Page 108: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Refrigerant Recovery

Page 109: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Refrigerant Recovery

Page 110: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Flushing the refrigerant loop with nitrogen to get rid of the contamination / debris

Page 111: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Flushing the refrigerant loop with nitrogen to get rid of the contamination / debris

debris removed from chiller 7

Page 112: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Flushing the refrigerant loop with nitrogen to get rid of the contamination / debris

debris removed from chiller 6

Page 113: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Vacuum creation prior to Refrigerant recycle

Vacuum Pump operation in progress

Page 114: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Vacuum creation prior to Refrigerant recycle

Vacuum gauge showing the vacuum condition in the refrigerant loop

Page 115: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Refrigerant Recycle thru’ filter driers

Page 116: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Refrigerant Recycle Process

Page 117: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop 1. Refrigerant recycle

Oil Filling

Page 118: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Refrigerant Recovery

Page 119: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Refrigerant Recovery

Page 120: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Refrigerant Recycle

Refrigerant liquid level in the sight glass- clear refrigerant without contamination

Page 121: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop1. Refrigerant Recycle

Refrigerant liquid level in the sight glass- clear refrigerant without contamination

Page 122: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop

Scope of Work 2:

Contractor shall replace the Oil Filter, Oil and dehydrator of Chiller unit 6 & 7

Action Taken :

• Replaced the Oil Filter, Oil and Dehydrators of Chiller 6 & 7 .

• Leak tested the joints / fittings, Observed the Oil level . Found normal

• The following Pictures shows the process conducted

Page 123: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop2. Replacement of Oil Filter – Chiller 6

Page 124: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop2. Replacement of Oil Filter – Chiller 6

Page 125: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop2. Replacement of dehydrator – Chiller 6

Page 126: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop2. Replacement of dehydrator – Chiller 7

Page 127: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop2. Replacement of Oil Filter – Chiller 7

Page 128: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop2. Replacement of Oil Filter – Chiller 7

Page 129: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop2. Replacement of Oil Filter – Chiller 7

Page 130: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop2. Replacement of Oil Filter – Chiller 7

Page 131: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop2. Replacement of Oil Filter – Chiller 7

Page 132: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop2. Replacement of Oil Filter – Chiller 7

Page 133: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop

Scope of Work 3:

Contractor shall rectify the faulty differential pressure switches on Chiller unit 6 & 7

Action Taken :

• Rectified the faulty differential switches of Chiller 6 & 7 .

• The following Pictures shows the testing and setting up of DPS

Page 134: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop 3. Differential Pressure Switch Setting – Chiller 7

Page 135: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

B. Refrigerant Loop 3. Differential Pressure Switch Setting – Chiller 7

Page 136: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

C. Distribution Pumps and Schneider Control System

Scope of Job 1:

Contractor shall perform laser alignment on Distribution Pumps DP-D-1 and DP-J-1

Action Taken :

• Tested the drive coupling alignment of Distribution Pumps DP-D-1 and DP-J-1

• Corrected the misalignment on DP-J-1

Page 137: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

C. Distribution Pumps and Schneider Control System 1. Distribution Pump alignment test

Page 138: Chiller repair, condenser & refrigerant loop test, pump alignment, videoscope

C. Distribution Pumps and Schneider Control System

Scope of Job 2:

Contractor shall investigate and rectify the cause of system short cycling in the Schneider Programming.

Action Taken :

• The sequencing of the chillers and its ancillary units were tested and the control parameter of the return chilled water temperature set point was found below the design of 12.2 c .

• Reset the control to 12.2 C.

• Observed the system for proper sequencing without short cycle. Found normal