23 rd March 2011 Chooz A dismantling project International atomic energy agency
Transcript
Page 1: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011

Chooz A dismantling project

International atomic energy agency

Page 2: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

DIN - CIDEN 2

SummarySummary

23rd March 2011

1. Presentation of Chooz A project2. The project team3. 2010 results4. 2011 - 2014 : project time plan5. Decontamination of the steam generators6. Dismantling of the vessel

Page 3: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

DIN - CIDEN 3

SummarySummary

23rd March 2011

1. Presentation of Chooz A project2. The project team3. 2010 results4. 2011 - 2014 : project time plan5. Decontamination of the steam generators6. Dismantling of the vessel

Page 4: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011 DIN - CIDEN 4

1 Presentation of Chooz A project1 Presentation of Chooz A project

Page 5: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011 DIN - CIDEN 5

First PWR built in France

Specificity : Underground nuclear buildings

Power : 305 MWConstruction from 1962 to 1966

Operating from 1967 to 1991

NPP shut down : 1993

End of fuel disposal : December 1995

Complete dismantling decree : September 2007

1 Presentation of Chooz A project1 Presentation of Chooz A project

HK cavern

HR cavern

Page 6: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011 DIN - CIDEN 6

Subproject 1 : preparatory construction work

Subproject 2 : nuclear auxiliaries dismantling

Subproject 3 : HR dismantling except the vessel

Subproject 4 : HR vessel dismantling

Subproject 5 : sanitation of the buildings

Subproject 6 : rehabilitation of the site

1 Presentation of Chooz A project1 Presentation of Chooz A project

Page 7: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

DIN - CIDEN 7

SummarySummary

23rd March 2011

1. Presentation of Chooz A project2. The project team3. 2010 results4. 2011 - 2014 : project time plan5. Decontamination of the steam generators6. Dismantling of the vessel

Page 8: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011 DIN - CIDEN 8

2 The project team (in Lyon)2 The project team (in Lyon)

Estelle GREVINProject managerSébastien ALBERTINI

Work CoordinatorPierre-Emmanuel PONCET

Studies Coordinator

Florence BERRYSupplies coordinator

Catherine BIASELLICost controller

Cyrille TRICARTTime plan

Project team : 6 people + 1 contractor

Sylvain MANDEVILLE (ALTRAN)Time plan and support

Page 9: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011 DIN - CIDEN 9

Team on site : 21 people

2 The project team (in Chooz)2 The project team (in Chooz)

Page 10: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

DIN - CIDEN 10

SummarySummary

23rd March 2011

1. Presentation of Chooz A project2. The project team3. 2010 results4. 2011 - 2014 : project time plan5. Decontamination of the steam generators6. Dismantling of the vessel

Page 11: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

2003 2004 2005 2006 2007 2008 2009 2010 2011

DIN - CIDEN 23rd March 201111

Complete dismantling decree

Forecasted physical progress : 44,90% Realised physical progress : 43,32%

3 2010 results : physical progress3 2010 results : physical progress

Page 12: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

DIN - CIDEN 12

SummarySummary

23rd March 2011

1. Presentation of Chooz A project2. The project team3. 2010 results4. 2011 - 2014 : project time plan5. Decontamination of the steam generators6. Dismantling of the vessel

Page 13: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011 DIN - CIDEN 13

The critical path for the project concerns the activities in the HR cavern :

• Primary circuit dismantling

• Renewal of the water filling circuit of the pool

• Vessel dismantling

2011

Dismantling of the primary circuit : 3 SG decontaminated and the 4th

SG extracted

End of nuclear auxiliaries dismantling in HK cavern, except

the casemates

2011

Dismantling of the primary circuit : 3 SG decontaminated and the 4th

SG extracted

End of nuclear auxiliaries dismantling in HK cavern, except

the casemates

2012

Dismantling of the primary circuit :

- Decontamination of the pressuriser and of the primary

loops

- Disposal of 2 SG to ANDRA in one piece

2012

Dismantling of the primary circuit :

- Decontamination of the pressuriser and of the primary

loops

- Disposal of 2 SG to ANDRA in one piece

2013

- Vessel cover lift and dismantling of the vessel

internals

- Dismantling of the casemates in HK cavern

2013

- Vessel cover lift and dismantling of the vessel

internals

- Dismantling of the casemates in HK cavern

4 2011 - 2014 : project time plan4 2011 - 2014 : project time plan

Page 14: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011 DIN - CIDEN

2011 20122010

HR dismantling except the vessel

14

HR vessel

Studies review

HR vessel : execution studies

Water filling of the pool

Safety report sending

Casemates in HK : contract signature

Safety report

Effluents treatment station

4 2011 - 2014 : project time plan (studies) 4 2011 - 2014 : project time plan (studies)

Page 15: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011 DIN - CIDEN

2011 2012 2013 20142010

HR dismantling except the vessel

HR vessel Internals dismantling

1st SG decontaminated

4 SG outside

Vessel cover lift

B wastes in HR

Dismantling in HK

Casemates in HK

15

HR cavern

HK cavern

Water filling of the pool

HR dismantling except the

er filling of the pool

Internals dismantling

Critical path

4 2011 - 2014 : project time plan (work)4 2011 - 2014 : project time plan (work)

Page 16: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

DIN - CIDEN 16

SummarySummary

23rd March 2011

1. Presentation of Chooz A project2. The project team3. 2010 results4. 2011 - 2014 : project time plan5. Decontamination of the steam generators6. Dismantling of the vessel

Page 17: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

17 23rd March 2011 DIN - CIDEN

5 SG decontamination process (2011)5 SG decontamination process (2011)

CORD : Chemical Oxidation Reducing DecontaminationAMDA : Automated Mobile Decontamination Appliance

Page 18: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

DIN - CIDEN 18

SummarySummary

23rd March 2011

1. Presentation of Chooz A project2. The project team3. 2010 results4. 2011 - 2014 : project time plan5. Decontamination of the steam generators6. Dismantling of the vessel

Page 19: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011 DIN - CIDEN 19

6 Vessel dismantling process (2013)6 Vessel dismantling process (2013)

Lift and treatment of the vessel cover (operations under water)

1. Containment plate 2. Inferior sub plate 3. Biological protection dome

4. Containment casing

Internals treatment (secondary sources, superior internals, operational wastes, inferior internals) - operations under water

Page 20: Chooz A dismantling project - International Atomic … DIN - CIDEN Summary 23rd March 2011 1. Presentation of Chooz A project 2. The project team 3. 2010 results 4. 2011 - 2014 : project

23rd March 2011 DIN - CIDEN 20

Insulated vessel handling (operation in the open)

Treatment of the vessel insulation (operation under water)

Vessel dismantling (operation under water)

6 Vessel dismantling process (2013)6 Vessel dismantling process (2013)