14
istopher C. Obropta, Ph.D., P.E. istant Extension Specialist, er Resources Program istant Professor, t. of Environmental Sciences sson 4: Rain Garden aintenance and ng Term Success
Transcript
Page 1: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Christopher C. Obropta, Ph.D., P.E.Assistant Extension Specialist, Water Resources ProgramAssistant Professor, Dept. of Environmental Sciences

Lesson 4: Rain GardenMaintenance andLong Term Success

Page 2: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Maintaining Your Rain Garden

Types of Maintenance Measures:• Inspections• Soil Testing• Weeding• Pruning• Mowing• Revegetating as necessary• Sediment removal as necessary

Notice that FERTILIZING is not listed above. A rain garden sustains itself with the help of organic material in the topsoil.

Page 3: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Measure #1: Inspections

What am I inspecting for?

• Weeds & Invasive Plants• Plant Health• Excessive Sediment• Movement of Sediment

within the Garden

When?GROWING SEASON

Prior to Season

• After large storm events• During weather

extremes

End of Season

Page 4: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Measure #2: Soil Testing

• Soil should be tested on an annual basis

• pH should be in an acidic range– If pH is < 5.2, apply limestone– If pH is > 7.0 to 8.0, add iron

sulfate and sulfur to reduce pH

• Soil amendments should only be added when no storms are expected

Page 5: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Measure #3: Weeding

• Some “Volunteers” may become part of your rain garden, which could be a positive addition

• Weeding more often will limit the amount of time you will have to spend weeding in the end

• Watch for overly-competitive speciesLook to RCE N.J. Weed Gallery for more infoNRCS also hosts a PLANTS Database for the

entire US• Some weeds can be aggressively spreading

underground by rhizomes

Page 6: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Measure #4: Pruning

Pruning directs growth of plants, improves health, and increases production of flowers and fruits.

How does pruning a rain garden differ from my other gardens?

• In a rain garden, dense shrub growth is encouraged rather than eliminated to provide increased filtering capacity

• Tattered and discolored plants should be cut back after spring arrives and growth is 4-6” tall

• “Deadheading” plants will also lead to succeeding new growths

Page 7: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Types of Pruning

• THINNING = basically, thinning out. This type of pruning removes entire branches back to main trunk. Or major branches to the ground.

Expected result: large, open shrub

• HEADING = also known as heading back. This type of pruning removes only part of a branch.

Expected result: growth of multiple branches in place of single branch, thus a more dense shrub

Page 8: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Pruning & Types of Wood

• In the case of flowering shrubs, pruning is a function of species and flowering periods.

Determine if the shrub blooms on new or old wood• NEW = shrub blossoms in late spring or summer on

wood that is grown during the current season. This wood may be light green or pinkish in color. Prune during dormant season or just before new growths in early spring.

• OLD = shrub blossoms in early spring on wood grown during previous season. This wood will be dark in color and can be brittle.

Page 9: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Measure #5: Mowing

• After the growing season, it will not be necessary to remove stems and seedheads. These can be left for habitat and in some cases, aesthetics.

• A string trimmer can be used to maintain over-competitive growths.

• Dead plant materials can also be removed by a string trimmer or mower, if the mowing deck can be raised to cut at 6-8”.

Page 10: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Mowing Schedule

• Mowing should occur two times a year, in your rain garden.

Initial mowing can be done after the first few weeks of growth – early Spring.

Final mowing can be completed after ground nesting birds have hatched the next generation – usually near mid-May.

Page 11: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Measure #6: Revegetating

• After the first season, it may be obvious what plants were successful in this niche and what plants do not work for your rain garden.

Over the growing season, was the weather drastically different than the conditions the basin was designed to retain?

Did the topsoil limit the holding capacity of the basin or encourage adsorption?

Was flow too fast through the basin, damaging health? Is flow being incorrectly diverted from the rain garden? Is sediment covering vegetation? Were some species over-shadowing others? Did pests reduce the success of certain species? Is one area of the rain garden not growing at the same

rate as another? Why?

Page 12: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Revegetating & Re-evaluating

• Questions from the previous slide require some thought as to whether the rain garden is serving the purposes of:

a. Trapping Pollutants

b. Reducing Runoff and Promoting Infiltration

c. Creating Habitat for Birds, Butterflies, & Beneficial Insects

d. Adding Beauty to your Yard

Page 13: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Next Steps

• Collect seeds and cuttings from successful plants in the rain garden and use them for the new season.

• Plant more of the successful species in the rain garden as necessary.

• Re-seed the berm if there are areas of exposed soil.

• Replace rocks that may be diverting flow out of the garden.

• Alternately, build up areas where more protection is needed.

Page 14: Christopher C. Obropta, Ph.D., P.E. Assistant Extension Specialist, Water Resources Program Assistant Professor, Dept. of Environmental Sciences Lesson.

Measure #7: Sediment Removal

Since the rain garden serves the purpose of catchment, sediment will tend to accumulate within the garden. This a sign of success – this soil would have been directed straight to the stream, without your efforts!

• With a flat shovel, remove soil that has accumulated in the basin. Avoid the vegetation….

• There is no exact schedule for when this should be done. Try to monitor sediment accumulation, especially after all heavy storm events.

• Be sure that sediment is not churning up from exposed areas of the rain garden. Flow should be dissipated to avoid these situations, which are likely to occur in the early stages of stabilization.

Heavy equipment should not be needed for this task…


Recommended