CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
11-18-70 Construction 32944 Road Concreting at Brgy. Sallacapo 02/28/09 I 0.855 18 C 0.375 0.200 0.300 - - - 87.50 *87.50%Satisfactory
121 Construction Corporation (Formerly:
121 Construction)21686 Const. of 2-Storey, 2-Classroom Sch.
Bldg. at Heritage ES, Loma de Gato 04/15/11 III 2.472 120 C 0.419 0.200 0.300 - - - 91.90 89.10% V. Satisfactory
121 Construction Corporation (Formerly:
121 Construction)21686 Impvt. of MPB at Sta. Maria Agro-
Industrial High School 11/26/08 III 1.717 90 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding
121 Construction Corporation (Formerly:
121 Construction)21686 Const. of MPB 11/24/08 NCR 3.821 90 C 0.280 0.200 0.300 - - - 78.00 *78.00%
Satisfactory
121 Construction Corporation (Formerly:
121 Construction)21686 Const. of MPB, Brgy. Mabini J. Rizal 06/02/10 NCR 9.315 180 C 0.475 0.200 0.300 - - - 97.50 91.97%
V. Satisfactory
2H2L Construction 16293 Const. of Two (2) Storey Sch. Bldg. Oogong E/S 04/04/11 IVA 0.999 60 C 0.382 0.200 0.300 - - - 88.20 *88.20%
Satisfactory
2H2L Construction 16293 Const. of Two (2) Storey, Six (6) Classrooms Cainta E/S 04/15/11 IVA 7.848 150 C 0.389 0.200 0.300 - - - 88.90 85.75%
Satisfactory
2H2L Construction 16293 Widening of Antipolo-Teresa Road 11/25/08 IV-A 19.224 180 C 0.261 0.300 0.300 - - - 86.10 80.34% V. Satisfactory
2H2L Construction 16293 Impvt. of Flood Control at So. Upper East Kamias & So. East Kamias 03/12/09 IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90 *89.90%
V. Satisfactory
2H2L Construction 16293 Impvt. of Multi-Purpose Pavement at Brgy. Dela Paz & Brgy. San Isidro 03/12/09 IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20 *91.20%
V. Satisfactory
2H2L Construction 16293Rehab./Reconst./Upgrading of
Marikina-Victoria Valley-Antipolo Road
08/26/09 IVA 19.222 180 C 0.475 0.200 0.300 - - - 97.50 91.86% V. Satisfactory
2H2L Construction 16293Rehab./Reconst./Upgrading of
Marikina-Victoria Valley-Antipolo Road
05/18/09 IV-A 19.221 180 O 0.387 0.239 0.150 0.030 0.025 0.050 88.10 -
2-R Construction & Supply 15304 Repair/Impvt. of Villasis-Malasiqui
San Carlos Road 08/27/08 I 2.410 60 C 0.338 0.200 0.300 - - - 83.80 *83.80% V. Satisfactory
2-R Construction & Supply 15304 Const. of Additional Classroom @
Comprehensive Nat'l. H/S 05/21/09 I 2.417 120 C 0.496 0.072 0.300 - - - 86.80 *86.80% Satisfactory
310 Construction Specialist Corporation 4875 Estrella-Pantaleon Bridge
Approaches (Across Pasig River) 11/28/08 NCR 38.627 405 C 0.376 0.200 0.300 - - - 87.60 83.22% V. Satisfactory
3FS Construction 30464Road Upgrading (Gravel to Paved) of
Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Road
04/06/11 VIII 19.108 180 C 0.459 0.176 0.300 - - - 93.50 90.62% V. Satisfactory
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page1
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
3FS Construction 30464 Const. of Coastal Road 04/08/11 VIII 18.895 150 C 0.421 0.133 0.300 - - - 85.40 *85.40% Satisfactory
3FS Construction 30464 Upgrading of Bagahupi-Babatngon-Sta. Cruz, Barugo-Carigara Rd. 03/11/10 VIII 19.289 230 C 0.497 0.189 0.300 - - - 98.60 91.07%
V. Satisfactory
3FS Construction 30464 Const. of Grouted Riprap @ Brgy. 90 03/18/09 VIII 0.962 70 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory
3K Builders 27277Repair/Rehab. of MNR, Km.174+000 -
Km.175+000 w/ exception Villasis Section
06/10/10 I 9.996 32 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
3K Rock Engineering 27908 Const. of One Unit Classroom School Building, San Antonio I/S 04/08/11 II 0.641 45 C 0.485 0.133 0.300 - - - 91.80 *91.80%
V. Satisfactory
3K Rock Engineering 27908 Construction of Multi-Purpose Building, Magsaysay 09/03/09 II 0.572 45 C 0.407 0.200 0.300 - - - 90.70 *90.70%
V. Satisfactory
3K Rock Engineering 27908 Const./Repair of Multi-Purpose Building 02/25/10 II 1.735 60 C 0.413 0.133 0.300 - - - 84.60 84.60%
Satisfactory
3K Rock Engineering 27908 Const./Completion of MPB, Liwayway 06/05/10 II 1.445 60 C 0.441 0.133 0.300 - - - 87.40 87.40%
Satisfactory
3K Rock Engineering 27908 Const. of Flood Control, Sangbay 08/18/08 II 0.954 70 C 0.321 0.204 0.300 - - - 82.50 *82.50% V. Satisfactory
3K Rock Engineering 27908 Const. of Sch. Bldg., Bannawang Integrated School 08/18/08 II 0.578 45 C 0.375 0.218 0.300 - - - 89.30 *89.30%
V. Satisfactory
3K Rock Engineering 27908 Const. of Sch. Bldg., Victoria H/S 11/25/08 II 1.622 100 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
3K Rock Engineering 27908 Completion of Multi-Purpose Building, Gundaway 03/06/09 II 1.783 60 C 0.458 0.200 0.300 - - - 95.80 *95.80%
V.Satisfactory
3-L Construction 16745 Const. of 2 Storey Multi-Purpose Bldg. (Brgy. Hall), Brgy. San Gabriel 03/09/09 V 0.955 120 C 0.436 0.175 0.300 - - - 91.10 *91.10%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page2
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
3-L Construction 16745 Road Upgrading (Gravel to Paved), Sipocot-Cabusao Road 09/09/09 V 6.555 150 C 0.418 0.200 0.300 - - - 91.80 89.64%
V. Satisfactory
3RB Construction & Supply 19541 Const. of Sto. Cristo Seawall 05/28/10 V 2.876 150 C 0.458 0.133 0.300 - - - 89.10 89.10%
Satisfactory
3RB Construction & Supply 19541 Const./Rehab. of Water Supply,
Level 1 and II System 08/19/08 IV-A 1.921 30 C 0.288 0.200 0.300 - - - 78.80 73.94% Satisfactory
3RB Construction & Supply 19541
Road Upgrading along DM Jct.-Leg.-Sto. Domingo-Tab.-Cam. Sur Bdry.,
Tiwi-Tabaco Section02/24/09 V 19.233 150 C 0.488 0.133 0.300 - - - 92.10 84.30%
Satisfactory
3RB Construction & Supply 19541 Impvt. of San Fernando North Road,
San Jacinto Section 02/17/10 V 9.450 210 O 0.378 0.240 0.150 0.015 0.035 0.050 86.80 -
3RB Construction & Supply 19541 Road Conc. & Impvt. of Barangay
Road 02/22/10 V 0.959 160 C 0.396 0.139 0.300 - - - 83.50 86.38% Satisfactory
3RB Construction & Supply/Ajan Jaeda, Inc.
(JV) JV-08-209 Const. of Tagas-Divino Rostro
Bridge 09/01/09 V 19.179 202 O 0.384 0.240 0.150 0.030 0.033 0.050 88.70 -
3S Builders 18009 Repair and Rehab. of MPB (Municipal Hall) 04/09/11 VII 1.893 97 C 0.491 0.133 0.300 - - - 92.40 *92.40%
V. Satisfactory
4 A's Construction 9446 Construction of 1-CL (7x9) Lupigue IS 09/05/09 II 1.108 45 C 0.454 0.133 0.300 - - - 88.70 *88.70%
Satisfactory
4 A's Construction 9446 Const./Conc. of Road 02/23/10 II 4.822 330 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory
4 A's Construction 9446 Construction of Road 08/11/08 II 1.926 90 C 0.326 0.200 0.300 - - - 82.60 79.54% Satisfactory
4 A's Construction 9446 Asphalt Overlay of Daang Maharlika 03/03/09 II 1.929 30 C 0.464 0.133 0.300 - - - 89.70 *89.70% V.Satisfactory
4B Construction Corporation 23445 Upgrading and Concreting of Subic-
Philseco Road 03/03/09 III 41.616 180 C 0.407 0.163 0.300 - - - 87.00 83.76% Satisfactory
4B Construction Corporation 23445
Rehab./Reconst./Upgrading of Damaged Paved National Road,
Olongapo-Bugallon Road05/23/09 III 33.265 45 C 0.374 0.200 0.300 - - - 87.40 *87.40%
Satisfactory
4B Construction Corporation 23445
Rehab./Reconst./Upgrading of Damaged Paved National Roads at
Subic-PHILSECO Rd.04/04/11 III 41.378 163 C 0.356 0.167 0.300 - - - 82.30 80.41%
Unsatisfactory
4B Construction Corporation 23445
Repair/Rehab. of Paete-Famy Pob. Rd., Pangil-Siniloan Sect. Km.109+000 - Km.110+400
05/25/10 IVA 9.608 20 C 0.472 0.133 0.300 - - - 90.50 90.50% V. Satisfactory
525 Construction 28532 Rehab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 04/15/11 III 38.599 210 C 0.330 0.200 0.300 - - - 83.00 89.66%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page3
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
525 Construction 28532 Rahab. of Sta. Rita-Biak na Bato via Pulong Bayabas Road 09/08/09 III 19.049 120 C 0.478 0.133 0.300 - - - 91.10 *91.10%
V. Satisfactory
525 Construction / MGSCC (JV)
JV-07-095/ SLI-SN-005104
Rehabilitation/Improvement of Sta. Rita Biak na Bato Road 03/11/09 III 44.000 200 C 0.405 0.200 0.300 - - - 90.50 *90.50%
V.Satisfactory
525 Construction/MGSCC Joint Venture JV-08-235 Rehabilitation of Sta. Maria-
Norzagaray Road 09/07/09 III 46.339 180 C 0.479 0.133 0.300 - - - 91.20 86.64% Satisfactory
628 Construction Enterprises 30049 Construction of Two Classroom
School Building at Lokeb Norte 03/06/09 I 1.369 70 C 0.429 0.178 0.300 - - - 90.70 *90.70%V. Satisfactory
722 Construction 21923 Rehab./Reconst./Upgrading at Old Cagayan Valley Rd. (Baliuag Sect.) 06/10/10 III 9.547 80 C 0.460 0.133 0.300 - - - 89.30 89.30%
V. Satisfactory
722 Construction 21923 Rehab./Impvt. of Bocaue-San Jose Road, Tumana & Parada Section 08/29/08 III 3.807 60 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
722 Construction 21923Repair/Maintenance of Bigaa-Plaridel via Bulacan & Malolos Road (Barihan
Section)08/27/08 III 4.957 10 C 0.361 0.200 0.300 - - - 86.10 *86.10%
V. Satisfactory
722 Construction 21923 Const. of Water System @ Northville II 08/19/08 NCR 1.424 60 C 0.278 0.177 0.300 - - - 75.50 *75.50%
Satisfactory
722 Construction 21923Rehab/Reconst./Upgrading of Old
Cagayan Valley Road (Pulilan Section)
05/28/09 III 9.543 45 C 0.359 0.200 0.300 - - - 85.90 *85.90%Satisfactory
722 Construction 21923 Const. of Sch. Bldg., 2 Storey, 2 CL Banga E/S 03/10/09 III 2.290 100 C 0.472 0.133 0.300 - - - 90.50 89.52%
V.Satisfactory
722 Construction 21923Const. of Multi-Purpose Bldg.
Malinta E/S Lawang Bato E/S, Brgy. Lawang Bato & Natividad Homes
03/03/09 NCR 1.882 90 C 0.405 0.136 0.300 - - - 84.10 *84.10% Satisfactory
722 Construction 21923Rehab./Reconst./Upgrading of
Damages Pavement along Mc Arthur Highway
05/31/10 NCR 9.506 120 C 0.436 0.200 0.300 - - - 93.60 93.60% V. Satisfactory
722 Construction 21923 Rehab./Reconst./Upgrading along Rizal Avenue Extension 05/27/09 NCR 9.494 120 C 0.380 0.200 0.300 - - - 88.00 *88.00%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page4
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
722 Construction 10221 Const. of MPB (Day Care) at Brgy. Polo 09/16/09 NCR 1.901 75 C 0.486 0.133 0.300 - - - 91.90 *91.90%
V. Satisfactory
739 Builders 31174 Const. of Ten (10) CL, Two (2) Storey Sch. Bldg. At Ilocos Sur NHS 03/31/11 I 8.068 240 C 0.351 0.142 0.300 - - - 79.30 83.36%
Satisfactory
739 Builders 31174 Construction of School Building, Pila E/S, Brgy. Pila 09/07/09 I 0.950 60 C 0.454 0.154 0.300 - - - 90.80 *90.80%
V. Satisfactory
739 Builders 31174 Const. of Drainage Canal, Brgy. VII 05/29/10 I 1.141 80 C 0.444 0.133 0.300 - - - 87.70 87.70% Satisfactory
739 Builders 31174 Completion of MPB, Brgy. Capangpangan 11/13/08 I 1.518 54 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
739 Builders 31174 Road Concreting, Brgy. Napo 02/28/09 I 0.950 20 C 0.364 0.200 0.300 - - - 86.40 *86.40%Satisfactory
747 Builders & Trader 16892 Upgrading/Conc. of Roads with Drainage Impvt., M. Naval St. 11/21/08 NCR 9.589 120 C 0.355 0.200 0.300 - - - 85.50 78.96%
Satisfactory
747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank 03/12/09 IVA 14.367 170 C 0.473 0.133 0.300 - - - 90.60 86.97%
Satisfactory
747 Builders & Trader 16892Proposed Rehab./Impvt. of Pres.
Quirino Ave. West Bound (Singalong-Roxas Blvd.)
05/24/10 NCR 14.475 20 C 0.442 0.200 0.300 - - - 94.20 94.20% V. Satisfactory
747 Builders and Trader 16892 Rehab./Reconst./Upgrading of Antipolo Circumferential Road "A" 08/26/09 IVA 19.213 180 C 0.411 0.200 0.300 - - - 91.10 88.70%
Satisfactory
811 Trading & Construction 21215
Impvt. of Jct. National Road-Osmeña Street-Sitio Toong Road Pob.
Caguray ARC04/08/11 IVB 20.482 160 O 0.354 0.212 0.150 0.030 0.048 0.050 84.40 -
811 Trading & Construction 21215 Repair/Rehab. of National Roads &
Bridges, Mansalay Section 11/19/08 IV-B 4.710 90 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory
811 Trading & Construction 21215 Repair/Rehab. of Multi-Purpose
Building (Phase II) 02/26/09 IV-B 0.288 27 C 0.463 0.133 0.300 - - - 89.60 *89.60% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page5
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
830 Builders & Developers Corp. 29781 Const. of 1 CL 7m x 7m Sch. Bldg. at
Lanatan Munting Tubig E/S 04/12/11 IVA 0.495 40 C 0.459 0.200 0.300 - - - 95.90 *95.90% V. Satisfactory
888 Acy Enterprises 32898Reconst. (Conc. Paving) of Loay
Interior Rd., Trinidad & San Miguel Sect.
03/31/11 VII 14.320 565 C 0.278 0.133 0.000 - - - 41.10 60.60% Poor
888 ACY Enterprises 32898Reconst. (Conc. Paving) of Jct. LIR, Buenavista, Carmen-Danao-Getafe
Rd., Poblacion Danao Sect.06/01/10 VII 9.541 419 O 0.360 0.300 0.000 0.030 0.045 0.033 76.80 -
888 ACY Enterprises 32898Repair/Rehab. of Tablas Circ. Road,
Calatrava-San Agustin Road (Intermittent Section)
11/25/08 IV-B 9.999 32 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding
920 Factors & Enterprises 20387
Road Upgrading (Gravel to Conc.) Gurel-Bukod-Kabagan-Buguias-
Abatan Road04/11/11 CAR 28.838 337 C 0.456 0.133 0.300 - - - 88.90 *88.90%
Satisfactory
A B Aponesto Construction, Parts &
Supply22998
Road Upgrading (Gravel to Paved) along Compostela-Cateel Road,
Osmeña Section04/09/11 XI 18.892 180 C 0.372 0.200 0.300 - - - 87.20 85.82%
Satisfactory
A C J Construction Resources 10635 Concreting of Poblacion Magpet-
Nowa-Basak Road (Basak Section) 05/30/09 R-XII 18.797 180 O 0.336 0.300 0.000 0.024 0.055 0.050 76.50 -
A C O Construction 13105
Const. of Rotonda along National Highway (Zamboanga Peninsula) Cross Rd. Upgrading Project @
Poblacion Ipil
02/25/10 IX 2.829 115 O 0.319 0.300 0.000 0.020 0.042 0.033 71.40 -
A C O Construction 13105Zamboanga Peninsula Crossroads Upgrading Project (Completion of
Roundabout) Sta.1801+231.50 06/05/10 IX 1.861 60 C 0.476 0.133 0.300 - - - 90.90 90.90%
V. Satisfactory
A C O Construction 13105
Const. of Rotonda along National Highway (Zamboanga Peninsula Crossroad Upgrading Project) at
Poblacion Ipil
06/05/10 IX 2.829 115 C 0.456 0.133 0.000 - - - 58.90 66.40% Poor
A C O Construction 13105 Conc. of Liloy-Zamboanga del Norte-Ipil-Zamboanga Sibugay Rd. Ph. I 03/05/09 IX 14.306 150 C 0.425 0.147 0.300 - - - 87.20 86.90%
Satisfactory
A. De Guia Construction 18228
Preventive Maintenance along Santiago-Tuguegarao Road @ A)
KO368+620 - KO369+000, Aurora B) KO374+000 - KO375+500
04/06/11 II 6.718 90 C 0.483 0.133 0.300 - - - 91.60 *91.60% V. Satisfactory
A. De Guia Construction 18228 Restoration of Jones Revetment 04/11/11 II 4.825 90 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page6
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A. De Guia Construction 18228 Restoration of Brgy. I Revetment 04/11/11 II 4.825 90 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory
A. De Guia Construction 18228 Repair/Restoration of Flood Control, Sta.000+000 - Sta.000+120 04/11/11 II 9.650 90 C 0.400 0.133 0.300 - - - 83.30 *83.30%
Satisfactory
A. De Guia Construction 18228
Rehab./Reconst./Upgrading of Santiago-Baluarte-Quirino Bdry.
Road; KO328+100 - KO331+000 w/ exception
04/10/11 II 18.623 150 C 0.428 0.133 0.000 - - - 56.10 70.44% Poor
A. De Guia Construction 18228Rehab./Reconst./Upgrading of
Santiago-Tuguegarao Rd. Burucboc Sect.
04/06/11 II 9.647 133 C 0.456 0.133 0.000 - - - 58.90 67.42% Poor
A. De Guia Construction 18228Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road,
KO333+500 - KO334+85004/10/11 II 17.123 149 C 0.335 0.200 0.000 - - - 53.50 65.26%
Poor
A. De Guia Construction 18228Rehab./Reconst./Upgrading of
Naguilian-San Mariano Rd., Villapaz Section
08/25/09 II 19.296 104 C 0.420 0.200 0.300 - - - 92.00 92.84% V. Satisfactory
A. De Guia Construction 18228 Concreting of Junction National -Potia Road 08/27/09 II 7.043 110 C 0.410 0.200 0.300 - - - 91.00 91.42%
V. Satisfactory
A. De Guia Construction 18228 Rehab./Reconst. of Daang Maharlika Road, KO309+300-KO309+878 08/27/09 II 18.811 130 C 0.411 0.200 0.300 - - - 91.10 91.10%
V. Satisfactory
A. De Guia Construction 18228 Rehab./Reconst./Upgrading of Gamu-Roxas Road (Roxas Section) 02/23/10 II 19.293 240 C 0.402 0.133 0.300 - - - 83.50 88.78%
Satisfactory
A. De Guia Construction 18228 Const./Completion/Continuation of Unfinished On-going Bridges 03/01/10 II 11.574 120 C 0.415 0.133 0.300 - - - 84.80 86.78%
Satisfactory
A. De Guia Construction 18228
Rehab./Reconst./Upgrading of Damaged Paved national Road,
Daang Maharlika KO 320+000 - KO 321+000
06/03/10 II 16.396 120 O 0.387 0.295 0.150 0.030 0.042 0.033 93.70 -
A. De Guia Construction 18228
Rehab./Reconst./Upgrading of Damaged Paved National Road
Santiago-Baluarte-Quirino Bdry. Road KO326+(-)280 - KO328+000 w/
exception
08/27/10 II 15.432 149 C 0.292 0.200 0.300 - - - 79.20 87.24% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page7
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A. De Guia Construction 18228
Restoration of Road Slope & Slope Protection along Naguilian-San
Mariano Road KO395+850 - KO401+800
08/25/10 II 14.471 120 C 0.389 0.150 0.300 - - - 83.90 85.28% Satisfactory
A. De Guia Construction 18228Road Upgrading (Gravel to Paved) of Jct. Ipil-Panang-Quirino Bdry. Road;
KO366+058 - KO367+11808/27/10 II 17.373 149 C 0.403 0.146 0.300 - - - 84.90 84.90%
Satisfactory
A. De Guia Construction 18228 Conc. of Pob. Burgos-Caliguian Road 11/20/08 II 9.648 180 C 0.344 0.200 0.300 - - - 84.40 82.84%
V. Satisfactory
A. Montalbo Trading and Construction 32684 Const. of Multi-Purpose Building at
Bigain 1st 03/01/10 IVA 1.135 30 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory
A.A De Vera Construction 6191 Rehab./Expansion of Waterworks System 09/02/09 VII 4.510 240 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
A.A De Vera Construction 6191 Const./Rehab. of School Bldg. at Cogon E/S 06/05/10 VII 0.591 35 C 0.415 0.200 0.000 - - - 61.50 61.50%
Poor
A.A De Vera Construction 6191 Const. of Water System Development Project 08/25/10 VII 1.413 90 C 0.497 0.133 0.300 - - - 93.00 93.00%
V. Satisfactory
A.A De Vera Construction 6191 Const. of 2 Storey, 6 CL Sch. Bldg. @ Lawis E/S 11/21/08 VII 4.175 120 C 0.367 0.300 0.300 - - - 96.70 94.18%
Outstanding
A.A De Vera Construction 6191 Const./Repair & Completion of Instructional Classroom, Corella CES 06/10/09 VII 0.504 105 C 0.492 0.200 0.300 - - - 99.20 *99.20%
Outstanding
A.A De Vera Construction 6191Completion of Tagbilaran City
Puericulture Center & Maternity House and Related Facilities
06/10/09 VII 4.575 150 C 0.500 0.169 0.300 - - - 96.90 *96.90% Outstanding
A.A De Vera Construction 6191 Const./Repair/Rehab. of Multi-Purpose Building 06/10/09 VII 0.460 105 C 0.483 0.154 0.300 - - - 93.70 95.52%
V. Satisfactory
A.A De Vera Construction 6191 Completion of Multi-Purpose Building 03/04/09 VII 0.458 60 C 0.382 0.200 0.300 - - - 88.20 *88.20%
Satisfactory
A.A. De Vera Construction 6191 Const. of Employees Quarters,
DPWH Bohol I 03/29/11 VII 4.710 210 C 0.485 0.162 0.300 - - - 94.70 *94.70% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page8
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.A. De Vera Construction 6191 Const. of MPB (School Stage) Loon
North CES 03/29/11 VII 1.318 110 C 0.469 0.133 0.300 - - - 90.20 *90.20% V. Satisfactory
A.B Aponesto Construction Parts &
Supply22998
Road Upgrading (Gravel to Paved) along Compostela-Cateel Rd.,
Osmeña Sect.06/04/10 XI 18.892 180 O 0.355 0.238 0.150 0.030 0.045 0.033 85.10 -
A.B Aponesto Construction, Parts &
Supply22998 Concreting of Montevista-DNAS
Road 03/01/10 XI 32.748 300 C 0.353 0.200 0.300 - - - 85.30 88.48% Satisfactory
A.B Taylan Construction & Development 25273 Const. of RCBC and Canal along
Manila North Road (Km. 483+040) 02/22/10 I 4.816 65 C 0.329 0.133 0.300 - - - 76.20 76.20% Unsatisfactory
A.B. Taylan Construction & Development / Fiat
Construction Services (JV)
JV-09-106
Road Opening/Const. of Missing Links of National Road, Solsona-Kabugao Road, Phase VI, Ilocos
Norte Side
04/03/11 I 192.448 540 O 0.294 0.300 0.150 0.030 0.042 0.033 84.90 -
A.C Cunanan Construction 20752
Repair/Rehabilitation of Sewer and Drainage System at Northwing and
Eastwing07/23/08 PUP 1.241 67 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A.C Rivero Development Corporation 5122
Rehab./Reconst./Upgrading of Bacolod South Road Km. 6+862-Km.
8+350 w/ exception09/12/09 VI 26.470 280 O 0.331 0.282 0.150 0.030 0.045 0.033 87.10 -
A.C Rivero Development Corporation 5122 Const./Impvt. of Multi-Purpose Bldg.
at Maasin City (Legislative Building) 03/06/09 VIII 0.934 75 C 0.500 0.133 0.300 - - - 93.30 *93.30%V. Satisfactory
A.C Rivero Development Corporation (Formerly:
A.C. Rivero Const.)5122
Rehab./Reconst./Upgrading of Bacolod South Rd. Km. 6+862 to Km.
8+350 with exceptions03/06/10 VI 26.337 280 C 0.393 0.200 0.300 - - - 89.30 87.98%
Satisfactory
A.C Rivero Development Corporation (Formerly:
A.C. Rivero Const.)5122 Const. of Subang Daku Bridge 09/04/10 VIII 18.890 345 O 0.382 0.240 0.150 0.030 0.037 0.033 87.20 -
A.C Soliven Construction & General Merchandise 19278
Channel Impvt./Slope Protection @ San Roque Creek, Camias Creek &
San Vicente Creek02/23/10 III 4.781 60 C 0.445 0.177 0.300 - - - 92.20 92.20%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page9
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.C Soliven Construction & General Merchandise 19278 Construction of 2 CL S.B. at La Paz
H/S 09/01/09 III 0.974 90 C 0.483 0.133 0.300 - - - 91.60 *91.60% V. Satisfactory
A.C. Rivero Development Corporation 5122 Const. of Subang Daku Bridge 04/13/11 VIII 18.890 466 O 0.377 0.240 0.150 0.030 0.043 0.033 87.30 -
A.C. Soliven Construction & General
Merchandise19278 Const. of Two (2) Cl. Sch. Bldg. @
Aranguren High School 04/06/11 III 0.925 90 C 0.456 0.178 0.300 - - - 93.40 *93.40% V. Satisfactory
A.D Construction 6946 Conc. of Line Canal along National Road, Concepcion 09/09/09 IVA 1.442 90 C 0.371 0.200 0.300 - - - 87.10 *87.10%
Satisfactory
A.D. Construction 6946 Partial Completion of Jose P. Laurel H/S 04/04/11 NCR 1.571 60 C 0.486 0.192 0.300 - - - 97.80 *97.80%
Outstanding
A.D.L Constrak 26442 Const. of Sch. Bldg. @ Roxas Central School 08/21/08 IV-B 0.481 69 C 0.360 0.200 0.300 - - - 86.00 84.11%
V. Satisfactory
A.D.P Construction & Supply 3466 Impvt./Conc. of Access Road,
Tubalan Port, Tubalan 06/14/10 XI 58.261 320 O 0.338 0.300 0.000 0.030 0.040 0.033 74.10 -
A.D.P Construction & Supply 3466 Impv't./Conc. Of Mana-Ticulon-
Lagumit-Little Baguio Rd. 08/25/10 XI 47.455 571 C 0.292 0.133 0.000 - - - 42.50 42.50% Poor
A.D.P Construction & Supply 3466
Const. of Bugasong-Valderrama Road, Liaures Section (Alternate
Route)11/27/08 VI 14.426 178 C 0.335 0.087 0.300 - - - 72.20 81.05%
V. Satisfactory
A.D.P Construction & Supply 3466
Rehab./Reconst./Upgrading of Damaged Paved National Road,
Roxas City Boundary-Panitan Road-Jct. Bailan Road, Capiz (KM.112+750-
Km.122+705) with exception
08/31/10 VI 53.673 225 O 0.364 0.240 0.150 0.030 0.051 0.050 88.50 -
A.D.P Construction & Supply 3466 Reconst. of Dumaguete North Road 03/12/09 VII 18.881 230 C 0.442 0.200 0.300 - - - 94.20 82.14%
Satisfactory
A.D.P. Const. & Supply 3466 Road Upgrading of Sara-Concepcion Road 04/13/11 VI 66.819 328 C 0.421 0.176 0.300 - - - 89.70 87.84%
Satisfactory
A.D.P. Const. & Supply 3466 Conc. of Pototan-Tina-Lambunao Road 04/12/11 VI 9.419 178 C 0.410 0.133 0.300 - - - 84.30 87.54%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page10
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.D.P. Const. & Supply 3466 Repair/Reconst./Upgrading of Roxas City Bdry.-Panitan Jct. Bailan Road 04/11/11 VI 53.673 225 C 0.409 0.134 0.300 - - - 84.30 86.61%
Satisfactory
A.D.P. Const. & Supply 3466 Const. of Various Drainage System at Roxas City 04/11/11 VI 28.854 240 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
A.D.S San Juan Construction 12853 Conc. of Dionisio Anore St., Brgy.
Mambog 02/16/10 IVA 1.728 90 C 0.427 0.200 0.300 - - - 92.70 92.70% V. Satisfactory
A.F.G Construction & Construction Supply 17161 Const. of MPB (Covered Court) at
San Enrique NHS 03/10/10 VI 1.925 78 C 0.405 0.200 0.300 - - - 90.50 87.08% Satisfactory
A.F.G Construction & Construction Supply 17161
Const. of Diversion/By Pass Road along Kalibo-Iloilo Highway, Banga
Section11/30/08 VI 14.461 180 C 0.351 0.300 0.300 - - - 95.10 90.90%
Outstanding
A.F.G Construction & Construction Supply 17161 Rehab. of Dumaguete North Road 11/27/08 VII 4.894 42 C 0.324 0.200 0.300 - - - 82.40 73.10%
Satisfactory
A.F.G Construction & Construction Supply 17161 Rehab. of Amerang Flood Control,
Tigum River, Brgy. Amerang 09/05/10 VI 8.159 257 C 0.456 0.133 0.000 - - - 58.90 69.28% Poor
A.F.G Construction & Construction Supply 17161 Rehab. of Bacolod South Rd.
(Hingaran Section) 09/15/09 VI 14.221 222 C 0.398 0.133 0.300 - - - 83.10 83.88% Satisfactory
A.F.G. Construction and Construction Supply 17161
Rehab./Reconst./Upgrading of Jct. National Road, Sagay-Bato-Dian-ay-Marcelo-Balea Jct. National Road,
Bato Sect
03/31/11 VI 37.184 210 C 0.448 0.135 0.300 - - - 88.30 83.38% Satisfactory
A.G Cosipag Construction 12700 Balogo CIS 06/1-6/09 NIA 2.144 150 C 0.421 0.126 0.300 - - - 84.68 *84.68%
Satisfactory
A.G Herrera Construction Corp. 26307 Construction of Multi-Purpose
Building, Sto. Cristo 06/01/09 III 2.381 80 C 0.488 0.133 0.300 - - - 92.10 90.42% V. Satisfactory
A.I.P Construction 32458 Road Concreting at Pinget Barangay 03/13/09 CAR 1.872 45 C 0.386 0.200 0.300 - - - 88.60 *88.60% Satisfactory
A.I.P Construction 32458 Rehab. of Ambasing-Balugang FMR 08/27/10 CAR 0.800 268 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page11
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.I.P. Construction 32458 Rehab. of Kin-iway-Tamboan FMR 04/10/11 CAR 1.000 250 C 0.436 0.147 0.300 - - - 88.30 85.42% Satisfactory
A.I.P. Construction 32458Restoration of Road cuts along
Bontoc Baguio Road Alab Section (Km.383+619 - Km.384+124)
04/09/11 CAR 1.732 70 C 0.340 0.200 0.300 - - - 84.00 82.68% Satisfactory
A.J Lava Builders 22265 Const. of the Makinabang Baliuag FMR 11/24/08 III 4.769 62 C 0.296 0.300 0.300 - - - 89.60 *89.60%
V. Satisfactory
A.J Lava Builders 22265 Repair & Rehab. of Daang Maharlika Road (Guiguinto & Plaridel Section) 08/28/08 III 9.930 20 C 0.257 0.211 0.300 - - - 76.80 *76.80%
Satisfactory
A.J Lava Builders 22265 Repair & Rehab. of Gen. Alejo Santos Highway 11/24/08 III 9.927 18 C 0.255 0.300 0.300 - - - 85.50 *85.50%
V. Satisfactory
A.J Lava Builders 22265 Impvt./Rehab. of MPB, Brgy. San Antonio 09/14/09 NCR 2.021 90 C 0.412 0.133 0.300 - - - 84.50 *84.50%
Satisfactory
A.J Lava Builders 22265 Impv't./Rehab. of MPB and Alley Fernandez St., Brgy. San Antonio 06/04/10 NCR 0.961 45 C 0.455 0.200 0.300 - - - 95.50 95.50%
V. Satisfactory
A.J Taylan Construction Corporation 2336
Road Opening/Const. of Missing Links of National Road, Solsona-Kabugao Road, Ilocos Norte Side
09/09/09 I 48.199 300 O 0.379 0.250 0.150 0.030 0.050 0.033 89.20 -
A.L Dare Construction 11932Const./Repair/Rehab. of Slope Protection along Porac River,
Mabical Sect.08/16/10 III 14.344 90 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
A.L Gantuangco Construction 30872
Construction of the Diversion Works and Canal System of Libertad CIP -
Phase 211/15-20/2010 NIA 16.060 202 O 0.373 0.264 0.150 0.023 0.038 0.050 89.69 -
A.L Gantuangco Construction 30872 Benolho CIS 10/6-10/08 NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -
A.L Salazar Construction, Inc. 3899 Impvt. of FMR, Brgy. Pintong
Bukawe, Phase II 11/27/08 IV-A 14.346 120 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
A.L. Dare Construction 11932 Impvt. along Kennon Road, Camp 4 04/14/11 CAR 7.177 150 C 0.388 0.200 0.300 - - - 88.80 85.98% Satisfactory
A.L.R Construction Corporation 24110 Completion of MPB at Brgy. Zapote 05/27/10 IVA 0.959 30 C 0.458 0.075 0.300 - - - 83.30 83.30%
Satisfactory
A.L.R Construction Corporation 24110 Completion of Two (2) Storey 4-CL at
Landayan E/S 08/23/10 IVA 2.302 225 C 0.407 0.165 0.300 - - - 87.20 87.06% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page12
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.L.R Construction Corporation 24110 Conc.of Road, Inday Subdivision 03/13/09 IVA 0.958 90 C 0.461 0.133 0.300 - - - 89.40 *89.40%
V. Satisfactory
A.L.R Construction Corporation 24110
Const.of Multi Purpose Pavement with Perimeter Fence, Marcelino M.
Santos NHS03/13/09 IVA 0.957 90 C 0.480 0.133 0.300 - - - 91.30 *91.30%
V. Satisfactory
A.L.R Construction Corporation 24110 Const. of Pedestrian Overpass
(Phase II) Brgy. Pagsawitan 09/01/09 IVA 2.882 35 C 0.484 0.185 0.300 - - - 96.90 *96.90% Outstanding
A.L.R Construction Corporation 24110 Const. of Multi-Purpose Building at
Brgy. Timugan 09/03/09 IVA 2.111 40 C 0.389 0.155 0.300 - - - 84.40 *84.40% Satisfactory
A.L.R Construction Corporation 24110 Conc. of Roads, Brgy. San Luis 02/15/10 IVA 3.358 90 C 0.455 0.200 0.300 - - - 95.50 95.50%
V. Satisfactory
A.L.R Construction Corporation 24110 Completion of 2-Storey 4-CL @
Landayan E/S 02/24/10 IVA 5.030 225 O 0.354 0.300 0.150 0.015 0.018 0.033 87.00 -
A.L.R Construction Corporation 24110 Construction of Overpass (Phase I),
Pagsawitan 05/30/09 IV-A 3.849 129 C 0.482 0.133 0.300 - - - 91.50 *91.50% V. Satisfactory
A.L.R Construction Corporation 24110
Const. of Pedestrian Overpass at Brgy. San Antonio and Biñan-
Carmona Road Intersection06/01/09 IV-A 19.203 241 C 0.466 0.133 0.300 - - - 89.90 90.86%
V. Satisfactory
A.L.R Construction Corporation 24110
Road Upgrading (Gravel to Paved-HDM-4) of Jct. MWCR (Bagong
Silang)-Cabacao Diversion Road, Brgy. Cabacao
08/28/10 IVB 9.649 145 C 0.409 0.198 0.300 - - - 90.70 88.60% Satisfactory
A.L.R. Construction Corporation 24110 Const. of Pedestrian Overpass, Old
Manila South Road, Km.34+520 04/06/11 IVA 9.632 202 C 0.395 0.111 0.300 - - - 80.60 85.64% Satisfactory
A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) JV-07-097 Conc. of Iloilo-Caticlan Highway
(Pototan-Passi-Capiz Bdry. Sect.) 05/31/10 VI 158.259 570 C 0.379 0.200 0.300 - - - 87.90 87.82% Satisfactory
A.M Oreta & CO., Inc./IBC Int'l Builders Corp. (JV) 7096
Kalibo Airport Development Project (Asphalt Overlay of Runway,
Extension of Apron and Construction of Drainage Canal)
04/14/10 DOTC 283.188 360 C 0.449 0.200 0.300 - - - 94.90 92.40% V. Satisfactory
A.M Robles Construction 28056 Conc. of FMR, Brgy. Colo 11/17/08 I 1.926 55 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
A.M Robles Construction 28056 Construction of Water Supply @ Brgy. San Simon 03/02/09 I 0.530 40 C 0.415 0.184 0.300 - - - 89.90 *89.90%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page13
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.M Robles Construction 28056 Completion of Multi-Purpose Building at Pinaglabanan 05/28/09 NCR 4.776 90 C 0.487 0.133 0.300 - - - 92.00 *92.00%
V. Satisfactory
A.M. Oreta / IBC (JV) JV-07-171Const. of CP-V, Pandan-Libertad-Antique Bdry. Rd., Sta.00+057 - Sta.27+762.66 with exception
04/06/11 PJHL 409.901 707 C 0.418 0.200 0.300 - - - 91.80 *91.80% V. Satisfactory
A.M. Oreta / IBC (JV) JV-09-227Rehab./Reconst./Upgrading of Iloilo-Capiz Road (Old Route) Cabatuan-Janiuay-Lambunao-Calinog Sect.
04/10/11 VI 143.049 360 O 0.336 0.300 0.150 0.030 0.056 0.033 90.50 -
A.M. Oreta / IBC International (JV) JV-08-261
Pototan Bridge along Iloilo-Capiz, (New Route) including Access Road
to the New Airport04/10/11 VI 308.770 676 C 0.447 0.133 0.300 - - - 88.00 83.50%
Satisfactory
A.P Consebido Construction & Trading 33616 Basey Irrigation Project 09/5-9/11 NIA 8.463 120 C 0.451 0.160 0.300 - - - 91.10 91.07%
V. Satisfactory
A.P Consebido Construction and Trading 33616 Const. of MPB, Brgy. Alimanguan 08/20/10 IVB 0.974 114 C 0.447 0.200 0.300 - - - 94.70 88.54%
Satisfactory
A.P Palacios Construction 29021 Const. of MPB, Brgy. Pingit 06/05/10 III 4.287 180 C 0.470 0.133 0.300 - - - 90.30 90.30%
V. Satisfactory
A.P Palacios Construction 29021 Rehab./Impvt. of Dikidit-Suguit FTMR 09/08/09 III 4.723 150 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -
A.P. Palacios Construction / Wilper
Const., Inc. (JV)
Rehab./Reconst./Upgrading of Damage Pave (SLAMAC) 04/09/11 III 46.297 240 C 0.419 0.188 0.300 - - - 90.70 *90.70%
V. Satisfactory
A.P.B Construction 17055Repair/Rehab. of Baguio-Bauang Road, Km. 296+050-Km. 297+050
with exceptions08/29/10 CAR 4.891 47 C 0.456 0.176 0.300 - - - 93.20 93.40%
V. Satisfactory
A.P.B Construction 17055 Rehab. and Conc. of Road at Brgy. Balligi, Kias Barangay 03/03/10 CAR 1.248 60 C 0.384 0.158 0.300 - - - 84.20 84.20%
Satisfactory
A.P.O General Construction 7010
Rehab./Reconst. of Dungon-Agat Section, Km. 216+648-Km. 217+723
(V.S.) Camp 108/29/10 CAR 4.555 90 C 0.466 0.133 0.300 - - - 89.90 89.90%
V. Satisfactory
A.P.O. General Construction 7010 Rehab./Reconst. along Gurel-Bokod-
Kabayan-Buguias-Abatan Rd. 04/11/11 CAR 31.838 441 C 0.453 0.153 0.300 - - - 90.60 *90.60% V. Satisfactory
A.Q Loisaga Construction & General
Services32691 Const. of 2 CL in Quillo-Quillo E/S 09/01/09 IVA 2.023 120 C 0.470 0.133 0.300 - - - 90.30 *90.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page14
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.R & Mark Builders 31673 Const. of @-CL Maramag CES 02/25/10 X 0.989 105 C 0.418 0.133 0.300 - - - 85.10 85.10% Satisfactory
A.R Lustre Jr. Construction 7680
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rds. At Bigaa-Plaridel via Bulacan and Malolos Rd.
08/27/10 III 14.352 90 C 0.367 0.185 0.300 - - - 85.20 85.20% Satisfactory
A.R Lustre Jr. Construction 7680 Conc. of Puerto-Princesa-Sabang
Road 09/11/09 IVB 48.140 284 C 0.419 0.200 0.300 - - - 91.90 90.61%V. Satisfactory
A.R Lustre Jr. Construction 7680 Asphalt Overlay along Capitol-
Canigaran Road 11/17/08 IV-B 9.697 60 C 0.332 0.300 0.300 - - - 93.20 91.16% Outstanding
A.R Lustre Jr. Construction 7680 Const. of Tagbarungis Bridge, PPSR 08/11/08 IV-B 20.378 240 C 0.374 0.200 0.300 - - - 87.40 85.06%
V. Satisfactory
A.R Lustre Jr. Construction 7680 Puerto Princesa Airport
Development Project 8/13-14/09 DOTC 90.817 270 C 0.488 0.200 0.300 - - - 98.80 98.80% Outstanding
A.R Lustre Jr. Construction 7680
Rehab/Reconst./Upgrading of Bigaa-Plaridel via Bulacan and Malolos
Road05/28/09 III 13.077 75 C 0.449 0.196 0.300 - - - 94.50 *94.50%
V. Satisfactory
A.R Lustre Jr. Construction 7680 Construction of Multi-Purpose
Building 03/07/09 IV-B 0.383 90 C 0.481 0.107 0.300 - - - 88.80 *88.80% Satisfactory
A.R Lustre Jr. Construction 7680 Repair/Rehab/Impvt. of Santiago-
Syjuco E/S 09/17/09 NCR 0.482 45 C 0.482 0.000 0.300 - - - 78.20 *78.20% Unsatisfactory
A.R. Lustre Jr. Construction 7680 Conc. of Puerto Princesa South
Road 03/31/11 IVB 7.481 95 O 0.319 0.300 0.150 0.022 0.048 0.050 88.90 -
A.R. Lustre Jr. Construction 7680 Conc. of Puerto Princesa South
Road 03/31/11 IVB 38.600 217 C 0.441 0.133 0.300 - - - 87.40 87.64% Satisfactory
A.R. Lustre Jr. Construction 7680
Const. of Puerto Princesa Airport Development Project (Building and
Industrial Plant)05/25/11 DOTC 38.547 210 C 0.417 0.200 0.300 - - - 91.70 91.70% V.
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page15
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
A.R. Lustre Jr. Construction 7680
Const. of Peurto Princesa Airport Development Project (Building and
Industrial Plant)05/26/11 DOTC 102.128 300 C 0.438 0.200 0.300 - - - 93.80 93.80% V.
Satisfactory
A.R.L Construction 27645 Repair/Rehab. of School Building BSU 03/03/10 III 0.989 18 C 0.454 0.148 0.300 - - - 90.20 90.20%
V. Satisfactory
A.R.L Construction 27645 Rehab/Impvt./Upgrading of Pulilan-Calumpit Road (Pulilan Section) 05/28/09 III 9.542 60 C 0.376 0.200 0.300 - - - 87.60 *87.60%
Satisfactory
A.R.L Construction 27645Const. of Flood Control
(Revetrment), Poblacion, San Sebastian, San Jose, Sta. Monica,
09/04/09 III 6.697 80 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory
A.R.L Construction 27645 Upgrading/Conc. of Roads with Drainage Improvement 03/04/09 NCR 0.476 45 C 0.364 0.200 0.300 - - - 86.40 *86.40%
Satisfactory
A.R.L Construction 27645Rehab./Reconst./Upgrading of
Damaged Pavement along 7th Ave. East
05/31/10 NCR 6.445 90 C 0.409 0.200 0.300 - - - 90.90 90.90% V. Satisfactory
A.S Obquia Construction 19844 Completion of MPB 09/03/08 VII 0.175 120 C 0.366 0.300 0.300 - - - 96.60 *91.60% Outstanding
A.S.M Francisco Dev't and Construction Corp. 19098 Proposed Exterior Repainting Works 03/24/09 U.P. 1.368 120 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
A.S.S Construction 31509 Completion of Alaremil Building II 03/2-3/10 DOST 9.607 250 C 0.496 0.200 0.300 - - - 99.60 97.64% Outstanding
A.S.S. Construction 31509 Completion of ACA Building II 05/14-15/09 DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -
A.S.S. Construction 31509 Construction of Sports Complex 05/14-15/09 DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding
A.S.S. Construction 31509 Partial Completion of vast set, PCASTRD & PCIERD bldg. 07/08/09 DOST 7.479 135 C 0.483 0.200 0.300 - - - 98.30 *98.30%
Outstanding
A.S.V Construction Supply and Services 13490 Const. of FMR, Venegas St., Brgy.
Layac-Sta.Isabel 05/26/10 III 0.473 60 C 0.444 0.133 0.300 - - - 87.70 87.70% Satisfactory
A.Y.U. Engineering and Construction 25632 Conc. of Roads @ Brgy. Sto. Niño,
Tugbok District 03/28/11 XI 2.825 210 C 0.368 0.200 0.300 - - - 86.80 *86.80% Satisfactory
AB Aponesto Construction, Parts &
Supply22998 Conc. of Lublub-Bolilac-Salad Road,
Km.277+707.50-Km.278+711 09/05/10 VI 14.425 192 O 0.356 0.240 0.150 0.030 0.042 0.033 85.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page16
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Abesco Construction & Development Corp. 2934 Construction of Multi-Purpose
Building @ Cupang Elem. School 05/21/09 III 3.273 88 C 0.484 0.133 0.300 - - - 91.70 90.23%V. Satisfactory
Abu Construction 22313 Const. of MPB, Brgy. Panay 04/08/11 XII 2.695 105 O 0.355 0.221 0.150 0.030 0.050 0.050 85.60 -
Abu Construction 22313 Const. of Multi-Purpose Building 06/10/10 XII 1.926 126 C 0.494 0.133 0.300 - - - 92.70 92.70% V. Satisfactory
Abu Construction 22313 Completion of MPB (Mini Gym) at Brgy. San Rafael 06/08/10 XII 1.897 65 C 0.386 0.133 0.300 - - - 81.90 81.90%
Unsatisfactory
Abu Construction 22313 Completion of MPB (Gym) at Brgy. Baras 06/08/10 XII 0.764 65 C 0.339 0.133 0.300 - - - 77.20 77.20%
Unsatisfactory
Abulug Construction Company, Inc. 5593
Reblocking along Bangag-Allapacan-Magapit Road (BAMR), KO686+400-
KO687+20009/08/09 II 7.999 150 C 0.406 0.200 0.300 - - - 90.60 *90.60%
V. Satisfactory
Abulug Construction Company, Inc. 5593 Concrete Paving of Ballesteros Road
(Washington & Luna St.,) 09/08/09 II 1.930 150 C 0.405 0.200 0.300 - - - 90.50 88.94% Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Zitanga Brgy. Roads 02/17/10 II 9.648 132 C 0.370 0.200 0.300 - - - 87.00 88.14%
Satisfactory
Abulug Construction Company, Inc. 5593 Rehab. of Ballesteros Central School
Building 02/17/10 II 0.192 60 C 0.437 0.133 0.300 - - - 87.00 87.00% Satisfactory
Abulug Construction Company, Inc. 5593 Construction of Deepwell 02/18/10 II 0.289 60 C 0.396 0.133 0.300 - - - 82.90 82.90%
Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Colony Road 11/13/08 II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -
Abulug Construction Company, Inc. 5593 Concreting of Jct. Claveria-Dibalio-
Luzon Road 05/21/09 II 9.648 273 C 0.485 0.133 0.300 - - - 91.80 88.95% Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Public Market (Phase II) 02/23/09 II 1.446 269 C 0.476 0.133 0.300 - - - 90.90 87.40%
Satisfactory
Abulug Construction Company, Inc. 5593 Lucban River Control Project 02/29/09 II 3.858 347 C 0.417 0.133 0.300 - - - 85.00 83.35%
Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Conc. of Luna Street at Centro West 05/24/10 II 0.964 120 C 0.434 0.200 0.300 - - - 93.40 93.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page17
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Abulug Developers & Builders Co., Inc. 2366
Emergency Restoration of Cadcadir Bridge #1 Approach KO 600+(-)595
Phase I05/24/10 II 0.995 90 C 0.419 0.200 0.300 - - - 91.90 91.90%
V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366
Restoration of Scoured Approaches & Eroded Bank of Cadcadir Bridge 2
KO 602+723 Phase II05/24/10 II 0.771 90 C 0.408 0.200 0.300 - - - 90.80 90.80%
V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366
Restoration of Scoured Approaches & Eroded Bank of Cadcadir Bridge 1
Phase II, KO 600+ (-594)05/24/10 II 0.963 90 C 0.467 0.134 0.300 - - - 90.10 90.10%
V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Reblocking along Manila North Road
(Ballesteros-Abulug Section) 09/08/09 II 18.527 210 C 0.407 0.200 0.300 - - - 90.70 89.38% V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Construction of 1-CL Bessang E/S 09/08/09 II 0.484 60 C 0.404 0.181 0.300 - - - 88.50 *88.50%
Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Emergency/Rehab. of Slope
Protection KO 590+640, MNR 02/17/10 II 1.495 90 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Emergency/Rehab. of Slope
Protection KO 590+340, MNR 02/17/10 II 0.995 90 C 0.467 0.133 0.300 - - - 90.00 90.00% V. Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Concrete Paving of Jones Street 02/12/10 II 0.868 90 C 0.384 0.200 0.300 - - - 88.40 88.40%
Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Reblocking along Manila North Road
(/Fugu Bdry. - Bangag Sect.) 02/17/10 II 19.299 234 C 0.394 0.200 0.300 - - - 89.40 88.08% Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Rehab./Regravelling of Curva to
Capallepaan Farm-to-Market Road 02/18/10 II 0.675 60 C 0.353 0.200 0.300 - - - 85.30 85.30% Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Road Opening of Pimpila Farm-to-
Market Road 02/17/10 II 0.820 75 C 0.348 0.200 0.300 - - - 84.80 84.80% Satisfactory
Abulug Developers & Builders Co., Inc. 2366 Reblocking along Manila North Road
(Fugu Bdry.-Bangag Section) 05/21/09 II 19.299 210 O 0.368 0.240 0.150 0.030 0.051 0.033 87.20 -
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Restoration of River Control Project along Goron & Langgangan River 03/31/11 II 12.542 179 C 0.445 0.133 0.300 - - - 87.80 92.90%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page18
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Conc. along Cadcadir-Kabugao Road 03/31/11 II 5.015 166 C 0.423 0.133 0.300 - - - 85.60 89.32% V. Satisfactory
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Rehab./Upgrading of Manila North Road 03/31/11 II 40.496 403 O 0.385 0.300 0.060 0.030 0.056 0.050 88.10 -
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Const. of Namuac Bridge Protection Works 03/31/11 II 9.647 180 C 0.426 0.133 0.300 - - - 85.90 *85.90%
Satisfactory
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Rehab. of Pamplona Bridge, Phase 3 03/30/11 II 14.473 210 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Const. of Lucban Flood Control Project, (Ph-3) 03/30/11 II 17.368 240 C 0.407 0.133 0.300 - - - 84.00 *84.00%
Satisfactory
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Const. of Sto. Tomas Farm-to-Market Road 03/31/11 II 0.962 199 C 0.410 0.133 0.300 - - - 84.30 84.00%
Satisfactory
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Restoration of Slope Protection KO591+320 - KO591+353, MNR 08/19/10 II 1.928 120 C 0.434 0.200 0.300 - - - 93.40 93.40%
V. Satisfactory
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Const. of Slope Protection at KO673+000 - KO673+853 MNR 08/19/10 II 1.929 90 C 0.420 0.200 0.300 - - - 92.00 92.00%
V. Satisfactory
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366Emergency Rehab. of Slope
Protection KO600+525 - KO602+200, MNR
08/19/10 II 4.195 90 C 0.347 0.200 0.300 - - - 84.70 87.58% Satisfactory
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Conc. along Claveria Dibalio-Luzon-Cagayan Bdry. Road 08/19/10 II 2.938 153 C 0.374 0.200 0.300 - - - 87.40 87.40%
Satisfactory
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Retrofitting of Pamplona Bridge, Manila North Road 02/24/09 II 10.290 180 C 0.386 0.200 0.300 - - - 88.60 82.96%
Satisfactory
Aca Construction & Supply 10784 Construction of Multi-Purpose
Building, Bancagan 02/26/09 I 0.096 30 C 0.417 0.133 0.300 - - - 85.00 *85.00%Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page19
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Aca Construction & Supply 10784 Construction of Water Supply 02/26/09 I 0.096 30 C 0.338 0.188 0.300 - - - 82.60 *82.60%
Satisfactory
Aca Construction & Supply 10784 Repair of Farm-to-Market Road 02/26/09 I 0.480 30 C 0.343 0.200 0.300 - - - 84.30 *84.30%
Satisfactory
Acer Industrial/Solid Rock Construction Joint
Venture
SLI-SN-005433/JV-
08-217
Rehabilitation of Libingan ng mga Bayani Road-MRT Road 05/27/09 NCR 4.694 75 C 0.396 0.133 0.300 - - - 82.90 *82.90%
Satisfactory
ACJ Construction Resources 10635
Conc. of Magpet Binay-Noa-basak-Arakan Road (Noa-Bagumbayan
Sect.)04/02/11 XII 18.363 224 C 0.410 0.140 0.300 - - - 85.00 *85.00%
Satisfactory
ACJ Construction Resources 10635
Conc. Of Paco-Roxas-Arakan Valley Road, Luhong Section along Paco-
Roxas-Arakan Valley Road04/02/11 XII 18.453 200 C 0.391 0.145 0.300 - - - 83.60 *83.60%
Satisfactory
ACJ Construction Resources 10635
Conc. of Paco-Roxas-Arakan Road Kiyaab-Antipas Section (Km. 1648+300-Km.1649+385.63)
09/05/09 XII 16.826 150 O 0.324 0.300 0.150 0.015 0.042 0.050 88.10 -
ACJ Construction Resources 10635
Conc. of Poblacion-Magpet-Nowa Road, Nowa-Basak Section w/
exception09/05/09 XII 18.798 200 C 0.358 0.200 0.300 - - - 85.80 84.30%
Satisfactory
ACJ Construction Resources 10635 Asphalt Overlay along Davao-
Cotabato Rd., Saguing Section 03/01/10 XII 6.765 68 C 0.429 0.200 0.300 - - - 92.90 92.90% V. Satisfactory
ACJ Construction Resources 10635
Const. of Kinamalig Bridge including Concrete Paving of Approach along
Paco-Roxas-Arakan03/02/10 XII 12.815 202 C 0.384 0.142 0.300 - - - 82.60 86.08%
Satisfactory
ACJ Construction Resources 10635
Conc. of Paco-Roxas-Arakan Road, Kiyab-Antipas Section, Km. 1648+300-Km. 1649+385.63
03/02/10 XII 16.826 175 C 0.379 0.143 0.300 - - - 82.20 85.71% Satisfactory
ACJ Construction Resources 10635
Conc. of Paco-Roxas-Arakan Road, inclined Gap Ipuan Section, Km. 1640+374.10 - Km. 1646+794.28
03/02/10 XII 13.144 189 C 0.394 0.145 0.300 - - - 83.90 83.90% Satisfactory
ACJ Construction Resources 10635
Rehab./Reconst. of Damaged Paved along Makilala-Allah Junction Road,
La Esperanza Section06/05/10 XII 9.961 55 C 0.436 0.133 0.300 - - - 86.90 86.90%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page20
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ACJ Construction Resources 10635
Rehab./Reconst. of Damage Paved along Matalam-M'lang-Bagontapay
Road06/05/10 XII 14.307 60 C 0.424 0.133 0.300 - - - 85.70 85.70%
Satisfactory
ACJ Construction Resources 10635
Road Upgrading of Matalam-Mlang-Bagontapay Road, Additional Lane
(Poblacion Section)08/27/10 XII 18.338 153 C 0.476 0.127 0.300 - - - 90.30 90.30%
V. Satisfactory
ACJ Construction Resources 10635 Concreting of Paco-Roxas-Arakan
Road (Luhong-Kiyaab Section) 05/30/09 R-XII 18.566 205 C 0.338 0.200 0.300 - - - 83.80 88.42% Satisifactory
ACJ Construction Resources 10635 Concreting of Poblacion Magpet-
Nowa Road (Nowa Basak Sect.) 03/10/09 XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -
Acme Builders Corp./MWJ Construction
JV JV-08-243
Conc. of Burauen-Albuena Road Km. 98+986.50-Km. 986+857.50 w/
exceptions02/22/10 VIII 46.887 240 C 0.411 0.200 0.300 - - - 91.10 91.10%
V. Satisactory
Acme Builders Corporation 6442
Const./Completion/Continuation/On-going of Nijaga Bridge along
Calbayog Diversion Road, Brgy. Nijaga
04/02/11 VIII 27.000 180 C 0.474 0.133 0.300 - - - 90.70 *90.70% V. Satisfactory
Acme Builders Corporation 6442 Const. of Palo-East-By-Pass Road
(including Bridge) 03/28/11 VIII 28.783 125 C 0.447 0.133 0.300 - - - 88.00 88.48% Satisfactory
Acme Builders Corporation 6442 Const. of Nijaga Bridge Along
Calbayog Diversion Road (Phase II) 04/02/11 VIII 37.279 300 O 0.400 0.240 0.150 0.020 0.040 0.033 88.30 -
Acme Builders Corporation 6442
Rehab./Reconst./Upgrading of Daang Maharlika, Palo-Tolosa Road Sect.,
Km.915+500 - Km.921+70004/06/11 VIII 24.050 200 C 0.423 0.133 0.300 - - - 85.60 87.04%
Satisfactory
Acme Builders Corporation 6442 Const. of Palo East By-Pass Road 03/11/10 VIII 19.260 240 C 0.436 0.200 0.300 - - - 93.60 89.76%
V. Satisfactory
Acme Builders Corporation 6442
Rehab./Reconst./Impvt./Upgrading of Damaged Pavement, Tacloban
Baybay South Rd.06/17/10 VIII 34.600 150 O 0.366 0.300 0.150 0.030 0.032 0.033 91.10 -
Acme Builders Corporation 6442
Rehab./Reconst./Impvt./Upgrading of Damaged Pavement, Tacloban
Baybay South Road09/08/10 VIII 33.358 150 C 0.398 0.133 0.300 - - - 83.10 87.90%
Satisfactory
Acme Builders Corporation 6442 Construction of Sinugbuhan Bridge 06/04/09 VI 33.384 676 C 0.441 0.133 0.300 - - - 87.40 85.20%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page21
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Acme Builders Corporation 6442
Asphalt Overlay along Tigbao-Pulak-Sta. Fe Road, Km 925+370-Km
926+37903/18/09 VIII 11.310 90 C 0.393 0.133 0.300 - - - 82.60 *82.60%
Satisfactory
Acme Builders Corporation 6442 Construction of Bagacay Bridge 03/02/09 VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -
Acme Builders Corporation 6442 Rehabilitation of Mahayahay Creek 03/03/09 VIII 6.709 170 C 0.375 0.133 0.300 - - - 80.80 84.10%
Satisfactory
Acme Builders Corporation / B. Vicencio
ConstructionJV-07-066 Const. of Palo East By Pass Road
(Const. of Bernard Reed II Bridge) 08/31/09 VIII 57.823 616 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 -
Acme Builders Corporation / MWJ Construction (JV)
JV-08-243 Const. of Albuera-Burauen Road including Bridges, Burauen Sect. 09/02/09 VIII 47.235 240 O 0.352 0.245 0.150 0.030 0.045 0.050 87.20 -
ACV Construction & Surveying 10903 Concreting of FMR @ Various
Brgys., Urbiztondo and Mangatarem 03/09/09 I 3.838 60 C 0.353 0.200 0.300 - - - 85.30 *85.30%Satisfactory
ADB Dynamic Builders & Supply 33359
Repair/Rehab. of St., Brgy. Dalupirit; Rehab. of San Roque St., Brgy.
Vinisitahan; Rehab./Repair of St., Brgy. Pilar
03/07/09 VIII 1.437 60 C 0.463 0.200 0.300 - - - 96.30 *96.30% Outstanding
Adelfa & Charlie Enterprises 11569 Construction of MPP Brgy.
Hibulangan 03/11/09 VIII 0.142 30 C 0.433 0.133 0.300 - - - 86.60 *86.60%Satisfactory
Adfil Corporation 14437Rehab. of Magaboy and Lucena Bridge Approaches-Slope/Bank
Protection06/13/10 XIII 4.709 105 C 0.450 0.200 0.300 - - - 95.00 95.00%
V. Satisfactory
Adfil Corporation 14437 Rehab. of River Dike 06/01/10 XIII 9.649 150 C 0.408 0.179 0.300 - - - 88.70 88.46% Satisfactory
Adfil Corporation 14437Repair/Maintenance with Asphalt
Overlay of Tabon-Tabon Slip along Agusan- Davao Road
06/17/10 XIII 32.364 225 O 0.371 0.240 0.150 0.030 0.055 0.033 87.90 -
Adfil Corporation 14437 Rehab. of Magsaysay Bridge along Iligan City 09/09/10 XIII 48.161 300 O 0.352 0.300 0.150 0.030 0.055 0.050 93.70 -
Adfil Corporation 14437 Completion/Continuation of Libertad Bridge & Approaches 09/08/10 XIII 11.224 180 C 0.462 0.189 0.300 - - - 95.10 92.58%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page22
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adfil Corporation 14437 Rehab. of Wawa Bridge along Agusan-Davao Road 09/06/10 XIII 110.862 315 O 0.379 0.263 0.150 0.030 0.055 0.033 91.00 -
Adfil Corporation 14437Rehab./Along Reconst. of Daang
Maharlika (Agusan-Surigao Road) Ampayon-Taguibo Sect.
09/09/10 XIII 35.253 270 C 0.400 0.200 0.300 - - - 90.00 90.54% V. Satisfactory
Adfil Corporation 14437Repair/Maintenance with Asphalt
Overlay of Tabon-Tabon Slip along Agusan-Davao Road
09/06/10 XIII 32.398 225 C 0.440 0.133 0.300 - - - 87.30 87.66% Satisfactory
Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Roads Gingoog-Calveria-
Villanueva Road09/10/09 X 96.400 405 O 0.259 0.300 0.150 0.030 0.061 0.050 85.00 -
Adfil Corporation 14437 Rehab./Reconst. of NRJ Bahbah-Talacogon Road 06/09/09 XIII 19.263 220 C 0.485 0.200 0.300 - - - 98.50 *98.50%
Outstanding
Adfil Corporation 14437
Repair/Rehab./Impvt. of Roads & Bridges along the National Highway Epoxy Sealing of Cracks in concrete girder, deck slab & conc. Pavement
(injectable epoxy) along Bahbah, Talacogon Road
06/09/09 XIII 9.429 180 C 0.464 0.200 0.300 - - - 96.40 *96.40% Outstanding
Adfil Corporation 14437 Rehabilitation/Concreting of Tagcatong-Vinapor Road 05/25/09 XIII 9.629 210 C 0.489 0.133 0.300 - - - 92.20 *92.20%
V. Satisfactory
Adfil Corporation 14437 Conc. of Dapa-Junction Cancohoy Road 03/07/09 XIII 28.451 241 C 0.414 0.200 0.300 - - - 91.40 88.94%
Satisfactory
Adfil Corporation 14437Rehab./Reconst. of Damaged Paved
National Road along Agusan-Misamis Road
03/02/09 XIII 9.634 180 C 0.405 0.200 0.300 - - - 90.50 86.36% Satisfactory
Adfil Corporation 14437Rehab./Reconst. of Damaged Paved
National Road along Agusan-Surigao Road
03/03/09 XIII 9.635 180 C 0.408 0.200 0.300 - - - 90.80 87.50% Satisfactory
Adfil Corporation 14437Repair/Reconst. of Butuan City-
Cagayan de Oro-Iligan Road (Agusan-Misamis Oriental Road) inc. Bridge
03/18/09 XIII 19.198 210 C 0.402 0.200 0.300 - - - 90.20 89.06% V.Satisfactory
Adfil Corporation 14437 Repair/Rehab. of NRJ Bahbah-Talacogon Road 03/20/09 XIII 9.633 188 C 0.431 0.200 0.300 - - - 93.10 87.04%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page23
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adfil Corporation 14437
Rehab./Reconst. of Damaged Paved National Rd. along Butuan City-CDO-Iligan Rd.,(Agusan-Misamis Oriental
Sect.)Libertad-Bancasi Sect.
09/16/09 XIII 54.954 285 O 0.371 0.300 0.150 0.030 0.055 0.050 95.60 -
Adfil Corporation 14437Const./Completion/Continuation of Unfinished Bridge and Approaches,
Brgy. Libertad09/16/09 XIII 23.830 195 O 0.364 0.300 0.150 0.030 0.055 0.050 94.90 -
Adfil Corporation 14437 Rehab. of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 14.427 210 C 0.416 0.194 0.300 - - - 91.00 94.66%
V.Satisfactory
Adfil Corporation 14437 Concreting of NRJ-Bahbah-Talacogon Rd. 09/13/09 XIII 15.872 225 O 0.371 0.244 0.150 0.030 0.065 0.050 91.00 -
Adfil Corporation (Formerly: Adfil Construction)
14437Rehab. of Taguibo Steel Bridge
along Daang Maharlika (Surigao-Agusan Road), Brgy. Taguibo
04/11/11 XIII 9.601 180 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437 Conc. of Pulang Lupa-Sta. Josefa Road 04/01/11 XIII 19.249 195 C 0.439 0.200 0.300 - - - 93.90 92.91%
V. Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437Rehab. of Magsaysay Bridge along Iligan City-Cagayan de Oro-Butuan
City Road04/13/11 XIII 48.161 300 C 0.476 0.134 0.300 - - - 91.00 92.62%
V. Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437 Conc. of Butuan City-Pianing/Tandag Road 04/13/11 XIII 9.021 148 O 0.332 0.300 0.150 0.030 0.054 0.050 91.60 -
Adfil Corporation (Formerly: Adfil Construction)
14437 Conc./Repair of Slip along NRJ-Cuevas-Sampaguita Rd. 04/01/11 XIII 47.951 470 C 0.478 0.133 0.300 - - - 91.10 91.19%
V. Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437 Rehab. of Wawa Bridge along Agusan-Davao Road 03/30/11 XIII 110.862 469 O 0.380 0.240 0.150 0.030 0.060 0.050 91.00 -
Adfil Corporation (Formerly: Adfil Construction)
14437Rehab./Reconst. of Butuan-Cagayan
de Oro-Iligan Road inc. Bridges (Agusan-Mis. Or. Road)
04/12/11 XIII 8.595 105 C 0.474 0.133 0.300 - - - 90.70 *90.70% V. Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437 Reconst. of Maglambing Bridge and Approaches 04/02/11 XIII 96.519 521 O 0.343 0.300 0.150 0.030 0.048 0.033 90.40 -
Adfil Corporation (Formerly: Adfil Construction)
14437 Conc. of NRJ Cuevas-Bislig Road, Phase II 04/01/11 XIII 26.309 245 O 0.377 0.247 0.150 0.030 0.048 0.050 90.20 -
Adfil Corporation (Formerly: Adfil Construction)
14437 Conc. of Butuan City-Pianing-Tandag Road 04/13/11 XIII 18.905 270 C 0.347 0.200 0.300 - - - 84.70 88.96%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page24
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adfil Corporation (Formerly: Adfil Construction)
14437 Conc. of NRJ Cuevas-Sampaguita Road 04/01/11 XIII 60.039 270 C 0.367 0.200 0.300 - - - 86.70 88.14%
Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437Rehab. of Butuan City-Cagayan de Oro-Iligan Road (Agusan-Misamis
Oriental Road)04/11/11 XIII 105.122 210 C 0.322 0.200 0.300 - - - 82.20 86.70%
Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437 Const. of Tubay-Lake Mainit Circ. Road, Tubay-Jabonga 03/28/11 XIII 96.438 438 O 0.348 0.240 0.150 0.030 0.061 0.033 86.20 -
Adfil Corporation (Formerly: Adfil Construction)
14437 Const. of River Dike Protection, Brgy. Agao 03/10/10 XIII 9.556 90 C 0.485 0.133 0.300 - - - 91.80 91.80%
V.Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437Impv't./Rehab. of Iligan-Cagayan-
Butuan Rd. (Agusan-Misamis Oriental Section)
02/23/10 XIII 67.446 180 C 0.480 0.133 0.300 - - - 91.30 91.30% V.Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437 Const./Conc. of NRJ San Francisco-Bahi Rd. 03/07/10 XIII 28.892 330 C 0.431 0.133 0.300 - - - 86.40 91.20%
V.Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437 Upgrading/Conc. of NRJ Cuevas-Bislig Rd. 03/07/10 XIII 28.874 315 C 0.485 0.133 0.300 - - - 91.80 90.66%
V.Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437 Conc. of Dapa-Del Carmen (Sayak-Airport Rd.) 02/26/10 XIII 75.947 390 C 0.456 0.133 0.300 - - - 88.90 88.90%
Satisfactory
Adfil Corporation (Formerly: Adfil Construction)
14437 Rehab./Reconst. of Damaged Rd. Gingoog-Claveria-Villanueva Rd. 03/10/10 X 96.400 405 C 0.437 0.200 0.300 - - - 93.70 89.71%
V.Satisfactory
Adfil Corporation/RID Corporation (JV) JV-06-022 Repair/Rehab. of Patin-ay Bridge
along Agusan-Davao Road, Patin-ay 06/08/09 XIII 23.749 658 C 0.458 0.200 0.300 - - - 95.80 91.84% V. Satisfactory
Adige Sta. Clara (JV) JV-06-032DPWH Component Project under the
Help for Catubig Agricultural Advancement Proj.
05/30/09 VIII 519.663 1,073 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -
Adige Sta. Clara (JV) JV-06-032DPWH Component Project under the
HELP for Catubig Agricultural Project (HCAAP)
08/25/08 VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -
Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase II) 08/28/08 III 1.907 56 C 0.334 0.200 0.300 - - - 83.40 83.61%
V. Satisfactory
Adimre Construction 25534 Marilao Port Development Project 08/20/09 DOTC 2.862 60 C 0.451 0.200 0.300 - - - 95.10
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page25
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adimre Construction 25534 Sta. Cruz Port Development Project 08/20/09 DOTC 0.960 30 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfactory
Adimre Construction 25534 Sasmuan Port Development Project 08/20/09 DOTC 2.871 60 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory
Adimre Construction 25534 Hagonoy Port Development Project 10/02/09 DOTC 0.949 30 C 0.460 0.200 0.300 - - - 96.00 96.00% Outstanding
Adimre Construction 25534 Baguio Airport Development Project 04/04/09 DOTC 861.940 60 C 0.435 0.181 0.300 - - - 91.60 91.60% V. Satisfactory
Adimre Construction 25534
Dumaguete Airport Dev't Project (Completion of Imprv't of Terminal Building and Purchase/ Installation
of Bagage Conveyor)
01/21/10 DOTC 13.500 90 C 0.402 0.199 0.300 - - - 90.10 90.10% V.Satisfactory
Adimre Construction 25534Tuguegarao Airport Dev't Project
(Continuation of Widening of Runway)
03/04/10 DOTC 9.588 90 C 0.452 0.200 0.300 - - - 95.20 95.20% V.Satisfactory
Adimre Construction 25534
Tuguegarao Airport Dev't Project (Continuation of Widening of
Runway and Improvement of Fire Station Building)
03/04/10 DOTC 12.490 90 C 0.458 0.200 0.300 - - - 95.80 95.80% V.Satisfactory
Adimre Construction 25534
Laoag Airport Development Project (Upgrading of Radar Area,
Continuation of Perimeter Fence Construction of Drainage System)
04/09/10 DOTC 9.604 120 C - 0.419 0.200 0.300 - - 91.90 91.90% V. Satisfactory
Adimre Construction 25534Laoag Airport Development Project
(Improvement of Fire Station Building)
04/09/10 DOTC 4.821 120 C 0.464 0.200 0.300 - - - 96.40 96.40% Outstanding
Adimre Construction 25534Laoag Airport Development Project
(Shoulder Grade Correction including Drainage System)
04/09/10 DOTC 4.793 75 C 0.410 0.200 0.300 - - - 91.00 91.00% V. Satisfactory
Adimre Construction 25534Tuguegarao Airport Development Project (Repair/Rehabilitation of
Terminal Building)09/10/10 DOTC 1.927 90 C 0.449 0.200 0.300 - - - 94.90 94.90%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page26
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Adimre Construction 25534 Canalate Port Development Project (Improvement of Port) 12/03/10 DOTC 1.919 60 C 0.458 0.200 0.300 - - - 95.80 95.80%
V. Satisfactory
Adimre Construction 25534Const. of Standard One Classroom
School Building (Modified) at GITMES
09/05/09 III 0.526 24 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory
Adimre Construction 25534Camiguin Ports Cluster Project
(Construction of Seawall Enclosure at Benoni Port and Repair of
02/17/11 DOTC 6.231 60 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory
ADP Const. & Supply 3466 Impvt./Conc. of Access Road, Tubalan Port, Tubalan 04/01/11 XI 58.261 320 C 0.135 0.200 0.000 - - - 33.50 61.25%
Poor
Adroit Construction 11169 Const. of 2-CL, Sta. Barbara E/S 04/08/11 III 1.324 60 C 0.45 0.048 0.300 - - - 79.80 *79.80% Unsatisfactory
Adroit Construction 11169 Completion of Bridge, General Luna 2nd Phase 03/02/09 III 3.026 30 C 0.332 0.200 0.300 - - - 83.20 *83.20%
Satisfactory
Adroit Construction 11169 Concreting of Brgy. Maligaya Road 03/02/09 III 1.867 25 C 0.404 0.133 0.300 - - - 83.70 *83.70%Satisfactory
Advance Foundation Const. System Corp. /
Abulug Developer Builders Const. Inc. (JV)
JV-09-289 Const. of Gov. Edgar R. Lara Bridge along Cagayan-Apayao Road 03/30/11 II 112.029 240 O 0.360 0.300 0.000 0.023 0.051 0.017 75.10 -
Advanced Foundation - IBC (JV) JV-09-265
Replacement of E. Marcos Bridge, Km.28+310 along Maasin-Cabatuan
Road (Over Tigan River)04/10/11 VI 163.350 430 O 0.360 0.240 0.150 0.030 0.056 0.050 88.60 -
Agafer Construction 7912 Const. of Cagayan River Control 11/11/08 II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -
Aguero Construction 23338 Rehab./Impvt. of Maharlika Road 04/04/11 XIII 3.766 150 O 0.400 0.239 0.150 0.030 0.045 0.033 89.70 -
Aguero Construction 23338 Impvt./Rehab. of MPB (R.M. Billanes Gym) 04/04/11 XIII 2.821 120 O 0.307 0.300 0.150 0.030 0.019 0.033 83.90 -
Aison Dominique Construction & Supply 32805 Const. of Multi-Purpose Building
(Cooperative) 02/23/10 VIII 0.473 86 C 0.399 0.200 0.300 - - - 89.90 77.79% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page27
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Aison Dominique Construction & Supply 32805 Const. of Cabucgayan MPB (Phase
III) 08/21/08 VIII 1.896 120 C 0.373 0.187 0.300 - - - 86.00 79.07% Satisfactory
Ajan Jaeda, inc. 17869 Corollary Works for Banquerohan Resettlement Project, Ph. 2 9/14-18/09 NHA 30.991 150 O 0.398 0.245 0.015 0.024 0.070 0.050 80.15 -
Ajan Jeada Inc. (Formerly: Jaeda
Construction)17869 Rehab./Impv't. of Puro-Lamba Road 03/28/11 V 36.498 416 O 0.369 0.197 0.150 0.030 0.040 0.050 83.60 -
Ajan Jeada, Inc. (Formerly: Jeada
Construction)17869 Impvt. of MPB, BU College of
Engineering Campus 02/24/09 V 16.149 240 C 0.457 0.133 0.300 - - - 89.00 89.80% V. Satisfactory
AJSYC Marketing 26924Road Upgrading (Gravel to Paved) Surallah-Lake Sebu Maitum Road
(Lake Sebu Sect.)04/09/11 XII 19.071 252 C 0.423 0.153 0.300 - - - 87.60 87.72%
Satisfactory
AJSYC Marketing 26924
Road Upgrading (Gravel to Concrete) along Isulan Hwy. Jct. Dukay-
Bagumbayan-Sen. Ninoy Aquino Road (Sitio Nuling Sect.)
04/05/11 XII 19.114 229 C 0.416 0.186 0.300 - - - 90.20 84.02% Satisfactory
AJYSC Marketing 26924
Road Upgrading (Gravel to Paved) along Isulan-H-way Jct. Dukay-
Dagumbayan-Sen. Ninoy Aquino Road (Sarmiento Sect.)
09/09/09 XII 19.094 235 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory
AJYSC Marketing 26924 Rehab./Impvt. of Bulok Bridge along Marbel-Makar Rd. Km. 1710+722 09/10/09 XII 4.764 90 C 0.400 0.200 0.300 - - - 90.00 87.60%
Satisfactory
AJYSC Marketing 26924 Const./Replacement of Banga Bridge and Approaches Phase II 03/08/10 XII 24.657 240 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 -
AJYSC Marketing 26924 Const. of Multi-Purpose Pavement, Norala Park 06/11/10 XII 1.907 133 C 0.410 0.200 0.300 - - - 91.00 91.00%
V. Satisfactory
AJYSC Marketing 26924Const. of Sapali River Bank
Protection/River Control along Lamsugod to Lamian Section
06/11/10 XII 4.803 140 C 0.400 0.133 0.300 - - - 83.30 84.50% Satisfactory
AJYSC Marketing 26924Repair of Buayan Bridge and
Approaches and its Protection Structures, Brgy. Buayan
09/09/10 XII 18.855 134 C 0.463 0.133 0.300 - - - 89.60 89.60% V. Satisfactory
AJYSC Marketing 26924 Const./Replacement of Banga Bridge and Approaches, (Phase II) 09/03/10 XII 26.942 255 C 0.428 0.133 0.300 - - - 86.10 85.74%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page28
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
AJYSC Marketing 26924
Const. of Office and Storage Bldg. and other Office/Quarter
Requirements of DPWH Regional Office XII
06/06/09 R-XII 10.437 150 C 0.477 0.200 0.300 - - - 97.70 *97.70% Outstanding
AJYSC Marketing 26924 Rehab./Improvement of Bulok Bridge along Marbel-Makar Road 06/05/09 R-XII 4.764 90 O 0.271 0.300 0.150 0.030 0.059 0.050 86.00 -
AJYSC Marketing 26924 Repair of Multi-Purpose Building at San Emmanuel 03/12/09 XII 0.960 105 C 0.433 0.200 0.300 - - - 93.30 *93.30%
V. Satisfactory
AJYSC Marketing 26924Road Upgrading (Gravel to concrete)
along Surallah-Lake Sebu-Maitum Road
03/15/09 XII 16.034 289 C 0.476 0.200 0.300 - - - 97.60 90.14% V. Satisfactory
AKH Construction and Trading Corporation 20759 Const. of MPB at Phase IV, Marcelo
Green Village, Brgy. Marcelo Green 04/11/11 NCR 3.615 75 C 0.483 0.095 0.300 - - - 87.80 *87.80% Satisfactory
AKH Construction and Trading Corporation 20759 Const. of MPB at Sto. Nino E/S,
Brgy. Sto. Nino 04/11/11 NCR 4.533 90 C 0.487 0.090 0.300 - - - 87.70 *87.70% Satisfactory
AKH Construction and Trading Corporation 20759
Repair/Maintenance of Waiting Area / Lounge of Secretary's Office DPWH
Central Office05/19/09 NCR 7.230 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
AKH Construction and Trading Corporation 20759
Construction of Multi-Purpose Building Phase I, T. Paez Elem.
School02/27/09 NCR 9.645 60 C 0.389 0.013 0.300 - - - 70.20 *70.20%
Poor
AKH Construction and Trading Corporation 20759 Proposed Rehab. of MPB at T. Paez
Elem. School (Phase 2) 09/01/09 NCR 10.609 90 C 0.476 0.133 0.300 - - - 90.90 90.90% V. Satisfactory
AKH Construction and Trading Corporation 20759 Proposed Repair/Rehab. of Roads &
Drainage at Brgy. 598/600 02/16/10 NCR 2.888 90 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory
AKN Construction Corporation (Formerly:
AKN Const.)11845
Proposed Impvt. of Road inc. Drainage System along Magallanes
St., Brgy. Tunasan02/25/09 NCR 19.089 162 C 0.341 0.184 0.300 - - - 82.50 83.88%
Satisfactory
AKN Construction Corporation (Formerly:
AKN Construction)11845
Widening/Conc. of R-10 inc. ROW, (Const. of Footbridge at corner
Pacheco)04/15/11 NCR 17.977 248 O 0.371 0.296 0.150 0.030 0.035 0.050 93.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page29
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
AKN Construction Corporation (Formerly:
AKN Construction)11845 Rehab./Reconstruction/Upgrading of
Ninoy Aquino Avenue 06/02/09 NCR 19.092 45 C 0.418 0.200 0.300 - - - 91.80 *91.80% V. Satisfactory
AKN Construction Corporation (Formerly:
AKN Construction)11845
Rehab./Reconstruction of Muntinlupa Insular Prison Road and
its Vicinity, Brgy. Poblacion09/09/09 NCR 19.113 100 O 0.297 0.219 0.150 0.023 0.035 0.050 77.40 -
AKN Construction Corporation (Formerly:
AKN Construction)11845
Reconst./Const. of Dikes, Valenzuela-Obando Bdry. Dike, Brgy. Palasan
and Pariancillo Villa08/19/10 NCR 2.850 90 C 0.339 0.200 0.300 - - - 83.90 83.90%
Satisfactory
Al Chris Construction 12406 Concrete Paving of Panglao Island Circ. Rd., Songculan 03/29/11 VII 9.075 160 C 0.406 0.200 0.300 - - - 90.60 88.92%
Satisfactory
AL Chris Construction 12406 Tagbilaran Airport Development Project 03/27/09 NIA 5.756 120 C 0.390 0.200 0.300 - - - 89.00 89.00%
Satisfactory
Al Fahdel Const. and Services 17953
Conc./Impvt. of Tubod-Ganassi Road (Caniogan Section) Sta. 1602+0000-
Sta. 1603+000 w/ exception09/14/09 X 18.126 150 C 0.429 0.200 0.300 - - - 92.90 89.18%
V. Satisfactory
Al Hussein Construction 18438
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads along Misamis Oriental-Ma. Cristina Bdry.
Road at Marcelo-Timoga Sect., Sta.1532+961 - Sta.1535+066 w/
exception
04/10/11 X 9.255 153 C 0.340 0.200 0.300 - - - 84.00 87.24% Satisfactory
Al Hussein Construction 18438
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Road along
Linamon-Zamboanga Road, Segapod Maigo Kolambugan Sect.,
Sta.1564+000 - Sta.1566+000 w/ exception
04/10/11 X 18.546 150 C 0.344 0.200 0.300 - - - 84.40 85.84% Satisfactory
Al Hussein Construction 18438Road Upgrading (Gravel to Paved) of Kibawe-Kadingilan-Kalilangan Road
(Bangahan Section)04/01/11 X 18.900 267 C 0.363 0.133 0.000 - - - 49.60 *49.60%
Poor
Al Hussein Construction 18438
Road Upgrading (Gravel to Concrete) of Kalilangan-Lampanusan Road (Macaopao Section), Sta.0+000 -
Sta 0+910
04/01/11 X 18.900 267 C 0.345 0.133 0.000 - - - 47.80 *47.80% Poor
Al Hussein Construction 18438 Conc. of Kibawe-Kadingilan-Kalilangan Road, Kadilingan Sect. 06/14/10 X 73.672 330 C 0.407 0.168 0.300 - - - 87.50 88.52%
Satisfactory
Alafalfa Construction 29712
Restoration of Roadslip along Nueva Vizcaya-Ifugao-Mt. Province Bdry. Road, Km. 330+800-Km. 330+828,
Phase I
08/25/10 CAR 1.238 136 C 0.445 0.133 0.300 - - - 87.80 87.80 Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page30
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alajeno Construction and Supplies 28713 Const. of Public Market at Brgy.
Penoles, Lakewood 06/11/10 IX 0.495 45 C 0.491 0.133 0.300 - - - 92.40 92.40% V. Satisfactory
Alajeno Construction and Supplies 28713 Construction of MPB (Municipal
Building) Phase II 06/02/09 IX 2.480 120 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
Al-B Construction 11740Rehab./Reconst./Upgrading along
Angeles-Porac-Floridablanca-Dinalupihan Rd.
06/01/10 III 18.839 90 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 -
Al-B Construction 11740
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rd. along Angeles-Porac-Floridablanca-
Dinalupihan Rd.
08/16/10 III 19.175 100 C 0.438 0.160 0.300 - - - 89.80 89.26% V. Satisfactory
Alberto Uy Construction & Development 20924 Conc. of Barangay Road, Sitio K.I.,
Poblacion 04/06/11 IVB 1.905 64 C 0.476 0.133 0.300 - - - 90.90 *90.90% V. Satisfactory
Alberto Uy Construction & Development 20924 Const. of MPB at Buong Lupa 05/26/10 IVB 0.480 43 C 0.447 0.180 0.300 - - - 92.70 92.70%
V. Satisfactory
Alberto Uy Construction & Development 20924
Repair/Rehab. of Multi-Purpose Building @ Sitio Facoma, Bagong
Bayan II05/27/09 IV-B 0.476 45 C 0.424 0.170 0.300 - - - 89.40 *89.40%
V. Satisfactory
Alberto Uy Construction & Development 20924 Concreting of Cantil-Dayhagan Road 02/26/09 IV-B 0.947 69 C 0.436 0.133 0.300 - - - 86.90 *86.90%
Satisfactory
Alcel Construction 15129 Conc. of Roads at Pangil-Poblacion Road, Brgy. Pangil 04/04/11 I 1.930 120 C 0.427 0.200 0.300 - - - 92.70 *92.70%
V. Satisfactory
Alcel Construction 15129 Const. of Public Market 04/12/11 I 14.472 93 C 0.446 0.133 0.300 - - - 87.90 *87.90% Satisfactory
Alcel Construction 15129 Completion of MPB, Tagudin 04/12/11 I 1.917 90 C 0.420 0.133 0.300 - - - 85.30 *85.30% Satisfactory
Alcel Construction 15129 Const. of San Vicente-Pogo Bridge, San Vicente 03/01/10 I 22.182 380 C 0.333 0.200 0.300 - - - 83.30 83.30%
Satisfactory
Alcel Construction 15129
Repair/Rehab. along Manila North Road, Km. 445+28 - Km.484+897,
Pinili, Badoc, Currimao, Batac & San Nicolas
06/02/10 I 9.649 60 C 0.473 0.133 0.300 - - - 90.60 90.60% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page31
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alcel Construction 15129Repair/Impvt. of Agoo Processional Road, Km. 235+298-Km. 236+708 w/
exception08/25/10 I 8.652 90 C 0.405 0.133 0.300 - - - 83.80 83.80%
Satisfactory
Alcel Construction 15129 Rehab./Impvt. at Kennon Road, Km.244+000 - Km.248+138 06/09/10 CAR 9.616 60 C 0.358 0.200 0.300 - - - 85.80 85.80%
Satisfactory
Alcel Construction 15129 Construction of School Building at Cayucay NHS 03/10/09 I 0.913 75 C 0.394 0.181 0.300 - - - 87.50 *87.50%
Satisfactory
Alcel Construction 15129Rehab./Reconst./Upgrading of
Mangaldan-Manaoag-Binalonan Road
08/28/09 I 48.250 240 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
Alcel Construction 15129 Completion of MPB, PSU Bamban 08/29/08 I 0.474 60 C 0.292 0.200 0.300 - - - 79.20 *79.20% Satisfactory
Alcel Construction 15129 Conc. of FMR, Brgy. Licsi 11/27/08 I 0.568 30 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory
Alcel Construction 15129Asphalt Overlay of Sta. Barbara-
Mangaldan Road Km. 203+700-Km. 205+300 w/exception
05/26/09 I 14.473 25 C 0.458 0.133 0.300 - - - 89.10 *89.10% V.Satisfactory
Aldana Construction 21763 Construction of Perimeter Fence Gate, Slope Protection 03/2-3/10 DOST 6.363 75 C 0.491 0.20 0.30 - - - 99.10 87.13%
Satisfactory
Aldana Construction 21736 Const. of Drainage Poblacion Zone II 03/04/10 I 2.407 90 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory
Aldana Construction 31174 Road Conc. of Farm-to-Market Road, Brgy. Sallacong (San Mariano) 02/19/10 I 1.901 70 C 0.329 0.200 0.300 - - - 82.90 82.90%
Satisfactory
Aldana Construction 21736 Const. of MPB (Phase V) 06/10/10 I 7.715 125 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
ALE Builders Construction &
Development Corp.5180 Proposed Rehab. of Roads and
Alleys, San Andres Bukid 04/14/11 NCR 4.820 135 C 0.481 0.067 0.300 - - - 84.80 *84.80% Satisfactory
ALE Builders Construction &
Development Corp.5180
Proposed Repair/Rehab./Const. of MPB, San Andres Sports Complex,
San Andres St.04/14/11 NCR 4.784 398 O 0.283 0.283 0.150 0.030 0.050 0.050 84.60 -
Ale Builders Construction &
Development Corp.5180 Drainage Impvt. along Boni-Serrano
Avenue 03/02/10 NCR 4.754 90 C 0.440 0.133 0.300 - - - 87.30 87.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page32
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ale Builders Construction &
Development Corp.5180 Proposed Const. of Roads and
Drainage at Baseco Compound 02/16/10 NCR 72.324 303 C 0.368 0.190 0.300 - - - 85.80 85.98% Satisfactory
ALE Builders Construction &
Development Corp.5180
Proposed Rehab./Reconst./Upgrading of
Damaged Paved National Roads, Quirino Ave.
05/24/10 NCR 19.294 30 C 0.442 0.200 0.300 - - - 94.20 94.20% V. Satisfactory
ALE Builders Construction &
Development Corp.5180
Proposed Const./Rehab./Repair of School Building @ Manuel A. Roxas
High School05/24/10 NCR 4.818 120 C 0.492 0.133 0.300 - - - 92.50 85.78%
Satisfactory
ALE Builders Construction and
Development Corp.5180
Impvt./Upgrading of Paraiso ng Batang Maynila Multi-Purpose
Building05/18/09 NCR 0.964 30 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
ALE Builders Construction and
Development Corp.5180 Repair/Rehab. Roads with Drainage
Impv't, Brgy. 34, Zone 3 03/03/09 NCR 5.254 90 C 0.342 0.200 0.300 - - - 84.20 *84.20% Satisfactory
ALE Builders Construction and
Development Corp.5180 Rehab./Reconst./Upgrading of G.
Araneta Ave. 08/18/10 NCR 9.549 90 C 0.300 0.200 0.300 - - - 80.00 80.00% Unsatisfactory
ALE Builders Construction and
Development Corp.5180 Proposed Repair/Rehab. of Baseco
MPB, Baseco Compound 08/23/10 NCR 1.155 45 C 0.322 0.133 0.300 - - - 75.50 75.50% Unsatisfactory
Ale-J Construction & Trading 26445 Const. of Multi-Purpose Bdlg. @
Veterans Memorial Medical Center 03/09/09 NCR 3.819 120 C 0.362 0.200 0.300 - - - 86.20 *86.20% Satisfactory
Al-Fahdel Const. and Eng'g 17953
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Misamis Oriental-Ma.Cristina Bdry. Road, Sta.1519+966 -
Sta.1520+962, Sta.Felomina-Valderama Section
08/28/10 X 13.919 120 C 0.468 0.200 0.300 - - - 96.80 91.64% V. Satisfactory
Al-Fahdel Const. and Eng'g 17953
Rehab./Reconst./Upgrading of Damged Paved National Roads along Misamis Oriental-Ma.Cristina Bdry. Road, Nunucan-Ditucalan Section,
Sta.1532+245.50 - Sta.1535+000
08/28/10 X 9.277 105 C 0.467 0.200 0.300 - - - 96.70 91.24% V. Satisfactory
Al-Fahdel Const. and Eng'g 17953
Conc./Impvt. of Tubod-Ganassi Road (Caniogan Sect.) Sta. 1602+000-Sta.
1603+000 with exception06/05/09 X 18.126 150 O 0.344 0.265 0.150 0.015 0.043 0.050 86.70 -
Al-Fahdel Const. and Eng'g. 17953 Const./Completion of MPB, Brgy.
Poblacion Kapatagan 04/09/11 X 1.877 123 O 0.352 0.240 0.150 0.030 0.032 0.033 83.70 -
Al-Fahdel Const. and Eng'g. 17953
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads along
Linamon-Zamboanga Road at Tacub Sect., Sta.1540+711 -
Sta.1543+440.50
04/10/11 X 9.279 105 C 0.282 0.200 0.000 - - - 48.20 71.72% Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page33
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Al-Fahdel Const. and Eng'g. 17953
Road Upgrading (Gravel to Paved) Iligan City-Marawi City via Bito-
Abaga Rd. 09/11/09 X 14.361 115 C 0.339 0.200 0.300 - - - 83.90 *83.90%
Satisfactory
Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. At SADMIS 03/14/09 X 0.944 111 C 0.408 0.133 0.300 - - - 84.10 *84.10%
Satisfactory
Al-Fahdel Construction & Engineering 17953 Rehab. of Linamon-Zamboanga
Road, Maigo Section 03/15/09 X 13.492 261 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory
Alfalfa Construction 29712Rehab./Reconst./ of Damaged Paved Nat'l. Rd. along N. Vizcaya-Ifugao-Mt.
Province Bdry. Rd. Nayon Sect.04/08/11 CAR 10.206 180 C 0.476 0.172 0.300 - - - 94.80 90.66%
V. Satisfactory
Alfalfa Construction 29712Road Upgrading of Banaue-
Hungduan Benguet Bdry. Road Hapao-Abatan Section
04/08/11 CAR 16.560 177 O 0.385 0.300 0.090 0.010 0.054 0.017 85.60 -
Alfalfa Construction 29712 Nueva Vizcaya-Ifugao-Mt. Province Road (Intermittent Section) 05/26/09 CAR 7.590 200 C 0.407 0.200 0.300 - - - 90.70 82.60%
Satisfactory
Alfalfa Construction 29712Restoration of Road along Banaue-Mayoyao-Aguinaldo-A Lista-Isabela
Bdry. Road03/06/09 CAR 4.277 179 C 0.443 0.200 0.300 - - - 94.30 92.80%
V.Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162Completion of Binalbagan Bridge 2 - Km. 66+910 along Hinigaran-Isabela
Road03/05/09 VI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162 Road Upgrading, Jct. Palencia-Boy Scout, Campsite Road 03/05/09 VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 -
Alfie's Construction 17162 Construction and Improvement of Taloc Main Drainage 3/16-21/09 NIA 5.762 408 C 0.441 0.200 0.300 - - - 94.14 *94.14%
Satisfactory
Alfie's Construction 17162 Rehabilitation and Improvement of Sibud Main Drainage 04/16-18/09 NIA 7.699 271 C 0.427 0.300 0.200 - - - 92.70 92.70%
V. Satisfactory
Alfie's Construction & Construction Supply Inc.
(Formerly: Alfie's Construction &
Construction Supply)
17162
Conc. of Jct. Bearin-Salong-Tapi-Dacongcogon-Bantayan Rd. (Km.
99+675-Km. 131+142.75 w/ exceptions) Brgy. Salong &
Bantayan
03/08/10 VI 79.400 400 C 0.363 0.192 0.300 - - - 85.50 85.50% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page34
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alfies Construction & Construction Supply, Inc. 17162 Completion of Binalbagan Bridge 2
along Hinigaran-Isabela Road 09/15/09 VI 45.049 850 C 0.465 0.133 0.300 - - - 89.80 86.22% Satisfactory
Alfies Construction & Construction Supply, Inc. 17162
Conc. of Junction Bearin-Salong-Tapi-Dacongcogon-Bantayan Raod (Km. 99+675.50-Km.131+142.75 w/ exception, Brgy. Salong & Batayan
09/17/09 VI 79.400 400 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -
Alfie's Construction & Construction Supply, Inc. 17162
Rehab./Reconst./Upgrading of Jct. National Rd., Sagay-Bato-Dian-ag-
Marcelo-Balea Jct. National Rd. (Conc./Widening) Sagay Sect.
03/31/11 VI 37.883 266 C 0.478 0.136 0.300 - - - 91.40 *91.40% V. Satisfactory
Alfie's Construction & Construction Supply, Inc. 17162 Reconst. of Antulan Bridge at
Km.66+500 04/01/11 VI 13.035 265 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
Alfie's Construction & Construction Supply, Inc. 17162
Rehab. (Asphalt Overlay) of Kabankalan-Bais Road, Km.99+500 -
Km.101+00004/02/11 VI 36.585 200 O 0.388 0.240 0.150 0.030 0.037 0.033 87.80 -
Alfie's Construction & Construction Supply, Inc. 17162
Rehab. (Asphalt Overlay) of Kabankalan-Bais Road, Km.102+000 -
Km.104+100004/01/11 VI 30.717 210 O 0.386 0.239 0.150 0.030 0.037 0.033 87.50 -
Alfie's Construction & Construction Supply, Inc. 17162
Rehab. (Asphalt Overlay) of Kabankalan-Bais Road, Km.101+000 -
Km.102+00004/01/11 VI 26.099 180 O 0.382 0.240 0.150 0.030 0.037 0.033 87.20 -
Alfie's Construction & Construction Supply, Inc. 17162 Reconst. of Taburda Bridge,
Km.66+759.26 04/01/11 VI 19.700 186 O 0.353 0.235 0.150 0.018 0.046 0.033 83.50 -
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)
17162Conc. of Jct. Bearin-Salong-Tapi-
Bantayan Rd. (Salong Section), Brgy. Salong
08/25/10 VI 14.301 110 C 0.409 0.133 0.300 - - - 84.20 85.16% Satisfactory
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)
17162
Reconst. of Vallehermosa-Canlaon City, La Castellana Road, Sta. 65+665.80-Sta. 66+500.00 w/
exception
08/26/10 VI 5.600 147 C 0.350 0.200 0.300 - - - 85.00 85.00% Satisfactory
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)
17162
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Bacolod North Road, Silay City Section
08/28/10 VI 14.900 130 C 0.423 0.133 0.300 - - - 85.60 84.94% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page35
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alfie's Construction & Construction Supply, Inc. (Formerly: Alfie's Const.
& Const. Supply)
17162Conc. of Kabankalan-Jct. Salong-
Tapi-Dacongcogon-Bantayan Road, Tapi Section at Brgy. Tapi
08/25/10 VI 28.917 290 O 0.355 0.240 0.150 0.030 0.037 0.033 84.50 -
Alfie's Construction & Construction Supply, Inc.
(Formerly: Alfies Construction &
Construction Supply)
17162Conc. of Kabankalan-Jct. Salong-Tapi-Dacongcogon-Bantayan Rd.,
Tapi Sect. at Brgy. Tapi06/05/10 VI 27.998 280 O 0.354 0.225 0.150 0.022 0.051 0.033 83.50 -
Alfrego Builders & Supply 19284 Construction of Mandug River
Control 03/08/10 XI 4.720 90 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory
Alfrego Builders & Supply 19284
Conc. of Road from Davao-Agusan National Road Jct. passing through
Iliong up to Purok Communal12/04/08 XI 1.882 90 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
Alfrego Builders & Supply 19284 Improvement/Riprapping of Sasa
Creek Second Congressional District 06/11/09 XI 4.720 150 O 0.343 0.300 0.150 0.030 0.047 0.050 92.00 -
Alfrego Builders & Supply 19284 Improvemant/Riprap of Sasa Creek 06/11/09 XI 4.721 160 C 0.476 0.133 0.300 - - - 90.90 91.56%
V. Satisfactory
Algamon Construction 31704 Completion of MPB (Covered Court), Brgy. Doongan 04/12/11 XIII 1.309 45 C 0.493 0.133 0.300 - - - 92.60 *92.60%
V. Satisfactory
Algamon Construction 30704 Const. of Municipal MPB, Brgy. Gamuton 04/06/11 XIII 3.302 90 O 0.289 0.300 0.150 0.020 0.032 0.033 82.40 -
Algamon Construction 30704 Const. of MPB (Covered Court) Brgy. Anticala 03/10/10 XIII 2.226 90 C 0.478 0.133 0.300 - - - 91.10 91.10%
V.Satisfactory
Algamon Construction 30704 Const. of MPB (Covered Court), Brgy. Doongan 06/16/10 XIII 1.898 90 C 0.441 0.200 0.300 - - - 94.10 94.10%
V. Satisfactory
Algamon Construction 30704 Const. of Ipil Public Market, Brgy. Ipil 06/07/10 XIII 0.733 60 C 0.407 0.133 0.300 - - - 84.00 84.00% Satisfactory
Algamon Construction 30704 Const./Widening/Gravelling of Roads from Brgy. R. Ecleo-Brgy. Del Pilar 06/01/09 XIII 1.927 209 C 0.385 0.168 0.300 - - - 85.30 84.52%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page36
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Algimar Construction 15232 Widening/Regravelling of Calatrava-San Andres Road (Calatrava Section) 04/11/11 IVB 24.124 180 C 0.434 0.144 0.300 - - - 87.80 *87.80%
Satisfactory
Algimar Construction 15232Conc. of Tablas Circ. Road (San
Agustin-Sta. Maria Road) Calatrava-San Agustin Road
04/11/11 IVB 14.473 120 O 0.319 0.285 0.150 0.030 0.025 0.033 84.20 -
Algimar Construction 15232 Widening/Regravelling of Sta. Fe-Guinbirayan Road 04/11/11 IVB 24.123 180 C 0.390 0.152 0.300 - - - 84.20 *84.20%
Satisfactory
Algimar Construction 15232 Const. of Multi-Purpose Building Phase I 04/12/11 V 4.774 90 C 0.469 0.133 0.300 - - - 90.20 *90.20%
V. Satisfactory
Algimar Construction 15232Conc. of Tablas Circumferential Road (Doña Juana-Binunga-an
Section)08/27/09 IVB 19.652 180 O 0.319 0.291 0.150 0.030 0.047 0.033 87.00 -
Algimar Construction 15232Conc. of Tablas Circumferential Road (Doña Juana-Binongaan
Section)02/22/10 IVB 19.652 180 C 0.388 0.200 0.300 - - - 88.80 87.72%
Satisfactory
Algimar Construction 15232Conc. of Tablas Circumferential
Road (Hinugusan-Camantaya Section)
02/23/10 IVB 19.676 180 C 0.395 0.200 0.300 - - - 89.50 85.81% Satisfactory
Algimar Construction 15232 Const. of Masbate 2nd DEO Bldg. (Phase I) 08/23/10 V 8.900 60 C 0.407 0.200 0.300 - - - 90.70 90.70%
V. Satisfactory
Algimar Construction 15232Rehab./Reconst. Of Masbate-
Cataingan Placer Rd., Masbate-Catingan-Placer
08/23/10 V 18.817 90 C 0.406 0.200 0.300 - - - 90.60 90.60% V. Satisfactory
Algimar Construction 15232Const. of 1 unit 1 CL 7x7 S/B Teofilo
Tamabago E/S, Palanas South realigned to Dimasalang C/S
08/24/10 V 0.843 190 C 0.347 0.200 0.300 - - - 84.70 84.00% Satisfactory
Algimar Construction 1523 Esperanza Port Development Project 07/08/09 DOTC 8.637 120 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory
Algimar Construction 15232 Const./Road Opening of Sta. Maria-Pato-o-Odiongan Road 08/24/10 IVB 19.298 175 C 0.354 0.036 0.300 - - - 69.00 69.00%
Poor
Algimar Construction 15232Concreting of Tablas Circumferential
Road (Hinugasan-Camantaya Section)
05/21/09 IV-B 19.298 180 O 0.312 0.236 0.150 0.030 0.040 0.033 80.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page37
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Algimar Construction 15232Repair/Rehab. of Masbate-Cataingan-
Placer Road, Nabangig-Pawican Sect.
05/26/09 V 14.249 120 C 0.466 0.133 0.300 - - - 89.90 *89.90% V. Satisfactory
Algimar Construction 15232Const. of 1 Unit 7x7 S/B at Teofilo
Tamabago E/S, Palanas South realigned to Dimasalang C/S
05/26/09 V 0.843 90 O 0.292 0.300 0.150 0.030 0.032 0.033 83.70 -
Algimar Construction 15232 Const. of Bridge Approaches @ Maingaran Bridge 02/27/09 V 9.495 87 O 0.337 0.235 0.000 0.030 0.056 0.033 69.10 -
Algimar Construction 15232 Const.of Multi-Purpose Building (Balai Alumni) 02/28/09 V 0.480 120 C 0.480 0.133 0.300 - - - 91.30 *91.30%
V. Satisfactory
Algimar Construction 15232 Repair/Rehab. of Masbate-Cataingan-Placer Road 02/28/09 V 9.598 90 C 0.466 0.133 0.300 - - - 89.90 *89.90%
V. Satisfactory
Algimar Construction 15232 Conc. of Buenavista-Cawayan Road, San Jose-Tuburan 08/28/09 V 18.998 131 C 0.432 0.150 0.300 - - - 88.20 *88.20%
Satisfactory
Algimar Construction 15232Concreting of Jct. Buenavista-Cawayan Road, Cabungahan-
Madbad Section08/28/09 V 19.000 130 C 0.427 0.151 0.300 - - - 87.80 *87.80%
Satisfactory
Algimar Construction 15232 Conc. of Milagros-Cataingan-Esperanza Road, Malamag Section 02/19/10 V 38.585 150 C 0.429 0.133 0.300 - - - 86.20 86.20%
Satisfactory
ALGIMAR Construction and HI-TONE
Construction and Development
Corporation Joint Venture
JV-09-255 Masbate Airport Development project 07/29/11 DOTC 67.400 180 C 0.445 0.200 0.300 - - - 94.50 94.50% V. Satisfactory
Algimar Construction/Hi-Tone Construction &
Development Corporation JV
JV-07-078 Concreting of Cataingan-Esperanza Road 02/19/10 V 90.015 453 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
Algon Eng'g Construction Corp. 270 Construction of Laboratory Building 02/02/10 DOST 16.635 210 C 0.468 0.20 0.30 - - - 96.80 97.43%
Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page38
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Algon Engineering Construction Corp. 270 Construction of Overhead Water
Tank with Cistern 4/29/09 DOST 3.153 124 O 0.373 0.291 0.12 0.03 0.07 0.05 93.40 -
Algon Engineering Construction Corporation 270 CP 6, (Mindanao Bridges) Sixth Road
Project, Bridge Component 04/12/11 ADB 147.346 1,157 C 0.446 0.200 0.300 - - - 94.60 85.24% Satisfactory
Algon Engineering Construction Corporation 270
Rehab. of Sumlog Bridge and Approaches along Davao-Oriental-
Surigao Coastal Road03/05/10 XI 52.988 270 C 0.485 0.133 0.300 - - - 91.80 91.80%
V. Satisfactory
Algon Engineering Construction Corporation 270
CP-5: Impvt./Conc. of Surigao Del Sur-Davao Oriental Coastal Road, (Manay-Boston) Caraga-Baganga
Section
03/04/10 XI 172.836 537 C 0.359 0.200 0.300 - - - 85.90 89.02% V. Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Impvt. of Davao-Bukidnon
Rd. at Calinan Sect. 05/31/10 XI 10.743 90 C 0.451 0.133 0.300 - - - 88.40 88.40% Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Reconst./Upgrading of Digos-
Makar Rd. 06/10/10 XI 14.465 90 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory
Algon Engineering Construction Corporation 270
Rehab. Sumlog Bridge and Approaches along Davao Oriental-
Surigao Coastal Rd.09/07/10 XI 82.031 530 C 0.467 0.133 0.300 - - - 90.00 89.94%
V. Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Impv't. of Davao-Bukidnon
Rd. at Mintal Sect. 08/24/10 XI 18.892 180 C 0.391 0.200 0.300 - - - 89.10 88.98% Satisfactory
Algon Engineering Construction Corporation 270 Rehab./Reconst./Upgrading of Digos-
Makar Road 05/30/09 XI 31.136 180 C 0.498 0.140 0.300 - - - 93.80 *93.80% V. Satisfactory
Algon Engineering Construction Corporation 270 Construction of Laboratory Building
Phase 2 11/17/10 DOST 17.637 - C 0.465 0.20 0.30 - - - 96.50 97.08% Outstanding
Alinab Construction & Supplies 29901 Const. of Brgy. Guma Poblacion A,
FMR 04/07/11 IX 1.774 90 C 0.466 0.133 0.300 - - - 89.90 *89.90% V. Satisfactory
Aliñab Construction & Supplies 29901 Const. of Pedestrian Overpass,
Barangay Cugman 03/29/11 X 1.598 135 O 0.395 0.240 0.000 0.030 0.038 0.033 73.60 -
Allado Construction Co. Inc. / Jejor's Construction
Corporation (JV)JV-08-331 Rehab./Reconst. of CCR Magting
Section 04/02/11 X 19.059 360 C 0.374 0.133 0.300 - - - 80.70 *80.70% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page39
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Allado Construction Co., Inc. 228
Rehab./Reconst./Upgrading along Davao-Cotabato Rd. (Davao City-Jct.
Digos Sect.)06/12/10 XI 93.085 450 C 0.408 0.133 0.300 - - - 84.10 86.08%
Satisfactory
Allado Construction Co., Ins. 228
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Davao-Cotabato Road (Davao City-Jct. Digos Sect.)
04/14/11 XI 78.045 270 C 0.315 0.200 0.300 - - - 81.50 83.69% Satisfactory
Allen Construction 12584 Impvt./Rehab. of MPB (15m x 27m), 04/08/11 III 2.325 50 C 0.419 0.124 0.300 - - - 84.30 *84.30% Satisfactory
Allen Construction 12584Repair/Restoration of Damaged Pavement Daang Maharlika Rd.
Km.136+050 - Km.136+55006/08/10 III 2.809 21 C 0.433 0.133 0.300 - - - 86.60 86.60%
Satisfactory
Allen Construction 12584 Rehab./Reconst. Cabanatuan City-Carmen Rd. 06/07/10 III 14.075 60 C 0.420 0.133 0.300 - - - 85.30 85.30%
Satisfactory
Allen Construction 12584 Rehab./Reconst. of Daang Maharlika Rd. Km.137+330 - Km.137+770, Baloc 08/23/10 III 5.430 25 C 0.394 0.200 0.300 - - - 89.40 89.40%
V. Satisfactory
Allen Construction 12584 Regravelling of Various Barangays 05/26/09 III 1.875 25 C 0.340 0.200 0.300 - - - 84.00 *84.00% Satisfactory
Allen Construction 12584 Construction of MPB, Baloc Nat'l Trade School 03/02/09 III 1.892 45 C 0.479 0.178 0.300 - - - 95.70 *95.70%
V. Satisfactory
Allen Construction 12584 Rehab./Reconst. of Nueva Ecija-Pangasinan Road 09/03/09 III 12.165 61 C 0.479 0.133 0.300 - - - 91.20 *91.20%
V. Satisfactory
Allencon Development Corporation 12303
Asphalt Overlay of Iloilo-Capiz Road (Old Route) Janiuay-Lambunao
Section Km.31+398 - Km.32+198 with exceptions Janiuay-Lambunao
Section
04/12/11 VI 9.519 90 C 0.465 0.133 0.300 - - - 89.80 *89.80% V. Satisfactory
Alleyway Construction 15310 Cons. of Multi-Purpose Building, Brgy. 204, Zone 18 02/27/09 NCR 3.839 60 C 0.338 0.200 0.300 - - - 83.80 *83.80%
Satisfactory
Alleyway Construction 15310 Rehab./Reconst./Upgrading of España Boulevard 08/24/10 NCR 38.956 204 C 0.345 0.193 0.300 - - - 83.80 83.80%
Satisfactory
Allied Trade Resources 31667 Construction of Site Development Projects 8/12/09 DOST 3.065 131 C 0.475 0.182 0.300 - - - 95.70 95.70%
Outstanding
Allied Trade Resources Multi - Purpose
Cooperative31667
Balingasag Port Development Project (Construction of Seawall
Enclosure)02/16/11 DOTC 2.887 60 C 0.388 0.200 0.300 - - - 88.80 88.80%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page40
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Allied Trade Resources Multi Purpose Cooperative
31667Const./Impv't of 2-CL School
Building @ Malitbog E/S, Brgy. New Malitbog
03/12/09 XI 2.352 60 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory
Allied Trade Resources Multi-Purpose Cooperative
31667 Completion of Multi-Purpose Buiding at Davao City National H/S 03/10/10 XI 0.940 90 C 0.413 0.200 0.300 - - - 91.30 91.30%
V. Satisfactory
Allied Trade Resources Multi-Purpose Cooperative
31667 DOTC-CARAGA Regional Office Dev't Project (Phase 1) 07/30/09 DOTC 3.953 150 C 0.426 0.200 0.300 - - - 92.60 92.60%
V. Satisfactory
Allied Trade Resources Multi-Purpose Cooperative
31667 Repair & Waterproofing of Central Administration Building 07/08/09 U.P. 1.154 60 C 0.450 0.200 0.300 - - - 95.00 *95.00%
V. Satisfactory
Almakar Builders and Metal Works 21929
Complete Const. of 2-Storey 2-CL Academic Sch. Bldg. at Soldier's Hill
IV E/S04/14/11 IVA 2.115 150 C 0.449 0.200 0.300 - - - 94.90 85.94%
Satisfactory
Alnino Construction & Supply 18378 Conc. of San Vicente-Mayon Road 04/11/11 V 1.448 60 C 0.433 0.133 0.300 - - - 86.60 86.00%
Satisfactory
Alnino Construction & Supply 18378 Conc. of Sugod-Sta. Teresita-
Canarum Road, Bacon District 04/11/11 V 1.448 60 C 0.430 0.133 0.300 - - - 86.30 85.16% Satisfactory
Alnino Construction & Supply 18378 Const. of Abucay-Cagdongon Road 05/25/10 V 4.705 90 C 0.348 0.200 0.300 - - - 84.80 84.80%
Satisfactory
Alnino Construction & Supply 18378 Conc. Of San Juan (Roro) Rd. 08/30/10 V 1.448 60 C 0.325 0.200 0.300 - - - 82.50 82.50%
Satisfactory
Alnino Construction & Supply 18378 Concreting of Bayawas Road 02/15/10 V 1.882 120 C 0.370 0.200 0.300 - - - 87.00 87.00%
Satisfactory
Alpha Ryder Construction and
Supplies12197 Road Upgrading of Ariman-
Casiguran 08/30/10 V 15.168 75 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory
Alpha Ryder Construction and
Supplies12197 Rehab./Reconst. Of Jct. Abuyog-
Gubat-Ariman Rd. 08/29/10 V 8.379 135 C 0.404 0.200 0.300 - - - 90.40 86.02% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page41
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alpha Ryder Construction and
Supplies12197
Conc. of Legazpi Manito-Punta De Jesus Road, Malabago-Tinapian
Section03/03/09 V 32.545 210 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
Alphin Trading & Construction 26260 Const./Repair of MPB 04/14/11 I 0.600 120 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V. Satisfactory
Alphin Trading & Construction 26260 Repair of Three (3) CL at Maronong
E/S 04/07/11 I 1.735 120 C 0.420 0.133 0.300 - - - 85.30 *85.30% Satisfactory
Alphin Trading & Construction 26260 Rehab. of DPWH Pangasinan 3rd
DEO Building, Tumana 08/25/09 I 2.885 75 C 0.442 0.139 0.300 - - - 88.10 91.39% V. Satisfactory
Alphin Trading & Construction 26260 Construction of 1 Classroom, Payas
NHS 03/06/09 I 0.482 150 C 0.456 0.154 0.300 - - - 91.00 *91.00%V. Satisfactory
Alphin Trading & Construction 26260 Construction of 2-CL @ Mabulitek 08/27/09 I 0.972 65 C 0.488 0.200 0.300 - - - 98.80 *98.80%
Outstanding
Alpiz Construction and Development Corp. 11039 Impvt. and Desilting of Teresa River 06/10/10 IVA 9.621 60 C 0.414 0.200 0.300 - - - 91.40 91.40%
V. Satisfactory
Alraf Construction & Enterprises 17297 Const. of Barangay Road 03/29/11 IX 4.486 55 O 0.354 0.300 0.150 0.030 0.059 0.050 94.30 -
Alraf Construction & Enterprises 17297
Impvt./Gravelling of Sirawai-Sibuco Road, Bongon-Piacan-Napolan-Lagao Section, Sta.11+160.00 -
Sta.11+860, Sta.11+860 - Sta.11+311.70, Sta.12+343 -
Sta.14+120.00
03/31/11 IX 60.373 569 C 0.473 0.133 0.300 - - - 90.60 89.46% V. Satisfactory
Alraf Construction & Enterprises 17297 Pagadian-Zamboanga City Rd.
(Sangali-Victoria Sect.) 09/08/10 IX 19.160 170 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
Alraf Construction & Enterprises 17297
Const./Opening of Zamboanga West Coast Rd., Napolan-Cawit-Cawit-
Anongan Sect. Sta.14+700 - Sta.18+780 w/ exceptions, Sta.18+420 - Sta.18+500
09/05/10 IX 95.698 765 C 0.439 0.133 0.300 - - - 87.20 85.78% Satisfactory
Alraf Construction & Enterprises 17297 Rehab./Const./Impvt. of Zamboanga
City-Pagadian Road 05/26/09 IX 44.695 253 O 0.396 0.300 0.150 0.030 0.042 0.050 96.80 -
Alraf Construction & Enterprises 17297 Rehabilitation of Brgy. Mercedes
Road (Phase II) 03/03/09 IX 4.651 60 C 0.426 0.200 0.300 - - - 92.60 *92.60% V. Satisfactory
Alraf Construction & Enterprises 17297
Rehab./Reconst. of Damaged Paved National Road (Pagadian-Zamboanga
City Road)09/01/09 IX 14.152 132 C 0.429 0.200 0.300 - - - 92.90 94.88%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page42
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alraf Construction & Enterprises 17297
Rehab./Const./Impvt. of Zambaonga City-Pagadian Road (with
Intermittent Section)09/02/09 IX 46.408 295 O 0.338 0.300 0.150 0.030 0.055 0.050 92.30 -
Alro Construction & Development Corp. 18361 Const. of Polangui-Iriga Bridge 11/21/09 V 13.202 200 C 0.400 0.200 0.300 - - - 90.00 87.90%
V. Satisfactory
Alro Construction & Development Corp. 18361 Road Opening/Improvement of
Montinegro Cabanbanan Road 03/09/09 V 19.108 90 C 0.458 - 0.500 - - - 95.80 *95.80% V. Satisfactory
Alro Construction & Development Corporation
18361 Rehab. of River Control with Grouted Riprap along Bulusan River 04/14/11 V 1.869 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
Alro Construction & Development Corporation
18361 Impvt. of Drainage System-Metro Poblacion 04/04/11 V 18.424 150 C 0.471 0.133 0.300 - - - 90.40 *90.40%
V. Satisfactory
Alro Construction & Development Corporation
18361 Rehabilitation of Goyundan to Payak Road 05/29/09 V 4.777 158 C 0.357 0.200 0.300 - - - 85.70 *85.70%
Satisfactory
Alro Construction & Development Corporation
8361 Concreting of FMR from Macad to Tilnac 06/01/09 V 9.459 150 C 0.418 0.133 0.300 - - - 85.10 *85.10%
Satisfactory
Alro Construction & Development Corporation
18361Rehab./Reconst. of Iriga City-San Isidro-Sagrada-San Ramon Road
(San Pedro Section)09/09/09 V 15.275 179 C 0.401 0.174 0.300 - - - 87.50 *87.50%
Satisfactory
Al's Enterprise and Construction 9721 Const./Rehab. of Hospital (Felipe
Abrigo Memorial Hospital) 03/17/09 VIII 4.775 151 O 0.349 0.240 0.000 0.010 0.000 0.000 59.90 -
Alzam Enterprises 19113Widening of Road at Package 1, Agusan-Davao Road, Licanan
Section04/13/11 XI 19.252 240 O 0.296 0.300 0.150 0.030 0.050 0.050 87.60 -
Alzam Enterprises 19113 Construction of Road Network Camp Catitipan, PNP 03/11/10 XI 22.145 180 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
Alzam Enterprises 19113
Rehab./Reconst./Upgrading of Damaged paved National Roads at
Davao City Diversion Road for Package 2-C at a) Junction Davao-
Agusan to Panacan Relocation Section
03/11/10 XI 19.275 210 C 0.397 0.200 0.300 - - - 89.70 89.70% V. Satisfactory
Alzam Enterprises 19113Rehab./Reconst. Of Damaged Paved National Roads/Widening of Road at
Package III09/09/10 XI 38.503 210 C 0.450 0.133 0.300 - - - 88.30 88.60%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page43
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Alzam Enterprises 19113 Rehab. of Bayabas-Eden Road 03/02/09 XI 19.280 210 C 0.365 0.200 0.300 - - - 86.50 85.66% Satisfactory
Alzam Enterprises 19113 Widening of Agusan-Davao Road, Tibungco Section 03/18/09 XI 28.925 210 C 0.439 0.200 0.300 - - - 93.90 93.42%
V. Satisfactory
Alzam Enterprises 19113
Rehab./ Reconst./Upgrading of Damaged Paved National Roads at
Davao City Diversion Road, La Verna Section
09/16/09 XI 19.272 210 C 0.476 0.200 0.300 - - - 97.60 97.60% Outstanding
Alzam Enterprises 19113Widening of Agusan-Davao Road for
Package 2-A, Bunawan Section, Brgy. Bunawan
09/16/09 XI 9.639 150 C 0.484 0.148 0.300 - - - 93.20 *93.20% V. Satisfactory
Ameg Construction & Supply 21556 Conc. Of San Antonio Sevilla Rd. 08/30/10 V 0.942 60 C 0.428 0.133 0.300 - - - 86.10 86.10%
Satisfactory
Ameg Construction & Supply 21556 Construction of 1-CL School
Building 08/24/09 V 0.575 90 C 0.398 0.162 0.300 - - - 86.00 85.02% Satisfactory
Angel & Sam Construction & General
Merchandise19968 Reconst. of DPWH Cagayan de Oro
City DEO Building 03/28/11 X 3.771 120 C 0.481 0.133 0.000 - - - 61.40 *61.40% Poor
Angel & Sam Construction & General
Merchandise19968 Const. of 2-Classroom School
Building, Kibungsod NHS 06/01/09 X 1.188 134 C 0.435 0.098 0.300 - - - 83.30 83.93% Satisfactory
Angel & Sam Construction & General
Merchandise19968 Rehab. of ICBR Puerto-Cugman
Section 03/02/09 X 13.912 198 O 0.298 0.240 0.144 0.030 0.040 0.050 80.20 -
Angel & Sam Construction & General
Merchandise19968
Rehab./Upgrading of National Road-South Divisiria (RN Abejuela St.-
Corrales St.)09/01/09 X 3.564 130 C 0.446 0.200 0.300 - - - 94.60 *94.60%
V. Satisfactory
Angel & Sam Construction & General
Merchandise19968 Repair of ICBR Puerto-Cugman
Section 09/01/09 X 14.311 207 C 0.459 0.133 0.300 - - - 89.20 83.80% Satisfactory
Angel & Sam Construction & General
Merchandise19968 Rehab./Upgrading of Sayre Highway 02/22/10 X 16.172 240 C 0.341 0.200 0.300 - - - 84.10 83.53%
Satisfactory
Anilos Trading & Construction 31557 Const. of 1 CL Tagumpay NHS 03/06/09 IV-B 0.568 180 C 0.493 0.200 0.300 - - - 99.30 83.20%
Satisfactory
Anilos Trading & Construction 31557 Const. of Multi-Purpose Building,
Phase II, Brgy. Bagong Sikat 03/07/09 IV-B 0.549 90 C 0.473 0.127 0.300 - - - 90.00 *90.00% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page44
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Anilos Trading & Construction 31557 Const.of MPB 1st Engineering
District, Poblacion Roxas 03/06/09 IV-B 0.947 100 C 0.482 0.105 0.300 - - - 88.70 *88.70% Satisfactory
Anilos Trading & Construction 31557 Construction of Farm to Market Road 03/07/09 IV-B 1.378 104 C 0.442 0.110 0.300 - - - 85.20 *85.20%
Satisfactory
Anilos Trading and Construction 31557 Rehab./Impvt. of DPWH-Palawan 1st
DEO Bldg. inc. Employees Quarters, 09/07/09 IVB 1.895 120 C 0.500 0.110 0.000 - - - 61.00 62.12%Poor
Anilos Trading and Construction 31557 Const. of 4-CL Don Ramon Roces
MES (Partial) 03/05/10 IVB 3.766 210 C 0.330 0.200 0.300 - - - 83.00 77.51% Unsatisfactory
Anilos Trading and Construction 31557 Construction of MPB Relocation Site
Brgy. Matahimik 06/05/09 IV-B 0.387 75 C 0.385 0.155 0.300 - - - 84.00 *84.00% Satisfactory
Anrol Construction 10136 Rehab. of Manila East Road, Morong-Pililla Section (Intermittent) 06/05/09 IV-A 19.212 75 C 0.446 0.133 0.300 - - - 87.90 *87.90%
Satisfactory
Anrol Construction 10136 Rehab. of Manila East Road, Baras Section (Intermittent) 06/05/09 IV-A 19.212 75 C 0.429 0.133 0.300 - - - 86.20 *86.20%
Satisfactory
Anrol Construction 10136 Impvt./Rehab. of MPB Brgy. West Triangle 03/01/10 NCR 3.372 120 C 0.486 0.133 0.300 - - - 91.90 91.90%
V.Satisfactory
Antonio V. Nidea Construction 6382 Road Opening of Hinipaan-Sabang
Road 08/13/08 V 14.358 120 C 0.386 0.282 0.300 - - - 96.80 75.02% Satisfactory
Antonio V. Nidea Construction 6382
Const. of Iriga Flood Control Project (Consolidation Dam, Ground Sill,
Slope Protection & Damage Canal)02/28/10 V 28.505 240 O 0.352 0.240 0.150 0.030 0.035 0.033 84.00 -
Antonio V. Nidea Construction 6382 Construction/Imvpt. Of Ponso-San
Agustin FMR 02/28/10 V 4.808 180 C 0.403 0.133 0.300 - - - 83.60 83.60% Satisfactory
Antonio V. Nidea Construction, Inc. 6382 Opening/Impv't./Const. of Bigaa-
Lumbuyan Road Phase V 04/07/11 VI 33.769 390 C 0.493 0.193 0.300 - - - 98.60 *98.60% Outstanding
Antonio V. Nidea Construction, Inc. 6382 Opening/Impv't./Const. of Guiamon-
San Ramon Road, Phase IX 04/07/11 VI 36.663 450 C 0.486 0.173 0.300 - - - 95.90 *95.90% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page45
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Antonio V. Nidea Construction, Inc. 6382 Opening/Impv't./Const. of Guiamon-
San Ramon Road Phase X 04/07/11 VI 40.523 480 C 0.478 0.116 0.300 - - - 89.40 *89.40% V. Satisfactory
Antonio V. Nidea Construction, Inc. 6382 Opening/Impv't./Const. of Bigaa-
Lumbuyan Road Phase IV 04/07/11 VI 36.664 420 C 0.482 0.053 0.300 - - - 83.50 *83.50% Satisfactory
Antonio V. Nidea Construction, Inc. 6382 Const./Repair/Rehab./Impv't. of
Libmanan-Cabusao Flood Control 09/02/10 V 57.610 240 C 0.389 0.200 0.300 - - - 88.90 88.90% Satisfactory
Antonio V. Nidea Construction, Inc.
(Formerly: Antonio V. Nidea Const.)
6382 Desilting/Deepening of Agbunyog River 04/11/11 IVB 33.770 240 C 0.462 0.014 0.300 - - - 77.60 83.54%
Satisfactory
Antonio V. Nidea Construction, Inc.
(Formerly: Antonio V. Nidea Construction)
6382 Opening/Impvt. of Brgy. Manika-Sitio Tina Rd. (Phase II) 02/27/10 VI 36.658 340 C 0.417 0.200 0.300 - - - 91.70 91.70%
V. Satisfactory
Antonio V. Nidea Construction, Inc.
(Formerly: Antonio V. Nidea Construction)
6382 Opening/Imprv't. of Sitio Babangan-Sito Igtulukon Rd. (Phase I) 02/26/10 VI 19.297 270 C 0.383 0.162 0.300 - - - 84.50 84.50%
Satisfactory
Antonio V. Nidea Construction, Inc.
(Formerly: Antonio V. Nidea Construction)
6382 Opening/Impvt. of Brgy. Manika-Sitio Tina Road (Phase I) 09/04/10 VI 40.517 360 C 0.480 0.191 0.300 - - - 97.10 89.30%
V. Satisfactory
AOG Construction 29758
Rehab. of National Arterial Secondary & Local Roads Brdy. Maasin-Macrohon-Sogod, Daang Maharlika Road with exception
05/26/09 VIII 19.088 270 C 0.337 0.200 0.300 - - - 83.70 82.98% Satisfactory
APB Construction 17055 Repair of Public Market at Baguio City 06/09/10 CAR 3.813 90 C 0.464 0.200 0.300 - - - 96.40 96.40%
Oustanding
APD Construction 17467 Impvt./Conc. along Victoria-Kasibu Road and its Related Roads 04/03/11 II 4.818 89 C 0.457 0.166 0.300 - - - 92.30 *92.30%
V. Satisfactory
APD Construction 17467 Impvt./Conc. along Divisoria - Panang Road and its related Roads 04/08/11 II 9.640 100 C 0.440 0.170 0.300 - - - 91.00 *91.00%
V. Satisfactory
APD Construction 17467
Impvt./Conc. along Cordon-Diffun-Madella-Aurora Bdry. Rds. & its
related roads (San Marcos-Gundaway Section & its Related
Road
09/03/09 II 19.300 150 C 0.437 0.200 0.300 - - - 93.70 94.30% V. Satisfactory
APD Construction 17467
Rehab./Reconst./Upgrading of Damaged Paved National Roads with
Widening, Daang Maharlika KO346+610-KO347+290
08/26/09 II 13.006 132 C 0.425 0.200 0.300 - - - 92.50 92.50% V. Satisfactory
APD Construction 17467 Upgrading/Concreting of Ilagan-Delfin-Mallig Road 08/25/09 II 12.540 104 C 0.421 0.200 0.300 - - - 92.10 92.10%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page46
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
APD Construction 17467Impvt./Conc. along Divisoria-Panang
Bdry. Road & Its Related Roads (Divisoria Rd. & its related roads)
02/25/10 II 19.223 150 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory
APD Construction 17467Impvt./Conc. along CDMA Bdry.
Road & its related Road (Palacian Road and its related Roads)
06/05/10 II 15.419 120 C 0.478 0.176 0.300 - - - 95.40 95.40% V. Satisfactory
APD Construction 17467
Impvt./Conc. along CDMA Boundary Road and its related Roads
(Gundaway Road and its Related Roads)
08/29/10 II 19.279 150 C 0.446 0.184 0.300 - - - 93.00 93.00% V. Satisfactory
APD Construction 17467 Impv't/Rehab of Ricarte Norte-Ifugao Villa Road, Ganano ARC 03/07/09 II 9.646 180 C 0.454 0.200 0.300 - - - 95.40 *95.40%
V.Satisfactory
Apex Builders 32329Const. of (7.0m x 9.0m) 1-CL G.I.
Roofing School Building at Pariaan H/S
03/29/11 V 0.573 240 O 0.364 0.275 0.150 0.023 0.032 0.033 87.70 -
Apex Builders 32329Const. of Modified 1-CL Sch. Bldg.,
FFCCCII-Type at San Vicente Pequeno E/S
03/29/11 V 0.454 240 O 0.319 0.300 0.150 0.023 0.029 0.033 85.40 -
Apex Builders 32329Repair/Rehab. of Scoured Slope
Protection along DM Jct. Legazpi-Sto. Domingo Tabaco-CamSur Bdry.
02/26/10 V 3.019 90 C 0.411 0.133 0.300 - - - 84.40 84.40% Satisfactory
APU Trading & Construction (Formerly:
APU Const.)8379
Const. of Farm-to-Market Road at Brgy. Doña Anicia Road, Brgy. Dau,
Mabalacat and San Ildefonso06/04/09 III 1.897 30 C 0.411 0.200 0.300 - - - 91.10 *91.10%
V. Satisfactory
Aqualine Construction 11555 Rehab. of Tamalarong-Libertad FMR, Sta. 0+000-Sta. 1+500 06/03/09 IV-B 2.690 90 C 0.358 0.171 0.300 - - - 82.90 83.70%
Satisfactory
Aqualine Construction 17555 Basey Irrigation Project 09/5-10/11 NIA 9.426 110 C 0.471 0.166 0.300 - - - 93.70 93.66% V. Satisfactory
Aquino-De La Cruz Eng'g & Construction 16751 Const. of Employees Qtrs., Rehab. of
DPWH Pang. III DEO Bldg. 04/14/11 I 3.856 120 C 0.455 0.133 0.300 - - - 88.80 84.67% Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751 Const. of One Unit, 2-CL S/B at
Enrico T. Prado NHS 03/02/10 I 0.965 60 C 0.401 0.133 0.300 - - - 83.40 83.40% Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751
Repair and Rehab. of Urdaneta Jct. - Dagupan Rd. Sta. Barbara and
Calasiao, Pangasinan, Km.202+130 - Km.203+064 with exception
06/03/10 I 10.000 30 C 0.449 0.133 0.300 - - - 88.20 88.20% Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751 Rehab. of Tarlac Road 06/07/10 I 8.675 20 C 0.428 0.133 0.300 - - - 86.10 86.10%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page47
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Aquino-Dela Cruz Eng'g & Construction 16751 Rehab./Impvt. of Sta. Barbara Old
Road Km. 200+024-Km. 200+407 08/31/10 I 4.014 15 C 0.420 0.195 0.300 - - - 91.50 91.50% V. Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751
Const. of Employees Quarter & Impvt. of DPWH Pangasinan Sub-
DEO08/30/10 I 3.858 120 C 0.483 0.133 0.300 - - - 91.60 87.19%
Satisfactory
Aquino-Dela Cruz Eng'g & Construction 16751 Rehabilitation of Farm-to-Market
Road 03/05/09 I 1.250 25 C 0.371 0.200 0.300 - - - 87.10 *87.10%Satisfactory
Aquino-Dela Cruz Eng'g. & Construction 16751
Road Upgrading (Gravel to Paved) of San Nicolas-San Quintin-Umingan-
Guimba Road08/25/09 I 10.598 89 C 0.407 0.200 0.300 - - - 90.70 89.26%
V. Satisfactory
AR Adlawan Construction 13108
Impvt./Asphalting of Sibonga-Dumanjug Rd., Sta.71+000 - Sta.73+920 (with exception)
04/08/11 VII 48.116 285 C 0.384 0.200 0.300 - - - 88.40 87.86% Satisfactory
AR Adlawan Construction 13108 Road Upgrading (Gravel to Paved),
Sibonga-Dumanjug Road 06/01/09 VII 9.531 45 C 0.413 0.200 0.300 - - - 91.30 *91.30% V. Satisfactory
AR Adlawan Construction 13108 Concreting of Sibonga-Dumanjug
Road 06/01/09 VII 28.915 210 C 0.440 0.200 0.300 - - - 94.00 83.14% Satisfactory
AR Adlawan Construction 13108
Conc. of Sibonga-Dumanjug Road, Starting at Boundary Cebu 2nd DEO
and Cebu 4th DEO (Km. 65+968-Km.64+988)
06/01/09 VII 18.391 120 C 0.426 0.200 0.300 - - - 92.60 74.48% Poor
AR Adlawan Construction 13108 Const. of Lower Calajo-an-Pakigne
Bridge 06/17/10 VII 4.815 90 C 0.363 0.200 0.300 - - - 86.30 86.30% Satisfactory
AR Adlawan Construction 13108
Rehab./Reconst//Upgrading of Carcar-Barili-Mantayupan Road, Km.
45+500 - Km. 46+07008/24/10 VII 25.387 210 C 0.421 0.200 0.300 - - - 92.10 92.10%
V. Satisfactory
Arago Construction & Supply 31324 Const. of 1 Unit 1 CL Sch. Bldg. @
Bagtong C/S 03/17/09 VIII 0.460 75 C 0.461 0.200 0.300 - - - 96.10 *96.10% Outstanding
Arcinue Commercial 6746
Rehab./Recosnt./Upgrading of Damaged Paved National Roads along Urdaneta Jct. Dagupan Rd.
Km.194+688 - Km.196+984 w/ exception
04/07/11 I 24.120 60 O 0.360 0.240 0.150 0.030 0.037 0.033 85.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page48
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Arcinue Commercial 6746Rehab./Impvt. of Calbayog-Allen
Road, Km.690+500 - Km.732+500 w/ exception
04/01/11 VIII 42.455 120 C 0.422 0.133 0.300 - - - 85.50 *85.50% Satisfactory
Arcinue Commercial 6746 Rehab./Reconst./Upgrading of Bacnotan-Luna-Balaoan Road 09/02/09 I 16.169 99 C 0.425 0.200 0.300 - - - 92.50 86.08%
Satisfactory
Arcinue Commercial 6746 Impvt. of Pias-Currimao-Balacad Road with exception, Paoay Section 09/09/09 I 31.831 360 C 0.364 0.168 0.300 - - - 83.20 85.96%
Satisfactory
Arcinue Commercial 6746 Const. of Mangato Bridge, Brgy. Mangato 09/10/09 I 27.553 519 C 0.459 0.133 0.300 - - - 89.20 82.96%
Satisfactory
Arcinue Commercial 6746 Construction of School Building @ Sto. Rosario E/S 09/01/09 I 2.148 210 C 0.440 0.086 0.300 - - - 82.60 *82.60%
Satisfactory
Arcinue Commercial 6746 Const./Repair of Tavora E/S 02/27/10 I 4.982 180 C 0.408 0.133 0.300 - - - 84.10 84.10% Satisfactory
Arcinue Commercial 6746Raising of Grade of Earthdike &
Const./Rehab. of Agno River Bank Protection, Brgy. Warding
06/04/10 I 9.647 120 C 0.325 0.200 0.300 - - - 82.50 82.50% Satisfactory
Arcinue Commercial 6746Asphalt Overlay along Manila North Road, Km.293+000 - Km.296+000 w/
exception05/25/10 I 14.256 40 C 0.390 0.003 0.300 - - - 69.30 69.30%
Poor
Arcinue Commercial 6746Concrete Lining Dike along
Sinocalan River, Maningding-Ventinilla-Tuliao Section
08/30/10 I 14.474 240 C 0.383 0.200 0.300 - - - 88.30 88.30% Satisfactory
Arcinue Commercial 6746
Installation & Application of Road Safety Devices Pangasinan-
Zambales Road, Pangasinan-Tarlac Road and Labrador-Lingayen Rd. w/
exceptions
09/01/10 I 4.997 30 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
Arcinue Commercial 6746
Urgent Rehab. Works due to Passage Typhoon Peping in the
Province of Pangasinan under the Agno River Control Project, Brgy.
San Felipe
08/27/10 AFCS-PMO 1.947 45 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory
Arcinue Commercial 6746 Rehab./Asphalt Overlay of Manaoag Cadre Road, Km. 0+000-Km. 0+587 05/26/09 I 3.857 20 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Arcinue Commercial 6746Rehab./Reconts./Upgrading along Bacnoton-Luna-Balaoan Road, Km. 283+221-Km. 307+896 w/exception
05/27/09 I 16.169 90 O 0.358 0.207 0.150 0.030 0.040 0.033 81.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page49
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Arcinue Commercial / Top Tech Trading &
Const. (JV)JV-09-223
Rehab./Reconst./Upgrading of Damaged National Rd., Diokno Highway inc. Slope Protection
08/24/10 IVA 23.874 150 C 0.462 0.133 0.300 - - - 89.50 89.50% V. Satisfactory
Aretas Development & Supply 25669 Const. of MPB, Sampaguita Hills,
Brgy. Marcelo Green 02/17/10 NCR 3.837 75 C 0.497 0.133 0.300 - - - 93.00 93.00% V.Satisfactory
Arky Construction & Supply / Lim General
Contractor Corporation(Formerly:
Lim General Contractor) (JV)
JV-09-068 Conc. of Poblacion Balud-Calumpang Road 04/03/11 V 72.367 360 C 0.327 0.200 0.300 - - - 82.70 *82.70%
Satisfactory
Arky Construction and Supply 32692
Rehab./Reconst. of Damaged Masbate-Cataingan-Placer National
Road (Intermittent Section) 08/27/09 V 17.364 150 C 0.387 0.200 0.300 - - - 88.70 *88.70%
Satisfactory
Arky Construction and Supply 32692
Rehab./Reconst. of Damaged Masbate Capitol-Cadre National
Road02/18/10 V 11.566 253 C 0.418 0.160 0.300 - - - 87.80 83.69%
Satisfactory
Arlor Construction 30822 Const./Rehab. of Road at Natunuan North-Kaingin 02/26/10 IVA 0.497 30 C 0.442 0.133 0.300 - - - 87.50 87.50%
Satisfactory
Armal Construction Supply & Services 2008-1439 Repair Renovation of PTRI Facilities
(Phase 2) 07/25/11 DOST 4.329 C 0.460 0.200 0.300 - - - 96.00 *96.00% Outstanding
Armando U. Khong Hun General Contractor 16163
Rehab./Reconst./Upgrading of Diokno Ave., including Approach of
Diokno Bridge (Phase I)05/19/09 NCR 19.290 120 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
Armando U. Khong Hun General Contractor 16163 Construction of Pedestrian
Overpass along Domestic Road 05/19/09 NCR 11.573 120 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory
Armando U. Khong Hun General Contractor 16163
Const./Improvement of Slope Protection of San Dionisio River
(Phase I, II & III)06/02/09 NCR 33.720 90 C 0.443 0.133 0.300 - - - 87.60 *87.60%
Satisfactory
Armando U. Khong Hun General Contractor 16163
Proposed Rehab./Reconst./Upgrading of
Damaged Paved National Road, South Superhighway West Service
Road, Pasay City
05/24/10 NCR 19.295 30 C 0.411 0.200 0.300 - - - 91.10 91.10% V. Satisfactory
Armando U. Khong Hun General Contractor, Inc. 16163 Rehab./Reconst./Upgrading of
Blumentrit St. 08/24/10 NCR 24.071 150 C 0.416 0.133 0.300 - - - 84.90 87.78% Satisfactory
ARN Builders 18930Upgrading/Impvt. along Sindangan-
Siayan-Dumingag Road, Piao-Siayan Section
04/13/11 IX 19.248 95 C 0.391 0.200 0.300 - - - 89.10 *89.10% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page50
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ARN Builders 18930 Const. of Cabancalan-Canduman Bridge (E. Cortes Bridge) 03/08/10 VII 30.409 255 C 0.444 0.078 0.300 - - - 82.20 73.92%
Poor
ARN Builders 18930 Road to Complete Nautical Highway, Rehab. of Daang Maharlika Road 02/28/10 VIII 47.490 365 C 0.392 0.200 0.300 - - - 89.20 88.58%
Satisfactory
ARN Builders 18930CP-4: Imprvt./Conc. of Kapalong-
Talaingod-Valencia, Bukidnon Road, Brgy. Sto. Niño Section Phase I
02/27/10 XI 153.445 530 C 0.387 0.200 0.300 - - - 88.70 90.29% V. Satisfactory
ARN Builders 18930CP-5: Impvt. / Conc. Of Kapalong-
Talaingod-Valencia, Bukidnon Road, Brgy. Sto. Nino Section Phase II
02/27/10 XI 173.459 540 C 0.363 0.200 0.300 - - - 86.30 89.60% V. Satisfactory
ARN Builders 18930CP-8: Const. of Six (6) Bridges inc.
Approaches along Kapalong-Talaingod-Valencia-Bukidnon Road
02/26/10 XI 123.463 540 C 0.355 0.133 0.300 - - - 78.80 89.52% V. Satisfactiry
ARN Builders 18930Repair/Rehab. of Caraga Gov. LN
Lopez and Quinonoan Bridges along Baganga-Mati Road
03/04/10 XI 93.754 375 C 0.402 0.133 0.300 - - - 83.50 83.50% V. Satisfactory
ARN Builders 18930 Rehab./Reconstruction of Aklan East Road 11/30/08 VI 19.283 180 O 0.218 0.240 0.100 0.015 0.032 0.100 70.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page51
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ARN Builders 18930 Rehab./Recons. of Aklan East Road 06/06/09 VI 19.283 180 C 0.438 0.200 0.300 - - - 93.80 84.32% Satisfactory
ARN Builders 18930 Rehab./Reconst./Upgrading of Aklan East Road 09/05/09 VI 31.795 240 O 0.335 0.240 0.150 0.000 0.032 0.100 -
ARN Builders 18930 Construction of Kinawahan Bridge & Approaches 03/06/09 VII 25.238 210 C 0.269 0.192 0.300 - - - 76.10 *76.10%
Unsatisfactory
ARN Builders 18930 Const. of Multi-Purpose Building at Cabadiangan 09/14/09 VII 1.776 90 C 0.485 0.200 0.300 - - - 98.50 -
ARN Builders, Inc. 8576 Additional Improvement of Basiao Port 03/22-23/11 PPA 28.575 270 O 0.382 0.299 0.150 0.030 0.061 0.050 97.20 -
ARN Builders, Inc. Additional Improvement of Basiao Port 09/21-22/11 PPA 28.575 270 C 0.442 0.200 0.300 - - - 94.17 96.00%
Outstanding
ARSVI Construction 23518 Const. of School Building at Elementary School, Brgy. Banjo East 03/03/10 IVA 0.998 90 C 0.484 0.133 0.300 - - - 91.70 91.70%
V. Satisfactory
ARSVI Construction 23518 Conc. and Impvt. of San Andres Road 09/09/09 IVA 2.893 90 C 0.444 0.133 0.300 - - - 87.70 *87.70%
Satisfactory
Arthur Blanco Construction and
Development Corp.33999 Const. of Lined Canal at Concepcion 04/11/11 IVA 0.299 60 C 0.403 0.200 0.300 - - - 90.30 *90.30%
V. Satisfactory
Aryanesa Construction & Enterprises 33362 Repair/Const. of Dolores River
Control 09/05/10 VIII 4.724 335 O 0.337 0.242 0.150 0.030 0.025 0.033 81.70 -
Asanco Gen. Merchandising &
Construction30517 Const. of Multi-Purpose Pavement,
Barangay New Guinlo 03/04/10 IVB 0.775 54 C 0.428 0.133 0.300 - - - 86.10 86.10% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page52
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Asand Construction 19250 Talakag Irrigation Project 09/26-10/01/11 NIA 15.181 360 O 0.326 0.300 0.120 0.030 0.051 0.050 87.64 -
Asand Construction and Development 21691 Construction of Academic Building II 12/2/09 DOST 10.309 210 C 0.455 0.195 0.300 - - - 95.00 95.00%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page53
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Asian Pearl Construction & Development
Corporation9059
Completion of Multi-Purpose Building, Sitio Parang, Brgy. San
Marcos03/03/09 I 1.414 34 C 0.416 0.133 0.300 - - - 84.90 *84.90%
Satisfactory
ASS Construction 31509 Construction of Sports Complex 5/14-15/09 DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding
Asugas Builders 32764 Const./Impvt. of MPB (Municipal Bldg.) Phase III, Poblacion Tigbao 03/14/09 IX 1.835 120 C 0.415 0.133 0.300 - - - 84.80 *84.80%
Satisfactory
Asugas Builders 32764 Construction and Completion of Multi-Pupose Building (Phase III) 03/14/09 IX 1.835 120 C 0.447 0.133 0.300 - - - 88.00 *88.00%
Satisfactory
Atlantic Construction 24232 Construction of 2-CL Naguilian Bacolod E/S 09/05/09 II 1.816 60 C 0.482 0.133 0.300 - - - 91.50 *91.50%
V. Satisfactory
Atlantic Construction 24232 Const. of Sta. Maria MPB 03/02/09 II 3.816 120 C 0.410 0.200 0.300 - - - 91.00 82.04% Satisfactory
Atlantic Construction 24232Rehab./Impvt. of Road Jct. Santiago-
Tuguegarao to Sta. Maria Town Proper
03/02/09 II 4.765 146 C 0.406 0.200 0.300 - - - 90.60 85.38% Satisfactory
Atlantic Construction 24232Road Concreting of Brgys. Quibal, San Andres, Visitacion, San Roque
and San Juan03/02/09 II 4.772 120 C 0.389 0.200 0.300 - - - 88.90 84.10%
Satisfactory
Atlas Enterprises 4953 Construction of Cabanatuan-Gen. Trinidad Road 09/04/09 III 4.752 90 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V. Satisfactory
ATR Construction 15968 Concreting of Roads at Brgy., Tres De Mayo, Quirino St.-Perfect 03/07/09 XI 1.884 45 C 0.462 0.192 0.300 - - - 95.40 *95.40%
V. Satisfactory
Avatar Construction Company 31455
Const./Conc. of Roads w/ Drainage System Leading to San Jose MPB,
Brgy. Don Ruben04/08/11 XIII 9.263 180 C 0.328 0.200 0.300 - - - 82.80 88.56%
Satisfactory
Avatar Construction Company 31455 Const. of MPB, Phase IV 04/08/11 XIII 14.473 240 C 0.485 0.200 0.000 - - - 68.50 83.41%
Satisfactory
Avatar Construction Company 31455 Const./Widening/Gravelling of Roads
from Brgy. Glenville to Brgy. Gomez 06/02/09 XIII 1.902 234 C 0.497 0.169 0.300 - - - 96.60 *96.60% Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page54
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Avatar Constructions Company 31455 Opening of Brgy. Matingbe - Brgy.
Gomez Farm to Market Rd. 02/24/10 XIII 4.813 150 C 0.491 0.133 0.300 - - - 92.40 92.40% V.Satisfactory
Avatar Constructions Company 31455 Road Conc. with Drainage along Jct.
National Rd. to Brgy. Justiniana Rd. 02/24/10 XIII 4.773 210 C 0.473 0.133 0.300 - - - 90.60 90.00 V.Satisfactory
Avatar Constructions Company 31455 Repair/Rehab. of Brgy. Sta. Cruz-
Brgy. Wilson FMR 08/25/10 XIII 9.452 210 C 0.437 0.133 0.300 - - - 87.00 87.24% Satisfactory
Avatar Constructions Company 31455
Rehab./Reconstruction of Damaged Paved National Road along Dinagat-
Loreto Road (San Jose Section)06/02/09 XIII 5.717 240 C 0.464 0.200 0.300 - - - 96.40 85.69%
Satisfactory
Avatar Constructions Company 31455 Completion of Road from Brgy.
Mahayahay Road to Shrine Road 03/05/09 XIII 2.364 180 C 0.385 0.200 0.300 - - - 88.50 *88.50% Satisfactory
Avatar Constructions Company 31455 Const. of Sta. Cruz Beach Road 03/05/09 XIII 3.855 210 C 0.473 0.132 0.300 - - - 90.50 *90.50%
V. Satisfactory
Avatar Constructions Company 31455 Const./Widening of Rds. From Brgy.
Poblacion to Brgy. Jacquez 09/04/09 XIII 1.897 332 C 0.497 0.133 0.300 - - - 93.00 *93.00% V.Satisfactory
Aylan Construction & Trading 11884 Completion of Multi-Purpose Bldg. 06/05/10 VII 0.143 150 C 0.329 0.133 0.300 - - - 76.20 76.20%
Unsatisfactory
Aylan Construction and Trading 11884 Repair/Rehab. of Ponciano Bernardo
E/S 03/31/11 NCR 1.443 60 C 0.476 0.133 0.300 - - - 90.90 *90.90% V. Satisfactory
Aylan Construction and Trading 11884 Completion of Academic Bldg.,
Malanday E/S 04/06/11 NCR 9.416 120 O 0.381 0.240 0.150 0.030 0.035 0.033 86.90 -
Aylan Construction and Trading 11884 Completion of Academic Bldg., San
Roque Elem. School 09/10/09 NCR 9.591 90 C 0.337 0.133 0.300 - - - 77.00 *77.00% Unsatisfactory
Aylan Construction and Trading 11884 Repair/Rehab. of Camp Crame High
School, Brgy. Lipunan ng Crame 02/26/10 NCR 1.781 90 C 0.493 0.133 0.300 - - - 92.60 92.60% V.Satisfactory
Aylan Construction and Trading 11884 Const. of MPB @ Monte Vista Subd.
Brgy. Industrial Valley Complex 06/02/10 NCR 1.445 60 C 0.458 0.200 0.300 - - - 95.80 95.80% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page55
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Aylan Construction and Trading 11884 Const./Completion of School
Building @ Leodegario Victorino E/S 06/03/10 NCR 14.450 170 C 0.406 0.200 0.300 - - - 90.60 87.24% Satisfactory
Aylan Construction and Trading 11884 Repair/Rehab. of Camp Crame E/S 08/16/10 NCR 0.654 75 C 0.398 0.133 0.300 - - - 83.10 83.10%
Satisfactory
B B C Construction 16510Const. of Multi-Purpose Building (Covered Court) Agusan National
High School 06/10/09 XIII 3.737 150 C 0.478 0.200 0.300 - - - 97.80 *97.80%
Outstanding
B B C Construction (Formerly: BBC Sand and
Gravel)16510 Completion of MPB (Covered Court)
@ Brgy. Limaha 04/13/11 XIII 1.312 45 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory
B L F Construction 15829Const. of School Building (CNM)
Phase III @ Bataan, Peninsula State University
08/28/09 III 1.870 36 C 0.420 0.133 0.300 - - - 85.30 *85.30% Satisfactory
B Y A Builders and Construction Supply 24158 Const./Impvt. of MPB (Legislative
Bldg.) 04/06/11 VIII 4.816 225 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory
B. Bernardo Construction 6196 Const. of Two (2) Classroom School Bldg. (2nd Flr.) at Caypombo 08/28/10 III 2.623 100 C 0.482 0.089 0.300 - - - 87.10 87.10%
Satisfactory
B. Bernardo Construction 6196 Improvement of Farm-to-Market Road, Brgy. Catmon 06/01/09 III 3.524 90 C 0.446 0.200 0.300 - - - 94.60 *94.60%
V. Satisfactory
B. Bernardo Construction 6196 Conc. Reblocking of Pulilan-Calumpit Road 03/06/09 III 9.566 90 C 0.346 0.200 0.300 - - - 84.60 84.72%
Satisfactory
B. Bernardo Construction 6196 Completion of Riprapping along Malanday Creek, Brgy. Malanday 02/23/10 NCR 4.785 60 C 0.371 0.200 0.300 - - - 87.10 87.10%
Satisfactory
B. Valencerena Trading & Construction 22147 Const./Impvt. of Various MPB, Brgy.
Teachers Village West 09/11/09 NCR 2.861 60 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory
B. Valencerina Trading & Construction 22147 Proposed Const. of MPB (Center),
Marcelo Marcela E/S 04/14/11 NCR 6.349 120 O 0.398 0.240 0.150 0.030 0.047 0.033 89.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page56
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose Building 06/10/10 IVA 0.994 45 C 0.472 0.200 0.300 - - - 97.20 97.20%
Outstanding
B. Valencerina Trading & Construction 22147 Rehab. of Hanging Bridge, Brgy. San
Rafael 08/16/10 IVA 1.927 45 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory
B. Valencerina Trading & Construction 22147 Const. of Road, Barangay Geronimo 08/16/10 IVA 1.919 45 C 0.356 0.200 0.300 - - - 85.60 85.60%
Satisfactory
B. Valencerina Trading & Construction 22147 Rehabilitation of Alley at Sweet
Dreams Compound, Brgy. Parang 05/28/09 NCR 0.675 90 C 0.389 0.133 0.300 - - - 82.20 *82.20% Satisfactory
B. Valencerina Trading and Construction 22147 Conc. of Bungon Farm-to-Market
Road 02/22/10 I 1.927 75 C 0.293 0.133 0.300 - - - 72.60 72.60% POOR
B. Valencerina Trading and Construction 22147 Const. of MPB., Brgy. Rosario 02/24/10 NCR 5.271 90 C 0.427 0.200 0.300 - - - 92.70 92.70%
V.Satisfactory
B. Vicencio Construction 9687Road Upgrading along Baybay-
Abuyog and Baybay-Mahaplag Road, Abuyog-Mahaplag
04/12/11 VIII 23.199 250 C 0.452 0.133 0.300 - - - 88.50 *88.50% Satisfactory
B. Vicencio Construction 9687
Road Upgrading (Gravel to Paved) of Sambulawan Jct. - Calaguise-
Calubian Road, Km.994+679.50 - Km.995+149.50
04/09/11 VIII 18.549 240 C 0.418 0.133 0.300 - - - 85.10 86.15% Satisfactory
B. Vicencio Construction 9687 Rehab. of Flood Control and Drainage Structure (Antiao Creek) 03/29/11 VIII 24.101 260 O 0.355 0.243 0.150 0.015 0.048 0.050 86.10 -
B. Vicencio Construction 9687Rehab./Const./Upgrading along Sto.
Niño-Nabuangan, Km.899+300 - Km.901+638 w/ exception
04/04/11 VIII 38.481 359 O 0.339 0.240 0.150 0.030 0.047 0.033 83.90 -
B. Vicencio Construction 9687
Rehab./Reconst./Upgrading of Bulalacao Bridge-Naubay Sect.,
Km.961+695 - Km.983+500 w/ exception
04/04/11 VIII 48.234 406 O 0.350 0.222 0.150 0.024 0.045 0.033 82.40 -
B. Vicencio Construction 9687
Rehab./Const./Upgrading of Mantang Bridge-Brgy. San Isidro, Km.895+591
- Km.897+600 w/ exceptions, Brgy. San Isidro
04/04/11 VIII 38.190 300 O 0.349 0.240 0.150 0.015 0.032 0.033 81.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page57
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B. Vicencio Construction 9687 Concreting of Antequera-Catagbacan (Loon) Rd. 09/01/09 VII 18.313 172 O 0.375 0.246 0.150 0.030 0.042 0.050 89.30 -
B. Vicencio Construction 9687 Concreting of Calbayog Diversion Road 06/02/09 VIII 18.794 240 C 0.364 0.133 0.300 - - - 79.70 82.28%
Satisfactory
B. Vicencio Construction 9687Rehab./Reconst./Upgrading of
Damaged Paved National Roads Calbayog-Catarman Road
06/02/09 VIII 94.550 300 O 0.303 0.238 0.089 0.030 0.045 0.033 73.80 -
B. Vicencio Construction 9687
Const. (Road Opening) of Missing Link of Calbayog Diversion Road,
Cagsalaosao-Gadgaran Road Section
06/02/09 VIII 18.794 150 O 0.223 0.240 0.150 0.030 0.050 0.033 72.60 -
B. Vicencio Construction 9687 Const. of River Control of Anitao Creek 03/02/10 VIII 14.016 270 C 0.347 0.189 0.300 - - - 83.60 83.48%
Satisfactory
B. Vicencio Construction 9687 Rehab./Reconst./Upgrading of Calbayog-Catarman Road 03/03/10 VIII 94.550 300 C 0.389 0.134 0.300 - - - 82.30 82.58%
Satisfactory
B. Vicencio Construction 9687Road Opening/Const. of Sitio
Nagbuong Section along Calbayog Diversion Road
09/01/10 VIII 19.291 150 C 0.336 0.200 0.300 - - - 83.60 84.32% Satisfactory
B. Vicencio Construction 9687 Calbayog Airport Development Project 11/16/09 DOTC 19.247 120 C 0.391 0.200 0.300 - - - 89.10 89.10%
V. Satisfactory
B. Vicencio Construction 9687 Calbayog Airport Development Project 12/14/09 DOTC 9.121 150 C 0.462 0.200 0.300 - - - 96.20 -
B. Vicencio Construction 9687 Const. of Maasin Shore Protection/Seawall 08/29/08 VIII 3.809 240 O 0.300 0.100 0.100 0.000 0.022 0.200 72.20 -
B. Vicencio Construction 9687 Const. of Bachawan River Control 08/24/10 IVB 9.647 130 C 0.421 0.200 0.300 - - - 92.10 92.10% V. Satisfactory
B. Vicencio Construction 9687 Concreting of Tawid-Guadalupe Circumferential Road 05/27/09 VIII 7.517 180 C 0.432 0.200 0.300 - - - 93.20 86.54%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page58
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B. Vicencio Construction 9687 Rehab./Impvt. of Brdy. Mahaplag-Sogod Road (Dampoy) 05/27/09 VIII 9.446 310 O 0.345 0.258 0.150 0.030 0.047 0.033 86.30 -
B. Vicencio Construction 9687 Concreting of Villaba-Leyte Road Km. 1015+820-Km. 1017+420 06/02/09 VIII 31.694 330 O 0.339 0.240 0.150 0.022 0.037 0.033 82.10 -
B. Vicencio Construction 9687
Rehab. of Sambulawan-Calaguise-Calubian Road (Concreting of Calaguise Section), Tigbawan
Section
06/02/09 VIII 17.942 220 C 0.292 0.139 0.300 - - - 73.10 70.43% Poor
B. Vicencio Construction 9687 Completion of 8 CL E/S Bldg., Remedios T. Romualdez E/S 03/18/09 VIII 4.337 90 C 0.399 0.200 0.300 - - - 89.90 *89.90%
V. Satisfactory
B. Vicencio Construction 9687 Conc. of Junction Pana-awan Airport Road 03/06/09 VIII 18.897 367 C 0.379 0.173 0.300 - - - 85.20 82.44%
Satisfactory
B. Vicencio Construction 9687Conc. of Naval-Calibiran Cross-
Country Road (Mohon-Pulang Yuta Section)
03/13/09 VIII 18.920 300 C 0.317 0.032 0.300 - - - 64.90 76.66%Unsatisfactory
B. Vicencio Construction 9687 Concreting of Tawid-Guadalupe Circumferential Road 03/06/09 VIII 7.517 180 O 0.338 0.238 0.150 0.015 0.030 0.050 82.10 -
B. Vicencio Construction 9687 Construction of Maasin Shore Protection/Seawall 03/06/09 VIII 3.809 270 C 0.250 0.200 0.300 - - - 75.00 73.32%
Poor
B. Vicencio Construction 9687 Rehab./Impv't of Brgy. Mahaplag-Sogod Road (Dampoy) 03/06/09 VIII 9.446 310 O 0.300 0.180 0.150 0.015 0.033 0.050 72.80 -
B. Vicencio Construction 9867 Road Upgrading of Junction Himay-Angan-Silago-Abuyog Road 09/08/09 VIII 53.210 365 O 0.350 0.300 0.150 0.008 0.035 0.050 89.30 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page59
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B. Vicencio Construction 9867 Rehab./Reconst./Upgrading of Calbayog-Catarman Road 09/10/09 VIII 94.551 300 O 0.320 0.300 0.150 0.023 0.050 0.050 89.30 -
B. Vicencio Construction 9687 Conc. of Villaba-Leyte Road, Km. 1015+820-Km. 1017+420 09/05/09 VIII 31.695 330 O 0.354 0.248 0.150 0.018 0.045 0.050 86.50 -
B. Vicencio Construction 9687 Rehab./Impvt. of Boundary Mahaplag-Sogod Road (Dampoy Sect.) 09/08/09 VIII 9.446 280 C 0.401 0.200 0.300 - - - 90.10 83.77%
Satisfactory
B. Vicencio Construction 9687Const. (Road Opening) of Missing Link of Calbayog Diversion Road,
Cagsalaosao-Gadgaran Sect.09/10/09 VIII 18.795 120 C 0.395 0.200 0.300 - - - 89.50 79.36%
Unsatisfactory
B. Vicencio Construction 9687 Siargao Airport Development Project 08/10/11 DOTC 16.333 90 C 0.444 0.200 0.300 - - - 94.40 94.40% V. Satisfactory
B. Vicencio Construction 9687Cotabato Airport Development
Project (Rehabilitation of Terminal Buildings)
08/26/10 DOTC 14.385 120 C 0.422 0.200 0.300 - - - 92.20 92.20% V. Satisfactory
B.E Construction 2730Conc. of Oton-Buray-Sta. Rita-Sta.
Monica-Rizal-Sta. Clara-San Antonio-San Miguel Road
09/07/10 VI 15.338 600 C 0.069 0.133 0.300 - - - 50.20 50.50% Poor
B.G Giron Construction & Supply 15197
Channel Rehab./Imprv't. of Rio Chico River (Guevarra-San Roque Sect.)
Sta.0+000 - Sta.1+27006/02/10 III 4.766 90 C 0.438 - 0.500 - - - 93.80 93.80%
V. Satisfactory
B.G Giron Construction & Supply 15197
Conc. of Shoulder of Concepcion-La Paz Rd. w/ Reinforced Concrete Slope Protection, Km.116+222 -
Km.136+020 w/ exception
08/28/10 III 9.557 60 C 0.394 0.200 0.300 - - - 89.40 89.40% V. Satisfactory
B.G Giron Construction & Supply 15197 Rehab./Reconst. & Impvt. of
Concepcion-Capas Road 05/20/09 III 9.561 45 C 0.492 0.199 0.300 - - - 99.10 *99.10% Outstanding
B.G Giron Construction & Supply 15197 Const. of FMR, Purok Sampaguita,
Brgy. San Agustin 05/22/09 III 1.505 60 C 0.415 0.139 0.300 - - - 85.40 *85.40% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page60
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B.G. Giron Construction & Supply 15197 Const. of MPB @ Brgy. Calaluan 04/06/11 III 1.855 90 C 0.487 0.154 0.300 - - - 94.10 *94.10%
V. Satisfactory
B.L. Jadulco Construction & Supply 33684 Const. of Drainage in Municipality of
Naval 04/07/11 VIII 1.926 100 C 0.436 0.133 0.000 - - - 56.90 76.28% Unsatisfactory
B.M Marketing 9852 Rehab./Reconst. of Damaged Pavement @ Burgos St. 09/08/10 VIII 4.830 90 C 0.398 0.133 0.300 - - - 83.10 83.10%
Satisfactory
B.M Marketing 9852 Guiuan Airport Development Project 10/07/09 DOTC 38.995 150 C 0.463 0.200 0.300 - - - 96.30 *96.30% Outstanding
B.M Marketing 9852 Tacloban Airport Development project 07/07/10 DOTC 77.038 210 C 0.455 0.200 0.300 - - - 95.50 95.50
V. Satisfactory
B.M Marketing 9852
Tacloban Airport Development Project (Construction of Passenger Terminal Building/Foundation and
Sub-Grade Devlopment)
11/25/10 DOTC 149.388 210 C 0.460 0.200 0.300 - - - 96.00 95.50% V. Satisfactory
B.M. Marketing 9852Rehab./Reconst./Upgrading of Daang Maharlika, Palo-Tolosa Road Sect.,
Km.932+100 - Km.934+35803/28/11 VIII 24.049 200 C 0.438 0.133 0.300 - - - 87.10 87.34%
Satisfactory
B.M.K Construction 8292 Rehab./Reconst./Upgrading of Dagupan-Bonuan-San Fabian Rd. 08/28/09 I 46.320 240 C 0.395 0.200 0.300 - - - 89.50 *89.50%
V. Satisfactory
B.M.K Construction 8292 Impvt. of Lingayen-Binmaley (via Matalava), Lingayen-Binmaley 08/28/09 I 23.809 359 O 0.349 0.300 0.077 0.030 0.055 0.033 84.40 -
B.M.K Construction 8292Widening/Conc. of McArthur
Highway (MNR) including Traffic Mgt.
03/05/10 I 28.947 211 C 0.307 0.200 0.300 - - - 80.70 82.20% Satisfactory
B.M.K Construction 8292Rehab./Reconst./Upgrading of
Villasis-Malasiqui-San Carlos Road, Villasis Section
08/26/10 I 7.766 120 C 0.395 0.200 0.300 - - - 89.50 87.40% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page61
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B.M.K Construction 8292 Repair of Various Brgy. Roads 08/25/10 I 1.898 60 C 0.260 0.200 0.300 - - - 76.00 76.00% Unsatisfactory
B.M.K Construction / R.R. Ricafort Construction
and Supplies (JV)JV-09-079
Rehab. of Daang Maharlika Highway, Package 1, Section 6, Allen-Malaga
Road Section, Km.680+366.55 - Km.683+866.55, with exceptions
09/10/10 VIII 96.434 230 C 0.429 0.196 0.300 - - - 92.50 92.80% V. Satisfactory
B.M.K Construction / R.R. Ricafort Construction
and Supplies (JV)JV-09-079
Rehab. of Daang Maharlika Highway, Package 1, Section 9, Allen-Malaga
Road Section, Km.690+866.55 - Km.694+500, with exceptions (inc. completion of asphalt overlay from
Section 1-5, Km.658+804.55 - Km.680+366.55)
09/10/10 VIII 192.901 360 C 0.448 0.194 0.300 - - - 94.20 92.76% V. Satisfactory
B.M.K Construction / R.V. Laborte Builders (JV) JV-08-046
Const. of Canda Bridge Phase I, Quezon Eco-Tourism Road (Lucena
City Batangas Coastal Road) inc. RROW Acquisition & Other Related Activities, Guisguis-Talaan Section
09/01/09 IVA 47.445 300 C 0.419 0.200 0.300 - - - 91.90 91.00% V. Satisfactory
B.M.K Construction / Royal Crown Monarch
Const. & Supplies Corporation (JV)
JV-07-093Impvt./Widening/Conc. of McArthur
Highway (MNR) Tarlac Section Phase IV, Package III, San Manuel Section
02/27/09 III 95.033 210 C 0.450 0.200 0.300 - - - 95.00 *95.00%V. Satisfactory
B.M.K Construction/Valley
Construction and Aggregates (JV)
JV-09-209
Raod Upgrading (Gravel to Concrete) Acop-Kapangan-Kibungan-Bakun Road (Km. 263+500-Km. 283+600)
(Intermittent Sections)
08/31/10 CAR 62.256 360 O 0.362 0.241 0.150 0.030 0.047 0.033 86.30 -
B.M.K. Construction 8292Rehab./Reconst./Upgrading of
Carmen Jct. Manat Rd. w/ exceptions Bautista-Alcala Sect.
04/14/11 I 22.413 160 C 0.435 0.130 0.300 - - - 86.50 86.02% Satisfactory
B.M.K. Construction / A.I.P. Construction (JV) JV-09-207 Rehab. of Cervantes-Sabangan Road 04/09/11 CAR 57.601 365 C 0.440 0.133 0.300 - - - 87.30 *87.30%
SatisfactoryB.M.K. Construction / Royal Crown Monarch
Construction & Supplies Corporation (JV)
JV-09-084
Widening/Conc. of McArthur Highway (MNR), Tarlac Province-Phase VI (Package I), Tarlac 1st
Congressional District (Paniqui and
04/07/11 III 164.060 210 C 0.464 0.146 0.300 - - - 91.00 90.64% V. Satisfactory
B.P. Cruz Builders and Trading 33272 Rehab./Impvt. of Road, Brgy. Tulo 06/02/10 IVA 4.766 60 C 0.391 0.133 0.300 - - - 82.40 82.40%
Satisfactory
B.R. Ramos Construction 3304 Impv't./Conc. Of Maligaya-Garchitorena Road 04/07/11 V 14.679 165 C 0.349 0.200 0.300 - - - 84.90 83.52%
Satisfactory
B.R.G Construction 21931 Conc. of Aritao-Quirino Road, Bua Section 03/04/10 II 9.650 104 C 0.343 0.200 0.300 - - - 84.30 87.24%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page62
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
B.R.G. Construction 21931 Conc. of Aritao-Quirino Road, Pudi Sect. 04/15/11 II 9.650 225 C 0.410 0.133 0.300 - - - 84.30 86.64%
Satisfactory
B.R.G. Construction 21931 Conc. of Bambang-Kasibu-Quezon-Solano Road, Alloy Sect. 04/15/11 II 11.812 210 C 0.412 0.133 0.300 - - - 84.50 84.68%
Satisfactory
B.R.G. Construction 21931 Concreting of Aritao-Quirino Road, Bua Section 06/04/09 II 9.650 104 O 0.375 0.240 0.150 0.030 0.047 0.050 89.20 -
Baby Santiago Construction & Supply 31662 Const. of 2-Storey 4-CL @ San
Antonio Elem. School 02/24/10 IVA 4.103 80 C 0.420 0.200 0.300 - - - 92.00 92.00% V. Satisfactory
Badoc Builders & Supply 31564 Concreting of Farm-to-Market Road, Brgy. Balioeg 03/02/09 I 1.442 45 C 0.371 0.200 0.300 - - - 87.10 *87.10%
Satisfactory
Badoc Builders & Supply / Busilac Builders (JV) JV-08-223
Rehab./Reconst./Upgrading of Damaged Paved National Road (HDM-
4) Batac-Espiritu (Banna) Road04/04/11 I 19.150 180 C 0.369 0.200 0.300 - - - 86.90 84.80%
Satisfactory
Badoc Builders/Busilac Builders Joint Venture JV-08-223 Road Upgrading of Batac-Espiritu
(Banna) Road 09/08/09 I 13.493 130 C 0.344 0.200 0.300 - - - 84.40 84.94% Satisfactory
Badsbro Construction and General Merchandise 32876
Repair/Rehab. of Road Slip along Nat'l. Highway at Brgy. Monching,
Siay09/07/10 IX 2.352 30 C 0.325 0.200 0.300 - - - 82.50 82.50%
Satisfactory
Badsbro Construction and General Merchandise 32876 Construction of 2-Cl School Building
at MSU 03/05/09 IX 0.945 80 C 0.455 0.133 0.300 - - - 88.80 *88.80% Satisfactory
Baje Construction 33252 Construction of Road, Patucannay-Dangdangla 09/08/09 CAR 0.710 43 C 0.458 - 0.500 - - - 95.80 *95.80%
V. Satisfactory
Baje Construction 33252 Const. of MPB, Zone 6 05/25/10 CAR 0.239 72 C 0.437 0.133 0.300 - - - 87.00 87.00% Satisfactory
Baje Construction 33252 Const. of School Building @ Sidongan P/S 05/25/10 CAR 0.626 182 C 0.372 0.185 0.300 - - - 85.70 85.70%
Satisfactory
Baje Construction 33252 Repair/Rehab. of Tayum C/S (Gabaldon Building) 08/17/10 CAR 0.484 72 C 0.395 0.200 0.300 - - - 89.50 89.50%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page63
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
BAP Construction 16215 Rehab./Reconst. of Lipa-Balete Road 06/10/10 IVA 8.201 60 C 0.465 0.133 0.300 - - - 89.80 89.80% V. Satisfactory
Barillo Construction & Enterprises 23836 Const. of 2 CL School Building @
Magdaup NHS 02/27/10 IX 1.155 80 C 0.410 0.200 0.300 - - - 91.00 91.00% V.Satisfactory
Barillo Construction & Enterprises 23836 Completion of MPB @ Provincial
Capitol Ground Ipil Heights 02/27/10 IX 0.958 45 C 0.353 0.200 0.300 - - - 85.30 85.30% Satisfactory
Barillo Construction & Enterprises 23836 Conc. Of Brgy. Rd. at Brgy. Pangi 09/07/10 IX 0.952 40 C 0.448 0.133 0.300 - - - 88.10 88.10%
Satisfactory
Barman Construction Corporation 7974
Rehab. of Calapan South Road Km.080+000 - Km.082+000, Balite
Section04/06/11 IVB 19.135 224 C 0.188 0.200 0.300 - - - 68.80 *68.80%
Poor
Barman Construction Corporation 7974
Restoration of Damaged Revetment and Slope Protection, Orcunoma
River Control (Upstream)08/30/10 IVB 9.507 260 C 0.376 0.200 0.300 - - - 87.60 86.10%
Satisfactory
Barman Construction Corporation 7974
Restoration of Damaged Revetment and Slope Protection Bansud River
Control (Upsteam)08/30/10 IVB 9.517 206 C 0.470 0.122 0.300 - - - 89.20 83.20%
Satisfactory
Barman Construction Corporation 7974
Completion of Mindoro Oriental/Occidental East Coastal
Road, Bulalacao Port Section08/30/10 IVB 28.551 210 C 0.367 0.133 0.300 - - - 80.00 82.70%
Satisfactory
Bascon Bros & Dev. Corp. 31387 Const. of Salinas Flood Control 04/13/11 II 1.430 28 C 0.475 0.133 0.300 - - - 90.80 *90.80%
V. Satisfactory
Bascon Bros & Dev. Corp. 31387 Conc. of Aritao-Quirino Road, Lupa
Section 04/15/11 II 9.650 225 C 0.394 0.133 0.300 - - - 82.70 83.18% Satisfactory
Batch 81 Engineering & Construction 31311 Conc. of FMR at Brgy. Sabangan 04/01/11 I 0.984 30 C 0.441 0.200 0.300 - - - 94.10 *94.10%
V. Satisfactory
Batch 81 Engineering & Construction 31311 Completion of Gongogong Bridge,
MNR 09/07/09 I 3.254 88 C 0.393 0.200 0.300 - - - 89.30 86.84% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page64
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Batch 81 Engineering & Construction 31311 Const. of Multi-Purpose Building,
Brgy. Tamurong 02/10/10 I 0.776 43 C 0.412 0.133 0.300 - - - 84.50 84.50% Satisfactory
Batch 81 Engineering & Construction 31311 Road Concreting, Brgy. Naguilian 02/27/09 I 1.425 40 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Const. of MPB (covered court) 03/18/09 XIII 2.240 120 C 0.458 0.200 0.300 - - - 95.80 *95.80%
V. Satisfactory
BCT Trading & Const./F. Alarcon Const. Corp/ JV 17612 San Vicente Airport Development
Project 03/13/09 DOTC 81.790 240 C 0.424 0.200 0.300 - - - 92.40 92.40% V. Satisfactory
BCT Trading & Construction 15199 San Vicente Airport Development
Project 04/26/10 DOTC 28.788 150 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory
BCT Trading and Construction 15199 Const. of MPB, Poblacion 03/31/11 IVB 1.437 94 C 0.319 0.133 0.300 - - - 75.20 87.73%
Satisfactory
BCT Trading and Construction 15199 Conc. of Puerto Princesa South
Road (Intermittent Section) 03/28/11 IVB 54.040 223 C 0.333 0.200 0.300 - - - 83.30 84.44% Satisfactory
BCT Trading and Construction 15199 Const./Completion of MPB Brgy.
Bagong Sikat 03/31/11 IVB 1.001 90 O 0.343 0.225 0.150 0.030 0.040 0.050 83.80 -
BCT Trading and Construction 15199 Conc. of Irawan-Tagburos Road 03/31/11 IVB 19.049 180 C 0.293 0.200 0.300 - - - 79.30 80.23%
Unsatisfactory
BCT Trading and Construction 15199 Impvt. of Quezon-Punta Baja Road,
Km. 171+400-Km. 175+200 09/10/09 IVB 18.985 282 C 0.398 0.200 0.000 - - - 59.80 *59.80%Poor
BCT Trading and Construction 15199 Construction Of MPB, Brgy. Princesa 03/05/10 IVB 0.329 75 C 0.481 0.133 0.300 - - - 91.40 85.45%
Satisfactory
BCT Trading and Construction 15199 Const. of MPB, Brgy. Model 03/05/10 IVB 1.425 90 C 0.477 0.133 0.300 - - - 91.00 84.98%
Satisfactory
BCT Trading and Construction 15199 San Vicente Airport Development
Project 08/12/09 DOTC 96.293 300 C 0.455 0.200 0.300 - - - 95.50 95.50% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page65
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
BCT Trading and Construction 15199 San Vicente Airport Development
Project 03/14/09 DOTC 48.138 210 C 0.451 0.200 0.300 - - - 95.10 95.10% V. Satisfactory
BDL Santos Construction and Supply 17535 Opening/Impvt. of Guiamon-San
Ramon Road Phase I 09/03/10 VI 19.296 180 C 0.496 0.199 0.300 - - - 99.50 99.50% Outstanding
Bedun Construction 15130 Const./Rehab. of Road, Brgy. Nagtoctoc 02/27/10 IVA 0.399 30 C 0.466 0.133 0.300 - - - 89.90 89.90%
V. Satisfactory
Bell Construction 27851 Const. of Gate and Stage @ Mambugan NHS 02/15/10 IVA 1.352 150 C 0.474 0.200 0.300 - - - 97.40 97.40%
Outstanding
Bell Construction 27851 Conc. of Roads (Dely St.) Brgy. Munting Dilaw 06/08/10 IVA 1.928 120 C 0.341 0.200 0.300 - - - 84.10 84.10%
Satisfactory
Bell Construction 27851 Conc. of Road, Sitio Pagrai, Brgy. Mayamot 08/19/10 IVA 2.886 120 C 0.468 0.133 0.300 - - - 90.10 90.10%
V. Satisfactory
Bemkar Construction 33047 Const. of Multi-Purpose Building Daet E/S, Brgy. VII 04/03/11 V 0.965 45 C 0.438 0.133 0.300 - - - 87.10 *87.10%
Satisfactory
Bemkar Construction 33047
Restoration of Damaged Embankment and Slope Protection
along Bagong Silang-Capalonga Road, Km.328+800 - Km.328+850,
Talagpucao
06/10/10 V 4.780 60 C 0.467 0.133 0.300 - - - 90.00 90.00% V. Satisfactory
Bemkar Construction 33047 Conc. of Talobatib-Jose Panganiban Pob. Port Road, Dalnac Section 09/12/09 V 4.361 150 C 0.371 0.200 0.300 - - - 87.10 86.74%
Satisfactory
Bemkar Construction 33047
Repair/Rehab. of Bagong Silang-Capalonga Road, Bagong Silang
Section, Km. 300+342-Km.300+414 with Intermittent Section
09/12/09 V 1.810 80 C 0.434 0.133 0.300 - - - 86.70 *86.70% Satisfactory
Bemkar Construction 33047 Const. of Slope Protection Sitio Paraiso Bulala Section 03/05/10 V 9.526 150 C 0.464 0.133 0.300 - - - 89.70 89.70%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page66
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Bemkar Construction 33047 Impvt. of Daang Maharlika Road Sitio Paraiso Maharlika Road 03/05/10 V 14.114 120 C 0.456 0.133 0.300 - - - 88.90 88.90%
Satisfactory
Bendimil Construction & Development Corporation
6135Impv't./Gravelling of Sirawai-Sibuco
Rd., Sirawai Poblacion Sect., Sta.0+600 - Sta.2.820
09/05/10 IX 20.338 352 C 0.346 0.200 0.300 - - - 84.60 84.60% Satisfactory
Bendimil Construction and Development Corp. 6135 Impvt./Gravelling of Siocon-Sirawai
Road (Sirawai Side) 08/26/08 IX 47.894 300 O 0.158 0.225 0.000 0.030 0.033 0.067 51.30 -
Beny's Trading & Construction 8762
Conc. of Irawan-Tagburos Road, Km. 11+910 - Km. 13+120 (with
exception), Irawan-Ragburos Road06/05/09 IV-B 14.012 217 C 0.369 0.191 0.300 - - - 86.00 83.70%
Satisfactory
Beron DC Construction 33896 Completion/Const./Rehab. of MPB at Brgy. M. Roxas 09/02/10 CAR 1.909 60 C 0.474 0.186 0.300 - - - 96.00 96.00%
V. Satisfactory
Berson's Construction & Trading 31181
Rehab./Recosnt./Upgrading of Camiling-Wawa-Bayambang-Malasiqui-Sta. Barbara Road,
Km.172+729 - Km.176+165 with exceptions, Wawa & Buayaaen Sect.
04/08/11 I 19.295 150 O 0.337 0.300 0.150 0.030 0.028 0.033 87.80 -
Berson's Construction & Trading 31181
Rehab./Reconst./Upgrading of Damaged Road, Villasis-Malasiqui-San Carlos Road (Km. 182+422-Km.
199+527 w/ exception)
08/27/09 I 9.647 120 C 0.461 0.200 0.300 - - - 96.10 91.06% V. Satisfactory
Berson's Construction & Trading 31181
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Urdaneta Jct. - Dagupan Road, Km.197+881 - Km.198+448 with
exception
06/03/10 I 4.824 15 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory
Berson's Construction & Trading 31181 Rehab. of Agno River Control Dike at
Brgy. Zone I to IV & Poblacion 06/04/10 I 3.858 120 C 0.404 0.133 0.300 - - - 83.70 83.70% Satisfactory
Berson's Construction & Trading 31181 Widening & Dredging of Banaoang
Creek 08/31/10 I 9.648 168 C 0.337 0.200 0.300 - - - 83.70 83.70% Satisfactory
Berson's Construction & Trading 31181
Asphalt Overlay of Pangasinan-La Union Road Km. 381+300-Km.
302+50005/23/09 I 19.297 30 C 0.451 0.200 0.300 - - - 95.10 *95.10%
V.Satisfactory
Berson's Construction & Trading 31181 Const. of One (1) Classroom @ Sta.
Maria E/S 03/04/10 I 0.484 45 C 0.427 0.133 0.300 - - - 86.00 86.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page67
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Berson's Construction & Trading / Jasa Builders
(JV)JV-09-048 Const./Rehab. of Infanta Seawall 09/02/10 I 9.648 120 C 0.400 0.200 0.300 - - - 90.00 86.88%
Satisfactory
Besao Unltd Enterprises 33007 Construction of Shaded Walk from KA to HKA Bldg. 01/20-22/2010 UP - Baguio 0.209 60 C 0.411 0.133 0.300 - - - 84.40 84.40%
Satisfactory
Besao Unltd Enterprises 33007Construction of Proposed Studio at
the College of Arts and Communication
01/20-22/2010 UP - Baguio 0.247 30 C 0.462 0.200 0.300 - - - 96.20 96.20% Outstanding
Bestech Construction & Development &
Development Corporation
17725
Emergency Repair of Tigaon-Goa-San Jose Lagonoy via San Vicente
Rd. KO 498+500-KO 505+800 w/ exceptions
05/30/09 V 1.316 60 C 0.429 0.200 0.300 - - - 92.90 83.84% Satisfactory
Bestech Construction & Development Corporation
17725 Repair/Impv't. of Comun-Peñafrancia Road 03/29/11 V 5.430 120 C 0.346 0.200 0.300 - - - 84.60 83.88%
Satisfactory
Bestech Construction & Development Corporation
17725 Rehab. of Maharlika National Rd., Rizal Ave. 08/18/10 V 2.655 24 C 0.350 0.200 0.300 - - - 85.00 85.00%
Satisfactory
Bet Construction & Supply 31764 Const.of MPB, Brgy. Salaan 04/12/11 I 1.254 30 C 0.442 0.133 0.300 - - - 87.50 *87.50%
Satisfactory
Bet Construction & Supply 31764 Const. of MPB (Mangaldan Public
Market Vegetable Sect.) 08/28/09 I 2.894 103 C 0.366 0.200 0.300 - - - 86.60 84.78% Satisfactory
Bet Construction & Supply 31764 Asphalt Overlay along Pangasinan-
La Union Road 03/02/10 I 4.823 8 C 0.407 0.133 0.300 - - - 84.00 84.00% Satisfactory
Bet Construction & Supply 31764 Rehab. of Urdaneta Junction-
Lingayen Road, Perez Blvd Section 06/07/10 I 10.118 21 C 0.448 0.133 0.300 - - - 88.10 88.10% Satisfactory
Beta Construction 9829 Const. of MPB, Minalabac Central School 08/31/10 V 0.985 120 C 0.359 0.200 0.300 - - - 85.90 85.90%
Satisfactory
Beta Construction 9829 Road Concreting of Lidong-Hibago Road 03/12/09 V 2.837 75 C 0.443 0.200 0.300 - - - 94.30 *94.30%
V. Satisfactory
Better Work Construction 24432Restoration/Protection Works of
Scoured Abutment A of Glan Jumbo Bridge
09/16/09 XII 9.642 110 C 0.352 0.200 0.300 - - - 85.20 *85.20% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page68
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Better Work Construction 24432 Construction of School Building, Tantangan National High School 06/06/09 R-XII 0.476 63 C 0.456 0.200 0.300 - - - 95.60 *95.60%
V. Satisfactory
Bext Enterprises 30392 Conc. of Road, Tonton to Bliss 04/11/11 I 0.491 30 C 0.410 0.133 0.300 - - - 84.30 *84.30% Satisfactory
Bicol Goldrock Construction Corporation 32376
Repair./Rehab. of Slope Protection along Daang Maharlika, La Medalla-
San Nicolas Sect.06/02/10 V 0.943 60 C 0.447 0.133 0.300 - - - 88.00 88.00%
Satisfactory
Bicol Goldrock Construction Corporation 32376 Conc. of FMR at Brgy. GRS 08/30/10 V 2.822 120 C 0.420 0.200 0.300 - - - 92.00 92.00%
V. Satisfactory
Bicol Goldrock Construction Corporation 32376 Conc. of National Road, Bato-Baras
Section 03/04/09 V 4.787 241 C 0.442 0.200 0.300 - - - 94.20 88.68% Satisfactory
Bicol Goldrock Construction Corporation 32376 Concreting of San Lucas-Sabang
Road 03/02/10 V 4.774 150 C 0.426 0.133 0.300 - - - 85.90 85.90% Satisfactory
Bigfoot Construction and Supply 24769
Rehab./Recons./Upgrading of Damaged National Rds. HDM-4,
Dumaguete North Rd, San Jose Rd. Sect.
09/13/09 VII 7.667 100 C 0.436 0.133 0.300 - - - 86.90 *86.90% Satisfactory
Bigfoot Construction and Supply 24769 Impv't. of Water System 03/05/10 VII 6.427 190 C 0.489 0.067 0.300 - - - 85.60 83.86%
Satisfactory
Bigfoot Construction and Supply 24769 Const. of River Control Dike along
Siaton River, Barangay San Jose 09/08/10 VII 4.536 190 C 0.370 0.200 0.300 - - - 87.00 83.28% Satisfactory
Bigfoot Construction and Supply 24769 Const./Impvt. of Bulado Section
(DNR) 09/06/10 VII 9.112 124 C 0.448 0.133 0.000 - - - 58.10 69.80% Poor
Bigfoot Construction and Supply 24769 Impvt. of Water Works System, Brgy.
Milagrosa 05/30/09 VII 1.918 138 C 0.494 0.133 0.300 - - - 92.70 *92.70% V. Satisfactory
Bigfoot Construction and Supply 24769 Repair/Rehabilitation of Farm-to-
Market Road, Mayabon-Najandig 03/13/09 VII 0.889 40 C 0.500 0.133 0.300 - - - 93.30 *93.30%V. Satisfactory
Bigfoot Construction and Supply 24769
Road Upgrading (gravel to concrete) at Masulog (missing link) Section
(VLCR) (Sta. 171+541.00-Sta.172+208.10)
03/18/09 VII 7.920 157 C 0.415 0.130 0.300 - - - 84.50 *84.50%Satisfactory
Bill Hill Construction and Supply 10846 Conc. of Capalayan-Mapawa-Quezon
Road (Phase 38) 03/10/09 XIII 11.814 650 C 0.443 0.200 0.000 - - - 64.30 74.98% Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page69
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Billena Construction/D.M. House Construction, Inc.
(JV)JV-08-145 Conc. of Bantayan-San Pedro-Cubay
Road, San Jose and Sibalom 09/02/09 VI 27.016 360 O 0.356 0.239 0.150 0.015 0.025 0.033 81.80 -
Bilrey Construction 32877Construction of Livelihood,
Production & Training Center (Building)
12/14/10 NHA 5.468 90 C 0.497 0.200 0.300 - - - 99.65 98.97% Outstanding
Bilrey Construction 32877Construction of Livelihood,
Production & Training Center (Building)
09/29/10 NHA 4.990 90 O 0.391 0.300 0.150 0.030 0.065 0.050 98.67 -
Bilrey Construction 32877
Construction of Multi-Purpose Livehood Center, Health/Day Care Centers, Police Center & Materials
Recovery Facility
08/06/10 NHA 6.492 153 C 0.450 0.200 0.300 - - - 95.00 82.70% Satisfactory
BL Jadulco Construction & Supply 33684 Const. of Sto. Niño Seawall, Brgy.
Sto.Niño 06/02/10 VIII 0.482 90 C 0.367 0.200 0.300 - - - 86.70 86.70% Satisfactory
BL Jadulco Construction & Supply 33684 Const. of Dainage in the Municipality
of Naval 08/26/10 VIII 1.926 100 O 0.397 0.240 0.150 0.030 0.042 0.033 89.20 -
BLF Construction 15829Const. of Proposed CNM Laboratory
Bldg. Phase I at Bataan Peninsula State University
02/25/09 III 1.869 60 C 0.433 0.200 0.300 - - - 93.30 *93.30% V. Satisfactory
Blimex Construction and Supply 27259 Construction of MPB at Bai-
Saripinang 06/03/09 R-XII 0.479 84 C 0.406 0.200 0.300 - - - 90.60 *90.60% V. Satisfactory
Blue Eagle Construction 10915 San Roque Port Development Project (Construction of Fishport) 06/14/10 DOTC 1.919 30 C 0.411 0.200 0.300 - - 0.00 91.10 91.10
V.Satisfactory
Blue Eagle Construction Company 10915
Masbate Airport Dev't Project (Continuation of Concrete Paving of
Runway)03/10/09 DOTC 14.400 120 C 0.389 0.200 0.300 - - - 88.90 88.90%
V. Satisfactory
BMJ Construction 14571 Conc. of Ilagan-Delfin Albano-Mallig Road 04/04/11 II 35.251 204 C 0.290 0.133 0.300 - - - 72.30 79.92%
Unsatisfactory
BMJ Construction 14571 Rehab. of Daang Maharlika Road 09/04/09 II 19.135 209 C 0.418 0.200 0.300 - - - 91.80 86.34% Satisfactory
BMJ Construction 14571 Rehab./Improvement of Santiago-Tuguegarao Road 09/04/09 II 28.651 120 C 0.366 0.200 0.300 - - - 86.60 86.06%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page70
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
BMJ Construction 14571 Concrete Paving of Cabagan - Sta. Maria Road 09/04/09 II 19.132 209 C 0.428 0.200 0.300 - - - 92.80 83.26%
Satisfactory
BMJ Construction 14571 Conc. of Cabagan-Sta. Maria Road 08/21/10 II 4.319 90 C 0.422 0.133 0.300 - - - 85.50 87.36% Satisfactory
BMJ Construction 14571 Conc. of Old Cagayan Valley Road (CVR) 08/21/10 II 2.217 95 C 0.391 0.141 0.300 - - - 83.20 83.20%
Satisfactory
BMK Construction 8292 Const. San Angel Small Reservoir Irrigation Project (Canal Structures) 05/12-14/11 NIA 12.808 180 O 0.351 0.276 0.150 0.024 0.037 0.050 88.85 -
BMK Construction / E.T. Latawan Construction
(JV)JV-09-115 Road Upgrading of Dantay-Sagada
Road, Km.384+700 - Km.398+100 04/09/11 CAR 48.020 320 O 0.355 0.266 0.150 0.015 0.038 0.050 87.40 -
BMW AD Joint Venture JV-10-012Const. of the Unfinished Works in
the KAMANAVA Area Flood Control and Drainage System Impvt. Project
04/09/11 KAMANAVA 300.001 147 C 0.449 0.167 0.300 - - - 91.60 *91.60% V. Satisfactory
BMW AD Joint Venture JV-08-059
Remaining Works of KAMANAVA Area Flood Control and Drainage System Impvt. Project. (Longos
Creek Drainage Channel Impvt. & Drainage Facilities in Northern
Catmon)
04/09/11 KAMANAVA 498.159 205 C 0.463 0.138 0.300 - - - 90.10 *90.10% V. Satisfactory
BN Builders & Construction Supplies 28232 Completion of MPB (Covered Court),
Brgy. Bayanihan 04/12/11 XIII 1.480 45 C 0.436 0.133 0.300 - - - 86.90 *86.90% Satisfactory
BN Builders & Construction Supplies 28232 Conc. of Brgy. Road, Brgy. Cubi-
Cubi, Nasipit 03/29/11 XIII 1.929 120 C 0.321 0.200 0.300 - - - 82.10 82.88% Satisfactory
BN Builders & Construction Supplies 28232 Const. of MPB Nasipit Vocational
School 02/22/10 XIII 0.964 45 C 0.480 0.133 0.300 - - - 91.30 91.30% V.Satisfactory
BN Builders & Construction Supplies 28232
Conc. of Jct. J. Rosales Street Charville 2 (Charitoville), Brgy.
Imadejas06/16/10 XIII 0.846 45 C 0.440 0.200 0.300 - - - 94.00 94.00%
V. Satisfactory
BN Builders & Construction Supplies 28232 Road Conc. of Brgy. Bay-ang Road 06/01/10 XIII 1.431 90 C 0.406 0.200 0.300 - - - 90.60 90.60%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page71
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
BN Builders & Construction Supplies 28232 Const. of MPB Poblacion 2 08/24/10 XIII 0.964 60 C 0.480 0.133 0.300 - - - 91.30 91.30%
V. Satisfactory
BN Builders & Construction Supply 28232 Construction of Multi-Purpose
Building, (Covered Court) 03/18/09 XIII 2.243 120 C 0.435 0.200 0.300 - - - 93.50 *93.50% V. Satisfactory
BNG Construction and General Services 18503 Const. of Seawall, Brgy. Sabang III 04/08/11 XIII 1.796 120 O 0.371 0.261 0.150 0.030 0.051 0.050 91.30 -
BNG Construction and General Services 18503 Conc. of Road Brgy. Siana 04/06/11 XIII 0.930 119 C 0.306 0.200 0.300 - - - 80.60 82.88%
Satisfactory
BNG Construction and General Services 18503
Rd. Upgrading (Gravel to Concrete) Quezon-Capatayan-Espina-Navarro
Rd. Arellano District03/01/10 XIII 9.231 285 C 0.488 0.200 0.300 - - - 98.80 85.36%
Satisfactory
BNG Construction and General Services 18503 Const./Conc. of Municipal Rd. 09/03/09 XIII 0.960 181 C 0.426 0.150 0.300 - - - 87.60 *87.60%
Satisfactory
BNG Construction and General Services 18503
Rd. Upgrading (Gravel to Concrete), Quezon-Capalayan-Espina-Navarro
Rd., Arellano Dist.09/07/09 XIII 9.231 253 O 0.378 0.225 0.150 0.030 0.054 0.033 87.00 -
BNG Construction and General Services 18503 Const. of Brgy. Sayak-Domoyog-San
Fernando FTMR 09/03/09 XIII 0.950 264 C 0.392 0.150 0.300 - - - 84.20 *84.20% Satisfactory
BNR Construction & Development Corporation
12903 Repair/Rehab. of F. Cabahug to M. Logarta Rd. 04/10/11 VII 4.590 82 C 0.480 0.133 0.300 - - - 91.30 *91.30%
V. Satisfactory
BNR Construction & Development Corporation
12903 Widening of Cebu North Hagnaya Wharf Road, Mandaue Section 04/10/11 VII 17.027 215 C 0.437 0.133 0.300 - - - 87.00 87.18%
Satisfactory
BNR Construction & Development Corporation
12903 Construction of Bonbon-Sinsin Road 06/10/09 VII 10.782 120 C 0.465 0.015 0.300 - - - 78.00 *78.00% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page72
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
BNYU Enterprises and Construction 27725 Continuation of Const. of MPB (Loon
Public Market) 03/29/11 VII 1.835 180 C 0.459 0.153 0.300 - - - 91.20 *91.20% V. Satisfactory
BNYU Enterprises and Construction 27725
Conc. of Jct. (TNR) Cortes-Balilihan-Catigbian-Macaas Rd. (Sta.9+305 -
Sta.10+155.56)03/30/11 VII 13.970 180 C 0.404 0.200 0.300 - - - 90.40 86.32%
Satisfactory
BNYU Enterprises and Construction 27725 Const. of Multi-Purpose Building 09/02/09 VII 8.719 240 C 0.387 0.200 0.300 - - - 88.70 *88.70%
Satisfactory
BNYU Enterprises and Construction 27725 Improvement of Causeway,
Panggahan 09/01/09 VII 7.339 240 C 0.483 0.133 0.300 - - - 91.60 85.90% Satisfactory
BNYU Enterprises and Construction 27725 Const. of MPB at Dep-Ed Division of
Bohol 06/04/10 VII 4.645 180 C 0.406 0.133 0.300 - - - 83.90 90.34% V. Satisfactory
BNYU Enterprises and Construction 27725 Conc. of Causeway, Pangangan 06/04/10 VII 5.238 120 C 0.397 0.200 0.300 - - - 89.70 89.70%
V. Satisfactory
BNYU Enterprises and Construction 27725 Const. of MPB, Loon Public Market 08/24/10 VII 9.285 260 C 0.496 0.133 0.300 - - - 92.90 89.12%
V. Satisfactory
BNYU Enterprises and Construction 27725 Talibon Small Reservoir Irrigation
Project9/29/08 10/3/08 NIA 4.990 210 O 0.328 0.173 0.100 0.030 0.047 0.200 87.80 -
Bonicab Builders 28100 Construction of Two (2) Classrooms, Dardarat E/S 02/28/09 I 0.950 60 C 0.439 0.133 0.300 - - - 87.20 *87.20%
Satisfactory
Bonifacio M. Carlos Construction 3303
Conc. of Puerto Princesa South Road (PPSR) Junction Abo-Abo
Quezon Road03/29/11 IVB 16.026 195 C 0.408 0.200 0.300 - - - 90.80 93.74%
V. Satisfactory
Bonifacio M. Carlos Construction 3303 Conc. of Tapul-Bahile Road 03/31/11 IVB 19.054 281 C 0.474 0.133 0.300 - - - 90.70 90.46%
V. Satisfactory
Bonimar Construction Enterprises 23760 Upgrading & Construction of
Drainage of Lingayen Cadre Road 08/28/09 I 19.298 90 C 0.449 0.200 0.300 - - - 94.90 *94.90% V. Satisfactory
Bonimar Construction Enterprises 23760 Const. of MBP Bldg. 3 DOLE Bldg.
and other attached agencies 08/26/10 I 10.614 155 C 0.459 0.148 0.300 - - - 90.70 90.70% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page73
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Bonimar Construction Enterprises 23760
Rehab./Asphalt Overlay of Lingayen-Labrador Diversion Road, Km.
364+000-Km. 366+000 w/exception05/25/09 I 19.299 30 C 0.396 0.133 0.300 - - - 82.90 *82.90%
Satisfactory
Bonimar Construction Enterprises 23760 Concreting of Brgy. Burgos to
Demtal 03/09/09 I 1.929 45 C 0.424 0.186 0.300 - - - 91.00 *91.00%V. Satisfactory
Bontoc Builders 33306 Const. of DPWH-MPDEO Retaining Wall 04/10/11 CAR 2.886 186 C 0.467 0.200 0.300 - - - 96.70 82.48%
Satisfactory
Bontoc Builders 33306 Const. of Abatan Drainage (Part of Cluster 5) 08/28/09 CAR 0.864 60 C 0.455 0.133 0.300 - - - 88.80 91.26%
V. Satisfactory
Bontoc Bulders 33306 Rehab./Impvt. of DPWH Mt. Province DEO Building 08/26/10 CAR 2.694 130 C 0.393 0.151 0.300 - - - 84.40 84.40%
Satisfactory
Borderline Construction and Supply 24433 Concreting of Road at Brgy. Ulamian 02/26/10 XII 0.901 45 C 0.400 0.133 0.300 - - - 83.30 83.30%
Satisfactory
Borderline Construction and Supply 24433 Completion of Footbridge @ Brgy.
Cabpangi Road 06/03/10 XII 0.470 75 C 0.429 0.133 0.300 - - - 86.20 86.20% Satisfactory
Borderline Construction and Supply 24433
Completion of MPB at (Covered Court Add. 1 Span) Brgy. North
Manuangan06/02/10 XII 0.777 45 C 0.427 0.133 0.300 - - - 86.00 86.00%
Satisfactory
Borderline Construction and Supply 24433 Const. of MPB at Brgy. Sinawingan 08/27/10 XII 2.589 110 C 0.446 0.133 0.300 - - - 87.90 87.90%
Satisfactory
Borderline Construction and Supply 24433
Rehab./Reconst. of Damage Pavement along Banisilan-Guiling-
Alamada-Libungan Road, Poblacion Banisilan Section
08/26/10 XII 12.780 190 C 0.363 0.177 0.300 - - - 84.00 84.00% Satisfactory
Borderline Construction and Supply 24433 Concreting of Dualing-New Panay-
Midsayap Road, Sta. Cruz Section 03/04/09 XII 9.405 165 C 0.422 0.133 0.300 - - - 85.50 *85.50% Satisfactory
Borobudur Construction 21497 Conc. of Road, Brgy. Amparado 04/04/11 V 0.940 150 C 0.451 0.133 0.300 - - - 88.40 *88.40% Satisfactory
Bre Construction 32605 Const. of 1 CL School Building at Tenorio E/S 03/29/11 XII 0.504 54 C 0.431 0.132 0.300 - - - 86.30 *86.30%
Satisfactory
Brima Const. and Enterprises 8746
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Linamon-Zamboanga Road, Larapan Section Sta 1535+817
08/28/10 X 10.248 105 C 0.442 0.200 0.300 - - - 94.20 82.68% Satisfactory
Brima Construction and Enterprises 8746
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads along
Linamon-Zamboanga Road at Binuni Esperanza Sect., Sta.1551+000 -
Sta.1557+000
04/10/11 X 13.92 120 C 0.269 0.200 0.300 - - - 76.90 83.98% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page74
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Brima Construction and Enterprises 8746
Rehab./Reconst./Upgrading along Linamon-Zamboanga Road, Larapan Section, Sta.1535+817 - Sta.1540+771
06/07/10 X 10.248 105 O 0.225 0.240 0.150 0.030 0.055 0.050 75.00 -
Brostan Construction & Development 12360
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road, KO335+000 to KO336+500
04/10/11 II 16.120 150 C 0.476 0.133 0.300 - - - 90.90 *90.90% V. Satisfactory
Brostan Construction & Development 12360 Const. of Academic Building 2 Phase
II 05/10-11/11 DOST 13.912 150 C 0.427 0.200 0.300 - - - 92.67 90.87% V. Satisfactory
Brostan Construction & Development 12360 Const. of Academic Building 2 Phase
I 05/10-11/11 DOST 3.314 120 C 0.445 0.200 0.300 - - - 94.50 94.50% V. Satisfactory
Brostan Construction & Development 12360 Const. of School Canteen Phase II
(Building) 05/10-11/11 DOST 1.221 150 C 0.470 0.200 0.300 - - - 97.00 97.00% Outstanding
Brostan Construction & Development 12360 Const. of School Canteen Phase I
(Building) 05/10-11/11 DOST 0.460 120 C 0.470 0.200 0.300 - - - 97.00 97.00% Outstanding
Brostan Construction & Development 12360 Const. of Dormitory Building 2
Phase I 05/10-11/11 DOST 2.737 120 C 0.490 0.200 0.300 - - - 99.00 99.00% Outstanding
Brostan Construction & Development 12360 Const. of Dormitory Building I - Girls
Annex 05/10-11/11 DOST 8.291 150 C 0.479 0.200 0.300 - - - 97.90 96.48% Outstanding
Brostan Construction & Development 12360 Const. of Dormitory Building &
Phase II (Boys) 05/10-11/11 DOST 13.536 150 C 0.474 0.200 0.300 - - - 97.40 97.40% Outstanding
Brostan Construction & Development 12360 Concreting of Junction Ipil-Quirino
Boundary Road 08/27/09 II 8.581 100 C 0.419 0.200 0.300 - - - 91.90 93.28% V. Satisfactory
Brostan Construction & Development 12360
Rehab./Reconst./Upgrading of Naguilian-San Mariano Road Santa
Filomena Section08/25/09 II 19.292 120 C 0.448 0.133 0.300 - - - 88.10 90.08%
V. Satisfactory
Brostan Construction & Development 12360
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Rd. (Roxas
Sect.)05/31/10 II 19.290 228 C 0.453 0.133 0.300 - - - 88.60 91.24%
V. Satisfactory
Brostan Construction & Development 12360
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road, (Nueva
Era Sect.)08/24/10 II 8.055 135 C 0.467 0.142 0.300 - - - 90.90 90.90%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page75
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Brostan Construction & Development 12360
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road,
(Villanueva Section)08/24/10 II 9.634 150 C 0.462 0.143 0.300 - - - 90.50 90.50%
V. Satisfactory
Brostan Construction & Development 12360
Rehab./Impvt. of National Rd. along Lanao-Pagadian-Zamboanga City Rd.
Zamboanga Del Sur, (Intermittent Sect.) Km.1641+000 to Km.1656+000
w/ exception
06/09/10 IX 19.278 154 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
Brostan Construction & Development 12360
Rehab./Impvt. of National Roads along Wright-Taft Road Km.850+000 -
Km.852+000 (with exceptions)09/03/10 VIII 19.263 95 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
Brostan Construction & Development 12360
Rehab./Impvt. of National Roads along Wright-Taft Road Km.852+000 -
Km.854+000 (with exceptions)09/03/10 VIII 19.262 90 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
Brostan Construction & Development 12360 Construction of Fence, Road
Network, Cistern & line 06/01/10 DOST 7.054 187 C 0.458 0.20 0.30 - - - 95.80 96.26 Outstanding
Brostan Construction & Development 12360 Const. of MPB (Phase I), Cagayan
State University 11/14/08 II 9.640 300 O 0.316 0.240 0.100 0.030 0.037 0.100 82.30 -
Brostan Construction & Development 12360 Const. of Road, Graceville, Brgy.
Maulawin 09/01/09 IVA 0.573 30 C 0.329 0.145 0.300 - - - 77.40 *77.40% Unsatisfactory
Brostan Construction & Development 12360 Const. of MPB at Brgy. Primera Pulo 02/22/10 IVA 0.494 40 C 0.414 0.137 0.300 - - - 85.10 85.10%
Satisfactory
Brostan Construction & Development 12360 Construction of Public Market 02/22/10 IVA 0.494 78 C 0.408 0.133 0.300 - - - 84.10 84.10%
Satisfactory
Brostan Construction & Development 12360 Repair/Rehab. of Multi-Purpose
Building Brgy. Poblacion 02/22/10 IVA 0.995 65 C 0.396 0.133 0.300 - - - 82.90 82.90% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page76
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Brostan Construction & Development 12360 Addalam River Irrigation Project 04/27/09
05/01/09 NIA 9.225 235 O 0.351 0.300 0.077 0.023 0.038 0.033 82.27 -
Brostan Construction & Development 12360
Const. of Multi-Purpose Building (Phase I), Cagayan State University,
Carig05/19/09 II 9.640 368 C 0.493 0.133 0.300 - - - 92.60 83.57%
Satisfactory
Brostan Construction & Development 12360
Rehab./Reconst./Upgrading of Damaged National Roads along
Pagsanjan-Lucban Road05/30/09 IV-A 12.538 90 C 0.466 0.133 0.300 - - - 89.90 *89.90%
V. Satisfactory
Brostan Construction and Development 12360
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road (Roxas
Section)02/23/10 II 19.290 228 O 0.339 0.300 0.150 0.030 0.050 0.050 91.90 -
Bruno C. Bangao Construction / DJCM
Construction (JV)JV-08-298 Conc. along Apayao-Ilocos Norte
Road, Parina Section 04/01/11 CAR 18.971 436 C 0.403 0.133 0.300 - - - 83.60 84.29% Satisfactory
Bruno C. Bangao Construction / E.A.
Unabia Construction (JV)JV-09-125
Road Upgrading (Gravel to Concrete) along Abbut-Conner-Kabugao Road, Caglayan-Moyomoy-Ripang Section
04/02/11 CAR 22.976 405 O 0.383 0.236 0.150 0.030 0.032 0.033 86.40 -
Bruno C. Bangao Construction/E.A. Unabia
Construction (JV)JV-09-125
Road Upgrading (Gravel to Concrete) along Abbut-Conner Kabugao Rd.,
Caglayan-Moyomoy-Ripang Section08/20/10 CAR 22.975 360 O 0.331 0.238 0.150 0.030 0.040 0.033 82.20 -
Bruno C. Bangao Construction/E.A. Unabia
Construction JVJV-09-071 Conc. along Calanasan-Claveria
Road, Eva Section 05/27/10 CAR 19.022 471 O 0.305 0.300 0.150 0.024 0.030 0.033 84.20 -
Brylle Trading & Construction Supplies 32880 Construction of Drainage System
along Rizal St., Poblacion 08/28/09 I 0.578 30 C 0.481 0.200 0.300 - - - 98.10 90.66% V. Satisfactory
Brylle Trading & Construction Supplies 32880 Const. of Drainage System at Brgy.
Amancoro 03/02/10 I 0.482 30 C 0.257 0.200 0.300 - - - 75.70 75.70% Unsatisfactory
BSP & Company, Inc. / E. Gardiola
Const./Readycon Trading & Const. Corp. (JV)
JV-08-017Const. of Pres. Garcia Ave. Ext. (C-5)
Fly-Over, Crossing Sucat Road, SLEX to Sucat Road
10/22/09 NCR 192.873 330 C 0.425 0.200 0.300 - - - 92.50 *92.50% V. Satisfactory
BSP & Company, Inc. / E. Gardiola
Const./Readycon Trading & Const. Corp. (JV)
JV-08-084 Const. of Circ. Road (C-5) Ext. Project, (Sucat Road to SLEX) 10/22/09 NCR 380.589 482 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page77
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Busilac Builders Incorporated 7701
Rehab./Reconst. of Damaged National Roads, Ilocos Norte-
Apayao Road06/02/10 I 24.758 198 C 0.462 0.133 0.300 - - - 89.50 87.28%
Satisfactory
Busilac Builders Incorporated 7701 Rehab. of Guerrero Flood Control 08/20/10 I 4.821 60 C 0.429 0.133 0.300 - - - 86.20 86.20%
Satisfactory
Busilac Builders, Incorporated 7701
Rehab./Reconst./Upgrading of Damaged National Road, Ilocos
Norte-Apayao Road09/09/09 I 24.758 206 O 0.295 0.300 0.150 0.030 0.050 0.033 85.80 -
Busilac Builders, Incorporated 7701 Improvement of Batac-Pinili Road
with exception, Batac Section 09/09/09 I 21.291 331 C 0.411 0.200 0.300 - - - 91.10 84.38% Satisfactory
Busilac Builders, Incorporated 7701 Rehab./Reconst./Upgrading of
Manila North Road, Nagsurot 09/11/09 I 14.462 150 C 0.346 0.190 0.300 - - - 83.60 *83.60% Satisfactory
C & F Construction & Development Corporation
3509Repair/Rehab. of Gapan-San
Fernando-Olongapo Rd. Km.118+250 - Km.118+735 w/ exception
05/10/10 III 9.839 45 C 0.483 0.133 0.300 - - - 91.60 91.60% V. Satisfactory
C & F Construction & Development Corporation
3509 Repair/Rehab./Asphalt Overlay of Roman Expressway (Phase XXIII) 05/26/10 III 9.945 60 C 0.461 0.133 0.300 - - - 89.40 89.40%
V. Satisfactory
C & F Construction & Development Corporation
3509 Rehab./Impvt. of Paradise Farm, FMR, Tungkong Mangga, Phase I 09/07/09 III 9.528 150 C 0.439 0.133 0.300 - - - 87.20 83.30%
Satisfactory
C A Miguel Construction Incorporated (Formerly:
C.A. Miguel Construction)
10221 Widening/Concrete Blocking of North Avenue 06/01/09 NCR 4.797 90 C 0.438 0.200 0.300 - - - 93.80 *93.80%
V. Satisfactory
C D U Construction 13915Rehab./Reconst./Upgrading of Allen Old Road, Km.697+147 - Km.700+679
with exceptions03/31/11 VIII 12.917 135 C 0.411 0.133 0.300 - - - 84.40 85.84%
Satisfactory
C D U Construction 13915Conc. of Laoang-Lapinig-Arteche-
San Policarpio Road, Mapanas-Manaybanay Sect. w/ exception
04/01/11 VIII 18.820 200 C 0.393 0.133 0.300 - - - 82.60 85.60% Satisfactory
C D U Construction 13915Rehab./Reconst./Upgrading of
Damaged Road along Poblacion Allen-Cabacungan National Road
03/31/11 VIII 9.537 155 C 0.445 0.133 0.000 - - - 57.80 76.16% Unsatisfactory
C D U Construction 13915 Upgrading of Poblacion Allen-Brgy. Cabacungan National Road 03/31/11 VIII 19.277 148 C 0.433 0.133 0.000 - - - 56.60 74.30%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page78
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C D U Construction 13915 Const./Impvt. of Talisay Bridge (Phase I), Brgy. Talisay 03/06/10 VIII 2.398 180 C 0.500 0.133 0.300 - - - 93.30 93.30%
V. Satisfactory
C D U Construction 13915 Const. of Shoreline Protection Brgy. Tomaligues 03/03/10 VIII 0.963 60 C 0.357 0.200 0.300 - - - 85.70 85.70%
Satisfactory
C D U Construction 13915 Upgrading of Allen-Cabacungan National Road 03/05/10 VIII 19.231 180 C 0.330 0.193 0.300 - - - 82.30 83.05%
Satisfactory
C D U Construction 13915Const. of One (1) Classroom School
Building Gadgaran Elementary School
03/03/10 VIII 0.544 60 C 0.392 0.133 0.300 - - - 82.50 82.50% Satisfactory
C D U Construction 13915 Road Opening/Const. of Nijaga Sect. along Calbayog Diversion Rd. 06/12/10 VIII 19.295 150 O 0.353 0.238 0.150 0.030 0.037 0.033 84.10 -
C D U Construction 13915 Rehab./Reconst./Upgrading of Catarman-Calbayog Rd., 06/14/10 VIII 19.275 130 O 0.325 0.240 0.150 0.030 0.042 0.050 83.70 -
C D U Construction 13915 Conc. of Palapag-Simora Road, Jangtud-Lanobe Section 08/24/10 VIII 18.808 200 C 0.407 0.200 0.300 - - - 90.70 90.70%
V. Satisfactory
C D U Construction 13915 Conc. of Palapag-Simora Road, Magsaysay-Jangtud Section 08/24/10 VIII 18.815 200 C 0.387 0.200 0.300 - - - 88.70 88.70%
Satisfactory
C D U Construction 13915 Conc. of Palapag-Simora Road, Lanobe-Rombang Section 08/24/10 VIII 18.793 200 C 0.386 0.200 0.300 - - - 88.60 88.60%
Satisfactory
C D U Construction 13915Conc. of Laoang-Lapinig-Arteche-
San Policarpio Road Mapanas-Manaybanay Section, with exception
08/25/10 VIII 18.820 200 O 0.321 0.300 0.150 0.030 0.025 0.050 87.60 -
C D U Construction 13915 Rehab./Reconst./Upgrading of Catarman-Calbayog Road 08/27/10 VIII 19.276 130 C 0.405 0.200 0.300 - - - 90.50 86.42%
Satisfactory
C D U Construction 13915Road Opening/Const. of Nijaga
Section along Calbayog Diversion Road
09/01/10 VIII 19.295 150 C 0.386 0.200 0.300 - - - 88.60 85.90% Satisfactory
C D U Construction 13915Road Opening/Const. of Dagum
Section along Calbayog Diversion Road
09/01/10 VIII 19.295 150 C 0.396 0.133 0.300 - - - 82.90 82.78% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page79
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C D U Construction 13915Road Opening/Const. of Pagbalican Section along Calbayog Diversion
Road09/01/10 VIII 19.295 150 C 0.414 0.133 0.300 - - - 84.70 82.66%
Satisfactory
C D U Construction 13915Rehab./Reconst./Upgrading of
Damaged Paved National Roads, along Catarman-Calbayog Road
05/27/09 VIII 19.010 210 C 0.395 0.133 0.300 - - - 82.80 *82.80% Satisfactory
C D U Construction 13915 Conc. of Laoang-Calomotan Road 11/29/08 VIII 19.065 180 O 0.358 0.240 0.100 0.015 0.025 0.100 83.80 -
C D U Construction 13915 Const. of 1 CL Sch. Bldg. @ Brgy. Bansud 03/10/09 VIII 0.454 60 C 0.372 0.200 0.300 - - - 87.20 *87.20%
Satisfactory
C D U Construction 13915 Const. of MPB @ Brgy. Carayman 03/10/09 VIII 0.963 90 C 0.429 0.200 0.300 - - - 92.90 *92.90% V. Satisfactory
C D U Construction 13915Const./Rehab./Replacement/Completion and Repair of Elem. & Secondary
Sch. Bldg., Bliss Primary School03/10/09 VIII 0.433 60 C 0.379 0.200 0.300 - - - 87.90 *87.90%
Satisfactory
C D U Construction 13915
Road Upgrading (Gravel to Paved) Pangpang-Palapag-Mapanas-Gamay-
Lapinig Road, Pangpang-Tinampo Section
09/12/09 VIII 18.900 200 C 0.425 0.144 0.300 - - - 86.90 87.02% Satisfactory
C D U Construction 13915 Upgrading of Allen-Frederick National Road 09/14/09 VIII 8.652 120 O 0.337 0.240 0.150 0.030 0.050 0.050 85.70 -
C D U Construction 13915 Conc. of Laoang-Lapinig-Arteche (SONA), Laoang-Binaticlan Sect. 09/12/09 VIII 18.756 200 O 0.331 0.240 0.150 0.030 0.050 0.050 85.10 -
C D U Construction 13915 Upgrading of Allen-Cabacungan National Road 09/14/09 VIII 19.231 150 O 0.334 0.240 0.150 0.015 0.050 0.050 83.90 -
C D U Construction 13915 Conc. of Laoang-Lapinig-Arteche (SONA), Magsaysay-Calomotan Sect. 09/12/09 VIII 18.788 200 C 0.395 0.144 0.300 - - - 83.90 *83.90%
Satisfactory
C E K Construction and Water Supply 13713
Const. of 2-CL School Building, Cebuano National High School,
Brgy. Cebuano09/15/09 XII 1.144 60 C 0.466 0.133 0.300 - - - 89.90 *89.90%
V. Satisfactory
C E K Construction and Water Supply 13713 Const. of Multi-Purpose Building @
Aplaya (Madrasha) 02/25/10 XI 0.494 45 C 0.427 0.133 0.300 - - - 86.00 86.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page80
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C E K Construction and Water Supply 13713 Const. of MPB 06/17/10 XII 2.832 133 C 0.383 0.133 0.300 - - - 81.60 84.68%
Satisfactory
C E K Construction and Water Supply 13713 Construction of Hanging Bridge at
Brgy. Midtungok 06/03/09 R-XII 0.481 65 C 0.323 0.200 0.300 - - - 82.30 *82.30% Satisfactory
C E K Construction and Water Supply 13713 Construction of Multi-Purpose
Building, Brgy. Sinawilan 05/29/09 XI 2.191 125 C 0.455 0.200 0.300 - - - 95.50 90.46% V. Satisfactory
C E K Construction and Water Supply 13713 Const. of MPB @ Brgy. Lamlahak 03/15/09 XII 0.667 70 C 0.478 0.200 0.300 - - - 97.80 82.68%
Satisfactory
C G G A Builders & Enterprises 23762
Rehab./Impvt. of National Roads in Eastern Samar, Borongan-Guiuan
Rd., Brgy. Casili-on - Mercedes Sect. (Asphalt Patching) Km.1020+000 -
Km.1040+000 w/ exceptions
06/10/10 VIII 9.580 60 C 0.475 0.133 0.300 - - - 90.80 90.80% V. Satisfactory
C G G A Builders & Enterprises 23762 Const. of MPB (Phase I) Brgy. Imelda 06/06/10 VIII 0.475 80 C 0.350 0.200 0.300 - - - 85.00 85.00%
Satisfactory
C G G A Builders & Enterprises 23762 Const. of MPB (Phase I) Brgy. Doos
Del Norte 06/06/10 VIII 0.473 80 C 0.341 0.200 0.300 - - - 84.10 84.10% Satisfactory
C L Carandang Enterprises 29494 Rehab./Reconst. of Damaged
Masbate Port National Road 05/25/09 V 7.715 150 O 0.317 0.300 0.150 0.023 0.040 0.033 86.30 -
C L Carandang Enterprises 29494 Rehab./Impvt. of DPWH Bldg.,
Masbate 1st DEO 05/25/09 V 1.926 80 O 0.331 0.240 0.150 0.030 0.040 0.033 82.40 -
C L Carandang Enterprises 29494
Repair/Impv't. of Tabuc Brgy. Hall (Phase I) (Const. of MPB Hall at Brgy.
Tabuc)08/20/10 V 0.289 45 C 0.474 0.133 0.300 - - - 90.70 90.70%
V. Satisfactory
C L Carandang Enterprises 29494 Const. of Reyes MPB Hall (Phase I) 08/20/10 V 1.926 148 C 0.417 0.179 0.300 - - - 89.60 89.60%
V. Satisfactory
C L Carandang Enterprises 29494 Impv't. of Cavañez-Nasanding Brgy.
Rd. 08/24/10 V 4.725 149 C 0.467 0.200 0.300 - - - 96.70 88.66% Satisfactory
C L Carandang Enterprises 29494 Rehab./Repair/Impv't. of Public
Market (Phase I) 08/20/10 V 2.894 150 C 0.414 0.169 0.300 - - - 88.30 88.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page81
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C L Carandang Enterprises 29494 Road Upgrading of San Fernando-
Talisay Rd. 08/24/10 V 11.001 190 O 0.313 0.300 0.150 0.020 0.025 0.033 84.10 -
C L Carandang Enterprises 29494 Rehab./Impvt. of Masbate
Circumferential Road 02/18/10 V 32.805 264 C 0.408 0.133 0.300 - - - 84.10 87.64% Satisfactory
C L Carandang Enterprises 29494 Rehab./Reconst. of Damaged
Masbate Port National Road 02/18/10 V 7.715 208 C 0.327 0.197 0.300 - - - 82.40 85.25% Satisfactory
C L Carandang Enterprises / Lim General Contractor Corporation
(JV)
JV-09-089 Conc. Of Jct. Paguiran-Brgy. Paguiran rd. 08/21/10 V 72.357 378 O 0.330 0.241 0.150 0.022 0.033 0.033 80.90 -
C L V Enterprises 18512 Const. of Multi-Purpose Building, Cawayan 05/27/09 X 0.939 119 O 0.300 0.300 0.150 0.020 0.025 0.033 82.80 -
C L V Enterprises 18512 Const. of Multi-Purpose Building, Bukidnon State University 09/02/09 X 3.372 150 O 0.388 0.240 0.150 0.030 0.047 0.033 88.80 -
C N E Construction 22148 Const. of MPB, Candahug 09/07/10 VIII 1.444 90 C 0.485 0.133 0.300 - - - 91.80 91.80% V. Satisfactory
C&F Construction & Development Corporation
3509 Impvt./Rehab. of MPB Brgy. Sta. Cruz 03/01/10 NCR 3.372 120 C 0.484 0.133 0.300 - - - 91.70 87.99%
Satisfactory
C&F Construction and Dev't Corporation 3509 Plaridel Airport Development Project 09/25/09 DOTC 4.800 45 C 0.450 0.200 0.300 - - - 95.00 95.00%
V. Satisfactory
C. Brotonel Construction 9727Completion of the Const. of Taal Lake Circ. Road (Talisay-Laurel-
Agoncillo Section)03/09/09 IV-A 9.643 145 C 0.465 0.133 0.300 - - - 89.80 88.18%
Satisfactory
C. Brotonel Construction 9727 Riprapping of Tumaway-Quiling Creek, Brgy. Tumaway 03/10/09 IV-A 0.481 45 C 0.450 0.200 0.300 - - - 95.00 *95.00%
V. Satisfactory
C. Dy Builders and General Merchandise 17003 Conc./Repair of Roads Brgy.
Macabalan 09/01/10 X 1.861 120 C 0.438 0.200 0.300 - - - 93.80 93.80% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page82
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C. Dy Builders and General Merchandise
(Formerly: CD Construction)
17003 Const. of a Classroom Building, Macabalan Elem. School 03/28/11 X 0.968 120 C 0.491 0.133 0.300 - - - 92.40 *92.40%
V. Satisfactory
C. Dy Builders and General Merchandise
(Formerly: CD Construction)
17003 Conc./Repair of Road Brgy. Lapasan 03/29/11 X 4.723 150 C 0.372 0.200 0.300 - - - 87.20 *87.20% Satisfactory
C. Dy Builders and General Merchandise
(Formerly: CD Construction)
17003 Partial Const. of 2-Storey, 4-CL Agusan NHS-Puerto Annex 04/13/11 X 3.731 110 C 0.392 0.133 0.000 - - - 52.50 *52.50%
Poor
C. Dy Builders and General Merchandise
(Formerly: CD Construction)
17003 Conc./Repair of Roads at Barangay Puntod 06/11/10 X 1.868 100 C 0.440 0.191 0.300 - - - 93.10 93.10%
V. Satisfactory
C. Dy Builders and General Merchandise
(Formerly: CD Construction)
17003 Const. of 10 units CL, Mancahan NHS 03/02/09 X 4.668 120 C 0.418 0.058 0.300 - - - 77.60 82.15%
Satisfactory
C. Dy Builders and General Merchandise
(Formerly: CD Construction)
17003 Conc. of Road, Brgy. Nazareth 02/22/10 X 2.777 90 C 0.427 0.133 0.300 - - - 86.00 86.00% Satisfactory
C.A Betalac Construction & Gen. Mdse. 28222 Repair/Rehab. of MPB @ DPWH 09/08/09 XII 0.964 64 C 0.408 0.200 0.300 - - - 90.80 *90.80%
V. Satifactory
C.A Betalac Construction & Gen. Mdse. 28222 Road Conc. of San Agustin towards
Purok Katipunan, Brgy. Calean 06/08/10 XII 5.766 130 C 0.437 0.133 0.300 - - - 87.00 87.00% Satisfactory
C.A Betalac Construction & Gen. Mdse. 28222
Conc. of Brgy. New Isabela, Tacurong City to Brgy. Calean (Tacurong Bus Terminal to Exit
Road)
06/08/10 XII 3.850 100 C 0.411 0.133 0.300 - - - 84.40 84.40% Satisfactory
C.A Betalac Construction & Gen. Mdse. 28222 Conc. of Purok Saranay, Brgy. San
Pablo 09/01/10 XII 0.963 120 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory
C.A Betalac Construction & Gen. Mdse. 28222
Rd. Conc. @ Purok San Agustin Towards Purok Katipunan, Brgy.
Calean09/01/10 XII 3.855 120 C 0.408 0.133 0.300 - - - 84.10 84.10%
Satisfactory
C.A Betalac Construction & Gen. Mdse. 28222 Construction of Roads at Brgy. San
Agustin, Calean 03/12/09 XII 0.962 65 C 0.401 0.200 0.300 - - - 90.10 *90.10% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page83
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C.A. Betalac Construction & Gen.
Mdse.28222
Const. of MPB IBP-Sarangani Legal Aid Bldg. Provincial Capitol Grounds
of Sarangani04/11/11 XII 0.988 236 C 0.440 0.139 0.300 - - - 87.90 84.40%
Satisfactory
C.B Garay Philwide Builders 6004 Construction of 1 Unit 3-Storey, 15-
Classroom School Building 01/18/10 NHA 18.115 150 O 0.3596 0.2756 0.00 0.0150 0.0255 0.0167 69.24 -
C.B Garay Philwide Builders 6004 Rehab./Impvt. of Masbate City Multi-
Purpose Building and Social Center 02/18/10 V 3.083 247 C 0.471 0.133 0.300 - - - 90.40 89.28% V. Satisfactory
C.B Garay Philwide Builders 6004
Construction of 3-Storey, 15-Classroom School Building,
Northville 16, Brgy. Atlu-bola, Mabalacat, Pampanga
01/12/11 NHA 21.244 454 C 0.4902 0.2000 0.3000 - - - 99.02 78.84% Unsatisfactory
C.B Tampengco Construction & Supply 18505 Const. of Multi-Purpose Pavement,
MPTC 03/01/10 III 1.872 30 C 0.467 0.176 0.300 - - - 94.30 94.30% V. Satisfactory
C.B Tampengco Construction & Supply 18505 Impv't. of Multi-Purpose Gym (Phase
IV) 08/23/10 III 2.364 60 C 0.450 0.152 0.300 - - - 90.20 90.20% V. Satisfactory
C.B Tampengco Construction & Supply 18505 Const. of 4-CL, San Andres H/S
Annex, Pacac 08/23/10 III 2.019 120 C 0.463 0.133 0.300 - - - 89.60 89.60% V. Satisfactory
C.B Tampengco Construction & Supply 18505 Continuation of Drainage
Canal/Sidewalk, Poblacion 08/23/10 III 3.461 60 C 0.361 0.200 0.300 - - - 86.10 86.10% Satisfactory
C.B Tampengco Construction & Supply 18505 Const. of Velasquez Health Center
Nepomuceno Cor. F. Varona St., 02/27/09 NCR 2.880 178 C 0.423 0.200 0.300 - - - 92.30 *92.30% V.Satisfactory
C.B Tampengco Construction & Supply 18505 Upgrading/Conc. of Roads with
Drainage Improvement 03/04/09 NCR 0.476 45 C 0.336 0.200 0.300 - - - 83.60 *83.60% Satisfactory
C.B Tampengco Construction & Supply 18505 Conct./Rehab./Impvt. of T. Paez High
School 09/08/09 NCR 1.913 90 C 0.419 0.133 0.300 - - - 85.20 *85.20% Satisfactory
C.B Tampengco Construction & Supply 18505 Completion of School Bldg., Tampo
E/S Main, Brgy. Tampo 09/03/09 NCR 1.904 60 O 0.328 0.225 0.150 0.030 0.041 0.033 80.70 -
C.B Tampengco Construction & Supply 18505 Repair/Rehab. of Amadeo V.
Hernandez E/S 02/22/10 NCR 1.691 60 C 0.487 0.133 0.300 - - - 92.00 92.00% V.Satisfactory
C.B Tampengco Construction & Supply 18505
Const./Rehab./Completion and Repair of School Bldg. at Silvestre Lazaro Elem. School, Brgy. Ugong
03/02/10 NCR 4.178 120 C 0.486 0.133 0.300 - - - 91.90 91.90% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page84
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C.B Tampengco Construction & Supply 18505 Const./Completion of School
Building, West Crame H/S 05/26/10 NCR 4.804 90 C 0.480 0.200 0.300 - - - 98.00 98.00% Outstanding
C.B Tampengco Construction & Supply 18505 Completion of Fisherman's Wharf
Road. Brgy. La Huerta 06/07/10 NCR 0.953 75 C 0.428 0.200 0.300 - - - 92.80 92.80% V. Satisfactory
C.B. Tampengco Construction & Supply 18505
Rehab./Reconst./Upgrading of Nicanor Reyes St. (Recto to Espana
Blvd.)04/05/11 NCR 9.619 110 C 0.454 0.200 0.300 - - - 95.40 *95.40%
V. Satisfactory
C.B. Tampengco Construction & Supply 18505 Conc. of Roads, Brgy. Tugatog 03/30/11 NCR 1.403 45 C 0.493 0.133 0.300 - - - 92.60 *92.60%
V. Satisfactory
C.B. Tampengco Construction & Supply 18505 Conc. of Roads, Barangay Tonsuya 03/30/11 NCR 0.965 60 C 0.471 0.133 0.300 - - - 90.40 *90.40%
V. Satisfactory
C.B. Tampengco Construction & Supply 18505
Repair/Rehab. of Intermediate Bldg. Of A. Maceda Integrated (Elem.)
School, Altura-Buenos Aires04/04/11 NCR 1.686 96 C 0.449 0.111 0.300 - - - 86.00 *86.00%
Satisfactory
C.B. Tampengco Construction & Supply / Triple 8 Construction & Supply Joint Venture
JV-09-148 Impvt. of Baybay Sapa Creek, Brgy. Mayamot 04/15/11 IVA 28.805 210 C 0.379 0.200 0.300 - - - 87.90 88.98%
Satisfactory
C.C.M Construction 11043Rehab. and Impvt. of Tajang
Causeway leading to Sandingan Island
02/23/10 VII 9.191 233 C 0.437 0.133 0.300 - - - 87.00 87.00% Satisfactory
C.C.M Construction 11043Widening/Concrete Paving of Jct. (TER) Dauis-Panglao Road, Sta.
11+184-Sta. 12+71008/25/10 VII 18.790 150 C 0.321 0.200 0.300 - - - 82.10 82.10%
Satisfactory
C.C.M Construction 11043 Const./Repair/Rehab. of Roads and Bridges 06/08/09 VII 0.367 169 C 0.460 0.200 0.300 - - - 96.00 *96.00%
V. Satisfactory
C.C.M Construction 11043 Concreting & Const. of Farm to Market Roads, Guiwanon 06/08/09 VII 0.183 120 C 0.496 0.135 0.300 - - - 93.10 *93.10%
V. Satisfactory
C.C.M Construction 11043 Concreting & Const of Farm-to-Market Road, San Isidro 06/08/09 VII 0.183 120 C 0.490 0.135 0.300 - - - 92.50 *92.50%
V. Satisfactory
C.C.M Construction 11043 Impvt./Concrete Paving, Panglao Airport Road 06/08/09 VII 2.785 70 C 0.472 0.142 0.300 - - - 91.40 *91.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page85
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C.C.M Construction 11043 Conc. of Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) Road 03/03/09 VII 13.714 238 C 0.415 0.200 0.300 - - - 91.50 87.93%
Satisfactory
C.C.M Construction 11043 Concreting of Multi-Purpose Pavement 03/04/09 VII 0.137 130 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
C.C.M Construction 11043 Const. of Brgy. Lumangog Road 03/05/09 VII 2.806 188 C 0.466 0.200 0.300 - - - 96.60 85.20%Satisfactory
C.C.M. Construction/IBC International Builders
Corporation (JV) JV-08-242
Impvt./Widening of Causeway. Sitio Ubos, Tagbilaran City-Totulan, Dauis Road including Ambassador Suarez
Bridge, Sta. 0+080-Sta. 0-920
02/24/10 VII 55.915 270 C 0.471 0.130 0.300 - - - 90.10 88.18% Satisfactory
C.D Valbuena Construction 26794 Const. of Multi-Purpose Building at
Brgy. Concepcion I, 02/17/10 IVA 1.249 30 C 0.439 0.200 0.300 - - - 93.90 93.90% V. Satisfactory
C.D.J. Builders & Const. Supplies / T. Solomon
Const. (JV)JV-09-094
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road,
KO330+000 - KO331+50004/11/11 II 19.290 149 C 0.417 0.133 0.000 - - - 55.00 69.79%
Poor
C.D.J. Builders & Const. Supplies / T. Solomon
Const. (JV)JV-09-094
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road,
KO332+000 - KO333+35004/11/11 II 17.123 149 C 0.448 0.133 0.000 - - - 58.10 66.08%
Poor
C.D.J. Builders & Construction Supplies 30347
Road Upgrading Papaya-Malabing Wangal-Binogawan-Tadji-Runruno
Road (Runruno Section)09/03/10 II 8.292 90 C 0.416 0.200 0.300 - - - 91.60 91.60%
V. Satisfactory
C.F Trinidad Construction 9199 Widening of Taytay Diversion Road
(Phase I) 08/26/09 IVA 9.611 150 C 0.435 0.200 0.300 - - - 93.50 88.82% Satisfactory
C.F Trinidad Construction 9199 Riprapping of Creek @ Robinson 02/15/10 IVA 1.925 120 C 0.449 0.200 0.300 - - - 94.90 94.90%
V. Satisfactory
C.F Trinidad Construction 9199 Conc. of BCI Compound, Brgy. Dalig 02/15/10 IVA 0.961 120 C 0.446 0.200 0.300 - - - 94.60 94.60%
V. Satisfactory
C.F Trinidad Construction 9199
Impvt./Widening of Cabrera-Kaytickling-Antipolo Road, Taytay
Section08/19/10 IVA 9.600 180 C 0.402 0.200 0.300 - - - 90.20 90.20%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page86
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C.F Trinidad Construction 9199 Riprapping of Creek, Peñafrancia 05/18/09 IV-A 1.437 120 C 0.464 0.133 0.300 - - - 89.70 92.22%
V. Satisfactory
C.F. Trinidad Construction 9199 Impvt./Widening of Taytay Diversion
Road 04/15/11 IVA 28.884 200 C 0.336 0.200 0.300 - - - 83.60 90.86% V. Satisfactory
C.L Carandang Enterprises 29494 Conc. of Sitio Calumpang Road 02/27/09 V 0.956 120 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
C.L Carandang Enterprises 29494 Concreting of Barangay Kalipay
Road 02/27/09 V 0.956 120 C 0.471 0.133 0.300 - - - 90.40 *90.40% V. Satisfactory
C.L Carandang Enterprises 29494 Rehab./Reconst. of Masbate
Circumferential Road 08/26/09 V 32.805 210 O 0.371 0.279 0.150 0.030 0.037 0.033 90.00 -
C.L Carandang Enterprises 29494 Rehab./Reconst. of Damaged
Masbate Port National Road 08/26/09 V 7.715 180 O 0.320 0.300 0.150 0.030 0.047 0.033 88.00 -
C.L Carandang Enterprises 29494 Rehab./Impvt. of DPWH Bldg.
Masbate 1st DEO 08/26/09 V 1.926 72 C 0.462 0.157 0.300 - - - 91.90 85.25% Satisfactory
C.L Carandang Enterprises 29494 Const. of Multi-Purpose Pavement at
District III 08/26/09 V 0.661 60 C 0.415 0.133 0.300 - - - 84.80 *84.80% Satisfactory
C.L Carandang Enterprises 29494 Impvt. of Canvanez-Nasandig Brgy.
Road 09/26/09 V 4.725 120 O 0.293 0.300 0.150 0.030 0.033 0.033 83.90 -
C.L. Carandang Enterprises / Lim General
Contractor (JV)JV-09-069 Conc. of Jct. Panguiranan-Brgy.
Panguiranan Road 04/03/11 V 72.357 379 C 0.347 0.200 0.300 - - - 84.70 82.42% Satisfactory
C.M Dancel Construction & Supply 12640 Rehab./Reconst./Upgrading of
Bonifacio Road 09/10/09 I 10.260 130 C 0.369 0.200 0.300 - - - 86.90 85.22% Satisfactory
C.M Dancel Construction & Supply 12640 Asphalt Overlay along Laoag-Sarrat-
Piddig-Solsona Road 02/24/10 I 13.678 90 O 0.300 0.300 0.150 0.030 0.055 0.033 86.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page87
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C.M Dancel Construction & Supply 12640
Repair and Maintenance along Manila North Road, Package I-
Asphalt Overlay at Laoag-Sarrat-Piddig Road
05/31/10 I 13.678 90 C 0.480 0.133 0.300 - - - 91.30 88.60% Satisfactory
C.M Dancel Construction & Supply 12640
Rehab./Reconst./Upgrading of Damaged Paved National Road,
Bonifacio Road06/05/09 I 10.260 130 O 0.358 0.225 0.150 0.030 0.045 0.033 35.80 -
C.M. Pancho Construction Incorporated
183 Rehab. of Surigao-Davao Coastal Road, Jct. Bacuag-Claver Section 11/23/08 XIII 661.069 540 O 0.338 0.300 0.070 0.030 0.070 0.100 90.80 -
C.R Domingo Construction, Inc.
(Formerly C.R. Domingo Contruction)
2992 Concreting of Potia, A Lista, Ifugao-Mt. Province Boundary Road 03/06/09 CAR 19.123 140 C 0.461 0.200 0.300 - - - 96.10 *96.10%
Outstanding
C.R. Domingo Construction, Inc. 2992 Const. (Continuation) of Majlong
FMR 04/06/11 CAR 0.953 89 C 0.426 0.161 0.300 - - - 88.70 *88.70% Satisfactory
C.R. Domingo Construction, Inc.
(Formerly: C.R. Domingo Construction)
2992Rehab./Reconst./Upgrading of Daang Maharlika, KO314+000 -
KO315+50004/10/11 II 19.289 149 C 0.221 0.200 0.000 - - - 42.10 59.38%
Poor
C.R. Domingo Construction, Inc.
(Formerly: C.R. Domingo Construction)
2992Rehab./Reconst./Upgrading of Daang Maharlika, KO321+000 -
KO322+00004/10/11 II 13.502 149 C 0.165 0.200 0.000 - - - 36.50 57.02%
Poor
C.S Garcia Construction 1901 Road Repair/Rehabilitation of Cadena de Amor St. 03/05/09 III 0.477 10 C 0.437 0.200 0.300 - - - 93.70 93.70%
V.Satisfactory
C.S Garcia Construction 1901 Rehabilitation of Tipas-Napindan Road 05/29/09 NCR 9.593 105 C 0.421 0.200 0.300 - - - 92.10 *92.10%
V. Satisfactory
C.S Garcia Construction 1901 Completion of Pateros (Aguho) Bridge Approaches, Brgy. Aguho 08/08/10 NCR 14.395 274 C 0.345 0.200 0.300 - - - 84.50 82.16%
Satisfactory
C.S Rayos Construction & General Services 9790
Rehab./ Reconst./ Impvt. of Batangas -Tabangao-Lobo Road (Intermittent
Section) Pinamucan Simlong Section Phase II
09/04/09 IVA 9.638 107 C 0.437 0.133 0.300 - - - 87.00 *87.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page88
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
C.V Construction & Development 8334 Const./Completion of Doña Helene
Bridge 1 & Approaches 03/05/09 XIII 7.007 529 C 0.485 0.200 0.000 - - - 68.50 71.11% Poor
Caana Construction 12905 Repair/Rehab. of Manila High Sch. 11/10/08 NCR 0.962 30 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory
Caana Construction 12905Conc./Upgrading with Drainage
Impvt. of Multi-Purpose Pavement PSG Compound, Malacanang Park
05/25/10 NCR 14.420 120 C 0.398 0.200 0.300 - - - 89.80 89.80% V. Satisfactory
Caana Construction Corporation 34399 Const./Rehab./Impv't. of MPB Brgy.
312, Zone 31, Dist. III 04/04/11 NCR 1.677 30 C 0.495 0.102 0.300 - - - 89.70 *89.70% V. Satisfactory
Cabilauan Construction and Supply (Formerly: JS Mondejar Construction)
18823 Const. of MPB at NIPSC, Lemery Campus 03/04/10 VI 0.948 60 C 0.384 0.200 0.300 - - - 88.40 88.40%
Satisfactory
Cad-Era Design and Builders 33076 Const. Of MPB at Middle Rock
Quarry Brgy. 03/03/10 CAR 1.930 80 C 0.431 0.133 0.300 - - - 86.40 86.40% Satisfactory
Camcu Construction & Supplies 18507
Const./Completion of Two (2) Classrooms, Buga National High
School09/07/10 VI 0.576 60 C 0.445 0.133 0.300 - - - 87.80 87.80%
Satisfactory
Camia Construction 20506Const./Road Impvt. along Kabugao-
Pudtol-Luna Road Bubulayan Section
03/31/11 CAR 18.879 360 C 0.438 0.500 - - - - 93.80 87.26% Satisfactory
Camia Construction 20506Const./Road Opening of Solsona-
Kabugao Road (Kabugao Side) Lenneng-Guina-ang Section
04/02/11 CAR 14.081 360 C 0.481 0.200 0.000 - - - 68.10 78.18% Unsatisfactory
Camia Construction 20506
Road Upgrading (Gravel to Concrete) along Kabugao-Pudtol-Luna-
Cagayan Bdry. Road, Lenneng Section
04/02/11 CAR 23.076 388 O 0.382 0.300 0.000 0.030 0.043 0.000 75.50 -
Camia Construction 20506
Road Opening/Const. of Missing Links of National Roads along Kabugao-Pudtol-MNA Rd. Paco
Section
04/02/11 CAR 18.454 388 O 0.374 0.300 0.000 0.020 0.043 0.000 73.70 -
Camia Construction 20506 New Const./Completion/Continuation of On-going Namunit Bridge 05/26/10 II 12.888 270 O 0.333 0.300 0.150 0.024 0.033 0.033 87.30 -
Camia Construction 20506 New Const./Completion/Continuation of On-going Namunit Bridge 08/17/10 II 12.888 270 O 0.312 0.270 0.150 0.030 0.040 0.033 83.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page89
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Camia Construction 20506 Concreting along Kabugao-Pudtol-Luna Road, Nagsungbatan Section 06/01/09 CAR 14.117 277 O 0.400 0.300 0.150 0.030 0.045 0.033 95.80 -
Camia Construction 20506 Conc. along Kabugao-Pudtol-Luna Road, Swan Section 06/01/09 CAR 18.862 277 O 0.357 0.240 0.150 0.030 0.056 0.033 86.60 -
Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Lenning Section 05/30/09 CAR 13.870 366 O 0.294 0.300 0.150 0.030 0.035 0.033 84.20 -
Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Capitol Poblacion Section 05/30/09 CAR 18.562 391 O 0.288 0.300 0.150 0.030 0.040 0.033 84.10 -
Camia Construction 20506 Maintenance/Rehab. Along Apayao-Calanasan Road 02/26/09 CAR 4.588 241 C 0.363 0.200 0.300 - - - 86.30 82.64%
Satisfactory
Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Capitol-Poblacion Section 02/28/09 CAR 18.563 390 O 0.351 0.300 0.150 0.030 0.035 0.033 89.90 -
Camia Construction 20506 Upgrading of Kabugao-Pudtol-Luna Road (Lenneng Sect.) 09/04/09 CAR 13.870 402 O 0.331 0.240 0.150 0.024 0.056 0.033 83.40 -
Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Capitol Poblacion Section 02/20/10 CAR 18.922 421 C 0.400 0.200 0.300 - - - 0.00 88.20%
Satisfactory
Camia Construction 20506Road Upgrading of Abbut-Conner-
Kabugao Road (Gravel to Concrete), Manag-Guina-ang Section
02/20/10 CAR 9.358 360 O 0.381 0.234 0.150 0.030 0.040 0.033 0.00 -
Camia Construction 20506 Conc. along Kabugao-Pudtol-Luna Road, Swan Section 02/18/10 CAR 18.862 277 C 0.417 0.133 0.300 - - - 0.00 85.96%
Satisfactory
Camia Construction 20506 Upgrading of Kabugao-Pudtol-Luna Road (Lenneng Sect.) 02/20/10 CAR 13.870 402 C 0.423 0.133 0.300 - - - 0.00 85.78%
Satisfactory
Camia Construction 20506 Conc. along Kabugao-Pudtol-Luna Road, Nagsungbatan Section 05/27/10 CAR 14.352 337 C 0.398 0.200 0.300 - - - 89.80 91.18%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page90
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Camia Construction 20506 Road Upgrading of Kabugao-Pudtol-Luna Road (Lenneng Section) 05/28/10 CAR 15.879 420 C 0.399 0.200 0.300 - - - 89.90 89.90%
V. Satisfactory
Camia Construction 20506Road Upgrading of Abbut-Conner-
Kabugao Road (Gravel to Concrete), Manag-Guina-ang Section
05/28/10 CAR 9.358 390 C 0.396 0.200 0.300 - - - 89.60 87.92% Satisfactory
Camia Construction 20506Conc. of Roads along Apayao (Calanasan)-Ilocos Norte Road
Tanglagan Section08/19/10 CAR 18.871 360 O 0.382 0.263 0.150 0.023 0.027 0.033 87.80 -
Camori Builders & Supply 30084 Impvt.Widening of Cainta-Kaytickling-
Antipolo-Teresa Road 08/26/09 IVA 4.801 120 C 0.484 0.200 0.300 - - - 98.40 92.58% V. Satisfactory
Carlo Joseph / Omicron Construction (JV) JV-09-276
Const./Repair/Rehab. of Slope Protection along Porac River, Valdez
Sect.08/16/10 III 14.333 90 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
Carlo Joseph Construction 21017
Drainage Canal along San Antonio-Floridablanca Road, Mabical-Valdez
Section02/17/10 III 4.774 60 C 0.446 0.142 0.300 - - - 88.80 88.80%
Satisfactory
Carlo Joseph Construction 21017
Const. of School Building at Mawaque Resettlement Elementary
School06/04/09 III 0.952 30 C 0.469 0.200 0.300 - - - 96.90 *96.90%
Outstanding
Carlo Joseph Construction 21017 Repair of Brgy. Roads @ Magnolia
St. 02/26/09 III 0.462 15 C 0.448 0.133 0.300 - - - 88.10 *88.10%Satisfactory
Carlo Joseph Construction 21017 Const. of 2-CL at Culubasa PS
Floridablanca East 08/24/09 III 0.958 60 C 0.465 0.133 0.300 - - - 89.80 *89.80% V. Satisfactory
Carlo Joseph Construction 21017 Dredging of Balagtas River and
Creeks 09/04/09 III 4.774 45 C 0.375 - 0.500 - - - 87.50 *87.50% Satisfactory
Carlyz Construction 19776Road Upgrading along Banaue-
Mayoyao-Aguinaldo-A. Iista-Isabela Bdry. Road (Kinakin-Dalican Section)
04/07/11 CAR 4.166 160 O 0.400 0.300 0.020 0.020 0.054 0.000 79.40 -
Carrascal Integrated Enterprises 4764 Completion of MPB at Brgy. Baybay 04/05/11 XIII 0.092 90 C 0.469 0.133 0.300 - - - 90.20 *90.20%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page91
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Carrascal Integrated Enterprises 4764 Const. of Carrascal Seawall 03/02/10 XIII 9.240 120 C 0.478 0.133 0.300 - - - 91.10 91.10%
V.Satisfactory
Carrascal Integrated Enterprises 4764 Const. of MPB Brgy. Panikian 03/02/10 XIII 0.458 84 C 0.477 0.133 0.300 - - - 91.00 91.00%
V.Satisfactory
Carrascal Integrated Enterprises 4764
Rehab./Reconst./Upgrading of Damaged Paved National Roads (Surigao-Davao Coastal Road)
08/31/10 XIII 19.279 142 C 0.374 0.200 0.300 - - - 87.40 87.52% Satisfactory
Carrascal Integrated Enterprises 4764 Conc.of Sibahay-Nurcia Section
(SDCR) 03/11/09 XIII 19.285 150 C 0.428 0.115 0.300 - - - 84.30 84.06% Satisfactory
Carry-On Construction 8014 Const. of MPB at Brgy. Tagalag 03/29/11 NCR 1.830 90 O 0.393 0.240 0.150 0.030 0.029 0.050 89.20 -
Carry-On Construction 8014 Completion of MPB at Isla 03/29/11 NCR 2.567 90 O 0.392 0.240 0.150 0.030 0.041 0.033 88.60 -
Carry-on Construction 8014 Const./Rehab. of Roads at Road 3 05/27/09 NCR 0.662 45 C 0.333 0.200 0.300 - - - 83.30 *83.30% Satisfactory
Carry-on Construction 8014 Upgrading/Conc. of Roads with Drainage Improvement, Brgy. Sipac 03/04/09 NCR 0.477 45 C 0.325 0.200 0.300 - - - 82.50 *82.50%
Satisfactory
Carry-on Construction 8014 Const. of Multi-Purpose Building, Lena Subd., Brgy. Dalandan 09/16/09 NCR 3.134 90 C 0.455 0.133 0.300 - - - 88.80 *88.80%
Satisfactory
Casipit Construction & Supply 11623 Completion of MPB 04/12/11 I 0.969 70 C 0.419 0.133 0.300 - - - 85.20 *85.20%
Satisfactory
Casipit Construction & Supply 11623 Const. of Multi-Purpose Building at
Brgy. Maawi 03/04/10 I 0.388 25 C 0.350 0.200 0.300 - - - 85.00 85.00% Satisfactory
Cauayan United Enterprises & Const.
Builders/Alcel Const. (JV) JV-08-235
Rehab./Reconst./Upgrading of Naguilian-San Mariano Road (San
Manuel Section)08/25/09 II 18.716 104 C 0.455 0.133 0.300 - - - 88.80 89.40%
V. Satisfactory
Cauayan United Enterprises & Const.
Builders/Brostan Construction and
Developmentn (JV)
JV-07-168 Concreting of Ilagan-Delfin Albano-Mallig Road (Manano Section) 05/25/09 II 19.290 404 C 0.475 0.133 0.300 - - - 90.80 89.12%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page92
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Cauayan United Enterprises and
Construction Builder8816
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road, Quezon
Section04/06/11 II 19.293 193 C 0.479 0.133 0.300 - - - 91.20 82.08%
Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Asphalt Overlay along Alicia-San
Mateo Road KO 357+000 to 358+000 02/24/10 II 3.818 90 C 0.424 0.200 0.300 - - - 92.40 92.40% V. Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Asphalt Overlay Daang Maharlika KO
376+000 - KO 379+000 02/24/10 II 5.511 90 C 0.411 0.200 0.300 - - - 91.10 91.10% V. Satisfactory
Cauayan United Enterprises and
Construction Builders8816
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road (Muñoz
Section)02/22/10 II 19.294 180 C 0.431 0.133 0.300 - - - 86.40 86.34%
Satisfactory
Cauayan United Enterprises and
Construction Builders8816
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road (Bantug-
Nuesa Section)02/22/10 II 19.295 180 C 0.397 0.133 0.300 - - - 83.00 86.30%
Satisfactory
Cauayan United Enterprises and
Construction Builders8816
Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road (Victoria-
Casili Section)02/22/10 II 14.470 205 C 0.425 0.133 0.300 - - - 85.80 86.04%
Satisfactory
Cauayan United Enterprises and
Construction Builders8816
Repair/Rehab. of Santiago-Tuguegarao Road Ko 0407+055-Km.
413+00002/22/10 II 9.998 70 C 0.408 0.148 0.300 - - - 85.60 85.60%
Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Asphalt Overlay along Calamgui-
Ilagan Rd. 05/30/10 II 9.798 25 C 0.489 0.133 0.300 - - - 92.20 92.20% V. Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Construction of Flood Control
Project 03/03/09 II 4.821 116 C 0.460 0.200 0.300 - - - 96.00 91.02% V.Satisfactory
Cauayan United Enterprises and
Construction Builders8816
Repair/Rehab Along Daang Maharlika, KO 364+591 to KO
370+50003/04/09 II 4.780 180 C 0.411 0.200 0.300 - - - 91.10 *91.10%
V.Satisfactory
Cavat Capitol Merchandising &
Construction3112 Conc. of Cagayan-Apayao National
Road, Tuao-Rizal Sect. 02/27/09 II 11.859 59 C 0.438 0.200 0.300 - - - 93.80 83.06% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page93
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Cavat Capitol Merchandising &
Construction3112 Conc. of Naruangan-Culong Road 02/27/09 II 6.266 210 C 0.446 0.200 0.300 - - - 94.60 82.18%
Satisfactory
CAVDEAL-Cavite Ideal International
Construction and Development Corporation
5599
Const. of El Nido-Bataraza Road, CP-2A, El Nido-Taytay-Roxas Road
Section, Segment 1-10 (Sta.147+417.00 - Sta.260+258.00
with exception)
04/01/11 PJHL 1,895.382 730 C 0.452 0.200 0.300 - - - 95.20 94.84% V. Satisfactory
Cavdeal-Cavite Ideal International
Construction and Development Corporation
5599
MMURTRIP Phase II, Const. of Metro Manila Urban Transport Integrated
CP4, SLEX East & West Service Roads and Pasong Tamo Ext.
11/15/08 URPO 629.011 752 O 0.360 0.300 0.100 0.030 0.042 0.100 93.20 -
Cavdeal-Cavite Ideal International
Construction and Development Corporation
5599
Const. of El Nido-Bataraza Road, CP 3B-1, Segments 1-8, Abo-abo-
Brooke's Point-Rio Tuba Section, (Sta. 128+026.93 to Sta. 247+923 w/
exception)
06/01/09 PJHL 1,988.008 730 O 0.325 0.300 0.150 0.030 0.042 0.050 89.70 -
Cavdeal-Cavite Ideal International
Construction and Development Corporation
5599
Const. of El Nido-Bataraza Rd. Contract Package 3B-3, Segment 1-8 Abo-abo - Brooke's Point - Rio Tuba
Rd. Sect.
06/01/10 PJHL 1,988.008 730 O 0.334 0.300 0.150 0.030 0.065 0.050 92.90 -
CBN Construction & Supply 16851
Conc. of Dancalan-Candoni-Damutan Valley Rd., Talacdan Section, Brgy.
Talacdan03/08/10 VI 13.419 209 C 0.364 0.200 0.300 - - - 86.40 88.08%
Satisfactory
CBN Construction & Supply 16851 Construction and Improvement of
Sibud Main Drainage 3/16-21/09 NIA 6.299 408 C 0.368 0.200 0.300 - - - 86.75 86.75% Satisfactory
CCM Construction 11043 Tagbilaran Airport Development Project 03/27/09 DOTC 6.704 120 C 0.456 0.200 0.300 - - - 95.60 95.60%
V. Satisfactory
CCM Construction 11043Tagbiliran Airport Development
Project (Expansion/ Rehabilitation of Terminal Building)
2/25/2010 DOTC 4.809 120 C 0.463 0.200 0.300 - - - 96.30 96.30 % Outstanding
CCM Construction 11043
Tagbiliran Airport Development Project (Shoulder Grade Correction
of Runway, Resurfacing of Vehicular Parking Area and Construction of
Covered Sidewalk
2/25/2010 DOTC 18.481 150 C 0.449 0.199 0.300 - - - 93.20 93.20% V.Satisfactory
CCM Construction 11043
Tagbiliran Airport Dev't Project (Completion of Shoulder Grade
Correction and Resealing of Cracks and Joints)
2/25/2010 DOTC 6.694 120 C 0.448 0.200 0.300 - - - 94.80 94.80% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page94
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
CDC Construction and Supplies 28275 Asphalt Overlay along Manila North
Road, Km. 233+000-Km. 235+000 02/27/10 I 14.182 60 C 0.371 0.183 0.300 - - - 85.40 85.40% Satisfactory
CDC Construction and Supplies 28275 Impvt. of Agoo Beach Road, Km.
236+503-Km. 242+853 w/ exceptions 08/25/10 I 10.922 120 C 0.495 0.133 0.300 - - - 92.80 92.80% V. Satisfactory
CDC Construction and Supplies 28275 Widening of Olongapo-Bugallon Rd.,
Castillejos Sect. 05/29/10 III 4.725 30 C 0.461 0.133 0.300 - - - 89.40 89.40% V. Satisfactory
CDC Construction and Supplies 28275
Asphalt Overlay along Rizal Ave. (50 mm. THK) Km.125+974 - Km.127+020
w/ exception05/30/10 III 9.600 30 C 0.426 0.133 0.300 - - - 85.90 85.90%
Satisfactory
CDC Construction and Supplies 28275
Const. of 1-CL at Jessmag Tech. Vocational High School, Brgy. Sta.
Maria08/23/10 III 0.591 30 C 0.496 0.133 0.300 - - - 92.90 92.90%
V.Satisfactory
CDC Construction and Supplies 28275 Upgrading of Drainage System at
Afable St., Brgy. Asinan Poblacion 08/23/10 III 0.458 45 C 0.474 0.133 0.300 - - - 90.70 90.70% V. Satisfactory
CDC Construction and Supplies 28275
Asphalting and Const. of Drainage System, Ilang Ilang St., Prk. 5, Brgy.
New Cabalan, Olongapo City05/23/09 III 1.901 45 C 0.431 0.200 0.000 - - - 63.10 70.96%
Poor
CDC Construction and Supplies 28275 Const. of Multi-Purpose Building,
San Nicolas 03/04/09 III 1.419 60 C 0.496 0.200 0.300 - - - 99.60 *99.60% Outstanding
CDC Construction and Supplies 28275 Const. of School Building @ Iba E/S 03/03/09 III 0.894 60 C 0.388 0.133 0.300 - - - 82.10 *82.10%
Satisfactory
Cebu 7H Technochem Industries Inc. 31578 Conc. of Barangay Poblacion Rd.
(with exception) 09/05/09 VII 0.952 50 C 0.388 0.200 0.300 - - - 88.80 *88.80% Satisfactory
Cebu 7H Technochem Industries Inc. 31578
Rehab/Improvement of Road Leading to the Chocolate Hills (Asphalt
Overlay) Loay Interior Road, Km. 152.430-Km. 183.300 (w/ exception)
03/08/09 VII 28.319 120 C 0.500 0.133 0.300 - - - 93.30 *93.30%V. Satisfactory
Cebu 7H Technochem Industries Inc. 31578
Construction of Two(2) units Classroom, Dapa National High
School03/07/09 XIII 0.964 90 C 0.415 0.128 0.300 - - - 84.30 *84.30%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page95
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Cebu 7H Technochem Industries, Inc. 31578
Asphalting of Sagbayan-Inabanga-Danao Rd. (Strategic Tourism Highway) Inabanga Section
03/30/11 VII 5.774 50 C 0.412 0.133 0.300 - - - 84.50 *84.50% Satisfactory
Cebu 7H Technochem Industries, Inc. 31578 Access Road to Ubay Roro Port 08/27/10 VII 15.094 120 C 0.458 0.133 0.300 - - - 89.10 89.10%
V. Satisfactory
Cebu Haydter Construction 31630 Impvt. of MPB, Brgy. San Antonio 09/15/09 VII 0.482 75 C 0.492 0.133 0.300 - - - 92.50 *92.50%
V. Satisfactory
Cebu Haydter Construction 31630 Impvt. of Multi-Purpose Building,
Brgy. Cogon Ramos 09/15/09 VII 0.482 75 C 0.466 0.133 0.300 - - - 89.90 *89.90% V. Satisfactory
Cebu Haydter Construction 31630 Const. /Repair/Impvt. of MPB at Brgy.
Buot Taup 09/03/10 VII 1.447 92 O 0.337 0.240 0.150 0.015 0.047 0.050 83.90 -
Cedan Construction 10172 Repair/Rehab. of Road San Marcelino-San Antonio Rd. 05/29/10 III 0.951 10 C 0.476 0.133 0.300 - - - 90.90 90.90%
V. Satisfactory
Cedan Construction 10172Rehab/Improvement of San
Marcelino-San Antonio-San Narciso Road
05/26/09 III 19.011 30 C 0.385 0.200 0.300 - - - 88.50 *88.50%Satisfactory
Cedan Construction 10172Rehab./Reconst./Upgrading of San Marcelino-San Antonio-San Narciso
Road05/23/09 III 11.400 30 C 0.433 0.133 0.300 - - - 86.60 *86.60%
Satisfactory
Cedan Construction 10172Const./Replacement/Comp. and
Repair of Elementary And Secondary S/B at San Vicente E/S
09/02/09 III 1.338 120 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory
Cedan Construction 10172Const./Replacement/Comp. and
Repair of Elementary and Secondary S/B at Bani NHS-Annex
09/02/09 III 0.955 120 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page96
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Cedar Construction 24865 Rehab./Impvt. of Farm-to-Market Road, Brgy. San Antonio 05/18/09 III 4.005 44 C 0.360 0.200 0.300 - - - 86.00 84.50%
Satisfactory
Cedar Construction 24865 Rehab/Improvement of Del Carmen Creek (Paskuhan Village Section) 02/23/09 III 4.786 60 C 0.375 - 0.500 - - - 87.50 *87.50%
Satisfactory
Cedar Construction 24865 Repairs/Rehab. of Sapalibutad (Farm to Market Road) 02/26/09 III 4.703 45 C 0.388 0.133 0.300 - - - 82.10 *82.10%
Satisfactory
Celso C. Ferrer Contractor 10643 Rehab./Reconst. of Nueva Ecija-
Aurora Rd. 08/18/10 III 28.505 120 C 0.432 0.133 0.300 - - - 86.50 85.48% Satisfactory
Celso C. Ferrer Contractor 10643
Concreting of Bambang-Kasibu-Quezon-Solano Road, (San Fernando
Section) 06/01/09 II 14.224 120 C 0.419 0.133 0.300 - - - 85.20 84.24%
Satisfactory
Celso C. Ferrer Contractor 10643 Conc. of Bambang-Kasibu-Quezon-
Solano Road (San Fernando Sect.) 11/27/08 II 47.758 120 O 0.366 0.240 0.100 0.030 0.033 0.067 83.60 -
Celso C. Ferrer Contractor 10643 Rehablitation of Daang Maharlika
Road 06/02/09 III 28.950 74 C 0.325 0.200 0.300 - - - 82.50 *82.50% Satisfactory
Central Mindanao Const. Multi-Purpose Cooperative
23697 Const. of MPB @ Pilot Provincial Science and Technology H/S 11/07/08 XII 1.907 65 O 0.211 0.300 0.100 0.030 0.016 0.067 72.40 -
Central Mindanao Construction Multi-
Purpose Coop.23697 Const. of MPB at Lower Saguing 04/01/11 XII 0.460 55 C 0.440 0.145 0.300 - - - 88.50 *88.50%
Satisfactory
Central Mindanao Construction Multi-
Purpose Coop.23697 Const. of Kabacan River Flood
Control, Binay 04/02/11 XII 4.563 220 C 0.472 0.132 0.300 - - - 90.40 84.22% Satisfactory
Central Mindanao Construction Multi-
Purpose Cooperative23697
Conc. of Paco-Roxas-Arakan Road, Pontevedra Section Km. 1656+100-
Km. 1656+75009/05/09 XII 9.337 150 O 0.376 0.300 0.150 0.015 0.047 0.050 93.80 -
Central Mindanao Construction Multi-
Purpose Cooperative23697
Conc. of Paco-Roxas-Arakan Road, CFCST Section (KM. 1667+200-Km.
1667+963.6509/05/09 XII 9.251 120 O 0.362 0.300 0.150 0.015 0.047 0.050 92.40 -
Central Mindanao Construction Multi-
Purpose Cooperative23697
Conc. of Paco-Roxas-Arakan Road, inclined Section, Km. 1641+043.38 -
Km. 1641+900.7603/02/10 XII 15.167 180 C 0.336 0.200 0.300 - - - 83.60 83.60%
Satisfactory
Central Mindanao Construction Multi-
Purpose Cooperative23697 Conc. of Roxas-Arakan Valley Road,
Doroluman Section 05/30/09 R-XII 14.988 150 C 0.368 0.200 0.300 - - - 86.80 88.24% Satisfactory
Central Mindanao Construction Multi-
Purpose Cooperative23697 Const. of MPB @ Pilot Provincial
Science and Technology H/S 03/02/09 XII 1.907 79 C 0.427 0.133 0.300 - - - 86.00 76.48% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page97
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Cesar T. Carpio Construction 20833
Const./Rehab./Impvt. of Pambujan Circ. Road , Cababtoan-Cabarian-
Canjumadal Road08/31/08 VIII 9.295 180 O 0.288 0.225 0.100 0.030 0.040 0.100 78.30 -
Cesar T. Carpio Construction 20833 Repair/Rehab. of Catarman-Calbayog
Road 08/26/08 VIII 9.594 150 O 0.364 0.240 0.100 0.030 0.032 0.100 86.60 -
Cesar T. Carpio Construction 20833 Concreting of Naval-Caibiran Cross
County Road, So. Cansceso Section 06/04/09 VIII 4.815 150 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
CGGA Builders & Enterprises 23762 Const. of 1-CL @ Esperansa E/S 02/27/10 VIII 0.486 90 C 0.477 0.133 0.300 - - - 91.00 91.00%
V. Satisfactory
CGGA Builders & Enterprises 23762 Const. of FMR 09/02/10 VIII 0.908 40 O 0.460 0.133 0.300 - - - 89.30 89.30%
V. Satisfactory
Cha Construction & Supply 28120 Conc. of San Jose Road 04/06/11 V 0.716 60 C 0.436 0.133 0.300 - - - 86.90 *86.90%
Satisfactory
Cha Construction & Supply 28120 Conc. of Tibgao Road 04/06/11 V 0.995 60 C 0.395 0.133 0.300 - - - 82.80 *82.80%
Satisfactory
Cha Construction & Supply 28420 Conc. of Bancao-Sto. Niño Rd. 08/28/10 V 4.725 120 C 0.377 0.200 0.300 - - - 87.70 87.70%
Satisfactory
Cha Construction & Supply 28420 Construction of San Francisco-San
Vicente 03/02/10 V 3.820 120 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
Cha Construction and Supply 28420 Const. of Roads, San Antonio-
Siembre Road 03/12/09 V 11.347 90 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
Charlz Construction 8709
Rehab./Reconst./Upgrading of Jct. S.H. Manolo Fortich-Libona-Indahag
Road, Gango Sect., (Gravel to Concrete)
03/31/11 X 28.417 230 C 0.401 0.133 0.300 - - - 83.40 85.44% Satisfactory
Charlz Construction 8709 Construction of Tagbao Road, Brgy. Tagbao 06/10/09 VII 2.831 60 C 0.350 0.134 0.300 - - - 78.40 *78.40%
Unsatisfactory
Charlz Construction 8709
Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-
Binuangan Sect.)
08/24/08 X 38.527 379 O 0.316 0.300 0.100 0.015 0.041 0.100 87.20 -
Charlz Construction 8709 Const. of 2 Units, 2 Storey, 10 CL @ Taptap E/S Bldg. 03/03/09 VII 13.360 195 C 0.281 0.177 0.300 - - - 75.80 83.29%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page98
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Charlz Construction 8709 Const. of DPWH Bukidnon 3rd DEO Building (Phase III), Diklum 05/29/09 X 4.795 90 O 0.350 0.263 0.150 0.030 0.011 0.033 83.70 -
Charlz Construction 8709 Const. of Two (2) Storey DPWH Office Building 03/06/09 X 2.888 180 C 0.373 0.133 0.300 - - - 80.60 82.84%
Satisfactory
Charlz Construction 8709 Const. of DPWH 1st DEO Building 09/03/09 X 4.812 150 C 0.455 0.172 0.300 - - - 92.70 *92.70% V. Satisfactory
Charlz Construction 8709Rehab./Reconst. (Asphalt to
Concrete) of Jct. S.H. Manolo Fortich Libona-Indahag Rd., (Kiliog Section)
09/04/09 X 19.210 150 O 0.394 0.236 0.150 0.030 0.047 0.033 89.00 -
Charlz Construction 8709 Const. of DPWH Bukidnon 3rd DEO Building (Phase III), Dicklum 09/04/09 X 4.795 90 C 0.499 0.165 0.300 - - - 96.40 87.51%
Satisfactory
Charlz Construction 8709
Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-
Binuangan Section w/ exceptions)
09/17/09 X 38.527 379 C 0.372 0.133 0.300 - - - 80.50 80.56% Unsatisfactory
Che-riss Construction & Trading 26557 Repair/Maintenance of Public School
Teachers Association, Catalina St. 09/09/09 NCR 0.720 45 C 0.428 0.133 0.300 - - - 86.10 *86.10% Satisfactory
Chiara Construction 8736 Const. of 18 LM RCDG Bridge along San Fernando Bypass Road 02/24/09 I 9.399 270 C 0.366 0.200 0.300 - - - 86.60 82.58%
Satisfactory
Chiara Construction 8736 Construction of 2-Storey Building / Library at Tarlac State University 02/27/09 III 14.399 270 C 0.439 0.176 0.300 - - - 91.50 84.85%
Satisfactory
Chiara Construction 8736Const. of Two (2) Storey Building / Library at Tarlac State University,
Lucinda Campus11/13/08 III 14.416 270 O 0.388 0.180 0.100 0.030 0.022 0.100 82.00 -
Chico Engineering and Construction 32395 Const. of Multi-Purpose Building,
Sitio Pospos, Brgy. Caluttit 02/26/10 CAR 1.445 246 C 0.392 0.200 0.300 - - - 89.20 83.92% Satisfactory
China CAMC Engineeing Co., LTD.
Const. of Agno River Integrated Irrigation Project (ARIIP) 08/15-20/11 NIA 93.846 900 O 0.370 0.290 0.150 0.030 0.070 0.050 95.97 -
China Harbour Engineering Company
SL1-SN-005059/FC-
07-005
CP5, Cervantes-Mankayan-Abatan, Phase V 03/11/09 PJHL 682.076 812 O 0.365 0.300 0.150 0.030 0.070 0.050 96.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page99
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
China Harbour Engineering Company FC-98-264 CP5, Cervantes-Mankayan-Abatan,
Phase V 11/14/08 PJHL 682.000 812 O 0.369 0.300 0.100 0.030 0.051 0.100 95.00 -
China Harbour Engineering Company FC-07-005
Contract Package 5, Cervantes-Mankayan-Abatan under Arterial Road Links Development Project,
Phase V, Sta.383+135 to Sta. 414+679 38
08/27/09 PJHL 682.076 812 O 0.373 0.240 0.150 0.030 0.056 0.033 88.20 -
China International Water & Electric Corporation FC-09-008
Pinatubo Hazard Urgent Mitigation Project (PHUMP), Phase III, CP-2,
Lower Porac-Gumain River Diversion Channel
03/31/11 MPE 1,549.931 750 O 0.398 0.300 0.150 0.030 0.042 0.050 97.00 -
China International Water & Electric Corporation FC-05-003
Const. of Package No.2 Impvt. of Jaro River Mouth, Iloilo River and
Upper Ignore Creek03/03/10 MFCP1 1,136.205 1,440 C 0.414 0.200 0.300 - - - 91.40 94.94%
V. Satisfactory
China International Water and Electric Company
SL1-SN-004851
Bago River Irrigation System Rehabilitation & Improvement of
Project10/19-21/09 NIA 0.820 1,263 C 0.428 0.191 0.300 - - - 91.90 91.90%
Satisfactory
China Road & Bridge Corporation
SL-2-SN-000631
Contract Package III, Calbayog-Gatanguit Road Sect., Arterial road
links Dev't. Project, Phase VI12/02/08 PJHL 1,397.424 1,020 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -
China State (Phils.) Construction Eng'g.
Corp.
SL1-SN-004865
CP No. C-5, Metro Manila Urban Transport Integration Project
(MMURTRIP), NLEX Junction to North Fairview
11/24/08 URPO 606.345 720 O 0.340 0.300 0.050 0.030 0.056 0.067 84.30 -
CHL Construction and Development
Enterprises, Inc.15001 Conc. of Road & Reblocking, Marbel-
Makar Road, Matin-ao, Silway 8 03/12/10 XII 15.114 180 C 0.378 0.200 0.000 - - - 57.80 73.88% Poor
Cholo Construction & Trading 32138 Construction of Multi-Purpose
Building 05/19/09 III 1.427 35 C 0.477 0.200 0.300 - - - 97.70 *97.70% Outstanding
Cholo Construction and Trading 32138 Channel Impvt. of Sapang Matulid &
Batasan River 05/25/10 III 4.753 45 C 0.375 - 0.500 - - - 87.50 87.50% Satisfactory
Chrisman Construction and Supplies 33274 Concreting of San Pedro Road 09/04/09 V 1.437 180 C 0.420 0.141 0.300 - - - 86.10 *86.10%
Satisfactory
Christian Ian Construction Corpoaration
8191 Const. of Togbongon Bridge and Approaches 06/03/10
Special Bridges-
PMO 18.604 604 C 0.464 0.172 0.300 - - - 93.60 93.60%
V. Satisfactory
Christian Ian Construction Corporation 8191
Upgrading of Unpaved shoulder along Pangasinan Tarlac Road w/
exception04/11/11 I 48.245 210 C 0.424 0.133 0.300 - - - 85.70 *88.28%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page100
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Christian Ian Construction Corporation 8191
Widening/Conc. of McArthur Highway (MNR), Tarlac Province-Ph-
VI (Package 3)04/07/11 III 129.000 210 C 0.332 0.200 0.300 - - - 83.20 85.36%
Satisfactory
Christian Ian Construction Corporation 8191
Impvt. (Widening/Conc.) of McArthur Highway (MNR) Tarlac Section,
Phase IV, Package I (Bamban-Capas Section)
06/05/09 III 63.849 240 C 0.336 0.200 0.300 - - - 83.60 88.34% Satisfactory
Christian Ian Construction Corporation 8191
Const. of Dibunog Bridge & App. and Sambay Bridge & App. (CP 1) along
Baler-Casiguran Road03/06/09 III 24.826 150 C 0.458 0.200 0.300 - - - 95.80 *95.80%
V. Satisfactory
Christian Ian Construction Corporation 8191 Const., Repair, Rehab. and
Completion of MPB at Brgy. Lawy 03/09/09 III 2.378 90 C 0.459 0.139 0.300 - - - 89.80 *89.80%V. Satisfactory
Christian Ian Construction Corporation 8191
Rehab./Replacement of San Luis Bridge and App. along San Luis-Sto.
Domingo Road03/11/09 III 113.287 546 C 0.464 0.200 0.300 - - - 96.40 89.56%
V. Satisfactory
Christian Ian Construction Corporation 8191 Improvement/Rehab.of Daang
Maharlika Road 09/05/09 III 41.225 180 O 0.342 0.300 0.150 0.030 0.050 0.033 90.50 -
Chu Builders & General Contractor 3940 Const. of San Pablo-Anao Bridge
including Access Rd. 05/25/10 III 23.886 180 C 0.458 0.133 0.300 - - - 89.10 89.10% V. Satisfactory
Cielito A. Bay-ag Construction 19032
Const. of Jct. National-Bitnong-Belance-NV Bdry. Rd. Belance
Section06/03/09 II 9.645 180 C 0.430 0.133 0.300 - - - 86.30 *86.30%
Satisfactory
Cielito A. Bay-ag Construction 19032 Concreting of Aritao-Quirino Road,
Lupa Section 06/04/09 II 9.606 120 O 0.338 0.240 0.150 0.030 0.051 0.033 84.20 -
Ciriaco Corporation 6932Proposed Const. of Underpass along
Mindanao Ave. crossing Quirino Highway (Completion)
04/08/11 NCR 103.626 120 C 0.491 0.133 0.300 - - - 92.40 93.66% V. Satisfactory
Ciriaco Corporation 6932Proposed Const. of Underpass along
Mindanao Ave. crossing Quirino Highway
04/08/11 NCR 354.338 240 C 0.471 0.133 0.300 - - - 90.40 91.27% V. Satisfactory
Ciriaco Corporation 6932 Const. of Delfin Albano Bridge along Tumauini-Delfin Albano Road (SA #2) 03/05/09 II 234.155 360 O 0.388 0.300 0.150 0.030 0.050 0.050 96.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page101
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ciriaco Corporation 6932 Const. of Delfin Albano Bridge along Tumauini-Delfin Albano Road (SA #1) 08/13/08 II 234.155 360 O 0.400 0.296 0.100 0.030 0.060 0.100 98.60 -
Ciriaco Corporation 6932Const. of Cansaga Bridge, Contract Package I, Cebu North Coastal Road
Project06/19/10 MCDP 2,366.958 600 C 0.449 0.200 0.300 - - - 94.90 95.68%
V. Satisfactory
Cleofe A. Aliviado Construction and
Engineering Services32676 Impvt. of Bacong-Valencia Road 09/08/10 VII 9.639 135 C 0.447 0.133 0.300 - - - 88.00 88.00%
Satisfactory
Clifford Construction Corporation 3724 Road Upgrading of Mandurriao-San
Miguel-Alimodian-Maasin Rd. 03/05/10 VI 25.699 291 C 0.386 0.196 0.300 - - - 88.20 89.52% V. Satisfactory
Clifford Construction Corporation 3724
Roxas Airport Development Project (Rehabilitation of Old Terminal
Buidling)06/11/10 DOTC 4.803 120 C 0.433 0.20 0.30 - - - 93.30 93.30
V.Satisfactory
Clifford Construction Corporation 3724 Road Upgrading (Gravel to Concrete)
Altavas-Jamindan Road 06/06/09 VI 3.849 150 O 0.362 0.246 0.150 0.023 0.045 0.033 85.90 -
Clifford Construction Corporation 3724 Road Upgrading / Concreting along
Altavas-Jamindan Road 03/14/09 VI 21.841 210 O 0.330 0.294 0.150 0.030 0.055 0.033 89.20 -
Clifford Construction Corporation 3724 Road Upgrading of Altavas-
Jamindan Road 09/05/09 VI 3.849 150 C 0.438 0.139 0.300 - - - 87.70 86.62% Satisfactory
Clifford Construction Corporation 3724 Road Upgrading/Conc. along Altavas-
Jamindan Road 09/05/09 VI 22.278 349 O 0.336 0.287 0.110 0.023 0.040 0.017 81.30 -
Clifford Construction Corporation 3724 Road Upgrading (Gravel to Paved),
Altavas-Jamindan Road 09/04/10 VI 11.559 150 C 0.458 0.133 0.300 - - - 89.10 89.10% V. Satisfactory
Clinton Builders Construction of Police Station (Building) 12/07/10 NHA 6.729 132 C 0.492 0.200 0.300 - - - 99.20 94.37%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page102
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
CLTG Builders 16852 Conc. of Road @ Countryhomes to Emilia Homes Section 04/13/11 XI 1.875 108 C 0.452 0.200 0.300 - - - 95.20 *95.20%
V. Satisfactory
CLTG Builders 16852 Const. of Multi-Purpose Building at Bunawan Aplaya E/S 03/10/10 XI 2.358 112 C 0.345 0.200 0.300 - - - 84.50 84.50%
Satisfactory
CLTG Builders 16852 Construction of Mandug River Control 06/11/09 XI 9.442 180 C 0.438 0.200 0.300 - - - 93.80 *93.80%
V. Satisfactory
CLTG Builders 16852Rehab./Reconst. of Damaged Paved National Roads at Daang Maharlika,
Bunawan Section, Davao City09/16/09 XI 9.642 180 C 0.488 0.133 0.300 - - - 92.10 *92.10%
V. Satisfactory
CLTG Builders 16852
Rehab./Reconst./Uograding of Damaged Road National Roads @
Daang Maharlika (MN), Ilang Tibungco Sec.
09/16/09 XI 9.652 180 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory
CLV Enterprises 18512 Const. of Multi-Purpose Bldg. Cawayan 02/24/10 X 0.939 119 C 0.403 0.133 0.300 - - - 83.60 83.04%
Satisfactory
CMSEL Construction and Developer 19610 Const. of MPB at Brgy. San Agustin 05/28/10 IVB 0.498 30 C 0.500 0.133 0.300 - - - 93.30 93.30%
V. Satisfactory
Coastland Construction and Development Corp. 11487 Mati Airport Development Project 06/19/09 DOTC 13.459 120 C 0.418 0.200 0.300 - - - 91.80 91.80%
V. Satisfactory
Coastland Construction and Development Corp. 11487
Mati Airport Development Project (Completion of Construction of
Access Road and Drainage Canal)09/17/10 DOTC 9.598 120 C 0.452 0.200 0.300 - - - 95.20 95.20%
V. Satisfactory
Coastland Construction and Development Corp. 11487 Conc. of Mati-Maragusan Road
(Tawas-Taguibo Section) 03/11/09 XI 14.021 145 C 0.361 0.200 0.300 - - - 86.10 86.40% Satisfactory
Coastland Construction and Development
Corporation11487
Maintenance and Rehab. of Davao Oriental-Surigao del Sur Coastal Rd.,
Km. 718.057-Km. 722+100 w/ exception)
03/02/10 XI 4.921 45 C 0.466 0.133 0.300 - - - 89.90 89.90% V. Satisfactory
Coastland Construction and Development
Corporation11487
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Davao Oriental-Surigao del Sur Coastal Rd., Pintatagan Sect.
09/03/10 XI 19.237 120 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page103
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Coastland Construction and Development
Corporation11487
Rehab./Reconst./Upgrading of Damaged Paved National Rds. Section, Junction Manikling-
Governor Generoso Rd.
09/03/10 XI 5.340 75 C 0.440 0.133 0.300 - - - 87.30 87.30% Satisfactory
Coastland Construction and Development
Corporation11487
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Davao Oriental Surigao Del Sur Coastal Road (Pintatagan-Puntalinao
Road)
09/14/09 XI 14.465 100 C 0.421 0.133 0.300 - - - 85.40 89.30% V. Satisfactory
Cofejok Construction and Supply 27493 Const./Rehab. of Roads, Arradaza
St., Diaz Subd. 04/14/11 XII 0.950 60 C 0.429 0.173 0.300 - - - 90.20 *90.20% V. Satisfactory
Cofejok Construction and Supply 27493 Completion of MPB, Brgy. Sulit 04/13/11 XII 0.978 85 C 0.467 0.133 0.300 - - - 90.00 *90.00%
V. Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB, Brgy. Liwanay 04/08/11 XII 0.805 84 O 0.366 0.240 0.150 0.030 0.041 0.050 87.70 -
Cofejok Construction and Supply 27493 Repair/Impvt./Const. of Office
Building 04/05/11 XII 4.780 250 C 0.464 0.133 0.300 - - - 89.70 86.41% Satisfactory
Cofejok Construction and Supply 27493 Repair/Rehab. of One (1) Unit Three
(3) CL Academic S/B at Arsenio E/S 09/09/09 XII 0.464 45 C 0.445 0.200 0.300 - - - 94.50 *94.50% V. Satisfactory
Cofejok Construction and Supply 27493 Const. of One (1) Unit Two (2) CL
Academic S/B at Pres. Quirino NHS 06/02/09 R-XII 0.929 100 C 0.456 0.200 0.300 - - - 95.60 *95.60% V. Satisfactory
Cofejok Construction and Supply 27493 Impvt. of MPB, Poblacion 03/15/09 XII 1.882 84 C 0.457 0.200 0.300 - - - 95.70 83.45%
Satisfactory
Cofejok Construction and Supply 27493 Repair of MPB @ Municipal Trial
Court Poblacion 03/13/09 XII 0.288 55 C 0.485 0.133 0.300 - - - 91.80 86.48% Satisfactory
Collera's Construction 13246 Construction/Impvt. of Liloan-San Ricardo-Bahay Circumferential Road 05/26/09 VIII 18.680 300 C 0.354 0.200 0.300 - - - 85.40 *85.40%
Satisfactory
Columbian Construction Services 27865 Impvt. of Camalog FMR 05/28/09 CAR 0.276 70 C 0.341 0.066 0.300 - - - 70.70 *70.70%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page104
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Compact Builders, Inc 14492 Const. of 1 unit 3-Storey, 15-Classroom School Building 12/10/09 NHA 21.491 210 O 0.291 0.300 0.121 0.030 0.038 0.050 83.00 -
Compact Builders, Inc 14492 Construction of Livehood, Productivity & Training Center 02/09/10 NHA 4.992 120 O 0.334 0.300 0.150 0.030 0.059 0.923 92.30 -
Compact Builders, Inc. 14492 Construction of Livehood, Productivity & Training Center 5/4/2010 NHA 5.481 120 C 0.4731 0.2000 0.3000 - - - 93.00 94.05
V.Satisfactory
Compact Construction & Development, Inc. 2358
Const. of Multi-Purpose Building (Cancer Care Institute), Cotabato
Regional Medical Center Compound05/26/09 R-XII 9.539 145 C 0.417 0.200 0.300 - - - 91.70 88.76%
Satisifactory
Compass Rose Builders 27024 Repair/Rehab. along Kennon Road 08/29/10 CAR 5.027 70 C 0.328 0.200 0.300 - - - 82.80 82.80% Satisfactory
Concepcion Basic Builders Incorporated 5255 Const. of Bislig Bridge (Completion)
along Surigao-Davao Coastal Road 06/11/10 XIII 92.432 425 C 0.473 0.175 0.300 - - - 94.80 90.18% V. Satisfactory
Concepcion Basic Builders, Incorporated 5255 Const. of Tago-Lapaz Bridge along
SDCR (Alternate Road) 04/04/11 XIII 144.549 375 O 0.352 0.262 0.150 0.030 0.054 0.050 89.80 -
Concepcion Basic Builders, Incorporated 5255 Conc. of Jct. Lingig-Trento Road
Section 04/02/11 XIII 18.618 393 O 0.234 0.300 0.150 0.030 0.060 0.050 82.40 -
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge (Completion)
along Surigao-Davao Coastal Rd. 03/03/10 XIII 92.432 340 O 0.373 0.235 0.150 0.030 0.050 0.033 87.10 -
Concepcion Basic Builders, Incorporated 5255 Const. of Tago-Lapaz Bridge 03/04/10 XIII 92.639 285 C 0.426 0.133 0.300 - - - 85.90 85.90%
Satisfactory
Concepcion Basic Builders, Incorporated 5255 Const. of Tago-Lapaz Bridge along
SDCR (Alternate Road) 08/25/10 XIII 144.549 330 O 0.369 0.240 0.150 0.030 0.061 0.050 90.00 -
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge along
Surigao-Davao Coastal Road 11/27/08 XIII 81.615 365 O 0.286 0.300 0.100 0.030 0.059 0.100 87.50 -
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge along
Surigao-Davao Coastal Road 06/06/09 XIII 81.615 365 O 0.400 0.300 0.097 0.030 0.056 0.050 93.30 -
Congimar Mechanical Services 31490 Const. of Multi-Purpose Building @
Bacnono 05/22/09 I 0.957 96 C 0.489 0.122 0.300 - - - 91.10 *91.10% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page105
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Conrado B. Bautista Construction 11411 Conc. of Road, Purok 1 & 2, Brgy.
Buhangin 08/21/10 III 4.722 150 C 0.384 0.200 0.300 - - - 88.40 86.36% Satisfactory
Constructicon's Inc. 31632 Partial Completion of Multi-Purpose (Covered Court) Building 08/24/09 IVA 6.740 150 C 0.370 0.200 0.300 - - - 87.00 83.85%
Satisfactory
Constructors Development Multi-
Purpose Cooperative31538
Const. of 1-Unit, 4-CL, 2-Storey Building Phase I at M'lang Central
District03/02/10 XII 2.813 120 C 0.487 0.137 0.300 - - - 92.40 92.40%
V. Satisfactory
Constructors Development Multi-
Purpose Cooperative31538 Construction of Bual River Flood
Control 06/01/09 R-XII 8.611 180 C 0.385 0.157 0.300 - - - 84.20 *84.20% Satisfactory
Constructor's Development Multi-
Purpose Cooperative31538 Const. of Bual River Control 03/10/09 XII 4.741 288 C 0.445 0.200 0.300 - - - 94.50 83.58%
Satisfactory
CR Domingo Construction, Inc.
(Formerly: C.R. Domingo Construction)
2992Asphalt Overlay along Jct, Potia-Mt. Province Bdry. Road, Km. 432+767-
Km. 432+00408/24/10 CAR 4.769 20 C 0.428 0.135 0.300 - - - 86.30 86.30%
Satisfactory
Crest Construction 15240Rehab./Reconst./Upgrading of
Cagayan-Apayao Road, Sampaguita-Warat Sect.
03/28/11 II 6.747 90 C 0.480 0.133 0.300 - - - 91.30 *91.30% V. Satisfactory
Crest Construction 15240Rehab./Reconst./Upgrading of
Cagayan-Apayao Road, Sta. Barbara Section
03/28/11 II 6.090 120 C 0.458 0.133 0.300 - - - 89.10 *89.10% V. Satisfactory
Crest Construction 15240Rehab./Reconst./Upgrading of Cagayan-Apayao Road, Sto.
Domingo Sect.03/28/11 II 9.190 120 C 0.452 0.133 0.300 - - - 88.50 *88.50%
Satisfactory
Crest Construction 15240 Rehab./Reconst./Upgrading of Tuao-Abbut Road 03/28/11 II 4.819 137 C 0.434 0.133 0.300 - - - 86.70 *86.70%
Satisfactory
Crest Construction 15240 Conc. of Cagayan-Apayao Road, Tuao-Rizal Section 03/28/11 II 7.714 142 C 0.427 0.133 0.300 - - - 86.00 *86.00%
Satisfactory
Crest Construction 15240
Rehab./Reconst./Upgrading of Damaged Paved National Roads
CAR, Villa Rey-Piat Section KO507+000-KO508+600
09/10/09 II 19.289 120 C 0.432 0.200 0.300 - - - 93.20 91.88% V. Satisfactory
Crest Construction 15240
Rehab./Reconst./Upgrading of Damaged Paved National Roads KO523+000-KO524+180, Alabug-
Tuao Section
09/10/09 II 14.223 120 C 0.429 0.133 0.300 - - - 86.20 *86.20% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page106
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Crest Construction 15240Const./Completion/Continuation of Unfinished On-going Bridges San
Pedro Bridge02/25/10 II 16.394 215 C 0.474 0.133 0.300 - - - 90.70 88.78%
Satisfactory
Crest Construction 15240Asphalt Overlay along Cagayan Apayao Road Iguig Section, KO
496+798-KO 497+00002/15/10 II 2.889 45 C 0.439 0.133 0.300 - - - 87.20 87.20%
Satisfactory
Crest Construction 15240Asphalt Overlay along Cagayan
Apayao Road Alimanao Section, KO 480+127-KO 481+000
02/15/10 II 4.818 45 C 0.435 0.133 0.300 - - - 86.80 86.80% Satisfactory
Crest Construction 15240Asphalt Overlay along Cagayan
Apayao Road Tuguegarao Section, KO 482+1512-KO 482+430
02/15/10 II 6.995 90 C 0.421 0.133 0.300 - - - 85.40 85.40% Satisfactory
Crest Construction 15240 Conc. of Cagayan Valley Agricultural College (CVAC) Road 02/19/10 II 17.367 203 C 0.420 0.133 0.300 - - - 85.30 84.52%
Satisfactory
Crest Construction 15240 Asphalt overlay of Cagayan-Apayao Road, Ugac-Buntun Section 02/27/09 II 4.782 45 C 0.475 0.200 0.300 - - - 97.50 *97.50%
Outstanding
Crest Construction 15240 Retrofitting of Caraycaray Bridge, Biliran-Naval Road 08/25/10 VIII 14.298 240 C 0.402 0.133 0.300 - - - 83.50 84.28%
Satisfactory
Crishelle Construction 17108 Const. of Multi-Purpose Pavement, Brgy. Iwahig 03/05/10 IVB 0.291 70 C 0.357 0.200 0.300 - - - 85.70 83.84%
Satisfactory
Crishelle Construction 17108 Rehab. of Sitio Bitas & Sitio Capisaan FMR 03/03/10 IVB 0.834 90 C 0.402 0.133 0.300 - - - 83.50 83.50%
Satisfactory
Crishelle Construction 17108 Impvt./Regravelling of Sitio Balintang to Amili Isugod FMR 03/03/10 IVB 0.816 90 C 0.401 0.133 0.300 - - - 83.40 83.40%
Satisfactory
Crishelle Construction 17108 Rehabilitation of Road Section, Brgy, Magkakaibigan 06/05/09 IV-B 0.201 70 C 0.427 0.200 0.300 - - - 92.70 *92.70%
V. Satisfactory
Crishelle Construction 17108 Impvt. of Quezon-Punta Baja Road 03/03/09 IV-B 18.990 252 C 0.385 0.133 0.300 - - - 81.80 75.44% Unsatisfactory
CS Construction and Supply (Formerly: CS
Construction)24237 Const. of MPB at Brgy. Alegria 04/12/11 XII 1.927 100 C 0.409 0.133 0.300 - - - 84.20 *84.20%
Satisfactory
CS Construction and Supply (Formerly: CS
Construction)24237
Road Upgrading (Gravel to Concrete) along Isulan Hwy. Jct., Dukay-
Bagumbayan-Sen. Ninoy Aquino Rd. (Masiag Sect.)
08/31/10 XII 14.275 139 C 0.424 0.133 0.300 - - - 85.70 85.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page107
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
CS Construction and Supply (Formerly: CS
Construction)24237 Road Upgrading (Gravel to Concrete)
Panyalam, Sultan Kudarat 06/03/09 R-XII 14.036 267 C 0.394 0.200 0.300 - - - 89.40 86.13% Satisfactory
CTC Builder and Supplies Inc./Sunwest
Const. & Dev. Corp. (JV)JV-06-070 Const. of Dancalan Bridge 02/25/09 V 57.031 720 O 0.352 0.240 0.150 0.030 0.061 0.033 86.60 -
CTC Builder and Supplies Incorporated
(Formerly: CTC Builder)12088 Concreting of Malbog-Siuton Road 05/22/09 V 4.704 120 C 0.401 0.133 0.300 - - - 83.40 *83.40%
Satisfactory
CTC Builder and Supplies Incorporated
(Formerly: CTC Builder)12088 Repair/Impv't. of Pawa River Control 04/14/11 V 1.829 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
CTC Builder and Supplies Incorporated
(Formerly: CTC Builder)12088 Repair/Impv't. of Tawog River
Control, Barangay Tawog 04/14/11 V 1.829 60 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
CTC Builder and Supplies Incorporated
(Formerly: CTC Builder)12088 Road Upgrading (Conc.) of Banuang-
Albay Bdry. Rd. 08/30/10 V 10.460 120 C 0.385 0.200 0.300 - - - 88.50 87.24% Satisfactory
CTC Builders & Supplies, Inc./Sunwest
Construction and Development
JV-06-070 Construction of Dancalan Bridge 02/15/10 V 57.031 720 C 0.441 0.133 0.300 - - - 87.40 86.03% Satisfactory
Currimao Integrated Builders and Const. 8738 Conc. of Pangil-Poblacion Farm-to-
Market Road, Brgy. Pangil 02/22/10 I 1.734 35 C 0.353 0.133 0.300 - - - 78.60 78.60% Unsatisfactory
D. C. E. Construction 29347 Conc. along Apayao-Ilocos Norte Road, Salongsong Sect. 04/01/11 CAR 18.565 436 C 0.453 0.133 0.300 - - - 88.60 89.02%
V. Satisfactory
D. C. E. Construction 29347 Conc. along Apayao-Ilocos Norte Road, Tanglagan Sect. 04/01/11 CAR 23.236 436 C 0.406 0.133 0.300 - - - 83.90 87.26%
Satisfactory
D.C.E Construction 29347Proposed Concreting along
Calanasan-Claveria Road, Poblacion Section
02/27/09 CAR 14.879 414 O 0.356 0.300 0.150 0.030 0.043 0.033 91.20 -
D.C.E Construction 29347Proposed Concreting along
Calanasan-Ilocos Norte Road, Tanglagan Section
02/18/10 CAR 14.116 418 C 0.457 0.133 0.300 - - - 89.00 89.96% V. Satisfactory
D.C.E Construction 29347 Const./Road Opening of Kabugao-Pudtol-Luna Road, Tawit Section 05/28/10 CAR 14.063 355 C 0.323 0.200 0.300 - - - 82.30 82.30%
Satisfactory
D.C.E. Construction 29347Road Upgrading of Rizal National
Road (Liwan-West Babalag-Macutay Section)
04/05/11 CAR 8.996 150 C 0.382 0.200 0.300 - - - 88.20 85.74% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page108
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
D.C.M Construction 5641
Completion of the Const. of Agus II Bridge (Pumping Bridge) &
Approaches, Phase II Raya Madaya-Pumping Road
09/13/09 X 22.952 2,868 O 0.383 0.185 0.150 0.030 0.051 0.033 83.20 -
D.C.M. Construction 5641Const. of Agus III (Pumping) Bridge & Approaches along Raya-Madaya
Pumping Road04/11/11 X 32.933 180 O 0.401 0.240 0.150 0.030 0.042 0.033 89.60 -
D.G Sarmenta Construction 13024 Rehab./Reconst. of Daang Maharlika
KO312+000-KO313+000 08/27/09 II 14.468 125 C 0.416 0.200 0.300 - - - 91.60 91.24% V. Satisfactory
D.G Sarmenta Construction 13024 Const. of Rural Health Center, Gen.
M. Natividad 02/25/10 III 1.427 90 C 0.480 0.133 0.300 - - - 91.30 87.52% Satisfactory
D.G Sarmenta Construction 13024 Road Conc. of Various Barangays 03/01/10 III 0.468 30 C 0.358 0.200 0.300 - - - 85.80 85.80%
Satisfactory
D.G Sarmenta Construction 13024 Const. of Drainage System at Gomez-
San Marcelino 06/04/10 III 3.907 90 C 0.389 0.133 0.300 - - - 82.20 82.20% Satisfactory
D.G Sarmenta Construction 13024
Asphalt Overlay of Marbel-Allah Valley-Cotabato Road, Km. 1781+000-
Km. 1784+000 w/ exception03/04/10 XII 14.371 110 C 0.414 0.200 0.300 - - - 91.40 91.40%
V. Satisfactory
D.G Sarmenta Construction 13024 Sumacab-San Josef-Bonifacio Road 06/01/09 III 22.195 43 C 0.373 0.200 0.300 - - - 87.30 *87.30%
Satisfactory
D.G Sarmenta Construction 13024 Const. of Multi-Purpose Bldg. at
Palayan Central School 03/04/09 III 3.121 90 C 0.425 0.174 0.300 - - - 89.90 *89.90%V. Satisfactory
D.G Sarmenta Construction 13024 Const. of Valdefuente-Fortaleza Rd.,
Km. 121+300 to Km. 125=750 03/04/09 III 28.378 300 C 0.096 0.200 0.300 - - - 59.60 *59.60%Poor
D.G Sarmenta Construction 13024 Const. of two (2) CL School Building
at Cabu E/S 09/05/09 III 1.240 60 C 0.472 0.133 0.300 - - - 90.50 *90.50% V. Satisfactory
D.G Sarmenta Construction 13024 Jct. Tablang-Gabaldon Road 09/10/09 III 38.600 120 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V. Satisfactory
D.G Sarmenta Construction 13024 Digmata Flood Control Pilot Project 09/07/09 III 8.170 90 C 0.333 0.200 0.300 - - - 83.30 *83.30%
Satisfactory
D.G. Chico Trading & Construction Corporation 8748 Const. of 4-Storey Sch. Bldg. at
Bagong Ilog E/S. Brgy. Bagong Ilog 04/05/11 NCR 11.374 180 C 0.477 0.095 0.300 - - - 87.20 *87.20% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page109
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
D.G.O Construction 6788 Reconst. along Baguio-Bontoc Road Km.252+414 - Km.262+000 04/13/11 CAR 5.537 120 C 0.445 0.133 0.300 - - - 87.80 *87.80%
Satisfactory
D.J.D. Construction 32217Rehab./Reconst./Upgrading of
Cagayan Valley Road (Magapit-Jct. Aparri Airport Sect.)
04/04/11 II 9.647 150 O 0.388 0.300 0.042 0.030 0.045 0.033 83.80 -
D.K Jocson Construction / TSD Builders Const.
and Supply JVJV-08-024 Conc. of Road along Bacolod North
Road (Toboso Section) 03/09/09 VIII 18.174 281 O 0.333 0.297 0.150 0.030 0.050 0.033 89.30 -
D.K Jocson Construction/TSD
Builders Construction and Supply Joint Venture
JV-09-120Conc. of Road along Bacolod North Road (Toboso Section) Km.110+620-
Km.112+097.5008/28/10 VI 18.174 281 C 0.317 0.200 0.300 - - - 81.70 86.26%
Satisfactory
D.K. Jocson Construction 6896
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Bacolod-San Carlos Road03/29/11 VI 18.893 205 C 0.429 0.133 0.300 - - - 86.20 86.68%
Satisfactory
D.K. Jocson Construction / TSD
Builders Construction and Supply (JV)
JV-09-120
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Bacolod North Road, Toboso Section
03/29/11 VI 37.696 220 C 0.417 0.135 0.300 - - - 85.20 86.82% Satisfactory
D.L Aureo Construction 24894 Const. of 1CL School Building @ Manlurip Primary School 03/01/10 VIII 0.623 45 C 0.475 0.092 0.300 - - - 86.70 86.70%
Satisfactory
D.L Aureo Construction 24894Rehab./Road Upgrading from Gravel to Concrete Pavement @ Tigbao-Sta.
Fe San Miguel Road09/08/10 VIII 5.505 90 C 0.353 0.200 0.300 - - - 85.30 85.30%
Satisfactory
D.L Aureo Construction 24894 Const. of River Control 08/23/10 VIII 0.482 60 C 0.414 0.133 0.300 - - - 84.70 84.70% Satisfactory
D.M Consunji, Inc. 101Opening/Conc. of Taguig Diversion Rd. (Linking Maestrang Pinang Gen.
Luna St. to C-5)02/25/10 NCR 9.271 1,081 C 0.410 0.133 0.300 - - - 84.30 84.30%
Satisfactory
D.M House Const. Inc. 25810Impvt./Rehab. of Roman Expressway, Bataan 1st Congressional District
05/28/10 III 53.666 90 O 0.386 0.240 0.150 0.030 0.043 0.033 88.20 -
D.M House Const. Inc. 25810Impv't. and Rehab. of Roman
Expressway, Bataan 1st Congressional Dist.
08/17/10 III 53.666 90 C 0.436 0.128 0.300 - - - 86.40 87.48% Satisfactory
D.M House Const. Inc. 25810
Asphalt Overlay/Concrete Reblocking along Manila North Road Intermittent Section (Km.
465+000-Km. 482+800
06/03/09 I 4.884 55 C 0.470 0.133 0.300 - - - 90.30 *90.30% V.Satisfactory
D.M House Const. Inc. 25810 Asphalt Overlay along Olongapo-Bungallon Road (100mm thickness) 03/02/09 III 6.945 30 C 0.423 0.133 0.300 - - - 85.60 *85.60%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page110
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
D.M House Const. Inc. 25810 Asphalt Overlay along Olongapo-Bungallon Road (80 mm thickness) 03/02/09 III 7.385 30 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
D.M House Const. Inc. 25810 Const. of Mulawin Tala Farm-to-Market Road 02/25/09 III 2.391 70 C 0.329 0.200 0.300 - - - 82.90 *82.90%
Satisfactory
D.M House Const. Inc. 25810 Improvement/Rehabilitation of Roman Expressway 05/21/09 III 71.955 150 O 0.378 0.300 0.150 0.030 0.037 0.050 94.50 -
D.M House Const. Inc. 25810 Imprvt./Rehab. of Roman Expressway 08/29/09 III 100.263 150 C 0.446 0.200 0.300 - - - 94.60 94.54%
V. Satisfactory
D.M House Const. Inc. 25810 Const./Completion of DPWH-Bataan 1st District Eng'g Office Bldg. 08/27/09 III 12.143 120 C 0.486 0.133 0.300 - - - 91.90 *91.90%
V. Satisfactory
D.M. House Construction, Inc. 25810 Const./Completion of DPWH-Bataan
1st DEO Bldg. 04/01/11 III 4.767 120 O 0.341 0.300 0.150 0.030 0.023 0.033 87.70 -
D.M. House Construction, Inc. 25810
Conc. Of Odiong Sibalom on Remegio Leon Rd., Km.114+220 -
Km.117+01604/06/11 VI 42.701 313 C 0.417 0.154 0.300 - - - 87.10 85.12%
Satisfactory
D.R Robles Construction 28559 Impvt. of Baybay Sapa Creek, Brgy. Mayamot 06/08/10 IVA 9.632 150 C 0.428 0.200 0.300 - - - 92.80 92.80%
V. Satisfactory
D.R Robles Construction 28559 Impvt. of Flood Control, So. Labangan, Brgy. Matambugan 03/13/09 IVA 1.730 120 C 0.472 0.133 0.300 - - - 90.50 *90.50%
V. Satisfactory
D.R Robles Construction 28559 Repair of Sch. Bldg. @ University of Rizal System 03/13/09 IVA 0.962 45 C 0.423 0.200 0.300 - - - 92.30 *92.30%
V. Satisfactory
D.R Robles Construction 28559 Rehab./Reconst./Upgrading of Antipolo-Teresa Road 08/26/09 IVA 19.207 180 C 0.460 0.200 0.300 - - - 96.00 91.68%
V. Satisfactory
D.R Robles Construction 28559 Repair & Impvt. of Brgy. San Guillermo Road 02/17/10 IVA 9.612 45 C 0.337 0.200 0.300 - - - 83.70 83.70%
Satisfactory
D.R Robles Construction 28559 Repair/Rehab. of MPB, Brgy. Western Bicutan 06/03/10 NCR 4.798 90 C 0.452 0.200 0.300 - - - 95.20 95.20%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page111
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
D.R Robles Construction 28559 Repair/Rehab. of Masambong H/S 08/31/10 NCR 2.503 90 C 0.462 0.133 0.300 - - - 89.50 89.50% V. Satisfactory
D.R. Robles Construction 28559 Widening of Angono Diversion Road 04/15/11 IVA 19.228 209 C 0.396 0.200 0.300 - - - 89.60 87.62% Satisfactory
D.S.O Enterprises 10733 Completion of MPB Brgy. Pangil 02/22/10 IVA 0.396 30 C 0.387 0.200 0.300 - - - 88.70 88.70% Satisfactory
Dadoy Freight Service Construction and Supply 28465 Const. of Barangay Sto. Nino-Sta.
Maria FMR (Phase I) 04/11/11 IVB 0.698 30 C 0.369 0.200 0.300 - - - 86.90 *86.90% Satisfactory
Dadoy Freight Service Construction and Supply 28465 Const. of Sta. Maria NHS 2-CL
Building 04/11/11 IVB 1.047 75 O 0.360 0.218 0.137 0.030 0.029 0.050 82.40 -
Dadoy Freight Service Construction and Supply 28465 Rehab./Repair of Jct. Limon Norte-
Cahayagan FMR 06/10/10 IVB 4.813 75 C 0.348 0.200 0.300 - - - 84.80 84.80% Satisfactory
Daewoo Engineering & Construction Co., Ltd. FC-01-108
Const. of Agno River Flood Control Project, Phase II, Contract Package II-
Guide Channel to Bayambang06/11/10 MFCDP II 1,580.331 1,614 O 0.375 0.300 0.150 0.030 0.055 0.050 96.00 -
Daewoo Engineering & Construction Co., Ltd. FC-01-108
Agno River Flood Control Project II, Package II-Guide Channel to Bayambang, Alcala-Bautista
08/26/09 MFCDP 1,511.681 1,492 O 0.376 0.300 0.150 0.030 0.065 0.050 97.10 -
Daewoo Engineering & Construction Company,
Ltd.FC-01-108
Const. of CP 2, Guide Channel to Bayambang under the Agno River
Flood Control Project, Phase II11/20/08 NIA 1,480.299 1,340 O 0.365 0.200 0.100 0.030 0.070 0.200 96.50 -
Dahl Construction 8931 Rehab./Impvt. of Taytay Diversion Road 03/12/09 IV-A 14.402 162 C 0.476 0.133 0.300 - - - 90.90 91.26%
V. Satisfactory
Dahl Construction 8931Rehab./Reconst./Upgrading of Damaged Pavement along T.
Santiago St.08/19/10 NCR 9.503 120 C 0.347 0.133 0.300 - - - 78.00 78.00%
Unsatisfactory
Dalanon Construction Refrigeration Supply &
Service11205 Road Upgrading (Gravel to Concrete)
Sewod-Bunay Section 09/09/09 XII 19.837 378 C 0.373 0.200 0.300 - - - 87.30 90.43% V. Satisfactory
Dalanon Construction Refrigeration Supply &
Service11205 Rehab./Reconst. of Dulawan-Marbel
(Tacurong-New Carmen Section) 06/08/10 XII 12.222 254 O 0.291 0.203 0.150 0.030 0.051 0.050 77.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page112
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Dalanon Construction Refrigeration Supply &
Service11205
Road Upgrading (Gravel to Paved) along Isulan Hwy. Jct. Dukay
Bagumbayan-Sen. Ninoy Aquino Road (Gamasil/Sitio Francisco Sec.)
08/30/10 XII 14.267 161 C 0.454 0.138 0.300 - - - 89.20 89.20% V. Satisfactory
Dalanon Construction Refrigeration Supply &
Service11205 Rehab./Reconst. of Dulawan-Marbel
(Tacurong-New Carmen Section) 09/01/10 XII 12.222 254 C 0.420 0.148 0.300 - - - 86.80 83.35% Satisfactory
Dalanon Construction Refrigeration Supply &
Service11205
Conc./Widening of Dulawan-Marbel Road (New Carmen Sect. with Bridge
Exception)06/03/09 R-XII 0.289 15 C 0.401 0.200 0.300 - - - 90.10 *90.10%
V. Satisfactory
Dalebo Construction & General Merchandise 32699 Repair/Rehab. of Academic and TLE
Building at Cavite Nat'l High School 03/01/10 IVA 1.169 60 C 0.404 0.200 0.300 - - - 90.40 90.40% V. Satisfactory
Damico Builders & Supplies 30355 Conc. of Road, Brgy. San Rafael 04/07/11 III 1.843 60 C 0.344 0.200 0.300 - - - 84.40 *84.40%
Satisfactory
Damico Builders & Supplies 30355 Rehab. of FMR at San Juan De
Valdez 02/24/10 III 0.477 30 C 0.363 0.200 0.300 - - - 86.30 86.30% Satisfactory
Damico Builders & Supplies 30355 Rehab. of FMR at San Agustin 02/24/10 III 0.716 45 C 0.359 0.200 0.300 - - - 85.90 85.90%
Satisfactory
Damico Builders & Supplies 30355 Conc. of Brgy. Rd., Brgy. Balibago II
(Phase I) 08/27/10 III 1.418 70 C 0.342 0.200 0.300 - - - 84.20 84.20% Satisfactory
Damico Builders & Supplies 30355 Concreting of Brgy. Road from Brgy.
San Agustin to Brgy. Bantog 09/02/09 III 1.687 87 O 0.365 0.240 0.150 0.030 0.047 0.033 86.50 -
Danvic Construction 24439Rehab./Impvt. of DPWH Davao City
1st DEO Bldg. inc. Employees Quarters
03/18/09 XI 7.560 198 C 0.493 0.200 0.300 - - 99.30 98.46% Outstanding
Danvic Construction 24439Improvement/ Rehab. for Package 1-
D Catalunan Grande Rd., Brgy. Catalunan Grande
09/17/09 XI 4.718 115 C 0.442 0.200 0.300 - - - 94.20 *94.20% V. Satisfactory
Danysons Construction 25452Road Upgrading of Ilagan-Delfin,
Albano-Mallig Road, Olango Manano Section
04/06/11 II 15.338 120 C 0.443 0.133 0.300 - - - 87.60 86.16% Satisfactory
Danysons Construction 25452 Rehab./Reconst./Upgrading of Gamu-Roxas Road, Roxas Section 04/06/11 II 9.646 180 O 0.358 0.244 0.150 0.030 0.042 0.033 85.70 -
Danysons Construction 25452Rehab./Reconst./ Upgrading of
Ilagan-Delfin Albano-Malig Road (Olango Sect.)
08/25/10 II 2.890 75 C 0.357 0.200 0.300 - - - 85.70 86.00% Satisfactory
Darynn Construction & Supply 22322 Const. of Hospital Building,
Provincial Hospital 04/02/11 XI 1.423 90 O 0.374 0.300 0.150 0.022 0.041 0.050 93.70 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page113
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Darynn Construction & Supply 22322
Construction of Drainage at R. Castillo National Road, Brgy. R.
Castillo03/08/10 XI 1.883 105 C 0.422 0.200 0.300 - - - 92.20 92.20%
V. Satisfactory
Darynn Construction & Supply 22322 Const. of Multi-Purpose Building @
Brgy. San Isidro 02/25/10 XI 2.861 110 C 0.463 0.133 0.300 - - - 89.60 89.60% V. Satisfactory
Darynn Construction & Supply 22322 Rehab./Impv't. of DPWH Davao del
Sur 1st DEO 08/27/10 XI 2.885 110 C 0.500 0.133 0.300 - - - 93.30 90.36% V. Satisfactory
Darynn Construction & Supply 22322 Const. of MPB at Bitaug 03/06/09 XI 1.714 110 C 0.450 0.200 0.300 - - - 95.00 86.46%
Satisfactory
Davao Concrete Products 12090 Const. of Drainage from Public Market to Municipal Road, Brgy. Pob. 04/07/11 XI 0.800 75 C 0.415 0.197 0.300 - - - 91.20 *91.20%
V. Satisfactory
Davao Concrete Products 12090Const./Rehab. of Sch. Bldg. (Const. of two (2) Storey Sch. Bldg.) Brgy.
Southern Davao04/11/11 XI 7.086 120 C 0.436 0.200 0.300 - - - 93.60 87.02%
Satisfactory
Davao Concrete Products 12090 Impvt./Conc. of Babak-Samal-Kaputian 02/27/10 XI 34.266 121 C 0.317 0.200 0.300 - - - 81.70 88.66%
Satisfactory
Davao Concrete Products 12090 Impvt./Conc. of Babak-Samal-Kaputian, Island Garden 06/02/09 XI 33.719 90 O 0.366 0.300 0.150 0.030 0.037 0.050 93.30 -
Davao Concrete Products 12090 Const. of Multi-Purpose Building, Muslim, Jama-a Brgy. Maputi 06/05/09 XI 0.352 60 C 0.497 0.121 0.300 - - - 91.80 *91.80%
V. Satisfactory
Davao Concrete Products 12090 Impvt./Conc. of Babak-Samal-Katipunan Road, Katipunan Section 03/13/09 XI 34.712 286 O 0.327 0.274 0.150 0.022 0.060 0.050 88.30 -
Davao Concrete Products 12090 Impv't/Conc. of Inawayan-Baracatan Road 03/02/09 XI 14.922 210 C 0.314 0.200 0.300 - - - 81.40 84.46%
Satisfactory
Davao Concrete Products 12090 Repair/Rehab. of MPB at Brgy. 76-A 03/18/09 XI 18.908 225 C 0.418 0.170 0.300 - - - 88.80 94.19% V. Satisfactory
Davao Concrete Products 12090
Road Upgrading ( Gravel to Paved) of Babak-Samal-Kaputian Road
Anonang Section Island Garden City of Samal
09/07/09 XI 5.775 60 C 0.476 0.151 0.300 - - - 92.70 93.48% V. Satisfactory
Davao Concrete Products 12090 Const. of Speech Laboratory Building Digos City NHS 09/05/09 XI 1.632 60 C 0.488 0.133 0.300 - - - 92.10 *92.10%
V. Satisfactory
Davao Concrete Products 12090
Impvt./Widening of Agusan-Davao Road (Daang Maharlika), Poblacion
Carmen and Poblacion Panabo Sections
09/08/09 XI 14.459 120 C 0.433 0.200 0.300 - - - 93.30 90.96% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page114
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Davao Concrete Products 12090Impvt./Conc. of Babak-Samal-
Katipunan Road (Km. 1522+100) Katipunan Section
09/08/09 XI 34.712 286 C 0.461 0.151 0.300 - - - 91.20 84.69% Satisfactory
Davao Contractor Development Cooperative
28542 Completion of unfinished work in the multi-purpose gynasium 08/12/09 DOST 2.374 - C 0.500 0.200 0.00 - - - 70.00 70.00%
Poor
Davao Contractors Development Cooperative
(DACODECO)
28542 Completion of Multi-Purpose Building @ Brgy. Limbaan 02/27/10 XI 1.082 60 C 0.434 0.200 0.300 - - - 93.40 93.40%
V. Satisfactory
Davao Contractors Development Cooperative
(DACODECO)
28542 Const. of MPB @ Purok 4, Bliss, Brgy. San Miguel 02/27/10 XI 2.359 90 C 0.470 0.133 0.300 - - - 90.30 90.30%
V. Satisfactory
Davao Contractors Development Cooperative
(DACODECO)
28542 Completion of Multi-Purpose Building, Brgy. Calumpang 03/11/10 XII 1.410 60 C 0.403 0.165 0.300 - - - 86.80 86.80%
Satisfactory
Davao Contractors Development Cooperative
(DACODECO)
28542 Const. of MPB Brgy. Linintian 03/02/10 XIII 0.369 88 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory
Davao Contractors Development Cooperative
(DACODECO)
28542Rehab./Impvt. of DPWH Davao del Norte DEO Bldg. inc. Employees
Quarters03/12/09 XI 9.642 280 C 0.478 0.146 0.300 - - - 92.40 90.44%
V. Satisfactory
Davao Contractors Development Cooperative
(DACODECO)
28542 Const. of MPB, Brgy. Mabini 03/14/09 XII 0.667 70 C 0.475 0.133 0.300 - - - 90.80 83.52% Satisfactory
Davao Engineers Contractors Cooperative
(DECC)30944 Concreting of Road @ Brgy. Tawan-
Tawan 05/25/09 XI 0.940 90 C 0.456 0.133 0.300 - - - 88.90 *88.90% Satisfactory
Davao Engineers Contractors Cooperative
(DECC)30944 Concreting of Road @ Brgy.
Balengaeng, Tugbok District 05/25/09 XI 0.938 90 C 0.422 0.133 0.300 - - - 85.50 *85.50% Satisfactory
Davao Engineers Contractors Cooperative
(DECC)30944 Completion of 4-CL, 2-Storey SB, @
E.B. Lopez NHS 09/01/09 XI 1.141 120 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory
Davao Engineers Contractors Cooperative
(DECC)30944 Const. of DPWH-DCSDEO Bldg.
including Employees Quarter, Mintal 09/01/09 XI 4.810 180 C 0.481 0.187 0.300 - - - 96.80 88.75% Satisfactory
Davao Engineers Contractors Cooperative
(DECK)30944 Construction of 3CL, 3-Storey at
Bangoy NHS 03/10/10 XI 3.362 115 C 0.470 0.133 0.300 - - - 90.30 92.54% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page115
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Davao Engineers Contractors Cooperative
(DECK)30944 Package C - Const. of Multi-Purpose
Building @ Brgy. Los Amigos 02/23/10 XI 0.975 150 C 0.436 0.133 0.300 - - - 86.90 86.90% Satisfactory
Davao Engineers Contractors Cooperative
(DECK)30944 Package B-Const. of Multi-Purpose
Building @ Brgy. Suawan 02/23/10 XI 2.263 150 C 0.414 0.133 0.300 - - - 84.70 84.70% Satisfactory
Davao Engineers Contractors Cooperative
(DECK)30944
Package 1) Installation of Transmission Pipes (WS) at Brgy. Marilog Proper, Marilog District
05/31/10 XI 1.411 120 C 0.488 0.133 0.300 - - - 92.10 92.10% V. Satisfactory
Davao Engineers Contractors Cooperative
(DECK)30944 Rehab./Impv't. of Davao-Cotabato
Rd. 08/23/10 XI 5.090 180 C 0.476 0.133 0.300 - - - 90.90 90.36% V. Satisfactory
Davao Rock Mixer Enterprises 19250 Talakag Irrigation Project 09/26-10/01/11 NIA 14.588 450 O 0.302 0.300 0.000 0.030 0.051 0.050 73.28 -
Davao Rock Mixer Enterprises 19250 Concreting of Road of Poblacion-
Pangutusan Section 03/16/09 XI 9.629 120 C 0.335 0.200 0.300 - - - 83.50 *83.50% Satisfactory
Davhez Trading and Construction 9833 Completion of Sch. Bldg. at
Pamplona Central E/S 04/13/11 NCR 1.713 60 C 0.493 0.180 0.300 - - - 97.30 *97.30% Outstanding
Davhez Trading and Construction 9833 Repair/Rehab. of Sch. Bldg. at
Pamplona E/S 04/13/11 NCR 1.427 60 C 0.473 0.200 0.300 - - - 97.30 *97.30% Outstanding
Davhez Trading and Construction 9833
Completion of Multi-Purpose Building at Talon 3 (Caseria
Mariposa)06/04/09 NCR 2.209 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
Davhez Trading and Construction 9833
Const. of Three (3) Storey, Nine (9) CL Sch. Bldg., Las Piñas Science
High School09/04/09 NCR 10.049 140 O 0.331 0.225 0.150 0.020 0.058 0.033 81.70 -
Davhez Trading and Construction 9833 Const. of MPB at Brgy. Ilaya and
Waste Management Facilities 09/02/10 NCR 0.970 206 C 0.465 0.133 0.300 - - - 89.80 89.80% V. Satisfactory
DCE Construction 29347 Conc. along Calanasan-Claveria Road, Poblacion Section 02/19/10 CAR 14.875 538 O 0.353 0.240 0.150 0.030 0.035 0.033 84.10 -
De Jesus Construction 11452 Const. of MPB at Carbon E/S (Phase I) 08/19/10 III 1.882 55 C 0.460 0.106 0.300 - - - 86.60 86.60%
Satisfactory
De Jesus Construction 11452 Concreting of Road, Sitio Bato-Bato and Malimatac, Brgy. Mabuco 08/27/09 III 0.475 60 C 0.394 0.133 0.300 - - - 82.70 *82.70%
Satisfactory
De La Cruz Construction and Supply 20775 Const. of Multi-Purpose Building at
Hibago Elementary School 03/02/10 V 3.342 120 C 0.459 0.154 0.300 - - - 91.30 91.30% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page116
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Deabsres Construction & Supply (Formerly:
Deabsres Sand & Gravel & Gen. Contr.)
10392 Rehab. of FMR @ Brgy. Diket to Brgy. Justo Abalos 04/14/11 I 0.699 36 C 0.428 0.133 0.300 - - - 86.10 *86.10%
Satisfactory
Dellosa Design-Build Services 11533 Additional Conc. of Road, Lagao-
Conel Rd. 04/14/11 XII 1.383 95 C 0.394 0.145 0.300 - - - 83.90 *83.90% Satisfactory
Digos Tesston Construction & Supplies 8921
Rehab./Reconst. of Damaged Paved National at Lipata, Surigao Del Norte-Davao City Highway through Marlika,
Daang Maharlika Rd. (Agusan to Davao Rd.) Ilang-Tibungco Sect.
06/17/10 XI 19.290 113 O 0.361 0.240 0.150 0.030 0.047 0.050 87.80 -
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921 Const. of Additional 2 Lanes along Davao-Cotabato Road (Bato Section) 04/02/11 XI 19.284 210 O 0.334 0.300 0.150 0.030 0.045 0.033 89.20 -
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921Conc. of Bansalan-Mt. Apo National
Park Road Mabunga-Buenavista Sect.
04/02/11 XI 9.907 237 C 0.354 0.200 0.300 - - - 85.40 86.42% Satisfactory
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921 Conc. of Bansalan-Mt. Apo National Park Road Managa-Pananag Sect. 04/02/11 XI 16.655 237 C 0.275 0.200 0.300 - - - 77.50 84.76%
Satisfactory
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921
Rehab./Reconst. Of Damaged Paved National Rd. at Lipata (Surigao del
Norte-Davao City) Highway Through Daang Maharlika Rd. (Agusan to Davao Rd.) Ilang-Tibungco Sect.
09/08/10 XI 19.290 128 C 0.392 0.200 0.300 - - - 89.20 88.36% Satisfactory
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921Rehab./Reconst. Of Damaged Paved
National Rds. at Davao Diversion Rd., Pangi Bangkal Sect.
09/09/10 XI 19.280 120 C 0.392 0.200 0.300 - - - 89.20 88.00% Satisfactory
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921Conc. Of Bansalan-Mt.Apo National
Park Road, Managa-Buenavista Section
08/27/10 XI 9.907 210 O 0.333 0.290 0.150 0.030 0.043 0.033 87.90 -
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921 Concreting of Roads at Package B-1 Brgy. 76-A, Candelaria St. 03/18/09 XI 0.956 120 C 0.380 0.200 0.300 - - - 88.00 *88.00%
Satisfactory
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921 Const./Completion of DPWH-DCSDEO Bldg., Tugbok District 03/02/09 XI 9.635 210 C 0.414 0.200 0.300 - - - 91.40 89.16%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page117
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Digos Tesston Construction & Supplies
(Formerly: ACT Constructuion)
8921 Raod Upgrading of Bansalan-Mt. Apo National Park Road 09/05/09 XI 24.104 175 C 0.482 0.133 0.300 - - - 91.50 90.78%
V. Satisfactory
Diplahan Commercial & Construction 32037 Rehab. of MPB (Covered Court) at
Poblacion, Diplahan 04/03/11 IX 0.934 120 C 0.473 0.133 0.300 - - - 90.60 *90.60% V. Satisfactory
Diplahan Commercial & Construction 32037 Rehab. of MPB at Poblacion
Malangas 09/06/10 IX 2.803 120 C 0.408 0.133 0.300 - - - 84.10 85.78% Satisfactory
Dipolog Top Construction and
Development Corporation
6678Upgrading (Gravel to Concrete) of
Sindangan-Siayan-Dumingag-Mahayag Rd. (Lagag-Denoyan Sect.)
06/16/10 IX 38.147 335 C 0.455 0.133 0.300 - - - 88.80 85.74% Satisfactory
Dipolog Top Construction and
Development Corporation
6678 Road Upgrading of Dipolog-Punta Dansullan-Sergio Osmeña Road 03/18/09 IX 18.879 400 O 0.380 0.263 0.150 0.030 0.048 0.050 92.10 -
Dipolog Top Construction and Dev't.
Corporation6678
Road Upgrading (Gravel to Concrete) along Dipolog-Punta-Dansullan-
Sergio Osmeña Road, Km. 1850+544.16-Km. 185+720
06/10/09 IX 18.879 400 C 0.443 0.133 0.300 - - - 87.60 88.26% Satisfactory
DJCM Construction 27678Continuation of Const. of MPB
Barangay Gabu near Laoag City Airport
08/19/10 I 1.888 60 C 0.475 0.133 0.300 - - - 90.80 90.80% V. Satisfactory
DJCM Construction 27678Continuation of the Const. of Health
Facility, Gov. Roque, Ablan Sr. Memorial Hospital
06/05/09 I 0.850 34 C 0.473 0.067 0.300 - - - 84.00 *84.00% Satisfactory
DK Construction 19367 Const. of MPB at Brgy. Barcenaga 05/28/10 IVB 0.997 40 C 0.458 0.133 0.300 - - - 89.10 89.10% V. Satisfactory
DK Construction 19367 Completion of MPB at Brgy. Barcenaga 09/02/10 IVB 1.541 60 C 0.397 0.170 0.300 - - - 86.70 86.70%
Satisfactory
DK Construction 19367 Construction of Multi-Purpose Building at Ordovilla 06/25/09 IV-B 0.865 60 C 0.428 0.131 0.300 - - - 85.90 *85.90%
Satisfactory
DL Enterprises 18155 Completion of Bonifacio MPB, Municipality of Bonifacio 08/24/10 X 0.951 90 C 0.417 0.200 0.300 - - - 91.70 91.70%
V. Satisfactory
DL Enterprises 18155 Const. of Road 03/16/09 X 1.906 204 C 0.471 0.200 0.300 - - - 97.10 82.13% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page118
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
DL Enterprises 18155Const. of Tangub City-Don
Victoriano Road, Tangub City Section
03/17/09 X 22.914 723 O 0.331 0.300 0.150 0.030 0.045 0.050 90.60 -
DMJ Construction & Supply 17211 Const. of Drainage Box Culvert &
Slope Protection Works, Bayanti 02/19/10 III 7.605 32 C 0.418 0.200 0.300 - - - 91.80 91.80% V. Satisfactory
DMJ Construction & Supply 17211 Rehab. of BMC Road Phase I & II,
Brgy. San Agustin 02/19/10 III 28.430 45 C 0.471 0.133 0.300 - - - 90.40 90.40% V. Satisfactory
DMJ Construction & Supply 17211
Asphalt Overlay along Olongapo-Bugallon Rd. Km.248+000 -
Km.250+00005/30/10 III 11.491 20 C 0.469 0.133 0.300 - - - 90.20 90.20%
V. Satisfactory
DMJ Construction & Supply 17211 Reconst. of Candelaria Public Market 05/29/10 III 9.554 90 C 0.442 0.133 0.300 - - - 87.50 90.20%
V. Satisfactory
DMJ Construction & Supply 17211 Rehab./Impv't. of Dike along Vega-
Maculcol 05/28/10 III 4.753 60 C 0.431 0.133 0.300 - - - 86.40 86.40% Satisfactory
DMJ Construction & Supply 17211
Reconst. of Nat'l. Highway, Baloganon Sect./Palauig Sect. (Km.235+000 - Km..237+000)
Masinloc along Olongapo - Bugallon Rd. Km.214+500 - Km.215+400,
Palauig along Olongapo - Bugallon Rd.
08/24/10 III 14.259 15 C 0.482 0.133 0.300 - - - 91.50 91.50% V. Satisfactory
DMJ Construction & Supply 17211
Rehab./Reconst./Upgrading of Damaged Paved along Amungan-
Palauig Banlog Rd.08/24/10 III 66.607 45 C 0.483 0.125 0.300 - - - 90.80 90.80%
V. Satisfactory
DMJ Construction & Supply 17211
Rehab./Reconst./Upgrading of Damaged Paved along San
Marcelino-San Antonio-San Narciso Rd., San Narciso Sect.
08/24/10 III 57.034 45 C 0.443 0.128 0.300 - - - 87.10 87.10% Satisfactory
DMJ Construction & Supply 17211 Rehab./Improvement of Amungan-
Palauig-Banlog Road 05/26/09 III 28.517 30 C 0.403 0.200 0.300 - - - 90.30 *90.30%V. Satisfactory
DMJ Construction & Supply 17211
Package III: Rehab/Improvement of Olongapo-Bugallon Road
1. Masinloc Section2. Palauig Section
05/26/09 III 45.858 50 C 0.401 0.200 0.300 - - - 90.10 *90.10%V. Satisfactory
DMJ Construction & Supply 17211 Const./Impvt. of MPB 03/02/09 III 9.423 120 C 0.436 0.133 0.300 - - - 86.90 84.98%
Satisfactory
DMJ Construction & Supply 17211 Repair/Rehab. of Olongapo-
Bungallon Road, Sindal Section 03/02/09 III 9.796 12 C 0.422 0.133 0.300 - - - 85.50 *85.50% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page119
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
DMJ Construction & Supply 17211
Package I-Rehab./Impvt. of Olongapo-Bugallon Rd., 1 San Felipe Sect. 2,
Botolan Sect.09/02/09 III 47.769 90 C 0.434 0.133 0.300 - - - 86.70 84.96%
Satisfactory
DNK Construction and Supply 33539 Const. of Multi-Purpose Building 06/01/10 V 0.480 60 C 0.424 0.133 0.300 - - - 85.70 85.70%
Satisfactory
Domarax Construction and Development 5502 Conc. of Roads, Brgy. del Rosario 08/29/10 XIII 1.398 117 C 0.424 0.133 0.300 - - - 85.70 87.26%
Satisfactory
Domarax Construction and Development 5502 Conc. of Roads, Poblacion Tubod,
Brgy. Poblacion 08/29/10 XIII 0.978 115 C 0.457 0.133 0.300 - - - 89.00 87.20% Satisfactory
Domarax Construction and Development 5502
Road Upgrading (Gravel to Concrete), Surigao City-San Juan
Coastal Road08/29/10 XIII 5.199 150 C 0.470 0.133 0.300 - - - 90.30 86.22%
Satisfactory
Domarax Construction and Development 5502 Const. of Box Culvert, Brgy. Cawilan 04/06/11 XIII 2.358 210 C 0.427 0.200 0.300 - - - 92.70 *92.70%
V. Satisfactory
Domarax Construction and Development 5502 Const. of MPB Surigao del Sur State
University San Miguel Campus 04/05/11 XIII 1.100 120 O 0.375 0.300 0.064 0.030 0.025 0.033 82.70 -
Domarax Construction and Development 5502 Const. of San Juan National High
School, Brgy. San Juan 03/01/10 XIII 1.432 86 C 0.422 0.133 0.300 - - - 85.50 85.08% Satisfactory
Domarax Construction and Development 5502 Conc. of Roads, Brgy. Del Rosario 06/07/10 XIII 1.398 117 O 0.395 0.240 0.150 0.030 0.035 0.033 88.30 -
Domarax Construction and Development 5502 Conc. of Road Protection Tubod,
Brgy. Poblacion 06/07/10 XIII 0.978 115 O 0.367 0.245 0.150 0.030 0.035 0.033 86.00 -
Domarax Construction and Development 5502 Road Upgrading (Gavel to Concrete)
Surigao City-San Juan Coastal Road 06/07/10 XIII 5.199 150 O 0.347 0.240 0.150 0.030 0.035 0.033 83.50 -
Domarax Construction and Development 5502
Completion of DPWH Employee's Quarter & Conferrence Hall DPWH
Compound09/08/09 XIII 2.893 90 C 0.489 0.150 0.300 - - - 93.90 95.93%
V.Satisfactory
Donato-Sakiwat Construction 33291 Conc. of Gadagad-Guiweng FMR 04/11/11 CAR 0.979 45 C 0.397 0.133 0.300 - - - 83.00 *83.00%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page120
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Double L Construction & Development Enterprises 9834 Reconst. of Dumaguete Airport Road
(Intermittent Section) 03/12/09 VII 10.395 185 C 0.477 0.133 0.300 - - - 91.00 82.48%Satisfactory
Double L Construction and Development
Enterprises9834
Rehab. of Tugas Section, Tanjay City, Dumaguete North Rd.,
Km.27.400 - Km.28.40004/05/11 VII 19.198 240 O 0.301 0.300 0.150 0.030 0.040 0.050 87.10 -
Double L Construction and Development
Enterprises9834
Rehab./ Reconst./ Upgrading Dumaguete North, Mainit-Ajong
Road Section09/12/09 VII 38.320 280 O 0.387 0.300 0.150 0.030 0.042 0.050 95.90 -
Double L Construction and Development
Enterprises9834
Rehab./Reconst./Upgrading of Damaged National Roads,
Dumaguete North Road, Mainit-ajong Road Section
09/02/10 VII 38.400 310 C 0.394 0.200 0.300 - - - 89.40 92.79% V. Satisfactory
Double L Construction and Development
Enterprises9834
Const./Impvt. of Dumaguete North Road (Intemittent Sections) a)
Himampangon Section, Manjuyod: Km. 62.720-Km.63.233; b) Manjuyod
09/09/10 VII 63.690 330 O 0.323 0.300 0.000 0.030 0.061 0.050 76.40 -
Double L Construction and Development
Enterprises9834 Concreting of Bios-os-Jantianon
Road (Intermittent Section) 05/26/09 VII 9.400 130 C 0.363 0.200 0.300 - - - 86.30 85.88% Satisfactory
Double L Construction and Development
Enterprises9834
Rehab./Reconst./Upgrading of DSR Real Dumaguete Public Market
Section Dumaguete South Road03/02/10 VII 36.480 310 C 0.437 0.133 0.300 - - - 87.00 87.96%
Satisfactory
Doulos Construction 30759Road Upgrading along Kalinga-Cagayan Road (Calanan-Enrile
Section)03/02/09 CAR 3.665 150 C 0.318 0.200 0.300 - - - 81.80 72.20%
Poor
DQT Builders Corporation 7950 Road Upgrading MSR, (Gravel to
Paved) Jct. Lopez-Buenavista Rd. 08/27/10 IVA 19.294 120 C 0.426 0.150 0.300 - - - 87.60 87.60% Satisfactory
DQT Builders Corporation 7950
Restoration of Collapsed Slope Protection, Tayabas-Mainit-Mauban
Rd., Brgy. Pinagbanderahan08/27/10 IVA 2.408 36 C 0.424 0.133 0.300 - - - 85.70 85.70%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page121
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
DQT Builders Corporation 7950 Const. of 1CL School Building at
Villa Padua Elementary Sch. 02/19/10 IVA 0.523 120 C 0.464 0.200 0.300 - - - 96.40 96.40% Outstanding
DQT Builders Corporation 7950 Const. of 1 CL School Building San
Roque Ilaya NHS 08/26/09 IVA 0.601 60 C 0.483 0.133 0.300 - - - 91.60 *91.60% V.Satisfactory
DQT Builders Corporation 7950 Const. of 1 CL School Building
Cogorin Ibaba NHS 08/26/09 IVA 0.601 60 C 0.466 0.133 0.300 - - - 89.90 *89.90% V.Satisfactory
DQT Builders Corporation 7950
Conc. of San Francisco -San Andres- San Narciso Road Barangay Binay
Section, Km. 381+457.50-Km. 382+164
08/25/09 IVA 19.086 150 C 0.452 0.133 0.300 - - - 88.50 *88.50% Satisfactory
DQT Builders Corporation 7950 Const. of 2 CL School Building
Palsabangon E/S 09/10/09 IVA 0.999 60 C 0.492 0.073 0.300 - - - 86.50 *86.50% Satisfactory
DQT Builders Corporation 7950 Rehab./Reconst. of MSR - Diversion
Road 08/27/09 IVA 27.964 114 C 0.406 0.133 0.300 - - - 83.90 *83.90% Satisfactory
DQT Builders Corporation (Formerly:
DQT Builders)7950
Const./Conc. of Candelaria By-Pass Road, Brgy. Pahinga Norte, inc.
RROW03/31/11 IVA 17.630 392 C 0.381 0.200 0.300 - - - 88.10 89.30%
V. Satisfactory
DQT Builders Corporation (Formerly:
DQT Builders)7950
Road Upgrading (Gravel to Concrete) Based on Gravel Road Strategies,
San Francisco-San Andres-San Narciso Road (Pansoy/Talisay
Section)
03/30/11 IVA 37.362 180 C 0.419 0.200 0.300 - - - 91.90 88.42% Satisfactory
DQT Builders Corporation (Formerly:
DQT Builders)7950
Pandanan River Control along Maharlika Highway, Canda Ibaba
Sect.05/31/10 IVA 4.820 60 C 0.455 0.133 0.300 - - - 88.80 88.80%
Satisfactory
DQT Builders Corporation (Formerly:
DQT Builders)7950
Repair/Rehab. of Slope Protection along Tayabas-Mainit-Mauban Rd., Km.156+580 - Km.156+725, (Right
Side) with exception
05/27/10 IVA 2.408 36 C 0.442 0.133 0.300 - - - 87.50 87.50% Satisfactory
DQT Builders Corporation
(Formerly:DQT Builders)7950
Impvt. of Lucena Bdry.-Tayabas-Lucban-Sampaloc-Mauban Road
(Sampaloc Side)02/26/09 IVA 19.199 222 C 0.435 0.133 0.300 - - - 86.80 84.46%
Satisfactory
DSB Construction & Supply, Inc. 16126
Restoration of Damaged Roadway (Albay West Coast Rd. Dumalagan
Sect.) Sitio Dumalagan, Pantao08/21/10 V 9.529 90 C 0.474 0.170 0.300 - - - 94.40 89.96%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page122
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
DSB Construction & Supply, Inc. 16126 Road Upgrading of Bagong Silang
Capalonga Road 09/01/10 V 14.450 145 C 0.392 0.200 0.300 - - - 89.20 86.62% Satisfactory
DSB Construction & Supply, Inc. 16126 Const. of Lidong MPB, Brgy. Lidong 08/17/10 V 0.479 150 C 0.453 0.099 0.300 - - - 85.20 85.20%
Satisfactory
DSB Construction & Supply, Inc. 16126 Rehab./Reconst. of Gahonon Rd.,
Brgy. Gahonon 09/01/10 V 12.984 145 C 0.409 0.153 0.300 - - - 86.20 85.06% Satisfactory
DSB Construction & Supply, Inc. 16126
Completion of the Reconst. of Gabaldon SB, Malilipot Central
School08/17/10 V 3.834 150 C 0.408 0.133 0.300 - - - 84.10 84.10%
Satisfactory
DSB Construction & Supply, Inc. 16126 Completion of San Jose Multi-
Purpose Building (Phase VII) 09/01/09 V 7.188 160 C 0.473 0.169 0.300 - - - 94.20 92.45% V. Satisfactory
DSB Construction & Supply, Inc. 16126 Rechanneling/Deepening of River in
San Vicente 09/01/09 V 19.288 105 C 0.416 - 0.500 - - - 91.60 *91.60% V. Satisfactory
DSB Construction & Supply, Inc. 16126
Rehab./Reconst. of National Road along Ligao-Tabaco Road Km.
516+845-Km. 529+46009/01/09 V 38.589 150 C 0.419 0.159 0.300 - - - 87.80 *87.80%
Satisfactory
DSB Construction & Supply, Inc. 16126 Conc. of San Fernando North Road,
Sta. 10+560, Washington 08/27/09 V 18.898 270 C 0.441 0.133 0.300 - - - 87.40 87.64% Satisfactory
DSB Construction & Supply, Inc. 16126 Construction of Multi-Purpose
Building 09/08/09 V 9.553 189 O 0.289 0.300 0.150 0.030 0.043 0.033 84.50 -
DSB Construction & Supply, Inc. 16126
San Vicente-San Carlos Road Linking Tabaco-Ligao to Legazpi-
Tabaco-Tiwi Road09/01/09 V 38.400 390 O 0.314 0.256 0.150 0.030 0.037 0.050 83.70 -
DSB Construction & Supply, Inc. 16126 Construction of Multi-Purpose
Building 02/27/10 V 9.553 189 C 0.452 0.133 0.300 - - - 88.50 85.70% Satisfactory
DSB Construction & Supply, Inc. 16126
Repair of Bridge Approach/Abutment Protection and Rechannelization of River Course, Taboc Bridge & along
Juban Magallanes Road
02/16/10 V 4.770 83 O 0.321 0.240 0.150 0.015 0.035 0.033 79.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page123
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
DSB Construction & Supply, Inc. (Formerly:
DSB Construction & Supply)
16126 Const. of School Building at Balonbato E/S 04/07/11 NCR 3.740 120 O 0.395 0.205 0.150 0.030 0.047 0.033 86.00 -
DSB Construction & Supply, Inc. (Formerly:
DSB Construction & Supply)
16126 Const. of Double Barrel Box Culvert Tramo Road 03/28/11 V 4.793 257 C 0.436 0.133 0.300 - - - 86.90 88.61%
Satisfactory
DSB Construction & Supply, Inc. (Formerly:
DSB Construction & Supply)
16126Rehab./Reconst. Of other section
Daang Maharlika, KO337+000 - KO361+000 (with excavation)
04/03/11 V 12.485 94 C 0.494 0.132 0.000 - - - 62.60 *62.60% Poor
DSB Construction & Supply, Inc. (Formerly:
DSB Construction & Supply)
16126 Rechanneling & Desilting of Various Rivers Baclayon-Igang Section 05/28/10 V 14.398 113 C 0.400 - 0.500 - - - 90.00 90.00%
V. Satisfactory
DSB Construction & Supply, Inc. (Formerly:
DSB Construction & Supply)
16126 Const. of Double Barrel Box Culvert Tramo Road 05/28/10 V 4.794 180 O 0.373 0.240 0.150 0.030 0.050 0.050 89.30 -
DSB Construction & Supply, Inc. (Formerly:
DSB Construction & Supply)
16126Rehab./Reconst. of Gahonon Road Brgy. Gahonon, (KO 342+442 - KO
342+618)06/10/10 V 12.984 145 O 0.350 0.240 0.150 0.030 0.040 0.033 84.30 -
DSB Construction & Supply, Inc. (Formerly:
DSB Construction & Supply)
16126
Repair of Bridge Approach/Abutment Protection and Rechannelization of River Course, Taboc Bridge & along
Juban-Magallanes Road
05/26/10 V 4.770 83 C 0.432 0.133 0.300 - - - 86.50 82.24% Satisfactory
DSB Construction & Supply, Inc./N Four
General Contractor and Supply (JV)
JV-08-236 Tabaco-Ligao Road (San Vicente, Bangkilingan & Bantayan Section) 02/22/09 V 9.636 120 C 0.468 0.133 0.300 - - - 90.10 90.10%
V. Satisfactory
DSB Construction and Supply 16126 Conc. of Bical Road 08/12/08 V 14.163 120 O 0.318 0.240 0.070 0.030 0.028 0.067 75.30 -
DSB Construction and Supply, Inc. 16126 Completion of Multi-Purpose
Building Phase VII 02/24/09 V 7.188 160 O 0.391 0.240 0.150 0.030 0.056 0.050 91.70 -
DSB Construction and Supply, Inc. 16126 Conc. of Bical Road 02/24/09 V 14.163 163 C 0.461 0.133 0.300 - - - 89.40 82.47%
Satisfactory
DSB Construction and Supply, Inc. 16126 Conc. of San Fernardo North Road 03/01/09 V 18.898 270 O 0.356 0.236 0.150 0.030 0.056 0.050 87.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page124
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
DSO Enterprises 10733 Construction of Road, Brgy. Pook 09/01/09 IVA 0.287 30 C 0.412 0.139 0.300 - - - 85.10 *85.10% Satisfactory
DSO Enterprises 10733 Const. of Two (2) Storey MPB, DPWH Compound, Laguna 1st DEO 08/21/10 IVA 3.826 85 C 0.422 0.133 0.300 - - - 85.50 84.52%
Satisfactory
DSO Enterprises 10733 Const. of MPB DPWH Compound, Laguna 1st DEO 05/30/09 IV-A 1.921 45 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
DSO Enterprises 10733Const./Replacement & Repair of Elem. & Secondary Sch. Bldg.,
Alaminos Central Sch. 03/03/09 IV-A 0.812 60 C 0.433 0.200 0.300 - - - 93.30 *93.30%
V. Satisfactory
Duros Development Corp. 22729
Rehab./Reconst./Upgrading of Dumaguete North Road, Bais City-
Villahermoso04/07/11 VII 86.776 430 O 0.278 0.300 0.150 0.030 0.055 0.050 86.30 -
Duros Development Corp. 22729
Road Upgrading of Antonio De Pio Highway, Sta.137+720 -
Sta.140+212.41, Sta.133+931 - Sta.135+300
04/09/11 VII 69.334 210 O 0.333 0.240 0.150 0.030 0.055 0.050 85.80 -
Duros Development Corp. 22729
Rehab. of Baha-baha to Ajong Sect., Widening & Conc. of DNR, Km.8.382 -
Km.9.50104/05/11 VII 19.276 240 O 0.347 0.240 0.150 0.023 0.045 0.050 85.50 -
Duros Development Corporation 22729 Concreting of Baloc-Isabela Rd. 09/14/09 VII 14.220 260 O 0.396 0.240 0.150 0.022 0.037 0.033 87.80 -
Duros Development Corporation 22729 Conc. of Baloc-Isabela Rd. 03/05/10 VII 14.375 260 C 0.321 0.140 0.300 - - - 76.10 80.71%
Unsatisfactory
Duros Development Corporation 22729
Conc. of St. Michael and St. Peter Streets, Ma. Asuncion Village, Brgy.
Daro09/02/10 VII 0.947 70 C 0.370 0.200 0.300 - - - 87.00 87.00%
Satisfactory
Duros Development Corporation 22729
Rehab./Reconst./Upgrading of Dumaguete North Road, Bais City-
Villahermoso09/04/10 VII 86.776 430 O 0.369 0.223 0.150 0.030 0.047 0.050 86.90 -
Duros Development Corporation 22729 Conc. of Babajuba Rd. 06/10/10 VII 0.948 70 C 0.345 0.196 0.300 - - - 84.10 84.10%
Satisfactory
Duros Development Corporation 22729 Impvt./Conc. of Access Road to
RORO Port Maya-Daanbantayan 09/04/10 VII 19.005 162 C 0.406 0.200 0.300 - - - 90.60 75.18% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page125
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Duros Development Corporation 22729
Impvt./Conc. of Access Road to RORO Port at Maya-Daan Bantayan
Road09/01/09 VII 19.005 162 O 0.247 0.300 0.106 0.030 0.045 0.033 76.10 -
Duros Development Corporation 22729
Road Upgrading (Gravel to Paved) along National Road at Bogo-Curva-Medellin-Daan Bantayan-Maya Road
09/01/09 VII 14.240 100 C 0.335 0.200 0.300 - - - 83.50 68.38% Poor
Dynamic Builders & Construction Co. (Phil)
Inc.24712
Rehab./Reconst./Upgrading along Bacolod City Bdry. Rd. Km.2+555 -
Km.5+092 w/ exceptions06/07/10 VI 37.772 270 O 0.315 0.238 0.150 0.030 0.056 0.050 83.90 -
Dynamic Builders & Construction Co. (Phil)
Inc.24712 Rehab. of Bacolod South Rd.
(Caradio-an Section) 03/09/10 VI 43.225 402 C 0.355 0.200 0.300 - - - 85.50 89.76% V. Satisfactory
Dynamic Builders & Construction Co. (Phil)
Inc.24712
Rehab./Reconst./Upgrading along Bacolod-San Carlos Rd., Km. 3+990
to Km. 13+610 w/ exceptions03/07/10 VI 20.866 280 C 0.357 0.194 0.300 - - - 85.10 89.42%
V. Satisfactory
Dynamic Builders & Construction Co. (Phil)
Inc.24712
Rehab./Reconst. of Damaged Paved National Rd., Jct. San Enrique-Pontevedra By Pass Rd. and its
Access Rd (Intermittent Sections) with exceptions
03/10/10 VI 46.579 444 C 0.342 0.196 0.300 - - - 83.80 88.00% Satisfactory
Dynamic Builders & Construction Co. (Phil)
Inc.24712 Rehabilitation of Sibud Main
Drainage 8/10-18/09 NIA 7.961 381 C 0.384 0.200 0.300 - - - 88.35 *88.35% Satisfactory
Dynamic Builders & Construction Co. (Phil)
Inc.24712 Rehab. of Bacolod South Road
(Caradio-An Section) 05/28/09 VI 42.774 392 O 0.396 0.240 0.150 0.030 0.060 0.050 92.60 -
Dynamic Builders & Construction Co. (Phil)
Inc.24712
Rehab./Recons/Upgrading of Concreting of Bacolod North road,
Caduha-an Section05/26/09 VI 18.331 140 O 0.355 0.300 0.130 0.030 0.045 0.050 91.00 -
Dynamic Builders & Construction Co. (Phil)
Inc.24712
Rehab./Reconst./Upgrading along Bacolod-San Carlos Road, Km.
3+990-Km. 13+610 with exception09/12/09 VI 20.800 235 O 0.320 0.300 0.150 0.030 0.055 0.050 90.50 -
Dynamic Builders & Construction Co. (Phil)
Inc.24712
Rehab./Reconst./Upgrading of Bacolod North Road, Caduha-an
Sect., 09/14/09 VI 18.528 154 C 0.353 0.200 0.300 - - - 85.30 88.72%
Satisfactory
Dynamic Builders & Construction Co. (Phil)
Inc.24712
Rehab./Reconst./Upgrading of Bacolod South Road (Tibsok-Ponte
Bridge Section)09/18/09 VI 33.415 210 C 0.437 0.133 0.300 - - - 87.00 88.20%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page126
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Dynamic Builders & Construction Co. (Phil)
Inc.24712
Widening/Impvt. of Bacolod South Kabankalan Road,Tangub Section,
Km.5+775.5- Km.5+937.5 with exception
03/03/09 VI 9.476 452 C 0.407 0.200 0.300 - - - 90.70 86.08% Satisfactory
Dynamic Builders & Construction Co. (Phils.),
Inc.24712
Rehab./Widening/Reblocking of Damaged Concrete Pavement at Murcia Section with exception
03/30/11 VI 34.344 234 C 0.423 0.179 0.300 - - - 90.20 *90.20% V. Satisfactory
Dynamic Builders & Construction Co. (Phils.),
Inc.24712
Rehab. of Bacolod South Road, Sta.52+000 - Sta.66+000 with
exception04/01/11 VI 35.877 317 C 0.452 0.141 0.300 - - - 89.30 *89.30%
V. Satisfactory
Dynamic Builders & Construction Co. (Phils.),
Inc.24712
Rehab./Reconst./Upgrading ofBacolod City Boundary Road along Km.2+555 - Km.5+092 with exception
03/28/11 VI 37.772 325 C 0.439 0.133 0.300 - - - 87.20 86.48% Satisfactory
Dynamic Builders & Construction Co. (Phils.),
Inc.24712
Rehab./Widening/Reblocking of Damaged Conc. Pavement at Murcia
Section with exception03/30/11 VI 34.344 234 C 0.357 0.192 0.300 - - - 84.90 *84.90%
Satisfactory
Dynamic Builders & Construction Co. (Phils.),
Inc.24712
Rehab./Reconst./Upgrading of along Jct. Murcia-Atipuluan Road,
KO031+150 - KO034+462 with exception (Atipuluan-Mining Section)
03/29/11 VI 33.694 310 C 0.442 0.133 0.300 - - - 87.50 84.59% Satisfactory
Dynamic Builders & Construction Co. (Phils.),
Inc.24712
Rehab./Reconst./Upgrading of Damaged Paved National Road,
Bacolod South Road04/01/11 VI 92.501 540 C 0.377 0.176 0.300 - - - 85.30 83.56%
Satisfactory
E and D Construction 32064Repair/Rehab. of Cotabato-Lanao
Road, PC Hill-Quezon Avenue-Parang Road Section
03/02/09 XII 9.419 65 C 0.278 0.133 0.300 - - - 71.10 *71.10% Poor
E & L Reyes Construction 15338 Const. of 1-CL @ Clarin School Of
Fisheries 09/10/09 VII 0.496 179 C 0.465 0.133 0.300 - - - 89.80 *89.80% V. Satisfactory
E & L Reyes Construction 15338 Repair of School Building, San
Roque E/S 09/02/09 VII 0.276 120 C 0.500 0.133 0.300 - - - 93.30 83.85% Satisfactory
E & L Reyes Construction 15338 Construction of Multi-Purpose
Building, Canlaas 06/09/09 VII 0.137 120 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfactory
E & L Reyes Construction 15338 Impvt. of Multi-Purpose Bldg., Sto.
Rosario 06/09/09 VII 0.138 120 C 0.422 0.133 0.300 - - - 85.50 82.49% Satisfactory
E E I Corporation 333
NAIA Expressway and its' Related Road Project Phase I, Contract
Package IV-A Sales St. Viaduct and Ramp Structure (MSE Retaining
Wall)
03/05/10 URPO 400.774 656 C 0.410 0.200 0.300 - - - 91.00 89.32% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page127
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E E I Corporation 333
NAIA Expressway and its Related Roads Project, Phase I, Package IV-
A, Sales St. Viaduct and Ramp Structure (MSE Retaining Wall)
03/12/09 URPO 368.005 270 O 0.364 0.300 0.000 0.030 0.065 0.050 80.90 -
E F C Enterprises 11795Conc./Rehab. of Sun Valley and Sta.
Ana Road System (Phase I), Brgy. Sun Valley
04/11/11 NCR 9.113 60 C 0.463 0.067 0.300 - - - 83.00 *83.00% Satisfactory
E F C Enterprises 11795 Rehab./Reconstruction/Upgrading of Sen. Gil Puyat Avenue 06/03/09 NCR 9.593 45 C 0.492 0.200 0.300 - - - 99.20 *99.20%
Outstanding
E F C Enterprises 11795Rehab./Restoration of McKinley
Road (EDSA towards Global City) w/ exception
06/07/10 NCR 9.591 30 C 0.413 0.200 0.300 - - - 91.30 91.30% V. Satisfactory
E F C Enterprises 11795 Rehab./Reconst./Upgrading of Dr. A. Santos Ave. 09/01/10 NCR 19.147 40 C 0.409 0.133 0.300 - - - 84.20 84.20%
Satisfactory
E M L Construction & Trading 10151 Channel Impvt. @ Cataning River 04/02/11 III 9.480 115 O 0.338 0.240 0.150 0.030 0.029 0.050 83.70 -
E M L Construction & Trading 10151 Const. of FMR at Brgy. San Vicente 05/18/09 III 0.950 30 C 0.402 0.200 0.300 - - - 90.20 *90.20%
V. Satisfactory
E M L Construction & Trading 10151 Rehab/Improvement of Brgy. San
Matias 02/24/09 III 4.753 60 C 0.366 0.200 0.300 - - - 86.60 *86.60%Satisfactory
E M L Construction & Trading 10151 Rehab. of Angeles-Porac-
Floridablanca-Dinalupihan Road 08/24/09 III 19.053 100 C 0.463 0.123 0.300 - - - 88.60 86.08% Satisfactory
E M L Construction & Trading 10151 Rehab. of Gapan-San Fernando-
Olongapo Road 08/24/09 III 19.189 104 C 0.430 0.133 0.300 - - - 86.30 83.96% Satisfactory
E S De Guzman Construction 17494 Const. of San Pablo, Multi-Purpose
Building 03/03/10 II 0.469 40 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory
E S De Guzman Construction 17494 Construction of Multipurpose Bldg. 04/16/09 DOST 30.986 120 O 0.361 0.264 0.150 0.030 0.052 0.050 90.70 -
E, G & I Construction Corporation 16225 Const. of Female Dormitory
(Building) 07/28/11 DOST 14.072 270 C 0.470 0.200 0.300 - - - 97.00 94.27% V. Satisfactory
E,G & I Construction 16225 Constrution of Perimeter Fence 04/07/10 DOST 10.230 300 C 0.4952 0.20 0.30 - - - 99.52 97.05% Outstanding
E. Garcia Construction & E. Garcia Gravel & Sand 7243
Impv't./Conc. of Digdigon (GOA)-Tinambac Road (Balynan-Payatan-
Lupi-Tierra Nevada-Binalay Section)04/09/11 V 47.382 310 C 0.441 0.133 0.300 - - - 87.40 89.23%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page128
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Conc. of Road, Dalipay-
Mayaopayawan San Antonio Road 04/04/10 V 9.187 240 C 0.445 0.133 0.300 - - - 87.80 *87.80% Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Conc. of Sagrada to San Jose Rd. 08/31/10 V 9.430 210 C 0.397 0.200 0.300 - - - 89.70 89.70%
V. Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Road Concreting of Zone 3 and Zone
4, Brgy. Malinao 03/09/09 V 0.946 120 C 0.432 0.200 0.300 - - - 93.20 *93.20% V. Satisfactory
E. Garcia Construction & E. Garcia Gravel &
Sand/HGG Builders & Supply (J.V.)
JV-08-311 Conc. of San Isidro-Bahao Road 06/08/10 V 37.827 385 C 0.368 0.200 0.300 - - - 86.80 86.44% Satisfactory
E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 11/06/09 DOTC 43.333 150 C 0.404 0.200 0.300 - - - 90.40 90.40%
V. Satisfactory
E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 11/06/09 DOTC 67.456 180 C 0.470 0.200 0.300 - - - 97.00 97.00%
Outstanding
E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 11/06/09 DOTC 14.421 90 C 0.478 0.200 0.300 - - - 97.80 97.80%
Outstanding
E. Garcia Construction and E. Garcia Gravel 7243
Naga Airport Development Project (Asphalt Overlay of Runway, Two-
Stub Taxiway and Vehicular Parking Area)
6/30/2010 DOTC 28.830 120 C 0.448 0.200 0.300 - - - 94.80 94.80% V. Satisfactory
E. Garcia Construction and E. Garcia Gravel 7243 Naga Airport Development Project 03/07/09 PMS 43.333 150 O 0.373 0.300 0.150 0.020 0.063 0.050 95.60 -
E. Gardiola Construction 17542Rehab. of Calbayog-Catbalogan Road, Km.751+400 - Km.753+500
with exception04/02/11 VIII 19.290 30 C 0.472 0.133 0.300 - - - 90.50 *90.50%
V. Satisfactory
E. Gardiola Construction 17542Rehab. of Calbayog-Catbalogan Road, Km.753+510 - Km.755+500
with exception04/02/11 VIII 14.467 30 C 0.442 0.133 0.300 - - - 87.50 *87.50%
Satisfactory
E. Gardiola Construction 17542
Impvt./Rehab. (Asphalt Overlay) along Jct. MSR, Daang Maharlika Rd.
Km.121+896 - Km.124+650, with exception
05/28/10 IVA 19.299 40 C 0.477 0.133 0.300 - - - 91.00 91.00% V. Satisfactory
E. Gardiola Construction 17542Impvt./Rehab. of Tayabas-Mainit-
Mauban Rd. Phase I (Mauban Sect.), Mauban, Quezon
05/28/10 IVA 19.300 45 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
E. Gardiola Construction 17542
Impvt./Rehab. of Lucban-Sampaloc-Mauban Rd. (Sampaloc Sect.), Km.138+000 - Km.140+000 with
exception
05/28/10 IVA 19.300 45 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
E. Gardiola Construction 17542
Impvt./Rehab. of Lucban-Sampaloc-Mauban Rd. (Sampaloc Sect.), Km.151+000 - Km.154+000 with
exception
05/28/10 IVA 19.300 45 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page129
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E. Gardiola Construction 17542
Impvt./Rehab./Asphalt Overlay along Jct. MSR Calumpang-Tayabas Rd., (Calumpang Sect.) Km.130+469 -
Km.132+469 with exception
05/28/10 IVA 19.299 40 C 0.393 0.131 0.300 - - - 82.40 82.40% Satisfactory
E. Gardiola Construction 17542 Drainage Impv't. of Manila-Batangas Rd., Tambo-Bugtong Sect. 08/19/10 IVA 9.643 183 C 0.410 0.133 0.300 - - - 84.30 84.30%
Satisfactory
E. Gardiola Construction 17542
Rehab./Impvt. along Ma-A Road Jct. Gem Village to Marfory Heights &
Mabini St. w/ exception, E.Quirino-Tiongko Ave. w/ exception
06/17/10 XI 19.144 90 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory
E. Gardiola Construction 17542
Rehab./Impvt. along Old Circ. Rd. to El Rio Rd., Jct. Davao City Diversion
Rd. w/ exception, Jacinto Ext. Arellano St. w/ exception
06/17/10 XI 19.144 90 C 0.422 0.133 0.300 - - - 85.50 85.50% Satisfactory
E. Gardiola Construction 17542
Impvt./Regravelling of National Roads along Surallah-Lake Sebu-Maitum Road (Hway. Jct. Dajay to
Lake Section)
03/05/10 XII 19.289 65 C 0.425 0.200 0.300 - - - 92.50 92.50% V. Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of Line Canal at Brgy. 2 03/09/09 IVA 14.471 150 C 0.406 0.200 0.300 - - - 90.60 *90.60%
V. Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of San Juan-Laiya Road, Laiya Aplaya Sect. 03/06/09 IVA 19.293 120 C 0.485 0.133 0.300 - - - 91.80 87.48%
Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of San Juan-Laiya Road, Laiya Hugom Sect. 03/06/09 IVA 19.294 120 C 0.486 0.133 0.300 - - - 91.90 87.52%
Satisfactory
E. Gardiola Construction 17542
Asphalting/Shouldering of Manila-Batangas Road, Banay-Banay Sect.
& Lipa-Mataas na Kahoy Road, Bdry. Sect.
09/02/09 IVA 14.464 120 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory
E. Gardiola Construction 17542Impvt. of Drainage System along Manila - Batangas Road Maraouy
Section09/02/09 IVA 9.644 120 C 0.461 0.133 0.300 - - - 89.40 *89.40%
V.Satisfactory
E. Gardiola Construction 17542 Impvt./Asphalting of Lipa-Cuatro Santos Road 05/22/09 IV-A 14.470 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab./Asphalting of City Park Road 05/22/09 IV-A 14.469 60 C 0.482 0.133 0.300 - - - 91.50 *91.50%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page130
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E. Gardiola Construction 17542 Impvt./Rehab./Asphalting of Municipal Street 05/28/09 IV-A 19.295 90 C 0.475 0.133 0.300 - - - 90.80 *90.80%
V. Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab./Asphalting of Tangco Drive, Maraouy-Balintawak Road 05/22/09 IV-A 14.472 60 C 0.472 0.133 0.300 - - - 90.50 *90.50%
V. Satisfactory
E. Gardiola Construction 17542Asphalt Overlay of Road at Brgy.
Antipolo del Norte, Gov't Cemetary Section
05/22/09 IV-A 14.467 60 C 0.461 0.133 0.300 - - - 89.40 *89.40% V. Satisfactory
E. Gardiola Construction 17542Asphalt Overlay of Banay-banay-
Muzon Road, Brgy. Poblacion West, Brgy. Muzon 2
05/20/09 IV-A 14.991 60 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory
E. Gardiola Construction 17542
Rehab./Impvt./Regravelling along Davao-Bukidnon Road, Km.
1632+185 -Km. 1643+685,with exception
09/02/09 XI 19.289 90 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory
E. Lapus Enterprises 10813 Rehab./Impv't. of Bagac-Mariveles Rd. 08/19/10 III 9.366 70 C 0.396 0.133 0.300 - - - 82.90 82.90%
Satisfactory
E. Lapus Enterprises 10813 Rehab./Impvt./Widening of Road at Old MSR, Brgy. Tagapo 06/01/09 IV-A 19.198 90 C 0.494 0.133 0.300 - - - 92.70 92.70%
V. Satisfactory
E. Lapus Enterprises 10813Const. of Vocational Building at Pedro Diaz High School, Brgy.
Alabang06/04/09 NCR 20.042 150 C 0.465 0.193 0.300 - - - 95.80 82.50%
Satisfactory
E. U. Jingco Construction 31486 Repair of Damaged Retaining Wall &
Concrete Pavement Bet. Pier I & II 03/25/11 PPA 6.928 90 O 0.364 0.225 0.150 0.030 0.035 0.033 83.70 -
E.A Ramirez Construction, Inc. 11631 Construction of 3-Storey School
Building 02/11/10 NHA 18.110 150 C 0.468 0.151 0.300 - - - 91.90 85.25% V. Satisfactory
E.A Ramirez Construction, Inc. 11631 Construction of 3-Storey School
Building 09/08/09 NHA 19.080 204 O 0.364 0.271 0.053 0.030 0.056 0.050 82.40 -
E.A Ramirez Construction, Inc. 11631 Construction of one (1) Unit Public
Market 09/16/10 NHA 3.972 90 O 0.3906 0.2904 0.0092 0.0150 0.0250 0.0333 76.35 -
E.A Ramirez Construction, Inc. 11631
Construction of 1 Unit Public Market Southville 8C, Brgy. San Isidro,
Rodriguez, Rizal03/22/11 NHA 4.369 141 C 0.4840 0.2000 0.3000 - - - 98.40 82.97%
Satisfactory
E.A Sancho Construction 5648 Road Opening/Impvt. of Gov. Felix O. Alfelor Highway 06/03/10 V 9.554 80 C 0.480 0.133 0.300 - - - 91.30 91.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page131
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.A Sancho Construction 5648 Impvt./Conc. Of Tabgon-Maysalay Road KO 502+400 - KO 504+476 06/04/10 V 14.142 150 O 0.301 0.293 0.150 0.030 0.035 0.033 84.20 -
E.A Sancho Construction 5648 Impv't./Conc. of Maysalay-Lamon Rd. 08/25/10 V 14.147 168 O 0.345 0.300 0.150 0.030 0.055 0.033 91.30 -
E.A Sancho Construction 5648 Impvt.(Conc.) of Cagliling-Matang-Buenavista-Union-Salvacion Road 03/10/09 V 3.791 151 C 0.444 0.133 0.300 - - - 87.70 83.08%
Satisfactory
E.A Sancho Construction 5648
Impvt. of Jct. Binalay (Tinambac)-Tamban Road (Olag-Pequeno-
Antipolo-Bataan-Banga Section) Km. 514+255-Km. 526+024 w/ exceptions
09/10/09 V 18.817 210 C 0.394 0.192 0.300 - - - 88.60 88.06% Satisfactory
E.A Sancho Construction 5648
Impvt. of Tinambac-Siruma Road (Salvacion-San Roque-San Ramon Section) Km. 515+615-Km. 550+510
w/ exception
03/01/10 V 18.817 210 C 0.403 0.133 0.300 - - - 83.60 87.32% Satisfactory
E.A. Sancho Construction 5648 Impv't./Conc. Of Maysalay-Lamon
Road 04/09/11 V 14.147 168 C 0.424 0.133 0.300 - - - 85.70 89.06% V. Satisfactory
E.A. Sancho Construction 5648 Impv't./Conc. Of Lamon-Pinamihagan
Road 04/09/11 V 14.146 168 C 0.374 0.200 0.300 - - - 87.40 87.55% Satisfactory
E.A. Sancho Construction 5648 Impv't./Conc. Of Tabgon-Maysalay
Road 04/09/11 V 14.142 168 C 0.426 0.133 0.300 - - - 85.90 86.50% Satisfactory
E.A. Sancho Construction 5648 Conc. of Iriga City-Masoli Road 04/06/11 V 24.651 215 C 0.389 0.133 0.300 - - - 82.20 83.88%
Satisfactory
E.A. Unabia Construction 29305 Const. of MPB Malama 04/02/11 CAR 2.841 180 C 0.491 0.200 0.000 - - - 69.10 80.93% Unsatisfactory
E.B.A Construction 6210 UP OU Centennial Center for Digital Learning 07/20/09 U.P. 12.948 60 O 0.361 0.261 0.150 0.020 0.020 0.050 86.20 -
E.B.J.R. Construction / PBO Construction (JV) JV-09-131 Road Upgrading (Gravel to Concrete)
Abbut-Conner Kabugao 04/04/11 CAR 22.951 388 C 0.409 0.133 0.300 - - - 84.20 86.30% Satisfactory
E.C De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906 CP IV, Gatanguit-Calbiga Road Sect.
Phase VI 12/03/08 PJHL 1,466.751 1,080 O 0.350 0.300 0.100 0.030 0.065 0.100 94.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page132
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.C De Luna Construction Corporation 11906
Marikina-Infanta Road Project, Km. 91+910-Km. 120+925 under SONA
Projects in Luzon Beltway03/05/10 PJHL 1,915.106 720 O 0.368 0.300 0.150 0.030 0.056 0.050 95.40 -
E.C De Luna Construction Corporation (Formerly: E.C De Luna
Const.)
11906
Const. of El Nido-Bataraza Rd. CP-3B-1 Puerto Prinsesa-Aborlan Abo-abo
Sect. Segments 1-7 Km.02+376 - Km.128+026.93 w/ exception
06/01/10 IVB 1,792.809 730 O 0.380 0.300 0.150 0.030 0.060 0.050 97.00 -
E.D Angas Construction 32106Const./Cont. of 2 Classroom, 2
Storey (7mx8m) School Building At Junob National High School
09/13/09 VII 1.199 85 C 0.485 0.133 0.300 - - - 91.80 *91.80% V. Satisfactory
E.D Angas Construction 32106 Const. of 1 unit, 1-CL School Building at Candigum P/S 09/07/09 VII 0.507 60 C 0.461 0.142 0.300 - - - 90.30 *90.30%
V. Satisfactory
E.D Angas Construction 32106 Const./Completion of MPB (Phase II) Parian 06/07/10 VII 1.230 150 C 0.406 0.200 0.300 - - - 90.60 90.60%
V. Satisfactory
E.D Angas Construction 32106Rehab./Impvt. of Sitio Ilihan
Simacolong Lazi to Sitio Tunga Minalulan Rd.
06/07/10 VII 1.928 180 C 0.368 0.188 0.300 - - - 85.60 85.60% Satisfactory
E.D Angas Construction 32106Const. of 7m x 18m (2CL) SB @ Jose
B. Cardenas MHS (Canlaon City NHS)
09/06/10 VII 1.040 90 C 0.469 0.133 0.300 - - - 90.20 90.20% V. Satisfactory
E.D Angas Construction 32106 Completion of Multi-Purpose Building (Phase II) 03/10/09 VII 0.703 75 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V. Satisfactory
E.D Angas Construction 32106 Const. of Drainage Facility along Siquijor Circumferential Road 03/10/09 VII 3.816 227 C 0.429 0.200 0.300 - - - 92.90 78.06%
Unsatisfactory
E.D Denosta Construction & Supply 28166 Const. of 2-CL Building at Villafont
E/S 09/02/09 VI 1.039 90 C 0.494 0.109 0.300 - - - 90.30 *90.30% V. Satisfactory
E.D Solano Construction & Engineering Services 14758 Construction of Multi-Purpose
Building 03/09/09 I 0.723 30 C 0.477 0.133 0.300 - - - 91.00 *91.00%V. Satisfactory
E.D Tabangay Consruction 31978 Const. of 1-School Building @
Aborlan C/S 03/04/09 IV-B 0.946 150 C 0.473 0.097 0.300 - - - 87.00 *87.00% Satisfactory
E.D Tabangay Const. / Bonifacio M. Carlos
Const. (JV)JV-07-099 Impv't. of Quezon-Punta Baja Road 03/03/09 IV-B 18.950 252 C 0.329 0.133 0.300 - - - 76.20 75.39%
Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page133
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.G & I Construction Corporation (Formerly: E.G. & I Construction)
16225 Road Upgrading (Gravel to Paved) of Argao-Moalboal Road 09/07/10 VII 18.814 40 C 0.409 0.200 0.300 - - - 90.90 90.90%
V. Satisfactory
E.G Canabe Const. 27358 Construction of Concrete Footbridge, Brgy. Lower Hiraan 03/16/09 VIII 0.944 120 C 0.400 0.133 0.300 - - - 83.30 *83.30%
Satisfactory
E.G Guillen Builders 14174 Conc. along Kabugao-Pudtol-Luna Road, Kapanikian Section 06/01/09 CAR 9.338 277 O 0.293 0.300 0.150 0.023 0.045 0.050 86.10 -
E.G.B. Construction 13722 Ilagan Flood Control Structures 05/29/10 II 14.995 115 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory
E.I Templonuevo & Associates, Incorporated 1090 Const. of Numancia Multi-Purpose
Bldg., Brgy. Poblacion 06/12/10 VI 1.926 130 C 0.439 0.184 0.300 - - - 92.30 92.93% V. Satisfactory
E.I Templonuevo & Associates, Incorporated 1090 Const. of Public Market, Brgy.
Poblacion 06/12/10 VI 0.995 60 C 0.420 0.188 0.300 - - - 90.80 90.80% V. Satisfactory
E.I Templonuevo & Associates, Incorporated 1090 Rehab. of Multi-Purpose Building
Barangay Poblacion 06/05/09 VI 1.925 90 C 0.426 0.133 0.300 - - - 85.90 *85.90% Satisfactory
E.I Templonuevo & Associates, Incorporated 1090 Rehab. of MPB @ Poblacion 03/15/09 VI 1.920 65 C 0.361 0.200 0.300 - - - 86.10 *86.10%
Satisfactory
E.I. Templonuevo and Associates, Incorporated 1090 Road Upgrading (Gravel to Concrete)
Caticlan-Malay-Libertad Road 04/08/11 VI 9.640 120 O 0.360 0.237 0.150 0.030 0.037 0.033 84.70 -
E.K.C Construction and Aggregates 14833
Impvt. of Baguio-Bontoc-Banaue Road, Conc. of Mt. Data-Bontoc
Road, Km. 367+228 - Km. 368+444 (one section),
03/08/09 CAR 13.750 657 O 0.300 0.300 0.000 0.030 0.045 0.033 70.80 -
E.K.C. Construction and Aggregates 14833 Restoration of Camp 3 Bridge No. 1
along Kennon Road 04/12/11 CAR 7.124 172 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory
E.L Gomez Construction 31522 Rehab. of Damaged Drainage Outfall along Balibago Creek 06/01/10 III 4.702 60 C 0.461 0.088 0.300 - - - 84.90 84.90%
Satisfactory
E.L Gomez Construction 31522 Construction of Four (4) CL (2-Units) Bldg. at Dolores H/S 02/25/09 III 1.896 60 C 0.408 0.109 0.300 - - - 81.70 *81.70%
Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page134
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.L Torres Construction and Trading 31406 Completion of MPB along Zone 15 03/03/09 NCR 0.949 60 C 0.369 0.200 0.300 - - - 86.90 83.68%
Satisfactory
E.L Torres Construction and Trading 31406 Rehab./Reconst./Upgrading of San
Jose-Novaliches Road 05/31/10 NCR 19.010 90 C 0.443 0.200 0.300 - - - 94.30 94.30% V. Satisfactory
E.L Torres Construction and Trading 31406 Construction of SOJR Library 03/23/09 U.P. 0.950 45 C 0.445 0.200 0.300 - - - 94.50 94.50%
V. Satisfactory
E.L. Gomez Construction 31522 Const./Repair of MPB (Covered Court) @ Brgy. Anunas 04/05/11 III 5.348 60 C 0.428 0.193 0.300 - - - 92.10 88.67%
Satisfactory
E.L. Gomez Construction 31522 Const./Repair of MPB @ Brgy. Lakandula 04/05/11 III 5.351 60 C 0.331 0.192 0.300 - - - 82.30 85.59%
Satisfactory
E.L. Torres Construction and Trading 31406 Completion of Three (3) Storey, Six
(6) classroom at Llano E/S 03/28/11 NCR 4.748 165 C 0.473 0.163 0.300 - - - 93.60 *93.60% V. Satisfactory
E.L.R Everybody's Construction 6336
Rehab./Reconst./Upgrading of Damaged Roads along Banay-Banay-
Cuenca Road08/18/10 IVA 6.751 90 C 0.374 0.200 0.300 - - - 87.40 88.72%
Satisfactory
E.L.R Everybody's Construction 6336
Rehab./Reconst./Upgrading of Damaged National Roads, Lipa-
Rosario Road05/28/09 IV-A 9.654 120 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V. Satisfactory
E.M Angeles Enterprises 10150 Widening of CAA Road Including Installation of Drainage System 09/04/09 NCR 19.089 100 C 0.446 0.133 0.300 - - - 87.90 88.98%
Satisfactory
E.M Angeles Enterprises 10150 Const. of Multi-Purpose Pavement at Lakeview E/S 02/18/10 NCR 4.762 60 C 0.495 0.133 0.300 - - - 92.80 88.66%
Satisfactory
E.M Angeles Enterprises 10150 Const. of Multi-Purpose Pavement @ Bayanan Elem. School Main 06/08/10 NCR 5.239 86 C 0.494 0.133 0.300 - - - 92.70 86.52%
Satisfactory
E.M Angeles Enterprises 10150Reconst./Upgrading of MSR-Quirino from Alido Bridge towards Zapote-
Alabang Roads at Brgy. Zapote09/02/10 NCR 9.649 75 C 0.409 0.133 0.300 - - - 84.20 84.20%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page135
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.M Aragon Enterprises 3314Const. (Conc.) /Widening of
Governor's Drive, Dasmariñas-Carmona
09/10/09 IVA 35.678 224 C 0.421 0.200 0.300 - - - 92.10 85.80% Satisfactory
E.M Bayatan Construction 21332 Const. of NVGCHS Four CL 2 Storey
Building (Phase 2) 03/03/10 II 2.849 95 C 0.464 0.133 0.300 - - - 89.70 89.70% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page136
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.M Bayatan Construction 21332 Construction of NVGCHS Main, 4 CL-
2 Storey Building 03/10/09 II 3.055 137 C 0.464 0.200 0.300 - - - 96.40 96.40% Outstanding
E.M Cuerpo, Inc. 30963Sta. Teresa Port Development
Project (Construction of Sta. Teresa Port)
07/22/10 DOTC 96.294 360 O 0.346 0.300 0.150 0.030 0.070 0.050 94.60 -
E.M Cuerpo, Inc. 30963Sta. Teresa Port Development
Project (Continuation of Contruction of Sta. Teresa Port)
07/23/10 DOTC 289.728 360 O 0.357 0.300 0.150 0.030 0.070 0.050 95.70 -
E.M Cuerpo, Inc. 30963Rehab./Reconst./Upgrading of
Mindoro Oriental/Occidental East Coastal Road
08/24/10 IVB 57.897 338 C 0.477 0.200 0.000 - - - 67.70 71.63% Poor
E.M Palomares Construction 23471
Rehab./Reconst. of Bayuhay-Sta. Catalina Road, San Vicente-Sta.
Catalina09/07/09 I 11.983 150 C 0.406 0.200 0.300 - - - 90.60 85.92%
Satisfactory
E.M Palomares Construction 23471 Construction of Road Network &
Parking Area I & II 03/2-3/10 DOST 2.592 180 C 0.469 0.10 0.30 - - - 86.90 86.90% Satisfactory
E.M Palomares Construction 23471 Land Development & Landscaping 03/2-3/10 DOST 1.895 180 C 0.50 0.20 0.00 - - - 70.00 70.00%
Poor
E.M Palomares Construction 23471 Rehabilitation of San Ildefonso Port
Road 02/28/09 I 0.951 25 C 0.358 0.200 0.300 - - - 85.80 *85.80%Satisfactory
E.M. Angeles Enterprises 10150 Completion of Sch. Bldg. at Golden Acres NHS 04/13/11 NCR 1.619 60 C 0.480 0.181 0.300 - - - 96.10 *96.10%
Outstanding
E.M. Palomares Construction 23471 Completion of Public Market 04/01/11 I 1.898 60 C 0.425 0.200 0.300 - - - 92.50 *92.50%
V. Satisfactory
E.M.L Construction & Trading 10151 Rehabilitation of Angeles-Porac-
Floridablanca-Dinalupihan Road 05/18/09 III 19.053 75 O 0.368 0.211 0.150 0.030 0.035 0.050 84.40 -
E.P De Guzman Consulting Engineer
Contractor9523 Repair of Santiago Syjuco E/S, Brgy.
Ibaba 05/28/10 NCR 0.481 45 C 0.481 0.200 0.300 - - - 98.10 98.10% Outstanding
E.P De Guzman Consulting Engineer
Contractor9523
Conc. of Pathwalk at Villegas Extension Brgy. Bungad, Q.C. and
Const. of MPB06/04/10 NCR 0.962 45 C 0.441 0.200 0.300 - - - 94.10 94.10%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page137
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.P De Guzman Consulting Engineer
Contractor9523 Repair/Rehab./Reconst./Upgrading of
Gov. Pascual Ave. 08/18/10 NCR 14.337 145 C 0.365 0.200 0.300 - - - 86.50 86.50% Satisfactory
E.P Manantan Construction and
Development Corp.6457 Const. of Multi-Purpose Building,
Brgy. Poblacion 03/03/10 XI 1.887 209 C 0.477 0.133 0.300 - - - 91.00 88.06% Satisfactory
E.P Manantan Construction and
Development Corp.6457 Const. of 4CL, 2-Storey Building @
Crossing Bayabas NHS, Piedad 02/23/10 XI 3.775 150 C 0.459 0.133 0.300 - - - 89.20 89.20% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page138
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.P Manantan Construction and
Development Corp.6457 Bagangan River Control 06/07/10 XI 4.813 133 C 0.320 0.225 0.150 0.030 0.055 0.050 83.00 -
E.P Manantan Construction and
Development Corp.6457 Banganga River Control 09/06/10 XI 4.813 120 C 0.420 0.133 0.300 - - - 85.30 83.92%
Satisfactory
E.P Manantan Construction and
Development Corp.6457 Completion of MPB, Purok Villa
Paraiso, Brgy. Visayan Village 03/13/09 XI 0.468 45 C 0.459 0.133 0.300 - - - 89.20 *89.20% V. Satisfactory
E.P Manantan Construction and
Development Corp.6457 Construction of Multi-Purpose
Building, Brgy. Jovellar 03/10/09 XI 1.469 180 C 0.364 0.157 0.300 - - - 82.10 *82.10% Satisfactory
E.P Manantan Construction and
Development Corp.6457
Road Upgrading (Gravel to Paved) of Tagum Diversion Road, Mankilam-
San Miguel Section06/01/09 XI 4.813 45 C 0.435 0.133 0.300 - - - 86.80 *87.00%
Satisfactory
E.P Manantan Construction and
Development Corp.6457
Rehab./Reconstruction of Davao-Agusan Road-Dapecol Compound
Channelization06/01/09 XI 5.025 45 C 0.429 0.133 0.300 - - - 86.20 *86.20%
Satisfactory
E.P. De Guzman Consulting Engineer
Contractor9523 Const. of MPB at 224 Sto. Domingo
Street Brgy. Balingasa 04/07/11 NCR 2.363 137 O 0.387 0.240 0.150 0.030 0.047 0.033 88.70 -
E.P. Manantan Construction and
Development Corporation
6457 Compostela-Casteel Road, Maglahus-Udiongan Section 04/05/11 XI 18.840 180 C 0.483 0.170 0.300 - - - 95.30 88.85%
Satisfactory
E.P. Manantan Construction and
Development Corporation
6457Rehab./Reconst./Upgrading of Damaged Paved National Road
Section Tagum-Panabo Circ. Road04/11/11 XI 18.893 165 C 0.452 0.146 0.300 - - - 89.80 88.36%
Satisfactory
E.P.L General Construction 15559 Conc. of San Jose East to San Jose
West Rd. 08/27/10 V 9.457 150 C 0.411 0.200 0.300 - - - 91.10 91.10% V. Satisfactory
E.P.L General Construction 15559 Construction of Road Binanuaanan 03/02/10 V 6.683 150 C 0.412 0.133 0.300 - - - 84.50 84.50%
Satisfactory
E.R Dela Cruz Construction & Supply 32158 Conc. of Binabalian Road 02/19/10 III 9.506 60 C 0.441 0.133 0.300 - - - 87.40 87.40%
Satisfactory
E.R Dela Cruz Construction & Supply 32158 Repair/Rehab. of Three(3) Room
School Bldg., Sto.Tomas E/S 05/29/10 III 0.951 45 C 0.486 0.133 0.300 - - - 91.90 91.90% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page139
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.R Dela Cruz Construction & Supply 32158 Asphalt Overlay along San Marcelino-
San Antonio-San Narciso Road 05/29/10 III 2.841 10 C 0.452 0.133 0.300 - - - 88.50 88.50% Satisfactory
E.R Dela Cruz Construction & Supply 32158 Rehab./Impv't. of DPWH Bldg.
Zambales 1st DEO 08/24/10 III 1.901 45 C 0.471 0.115 0.300 - - - 88.60 88.60% Satisfactory
E.R Dela Cruz Construction & Supply 32158 Construction of Multi-Purpose
Building, Brgy. Buenavista 05/23/09 III 0.570 90 C 0.440 0.200 0.300 - - - 94.00 *94.00%V. Satisfactory
E.R Dela Cruz Construction & Supply 32158 Widening of Olongapo-Bugallon
Road, Castillejos Section 05/23/09 III 9.499 30 C 0.402 0.200 0.300 - - - 90.20 *90.20%V. Satisfactory
E.R Dela Cruz Construction & Supply 32158 Iba Airport Road 05/26/09 III 4.729 90 C 0.337 0.200 0.300 - - - 83.70 *83.70%
Satisfactory
E.R Venzon Construction (Formerly: Lion Const.) 19013 Rehab. of FMR, Brgy. Masapsap 08/18/10 III 0.473 60 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
E.R Venzon Construction (Formerly: Lion Const.) 19013
Const. of One (1) Classroom School Building at Balon Anito ES, Brgy.
Balon Anito08/28/09 III 0.513 32 C 0.473 0.133 0.300 - - - 90.60 *90.60%
V. Satisfactory
E.R. Venzon Construction (Formerly:
Lion Construction)19013 Repair/Rehab. of Perimeter Road,
Bataan Peninsula State University 04/01/11 III 1.911 90 C 0.418 0.133 0.300 - - - 85.10 *85.10% Satisfactory
E.S De Guzman Construction 17494 Construction of Multipurpose
Building 07/23/09 DOST 3.406 160 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfactory
E.S. Almuete Construction 5131 Const. of Bonfal East Flood Control 04/12/11 II 0.997 45 C 0.299 0.133 0.300 - - - 73.20 *73.20%
Poor
E.S. Quillo Mini Enterprises 28854 Const. of Multi-Purpose Bldg. Little
Baguio 02/24/10 X 0.972 75 C 0.370 0.174 0.300 - - - 84.40 84.40% Satisfactory
E.S.L. Builders and Parts Supply 9014 Const. of MPB at Brgy. Bayanan 1 04/05/11 IVB 2.409 120 C 0.459 0.200 0.300 - - - 95.90 76.72%
Unsatisfactory
E.S.L. Builders and Parts Supply 9014 Road Opening @ Malad 05/25/09 IV-B 1.444 40 C 0.345 0.200 0.300 - - - 84.50 *84.60%
Satisfactory
E.S.L. Builders and Supply 9014 Rehab. of Calapan South Road, Sto.
Niño Section 04/06/11 IVB 19.249 175 C 0.440 0.135 0.300 - - - 87.50 *87.50% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page140
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
E.S.R Construction and Supplies 10451 Gadakinsur CIP 10/6-10/08 MOPIO 10.740 270 O 0.360 0.160 0.100 0.020 0.040 0.200 88.00 -
E.S.R Construction and Supplies 10451 Gadakinsur Communal Irrigation
Project, Package II 10/6-10/08 MOPIO 13.049 977 O 0.371 0.160 0.050 0.010 0.050 0.200 84.11 -
E.T.V.R Trading and Construction 14581 Road Upgrading of Calapan North
Road (Intermittent Section) 02/16/10 IVB 19.299 180 C 0.446 0.144 0.300 - - - 89.00 86.24% Satisfactory
E.T.V.R Trading and Construction 14581 Rehab./Impvt. of DPWH Office Bldg.,
Regional Office 12/04/08 XI 19.250 300 O 0.389 0.300 0.100 0.030 0.058 0.100 97.70 -
E.T.V.R Trading and Construction 14581
Road Upgrading @ CNR Km. 37+177 to Km. 37+348 & Km. 38+744 to Km.
39+185 (Intermittent Section)05/26/09 IV-B 14.204 150 C 0.454 0.145 0.300 - - - 89.90 85.88%
Satisfactory
E.T.V.R. Trading and Construction 14581 Road Upgrading of Calapan North
Road (Intermittent Section) 04/05/11 IVB 13.670 150 C 0.479 0.173 0.300 - - - 95.20 85.30% Satisfactory
E.T.V.R. Trading and Construction 14581
Road Upgrading of Calapan North Road at Puerto Galera (Intermittent
Section)04/05/11 IVB 17.460 180 O 0.367 0.186 0.150 0.030 0.043 0.050 82.60 -
E.V. & E Construction 31176Repair/Rehab. of School Bldg. F.G.
Calderon Integrated School, Hermosa St.
02/26/10 NCR 0.481 45 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory
EA-EC Construction 15737 Const. of 2-Classroom S/B San Antonio HS 04/06/11 V 1.015 45 C 0.415 0.133 0.300 - - - 84.80 84.10%
Satisfactory
EA-EC Construction 15737 Road Conc., Sta. Cruz-Maliban 06/02/10 V 0.483 60 C 0.419 0.133 0.300 - - - 85.20 85.20% Satisfactory
EA-EC Construction 15737 Const. of Classroom S/B Catasan E/S 08/23/10 V 0.540 90 O 0.337 0.300 0.150 0.030 0.029 0.033 87.90 -
EA-EC Construction 15737 Rehabilitation of Santiago-Sagrada Road 05/29/09 V 0.382 60 C 0.357 0.200 0.300 - - - 85.70 *85.70%
Satisfactory
EA-EC Constuction 15737 Construction of Camp Elias Angeles MPB 03/09/09 V 2.405 90 C 0.483 0.133 0.300 - - - 91.60 *91.60%
V. Satisfactory
Earl Construction 8461 Const./Impvt. of MPB II 08/19/10 IVA 19.237 180 C 0.466 0.145 0.300 - - - 91.10 93.69% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page141
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Early Riser Construction 33960 Rehailitation of Jalaur Proper River Irrigation System 01/10-15/2011 NIA 1.991 120 C 0.4220 0.1333 0.3000 - - - 85.53 85.53%
Satisfactory
Earth Movers Construction 27145 San Antonio Airport Development
Project 05/29/09 DOTC 2.870 90 C 0.413 0.200 0.300 - - - 91.30 91.30% V. Satisfactory
East Asia Construction Inc. 4904 Const./Rehab./Repair of Zaldivar
Road @ Brgy. Zaldivar 03/11/09 VI 1.525 60 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
East Asia Construction, Inc. 1904
Rehab. (Impvt./Asphalt Overlay) along Bacolod-Granada City Bdry.
Rd., Burgos St.03/29/11 VI 9.498 20 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
East Asia Construction, Inc. 1904
Repair/Rehab. of Guimaras Circumferential Rd., Nueva Valencia
to Jordan Rd. Km. 108+759 with exception
02/22/10 VI 10.273 120 C 0.458 0.200 0.300 - - - 95.80 95.80% V. Satisfactory
East Asia Construction, Inc. 1904 Completion of Multi-Purpose
Building (Justice Hall) 02/22/10 VI 3.748 200 C 0.423 0.200 0.300 - - - 92.30 84.53% Satisfactory
East Asia Construction, Inc. 1904 Construction of Guimaras District
Engineering Office, San Miguel 06/01/09 VI 2.846 90 C 0.440 0.200 0.300 - - - 94.00 *94.00% V. Satisfactory
East Asia Construction, Inc. 1904 Rehab./Reconst. of Balasan-Carles
Road (Asphalt Overlay) 09/06/10 VI 28.318 90 C 0.482 0.133 0.300 - - - 91.50 91.50% V. Satisfactory
East Asia Construction, Inc. 1904
Conc. of Barotac Nuevo-Dumangas-Dacutan Wharf Road, Barotac Nuevo-
Dumangas, Km. 273+237 - Km. 286+602 with exception
09/05/10 VI 8.685 150 C 0.408 0.133 0.300 - - - 84.10 84.10% Satisfactory
Eastern Pacific Construction 32157 Repair/Rehab. of Lawaan River
Control, Brgy. Lawaan 06/11/10 VIII 4.670 120 C 0.434 0.186 0.300 - - - 92.00 92.00% V. Satisfactory
EC Samonte Construction 31019 Proposed Road/Upgrading (Gravel to
Concrete) Lamao Port 04/01/11 IX 2.876 46 C 0.454 0.135 0.300 - - - 88.90 *88.90% Satisfactory
EC Samonte Construction 31019 Const. of MPB (Phase II) at JRMSU 04/01/11 IX 1.680 166 C 0.444 0.133 0.300 - - - 87.70 *87.70%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page142
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
EC Samonte Construction 31019 Const. of MPB (Three Storey Multi-
Purpose Cooperative Bldg.) 04/01/11 IX 1.675 150 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
EC Samonte Construction 7040 Const. of Break Water at
Malintuboan 04/01/11 IX 2.646 188 C 0.366 0.200 0.300 - - - 86.60 *86.60% Satisfactory
EC Samonte Construction 31019 Const. of Tilubog E/S 1 unit (2)
Classroom School Building 03/03/10 IX 0.929 60 C 0.367 0.200 0.300 - - - 86.70 86.70% Satisfactory
EC Samonte Construction 31019 Rehab. of Brgy. Rd./Spillway at Brgy.
Panganuran 06/04/10 IX 1.844 130 C 0.444 0.133 0.300 - - - 87.70 87.70% Satisfactory
EC Samonte Construction 31019
Proposed Const. of MPB for National Commission on Indigenous People
(NCIP)09/02/10 IX 1.445 90 C 0.447 0.133 0.300 - - - 88.00 85.13%
Satisfactory
EC Samonte Construction 31019 Concreting of Pathway Liloy Central
School 06/01/09 IX 0.962 88 O 0.387 0.240 0.150 0.030 0.047 0.050 90.40 -
EC Samonte Construction 31019
Const. of Liloy-Siocon Dansalan-Lopoc, Km. 1982+123.50-
Km.1983+39006/01/09 IX 28.654 314 C 0.495 0.133 0.300 - - - 92.80 87.49%
Satisfactory
EC Samonte Construction 31019 Const. of Liloy-Siocon Road,
Dansalan-Lopoc 03/09/09 IX 28.654 311 O 0.369 0.281 0.150 0.030 0.035 0.050 91.50 -
EC Samonte Construction 31019 Proposed/Impvt. of Multi-Purpose
Building (Gym), Kalawit 09/08/09 IX 1.445 70 C 0.457 0.200 0.300 - - - 95.70 *95.70% V. Satisfactory
EC Samonte Construction 31019
Const. of MPB at Jose Rizal Memorial State College (Covered
Court)09/08/09 IX 1.927 100 C 0.435 0.200 0.300 - - - 93.50 *93.50%
V. Satisfactory
EC Samonte Construction 31019 Concreting of Pathway Liloy Central
School 09/08/09 IX 0.962 98 C 0.429 0.200 0.300 - - - 92.90 91.40% V. Satisfactory
EC Samonte Construction 31019
Impvt./Rehab. of Farm-to-Market Road at Sarawagan Godod
(Guisapong-Rambon-Dipopor Road)09/08/09 IX 4.815 110 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
ECS Const. & Traffic Supply Enterprises, Inc. 33620
Rehab. (Slope Protection) along Teresa-Morong Rd. Teresa Bridge,
Km.34+61206/10/10 IVA 1.433 45 C 0.381 0.200 0.300 - - - 88.10 88.10%
Satisfactory
Ed Fabro Construction 18726 Const. of Sch. Bldg. at North Central School DepEd, Brgy. Tanqui 03/29/11 I 0.968 90 C 0.451 0.163 0.300 - - - 91.40 *91.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page143
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ed Fabro Construction 18726 Const. of Women's Center at Camp Diego Silang 03/29/11 I 0.488 80 C 0.416 0.200 0.300 - - - 91.60 86.56%
Satisfactory
Ed Fabro Construction 18726 Conc. of Poblacion Drainage Canal 03/29/11 I 0.922 60 C 0.333 0.200 0.300 - - - 83.30 *83.30% Satisfactory
Ed Fabro Construction 18726 Construction of Multi-Purpose Building 09/02/09 I 1.882 90 C 0.474 0.200 0.300 - - - 97.40 87.81%
Satisfactory
Ed Fabro Construction 18726 Improvement of MPB 02/26/10 I 0.976 90 C 0.469 0.133 0.300 - - - 90.20 90.20% V. Satisfactory
Ed Fabro Construction 18726 Rehab. of Rizal Avenue 05/25/10 I 0.973 58 C 0.356 0.200 0.300 - - - 85.60 85.60% Satisfactory
Ed Fabro Construction 18726 Const. of 2-Classroom @ La Union National High School 05/27/09 I 1.143 80 C 0.492 0.163 0.300 - - - 95.50 *95.50%
V.Satisfactory
Ed Fabro Construction 18726Rehabilitation of Multi-Purpose
Pavement at PNR Biday-Mameltac and Bangbangolan
02/24/09 I 1.882 120 C 0.345 0.200 0.300 - - - 84.50 83.48%Satisfactory
Edanna Construction 25492 Road Upgrading (Gravel to Paved) Cebu Transcentral (Road Slip) 04/14/11 VII 19.287 200 C 0.421 0.133 0.300 - - - 85.40 88.46%
Satisfactory
Edanna Construction 25492 Road Conc. from Brgy. Guba to Brgy. Sirao 04/14/11 VII 6.180 119 C 0.353 0.200 0.300 - - - 85.30 *85.30%
Satisfactory
Edanna Construction 25492 Completion of MPB, Oac, Canhayupon and Malijao, Dimiao 06/02/10 VII 0.488 93 C 0.345 0.200 0.300 - - - 84.50 84.50%
Satisfactory
Eddie G. Guillen Builders 14174 Const. of Regional Center Road Network 04/03/11 II 42.446 322 C 0.480 0.133 0.300 - - - 91.30 90.37%
V. Satisfactory
Eddie G. Guillen Builders 14174 Reblocking of Cagayan Valley Road (Magupit Junction Aparri Section) 09/09/09 II 16.402 180 C 0.411 0.200 0.300 - - - 91.10 88.76%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page144
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Eddie G. Guillen Builders 14174 Restoration of Collapsed Revetment at Sapping River Control 05/26/10 II 13.356 360 C 0.431 0.133 0.300 - - - 86.40 86.40%
Satisfactory
Eddie G. Guillen Builders 14174 Conc. along Kabugao-Pudtol-Luna Road, Kapanikian Section 02/18/10 CAR 9.338 277 C 0.383 0.139 0.300 - - - 82.20 84.54%
Satisfactory
Eddie G. Guillen Builders 14174Concrete Reblocking at KO 571+000 -
KO 585+000, along Dugo-San Vicente Road
05/20/09 II 14.215 210 C 0.482 0.133 0.300 - - - 91.50 87.51% Satisfactory
Eddmari Const. & Trading / Cholo Const. &
Trading (JV) JV-07-091 Candaba-San Miguel Road 02/24/09 III 25.964 234 O 0.335 0.300 0.150 0.030 0.042 0.050 90.70 -
Eddmari Const./Christian Ian Corp. Joint Venture JV-07-133 Upgrading/Concreting of Tulaoc-Sto.
Domingo Road (San Simon Section) 06/05/09 III 91.773 230 C 0.307 0.200 0.300 - - - 80.70 87.48% Satisfactory
Eddmari Construction & Trading 20301
Construction of 4 Units Health/Day Care Center and 2 Units Police
Center, NV 3, 4A,4B and 5A06/04/10 NHA 8.989 90 O 0.40 0.30 0.15 0.026 0.051 0.05 97.70 -
Eddmari Construction & Trading 20301 Construction of 1-Unit Health/Day
Care Center 06/04/10 NHA 1.998 90 O 0.40 0.30 0.150 0.024 0.049 0.05 97.30 -
Eddmari Construction & Trading 20301 Construction of 1-Unit Police Center 06/04/10 NHA 0.498 90 O 0.40 0.30 0.15 0.024 0.049 0.050 97.30 -
Eddmari Construction and Trading 20301
Rehab./Reconst./Upgrading of Damaged Paved along Baliwag-
Candaba-Sta. Ana Road03/28/11 III 14.293 120 C 0.351 0.174 0.300 - - - 82.50 83.46%
Satisfactory
Eddmari Construction and Trading 20301
Rehab./Reconst./Upgrading of Damaged Pavement at Candaba-San
Miguel Road02/15/10 III 19.030 104 C 0.423 0.200 0.300 - - - 92.30 92.30%
V. Satisfactory
Eddmari Construction and Trading 20301 Slope Protection Works along Sta.
Ana-Candaba Road 02/15/10 III 4.777 30 C 0.470 0.133 0.300 - - - 90.30 90.30% V. Satisfactory
Eddmari Construction and Trading 20301
Rehab./Reconst./Upgrading of Damaged Paved along Apalit-
Macabebe-Masantol Rd.08/31/10 III 14.295 120 C 0.382 0.200 0.300 - - - 88.20 88.20%
Satisfactory
Eddmari Construction and Trading 20301 Conc. of Brgy. Road at Sta. Monica 08/31/10 III 0.951 45 C 0.347 0.200 0.300 - - - 84.70 84.70%
Satisfactory
Eddmari Construction and Trading 20301
Rehab./Reconst./Upgrading of Damaged Paved along San Vicente
Rd.08/31/10 III 14.286 120 C 0.371 0.200 0.300 - - - 87.10 84.16%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page145
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Eddmari Construction and Trading 20301 Const./Repair/Completion of Multi-
Purpose Building, Bebe Anac 05/19/09 III 0.571 40 C 0.477 0.200 0.300 - - - 97.70 *97.70% Outstanding
Eddmari Construction and Trading 20301 Candaba-San Miguel Road 02/24/09 III 45.764 193 O 0.379 0.299 0.150 0.030 0.037 0.050 94.50 -
Eddmari Construction and Trading 20301 Const/Conc./Rehab/Completion of
San Gabriel Multi-Purpose Bldg. 08/24/09 III 0.667 45 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory
Eddmari Construction and Trading/Cholo
Const. & Trading (JV) JV-07-091 Candaba-San Miguel Road 02/15/10 III 25.794 234 C 0.427 0.200 0.300 - - - 92.70 91.50%
V. Satisfactory
Edelsons Builders, Inc. 24826 Conc. of Purok 4 Rd. Brgy. Ithan 06/07/10 IVA 2.400 90 C 0.377 0.200 0.300 - - - 87.70 87.70% Satisfactory
Edelsons Builders, Inc. 24826 Asphalting/Concrete Blocking of Del Monte Avenue 06/01/09 NCR 9.550 90 C 0.489 0.133 0.300 - - - 92.20 *92.20%
V. Satisfactory
Edelsons Builders, Inc. 24826 Asphalt Overlay/Conc. Reblocking at Tandang Sora Ave. 03/09/09 NCR 9.600 60 C 0.345 0.200 0.300 - - - 84.50 *84.50%
Satisfactory
Edelsons Builders, Inc. 24826Rehab./Reconst./Upgrading of
Damaged Paved National Roads, General Luis Street
06/04/10 NCR 9.549 60 C 0.457 0.200 0.300 - - - 95.70 95.70% V. Satisfactory
Eden Construction 13072 Const. of Drainage System at Brgy. Aguinaldo 06/04/10 III 1.897 90 C 0.444 0.133 0.300 - - - 87.70 95.70%
V. Satisfactory
EDT Construction 10225 Restoration of Slope Protection at Pentor Balsik River 02/24/09 III 0.951 60 C 0.350 0.200 0.300 - - - 85.00 *85.00%
Satisfactory
EFC Enterprises 11795 Const. of Bridge at Brgy. Talon 1 (Phase I) 09/04/09 NCR 3.841 61 C 0.409 0.133 0.300 - - - 84.20 *84.20%
Satisfactory
EFC Enterprises 11795Asphalt Overlay along Gil Puyat Ave. East Bound (Phase II) EDSA to Ayala
with exception02/17/10 NCR 9.591 30 C 0.445 0.133 0.300 - - - 87.80 87.80%
Satisfactory
EFC Enterprises / B.M.K. Construction (JV) JV-08-321 Const./Widening of Katihan/NBP
Bridge SLEX, Brgy. Poblacion 09/02/10 NCR 21.229 104 C 0.465 0.133 0.300 - - - 89.80 89.80% V. Satisfactory
EGB Construction 13722Rehab./Reconst./Upgrading of
Santiago-Tuguegarao Road, Roma Norte Section
03/28/11 II 38.630 210 C 0.402 0.185 0.300 - - - 88.70 *88.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page146
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
EGB Construction 13722
Rehab./Reconst./Upgrading of Damaged Paved National Roads, CAR, Sampaguita-Solano Section
KO502+000-KO503+600
09/10/09 II 19.285 146 C 0.471 0.200 0.300 - - - 97.10 93.68% V. Satisfactory
EGB Construction 13722 Concreting of Jct. National to Sta. Victoria Road 09/05/09 II 22.144 120 C 0.434 0.200 0.300 - - - 93.40 91.84%
V. Satisfactory
EGB Construction 13722 Conc. of Jct. National to Sta.Victoria Rd. 05/29/10 II 3.276 60 C 0.464 0.143 0.300 - - - 90.70 90.70%
V. Satisfactory
EGB Construction 13722 Conc. of Ilagan-Bigao-Palanan Rd. 05/29/10 II 14.475 110 O 0.380 0.240 0.150 0.030 0.056 0.033 88.90 -
EGB Construction 13722 Const./Impvt. of Public Market 05/28/10 II 2.406 120 O 0.378 0.240 0.150 0.030 0.051 0.033 88.20 -
EGB Construction 13722 Conc. of Ilagan-Bigao-Palanan Road 08/22/10 II 14.475 110 C 0.398 0.200 0.300 - - - 89.80 89.26% V. Satisfactory
EGB Construction 13722 Const./Impv't. of Public Market 08/20/10 II 2.406 140 C 0.430 0.150 0.300 - - - 88.00 88.12% Satisfactory
EGB Construction 13722 Const. of Aggasian Flood Control along Pinacanauan River (Phase II) 08/22/10 II 14.469 120 C 0.400 0.150 0.300 - - - 85.00 85.00%
Satisfactory
EGB Construction 13722 Rehab./Concreting of San Antonio-Cabisera Road 05/22/09 II 4.673 120 C 0.439 0.200 0.300 - - - 93.90 91.92%
V. Satisfactory
EGB Construction 13722 Rehab/Recons. of Damaged National Road 02/27/09 II 19.132 288 C 0.429 0.200 0.300 - - - 92.90 85.58%
Satisfactory
EGB Construction 13722 Conc. of Jct. Nat'l to Sta. Victoria Road 08/13/08 II 13.098 90 C 0.306 0.294 0.300 - - - 90.00 88.68%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page147
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
EGB Construction 13722 Const. of MPB 08/26/08 II 1.923 200 C 0.378 0.248 0.300 - - - 92.60 87.56% V. Satisfactory
Eirish Builders & Supply Co. 33656
Const. of MP Bldg. Nabaong Garlang Elementary School, Brgy. Nabaong
Garlang08/27/10 III 1.272 70 C 0.481 0.121 0.300 - - - 90.20 90.20%
V. Satisfactory
EJR Builders & Construction Supply 24255 Construction of School Building
(Phase I) at Ranao NHS 03/11/09 I 0.507 40 C 0.389 0.200 0.300 - - - 88.90 *88.90%Satisfactory
EJR Builders and Construction Supply 24255 Const. of MPB @ Maliga E/S 03/04/10 I 0.387 37 C 0.466 0.133 0.300 - - - 89.90 89.90%
V. Satisfactory
EJR Builders and Construction Supply 24255 Const. of MPB at Inerangan NHS 06/09/10 I 0.436 30 C 0.389 0.133 0.300 - - - 82.20 82.20%
Satisfactory
El Kapitan Construction Service 33123 Const./Conc./Rehab./Completion of
Sto. Tomas Multi-purpose Bldg. 08/24/09 III 0.475 35 O 0.356 0.240 0.150 0.030 0.051 0.050 87.70 -
El Kapitan Construction Services 33123 Rehab./Impvt. of San Agustin Road 08/24/09 III 3.327 40 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
El Nido Construction And Trading 25814 Basey Irrigation Project 09/05/10 NIA 8.673 105 C 0.458 0.165 0.300 - - - 92.30 92.30%
V. Satisfactory
Eldico Builders 26601 Improvement/Rehab. of Anao-San Pablo FMR 02/24/09 III 2.852 25 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
Eleazar V. Adlawan Construction 576 Rehab., Reconst. of Natalio Bacalso
Avenue, Carcar-Sibonga Section 06/01/09 VII 9.647 35 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Elkankonstrak Development
Corporation (Formerly: Elkan Konstrak &
Aggregates)
26220 Const. of 1 unit-CL SB (7.0 x 9.0) at Maysua High School 03/30/11 V 0.579 90 C 0.425 0.133 0.300 - - - 85.80 *85.80%
Satisfactory
Enrique A. Flores Contractor 2421 Rehab./Conc. Of Road of SLU-SVP
Brgy. 03/03/10 CAR 1.446 30 C 0.357 0.200 0.300 - - - 85.70 85.70% Satisfactory
EPN Builders & Developers 30341 Const. of One (1) CL SB, Gomez
Primary School 09/03/09 II 0.484 60 C 0.358 0.200 0.300 - - - 85.80 *85.80% Satisfactory
EPN Builders & Developers 30341 Const. of One (1) CL School Building
(7m x 7m) at Maligaya E/S 02/22/10 II 0.499 60 C 0.441 0.123 0.300 - - - 86.40 86.40% Satisfactory
EPN Builders & Developers 30341 Const./Repair of Multi-Purpose
Building 02/25/10 II 1.350 60 C 0.430 0.133 0.300 - - - 86.30 86.30% Satisfactory
EPN Builders and Developers 30341 Completion of Multi-Purpose
Building 03/06/09 II 1.491 60 C 0.417 0.200 0.300 - - - 91.70 *91.70% V.Satisfactory
Equilibrium Engineering 13606 Concreting of Access Road (Shouldering) Daet-Mercedes Road 06/04/09 V 2.820 150 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page148
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Equi-Parco / Adfil Joint Venture JV-09-023 Conc.-Impvt. of Tiniwisan-Maguinda
Road (Lemon-Pigdaulan Sect.) 04/15/11 XIII 335.031 540 C 0.401 0.200 0.300 - - - 90.10 90.43% V. Satisfactory
Equi-Parco Construction 14332Rehab./Reconst. of Butuan City-Cagayan de Oro City-Iligan City
(BCIR) Road09/08/10 X 474.723 360 C 0.426 0.200 0.300 - - - 92.60 92.60%
V. Satisfactory
Equi-Parco Construction 14332 Asphalt Overlay along Butuan City-Masao Port Rd. 03/10/10 XIII 8.640 90 C 0.488 0.133 0.300 - - - 92.10 92.10%
V.Satisfactory
Equi-Parco Construction 14332Asphalt Overlay along Agusan-Misamis Rd. Carmen-Tagcatong
Section02/22/10 XIII 18.528 75 C 0.479 0.133 0.300 - - - 91.20 91.20%
V.Satisfactory
Equi-Parco Construction 14332 Const. of Butuan City By Pass Road 02/23/10 XIII 143.662 375 C 0.340 0.200 0.300 - - - 84.00 89.70% V.Satisfactory
Equi-Parco Construction 14332Asphalt Overlay of Butuan City-
Masao Port Road, Balbarino-Holy Redeemer Section
06/16/10 XIII 19.255 150 C 0.457 0.200 0.300 - - - 95.70 95.70% V. Satisfactory
Equi-Parco Construction 14332Asphalt Overlay along Daang
Maharlika, Surigao-Agusan Section (50 mm thk.), Tagbayucan Section
06/01/10 XIII 13.896 60 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory
Equi-Parco Construction 14332 Conc. of Butuan City-Masao Port Road 06/16/10 XIII 18.855 240 C 0.421 0.200 0.300 - - - 92.10 92.10%
V. Satisfactory
Equi-Parco Construction 14332
Const./Conc. of Surigao-Davao Coastal Road (Lingig Boundary-
Boston Sect.) along Bislig-Boston Section
06/11/10 XIII 322.527 585 C 0.391 0.200 0.300 - - - 89.10 89.82% V. Satisfactory
Equi-Parco Construction 14332 Asphalt Overlay of Agustin-Mis. Or. Rd., Butuan Airport-Dumalagan Sect. 09/09/10 XIII 19.256 150 C 0.414 0.200 0.300 - - - 91.40 91.40%
V. Satisfactory
Equi-Parco Construction 14332Asphalt Overlay of Agusan-Misamis
Or. Rd., NIA Substation-Bancasi Section
09/09/10 XIII 19.256 150 C 0.408 0.200 0.300 - - - 90.80 90.80% V. Satisfactory
Equi-Parco Construction 14332 Asphalt Overlay of Agusan-Misamis Or. Rd., Libertad-NIA Substation 09/09/10 XIII 19.256 150 C 0.407 0.200 0.300 - - - 90.70 90.70%
V. Satisfactory
Equi-Parco Construction 14332 Impvt./Rechanneling of Jaliobong River 08/24/10 XIII 48.212 180 C 0.407 - 0.500 - - - 90.70 90.70%
V. Satisfactory
Equi-Parco Construction 14332Asphalt Overlay of Agusan-Misamis
Or. Rd.,, Bancasi-Butuan Airport Section
09/09/10 XIII 19.256 150 C 0.403 0.200 0.300 - - - 90.30 90.30% V. Satisfactory
Equi-Parco Construction JV-08-062Conc. of Dinagat Island Road Network, Dinagat-Loreto Road
(Basilisa-Albor Section)08/26/10 XIII 161.113 447 C 0.434 0.185 0.300 - - - 91.90 90.19%
V. Satisfactory
Equi-Parco Construction 14332Asphalt Overlay of Butuan-Cagayan
de Oro-Iligan Road, Otis Mall-Arujville
09/09/10 XIII 14.415 120 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory
Equi-Parco Construction 14332 Impvt./Rechanneling of Jaliobong River (Phase 2) 08/24/10 XIII 48.211 180 C 0.397 - 0.500 - - - 89.70 89.70%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page149
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Equi-Parco Construction 14332 Repair/Rehab. of NRJ Bahbah-Talacogon Road, (Asphalt Overlay) 06/15/10 XIII 9.243 120 C 0.443 0.200 0.300 - - - 94.30 94.30%
V. Satisfactory
Equi-Parco Construction 14332 Conc. of Misamis Oriental-Bukidnon-Agusan Road 03/19/09 X 91.466 330 O 0.347 0.300 0.100 0.030 0.045 0.050 87.20 -
Equi-Parco Construction 14332 Conc. of Misamis Oriental-Bukidnon-Agusan Road 06/10/09 X 91.466 330 O 0.271 0.300 0.150 0.030 0.043 0.050 84.40 -
Equi-Parco Construction 14332 Conc. of Gingoog-Calveria-Villanueva Road, Samay Section 09/08/09 X 13.721 180 C 0.484 0.180 0.300 - - - 96.40 *96.40%
Outstanding
Equi-Parco Construction 14332 Rehab./Reconst. of Butuan City-Cagayan De Oro City- Iligan Road 09/09/09 X 145.175 405 O 0.357 0.300 0.150 0.030 0.056 0.050 94.30 -
Equi-Parco Construction 14332Rehab./Reconst. of Butuan City-Cagayan de Oro City-Iligan City
(BCIR) Road09/07/09 X 474.722 360 O 0.378 0.248 0.150 0.030 0.070 0.050 92.60 -
Equi-Parco Construction 14332 Conc. of Misamis Oriental-Bukidnon-Agusan Rd. 03/11/10 X 96.040 330 C 0.410 0.200 0.000 - - - 61.00 75.88%
Unsatisfactory
Equi-Parco Construction 14332 Asphalt Overlay of Agusan-Misamis Oriental Road 03/18/09 XIII 14.446 90 C 0.460 0.200 0.300 - - - 96.00 *96.00%
V.Satisfactory
Equi-Parco Construction 14332Conc. of Agusan del Norte-Surigao del Sur (Cabadbaran-Puting Bato
Section)03/03/09 XIII 95.698 540 O 0.335 0.300 0.150 0.030 0.056 0.050 92.10 -
Equi-Parco Construction 14332 Conc. of Kinabjangan By-Pass National Secondary Road 03/02/09 XIII 13.876 180 C 0.398 0.200 0.300 - - - 89.80 85.96%
Satisfactory
Equi-Parco Construction 14332 Conc.of Agusan-Bukidnon National Road 03/02/09 XIII 15.034 207 C 0.435 0.200 0.300 - - - 93.50 90.14%
V.Satisfactory
Equi-Parco Construction 14332 Construction of Butuan City By-Pass Road, Bonbon-Kinamlutan Section 03/19/09 XIII 24.594 195 O 0.353 0.300 0.150 0.030 0.042 0.050 92.50 -
Equi-Parco Construction 14332 Rechanneling of Cabadbaran River, Putting Bato, Phase 1 03/03/09 XIII 19.280 180 O 0.334 0.000 0.200 0.050 0.067 0.250 90.10 -
Equi-Parco Construction 14332 Upgrading of Agusan-Bukidnon National Road 05/25/09 XIII 14.326 210 O 0.393 0.300 0.150 0.030 0.047 0.050 97.00 -
Equi-Parco Construction 14332 Construction of Camingawan-Canticol Road, Phase VI 05/26/09 XIII 19.278 180 C 0.459 - 0.500 - - - 95.90 *95.90%
V. Satisfactory
Equi-Parco Construction 14332 Rehab./Reconst. of Buenavista-Bunaguit Road Section 05/25/09 XIII 7.572 180 O 0.376 0.300 0.150 0.030 0.047 0.050 95.30 -
Equi-Parco Construction 14332 Const. of Butuan City Bypass Road (Bon-bon) Kinamlutan Section 06/11/09 XIII 24.594 195 C 0.478 0.200 0.300 - - - 97.80 94.62%
V. Satisfactory
Equi-Parco Construction 14332 Const. of Camingawan-Canticol Road Phase V 05/26/09 XIII 19.280 180 C 0.445 0.000 0.500 - - - 94.50 *94.50%
V. Satisfactory
Equi-Parco Construction 14332Conc. of Agusan Del Norte-Surigao Del Sur (Cabadbaran-Puting Bato
Sect.) 05/26/09 XIII 95.698 540 C 0.487 0.170 0.300 - - - 95.70 94.26%
V. Satisfactory
Equi-Parco Construction 14332 Rechanneling of Cabadbran River Puting Bato, Phase I 05/26/09 XIII 19.279 180 C 0.445 0.000 0.500 - - - 94.50 91.86%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page150
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Equi-Parco Construction 14332
Rehab./Asphalt Overlay along Butuan-Cagayan de Oro-Iligan Rd. along Brgy. Ampayon-Brgy. Baan
Sec.
09/16/09 XIII 48.164 250 C 0.457 0.200 0.300 - - - 95.70 *95.70% V.Satisfactory
Equi-Parco Construction 14332 Upgrading of Buenavista-Bunaguit Rd.(Malpoc-Rizal Sect.) 09/01/09 XIII 14.326 210 C 0.409 0.189 0.300 - - - 89.80 92.56%
V.Satisfactory
Equi-Parco Construction 14332Rehab./Reconst. of Damaged Paved National Rd.,Buenavista-Bunaguit
Rd. Sect.09/01/09 XIII 7.572 160 C 0.400 0.174 0.300 - - - 87.40 92.14%
V.Satisfactory
Equi-Parco Construction 14332 Concreting of Butuan City-Masao Port Rd., Jct. Doongan Bridge 09/16/09 XIII 14.213 195 O 0.378 0.240 0.150 0.030 0.060 0.050 90.80 -
Equi-Parco Construction 14332Const./Conc. of SDCR(Lingig
Boundary-Boston Sect.) along Bislig-Boston Sect.
09/11/09 XIII 325.527 585 O 0.383 0.225 0.150 0.030 0.065 0.050 90.30 -
Equi-Parco Construction 14332 Upgrading of Agusan-Bukidnon National Rd. 09/01/09 XIII 14.326 210 O 0.394 0.216 0.150 0.030 0.050 0.050 89.00 -
Equi-Parco Construction 14332Asphalt overlay-Daang Maharlika
(cracks & joints Sealing) Sibagat and Bayugan Sect.
09/13/09 XIII 14.292 97 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory
Equi-Parco Construction Co. 14332 Siargao Airport Development Project 08/09/11 DOTC 75.112 210 C 0.455 0.300 0.200 - - - 95.50 95.30%
V. Satisfactory
Equi-Parco Construction Company 14332
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads, Butuan City-Cagayan de Oro City-Iligan City Road (BCIR) Alubijid-Lugait Sect. w/
exception
04/13/11 X 101.251 240 C 0.492 0.133 0.300 - - - 92.50 92.56% V. Satisfactory
Equi-Parco Construction Company 14332
Rehab./Reconst./Upgrading of Damged Paved Nat'l. Roads along
Sayre Highway, Mambatangan Section
03/30/11 X 19.235 300 C 0.391 0.200 0.300 - - - 89.10 91.14% V. Satisfactory
Equi-Parco Construction Company 14332
Completion/Continuation of Cagayan de Oro City Third (3rd) Bridge &
Access Road04/14/11 X 58.169 390 O 0.305 0.300 0.150 0.030 0.042 0.033 86.00 -
Equi-Parco Construction Company 14332
Const. of Butuan City By-Pass Road (Bonbon-Bancasi Airport & Lemon-
NRJ-Antongalon Sect.)04/15/11 XIII 177.960 405 C 0.439 0.200 0.300 - - - 93.90 *93.90%
V. Satisfactory
Equi-Parco Construction Company 14332 Conc. of Dinagat-Loreto Road
(Basilisa-Albor Section) 04/07/11 XIII 161.660 420 C 0.388 0.200 0.300 - - - 88.80 91.50% V. Satisfactory
Equi-Parco Construction Company 14332
Rehab./Impvt. (Conc.) along Surigao-Davao Coastal Road, Bislig-Manay
Sect. (Bislig-Lingig Sect.)04/03/11 XIII 296.620 390 C 0.414 0.200 0.300 - - - 91.40 *91.40%
V. Satisfactory
Equi-Parco Construction Company 14332
Rehab./Impvt. (Conc.) along Surigao-Davao Coastal Road, Bislig-Manay (Lingig-Region XIII Boundary Sect.)
04/03/11 XIII 308.286 390 C 0.401 0.200 0.300 - - - 90.10 *90.10% V. Satisfactory
Equi-Parco Construction Construction / Gicar
Construction (JV)JV-08-062
Conc. of Dinagat Island Road Network, Dinagat-Loreto Road
(Basilisa-Albor Section)06/02/10 XIII 161.113 447 O 0.283 0.300 0.150 0.030 0.055 0.033 85.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page151
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Equi-Parco Construction Corp. 14332
Butuan Airport Development Project (Construction of Asphalt Overlay of
Runway, Slope Protection for Runway Extension, Construction of Pedestrian Gate and Improvement of
Terminal Building)
02/18/11 DOTC 160.730 360 C 0.442 0.200 0.300 - - - 94.20 95.80% V. Satisfactory
Equi-Parco Construction Corp. 14332 Butuan Airport Development Project 03/17/09 DOTC 48.145 240 C 0.451 0.200 0.300 - - - 95.10 95.10%
V. Satisfactory
Equi-Parco Construction Corp. 14332
M'lang, Airport Development Project (Concreting of Runway, Taxiway &
Apron and Construction of Vehicular Parking Area)
10/11-12/2010 DOTC 96.366 270 C 0.462 0.200 0.300 0.000 0.000 0.000 96.20 92.60% V. Satisfactory
Equi-Parco Construction Corp. 14332 Butuan Airport Development Project 07/31/09 DOTC 9.606 120 C 0.459 0.200 0.300 - - - 95.90 95.90%
V. Satisfactory
Equi-Parco/Adfil Joint Venture JV-09-023
Conc./Impv't. of Tiniwisan-Maguinwall Rd. (Lemon-Pigdanlan
Section)02/23/10 XIII 335.031 51 O 0.370 0.240 0.150 0.030 0.050 0.050 89.00 -
Eric Van P. Sesbreno Construction 26243 Conc. Of Nueva Vizcaya-Pangasinan
Road, Imugan Section 04/15/11 II 9.635 180 C 0.442 0.133 0.300 - - - 87.50 86.78% Satisfactory
Eric Van P. Sesbreno Construction 26243 Construction of Mabasa Flood
Control 09/01/09 II 0.473 30 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory
Ermy Construction and Trading 15741 Rehab/Improvement of Sta. Lucia
Farm to Market Road 02/23/09 III 4.753 50 C 0.406 0.200 0.300 - - - 90.60 *90.60%V. Satisfactory
Ermy Construction and Trading (Formerly: Ermy
Construction)15741 Conc. of FMR @ Brgy. San Felipe 03/28/11 III 0.945 30 C 0.415 0.133 0.300 - - - 84.80 *84.80%
Satisfactory
ES De Guzman Construction 17494 Const. of NVGCHS, 6CL,3-Storey
Building, Bontal Annex 08/28/09 II 1.604 90 O 0.325 0.240 0.150 0.030 0.018 0.050 81.30 -
ESD Cruz Construction & Supply 32368
Conc. of Palapag-Mapanas-Gamay-Lapinig Road, Pangpang-Mapno
Section, w/ exception04/01/11 VIII 18.809 200 C 0.412 0.133 0.300 - - - 84.50 85.28%
Satisfactory
ESD Cruz Construction & Supply 32368
Conc. of Palapag-Mapanas-Gamay-Lapinig Road, Cabatuan-Magtaon
Section w/ exception04/01/11 VIII 18.818 200 C 0.416 0.133 0.300 - - - 84.90 84.90%
Satisfactory
ESD Cruz Construction & Supply 32368
Conc. of Palapag-Mapanas-Gamay-Lapinig Road, Nipa-Cabatuan
Section, w/ exception04/01/11 VIII 18.789 200 C 0.411 0.133 0.300 - - - 84.40 83.92%
Satisfactory
ESD Cruz Construction & Supply 32368
Conc. of Palapag-Simora Road, Palapag-Magsaysay Section with
exception04/01/11 VIII 18.789 200 C 0.405 0.200 0.300 - - - 90.50 83.12%
Satisfactory
ESD Cruz Construction & Supply 32368 Asphalt Overlay of Catarman-Laoang
Road, Pambujan-Rawis Sect. 05/25/09 VIII 14.719 120 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory
ESD Cruz Construction & Supply 32368 Const. of Multi-Purpose Pavement
Brgy. Dale 03/06/10 VIII 0.968 180 C 0.389 0.200 0.300 - - - 88.90 88.90% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page152
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ESD Cruz Construction & Supply 32368
Repair/Rehab. of National Road (Pangpang-Mapanas-Gamay-Lapinig
Road03/04/09 VIII 9.789 120 C 0.465 0.133 0.300 - - - 89.80 84.22%
Satisfactory
ESD Cruz Construction & Supply 32368 Concrete Paving along Brgy. San
Roque-Balud-Coroconog FMR 09/12/09 VIII 9.618 90 C 0.387 0.200 0.300 - - - 88.70 *88.70% Satisfactory
Eser Enterprises-Burot 23902 Const./Repair of Multi-Purpose Building at Brgy. Oloybuaya 05/22/09 III 1.229 60 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V. SatisfactoryESN Construction &
Trading 32720 Const. of One Classroom School Bldg., Taal E/S 08/27/10 III 0.602 24 C 0.480 0.167 0.300 - - - 94.70 94.70%
V. SatisfactoryESN Construction &
Trading 32720 Repair/Rehab. of School Bldg., San Marcos E/S 08/27/10 III 0.315 25 C 0.484 0.156 0.300 - - - 94.00 94.00%
V. Satisfactory
ESR Construction and Supplies 10451
Const. of Multi-Purpose Pavement (Phase I) at Jose Rizal Memorial
State University (JRMSU) Complex04/14/11 IX 9.629 60 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
ESR Construction and Supplies 10451
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Liloy-Ipil Road04/01/11 IX 41.534 182 C 0.473 0.133 0.300 - - - 90.60 90.06%
V. Satisfactory
ESR Construction and Supplies 10451
Rehab./Impvt. of Dipolog-Punta-Dansulian-Sergio Osmeña Rd. (Dilawa-De Venta Perla Sect.)
04/08/11 IX 94.138 570 C 0.413 0.195 0.300 - - - 90.80 89.82% V. Satisfactory
ESR Construction and Supplies 10451 Road Upgrading (Gravel to Concrete)
Dumalinao-Margosatubig Road 04/06/11 IX 18.392 240 C 0.459 0.200 0.300 - - - 95.90 89.78% V. Satisfactory
ESR Construction and Supplies 10451
Asphalt Overlay along Pagadian City-Zamboanga City Road (Using
Instapave Surface Treatment) Anonang-Sumadat Sect.
04/06/11 IX 8.820 195 C 0.417 0.200 0.300 - - - 91.70 89.18% V. Satisfactory
ESR Construction and Supplies 10451
Road Upgrading (Gravel to Concrete) along Polanco-Macleodes Rd., Dap-
Dap Section04/13/11 IX 18.579 197 C 0.418 0.200 0.300 - - - 91.80 88.50%
Satisfactory
ESR Construction and Supplies 10451
Reconst. of Lanao-Pagadian-2Z Road Km. 1724+940 - Km. 1750+000,
Concreting of Unpaved Shoulder @ Poblacion Imelda
02/26/10 IX 4.426 155 C 0.412 0.139 0.300 - - - 85.10 85.58% Satisfactory
ESR Construction and Supplies 10451 Dumingag-Siayan Road (Road
Upgrading Gravel to Concrete) 03/06/10 IX 46.778 300 O 0.295 0.300 0.150 0.030 0.047 0.033 85.50 -
ESR Construction and Supplies 10451
Completion of Kagawasan, Dimataling-Pitogo Provincial Road
Sta. 0+000 - Sta. 3+540 with exception
03/04/10 IX 27.575 263 O 0.300 0.281 0.150 0.030 0.042 0.050 85.30 -
ESR Construction and Supplies 10451
Reconst. of Lanao-Pagadian-Zamboanga City Road Km. 1724+940 -Km. 1750+000, Installation of RCCP
and Reblocking @ Basalem
02/26/10 IX 1.070 57 C 0.307 0.200 0.300 - - - 80.70 83.82% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page153
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ESR Construction and Supplies 10451
Rehab./Impvt. of Dimataling-Tabina Provincial Road Sta. 0+800 - Sta.
11+602.75 with exception03/04/10 IX 101.168 735 O 0.307 0.257 0.150 0.030 0.033 0.050 82.70 -
ESR Construction and Supplies 10451
Conc./Widening of Jct. Dumalinao-Margosatubig Rd. Intermittent
Sections06/10/10 IX 18.073 277 C 0.471 0.133 0.300 - - - 90.40 91.69%
V. Satisfactory
ESR Construction and Supplies 10451
Rehab./Impvt. of Dipolog-Punta-Dansullan-Sergio Osmeña Rd. (De Venta Perla-Poblacion Alto Sect.)
06/12/10 IX 28.120 240 C 0.437 0.133 0.300 - - - 87.00 91.23% V. Satisfactory
ESR Construction and Supplies 10451 Dapitan-Dakak Rd. (Taguilon Sect.)
Phase V 06/13/10 IX 55.050 300 O 0.392 0.256 0.150 0.030 0.040 0.033 90.10 -
ESR Construction and Supplies 10451 Road Upgrading (Gravel to Concrete)
Jct. Blancia-Molave-Josefina Rd. 06/08/10 IX 46.470 300 C 0.450 0.133 0.300 - - - 88.30 88.80% Satisfactory
ESR Construction and Supplies 10451 Dapitan-Dakak Rd. (Sto.Niño-
Taguilon Sect., Phase IV) 06/13/10 IX 54.983 322 C 0.451 0.133 0.300 - - - 88.40 87.80% Satisfactory
ESR Construction and Supplies 10451
Rehab./Impvt. of Dimataling-Tabina Provincial Rd., Sta.0+800 - Sta.11+602.75 w/ exception
06/10/10 IX 101.168 735 O 0.360 0.240 0.150 0.030 0.037 0.050 86.70 -
ESR Construction and Supplies 10451 Dapitan-Dakak Rd. (Taguilon Sect.),
Phase V, Dapitan City 08/25/10 IX 55.050 300 O 0.369 0.240 0.150 0.030 0.047 0.050 88.60 -
ESR Construction and Supplies 10451
Asphalt Overlay along Dipolog-Oroquieta Nat'l. Rd., Km.1810+163 -
Km.1813+000 (using Instapave Surface Treatment)
08/31/10 IX 9.243 50 C 0.429 0.133 0.300 - - - 86.20 86.20% Satisfactory
ESR Construction and Supplies 10451 Dumingag-Siayan Rd. (Road
Upgrading Gravel to Concrete) 08/29/10 IX 46.778 300 C 0.418 0.133 0.300 - - - 85.10 85.98% Satisfactory
ESR Construction and Supplies 10451
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rd. along Jct.
Pulauan Port Rd.08/31/10 IX 9.066 122 C 0.424 0.133 0.300 - - - 85.70 84.32%
Satisfactory
ESR Construction and Supplies 10451
Asphalt Overlay along Dipolog-Oroquieta Nat'l. Rd. Km.1806+420 - Km.1810+163 w/ exception (using
Instapave Surface Treatment)
08/31/10 IX 13.876 58 C 0.391 0.133 0.300 - - - 82.40 82.40% Satisfactory
ESR Construction and Supplies 10451
Road Upgrading (Gravel to Concrete) Dipolog-Punta-Dansullan-
SergionOsmeña, Zambo. Del Norte-Sur Bdry., Km.1876+000-
Km 1877+000 De Venta Perla
06/08/09 IX 18.674 120 O 0.390 0.238 0.150 0.010 0.037 0.050 87.50 -
ESR Construction and Supplies 10451 Road Upgrading (Gravel to Concrete)
, Jct. Blancia-Molave-Josefina Road 06/04/09 IX 46.470 300 O 0.342 0.240 0.150 0.030 0.051 0.050 86.30 -
ESR Construction and Supplies 10451
Impv't/Conc. Paving of Gutalac-Baliguian-Siocon Road, Sta. Maria-
Siocon Section03/07/09 IX 48.189 552 C 0.445 0.158 0.300 - - - 90.30 *90.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page154
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ESR Construction and Supplies 10451
Rehab./Reconst. of Damaged Paved National Road along Sindangan-Liloy-Ipil Road, Liloy-Ipil Section
09/04/09 IX 108.028 400 C 0.457 0.200 0.300 - - - 95.70 93.78% V. Satisfactory
ESR Construction and Supplies 10451 Conc./Widening of Jct. Dumalinao-
Margosatubig Intermittent Section 09/09/09 IX 18.073 247 O 0.372 0.300 0.150 0.030 0.040 0.033 92.50 -
ESR Construction and Supplies 10451
Rehab./Impvt. of Dipolog-Punta-Dansullan-Sergio Osmeña Road (De Venta Perla-Poblacion Alto Section)
09/14/09 IX 28.120 210 O 0.360 0.300 0.150 0.030 0.045 0.033 91.80 -
ESR Construction and Supplies 10451
Reblocking/Asphalt Overlaying of Junction Dumalinao-Margosatubig Road, Margosatubig Section, Sta. 1714+920 00-Sta 1719+739 10 with
09/10/09 IX 20.215 168 O 0.384 0.300 0.100 0.030 0.040 0.033 88.70 -
ESR Construction and Supplies 10451 Construction of 109 Duplex Housing
Units 05/19/09 NHA 25.499 120 C 0.299 0.300 0.300 - - - 89.90 89.90% V. Satisfactory
ESR Construction and Supply/Mindanao Rock
(JV)JV-07-170 Ozamis Airport Development Project 09/03/09 DOTC 41.400 240 C 0.451 0.200 0.300 - - - 95.10 95.10%
V. Satisfactory
ESR-MCDC (JV) JV-08-074Rehab./Impvt.. of Dipolog-Punta-
Dansullan-Sergio Osmeña Rd., De Venta Perla-Poblacion Alto Sect.
06/12/10 IX 95.149 633 C 0.456 0.133 0.300 - - - 88.90 89.98% V. Satisfactory
ETM Construction 16285 Const. of FMR at Brgy. Kataasan 05/26/10 III 0.548 60 C 0.436 0.133 0.300 - - - 86.90 86.90% Satisfactory
ETM Construction 16285Rehab. of Multi-Purpose Building at
304th Provincial Mobile Group, Brgy. Lamao
08/28/09 III 0.465 40 C 0.415 0.133 0.300 - - - 84.80 *84.80% Satisfactory
Euluz Construction and Supply 32080 Repair/Rehab. of Quezon City High
School, Brgy. Sacred Heart 03/31/11 NCR 1.476 60 C 0.498 0.133 0.300 - - - 93.10 *93.10% V. Satisfactory
Euluz Construction and Supply 32080
Const. of R.C. Box Culvert with Drainage System, Kaingin I, Brgy.
Pansol02/26/10 NCR 0.712 30 C 0.495 0.133 0.300 - - - 92.80 92.80%
V.Satisfactory
Everlast Construction 2364 Const. of MPB (Covered Court 5-Bay) 03/28/11 IX 2.894 114 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory
Everlast Construction 2364Const. of 2-Storey 4-Classroom
School Bldg. (Partial) at Southcom NHS
05/31/10 IX 3.628 120 C 0.477 0.133 0.300 - - - 91.00 90.93% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page155
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Everlast Construction 2364 Const. of Zamboanga City Schools Division Office 09/01/09 IX 14.182 305 O 0.370 0.300 0.150 0.030 0.035 0.033 91.80 -
Excel C'S Builders 24445 Const./Rehab. of Laray Multi-Purpose Pavement (MPP) Javier 02/26/10 VIII 0.944 70 C 0.363 0.200 0.300 - - - 86.30 87.14%
Satisfactory
Excel C's Builders 24445 Repair of Brgy. Roads, Brgy. Poblacion-Odiong 05/28/09 VIII 1.909 20 C 0.250 0.200 0.300 - - - 75.00 -
Express Construction 29649 Repair/Rehab. of MPB, Brgy. Milagros 03/31/11 NCR 1.433 103 C 0.493 0.104 0.300 - - - 89.70 *89.70%
V. Satisfactory
Express Construction 29649 Repair of School Bldg. at General Roxas E/S, Brgy. Roxas 02/26/10 NCR 1.412 15 C 0.472 0.133 0.300 - - - 90.50 90.50%
V.Satisfactory
Express Construction 29649 Repair/Rehab. of MPB at La Mesa Dam 08/16/10 NCR 1.464 15 C 0.460 0.133 0.300 - - - 89.30 89.30%
V. Satisfactory
F. A. Asper Construction 21579Const. of Dipolog Airport
Development Project (Building and Industrial Plant)
05/16/11 DOTC 12.977 180 C 0.457 0.200 0.300 - - - 95.70 90.50% V. Satisfactory
F. Alarcon Construction Corporation 17612 Inabangan Port Development Project 06/19/09 DOTC 2.888 90 C 0.473 0.200 0.300 - - - 97.30 97.30%
Outstanding
F. Alarcon Construction Corporation 17612 Sagay Port Development Project
(Extension of Causeway) 02/05/10 DOTC 4.798 120 C 0.468 0.200 0.300 - - - 96.80 96.80% Outstanding
F. Gurrea Construction Incorporated 6695 Rehab./Reconst./Upgrading of Iloilo
East Coast Estancia Wharf Road 04/13/11 VI 45.327 120 C 0.441 0.133 0.300 - - - 87.40 *87.40% Satisfactory
F. Gurrea Construction, Incorporated 6995 Conc. of Oton-Mambog Rd. 06/08/10 VI 28.673 270 C 0.357 0.200 0.300 - - - 85.70 85.70%
Satisfactory
F. Gurrea Construction, Incorporated 6995
Rehab./Reconst./Upgrading of Roxas City Bdry.-Panitan-Bailan Rd. Km.116+262 - Km.177+775 w/
exception
06/15/10 VI 19.086 254 C 0.330 0.200 0.300 - - - 83.00 83.00% Satisfactory
F. Gurrea Construction, Incorporated 6995
Conc. of Bantayan-San Pedro-Cubay Rd. (Magcalon-San Pedro Sect. and
Lugutan-Igbonglo Sect.)06/10/10 VI 30.068 300 C 0.381 0.200 0.300 - - - 88.10 82.28%
Satisfactory
F. Gurrea Construction, Incorporated 6995 Completion of Anahawon 12/01/08 VI 9.423 180 O 0.381 0.223 0.000 0.022 0.043 0.067 73.60 -
F. Gurrea Construction, Incorporated 6995
Conc. of Oton-Mambog-Caboloan-Abilay-SanJose-San Miguel Road
leading to Iloilo International Airport05/25/09 VI 57.850 462 O 0.295 0.300 0.150 0.030 0.065 0.050 89.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page156
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
F. Gurrea Construction, Incorporated 6995 Asphalt Paving of Lambunao-
Pototan Road 03/18/09 VI 9.525 120 C 0.444 0.200 0.300 - - - 94.40 89.96% V. Satisfactory
F. Gurrea Construction, Incorporated 6995
Rehab./Reconst. of Damaged Paved Nat'l Road, Jct. Bancal-Leon-Antique
Bdry. Road03/19/09 VI 9.577 195 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995 Repair/Rehab. of Iloilo-Antique Road 03/13/09 VI 9.642 50 C 0.424 0.200 0.300 - - - 92.40 *92.40%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995
Conc. of Oton-Mambog-Caboloan-Abilay-San Jose-San Miguel Road
leading to Iloilo International Airport Km. 11+436.25-Km.15+96.25 w/
exception
09/10/09 VI 57.894 467 O 0.314 0.300 0.150 0.030 0.060 0.050 90.40 -
F. Gurrea Construction, Incorporated 6995 Completion of Valderrama Bridge
and Approaches 09/02/10 VI 53.073 200 O 0.396 0.240 0.150 0.030 0.042 0.050 90.80 -
F. Gurrea Construction, Incorporated 6995 Conc. of Iloilo East West Road, San
Rafael-Passi Section 09/06/10 VI 18.915 210 O 0.375 0.240 0.150 0.030 0.037 0.033 86.50 -
F. Gutirrez Const./Gener R. Flancia and
Associates4572 Design and Const. of Cagayan De
Oro Convention and Civic Center 03/12/10 X 337.982 3,020 C 0.427 0.200 0.000 - - - 62.70 75.13% Unsatisfactory
F. R Ignacio Construction and Incorporated 687 Pasay City LTO District Office
Building Project 11/14/09 DOTC 11.937 255 C 0.395 0.200 0.300 - - - 89.50 89.50% V. Satisfactory
F.A Asprer Construction 21579 Camiguin Airport Development Project (Extension of Runway) 02/16/11 DOTC 9.596 60 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
F.A Asprer Construction 21579 Conc. Of Brgy. Road with Drainage Canal at Block 5 02/24/10 III 1.473 70 C 0.425 0.200 0.300 - - - 92.50 92.50%
V. Satisfactory
F.A Asprer Construction 21579 Dipolog Airport Development Project (Construction o Terminal Building) 11/10/10 DOTC 12.977 180 O 0.361 0.300 0.150 0.020 0.035 0.017 88.30 -
F.A Asprer Construction 21579 Construction/Repair of Multi-Purpose Building at Brgy. Caturay 05/22/09 III 1.227 60 C 0.389 0.200 0.300 - - - 88.90 *88.90%
V. Satisfactory
F.A Asprer Construction 21579 Const. of Flood Control (Drainage System) Villa Aglipay E/S 05/23/09 III 0.489 45 C 0.358 0.200 0.300 - - - 85.80 *85.80%
Satisfactory
F.A Sison Trading and Construction 27150
Rehab./Upgrading of Damaged National Roads (PMS/HDM-4)
Mindoro Oriental/Occidental East Coastal Road
08/27/10 IVB 7.522 200 O 0.361 0.055 0.150 0.030 0.055 0.033 68.40 -
F.A Sison Trading and Construction 13725 Const./Rehab./Improvement of Magat
Salamat Elem. School 05/20/09 NCR 2.404 120 C 0.471 0.200 0.300 - - - 97.10 *97.10% Outstanding
F.A Sison Trading and Construction 13725 Rehab./Impv't./Const. of MPB in
Brgy. 354, Zone 36 02/26/10 NCR 0.624 60 C 0.481 0.133 0.300 - - - 91.40 91.40% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page157
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
F.A. Sison Trading and Construction 13725
Const./Rehab./Repair/Impv't. of Teodoro R. Yangco E/S, Franco
corner Dandan St., Brgy. 89, Zone 704/04/11 NCR 4.721 90 C 0.491 0.097 0.300 - - - 88.80 *88.80%
Satisfactory
F.A. Torres Construction 27150
Rehab./Reconst./Upgrading of Damaged National Roads, Mindoro Oriental/Occidental Mindoro East
Coastal Road
04/08/11 IVB 21.134 214 C 0.456 0.136 0.300 - - - 89.20 84.13% Satisfactory
F.C. Martinez Construction 31243 Const. of MPB, Poblacion East 04/08/11 III 1.182 25 C 0.420 0.127 0.300 - - - 84.70 *84.70%
SatisfactoryF.F Cruz & Co., Inc. /
Filipinas (Prefab. Bldg.) System, Inc. (JV)
JV-08-139 Impv't./Conc. of Roads and Bridges along Baler-Casiguran Rd. (CP-1) 08/20/10 III 1,073.612 450 C 0.387 0.200 0.300 - - - 88.70 89.76%
V. Satisfactory
F.F Cruz & Co., Inc. / Filipinas (Prefab. Bldg.)
System, Inc. (JV) JV-08-138
Conc. of Mindoro Oriental East Coastal Road (Intermittent Sections), Mansalay-Bdry. Mindoro Occidental
Sect.
09/05/09 IVB 192.400 562 O 0.363 0.300 0.150 0.030 0.042 0.033 91.80 -
F.F Galang Construction 26801 Rehab./Regravelling of RVN NHS Rd. 06/01/10 IVB 0.928 120 C 0.427 0.133 0.300 - - - 86.00 86.00% Satisfactory
F.F Galang Construction 26801 Const. of 1-CL Bato C/S Brgy. Bato 06/22/10 IVB 0.681 75 C 0.429 0.133 0.300 - - - 86.20 84.59% Satisfactory
F.F Galang Construction 26801 Const./Impvt. of DPWH Palawan Third DEO, Brgy. Sta. Monica 08/22/10 IVB 1.900 90 C 0.459 0.200 0.300 - - - 95.90 95.90%
V. Satisfactory
F.F Rosales Construction 8814
Concrete Paving of Mulanay-San Francisco Road (Mulanay Side),
Solcom-Botaniog Road Sect., inc. Length of Botaniog Bridge
05/27/09 IV-A 18.919 208 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory
F.F Rosales Construction 8814Impvt. (Rehab.) of Lucena-Tayabas-
Lucban-Sampaloc-Mauban Port Road
06/01/09 IV-A 25.072 382 C 0.409 0.133 0.300 - - - 84.20 *84.20% Satisfactory
F.F. Galang Construction 26801 Const. of 1-CL Barotuan NHS 04/02/11 IVB 0.585 80 C 0.404 0.133 0.300 - - - 83.70 *83.70% Satisfactory
F.L Reguyal Construction Corp. (Formerly: F.L.
Const.)3315
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rd. along
Cabanatuan-Papaya Rd. 08/18/10 III 19.088 150 C 0.381 0.200 0.300 - - - 88.10 87.08%
Satisfactory
F.L Reguyal Construction Corp. (Formerly: F.L.
Const.)3315 Jct. Tablang-Gabaldon Road
(Upgrading) 06/02/09 III 11.580 60 C 0.327 0.200 0.300 - - - 82.70 *82.70% Satisfactory
F.P De Guzman Construction, Inc. 10296 Const. of Multi-Purpose Building,
Brgy. 307 05/20/09 NCR 1.918 60 C 0.490 0.133 0.300 - - - 92.30 *92.30% V. Satisfactory
F.P De Guzman Construction, Inc. 10926 Rehab. of Marikina-San Mateo Road 09/10/09 NCR 9.605 120 C 0.406 0.133 0.300 - - - 83.90 *83.90%
Satisfactory
F.P De Guzman Construction, Inc. 10296
Const. of Pedestrian Overpass along Blumentritt St. crossing España
Blvd.02/22/10 NCR 9.608 236 C 0.484 0.133 0.300 - - - 91.70 91.70%
V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page158
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
F.R Ignacio Construction Incorporated 687 Pasay City LTO District Office
Building Project 09/18/09 DOTC 11.937 255 O 0.384 0.300 0.150 0.030 0.039 0.050 95.30 -
F.R Mapilisan Construction 13804
Construction of School Building Bambang Elementary School,
Bambang05/29/09 III 1.908 56 C 0.442 0.200 0.300 - - - 94.20 *94.20%
V. Satisfactory
F.R. Mapilisan Construction 13804 Rehab. of Road Sipat 04/13/11 III 0.481 12 C 0.428 0.000 0.300 - - - 72.80 *72.80%
Poor
F.S Sugay Construction & Supplies 28489 Const. of MPB at Poblacion 2 05/28/10 IVB 0.891 90 C 0.458 0.133 0.300 - - - 89.10 85.67%
Satisfactory
F.S Sugay Construction & Supplies 28489 Const. of Drainage - Brgy. Bayanan II 09/01/10 IVB 1.445 60 C 0.471 0.133 0.300 - - - 90.40 90.40%
V. Satisfactory
Fairchild Builders & Developers, Inc. 10024
Rehab. along Tacloban-Baybay South Road along Tacloban South
Road05/28/09 VIII 9.486 150 O 0.336 0.239 0.150 0.030 0.037 0.033 82.50 -
Family Circle Construction 32608 Const. of Ba-ayan E/S Annex 08/31/10 CAR 1.286 60 C 0.448 0.161 0.300 - - - 90.90 90.90%
V. SatisfactoryFamily Circle Construction 32608 Conc. of Becol to Poblacion Basil
Footpath 08/31/10 CAR 0.189 41 C 0.340 0.200 0.300 - - - 84.00 84.00% Satisfactory
FCVS Construction & Supply 32518 Repair of (1CL) School Building
Aramaywan NHS 06/05/09 IV-B 0.317 90 C 0.377 0.169 0.300 - - - 84.60 *84.60% Satisfactory
FEAJ Construction and General Services 13609 Conc. of Road at Brgy. Bacungan 02/16/10 IVB 1.157 60 C 0.353 0.200 0.300 - - - 85.30 85.30%
Satisfactory
FEAJ Construction and General Services 13609 Completion of MPB at Brgy. Sto.Niño 05/28/10 IVB 0.395 45 C 0.453 0.133 0.300 - - - 88.60 88.60%
Satisfactory
FEAJ Construction and General Services 13609 Conc. of Road at Brgy. Sampaguita 09/02/10 IVB 0.996 60 C 0.337 0.200 0.300 - - - 83.70 83.70%
SatisfactoryFEAJ Construction and
General Services 13609 Concreting of Road @ Katwiran II 02/23/09 IV-B 0.961 40 C 0.406 0.133 0.300 - - - 83.90 *83.90% Satisfactory
Ferdstar Builders Contractor 4965 Rehab. of Farm to Market Road @
Brgy. San Roque, Bitas 08/25/09 III 4.776 107 C 0.426 0.133 0.300 - - - 85.90 *85.90% Satisfactory
Ferdstar Builders Contractors 4965
Repair/Rehab./Rechanneling of Binahaan/Embakadero River Control
Structure03/28/11 VIII 48.149 290 C 0.494 0.185 0.300 - - - 97.90 89.68%
V. Satisfactory
Ferdstar Builders Contractors 4965
Repair/Rehab. of Flood Control @ Lirang Creek, Sta.0+800 - Sta.3+000
with exception04/14/11 VIII 9.640 200 C 0.474 0.164 0.300 - - - 93.80 89.00%
Satisfactory
Ferdstar Builders Contractors 4965
Rehab./Impvt. of Daang Maharlika, Calbiga-Tacloban, Km.901+200 -
Km.905+200 with exceptions04/15/11 VIII 28.321 70 C 0.455 0.133 0.300 - - - 88.80 87.90%
Satisfactory
Ferdstar Builders Contractors 4965 Rehab./Impvt. of Daang Maharlika
Km.898+092 - Km.903+000 04/14/11 VIII 48.238 240 C 0.440 0.133 0.300 - - - 87.30 86.16% Satisfactory
Ferdstar Builders Contractors 4965
Rehab./Impvt. of Daang Maharlika, Calbiga-Tacloban, Km.897+200 -
Km.901+20004/15/11 VIII 28.322 95 C 0.446 0.133 0.300 - - - 87.90 85.98%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page159
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ferdstar Builders Contractors 4965 Const./Rehab./Impvt. of FMR in
Bamban 02/25/10 III 4.821 150 C 0.379 0.186 0.300 - - - 86.50 86.50% Satisfactory
Ferdstar Builders Contractors 4965 Rehab./Reconst./Upgrading of Tarlac-
Zambales Rd. (Capas Sect.) 06/02/10 III 21.138 60 C 0.474 0.133 0.300 - - - 90.70 90.70% V. Satisfactory
Ferdstar Builders Contractors 4965
Repair & Rehab. of Concepcion-Capas Rd. (Concepcion Sect.) Km.110+516 - Km.117+238 w/
exception
06/02/10 III 9.983 30 C 0.471 0.133 0.300 - - - 90.40 90.40% V. Satisfactory
Ferdstar Builders Contractors 4965
Repair & Rehab. of Arayat-Magalang-Mabalacat Rd. at Km.111+520 -
Km.113+000 w/ exception06/01/10 III 9.965 10 C 0.444 0.133 0.300 - - - 87.70 90.40%
V. Satisfactory
Ferdstar Builders Contractors 4965
Rehab./Impv't. of Baliwag-Candaba-Sta.Ana Rd. (Sta.Ana Sect.)
Km.74+280 - Km.76+464 w/ exception05/25/10 III 11.942 70 C 0.404 0.133 0.300 - - - 83.70 83.70%
Satisfactory
Ferdstar Builders Contractors 4965 Const. of School Bldg. at
Sapalibutad 08/16/10 III 7.690 48 C 0.415 0.200 0.300 - - - 91.50 91.50% V. Satisfactory
Ferdstar Builders Contractors 4965
Slope Protection along Gumain River, San Pedro Sect.,
Floridablanca, (Rehab. of Porac-Gumain River, Brgy. San Pedro)
08/16/10 III 9.552 90 C 0.397 0.133 0.300 - - - 83.00 83.00% Satisfactory
Ferdstar Builders Contractors 4965
Rehab./Reconst./Upgrading of Tacloban-Baybay South Road,
Pawing Section03/11/10 VIII 12.357 180 C 0.456 0.192 0.300 - - - 94.80 92.70%
V. Satisfactory
Ferdstar Builders Contractors 4965
Concrete Paving of Biliran Circumferential Road, (Ariuin-Julita
Section) 02/23/10 VIII 38.395 300 C 0.392 0.133 0.300 - - - 82.50 84.27%
Satisfactory
Ferdstar Builders Contractors 4965
Rehab./Impvt. of Daang Maharlika, Calbiga-Tacloban Rd. Sect.
Km.897+200 - Km.901+200 w/ exceptions, Leyte Side
06/09/10 VIII 28.322 95 O 0.339 0.258 0.150 0.030 0.037 0.033 84.70 -
Ferdstar Builders Contractors 4965
Asphalt Concrete Overlay @ Tacloban Baybay South Road
Km.910+559 - Km. 916+56709/08/10 VIII 48.237 240 C 0.457 0.133 0.300 - - - 89.00 89.00%
Satisfactory
Ferdstar Builders Contractors 4965
Asphalt Concrete Overlay @ Tacloban Baybay South Road
Km.0+000 - Km.0+43409/08/10 VIII 25.080 195 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
Ferdstar Builders Contractors 4965
Rehab./Regraveling of Dolitan Farm-to-Market Road (FMR), Nagbunga,
Dolitan05/23/09 III 4.755 45 C 0.352 0.200 0.300 - - - 85.20 *85.20%
Satisfactory
Ferdstar Builders Contractors 4965 Improvement/Rehabilitation of Brgy.
San Pedro Polcarangan FMR 05/18/09 III 4.767 60 C 0.335 0.200 0.300 - - - 83.50 83.68%Satisfactory
Ferdstar Builders Contractors 4965 Completion Works of Arayat Public
Market 02/23/09 III 14.330 60 C 0.481 0.171 0.300 - - - 95.20 *95.20%V. Satisfactory
Ferdstar Builders Contractors 4965 Const. of Pampanga 2nd District
Engineering Office Building 02/23/09 III 14.394 150 C 0.446 0.200 0.300 - - - 94.60 *94.60% V.Satisfactory
Ferdstar Builders Contractors 4965 Const. of Multi-Purpose Building at
San Roque 08/25/09 III 5.254 93 O 0.384 0.240 0.150 0.030 0.051 0.033 88.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page160
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ferdstar Builders Contractors 4965
Const./Completion of Rafael Lazatin Memorial N/S (3rd level), Brgy.
Balibago08/26/09 III 2.750 60 C 0.448 0.133 0.300 - - - 88.10 *88.10%
Satisfactory
Ferdstar Builders Contractors 4965 Rehab./Reconst & Impvt. of Bamban-
Poblacion Road 09/01/09 III 19.003 120 C 0.478 0.133 0.300 - - - 91.10 86.90% Satisfactory
Ferdstar Builders Contractors 4965 Impvt./Rehab. of Abacan River
(Culubasa Section) 08/25/09 III 9.553 60 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory
Ferdstar Builders Contractors 4965
Const. of Drainage along Don Bonifacio-Gueco Ave. @ Brgy.
Balibago, Pulung Maragui08/27/09 III 23.535 120 C 0.416 0.133 0.300 - - - 84.90 84.90%
Satisfactory
Ferdstar Builders Contractors 4965 Impvt/Rehab. of MBP @ Brgy. St.
Peter, Brgy. Project 6 06/01/09 NCR 3.756 120 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory
Ferrer Construction and Engineering Services 16711 Proposed Exterior Repainting of PAZ
Mendoza & Med. Lib. 03/20/09 U.P. 751.116 120 O 0.366 0.300 0.000 0.030 0.054 0.050 80.00 -
Ferreze Const. Supply & Manufacturing 26968 Rehab. of Brgy. Mercedes Road 03/03/09 IX 4.733 106 C 0.395 0.200 0.300 - - - 89.50 85.90%
Satisfactory
Ferreze Construction Supply & Manufacturing 26968 Const. of Barangay Road 03/28/11 IX 4.553 60 O 0.359 0.240 0.150 0.030 0.059 0.050 88.80 -
Ferreze Construction Supply & Manufacturing 26968
Const. of MPB (Renov./Rehab. of Psychiatric Ward) Zamboanga City
Medical Center09/02/09 IX 5.220 126 O 0.327 0.300 0.150 0.030 0.053 0.050 91.00 -
FF Cruz & Co. Inc. / Filipinas (Prefab. Bldg.)
System Inc. (JV)JV-08-138
Conc. of Mindoro East Coastal Rd. (Intermittent Sect.) Mansalay, Bdry.
Mindoro Occidental Sect.05/26/10 IVB 192.376 562 C 0.477 0.185 0.300 - - - 96.20 93.56%
V. Satisfactory
FF Cruz & Co. Inc./Filipinas (Prefab.
Bldg.) Systems, Inc. JV JV-08-139 Impvt./Const. of Roads and Bridges
along Baler-Casiguran Road (CP1) 09/09/09 III 1,703.61 450 O 0.378 0.300 0.150 0.030 0.050 0.050 95.80 -
FFJJ Construction 16712Rehab./Reconst./Upgrading of
Damaged Paved National Roads, Upper Kiblagon Sect.
04/01/11 XI 19.299 210 C 0.093 0.200 0.300 - - - 59.30 74.66% Poor
FFJJ Construction 16712Rehab./Reconst./Upgrading of
Damaged Paved National Roads, Lower Baluyan Sect.
04/01/11 XI 19.297 210 C 0.000 0.200 0.300 - - - 50.00 68.72% Poor
FFJJ Construction 16712Rehab./Reconst./Upgrading of
Damaged Paved National Roads, Lower Tagansule Sect.
04/01/11 XI 10.789 180 C 0.000 0.200 0.300 - - - 50.00 68.24% Poor
FFJJ Construction 16712Land Dev't. for the Const. of MPB (Cotabato Cultural Center / Grand
Mosque)03/28/11 XII 29.523 165 O 0.392 0.231 0.150 0.030 0.035 0.033 87.10 -
FFJJ Construction 16712 Conc. of San Teodoro-Nueva Era-Veruela Road 04/04/11 XIII 3.762 145 O 0.314 0.300 0.150 0.030 0.048 0.050 89.20 -
FFJJ Construction 16712 Conc. of Cotabato City Circumferential Road 06/01/10 XII 27.563 150 O 0.320 0.201 0.150 0.030 0.042 0.033 77.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page161
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
FFJJ Construction 16712 Conc. of Paco-Roxas-Arakan Valley Road, New Pontevedra Sect. 06/05/10 XII 15.096 333 C 0.138 0.133 0.000 - - - 27.10 56.74%
Poor
FFJJ Construction 16712Conc. of Paco-Roxas-Arakan Valley
Road, Tinanan Bridge Poblacion Arakan Gap Sect.
08/28/10 XII 18.567 153 C 0.393 0.187 0.300 - - - 88.00 88.00% Satisfactory
FFJJ Construction 16712Conc. of Davao del Sur-Sarangani Coastal Road, Kitayo-Balangonan
Section11/22/08 XI 28.900 300 O 0.274 0.241 0.100 0.022 0.035 0.067 73.90 -
FFJJ Construction 16712 Const. of Kinangan Bridge and Approaches 09/02/08 XI 18.593 332 O 0.304 0.240 0.070 0.015 0.035 0.100 76.40 -
FFJJ Construction 16712 Const. of Pangian Bridge II and Approaches 11/23/08 XI 22.868 454 O 0.307 0.151 0.100 0.030 0.030 0.067 68.50 -
FFJJ Construction 16712Const. of Kiblis Bridge with Bridge and Approaches, Sarangani-Sultan
Kudarat Coastal Road09/02/08 XII 21.574 280 O 0.342 0.273 0.000 0.030 0.028 0.067 74.00 -
FFJJ Construction 16712Concreting of Paco-Roxas-Arakan
Valley Road, New Pontevedra Section
05/30/09 R-XII 15.095 206 O 0.327 0.300 0.000 0.024 0.045 0.033 72.90 -
FFJJ Construction 16712 Rehab./Conc. of Road Junction Mana-Ticulon Lagumit Little Baguio Road 05/28/09 XI 19.293 262 C 0.425 0.200 0.300 - - - 92.50 82.12%
Satisfactory
FFJJ Construction 16712
Rehab./Recons/Upgrading of Digos-Makar Road, Baluyan-Tagansule
Section, Km. 1587+500-Km. 1589+000
05/28/09 XI 19.289 210 O 0.320 0.225 0.150 0.030 0.046 0.050 82.10 -
FFJJ Construction 16712 Rehab/Conc. of Road Jct. Mana-Ticulon Lagumit Little Baguio Road 03/04/09 XI 19.293 262 O 0.279 0.252 0.110 0.030 0.048 0.033 75.20 -
FFJJ Construction 16712
Rehab./Reconst./Upgrading of Damaged Paved National Road, Digos-Makar Road Tagansule Section, Km. 1587+500-Km.
1589+000
09/03/09 XI 19.289 210 C 0.434 0.133 0.300 - - - 86.70 83.94% Satisfactory
FFJJ Construction 16712 Conc. of Davao del Sur-Sarangani Coastal Kitayo-Balangonan Section 09/03/09 XI 28.906 360 C 0.401 0.133 0.000 - - - 53.40 65.70%
Poor
FFJJ Construction 16712 Conc. of Paco-Roxas-Arakan Rd. (New Ponteverdra Section) 03/10/09 XII 15.095 150 O 0.378 0.300 0.000 0.030 0.060 0.033 80.10 -
FFJJ Construction 16712Rehab./Reconst. of Damaged Paved
National Rd along NRJ-Bahbah-Talacogon Rd.
09/15/09 XIII 4.753 160 C 0.390 0.150 0.300 - - - 84.00 *84.00% Satisfactory
FGM Builders Resources & Development
Corporation31807
Const. of 2CL-1 Storey Academic Bldg. @ Marilog NHS, Marilog
District 03/29/11 XI 1.718 90 C 0.461 0.182 0.300 - - - 94.30 *94.30%
V. Satisfactory
FGM Builders Resources & Development
Corporation31807 Const. of MPB, Bago Aplaya 04/13/11 XI 0.980 90 C 0.434 0.200 0.300 - - - 93.40 *93.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page162
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
FGM Builders Resources & Development
Corporation31807 Completion of MPB at Brgy. T.
Monteverde Package 2-D 06/16/10 XI 1.228 150 C 0.496 0.133 0.300 - - - 92.90 94.51% V. Satisfactory
FGW Construction Corp. 7436 Conc. of Brgy. Rd. Purok 8, Brgy. Del Monte 09/14/09 XIII 2.791 135 C 0.427 0.125 0.300 - - - 85.20 89.40%
V.Satisfactory
FGW Construction Corporation 7436 Conc. of Road, Brgy. Zamora 03/09/10 XIII 1.880 120 C 0.421 0.133 0.300 - - - 85.40 85.40%
SatisfactoryFGW Construction
Corporation 7436 Const./Rehab. of MPB, PNP Headquarters 06/13/10 XIII 1.883 170 C 0.443 0.200 0.300 - - - 94.30 89.19%
V. Satisfactory
FGW Construction Corporation 7436
Conc. of Road at Barangay San Isidro along Bayugan-Bucac-
Marcelina Road09/05/10 XIII 4.700 150 O 0.325 0.300 0.150 0.030 0.045 0.033 88.30 -
FGW Construction Corporation (Formerly:
FGW Construction)7436 Completion of 2-Storey 4 CL, East
City CS 04/13/11 X 2.334 90 C 0.463 0.133 0.300 - - - 89.60 *89.60% V. Satisfactory
FGW Construction Corporation (Formerly:
FGW Construction)7436 Rehab. of Flood Controls, Brgy.
Patin-ay 03/30/11 XIII 1.403 90 O 0.400 0.180 0.150 0.022 0.038 0.050 84.00 -
FGW Construction Corporation (Formerly:
FWG Construction)7436 Road/Upgrading (Gravel to Paved),
Loguilo-Alubijid By-Pass Road 06/03/09 X 7.353 150 C 0.404 0.148 0.300 - - - 85.20 *85.20% Satisfactory
Fiat Construction Services 5463 Conc. of Dinagat-Loreto Road (San
Jose-Basilisa Sect) 04/07/11 XIII 190.877 450 O 0.374 0.247 0.138 0.030 0.055 0.050 89.40 -
Fiat Construction Services 5463 Repair/Rehab. of Dinagat-Loreto
Road 03/07/11 XIII 9.253 180 C 0.407 0.133 0.300 - - - 84.00 *84.00% Satisfactory
Fiat Construction Services 5463
Conc. of Surigao-Davao Coastal Rd. : Cortes-Tandag-Marihatag Rd. (Unaban-Sumo-sumo Section)
03/03/10 XIII 130.968 435 C 0.437 0.133 0.300 - - - 87.00 86.18% Satisfactory
Fiat Construction Services 5463 Conc. of Butuan City-Paining-Tandag
Road 06/12/10 XIII 26.285 195 O 0.343 0.300 0.150 0.030 0.040 0.033 89.60 -
Fiat Construction Services 5463 Repair/Restoration of Dinagat-Loreto
Road 08/26/10 XIII 9.253 190 O 0.327 0.282 0.150 0.030 0.045 0.050 88.40 -
Fiat Construction Services 5463 Conc. of Dinagat-Loreto Road (San
Jose Basilisa Section) 08/26/10 XIII 190.878 420 O 0.360 0.262 0.150 0.030 0.047 0.033 88.20 -
Fiat Construction Services 5463
Conc. of Dinagat Island Road Network (San Jose-Basilisa Section with One (1) Bridge and One (1) Box
Culvert
08/26/10 XIII 188.939 525 O 0.380 0.287 0.064 0.030 0.047 0.017 82.50 -
Fiat Construction Services 5463
Conc. of Dinagat Island Rd. Network(San Jose-Basilisa Sect. with 1 Bridge and 1 Box Culvert)
09/05/09 XIII 188.939 465 O 0.382 0.253 0.150 0.030 0.047 0.033 89.50 -
Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with Roof
Deck for DBM Building 11/26/08 Sp. Bldgs. 445.429 710 O 0.372 0.300 0.100 0.030 0.061 0.067 93.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page163
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Firmabuilt Construction / Marcbilt Construction,
Inc. Joint VentureJV-09-256
Road Upgrading at Abre de Ilog-San Jose Road (Marilao-Bagong Silang
Sect.), Brgy. New Dagupan08/27/10 IVB 19.192 180 O 0.355 0.054 0.150 0.030 0.025 0.033 64.70 -
First Northway Development and
Construction Corporation11645
Rehab./Reconst./Upgrading of Damaged Paved National Road
Candon City & Santiago03/30/11 I 23.980 70 C 0.442 0.197 0.300 - - - 93.90 *93.90%
V. Satisfactory
First Northway Development and
Construction Corporation11645
Rehab./Reconst./Upgrading of Damaged Paved National Roads,
Candon Section09/05/09 I 19.095 265 C 0.355 0.200 0.300 - - - 85.50 83.28%
Satisfactory
First Northway Development and
Construction Corporation11645 Const. of Lubong Road 02/17/10 I 0.956 32 C 0.458 0.133 0.300 - - - 89.10 89.10%
V. Satisfactory
First Northway Development and
Construction Corporation11645 Completion of Candon-Salcedo Road 02/18/10 I 14.320 225 O 0.279 0.129 0.150 0.030 0.051 0.050 68.90 -
First Northway Development and
Construction Corporation11645
Rehab./Reconst./Upgrading of Damaged paved National Road along
MNR, Sta. Lucia Section05/28/10 I 19.102 60 C 0.478 0.133 0.300 - - - 91.10 91.10%
V. Satisfactory
First Northway Development and
Construction Corporation11645 Const. of Oaig-Daya-Sn. Nicolas
Flood Control 08/18/10 I 9.650 123 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
First Northway Development and
Construction Corporation11645 Repair/Rehabilitation of Candon City
Road 02/27/09 I 0.942 31 C 0.380 0.193 0.300 - - - 87.30 *87.30%Satisfactory
First Northway Development and
Construction Corporation11645 Sulvec Port Road 02/27/09 I 6.358 149 C 0.340 0.200 0.300 - - - 84.00 82.14%
Satisfactory
Flordale Construction 31683Installation of Traffic Signs at Manila
South Road-Daang Maharlika (Tiaong Section)
05/25/09 IV-A 4.777 65 C 0.482 0.133 0.300 - - - 91.50 *91.50% V. Satisfactory
Flordes Construction & Trading 16916
Const./Rehab./Replacement/ Completion and Repair of Andres
Bonifacio E/S04/04/11 NCR 7.208 115 C 0.443 0.101 0.300 - - - 84.40 87.62%
Satisfactory
Flordes Construction & Trading 16916 Const. of Sch. Bldg. at Sapang Palay
Proper ES, CSJDM, 2 Classroom 04/15/11 III 1.069 120 C 0.421 0.200 0.300 - - - 92.10 86.78% Satisfactory
Flordes Construction & Trading 16916 Conc. of Visitacion-Kapanikian
Barangay Road 04/02/11 II 48.240 410 C 0.421 0.133 0.300 - - - 85.40 85.90% Satisfactory
Flordes Construction & Trading 16916 Const. of School Building, Bulacan
Polytechnic College Campus 03/04/10 III 47.670 300 C 0.465 0.133 0.300 - - - 89.80 89.80% V. Satisfactory
Flordes Construction & Trading 16916
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rd. along
Bangad-Fort Magsaysay Rd.08/18/10 III 15.746 150 C 0.359 0.200 0.300 - - - 85.90 85.90%
Satisfactory
Flordes Construction & Trading 16916 Rehabilitation of NCR/Bulacan
Boundary-Bigte Ipo Dam Road 06/01/09 III 42.902 150 O 0.334 0.240 0.150 0.030 0.040 0.050 84.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page164
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Flordes Construction & Trading 16916
Repair/Rehab. & Const. of Bambang-Bagumbayan-Maysantol-San Nicolas
FMR03/05/09 III 4.767 96 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
Flordes Construction & Trading 16916 Rehabilitation of Bocaue-San Jose
Road 09/07/09 III 9.535 110 C 0.483 0.133 0.300 - - - 91.60 *91.60% V. Satisfactory
Flordes Construction & Trading 16916 Rehab. of Sibul-Biak na Bato Road 08/08/09 III 4.758 90 C 0.469 0.133 0.300 - - - 90.20 *90.20%
V. SatisfactoryFlordes Construction &
Trading 16916 Rehab.of NCR/Bulacan Bdry.-Bigte Ipo Dam Road 09/07/09 III 42.907 150 C 0.441 0.133 0.300 - - - 87.40 85.60%
SatisfactoryFlordes Construction &
Trading 16916 Concreting/Impvt. of Kayquit-Asis FMR 09/09/09 IVA 9.558 120 C 0.346 0.200 0.300 - - - 84.60 *84.60%
Satisfactory
Flordes Construction & Trading 16916
Rehab./Reconst./Upgrading of Del Pan Road (M. dela Industria to C.M.
Recto)05/20/09 NCR 9.600 120 C 0.461 0.133 0.300 - - - 89.40 *89.40%
V. Satisfactory
Flordes Construction & Trading 16916
Const./Rehab./Replacement/ Completion and Repair of A. Regidor
Elem. School05/20/09 NCR 2.481 120 O 0.326 0.240 0.150 0.030 0.065 0.050 86.10 -
Flordes Construction & Trading 16916 Const./Replacement/Completion &
Repair of A. Regidor E/S 09/09/09 NCR 2.482 120 C 0.451 0.133 0.300 - - - 88.40 86.79% Satisfactory
Flordes Construction & Trading 16916 Rehab./Const./Upgrading of T.
Mapua Street, Binondo/Sta. Cruz 09/09/09 NCR 7.681 120 C 0.422 0.133 0.300 - - - 85.50 *85.50% Satisfactory
Flordes Construction & Trading 16916
Const./Rehab./Replacement/Completion & Repair of S/B at Canumay NHS
(Batch 2)03/02/10 NCR 4.559 120 C 0.386 0.191 0.300 - - - 87.70 87.70%
Satisfactory
Flordes Construction & Trading 16916 Rehab. of Dr. Jose Fabella Memorial
Hospital 02/22/10 NCR 4.799 75 C 0.423 0.133 0.300 - - - 85.60 85.60% Satisfactory
Flordes Construction & Trading 16916
Const./Rehab./Replacement/Completion and Repair of Cayetano Arellano
E/S05/25/10 NCR 9.601 120 C 0.458 0.200 0.300 - - - 95.80 95.80%
V. Satisfactory
Flordes Construction & Trading 16916 Rehab./Upgrading of Felix Huertas
St. and vicinity 05/25/10 NCR 11.521 90 C 0.416 0.200 0.300 - - - 91.60 91.60% V. Satisfactory
Floriane Construction and Supply 12261 Construction of Multi-Purpose
Building, North Pob. 06/01/09 X 0.938 105 C 0.395 0.061 0.300 - - - 75.60 79.66% Unsatisfactory
FLT Enterprises 23039Const. of Hospital Building, Angel Salazar Memorial General Hospital
(Phase I)04/06/11 VI 4.817 270 C 0.487 0.133 0.300 - - - 92.00 85.28%
Satisfactory
Footprints Construction 16713 Conc. of FMR, Manaol, Lagonglong 09/08/10 X 0.978 160 C 0.429 0.133 0.300 - - - 86.20 86.56% Satisfactory
Footprints Construction 16713 Const. of Road with Drainage, Vicmar Circumferential Road, Zone 7 02/22/10 X 3.735 120 C 0.367 0.200 0.300 - - - 86.70 86.70%
Satisfactory
Foremost Builders 23774 Completion of MPB at Brgy. Angliongto 04/13/11 XI 1.779 120 O 0.389 0.300 0.150 0.030 0.052 0.050 97.10 -
Foretop Construction 32813 Construction of Boton River Control 05/19/09 IV-B 2.845 108 C 0.389 0.200 0.300 - - - 88.90 *88.90% Satisfactory
Foretop Construction 32813Concreting of Marinduque
Circumferential Road (Dili-Bangbang Section)
05/18/09 IV-B 6.172 90 C 0.406 0.200 0.300 - - - 90.60 86.46% Satisfactory
Forthright Construction 32883 Const. of MPB 04/12/11 III 4.362 90 C 0.449 0.135 0.300 - - - 88.40 87.84% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page165
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Fortstone Construction Enterprises 31668 Const. of 2-CL Academic Bldg. at
Biao P/S 02/24/10 XI 1.094 120 C 0.424 0.133 0.300 - - - 85.70 85.42% Satisfactory
Fortstone Construction Enterprises 31668 Const./Rehab./ Repair of Multi-
Purpose Bldg., Sultan Mastura 09/01/09 XII 1.421 45 C 0.417 0.133 0.300 - - - 85.00 87.38% Satisfactory
Fortstone Construction Enterprises 31668 Construction of Water Supply at
Brgy. Wawa 03/04/09 XI 1.887 120 C 0.388 0.200 0.300 - - - 88.80 *88.80% Satisfactory
Fortunato T. Sanchez 407 Conc. of Road Brgy. Poblacion 04/06/11 XIII 1.375 111 O 0.361 0.264 0.150 0.015 0.054 0.050 89.40 -
Foundation Specialists, Inc. 7437 Widening of R-10 Road Project, Vitas
Bridge and its approaches 03/05/10 URPO 165.623 690 C 0.477 0.200 0.300 - - - 97.70 86.42% Satisfactory
Four Brothers Construction 31614 Repair/Rehab. of School Building,
Bontoc Central School 08/27/10 CAR 0.500 218 C 0.469 0.091 0.300 - - - 86.00 86.00% Satisfactory
Four Brothers Corporation 31614 Contruction of Pontino ES
Ambassador 03/01/10 CAR 0.426 45 C 0.397 0.200 0.000 - - - 59.70 64.74% Poor
Four SG Enterprises 30069Road Upgrading (Gravel to Paved), Bago-Mambucal Road, Intermittent
Section, Km.57+000-Km.57+46008/27/10 VI 5.020 60 C 0.396 0.133 0.300 - - - 82.90 82.90%
Satisfactory
Framecon Builders 22482 Conc. of Roads at Various Brgy. San Isidro 02/26/10 III 1.819 60 C 0.409 0.200 0.300 - - - 90.90 90.90%
V. Satisfactory
Framecon Builders 22482 Rehab. of Farm to Market Road at Kalikid Sur 02/25/10 III 0.951 60 C 0.446 0.133 0.300 - - - 87.90 87.90%
Satisfactory
Framecon Builders 22482 Const. of Farm-to-Market Road at Brgy. Bagong Sikat 06/03/09 III 0.955 30 C 0.311 0.195 0.300 - - - 80.60 *80.60%
Unsatisfactory
Framecon Builders 22482 Completion of Multi-Purpose Building, San Luis Central School 03/03/09 III 2.574 120 C 0.440 0.133 0.300 - - - 87.30 *87.30%
Satisfactory
Framecon Builders 22492 Construction of 3-CL School Building, Diteki Elementary School 09/08/09 III 1.773 120 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V. Satisfactory
Framecon Builders 22482 Concreting of GK Soledad Road, Brgy. Tabon 09/04/09 III 1.911 70 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Franzcor Trading & Construction 18082
Impvt. of Blk. 18, Purok 6, Kenneth Road, Lupang Arenda, Brgy. Sta.
Ana05/18/09 IV-A 2.886 120 C 0.446 0.133 0.300 - - - 87.90 *87.90%
Satisfactory
Franzcor Trading & Construction 18082 Impvt. of Blk. 29, Purok 5, Lupang
Arenda, Brgy. Sta. Ana 05/18/09 IV-A 2.885 120 C 0.446 0.133 0.300 - - - 87.90 *87.90% Satisfactory
Franzcor Trading & Construction 18082 Completion of Napindan E/S MPB,
Napindan E/S Brgy. Napindan 02/24/10 NCR 1.925 60 C 0.403 0.133 0.300 - - - 83.60 83.60% Satisfactory
FRD Construction 10227 Rehab. of Wright-Taft-Borongan Road with exceptions 04/05/11 VIII 34.207 280 C 0.410 0.133 0.300 - - - 84.30 84.24%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page166
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
FRD Construction 10227
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Road, Brgy.
Piliw - Brgy. Bacayawan, Km.983+500 - Km.987+200 w/
exception
04/04/11 VIII 48.152 380 O 0.342 0.240 0.150 0.023 0.041 0.033 82.90 -
FRD Construction 10227
Rehab./Reconst./Upgrading of Wright-Taft-Borongan Road (along Brgy. Binaloan - Brgy. San Pablo
Road Section) with exceptions
04/05/11 VIII 57.890 240 O 0.339 0.240 0.150 0.022 0.040 0.033 82.40 -
FRD Construction 10227Rehab./Reconst./Upgrading of
Canciledes-Manglos, Km.989+400 - Km.998+400 w/ exceptions
04/11/11 VIII 48.241 350 O 0.331 0.222 0.150 0.030 0.045 0.033 81.10 -
FRD Construction 10227Rehab./Reconst./Upgrading of
Bacayawan-Canciledes, Km.98+200 - Km.989+400 w/ exceptions
04/11/11 VIII 38.192 300 O 0.312 0.240 0.150 0.030 0.043 0.033 80.80 -
FRD Construction 10227Upgrading (Conc.) of Wright-Taft-Borongan Road, Km. 870+000-Km.
880+000 (w/ exceptions)03/09/10 VIII 33.775 360 C 0.345 0.200 0.300 - - - 84.50 84.11%
Satisfactory
FRD Construction 10227 Const. of 1 Unit 1 CL Sch. Bldg. @ Malinao HS 03/16/09 VIII 0.496 75 C 0.430 0.200 0.000 - - - 63.00 68.74%
Poor
FRD Construction 10227 Rehab./Impvt. of Liloan-Himay-Angan-Libagon Road 09/08/09 VIII 18.692 360 C 0.438 0.133 0.300 - - - 87.10 88.60%
Satisfactory
Freden Construction 22665 Const. of MPB, Brgy. Cannery Site 04/13/11 XII 1.407 75 C 0.499 0.178 0.300 - - - 97.70 *97.70% Outstanding
Freden Construction 22665 Const. of MPB at Hermogenes, Cahilsot E/S, Brgy. Calumpang 04/13/11 XII 1.880 90 C 0.498 0.177 0.300 - - - 97.50 *97.50%
Outstanding
Freden Construction 22665 Const. of Lined Canal 03/20/09 XII 1.864 117 C 0.445 0.200 0.300 - - - 94.50 *88.56% Satisfactory
Freden Construction 22665
Repair & Maintenance of National Roads & Bridges Makar-Marbel Road (going to Makar) and Makar-Kiamba
Road
03/20/09 XII 1.238 60 C 0.425 0.200 0.300 - - - 92.50 *92.50% V. Satisfactory
FVCS Construction & Supply 32518 Const. of MPB Brgy. Poblacion I 06/01/10 IVB 1.318 90 C 0.430 0.101 0.300 - - - 83.10 84.71%
Satisfactory
G M Pajarillaga Construction & Supply 21760 Conc. of Bambang-Kaibu-Quezon-
Solano Road, Kongkong Section 04/14/11 II 9.646 120 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory
G. Uymatiao Jr. Construction 6663
Conc./Widening of Dumaguete North Rd. (Jct. Kabankalan-Negros
Occidental Bdry.) Mambid Sect. to San Jose Sect.
06/10/10 VII 15.440 110 C 0.329 0.133 0.000 - - - 46.20 46.20% Poor
G. Uymatiao, Jr. Construction 6663 Const./Impvt. of Dayoyo Section
(DNR) Km. 95.720-Km.96.880 05/29/09 VII 9.094 147 C 0.459 0.141 0.300 - - - 90.00 *90.00% V. Satisfactory
G. Uymatiao, Jr. Construction 6663
Const./Impvt. of San Jose-Cantupa Section DNR (Km. 101.980-Km.
104.12235)05/29/09 VII 18.384 292 C 0.371 0.200 0.300 - - - 87.10 83.14%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page167
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
G.B. Construction Supply of Labor and Materials for Completion of UPV High School
Building 07/27/11 UP 9.957 163 O 0.339 0.300 0.150 0.030 0.047 0.050 91.60 -
G.C.I Construction 11346 Const. of San Vicente-Gutan Lubak-Anguib Road, Phase V 09/09/09 II 20.642 415 C 0.426 0.030 0.300 - - - 75.60 80.16%
Unsatisfactory
G.C.I Construction 11346 Rehab./Reconst. of Naga Carolina-Panicuason Road 06/08/10 V 37.449 90 C 0.431 0.133 0.300 - - - 86.40 86.40%
Satisfactory
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Jct. Bato-Baras Rd. 08/17/10 V 76.800 285 C 0.438 0.200 0.300 - - - 93.80 92.30%
V. Satisfactory
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Gigmoto-Viga Rd., Phase II 08/17/10 V 74.100 285 O 0.334 0.300 0.150 0.022 0.042 0.050 89.80 -
G.C.I Construction 11346
Upgrading (Gravel to Concrete) along Jct. CCR Panganiban-
Sabloyon Rd., Panganiban Sect. K0057+786 - K0060+755 w/ exception
08/17/10 V 48.170 269 O 0.337 0.300 0.150 0.022 0.035 0.050 89.40 -
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Viga-Panganiban-Bagamanoc Rd. 08/18/10 V 19.192 190 C 0.417 0.188 0.300 - - - 90.50 88.46%
Satisfactory
G.C.I Construction 11346Quinali-Talisay River Flood Control
Embankment & Channelization,Talisay
08/21/10 V 38.599 506 C 0.500 0.133 0.300 - - - 93.30 90.00% V. Satisfactory
G.C.I Construction 11346Quinali-Talisay River Flood Control
Embankment & Channelization (Phase II),Talisay
08/21/10 V 17.285 220 C 0.500 0.133 0.300 - - - 93.30 88.50% Satisfactory
G.C.I Construction 11346 Const. of San Vicente-Gutan-Lubak-Anguib Road,Phase V 02/25/09 II 20.259 330 O 0.267 0.300 0.150 0.030 0.035 0.050 83.20 -
G.C.I Construction 11346 Libmanan-Cabusao Embankment (Poblacion Revetment) 08/26/08 V 10.523 270 O 0.282 0.200 0.100 0.030 0.028 0.200 84.00 -
G.C.I Construction 11346 Concreting of Baao-Iriga City, San Nicolas, Baao Section 05/29/09 V 1.433 87 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
G.C.I Construction 11346 Road Upgrading of Libon-Bacolod-San Vicente-Marocmoc-Buga Road 05/28/09 V 19.230 134 O 0.326 0.240 0.150 0.030 0.040 0.050 83.60 -
G.C.I Construction 11346Const. of San Fernando-Oas By-Pass Road, Brgy. Bonbon, Libon to Brgy.
Calzada03/02/09 V 19.160 300 C 0.432 0.133 0.300 - - - 86.50 84.48%
Satisfactory
G.C.I Construction 11346 Construction of 2 Storey Multi-Purpose Building 03/09/09 V 0.945 120 C 0.431 0.200 0.300 - - - 93.10 *93.10%
V. Satisfactory
G.C.I Construction 11346 Construction of Roads 03/12/09 V 3.821 120 C 0.438 0.200 0.300 - - - 93.80 *93.80% V.Satisfactory
G.C.I Construction 11346 Rehab./Impv't of Talongog-Busac River Control 03/06/09 V 19.269 90 C 0.469 0.133 0.300 - - - 90.20 *90.20%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page168
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
G.C.I Construction 11346
Rehab./Reconst. of Damaged National Road and Generated from Pavement Mgt. System (Highway
Dev't & Mgt. HDM-4) Jct. Bato-Baras Road
03/04/09 V 19.180 301 O 0.361 0.300 0.150 0.030 0.061 0.050 95.20 -
G.C.I Construction 11346 Repair/Restoration of Damaged Dike Maipon R.C. 03/06/09 V 14.385 180 C 0.445 0.200 0.300 - - - 94.50 84.54%
Satisfactory
G.C.I Construction 11346
Rehab./Reconst./Upgrading of Damaged National Roads, Daang
Maharlika, Km. 395+000-Km. 426+000 with exception
09/09/09 V 28.084 180 C 0.479 0.154 0.300 - - - 93.30 *93.30% V. Satisfactory
G.C.I Construction 11346Rehab./Reconst. of Damaged
National Roads, Jct. Bato-Baras Road
09/05/09 V 19.180 390 C 0.386 0.200 0.300 - - - 88.60 92.56% V. Satisfactory
G.C.I Construction 11346 Rehab./Reconst. of Naga City Bdry,. Calabanga-Balongay Road 09/10/09 V 47.763 120 C 0.476 0.148 0.300 - - - 92.40 *92.40%
V. Satisfactory
G.C.I Construction 11346 Rehabilitation of Danao-Pasacao Road 09/11/09 V 47.955 318 C 0.416 0.200 0.300 - - - 91.60 *91.60%
V. Satisfactory
G.C.I Construction 11346 Road Opening of Pararapo-Pulang Daga Road 09/09/09 V 19.107 100 C 0.400 - 0.500 - - - 90.00 *90.00%
V. Satisfactory
G.C.I Construction 11346 Rehab./Dredging of Bato River Control 09/04/09 V 14.390 180 C 0.384 - 0.500 - - - 88.40 *88.40%
Satisfactory
G.C.I Construction 11346 Reconst. of Cabangan River Control, Ubaliw 09/02/09 V 19.269 90 C 0.375 - 0.500 - - - 87.50 *87.50%
Satisfactory
G.C.I Construction 11346Road Opening/Const. of Missing
Links of Malinao-Buhi Road, (Buhi Side)
09/08/09 V 19.107 179 O 0.311 0.300 0.150 0.030 0.047 0.033 87.10 -
G.C.I Construction 11346 Const. of Salvacion-Baybay, Zone 7 Road 09/10/09 V 3.061 120 C 0.362 0.200 0.300 - - - 86.20 *86.20%
Satisfactory
G.C.I Construction 11346 Road Upgrading of Libon-Bacolod-San Vicente-Marocmoc-Buga Road 09/02/09 V 19.230 134 C 0.424 0.154 0.300 - - - 87.80 85.20%
Satisfactory
G.C.I Construction 11346Completion of Minaili Bridge and Approaches along Panganiban-
Bagamanoc Road02/25/10 V 13.891 275 C 0.492 0.133 0.300 - - - 92.50 92.50%
V. Satisfactory
G.C.I Construction 11346 Quinali-Talisay River Flood Control Embankment & Channelization 02/26/10 V 38.400 417 O 0.360 0.300 0.105 0.030 0.050 0.033 87.80 -
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Gigmoto-Viga Road, Phase II 02/25/10 V 74.100 270 O 0.349 0.245 0.150 0.030 0.050 0.050 87.40 -
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Viga Panganiban-Bagamanoc Road 02/25/10 V 19.192 180 O 0.366 0.247 0.133 0.030 0.045 0.050 87.10 -
G.C.I Construction 11346 Road Upgrading (Gravel to Concrete) Baras-Gigmoto-Viga Road 02/25/10 V 75.850 343 C 0.424 0.133 0.300 - - - 85.70 85.70%
Satisfactory
G.C.I. Construction 11346Const. of Poblacion-Marede-Sta. Clara-Patunungan-Sinago Brgy.
Road04/02/11 II 48.240 353 C 0.392 0.133 0.000 - - - 52.50 77.88%
Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page169
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
G.D.L Construction 22796 Rehab. of San Miguel-Sibul Road 09/08/09 III 19.043 120 C 0.414 0.133 0.300 - - - 84.70 *84.70% Satisfactory
G.D.L. Construction / Persan Construction, Inc.
(JV) JV-07-165 Norzagaray-Bigte Road Including of
Replacement of Kay Uwak Bridge 06/01/09 III 29.494 180 C 0.270 0.200 0.300 - - - 77.00 84.02%Satisfactory
G.D.L. Construction/E.C. De Luna Constructio
Corporation (JV)JV-07-094
Rehab./Reconst. of Damaged Paved National Road at Gen,. Alejo Santos
Highway, Plaridel-Bustos09/04/09 III 150.985 310 C 0.402 0.133 0.300 - - - 83.50 84.16%
Satisfactory
G.E.A Construction Corp. 10163Road Upgrading at Abre de Ilog-San
Jose Road (San Pedro-Mangat Section) Brgy. San Pedro
08/27/10 IVB 6.808 90 O 0.293 0.240 0.000 0.030 0.014 0.017 59.40 -
G.F Rovero Merchandising 27268 Const./Rehab. of Multi-Purpose Bldg.
at Brgy. Poblacion 02/28/10 VI 0.958 40 C 0.425 0.200 0.300 - - - 92.50 92.50% V. Satisfactory
G.F Rovero Merchandising 27268 Impvt. of Access Road to Caticlan
Port 02/27/10 VI 9.639 260 C 0.408 0.200 0.300 - - - 90.80 89.21% V. Satisfactory
G.F Rovero Merchandising 27268 Const. of Ibajay Public Market, Brgy.
Poblacion 06/12/10 VI 4.821 120 C 0.324 0.143 0.300 - - - 76.70 86.43% Satisfactory
G.F Rovero Merchandising 27268 Rehab./Construction of Flood
Control Structure, Poblacion 06/05/09 VI 4.812 120 C 0.483 0.192 0.300 - - - 97.50 93.84% V. Satisfactory
G.F Rovero Merchandising 27268 Impvt. of Access Road to Kalibo
Airport 09/05/09 VI 8.032 244 O 0.378 0.300 0.150 0.030 0.025 0.033 91.60 -
G.F. Rovero Merchandising 27268 Const of Ibajay Public Market, Brgy.
Poblacion 04/08/11 VI 4.821 120 O 0.387 0.203 0.150 0.030 0.041 0.050 86.10 -
G.F. Rovero Merchandising 27268 Upgrading of Banga Diversion Road,
including ROW 04/08/11 VI 8.745 271 C 0.476 0.144 0.300 - - - 92.00 82.16% Satisfactory
G.O Marron General Contractor 6844 Concrete Paving of Tallaoen-
Nagrebcan-Sucoc Norte Road 02/26/10 I 0.974 60 C 0.404 0.133 0.300 - - - 83.70 83.70% Satisfactory
G.O Marron General Contractor 6844 Rehab. of Amburayan River Control
@ Brgy. Terrero/Alzate 08/23/10 I 2.805 80 C 0.443 0.200 0.300 - - - 94.30 94.30% V. Satisfactory
G.O. Marron General Contractor 6844 Rehab. of Sch. Bldg. at Paraoir NHS 03/29/11 I 0.475 50 C 0.363 0.200 0.300 - - - 86.30 *86.30%
Satisfactory
G.O. Marron General Contractor 6844 Repair and Maintenance of Busilac
River Control 03/29/11 I 0.913 40 C 0.340 0.200 0.300 - - - 84.00 *84.00% Satisfactory
G.V Burton Builders 26804 Conc. of Aritao-Quirino Rd., Bitnong Sect. 06/07/10 II 9.646 180 O 0.345 0.300 0.150 0.024 0.042 0.033 89.40 -
G.V Burton Builders 26804 Conc. Of Aritao-Quirino Road, Bitnong Section 08/31/10 II 9.618 180 C 0.251 0.200 0.300 - - - 75.10 83.68%
Satisfactory
G.V Burton Builders 26804 Const. of Jct. National-Bitnong-Belance-NV Bdry. Rd. Oyao Section 06/03/09 II 9.644 180 C 0.398 0.133 0.300 - - - 83.10 *83.10%
Satisfactory
G.V. Burton Builders 26804 Conc. Of Aritao-Quirino Rd., Bua Section 04/15/11 II 9.650 180 C 0.442 0.133 0.300 - - - 87.50 89.00%
Satisfactory
G-3 Construction 32869Const. of School Bldg. 2-Storey 4-CL, Mahabang Parang NHS, Brgy.
Mahabang Parang06/07/10 IVA 5.189 180 C 0.429 0.200 0.300 - - - 92.90 92.13%
V. Satisfactory
Gacutan Construction 10789 Road Upgrading (Gravel to Paved) Ilocos Norte-Abra Road 06/02/10 I 19.149 180 O 0.344 0.240 0.150 0.030 0.030 0.033 82.70 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page170
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Galeno Construction, Inc. 3427 Completion of Bacolod South Kabankalan Rd. 03/06/10 VI 18.705 314 C 0.338 0.200 0.300 - - - 83.80 87.55%
Satisfactory
Galeno Construction, Inc. 3427Completion of Camindangan Bridge along Candoni-Sipalay Road, Brgy.
Camindangan03/07/09 VI 11.954 306 C 0.389 0.200 0.300 - - - 88.90 86.62%
Satisfactory
Galeno Construction, Inc. 3427
Reblocking of Deteriorated Concrete Pavement along Bacolod North Road (Manapla Section) Km. 36+800-Km.
40+500 with exception
09/14/09 VI 19.116 336 C 0.397 0.082 0.300 - - - 77.90 83.48% Satisfactory
Gampik Construction & Development Inc. 8019 Asphalt Overlay along Sayre
Highway Alae-Kisolon Road 03/06/09 X 9.644 75 C 0.429 0.133 0.000 - - - 56.20 71.71% Poor
Gane Tekno Builders 19528 Rehab./Impv't. of Road Brgy. Batang 03/30/11 V 4.815 115 C 0.388 0.133 0.300 - - - 82.10 *82.10% Satisfactory
Gaver General Merchandising 24186 Const. of Brgy. Road, Brgy. Aquino,
Sitio Agbucad 06/12/10 VI 0.964 80 C 0.395 0.133 0.300 - - - 82.80 82.80% Satisfactory
Gaver General Merchandising 24186 Construction of School Building at
Aklan NHS for Arts & Trades 06/05/09 VI 1.360 75 C 0.468 0.107 0.300 - - - 87.50 *87.50% Satisfactory
GC Builders 14768 Concreting of Road, Brgy. Binaliw 09/15/09 VII 0.482 65 C 0.494 0.133 0.300 - - - 92.70 *92.70% V. Satisfactory
GC Builders 14768 Concreting of Road, Brgy. Lusaran 09/15/09 VII 0.675 65 C 0.489 0.133 0.300 - - - 92.20 *92.20% V. Satisfactory
GCI Construction 11346 Virac Airport Development Project 07/11/09 DOTC 25.232 150 C 0.424 0.200 0.300 - - - 92.40 92.40% V. Satisfactory
GCI Construction 11346 Virac Airport Development Project (Extension Runway) 02/19/10 DOTC 17.257 150 C 0.469 0.200 0.300 - - - 96.90 96.90%
OutstandingGCI Construction and
Development Corp. (Formerly: G.C.I.
Construction)
11346 Rehab./Impv't. of Revetment Brgy. San Vicente 04/06/11 V 19.109 145 C 0.441 0.133 0.300 - - - 87.40 *87.40%
Satisfactory
GCI Construction and Development Corp.
(Formerly: G.C.I. Construction)
11346 Rehab./Impv't. of Sipocot-Cabusao Road, Sipocot-Cabusao 04/07/11 V 18.980 210 C 0.441 0.133 0.300 - - - 87.40 *87.40%
Satisfactory
GCI Construction and Development Corp.
(Formerly: G.C.I. Construction)
11346Road Upgrading (Gravel to Paved) Basicao Section, Albay West Coast
Road04/07/11 V 19.452 145 C 0.351 0.200 0.300 - - - 85.10 84.77%
Satisfactory
GCMG Construction 9743Const./Impvt. of CCR Slope
Protection Works Manuyog Sect. (Km.30+400 - Km.30+900)
04/02/11 X 9.472 155 O 0.371 0.228 0.150 0.030 0.032 0.025 83.60 -
GCMG Construction 9743Const. of Standard Modified School Bldg. Two (2) CL (7m x 14m) Gaston
E/S06/17/10 X 1.220 120 C 0.443 0.133 0.300 - - - 87.60 84.73%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page171
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
GCMG Construction 9743Const. of Standard Modified School Bldg. Two (2) CL (7m x 18m) Portulin
NHS03/03/10 X 1.312 120 C 0.425 0.133 0.300 - - - 85.80 84.54%
Satisfactory
GEA Construction Corporation 10163 Romblon Airport Development
Project 04/27/09 DOTC 4.800 90 C 0.436 0.200 0.300 - - - 93.60 93.60% V. Satisfactory
GEA Construction Corporation 10163 Laguindingan Airport Development
Project 06/25/09 DOTC 22.360 180 O 0.400 0.300 0.150 0.020 0.039 0.050 95.90 -
GEA Construction Corporation 10163 San Jose Airport Development
Project 11/21/09 DOTC 3.359 120 C 0.470 0.200 0.300 - - - 97.00 97.00% Outstanding
GEA Construction Corporation 10163 Romblon Airport Development
Project 11/27/09 DOTC 1.437 90 C 0.462 0.200 0.300 - - - 96.20 96.20% Outstanding
GEA Construction Corporation 10163 Antique Dev't Project (Expansion of
Terminal Building) 03/27/10 DOTC 1.916 120 C 0.459 0.200 0.300 - - - 95.90 95.90% V.Satisfactory
GED Construction 13514 Const. of MPB (Phase II) 04/12/11 I 0.968 60 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory
Geed Construction 10823Road Upgrading (Gravel to Concrete)
along Aras-asan Diversion Road Aras-asan
09/01/10 XIII 19.249 171 C 0.402 0.140 0.300 - - - 84.20 86.06% Satisfactory
Geety Realty & Development Corporation
30447 Impvt. (Conc. with Concrete Canal Lining) of Ubay Port Access Road 03/31/11 VII 7.638 542 C 0.378 0.133 0.000 - - - 51.10 63.34%
Poor
Geety Realty & Development Corporation
30447 Construction of Colon Flood Control Structures 06/01/09 VII 4.622 90 C 0.485 0.162 0.300 - - - 94.70 *94.70%
V. Satisfactory
Geety Realty & Development Corporation
30447 Rehab., Reconst. of Tapal (Carcar)-Zaragoza-Olango-Aloguinsan Road 06/01/09 VII 19.191 45 C 0.444 0.200 0.300 - - - 94.40 *94.40%
V. Satisfactory
Geety Realty & Development Corporation
30447Road Upgrading (Gravel to Concrete)
Tapal (Carcar)-Zaragoza-Olango-Alonguinsan Road
06/01/09 VII 5.755 60 C 0.438 0.200 0.300 - - - 93.80 *93.80% V. Satisfactory
Geety Realty & Development Corporation
30447Reconst. (Concrete Paving) of
Tagbilaran East Road, San Pascual and Poblacion, Ubay Section
08/27/10 VII 11.454 380 C 0.273 0.200 0.000 - - - 47.30 57.62% Poor
Geety Realty & Development Corporation
30447 Comst. of Drainage System Projects at A.S. Fortuna St. to Tipolo Bridge 09/05/10 VII 9.332 259 C 0.337 0.200 0.300 - - - 83.70 70.14%
Poor
Geety Realty and Development Corporation
30447Rehab./Reconst//Upgrading of
Damaged National Road at Cebu North Hagnaya Wharf Road
09/05/10 VII 18.690 45 C 0.402 0.196 0.300 - - - 89.80 89.80% V. Satisfactory
Gemma Construction Supply 5044 Const. of MPB (Phase I) 03/20/09 XII 4.767 120 C 0.416 0.133 0.300 - - - 84.90 83.43%
SatisfactoryGemma Construction
Supply 5044 Construction of Provincial Hospital 03/13/09 XII 1.917 85 C 0.467 0.133 0.300 - - - 90.00 *90.00% V. Satisfactory
Gemma Construction Supply 5044
Repair/Rehab. of Road along Marbel-Alah Valley-Cotabato Road (Alah Highway Bdry. w/ Maguindanao)
03/12/09 XII 9.551 128 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory
Gemma Construction Supply 5044
Rerpair/Rehab. of Road along Kidapawan-Alah Jct. Road
(kapingkong Isulan Section)03/13/09 XII 9.544 129 C 0.393 0.133 0.300 - - - 82.60 *82.60%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page172
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Gemma Construction Supply Inc. (Formerly: Gemma Construction
Supply)
5044 Completion of MPB at Brgy. Kalanawi-I 06/08/10 XII 0.481 221 C 0.441 0.133 0.300 - - - 87.40 84.64%
Satisfactory
Gemma Construction Supply Inc. (Formerly: Gemma Construction
Supply)
5044 Completion of MPB at Marquez 06/08/10 XII 0.964 150 C 0.402 0.133 0.300 - - - 83.50 83.50% Satisfactory
Gemma Construction Supply Inc. (Formerly: Gemma Construction
Supply)
5044 Road Upgrading (Gravel to Concrete) Dulawan-Marbel Road 06/08/10 XII 18.922 649 C 0.333 0.133 0.300 - - - 76.60 82.40%
Satisfactory
Gemma Construction Supply Inc. (Formerly: Gemma Construction
Supply)
5044
Rehab. of National Roads along Isulan Highway Junction Dukay-Bagumbayan-Sen. Ninoy Aquino
Road, Km.1817+700 - Km.1825+000 w/ exception
06/09/10 XII 4.824 93 C 0.375 0.133 0.300 - - - 80.80 80.80% Unsatisfactory
Gemma Construction Supply Inc. (Formerly: Gemma Construction
Supply)
5044Conc. of Isulan Highway Junction Dukay-Bagumbayan-Sen. Ninoy Aquino Road (D' Lotilla Section)
06/08/10 XII 25.934 304 C 0.424 0.133 0.300 - - - 85.70 86.60% Satisfactory
Gemma Construction Supply, Inc. 5044 Road Upgrading (Gravel to Paved)
along Columbio-Lutayan Rd. 04/05/11 XII 47.286 401 O 0.357 0.298 0.150 0.030 0.045 0.033 91.30 -
Gemma Construction Supply, Inc. 5044 Road Upgrading (Gravel to Paved) of
Marbel-Makar Road 09/11/09 XII 8.561 154 C 0.427 0.200 0.300 - - - 92.70 89.28% V. Satisfactory
Gemma Construction Supply, Inc. 5044
Const. of Isulan Highway Junction Dukay-Bagumbayan Sen. Ninoy Aquino Road (D' Lotilla Section)
03/03/10 XII 14.139 175 O 0.373 0.240 0.150 0.030 0.050 0.033 87.60 -
Gemma Construction Supply, Inc. (Formerly: Gemma Construction
Supply)
5044Conc. of Isulan Hwy. Jct. Dukay-Bagumbayan-Sen. Ninoy Aquino
Road (D'Lotilla Section)08/31/10 XII 25.934 175 C 0.455 0.133 0.300 - - - 88.80 88.08%
Satisfactory
Gemma Construction Supply, Inc. (Formerly: Gemma Construction
Supply)
5044Road Upgrading (Gravel to Concrete)
along Dulawan-Marbel Road, inc. Lambayong Bridge
09/01/10 XII 20.953 162 O 0.355 0.238 0.150 0.030 0.047 0.033 85.30 -
Gemma Construction Supply, Inc. (Formerly: Gemma Construction
Supply)
5044Road Upgrading (Gravel to Concrete) of Cotabato-Marbel Road, Koronadal
Sect.09/03/10 XII 9.609 224 C 0.407 0.133 0.300 - - - 84.00 84.00%
Satisfactory
Gemma ConstructionSupply 5044 Completion of MPB at Brgy.
Kalanawi-I 06/02/09 R-XII 0.481 221 O 0.300 0.269 0.150 0.030 0.041 0.050 84.00 -
Gemron Steel Works and Construction 25287 Repair of Port and Back-up Area
Project 05/12-13/11 PPA 11.591 240 O 0.339 0.292 0.150 0.030 0.063 0.033 90.73 *90.73% V. Satisfactory
Geneson Construction & Supply 13728 Completion of Kabaka/KMTC Multi-
Purpose Building 02/26/09 NCR 1.928 76 C 0.456 0.109 0.300 - - - 86.50 *86.50% Satisfactory
Genetian Builders 18052 Conc./Repair of Road, Brgy. Macasandig 03/29/11 X 1.133 120 C 0.418 0.133 0.300 - - - 85.10 *85.10%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page173
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Genetian Builders 18052Conc. along Liloy-ZN-Ipil, ZSP Rd. (Phase III), Sta. 1999+490 to Sta.
2000+24002/25/10 IX 14.348 130 C 0.350 0.154 0.300 - - - 80.40 82.32%
Satisfactory
Genetian Builders 18052Conc. along Liloy-ZN-Ipil, ZSP (Phase II) Sta. 1998+720 - Sta.
1999+47002/25/10 IX 14.348 140 C 0.285 0.200 0.300 - - - 78.50 75.08%
Unsatisfactory
Genetian Builders 18052 Conc. of Roads at Barangay Camaman-an 06/11/10 X 1.119 120 C 0.420 0.200 0.300 - - - 92.00 92.00%
V. Satisfactory
Genetian Builders 18052 Conc./Const./Repair of Roads, Brgy. 2 09/01/10 X 1.121 169 C 0.449 0.200 0.300 - - - 94.90 94.90%
V. SatisfactoryGenetian Builders /
Badsbro Construction and General Merchandise
(JV)
JV-09-202 Conc. of Ipil-Liloy-Sindangan Rd. (Titay-Ipil Sect.) 04/04/11 IX 40.763 360 C 0.406 0.133 0.300 - - - 83.90 81.38%
Unsatisfactory
Gerald Builders and Trading 32139 Riprapping and Concrete Paving of
San Francisco-Ambitacay Rd. 04/06/11 I 1.734 75 C 0.358 0.200 0.300 - - - 85.80 *85.80% Satisfactory
Gerald Builders and Trading 32139 Const. of Two (2) CL Sch. Bldg.
Special Education 04/06/11 I 1.705 120 C 0.373 0.177 0.300 - - - 85.00 *85.00% Satisfactory
Gerezsons Resources Corporation 20699 Const. of Road Opening Brgy.
Milagros-Brgy. Badiangay 06/09/09 VIII 1.776 175 C 0.389 0.200 0.000 - - - 58.90 40.30% Poor
Gerezsons Resources Corporation 20699 Repair/Rehab. of Grouted Riprap @
Brgy. 39 03/16/09 VIII 0.964 95 C 0.437 0.200 0.000 - - - 63.70 *63.70% Poor
Gerezsons Resources Corporation 20699 Repair/Rehab. of National Road
along Jct. Taft-Arteche Rd. Sect. 03/16/09 VIII 4.755 90 C 0.454 0.200 0.300 - - - 95.40 *95.40% V. Satisfactory
Gerra Construction 29359 Rechanneling/Desilting of Digmala River (Pesa Sect.) 06/04/10 III 9.550 120 C 0.445 0.175 0.300 - - - 92.00 92.00%
V. Satisfactory
Gerra Construction 29359 Const. of Road Network & Concreting (Road) 05/10-11/11 DOST 7.917 120 C 0.490 0.200 0.300 - - - 99.00 99.00%
OutstandingGershli Construction &
Supply 28480 Const. of Lined Canal at Barangay 10 04/11/11 IVA 0.299 60 C 0.328 0.200 0.300 - - - 82.80 *82.80% Satisfactory
Gershli Construction & Supply 28480 Concreting of Road in Brgy. Malalay 02/25/10 IVA 0.490 45 C 0.432 0.200 0.300 - - - 93.20 93.20%
V. Satisfactory
Gershli Construction & Supply 28480 Const./Rehab. of Road at San Pedro 02/26/10 IVA 0.399 30 C 0.463 0.133 0.300 - - - 89.60 89.60%
V. SatisfactoryGershli Construction &
Supply 28480 Repair/Rehab. of Road, Sixto Castillo St. 03/03/10 IVA 1.928 60 C 0.454 0.133 0.300 - - - 88.70 88.70%
SatisfactoryGershli Construction &
Supply 28480 Conc. Of Brgy. Lucsuhin-Biga Rd. 08/25/10 IVA 4.823 90 C 0.442 0.133 0.300 - - - 87.50 87.50% Satisfactory
Gershli Construction & Supply 28480 Const. of Multi-Purpose Building at
Brgy. Loma 09/05/09 IVA 1.910 90 C 0.447 0.133 0.300 - - - 88.00 *88.00% Satisfactory
Gershli Construction & Supply 28480 Conc. of Roads, Brgy. Tanagan 03/04/09 IV-A 0.954 60 C 0.435 0.141 0.300 - - - 87.60 *87.60%
Satisfactory
GES Construction 30299 Construction of Multi-Purpose Building @ Brgy. 46 06/10/09 VIII 0.963 70 C 0.302 0.133 0.300 - - - 73.50 87.15%
Satisfactory
GES Construction 30299 Construction of the Canal System of Alahag CIP - Phase 5 11/15-20/2010 NIA 4.821 90 C 0.448 0.160 0.300 - - - 90.78 90.78%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page174
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
GES Construction 30299 Taripa CIS 10/6-10/08 PIO 1.012 90 O 0.359 0.238 0.100 0.015 0.029 0.100 84.14 -
GES Construction 30299 Basey Irrigation Project 09/5-10/11 NIA 11.675 120 C 0.445 0.150 0.300 - - - 89.50 89.50% V. Satisfactory
GES Construction 30299 Basey Irrigation Project 9/5-10/11 NIA 5.017 110 O 0.371 0.259 0.150 0.023 0.057 0.033 89.35 -
Gicar Construction 12624 Const. of Matingbe-Gomez Road 04/08/11 XIII 18.679 180 C 0.416 0.200 0.300 - - - 91.60 *91.60% V. Satisfactory
Gicar Construction 12624 Conc. of Jct. Magsaysay-Cagdianao Road 04/07/11 XIII 19.273 240 C 0.369 0.200 0.300 - - - 86.90 86.60%
Satisfactory
Gicar Construction 12624 Const./Conc. of Junction Magsaysay-Cagdianao Rd. 02/24/10 XIII 24.071 270 C 0.433 0.133 0.300 - - - 86.60 84.65%
Satisfactory
Gicar Construction 12624 Concreting of Surigao City-San Juan Coastal Rd. 09/06/09 XIII 28.595 315 C 0.431 0.148 0.300 - - - 87.90 88.88%
Satisfactory
Gicar Construction 12624 Reconst./Reblocking of Surigao City-San Juan Coastal Rd. 09/06/09 XIII 9.646 281 C 0.422 0.150 0.300 - - - 87.20 *87.20%
Satisfactory
Gicar Construction 12624Rehab./Reconst. Along Quezon-
Mapawa-Capalayan-Espina-Navarro Rd., Arellano Dist.
09/06/09 XIII 21.144 225 C 0.434 0.133 0.300 - - - 86.70 *86.70% Satisfactory
Gind Construction and Enterprises 18679 Const. of Bagani Gabor MPB 02/17/10 I 2.295 65 C 0.474 0.133 0.300 - - - 90.70 90.70%
V. Satisfactory
Gind Construction and Enterprises 18679 Const. of Public Market Toilet &
Market Office & Site Devlopment 06/01/09 I 8.514 230 C 0.457 0.133 0.300 - - - 89.00 *89.00% Satisfactory
GJD Construction & Supply 25866 Const. of MPB (Regional Trial Court) 02/27/10 IX 0.944 75 C 0.334 0.200 0.300 - - - 83.40 83.40%
Satisfactory
GJE Builders 18286 Const. of Drainage Canal, Brgy. Abagon 04/07/11 III 1.852 70 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
GJE Builders 18286Restoration of Sinking Road of Jct.
Abbag-Ponggo-Nueva Vizcaya Bdry. Road
06/04/10 II 2.886 50 C 0.446 0.200 0.300 - - - 94.60 94.60% V. Satisfactory
GJE Builders 18286 Conc. of Brgy. Road @ Brgy. Dolores (Phase I) 02/24/10 III 0.454 75 C 0.440 0.200 0.300 - - - 94.00 94.00%
V. Satisfactory
GJE Builders 18286 Conc. Of Brgy. Road at Brgy. San Jacinto 02/24/10 III 0.936 60 C 0.419 0.200 0.300 - - - 91.90 91.90%
V. Satisfactory
GJE Builders 18286
Conc. of Roads (1.) Cabugbugan-Caanamongan-Pinpinas Rd.,
Sta.Ignacia, (2.) San Jose-San Roman Rd. Brgy. Baguindoc, Anao
06/02/10 III 6.587 120 C 0.436 0.133 0.300 - - - 86.90 91.90% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page175
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
GJE Builders 18286 Conc. of Brgy. Road at 7th St. Fairlane, Brgy. San Vicente 08/26/10 III 1.891 70 C 0.393 0.200 0.300 - - - 89.30 89.30%
V. Satisfactory
GJE Builders 18286 Construction of Multi-Purpose Building, Brgy. Masalasa 05/22/09 III 0.520 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%
Satisfactory
GJE Builders 18286 Concreting of Road at Fairlane Subdivision, Brgy. San Vicente 02/26/09 III 2.821 90 C 0.422 0.196 0.300 - - - 91.80 *91.80%
V. Satisfactory
GJE Builders 18286 Construction of 2-CL School Buidling at Balaoang H/S Annex 02/26/09 III 0.889 60 C 0.452 0.133 0.300 - - - 88.50 *88.50%
Satisfactory
GNGC Enterprises 29124 Const. of MPB at Goodwill, Brgy. BF Homes 02/17/10 NCR 3.816 75 C 0.470 0.133 0.300 - - - 90.30 90.30%
V.Satisfactory
GNGC Enterprises 29124Repair/Restoration of Kalayaan
Avenue, Pasong Tamo to EDSA with exception
06/07/10 NCR 4.796 20 C 0.424 0.200 0.300 - - - 92.40 92.40% V. Satisfactory
Gold Rich Construction & Trading (Formerly: Gold
Rich Construction)16489
Rehab./Reconst. of Damaged National Roads along Kennon
Road, Outlook Drive06/03/09 CAR 19.010 88 C 0.449 0.200 0.300 - - - 94.90 *94.90%
V. Satisfactory
Gold Rich Construction & Trading (Formerly: Gold
Rich Construction)16489
Conc. and Impvt. Project along Benguet (Impvt. along Baguio City
limit to Sto. Tomas Road)03/02/10 CAR 25.662 120 C 0.421 0.133 0.300 - - - 85.40 85.28%
Satisfactory
Gold Rich Construction & Trading (Formerly: Gold
Rich Construction)16489
Conc. and Impvt. Project along Benguet (Conc. along Itogon-
Dalupirip Road)03/02/10 CAR 15.838 170 C 0.340 0.200 0.300 - - - 84.00 84.42%
Satisfactory
Gold Rich Construction & Trading (Formerly: Gold
Rich Construction)16489
Repair/Rehab. of Road Slip and Slope Protection along Palispis
(Marcos) Highway (Phase I), Km.268+400 - Km.268+496
06/07/10 CAR 48.218 120 C 0.367 0.200 0.300 - - - 86.70 86.70% Satisfactory
Gold Rich Construction & Trading (Formerly: Gold
Rich Construction)16489 Rehab., Reconst. of Gurel-Bokod-
Kabayan-Buguias-Abatan Road 06/08/10 CAR 51.361 360 C 0.376 0.200 0.300 - - - 87.60 85.20% Satisfactory
Gold Rich Construction &Trading (Formerly: Gold
Rich Const.)16489 Rehabilitation along City Limit-Santo
Tomas Road 02/23/09 CAR 28.926 265 C 0.465 0.200 0.300 - - - 96.50 *96.50% Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page176
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Golden Tech Construction 14820 Construction of Water Supply,
Masaya Centro 08/27/09 II 1.186 90 C 0.430 0.130 0.300 - - - 86.00 *86.00% Satisfactory
Golden Tech Construction 14820 Addalam River Irrigation Project 04/27/09
05/01/09 NIA 9.792 370 O 0.325 0.240 0.150 0.023 0.038 0.050 82.57 -
Goldfin Construction 21343Const. of 4 Storey-8 Classroom Sch.
Bldg. at Basak Community Elementary School
03/08/10 VII 5.220 120 C 0.425 0.139 0.300 - - - 86.40 89.83% V. Satisfactory
Goldrich Construction 16489 Masantol River Wharf (Phase 2) Improvement Project 7/1-4/08 PPA 16.879 120 O 0.362 0.240 0.100 0.015 0.035 0.067 81.84 -
Goldrich Construction 31884 Repair of retaining Wall, Mooring and Fendering System 10/25-27/11 PPA 17.960 240 O 0.374 0.254 0.093 0.030 0.047 0.050 84.75 -
Goldrich Construction 16489 Repair/Rehab. Multi-Purpose Building, San Jose St. 02/27/09 NCR 2.879 127 C 0.494 0.166 0.300 - - - 96.00 *96.00%
V.Satisfactory
Goldrich Construction & Trading (Formerly Gold
Rich Construction)16489
Rehab., Reconst. of Damaged National Roads along Kennon Road,
Loakan Road09/10/09 CAR 19.279 88 C 0.455 0.133 0.300 - - - 88.80 *88.80%
Satisfactory
Goldrock Construction & Development Corp. 5389
Road Upgrading (Conc.) of El Nido-Jct. New Ibajay Road, Sta.276+960 -
Sta.280+00004/01/11 IVB 47.953 210 C 0.404 0.135 0.300 - - - 83.90 86.66%
Satisfactory
Goldrock Construction & Development Corp. 5389 Conc. of Aramaywan-Berong-Puerto
Princesa Road 03/28/11 IVB 76.938 387 O 0.331 0.229 0.150 0.030 0.047 0.050 83.70 -
Goldrock Construction & Development Corp. 5389 Conc. of Jct. Itabiak-San Vicente
Airport Road 03/04/10 IVB 47.452 228 C 0.438 0.200 0.300 - - - 93.80 90.29% V. Satisfactory
Goldrock Construction & Development Corp. 5389 Conc. of Aramaywan-Berong-Puerto
Princesa Road 08/10/10 IVB 76.944 240 O 0.376 0.300 0.070 0.030 0.042 0.033 85.10 -
Goldrock Construction & Development Corp. 5389 Rehab./Impv't of Quezon-Punta Baja
Road, 150+000-Km. 168+000 03/03/09 IV-B 14.230 210 C 0.397 0.200 0.300 - - - 89.70 82.23% Satisfactory
Gonzalo Construction 1826 Repair/Rehab. of Multi-Purpose Building (DBM) 06/04/09 CAR 9.637 270 C 0.451 0.146 0.300 - - - 89.70 87.25%
Satisfactory
Gonzalo Construction 1826Rehabilitation/Reconstruction of
Damanged Road along Abra-Kalinga Road
02/25/09 CAR 14.328 200 O 0.159 0.000 0.114 0.000 0.025 0.000 29.80 -
Gonzalo Construction/Valley
Construction and Aggregates JV
JV-08-297 Rehab., Reconst. of Acop-Kapangan-Kibungan-Bakun Road 06/05/10 CAR 58.632 403 C 0.391 0.200 0.300 - - - 89.10 89.10%
V. Satisfactory
Gonzalodo Enterprises 30681 Rehabilitation of Various Barangay Roads 06/04/09 VII 3.742 95 C 0.392 0.133 0.300 - - - 82.50 *82.50%
Satisfactory
Gonzalodo Enterprises 30681 Const./Repair/Rehab. of Multi-Purpose Building 03/05/09 VII 0.470 60 C 0.402 0.200 0.300 - - - 90.20 *90.20%
V. Satisfactory
Gonzalodo Enterprises 30681 Const./Repair/Rehab. of Multi-Purpose Building @ Tabugon 03/06/09 VII 0.482 75 C 0.347 0.000 0.300 - - - 64.70 *64.70%
Poor
Gonzalodo Enterprises 30681 Repair of Old Multi-Purpose Building, Brgy. Sitio Planta 09/01/09 VII 0.288 30 C 0.422 0.117 0.300 - - - 83.90 *83.90%
Satisfactory
Gonzalodo Enterprises 30681 Completion of School Bldg. at Tominjao NHS, Brgy. Tominjao 09/04/10 VII 0.342 30 C 0.328 0.200 0.300 - - - 82.80 82.80%
SatisfactoryGood Fortune International Incorporated
9246
Const. of Nabitasan River Control along Iloilo City, Dumangas Coastal
Road and Metro Iloilo Circumferential Road
06/10/09 VI 8.910 267 C 0.442 0.200 0.300 - - - 94.20 *94.20% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page177
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Good Fortune International Incorporated
9246 Concreting of Lemery-San Rafael Road 09/08/09 VI 28.639 430 O 0.312 0.300 0.150 0.023 0.050 0.050 88.50 -
Good Fortune International, Inc. 9246
Const. of Rehabilitation of Jalaur Proper River Irrigation System
(Irrigation & Flood Control)06/04/11 NIA 3.584 120 C 0.471 0.200 0.300 - - - 97.10 89.43%
V. Satisfactory
Good Fortune International, Inc. 9246
Aganan Sta. Barbara RIS (Rehabilitation of Aganan Sta.
Barbara RIS Aganan Area Lateral D Bench Flume)
01/10-15/2011 NIA 3.586 120 O 0.3816 0.2400 0.0907 0.0300 0.0509 0.0500 84.32 -
Good Fortune International, Inc. 9246 Rehabilitation of Sibud Main
Drainage 8/10-18/09 NIA 5.428 381 C 0.432 0.200 0.300 - - - 93.22 *93.22% V. Satisfactory
Good Fortune International, Incorporated
9246 Rehab./Upgrading of Mandurriao-San Miguel-Alimodian-Maasin Road 04/04/11 VI 22.370 210 C 0.433 0.133 0.300 - - - 86.60 85.40%
Satisfactory
Good Fortune International, Incorporated
9246 Road Upgrading of San Rafael-Passi Rd. 06/16/10 VI 19.087 150 C 0.397 0.149 0.300 - - - 84.60 85.74%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page178
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Good Fortune International, Incorporated
9246 Const. of Bayunan Bridge 03/12/09 VI 17.478 479 C 0.453 0.200 0.300 - - - 95.30 88.55% Satisfactory
Good Fortune International, Incorporated
2946 Conc. of Tiwi-Talisay-Guintas Port Road, Km.270+920-Km.272+441 09/05/10 VI 19.289 180 C 0.413 0.133 0.300 - - - 84.60 84.54%
Satisfactory
Goodspeed Construction & Services 29572 Completion of 2-Storey 4-CL Bldg. at
Pulong Sta.Cruz NHS 05/27/10 IVA 1.463 120 C 0.445 0.095 0.300 - - - 84.00 84.00% Satisfactory
Goodspeed Construction & Services 29572 Const. of 2-New Classroom @ Los
Baños NHS, (Batong Malake) 02/24/10 IVA 3.532 60 C 0.362 0.200 0.300 - - - 86.20 86.20% Satisfactory
Goodspeed Construction & Services 29572 Completion of Two (2) Storey 4CL
Sch. Bldg. at Dr. Tamayo MES 08/23/10 IVA 4.009 100 O 0.342 0.242 0.150 0.030 0.021 0.033 81.80 -
Goodvibe Builders, Inc. 32686 Conc. of Farm-to-Market Road at San Pedro Apartado 03/04/10 I 0.482 60 C 0.324 0.200 0.300 - - - 82.40 82.40%
Satisfactory
Goodvibe Builders, Inc. 32686 Conc. of Farm-to-Market Road, Brgy. Canarvacanan 03/04/10 I 0.484 60 C 0.322 0.200 0.300 - - - 82.20 82.20%
Satisfactory
Goodvibe Builders, Inc. 32686 Widening of MNR, Urdaneta-Villasis Section 05/19/09 I 7.237 620 O 0.367 0.218 0.150 0.030 0.030 0.050 84.50 -
Gowil Builders 18733 Const. of Luray II NHS (Day & Night) Bldg., Brgy. Luray 04/12/11 VII 2.200 120 C 0.410 0.133 0.300 - - - 84.30 83.46%
Satisfactory
Gowil Builders 18733Const. of Flood Control and
Drainage Facilities, Brgy. Punta Princesa
06/09/09 VII 0.944 45 C 0.417 0.000 0.300 - - - 71.70 *71.70% Poor
Gowil Builders 18733 Const./Completion of MPB (Covered Court) 03/12/09 VII 4.225 120 C 0.417 0.197 0.300 - - - 91.40 *91.40%
V. Satisfactory
Gowil Builders 18733 Const./Completion of MPB (Covered Court) 03/12/09 VII 1.406 120 C 0.389 0.055 0.300 - - - 74.40 *74.40%
Poor
Gowil Builders 18733 Const./Completion/Extension of Two (2) Storey Bldg at Luray II NHS 09/04/09 VII 1.980 120 C 0.417 0.133 0.000 - - - 55.00 *55.00%
Poor
Grace Const. Corp./Dipolog Top Const.
Dev't. Corp (JV)JV-08-016 Dipolog Airport Development Project 09/02/09 DOTC 0.163 360 O 0.368 0.300 0.150 0.030 0.051 0.050 94.90 -
Grace Construction Corp./Dipolog Top Const.
Dev't Corp.JV-08-016
Dipolog Airport Dev't Project (Extension of Runway, Construction of Perimeter Fence and Continuation
of Shore Protection)
03/11/10 DOTC 163.779 360 C 0.404 0.200 0.300 - - - 90.40 92.70% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page179
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Grace Construction Corp./Dipolog Top
Construction Dev't Corp. (JV)
JV-08-016
Dipolog Airport Development Project (Continuation of Extension of
Runway, Asphalt Overlay, Shore Protection, Construction of Fire Station Building, Elevated Water
Tank, Access Road and Box Culvert)
11/10/10 DOTC 86.640 180 C 0.460 0.200 0.300 - - - 96.00 93.40% V. Satisfactory
Grace Construction Corporation 3771
Rehab. of Ozamiz City - Oroquieta City Road, Km.1738+000 -
Km.1742+025 w/ exceptions04/07/11 X 26.003 119 C 0.419 0.133 0.300 - - - 85.20 *85.20%
Satisfactory
Grace Construction Corporation 3771 Conc. of Iligan Circ. Road (Phase 1) 04/11/11 X 329.805 1,083 O 0.286 0.240 0.148 0.030 0.042 0.033 77.90 -
Grace Construction Corporation 3771 Reconst. of Kalaw Bridge 04/10/11 XI 94.331 632 O 0.377 0.300 0.150 0.030 0.060 0.050 96.70 -
Grace Construction Corporation 3771
Impvt. of Road along Marbel-Makar Road Km. Sta.1695+619 - Km.
Sta.1710+76804/10/11 XII 19.180 165 C 0.412 0.150 0.300 - - - 86.20 *86.20%
Satisfactory
Grace Construction Corporation 3771
Const./Completion of Upper Makar Bridge #1 Phase V along General Santos City Circ. Road, Western
Sect., Brgy. Fatima
04/14/11 XII 37.838 240 C 0.385 0.193 0.300 - - - 87.80 84.74% Satisfactory
Grace Construction Corporation 3771 Impv't. Conc. Paving of Dapitan City-
Dakak Road, Phase II 03/08/10 IX 47.488 702 C 0.395 0.161 0.300 - - - 85.60 86.98% Satisfactory
Grace Construction Corporation 3771
Impvt./Regravelling of Siocon-Sirawai Rd. Siocon Side Sect. Sta.2076+250 - Sta.2089+640
06/02/10 IX 171.339 580 C 0.435 0.172 0.300 - - - 90.70 90.70% V. Satisfactory
Grace Construction Corporation 3771
Repair/Asphalt Overlay along Lanao-Pagadian-Zamboanga City Rd. Km.1795+350 - Km.1797+000
09/06/10 IX 9.383 60 C 0.486 0.133 0.300 - - - 91.90 91.90% V. Satisfactory
Grace Construction Corporation 3771
Asphalt Overlay along Ipil-Liloy-Sindangan Rd., Km.2004+000 -
Km.2005+67009/06/10 IX 9.356 100 C 0.473 0.133 0.300 - - - 90.60 90.60%
V. Satisfactory
Grace Construction Corporation 3771
Asphalt Overlay along Sindangan-Liloy Rd., Km.1951+000 -
Km.1953+000 w/ exception09/02/10 IX 4.825 85 C 0.459 0.133 0.300 - - - 89.20 89.20%
V. Satisfactory
Grace Construction Corporation 3771
Asphalt Overlay along Sindangan-Liloy Rd., Km.1938+000 -
Km.1940+000 w/ exception09/02/10 IX 13.896 110 C 0.458 0.133 0.300 - - - 89.10 89.10%
V. Satisfactory
Grace Construction Corporation 3771
Rehab./Impv't. of Nat'l. Rd. along Lanao-Pagadian-Zamboanga City Rd., Km.1801+000 - Km.1819+000
(Intermittent Sect.)
09/06/10 IX 19.105 120 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
Grace Construction Corporation 3771
Repair/Rehab./Impv't. of Nat'l. Rd. along MCLL Nat'l. Highway
Km.1905+000 - Km.1935+00009/08/10 IX 19.005 120 C 0.443 0.133 0.300 - - - 87.60 87.60%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page180
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Grace Construction Corporation 3771
Repair/Rehab./Impv't. of Nat'l. Rd. along Zamboanga City-Labuan-
Limpapa Rd., Km.1938+000 - Km.1960+000 (Ayala-Talisayan Old &
New Highway)
09/08/10 IX 19.005 120 C 0.440 0.133 0.300 - - - 87.30 87.30% Satisfactory
Grace Construction Corporation 3771
Repair/Rehab./Impv't. of Nat'l. Rd. along MCLL Nat'l. Highway
Km.1852+943 - Km.1881+000 (Licomo-Marangan Sect.)
09/08/10 IX 19.020 160 C 0.425 0.133 0.300 - - - 85.80 85.80% Satisfactory
Grace Construction Corporation 3771 Const. of Lobog Parallel Bridge and
Approaches (Phase IV) 06/02/10 X 52.566 441 O 0.379 0.300 0.150 0.030 0.047 0.033 93.90 -
Grace Construction Corporation 3771 Conc. of Iligan Circumferential Road 08/28/10 X 329.805 1,083 O 0.396 0.227 0.124 0.030 0.055 0.033 86.50 -
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Manay Caraga Section,
Phase II
03/05/10 XI 178.716 862 C 0.377 0.200 0.300 - - - 87.70 89.86% V. Satisfactory
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Manay Caraga Section,
Phase I
03/05/10 XI 192.464 898 C 0.373 0.200 0.300 - - - 87.30 88.77% Satisfactory
Grace Construction Corporation 3771 Rehab./Impvt. of Cotabato-Davao
Road (Panatan-Simuay Section) 02/23/10 XII 23.866 65 C 0.437 0.200 0.300 - - - 93.70 93.70% V. Satisfactory
Grace Construction Corporation 3771 Rehab./Impvt. of Cotabato-Lanao
Rd., (Sta. 1872+468-Sta. 1877+000) 02/23/10 XII 23.841 65 C 0.436 0.200 0.300 - - - 93.60 93.60% V. Satisfactory
Grace Construction Corporation 3771
Const. of Upper Makar Bridge No.1 Phase IV (Completion of Abutment "A" and Const. of 4 spans, 30 LM
PSCG Superstructure) along Circumferential Rd.
03/10/10 XII 47.371 240 O 0.343 0.253 0.150 0.030 0.040 0.033 84.90 -
Grace Construction Corporation 3771
Const. of Upper Makar Bridge No.1, Phase IV, (Completion of Abutment and Const. Of 4 spans, 30 lm. PSCG Superstructure) along Circ. Road
09/08/10 XII 48.658 295 C 0.471 0.133 0.300 - - - 90.40 87.10% Satisfactory
Grace Construction Corporation 3771
Impvt./Repair of General Santos-Makar-Kiamba Road, (going to Maitum Sarangani Province)
09/09/10 XII 9.439 90 C 0.359 0.200 0.300 - - - 85.90 85.90% Satisfactory
Grace Construction Corporation 3771 Const. of Limpapa Bridge &
Approaches 08/19/08 IX 60.097 360 O 0.226 0.240 0.100 0.030 0.047 0.100 74.30 -
Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan City-
Dakak Road, Phase I 09/03/08 IX 48.038 340 O 0.360 0.270 0.100 0.030 0.042 0.100 90.20 -
Grace Construction Corporation 3771 Const. of Opao Bridge and
Approaches, Brgy. Opao 06/09/09 IX 71.037 1,067 O 0.373 0.300 0.132 0.030 0.047 0.033 91.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page181
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Grace Construction Corporation 3771 Impv't/Conc. Paving of Dapitan City-
Dakak Road, Phase II 03/17/09 IX 47.488 702 O 0.337 0.277 0.150 0.030 0.035 0.050 87.90 -
Grace Construction Corporation 3771
Impvt./Repair of General Santos-Apopong-Marbel Road going to
Cotabato06/09/09 R-XII 18.891 90 C 0.436 0.200 0.300 - - - 93.60 89.76%
V. Satisfactory
Grace Construction Corporation 3771 Installation of Road Safety Devices
along Dobleston-Butadon Road 03/12/09 X 9.943 60 C 0.419 0.133 0.300 - - - 85.20 *85.20% Satisfactory
Grace Construction Corporation 3771 Concreting of Iligan Circumferential
Road 09/12/09 X 329.805 540 O 0.272 0.300 0.123 0.030 0.047 0.033 80.50 -
Grace Construction Corporation 3771 Const. of Lobog Parallel Bridge and
Approaches (Phase IV) 09/15/09 X 52.566 180 O 0.353 0.240 0.100 0.030 0.037 0.033 79.30 -
Grace Costruction Corp./Ulticon Builders,
Inc. (J.V.)JV-05-061
Reconst. of Padada Br. Along Digos-Makar Rd. inc. Const. of Padada By
Pass Bridge & Approaches09/05/09 XI 227.509 1,094 C 0.498 0.133 0.300 - - - 93.10 89.36%
V. Satisfactory
Graia Const. & Supply (Formerly: Graia Const. &
Supplies)30826 Repair/Rehab. Maragondon-
Magallanes Road 03/10/09 IV-A 9.629 25 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory
Graia Construction Corporation (Formerly: Graia Const. Supply)
30856 Const. of Multi-Purpose Building at Cavite State University 09/09/09 IVA 1.913 60 C 0.489 0.159 0.300 - - - 94.80 *94.80%
V. Satisfactory
Graia Construction Corporation (Formerly: Graia Construction &
Supply)
30826 Rehab./Dredging of Water Ways and Creeks 08/28/10 IVA 33.727 210 O 0.400 - 0.200 0.025 0.038 0.250 91.30 -
Granby Trading & Construction 27554 Conc. of Bayanan-Tiguihan Pola Port
Access Road 02/24/09 IV-B 4.747 75 C 0.398 0.133 0.300 - - - 83.10 77.46% Unsatisfactory
Grand Builders 6845
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads along
Linamon-Zamboanga Road, LANECO-Baroy Sect., Sta.1589+820 -
Sta.1590+580.50 w/ exception
04/10/11 X 18.550 170 C 0.360 0.133 0.300 - - - 79.30 84.58% Satisfactory
Grand Builders 6845Conc./Impvt. of Tubod-Ganassi Road (Pinpin Section) Sta. 1595+945-Sta.
1597+51509/14/09 X 18.054 150 C 0.353 0.155 0.300 - - - 80.80 83.14%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page182
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Grand Builders 6845 Conc. of Iligan-Bukidnon Rd. Km. Sta. 1527+308 - Km. Sta. 1527+930 03/05/10 X 18.029 180 C 0.412 0.146 0.300 - - - 85.80 87.18%
Satisfactory
Great Lakes Enterprises 31429 Conc. of Road at Brgy. Puting Tubig 02/16/10 IVB 1.242 70 C 0.386 0.149 0.300 - - - 83.50 83.50% Satisfactory
Great Lakes Enterprises 31429 Const. of MPB at San Vicente South 05/28/10 IVB 0.498 55 C 0.491 0.133 0.300 - - - 92.40 92.40% V. Satisfactory
Great Lakes Enterprises 31429 Const. of MPB at Brgy. Pachoca 09/01/10 IVB 0.898 90 C 0.438 0.200 0.300 - - - 93.80 93.80% V. Satisfactory
Great Street Construction Equipment Rentals 29719 Concrete of Roads at Brgy. Astorga-
Sitio Idong 04/02/11 XI 1.871 120 C 0.358 0.200 0.300 - - - 85.80 *85.80% Satisfactory
Green Horizon Landscapers & Developers, Inc.
18802Impvt. (Conc. of Access Road @ Juction Pola Road Km 73+000
(leading to Pola Port)09/03/09 IVB 35.603 240 O 0.337 0.288 0.150 0.030 0.051 0.050 90.60 -
Green Horizon Landscapers & Developers, Inc.
18802 Completion of Calapan South Road, Tabtabong-Banti Section 09/05/09 IVB 38.059 238 O 0.359 0.240 0.150 0.030 0.042 0.050 87.10 -
Green Horizon Landscapers & Developers, Inc.
18802 Rehab./Const. of Multi-Purpose Pavement, Town Plaza, Poblacion 08/30/10 IVB 4.763 150 C 0.376 0.166 0.300 - - - 84.20 84.20%
Satisfactory
Greg Construction and Trading 19455 Const. of MPB at San Antonio Valley
8, Brgy. San Antonio 02/17/10 NCR 3.835 75 C 0.478 0.133 0.300 - - - 91.10 91.10% V.Satisfactory
Greg Construction and Trading 19455 Repair/Rehab. of Fortune High
School 08/26/10 NCR 0.964 45 C 0.429 0.133 0.300 - - - 86.20 86.20% Satisfactory
Greyrock Construction 9296 Reconst. of Zamboanga City-Labuan-Limpapa Road 03/02/09 IX 12.273 128 C 0.455 0.200 0.300 - - - 95.50 91.24%
V.Satisfactory
Greyrock Construction 9296Road Upgrading (Gravel to Concrete)
Zamboanga City-Labuan-Limpapa Road
09/01/09 IX 16.076 195 C 0.427 0.200 0.300 - - - 92.70 90.06% V. Satisfactory
H C M Construction Corporation 19382
Const./Widening of Pres. C.P. Garcia Commonwealth Ave. inc. RROW (Const. of Pedestrian Overpass
crossing C.P. Garcia near Magsaysay Ave.)
04/08/11 NCR 27.662 250 C 0.498 0.133 0.300 - - - 93.10 *93.10% V. Satisfactory
H C M Construction Corporation 19382
Const. of Pres. Garcia Ave. (C-5) Extension (Sucat Road-Coastal
Road)04/08/11 NCR 82.451 276 C 0.474 0.152 0.300 - - - 92.60 91.88%
V. Satisfactory
H C M Construction Corporation 19382 Rehab. of MSR-Quirino Brgy.
Manuyo to Brgy. Aldana 06/04/09 NCR 14.320 60 C 0.485 0.133 0.300 - - - 91.80 *91.80% V. Satisfactory
H C M Construction Corporation 19382 Rehab./Reconst. of CAA Road 06/08/10 NCR 4.762 60 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page183
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
H R B Construction 10528 Concrete Pedestrian Bridge, San Francisco 03/12/09 V 0.946 94 C 0.422 0.200 0.300 - - - 92.20 *92.00%
V. Satisfactory
H R B Construction 10528 Const. of Multi-Purpose Building (Phase III) San Ramon Pilot H/S 03/10/09 V 0.473 90 C 0.457 0.133 0.300 - - - 89.00 *89.00%
Satisfactory
H.D de Castro Construction 33146
Repair/Rehab. along Baguio-Bua-Itogon Road, Km. 263+600-Km.
263+62608/29/10 CAR 2.611 120 C 0.434 0.186 0.300 - - - 92.00 92.00%
V. Satisfactory
H.G Lopez Construction 17691 Construction of 2-CL School Building @ Ayaoan Elem. School 09/02/09 I 1.241 85 C 0.453 0.189 0.300 - - - 94.20 *94.20%
V. Satisfactory
H.G Lopez Construction 17691Repair/Rehab. of Damaged Flood
Control Structures at San Juan River Control, Brgy. Carcarabasa
05/25/10 I 2.852 75 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
H.G Lopez Construction 17691 Const. of MPB Phase IV at Central East No. 2 05/26/10 I 0.929 108 C 0.398 0.133 0.300 - - - 83.10 83.10%
Satisfactory
H.G Lopez Construction 17691Construction of Road leading to
Christ the Redeemer, Brgy. 1 (Lubrin Hts.)
02/24/09 I 1.099 88 C 0.409 0.172 0.300 - - - 88.10 83.60%Satisfactory
H.G. Lopez Construction 17691
Road Upgrading (Gravel to Paved) of San Fernando - Bagulin Road at
Km.269+000 - 279+000 with exceptions
03/29/11 I 16.071 280 C 0.368 0.200 0.300 - - - 86.80 84.94% Satisfactory
H.L.J Construction & Enterprises 18080
Conc. of Dancalan-Candoni-Damutan Valley Rd., Caningay Section, Brgy.
Caningay03/08/10 VI 16.235 280 C 0.339 0.187 0.300 - - - 82.60 87.82%
Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Anilao-Banate Rd., Km.
250+660 - Km. 256+000 02/24/10 VI 5.788 120 C 0.415 0.193 0.300 - - - 90.80 86.66% Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Tiwi-Talisay Rd., Buri
Section Km. 274+173 - Km. 274+560 02/04/10 VI 4.823 120 C 0.374 0.190 0.300 - - - 86.40 86.40% Satisfactory
H.L.J Construction & Enterprises 18080
Conc. of Rosario-Cansilayan Rd., Km. 280+300 - Km. 281+395.50 w/
exception02/24/10 VI 6.753 130 C 0.406 0.200 0.300 - - - 90.60 83.58%
Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Boracay Rd. (Lapus-Lapus,
Fairways Section) 02/28/10 VI 19.686 452 C 0.374 0.200 0.300 - - - 87.40 82.03% Satisfactory
H.L.J Construction & Enterprises 18080
Conc. of Barotac-Nuevo-Dumangas-Dacutan Wharf National Rd. (Conc. of Coastal Rd., Beach Bum Portion)
06/17/10 VI 4.823 120 C 0.363 0.200 0.300 - - - 86.30 86.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page184
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
H.L.J Construction & Enterprises 18080
Rehab./Recons./Upgrading of Dumaguete North Rd., Polo-Tugas
Rd. Sect.09/12/09 VII 23.022 210 O 0.372 0.240 0.150 0.030 0.037 0.033 86.20 -
H.L.J Construction & Enterprises 18080
Rehab./Reconst./Upgrading of Dumaguete North Road, Polo-Tugas
Road Section03/01/10 VII 23.040 245 C 0.366 0.200 0.300 - - - 86.60 85.79%
Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Barangay Tampi-San Roque-
Siapo Road 09/02/10 VII 5.740 100 C 0.357 0.200 0.300 - - - 85.70 85.70% Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Farm-to-Market Road, Brgy.
Panub-tuban 06/08/10 VII 0.852 120 C 0.349 0.180 0.300 - - - 82.90 82.90% Satisfactory
H.L.J Construction & Enterprises 18080
Impvt. of Roads leading to the Twin Springs Project, Brgy. Bunga to
Brgy. Baslay Road11/25/08 VII 9.311 145 O 0.323 0.236 0.100 0.030 0.027 0.067 78.30 -
H.L.J Construction & Enterprises 18080
Conc. of Dancalan-Candoni-Damutan Valley Road, Caningay Section,
Brgy. Caningay05/30/09 VI 16.235 280 O 0.380 0.268 0.150 0.023 0.045 0.033 89.90 -
H.L.J Construction & Enterprises 18080
Conc. of Dancalan-Candoni-Damutan Valley Road, Tabu Section, Brgy.
Tabu05/30/09 VI 18.335 280 O 0.366 0.251 0.150 0.023 0.050 0.033 87.30 -
H.L.J Construction & Enterprises 18080 Reconstruction of Bacolod South
Kabankalan Road 06/01/09 VI 16.997 180 C 0.375 0.200 0.300 - - - 87.50 84.26% Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Boracay Road (Lapus-
Lapus, Fairways Sect.) 03/15/09 VI 19.686 289 O 0.312 0.296 0.150 0.018 0.050 0.033 85.90 -
H.L.J Construction & Enterprises 18080
Conc. Paving of National Road along Dancalan-Candoni Road, km. 104+058 - km. 104+372, Brgy.
Dancalan
03/07/09 VI 2.957 182 C 0.392 0.200 0.300 - - - 89.20 85.66% Satisfactory
H.L.J Construction & Enterprises 18080
Conc. Paving of National Road along Dancalan-Candoni Road, km. 105+447 - km. 105+777, Brgy.
Dancalan
03/07/09 VI 3.047 120 C 0.436 0.200 0.300 - - - 93.60 82.20% Satisfactory
H.L.J Construction & Enterprises 18080 Reconst. of Bacolod South
Kabankalan Road 03/03/09 VI 16.997 180 O 0.261 0.292 0.150 0.030 0.055 0.033 82.10 -
H.L.J Construction & Enterprises 18080 Conc. of Dancalan-Candoni-Damutan
Valley Road, Tabu Sect., Brgy. Tabu 09/17/09 VI 18.335 280 C 0.394 0.200 0.300 - - - 89.40 88.14% Satisfactory
H.L.J Construction & Enterprises 18080 Conc. of Road, Capalla Avenue
Barangay Poblacion 09/10/09 VI 0.959 60 C 0.490 0.067 0.300 - - - 85.70 *85.70% Satisfactory
H.L.J Construction & Enterprises 18080
Rehab. of Sigma-Ivisan Road Section Km.88+352-Km.93+090 with
exception08/31/10 VI 14.340 180 C 0.448 0.133 0.300 - - - 88.10 86.72%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page185
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
H.L.J Construction & Enterprises 18080 Conc. of National Road @ Barangay
Sangke 08/25/10 VI 4.737 100 C 0.366 0.200 0.300 - - - 86.60 84.02% Satisfactory
H.L.J Construction & Enterprises 18080
Rehab./Reconst./Upgrading of Damaged Paved Roads Digos-Makar Rd., Tagansule Proper Section, Km.
1586+100-Km. 1587+000
09/03/09 XI 11.575 180 C 0.423 0.133 0.300 - - - 85.60 86.44% Satisfactory
H.L.J. Construction & Enterprises 18080 Road Upgrading of Ajuy-Jamul-Awon-
Concepcion Road 04/13/11 VI 9.454 238 C 0.452 0.133 0.300 - - - 88.50 *88.50% Satisfactory
H.L.J. Construction & Enterprises 18080
Conc. of Balabag-Marquina-Cayos Patlad Road, Km.283+018 -
Km.284+022.25 w/ exception04/12/11 VI 14.448 210 C 0.438 0.133 0.300 - - - 87.10 88.00%
Satisfactory
H.L.J. Construction & Enterprises 18080
Road Upgrading of Jct. Bancal-Leon-Antique Bdry. Road Sta.43+740 -
Sta.43+940 and Sta.47+360 - Sta.47+885
04/14/11 VI 17.761 210 C 0.480 0.133 0.300 - - - 91.30 87.88% Satisfactory
H.L.J. Construction & Enterprises 18080
Concrete Paving of National Road along Bacolod South Road,
Km.195+516 - Km.196+463 with exception Brgy. Asia
04/02/11 VI 9.232 230 O 0.376 0.215 0.150 0.030 0.047 0.033 85.10 -
H.L.J. Construction & Enterprises 18080 Conc. of Bacolod South Road,
Sangke Section Brgy. Sangke 04/02/11 VI 28.170 280 O 0.367 0.237 0.150 0.030 0.004 0.050 83.80 -
H.L.J. Construction & Enterprises 18080
Rehab. of Polo Sect., Tanjay-Dumaguete North Rd., Tanjay City-existing pavement (w/ exceptions),
Km. 26.378 - Km. 27.294
04/05/11 VII 19.249 240 O 0.332 0.300 0.150 0.030 0.050 0.050 91.20 -
H.S Oaminal Construction & Gen.
Merchandising10578 Completion of Dormitory Building I
Phase I 12/2/09 DOST 5.829 155 C 0.446 0.191 0.300 - - - 93.70 93.70% V. Satisfactory
H.T.L - OQC Sta. Fe Road Project (JV) JV-09-122
Rehab./Reconst./Upgrading of Damaged Paved Nat'l Road,
KO209+(896) - KO(-236) Dalton Section
09/01/10 II 19.296 120 C 0.000 0.200 0.300 - - - 50.00 50.00% Poor
H.T.L Construction 3962 Conc. of Burgos-Gen. Aguinaldo Road 03/14/09 II 14.459 120 C 0.415 0.200 0.300 - - - 91.50 82.38%
Satisfactory
H.T.L Construction 3962 Redecking of Ipil Bridge along Daang Maharlika 03/05/09 II 11.560 90 C 0.438 0.200 0.300 - - - 93.80 84.08%
Satisfactory
H2 Landmark Builders, Inc. (Formerly: Landmark
Builders)7400
Road Upgrading of Mati-Maragusan Rd. Menzi-Don Martin Maragusan
Sect.06/07/10 XI 19.296 120 C 0.464 0.133 0.300 - - - 89.70 89.70%
V. Satisfactory
H2 Landmark Builders, Inc. (Formerly: Landmark
Builders)7400 Road Upgrading of Mati-Maragusan
Rd. Taguibo-Calapagan Sect. 06/07/10 XI 17.052 100 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
Haidee Construction - AL B. Construction (JV) JV-07-081
Impvt./Widening/Conc. of McArthur Highway (MNR) Package IV, Apalit-
San Simon-Minalin-Sto. Tomas Section
03/10/09 III 64.127 180 C 0.443 0.200 0.300 - - - 94.30 *94.30%V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page186
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Haidee Construction & Dev't. Corp. / Northern
Builders (JV)JV-09-272
Widening/Conc. of McArthur Highway (MNR), Meycauayan
(Bulacan) to Mabalacat (Pampanga), Pampanga 1st Congressional District
(Angeles to Mabalacat Sect.)
03/30/11 III 82.007 210 C 0.436 0.200 0.300 - - - 93.60 91.62% V. Satisfactory
Haidee Construction and Development Corp. 10365
Impvt./Widening/Conc. of Manila North Road (MNR) Phase V,
Meycauayan (Bulacan) to Mabalacat (Pampanga), Pampanga Section, Completion of Dalaquitan Bridge,
Contract Package VII
02/22/10 III 46.389 150 C 0.447 0.200 0.300 - - - 94.70 91.52% V. Satisfactory
Haidee Construction and Development Corp. 10365 Replacement of Dalaquitan Bridge &
Approaches, Package VI 03/10/09 III 82.045 180 C 0.443 0.200 0.300 - - - 94.30 *94.30%V. Satisfactory
Hakkatan Konstruk & General Merchandise 31610
Const./Impvt. of DPWH Office Bldg., 3rd Negros Occidental District
Engineering & Sitio Mojon, Brgy. I06/05/10 VI 4.308 220 O 0.356 0.266 0.150 0.022 0.041 0.033 86.80 -
Hakkatan Konstruk & General Merchandise 31610
Const./Impvt. of DPWH Bldg., 3rd Negros Occidental DEO at Sitio
Mojon, Brgy. 108/24/10 VI 4.474 220 O 0.369 0.240 0.150 0.030 0.035 0.033 85.70 -
Halrey Construction Inc. 3267 Rehab. of Muzon-Tungkong Mangga Road, City of San Jose del Monte 03/04/10 III 14.282 110 C 0.421 0.133 0.300 - - - 85.40 85.40%
Satisfactory
Halrey Construction Inc. 2267Rehab./Reconst./Upgrading of
Damaged National Roads at San Juan-Laiya Rd.
06/07/10 IVA 46.279 284 C 0.448 0.136 0.300 - - - 88.40 89.69% V. Satisfactory
Halrey Construction Inc. 2267Const. (Opening/Widening/Conc.) of
CALA-Daang Hari Road Boundary (Pasong Buwaya 1 Section)
08/31/10 IVA 37.947 209 C 0.436 0.184 0.300 - - - 92.00 87.32% Satisfactory
Halrey Construction Inc. 2267 Rehab./Reconst. (Conc.) of Naic-Jct. Caylabne Road 03/11/09 IV-A 28.921 180 C 0.429 0.133 0.300 - - - 86.20 87.64%
Satisfactory
Halrey Construction Inc. 2267Rehab./Reconst. of Damaged paved
along Carlos P. Garcia Ave. (C-5) (Ortigas Avenue Broadcast City)
09/11/09 NCR 9.640 150 C 0.434 0.133 0.300 - - - 86.70 89.64% V. Satisfactory
Halrey Construction Inc. 2267
Rehab./Reconst. of Damaged Paved/Conc. Blocking along G.
Araneta (Aurora Blvd.-E. Rodriguez Ave.) both sides
09/11/09 NCR 9.595 161 C 0.432 0.133 0.300 - - - 86.50 *86.50% Satisfactory
Halrey Construction, Inc. 2267 Impvt./Concrete Blocking along Epifanio delos Santos Ave. 03/31/11 NCR 4.623 60 O 0.397 0.200 0.150 0.030 0.045 0.033 85.50 -
Halrey Construction, Inc. 2267 Rehab. of Roads, Bagong Nayon, San Roque 04/13/11 III 0.482 12 C 0.316 0.000 0.300 - - - 61.60 *61.60%
Poor
Hanjin Heavy Industries & Const. Co. Ltd. FC-03-010 CP No.1 Const. of Jaro Floodway &
Imprv't. of Tigum & Aganan Rivers 03/03/10 MFCP1 1,979.449 1,920 O 0.335 0.265 0.150 0.030 0.056 0.050 88.60
Hanjin Heavy Industries & Const. Co. Ltd.
SL1-SN-004892
Help for Catubig Agricultural Advancement Project (HCAAP) 11/9-12/09 NIA 0.994 1,253 O 0.393 0.288 - 0.024 0.037 0.037 77.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page187
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Hanjin Heavy Industries & Const. Co. Ltd. 4892
Help for Catubig Agricultural Advancement Project - Irrigation & Drainage Component (HCAAP-IDC)
09/27/10 NIA 749.759 1,381 O 0.398 0.300 - 0.030 0.061 0.050 83.90 -
Hanjin Heavy Industries and Construction Co.,
Ltd.FC-08-005
Central Mindanao Road Project, Contract Package 2,
Const./Improvement of North Upi-Maguindanao/Sultan Kudarat
Boundary
03/30/11 RRNDP 892.399 782 O 0.363 0.240 0.150 0.030 0.047 0.033 86.30 -
Hanna Via Design & Construction 32887 Completion of MPB, Brgy. Sulit 04/13/11 XII 0.973 75 C 0.449 0.162 0.300 - - - 91.10 *91.10%
V. Satisfactory
HB Construction 32855 Const./Rehab of Drainage System, Sitio, Payong, Area, Phase 2 03/02/09 NCR 0.712 30 C 0.437 0.116 0.300 - - - 85.30 *85.30%
Satisfactory
HCM Construction Corporation 19382
Const. of Slope Protection for the Zapote River Impv't Projects and its
Tributaries02/25/09 NCR 18.753 120 C 0.400 0.198 0.300 - - - 9,685.90 *89.80%
V.Satisfactory
Henry S. Oaminal Const. & General Merchandise 10578
Conc. of Jct. Dat-an, Carmen-Sierra Bullones-Pilar Rd., Sierra Bullones-
Pilar09/04/09 VII 32.346 234 C 0.436 0.133 0.300 - - - 86.90 85.64%
Satisfactory
Henry S. Oaminal Const. & General Merchandise 10578
Conc. of Jct. Dat-an-Sierra Bullones-Carmen-Sagbayan-Bacane-Tubigon
Rd. (Intermittent Sect.)02/23/10 VII 61.899 300 C 0.355 0.145 0.300 - - - 80.00 83.60%
Satisfactory
Henry S. Oaminal Const. & General Merchandise 10578 PSHS CVC Construction of 3-storey
ACA Bldg. 02/26/09 DOST 13.530 339 C 0.359 0.289 0.300 - - - 94.80 94.80% V. Satisfactory
Henry S. Oaminal Const. & General Merchandise 10578 Completion of Dormitory bldg. Phase
I 11/26/08 DOST 5.829 150 O 0.320 0.300 0.128 0.017 0.043 0.023 74.80 -
Henry S. Oaminal Const. & General Merchandise 10578 Conc. of Jct. (LIR) Carmen-Sagbayan-
Bacane Road 08/29/08 VII 22.646 250 O 0.293 0.222 0.000 0.020 0.032 0.100 66.70 -
Henry S. Oaminal Construction and
General Merchandise10578 Road Upgrading (Gravel to Paved)
Loquilo-Alubijid By-Pass Road 04/13/11 X 14.381 311 C 0.425 0.133 0.300 - - - 85.80 85.80% Satisfactory
Herbana Builders and Supply 32523
Construction of PSTC, S&J Proportion Bldg. Repair of Training Center & Improvement of Perimeter
Fence
03/11/10 DOST 26.183 - C 0.47 0.20 0.00 - - - 67.00 67.00% Poor
Herbana Builders and Supply 32523 Rehab. of Jct. Tawad-Balud Road 02/27/09 V 4.809 60 C 0.428 0.133 0.300 - - - 86.10 *86.10%
SatisfactoryHerbana Builders and
Supply 32523 Construction of Sta. Cruz River Control 08/24/09 V 4.680 180 C 0.416 0.200 0.300 - - - 91.60 89.26%
V. Satisfactory
Herefold Builders Construction and Supply 20789 Impvt.of MPB 03/09/09 IV-A 0.099 45 C 0.417 0.200 0.300 - - - 91.70 87.36%
Satisfactory
HG III Construction and Development Corporation
8431 Repair of Damaged Breakwater at Port of Culasi, Roxas City 09/19-23/11 PPA 15.600 240 O 0.387 0.286 0.150 0.030 0.056 0.050 95.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page188
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
HGG Builders & Supply 17824 Const. of Flood Control (Seawall) Brgy. Barcelonita 08/30/10 V 4.710 150 C 0.411 0.200 0.300 - - - 91.10 91.10%
V. Satisfactory
HGG Builders & Supply 17824 Construction of Ala Building II Phase II 03/10/10 DOST 27.272 280 C 0.494 0.20 0.30 - - - 99.40 97.18%
Outstanding
HGG Builders & Supply 17824 Site Development Phase I 11/11/10 DOST 3.892 150 C 0.497 0.187 0.300 - - - 98.40 95.81% V.Satisfactory
HGG Builders & Supply 17824 Construction of Dormitory Bldg. II 11/11/10 DOST 32.164 240 C 0.498 0.20 0.30 - - - 99.80 97.35% Outstanding
HGG Builders & Supply 17824 Completion of Dormitory bldg. Phase III 03/19/09 DOST 18.930 290 C 0.374 0.297 0.300 - - - 97.10 97.10%
OutstandingHGG Builders and
Supply 17824 Conc. of Roads in Camarines Sur, Brgy. Baliuag 04/04/11 V 0.940 150 C 0.429 0.133 0.300 - - - 86.20 *86.20%
SatisfactoryHGG Builders and
Supply 17824 Rehab./Impv't. of Roads Brgy. District I 04/04/11 V 0.961 150 C 0.421 0.133 0.300 - - - 85.40 *85.40%
SatisfactoryHGG Builders and
Supply 17824 Conc. of Barangay Road Midem St., Brgy. North Centro 04/07/11 V 0.480 120 C 0.407 0.133 0.300 - - - 84.00 *84.00%
Satisfactory
HG-III Construction and Development
Corporation (Formerly: Golden City Engineering
and Const.)
8431 Upgrading of Pantabangan-Canili-Baler Road, Cadaclan Section 05/29/09 III 46.840 134 C 0.183 0.200 0.300 - - - 68.30 77.72%
Unsatisfactory
Hibiscus Trading & Construction Services 28280 Concreting/Drainage System along
Pelaez St., Villa Ma. Clara 05/25/09 NCR 5.578 90 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory
High Strength Dev. Corporation 31976 Const. of MPB (Cluster II), Brgy.
Buenavista & Brgy. Binauganan 02/24/10 III 4.348 120 C 0.346 0.200 0.300 - - - 84.60 84.60% Satisfactory
High Strength Dev. Corporation 31976 Construction of Bantog-Balbaloto,
FMR 05/22/09 III 1.879 79 O 0.294 0.300 0.150 0.020 0.030 0.050 84.40 -
High Strength Dev. Corporation 31976 Construction of MPB @ Brgy. San
Francisco 09/02/09 III 1.418 129 C 0.499 0.133 0.300 - - - 93.20 *93.20% V. Satisfactory
High Strength Dev. Corporation 31976 Const. of Bantog-Balbaloto FMR 09/02/09 III 1.879 94 C 0.450 0.133 0.300 - - - 88.30 85.96%
Satisfactory
Hi-point Construction Corporation 30744
Repair/Rehab. of Catarman-Mondragon Road along Catarman
Bridge03/06/09 VIII 9.600 180 C 0.244 0.200 0.300 - - - 74.40 77.07%
Unsatisfactory
Hi-Tone Const. and Development Corporation
23385 Const./Repair/Rehab./Impv't. of Libmanan-Cabusao Flood Control 09/02/10 V 38.448 270 O 0.307 0.279 0.141 0.030 0.045 0.033 83.50 -
Hi-Tone Const. and Development Corporation
23385 Completion of Tokyo Bridge along Catanduanes Circum. Road 09/05/09 V 14.379 330 C 0.441 0.200 0.300 - - - 94.10 93.86%
V. Satisfactory
Hi-Tone Const. and Development Corporation
23385 Construction of Dapdap Rockcauseway Northern Side 09/08/09 V 47.515 240 C 0.416 0.200 0.300 - - - 91.60 *91.60%
V. Satisfactory
Hi-Tone Const. and Development Corporation
23385 Desilting & Channelization of San Juan River, 09/02/09 V 9.600 45 C 0.416 - 0.500 - - - 91.60 *91.60%
V. Satisfactory
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Widening/Regravelling of Binongaan Road (Sitio Gui-ob Section) 08/27/09 IVB 19.297 180 C 0.325 0.012 0.300 - - - 63.70 *63.70%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page189
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Widening/Regravelling of Agtigbao Road (Sitio Naabang Section) 08/27/09 IVB 19.297 180 C 0.302 0.012 0.300 - - - 61.40 *61.40%
Poor
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Widening/Regravelling of San Andres-Calatrava Rd. (Balogo Sect.) 06/10/10 IVB 39.081 280 C 0.487 0.197 0.300 - - - 98.40 98.40%
Outstanding
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Widening/Road Opening of Linao-Talisay Road 02/22/10 IVB 19.296 180 C 0.490 0.196 0.300 - - - 98.60 98.60%
Outstanding
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Const. of Salugan River Control 08/18/10 V 9.592 89 C 0.444 0.200 0.300 - - - 94.40 94.40% V. Satisfactory
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
16055 Conc. of Puro-Lamba Coastal Rd., Sta.1+380 - Sta.1+483 08/16/10 V 38.398 210 C 0.459 0.163 0.300 - - - 92.20 92.20%
V. Satisfactory
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Const. of Puro-Dapdap Coastal Road 05/28/10 V 19.204 150 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Dredging/Deepening of Lajong River 05/26/10 V 19.117 90 C 0.350 - 0.500 - - - 85.00 85.00% Satisfactory
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Const. of Salugan River Control 05/27/10 V 9.592 60 C 0.284 0.036 0.300 - - - 62.00 62.00% Poor
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Const. of Binagasbasan Spillway 08/17/10 V 14.250 180 C 0.402 0.200 0.300 - - - 90.20 90.20% V. Satisfactory
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Corollary Works at Tagaytay Resettlement Project 10/26-29/09 NHA 19.985 120 O 0.390 0.300 0.128 0.030 0.056 0.033 93.70 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page190
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Corollary Works at Tagaytay Resettlement Project 04/27/10 NHA 19.977 120 C 0.50 0.20 0.30 - - - 100.00 97.78%
Outstanding
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Const. of Sabang MPB 03/03/09 V 9.556 490 C 0.494 0.133 0.300 - - - 92.70 88.29% Satisfactory
Hi-Tone Construction & Development
Corporation (Formerly: Lo-Tone Const. Supply)
23385 Dredging / Desilting of Buyuan River 02/22/10 V 19.232 120 C 0.425 - 0.500 - - - 92.50 92.50% V. Satisfactory
Hi-Tone Construction and Development
Corporation 23385 Asphalt Overlay/Const. of Buragwis-
Puro Road 03/28/11 V 28.776 347 O 0.337 0.200 0.150 0.022 0.070 0.050 82.90 -
Hi-Tone Construction and Development
Corporation (Formerly: Lo-Tone Construction &
Supply)
JV-09-170 Const. of Drainage System along Inascan-Paulog Road 03/30/11 V 19.119 180 C 0.453 0.133 0.300 - - - 88.60 88.36%
Satisfactory
Hi-Tone Construction and Development
Corporation / Bicol Goldrock Construction
Corporation (JV)
JV-09-170
Libmanan-Cabusao Embankment, Const./Extension of Libmanan-
Revetment Dike & Impv't. of 2-Barrel Control Gate
04/06/11 V 86.850 300 C 0.497 0.133 0.300 - - - 93.00 *93.00% V. Satisfactory
Hi-Tone Construction and Development
Corporation / Bicol Goldrock Construction
Corporation (JV)
JV-09-170Road Upgrading (Gravel to Paved) Tapel-Cagmanaba Section, Albay
West Coast Road04/01/11 V 19.063 145 C 0.328 0.200 0.300 - - - 82.80 84.72%
Satisfactory
Hi-Tone Construction and Development
Corporation / Bicol Goldrock Construction
Corporation (JV)
JV-09-170 Widening/Impv't. of Eztanza-Maticol-Pinaric Road (Phase III) 03/28/11 V 38.369 451 O 0.276 0.300 0.150 0.030 0.040 0.050 84.60 -
Hi-Tri Development Corporation 1758
Rehab./Reconst./Upgrading of Marinduque Circ. Road (Ihatub-
Laylay Section)04/14/11 IVB 21.986 135 C 0.340 0.200 0.300 - - - 84.00 *84.00%
Satisfactory
Hi-Tri Development Corporation 1758
Const./Road Opening of Zamboanga West Coast Road, Panganuran-Sitio-
Sibongon-Bato Tindog Sect., Sta.32+495.00-Sta.40+580.00 with
exceptions
03/30/11 IX 287.698 940 C 0.375 0.133 0.300 - - - 80.80 83.74% Satisfactory
Hi-Tri Development Corporation 1758
Const. of Dr. Damian Reyes Memorial Road (Missing Link) Hinapulan-Tumagabok Section
02/25/10 IVB 48.221 240 C 0.484 0.200 0.300 - - - 98.40 95.40% V. Satisfactory
Hi-Tri Development Corporation 1758 Const. of Dr. Damian Reyes
Memorial Road (Missing Link) 02/24/10 IVB 77.147 320 C 0.398 0.133 0.300 - - - 83.10 86.60% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page191
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Hi-Tri Development Corporation 1758
Const./Road Opening of Zamboanga West Coast Rd., Sirawai-Sibuco Rd.,
Sitio Sibongon-Bato Tindog Sect.08/24/10 IX 373.450 600 O 0.355 0.283 0.150 0.023 0.042 0.033 88.60 -
Hi-Tri Development Corporation 1758 Concrete Paving of Biliran Circ.
Road (Bool-Patag Section) 09/03/09 VIII 23.968 220 C 0.430 0.133 0.300 - - - 86.30 84.26% Satisfactory
Hi-Tri Development Corporation 1758
Concrete Paving of Critical Portion Kawayan-Culaba Road (Burabud-
Mapuyo Section)08/25/10 VIII 19.060 360 C 0.418 0.133 0.300 - - - 85.10 86.40%
Satisfactory
HLJ Construction & Enterprises 18080
Impvt. of Roads leading to the Twin Springs Project, Brgy. Bunga to
Brgy. Baslay Road03/13/09 VII 9.311 145 C 0.443 0.200 0.300 - - - 94.30 84.70%
Satisfactory
HNR Construction & Supply 22085 Const. of MPB at Lower Everlasting,
Brgy. Payatas 04/07/11 NCR 4.283 120 O 0.394 0.240 0.150 0.030 0.047 0.033 89.40 -
Homefixmix Builders Center 29997 Conc. of Pagudpud Barangay road,
Purok 5 03/29/11 I 0.944 38 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory
Homefixmix Builders Center 29997 Conc. of FTMR at Talogtog-
Sinapangan 03/29/11 I 0.969 48 C 0.361 0.200 0.300 - - - 86.10 *86.10% Satisfactory
Homefixmix Builders Center 29997 Rehab. of Ilocanos Sur Bridge 03/29/11 I 2.164 140 C 0.357 0.200 0.300 - - - 85.70 *85.70%
SatisfactoryHomefixmix Builders
Center 29997 Const. of 2CL Building at Cabaroan E/S 08/23/10 I 0.494 77 C 0.489 0.133 0.300 - - - 92.20 92.20%
V. SatisrfactoryHomefixmix Builders
Center 29997 Construction of Multi-Purpose Building 05/27/09 I 1.880 120 C 0.494 0.142 0.300 - - - 93.60 86.46%
SatisfactoryHomefixmix Builders
Center 29997 Concreting of Bugbugcao Barangay Road 02/24/09 I 0.191 18 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
Homefixmix Builders Center 29997 Concreting of Pagdildilan Barangay
Road, Brgy. Pagdildilan 02/24/09 I 0.099 25 C 0.446 0.133 0.300 - - - 87.90 *87.90%Satisfactory
Homeworld Construction Corporation 14725
Rehab./Reconst./Upgrading of Damaged Paved national Road along
Bacolod North Road Calatrava Section
03/31/11 VI 37.703 238 C 0.450 0.134 0.300 - - - 88.40 *88.40% Satisfactory
Homeworld Construction Corporation 14725 Const./Rehab./Widening of Concrete
Pavement along Bacolod North Road 03/30/11 VI 47.869 273 C 0.393 0.200 0.300 - - - 89.30 87.98% Satisfactory
Homeworld Construction Corporation 14725 Rehab. (Asphalt Overlay) of Bacolod
South Road 04/01/11 VI 28.475 245 C 0.470 0.133 0.300 - - - 90.30 86.04% Satisfactory
Homeworld Construction Corporation 14725 Rehab./Reconst. of Sum-ag-
Abuanan Road 05/27/09 VI 31.087 564 C 0.397 0.186 0.300 - - - 88.30 89.83% Satisfactory
Homeworld Construction Corporation 14725
Rehab./Reconst./Upgrading of Bacolod South Road (San Enrique-
Tibsok Section)09/18/09 VI 19.095 185 C 0.395 0.133 0.300 - - - 82.80 86.88%
Satisfactory
Homeworld Construction Corporation 14725 Conc. of Bacolod South Road (Brgy.
4 Section) 09/16/09 VI 7.750 121 C 0.440 0.124 0.300 - - - 86.40 85.44% Satisfactory
Homeworld Construction Corporation (Formerly:
Homeworld Engineering)14725 Asphalt Overlay of Existing Asphalt
Pavement along Bacolod North Rd. 03/11/10 VI 13.946 80 C 0.435 0.200 0.300 - - - 93.50 93.50% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page192
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Homeworld Construction Corporation (Formerly:
Homeworld Engineering)14725
Rehab./Impvt. (Asphalt Overlay) of Bacolod North Road, Km. 1+904-Km.
3+704 (with exceptions)08/24/10 VI 23.619 60 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
Homeworld Engineering 14725Rehab./Reconst. of Damaged Paved
Nat'l Roads Generated from PMS/HDM-4, Sum-ag-Abuanan Road
03/05/09 VI 31.087 471 O 0.266 0.281 0.150 0.030 0.060 0.050 83.70 -
Honexson Builders 22288 Completion of MPB at Brgy. Paciano Bangoy 04/13/11 XI 0.970 85 C 0.431 0.200 0.300 - - - 93.10 *93.10%
V. Satisfactory
Honexson Builders 22288 Package 2-A: Concreting of Road at Brgy. Panacan 03/10/10 XI 1.888 180 C 0.388 0.200 0.300 - - - 88.80 88.80%
Satisfactory
Honeyville Construction 32160 Impv't./Conc. Of Presentacion-Maligaya Road 04/08/11 V 18.835 210 C 0.447 0.133 0.300 - - - 88.00 85.90%
Satisfactory
Honeyville Construction 32160 Impv't./Conc. Of San Rafael-Mampirao-Calalahan-San Jose Road 04/09/11 V 43.725 240 C 0.451 0.133 0.300 - - - 88.40 84.95%
Satisfactory
Honeyville Construction 32160Impvt. of San Rafael-Mampirao-San
Jose Road, (Pugay-Mampirao Section)
05/30/09 V 18.817 215 O 0.335 0.300 0.150 0.030 0.040 0.050 90.50 -
Honeyville Construction 32160 Impvt. of Goa-Digdigon-San Isidro Road, San Isidro Section 09/09/09 V 18.788 195 O 0.313 0.278 0.150 0.030 0.047 0.050 86.80 -
Hony Trading and Construction 26898 Completion of MPB at Brgy. Palatiw 09/10/09 NCR 1.433 80 C 0.482 0.133 0.300 - - - 91.50 *91.50%
V. Satisfactory
Hony Trading and Construction 26898
Rehab./Reconst./Upgrading of Damage Paved National Road, Baay-
Suba Road08/20/10 I 19.288 180 C 0.423 0.139 0.300 - - - 86.20 86.20%
Satisfactory
Hony Trading and Construction 26898 Const. of R.P. Cruz E/S MPB, R.P.
Cruz E/S, Brgy. Lower Bicutan 06/03/10 NCR 3.849 146 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfactory
Horamabi Builders 24129 Const. of Two (2) CL Units, Three (3) CL Sch. Bldg. @ Payangan E/S 04/01/11 III 4.473 150 O 0.369 0.300 0.150 0.030 0.029 0.033 91.10 -
Horamabi Builders 24129 Channel Impvt. at Tenejero River 04/02/11 III 9.475 115 O 0.352 0.240 0.150 0.030 0.029 0.033 83.40 -
Horamabi Builders 24129 Rehab./Reconst./Upgrading of Mt.Samat Rd. 05/27/10 III 18.996 28 C 0.458 0.129 0.300 - - - 88.70 88.70%
Satisfactory
Horamabi Builders 24129 Rehab./Reconst./Upgrading of Roman Expressway 05/27/10 III 10.553 20 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
Horamabi Builders 24129 Rehab./Reconst./Upgrading of Gov. J.J. Linao Rd. 05/27/10 III 9.507 20 C 0.406 0.133 0.300 - - - 83.90 83.90%
Satisfactory
Horamabi Builders 24129 Rehab of Flood Control Dike, Brgy. Tenejero 08/19/10 III 4.720 50 C 0.450 0.133 0.300 - - - 88.30 88.30%
Satisfactory
Horamabi Builders 24129 Improvement/Rehabilitation of Roman Expressway 05/21/09 III 39.329 90 O 0.348 0.300 0.150 0.030 0.037 0.050 91.50 -
Horamabi Builders 24129 Road Upgrading (Gravel to Paved) @ 5th Street, Mariveles 05/22/09 III 2.895 36 C 0.382 0.200 0.300 - - - 88.20 *88.20%
Satisfactory
Horamabi Builders 24129 Rehab/Reconstruction/Upgrading of Lamao Access Road 05/22/09 III 10.615 42 C 0.413 0.133 0.300 - - - 84.60 *84.60%
Satisfactory
Horamabi Builders 24129 Const. of Two (2) Classroom Sch. Bldg. @ E.C. Bernabe National HS 02/26/09 III 0.887 58 C 0.366 0.187 0.300 - - - 85.30 89.64%
V.Satisfactory
Horamabi Builders 24129 Impvt./Rehab. of Roman Expressway 08/29/09 III 39.564 90 C 0.434 0.200 0.300 - - - 93.40 92.26% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page193
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Horamabi Builders 24129 Rehab./Reconst./Upgrading of Jct. Layac-Balanga-Mariveles Port Road 08/28/09 III 48.250 81 C 0.469 0.133 0.300 - - - 90.20 86.78%
Satisfactory
Horomabi Builders 24129 Rehab. of Road at Brgy. Talisay 02/19/10 III 1.402 32 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory
Houserock Builders & Trading 18822
Const./Repair & Rehab. of Multi-Purpose Bldg., Calabash St., (Phase
II)05/20/09 NCR 1.919 75 C 0.366 0.200 0.300 - - - 86.60 *86.60%
Satisfactory
HPL General Construction 22289
Restoration of Scoured Foundation of Flood Control Structure at
Minanga River Control04/01/11 II 9.612 270 C 0.431 0.133 0.300 - - - 86.40 85.41%
Satisfactory
HPL General Construction 22289
Const./Replacement of Camanauan Bridge, along Dugo-San Vicente
Road (DVSR)02/25/09 II 4.240 313 C 0.479 0.200 0.000 - - - 67.90 74.26%
Poor
HRB Construction 10528 Const. of RCBC along Pili-Tigaon Road, Mabalodbalod 06/04/10 V 4.723 117 C 0.415 0.191 0.300 - - - 90.60 87.78%
Satisfactory
HRB Construction 10528 08/25/10 V 4.729 90 C 0.416 0.200 0.300 - - - 91.60 86.98% Satisfactory
HRB Construction 10528 Const. of Hanawan H/S, MPB 08/28/10 V 4.776 150 C 0.374 0.200 0.300 - - - 87.40 85.44% Satisfactory
HRB Construction 10528 Land Development of Magarao Resettlement Project 11/9-12/09 NHA 5.277 110 O 0.454 0.200 0.300 - - - 95.40 -
HRB Construction 10528 Const. of MPB, Brgy. Sua 06/07/10 V 4.776 150 C 0.433 0.200 0.300 - - - 93.30 93.30% V. Satisfactory
HVC Sagittarius Commercial and
Construction12954 Completion of Multi-Purpose Bldg.
Brgy. San Roque 09/11/09 XII 0.384 42 C 0.426 0.162 0.300 - - - 88.80 *88.80% Satisfactory
HVC Sagittarius Commercial and
Construction12954 Sarangani-Davao Del Sur Coastal
Road, Punsad-Pangyan Section 03/09/10 XII 9.440 180 C 0.427 0.142 0.300 - - - 86.90 83.39% Satisfactory
HVC Sagittarius Commercial and
Construction12954 Sarangani-Davao del Sur Coastal
Road (Baliton Section) 09/07/10 XII 9.394 150 C 0.425 0.133 0.300 - - - 85.80 85.80% Satisfactory
HVC Sagittarius Commercial and
Construction12954
Const. of Multi-Purpose Building (Mini Gymnasium), Brgy. Plaza,
Centrala06/05/09 R-XII 0.797 168 C 0.464 0.200 0.300 - - - 96.40 *96.40%
Outstanding
HVC Sagittarius Commercial and
Construction12954 Concrete Reblocking of Cotabato to
Marbel Road 06/06/09 R-XII 5.297 91 C 0.434 0.200 0.300 - - - 93.40 *93.40% V. Satisfactory
HVC Sagittarius Commercial and
Construction12954
Conc. of Sarangani-Davao del Sur Coastal Road, Kalatungan-Punsad
Sect. 06/11/09 R-XII 9.429 247 C 0.406 0.182 0.300 - - - 88.80 88.86%
Satisifactory
HVC Sagittarius Commercial and
Construction12954 Sarangani-Davao del Sur Coastal
Road, Punsad-Pangyan Section 06/11/09 R-XII 9.390 180 O 0.327 0.265 0.150 0.024 0.040 0.033 83.90 -
I & E Construction 10410
Widening of Road inc. RROW Acquisition Old Manila South Road
(Sta. Rosa Sect.) Laguna 1st District, Brgy. Balibago to Dila (w/ exception)
04/06/11 IVA 19.256 202 C 0.443 0.200 0.300 - - - 94.30 89.26% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page194
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
I & E Construction 10410
Removal of Landslides and Restoration of Collapsed Stone
Masonry, Tagaytay-Taal Lake Rd. (Intermittent Sect.)
06/03/10 IVA 14.460 115 O 0.400 0.300 0.150 0.030 0.030 0.033 94.30 -
I & E Construction 10410Widening of Road inc. RROW
acquisition Old Manila South Rd. (San Pedro Sect.)
05/27/10 IVA 19.259 50 C 0.401 0.200 0.300 - - - 90.10 90.10% V. Satisfactory
I & E Construction 10410 Const./Repair/Impvt. of Farm-to-Market Road, Brgy. Tamlong 09/03/09 IVA 9.641 129 C 0.347 0.200 0.300 - - - 84.70 *84.70%
Satisfactory
I & E Construction 10410 Const./Repair/Improvement of Brgy. Del Carmen FMR 09/03/09 IVA 9.643 129 C 0.340 0.200 0.300 - - - 84.00 *84.00%
Satisfactory
I & E Construction 10410 Impvt. of Manila East Road, Cardona-Pililla Section (with exception) 02/17/10 IVA 14.395 60 C 0.387 0.200 0.300 - - - 88.70 88.70%
Satisfactory
I & E Construction 10410Rehab/Repair of CSCFJ Road, Km. 51+880-Km. 53+955 (w/ exception)
Calamba Section02/24/10 IVA 19.900 15 C 0.365 0.200 0.300 - - - 86.50 86.50%
Satisfactory
I & E Construction 10410
Removal of Landslides and Restoration of Collapsed Stone
Masonry, Tagaytay-Taal Lake Road (Intermittent Section)
09/02/10 IVA 14.460 115 C 0.484 0.133 0.300 - - - 91.70 93.26% V. Satisfactory
I & E Construction 10410Impvt./Rehab. of Padre Burgos-Pototanin Jct. Road (Additional
Safety Warning Device)05/27/09 IV-A 9.995 45 C 0.475 0.133 0.300 - - - 90.80 *90.80%
V. Satisfactory
I & E Construction 10410Widening of Road at Old MSR Sta. Rosa Section, Laguna 1st District
inc. RROW acquisition06/01/09 IV-A 48.179 60 C 0.460 0.133 0.300 - - - 89.30 *89.30%
V. Satisfactory
I & E Construction 10410 Rehab./Reconst. of Road at Sta. Rosa-Ulat Tagaytay Road 06/01/09 IV-A 28.860 60 C 0.409 0.133 0.300 - - - 84.20 *84.20%
Satisfactory
I.A. Bosque Construction Corporation Mauban Port Improvement Project 04/11-15/11 PPA 32.798 403 O 34.750 30.000 5.266 3.000 7.000 1.667 81.68 -
I.A. Bosque Construction Corporation
Const of Mauban Port Improvement Project (Ports & Harbor) 02/15-18/11 PPA 32.797 403 O 0.387 0.291 0.087 0.030 0.064 0.017 87.62 -
I.D.A. Jr Builders & Construction Supply 32022 Const. of Drainage System @ Brgy.
69 & 14 03/18/09 VIII 0.964 60 C 0.471 0.200 0.300 - - - 97.10 *97.10% Outstanding
I.F. Blanco's Construction 25350 Rehab. of Calapan South Road, G.
Antonino-Sta. Maria Section 04/06/11 IVB 21.042 235 C 0.358 0.200 0.300 - - - 85.80 91.02% V. Satisfactory
I.N.C. Builders 25351 Conc. of FMR, Brgy. San Vicente 03/29/11 III 0.936 60 C 0.070 0.200 0.300 - - - 57.00 *57.00% Poor
Ian Jason Construction and Supply 26408
Road Upgrading (Conc.) PPNR, Jct. Taytay Poblacion Road Km.209+820 -
Km.210+95104/01/11 IVB 9.502 220 C 0.450 0.133 0.300 - - - 88.30 88.54%
Satisfactory
IBC Intenational Builders Corporation 8576
New Iloilo Airport Development Project (Construction of Secondary
Access Road)08/05/10 DOTC 121.222 210 O 0.355 0.300 0.107 0.030 0.070 0.050 91.20 -
IBC International Builders Corporation 8576
New Iloilo Airport Development Project (Construction of Secondary
Access Road)3/24/2011 DOTC 121.074 260 C 0.446 0.200 0.300 - - - 94.60 92.50%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page195
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
IBC International Builders Corporation 8576
Kalibo Airport Development Project (Rehabilitation/Repair of Old
Passenger Terminal Building, Power House and Fire Station Building
04/14/10 DOTC 3.814 120 C 0.456 0.200 0.300 - - - 95.60 95.60% V. Satisfactory
IBC International Builders Corporation 8576 Kalibo Airport Development Project
(Construction of Terminal Building) 04/15/10 DOTC 48.088 300 C 0.457 0.200 0.300 - - - 95.70 95.10% V. Satisfactory
IBC International Builders Corporation 8576 Kalibo Airport Development Project
(Expansion of Terminal Building) 04/15/10 DOTC 28.835 180 C 0.456 0.200 0.300 - - - 95.60 95.60% V. Satisfactory
IBC International Builders Corporation 8576
Asphalt Paving along Iloilo-Capiz Road (New Route) Pototan Section
Km. 21+619-Km. 23+61906/11/09 VI 14.424 78 C 0.429 0.200 0.300 - - - 92.90 *92.90%
V. Satisfactory
IBC International Builders Corporation 8576 Asphalt Overlay along Bacolod North
Road 03/03/09 VI 9.638 60 C 0.439 0.133 0.300 - - - 87.20 *87.20% Satisfactory
IBC International Builders Corporation 8576 Conc. of Iloilo-Capiz Road (Old
Route) 03/17/09 VI 28.319 374 C 0.434 0.200 0.300 - - - 93.40 82.78% Satisfactory
IBC International Builders Corporation 8576 Preventive Maintenance, Asphalt
Overlay of Iloilo-Capiz Road 03/19/09 VI 14.430 40 C 0.379 0.194 0.300 - - - 87.30 *87.30% Satisfactory
IBC International Builders Corporation 8576 Repair/Rehab. along Iloilo-Capiz
Road (New Route), Leganes-Zarraga 03/19/09 VI 9.608 30 C 0.438 0.194 0.300 - - - 93.20 *93.20% V. Satisfactory
IBC International Builders Corporation 8576 Widening of Dungon Bridge IV, Iloilo-
Jaro Diversion Road 03/02/09 VI 14.389 436 O 0.303 0.240 0.150 0.030 0.055 0.033 81.10 -
IBC International Builders Corporation 8576 Rehab. of Bacolod-South Road,
Dancalan Section Brgy. Dancalan 09/17/09 VI 33.775 127 C 0.432 0.168 0.300 - - - 90.00 88.92% Satisfactory
IBC International Builders Corporation 8576
Asphalt Overlay on existing pavement along Bacolod North Road
(E.B. Magalona Section)09/14/09 VI 13.963 90 C 0.428 0.133 0.300 - - - 86.10 *86.10%
Satisfactory
IBC International Builders Corporation 8576 Widening of Dungon Bridge IV Iloilo -
Jaro Diversion Road 09/01/09 VI 14.388 530 C 0.482 0.133 0.300 - - - 91.50 85.26% Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576
Road Upgrading of Cabatuan New Lucena, Banga-Bante Road, Km.46+060 - Km.46+720 with
exception
04/13/11 VI 16.808 297 C 0.443 0.178 0.300 - - - 92.10 *92.10% V. Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576Rehab. (Asphalt Overlay) of Bacolod South Road, Gil Montilla Section at
Brgy. Montilla04/11/11 VI 28.946 249 C 0.454 0.133 0.300 - - - 88.70 91.10%
V. Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576 Rehab. of Aklan East Road, Kalibo, Banga, Balete, Altavas 04/08/11 VI 73.274 270 C 0.344 0.191 0.300 - - - 83.50 87.10%
Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576Completion of Baltazar Aquino
Bridge, Phase II along Leon-Baucari Road
04/10/11 VI 101.349 390 O 0.335 0.240 0.150 0.030 0.056 0.050 86.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page196
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576Repair/Rehab. of Tiolas-Sinugbuhan
Rd. Km. 59+516-Km. 74+021 with exception
02/23/10 VI 9.628 55 C 0.433 0.200 0.300 - - - 93.30 93.30% V. Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576 Road Upgrading/Conc. of Tiolas-Sinugbuhan Rd. 02/23/10 VI 18.228 210 O 0.320 0.300 0.150 0.030 0.047 0.050 89.70 -
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576 Rehab./Reconst. of Farm to Market Rd. in Brgy. Tabuc Suba 03/12/10 VI 9.629 294 C 0.375 0.150 0.300 - - - 82.50 82.50%
Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576 Rehab./Reconst./Upgrading of Iloilo-Jaro Diversion Rd. 05/31/10 VI 1.849 30 C 0.450 0.133 0.300 - - - 88.30 88.30%
Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576 Road Upgrading of Tiolas-Sinugbuhan Rd. 06/08/10 VI 28.629 240 C 0.338 0.200 0.300 - - - 83.80 87.34%
Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576Rehab. (Asphalt Overlay) of Bacolod
South Road (Tiling Sect.) at Brgy. Tiling
06/05/10 VI 15.827 117 O 0.364 0.240 0.150 0.022 0.037 0.033 84.60 -
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576 Rehab./Repair/Impvt. of Molo Boulevard-Calumpang-Arevalo Road 09/08/10 VI 16.807 90 C 0.488 0.133 0.300 - - - 92.10 92.10%
V. Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576Rehab./Impvt. (Asphalt Overlay) of
Bacolod South Road, Km. 0+000-Km. 10+441 (with exceptions)
08/24/10 VI 35.368 131 C 0.482 0.133 0.300 - - - 91.50 91.50% V. Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corporation)
8576Rehab. (Asphalt Overlay) of Bacolod-South Road, Tiling Sect., Cauayan at
Brgy. Tiling08/25/10 VI 16.340 139 C 0.458 0.133 0.300 - - - 89.10 86.40%
Satisfactory
Icalina Builders and Construction Supply 26889
Conc. of Iligan-Bukidnon Road at Sitio Cabangahan Sect.,
Sta.1537+565 - Sta.1637+850 w/ exception, Brgy. Rogongon
04/10/11 X 9.279 160 C 0.412 0.133 0.300 - - - 84.50 *84.50% Satisfactory
Icalina Builders and Construction Supply 26889 Const. of 3-CL (2-Storey Type) SB,
Mancanhon E/S 05/25/09 X 3.081 140 O 0.295 0.300 0.080 0.030 0.013 0.033 75.10 -
Icalina Builders and Construction Supply 26889 Const. of 3 CL 2 Storey Sch. Bldg.,
Macanhan E/S 03/02/09 X 3.167 120 O 0.305 0.180 0.150 0.030 0.020 0.033 71.80 -
Icalina Builders and Construction Supply 26889 Const. of 3-CL (2-Storey Type) SB,
Mancanhan E/S 09/01/09 X 3.047 140 C 0.483 0.200 0.300 - - - 98.30 80.91% Unsatisfactory
IKM Builders & Construction Supply 30252
Rehab./Reconst./Upgrading of Damaged Roads along Lipa-Rosario
Rd., Antipolo del Norte Sect.08/18/10 IVA 9.644 90 C 0.477 0.133 0.300 - - - 91.00 86.80%
Satisfactory
Ilfreo Construction & Trading 22671 Rehab./Reconst./Upgrading of Gen.
Luna St., 05/26/09 NCR 9.602 105 C 0.382 0.200 0.300 - - - 88.20 *88.20% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page197
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ILG Enterprises 31985 Impvt. of River Control, Brgy. Poblacion V 05/25/10 IVA 4.819 107 O 0.400 0.240 0.150 0.020 0.037 0.033 88.00 -
ILG Enterprises 31985 Const. of Road, TG Cruz, Brgy. Duhat 05/24/10 IVA 0.688 30 C 0.408 0.133 0.300 - - - 84.10 84.10%
Satisfactory
ILG Enterprises 31985 Conc. of FMR Brgy. Cansuso to Sitio Calminue 02/28/09 IVA 0.956 60 C 0.450 0.133 0.300 - - - 88.30 *88.30%
Satisfactory
ILG Enterprises 31985 Construction of Rural Health Unit 02/22/10 IVA 0.980 55 C 0.451 0.200 0.300 - - - 95.10 95.10% V. Satisfactory
ILG Enterprises 31985 Impvt. of River Control, Brgy. Burgos 08/21/10 IVA 4.819 88 C 0.500 0.133 0.300 - - - 93.30 93.30% V. Satisfactory
IM Construction Corporation 20074 Const. of MPB at Commonwealth E/S 04/07/11 NCR 4.208 90 O 0.389 0.288 0.150 0.030 0.047 0.033 93.70 -
IM Construction Corporation 20074 Const. of MPB, Zone 15 03/28/11 NCR 1.375 67 C 0.475 0.161 0.300 - - - 93.60 *93.60%
V. Satisfactory
IM Construction Corporation 20074
Rehab./Reconst./Upgrading of Damaged Paved at Marikina-San
Mateo Rd.04/06/11 NCR 9.167 150 C 0.491 0.117 0.300 - - - 90.80 *90.80%
V. Satisfactory
IM Construction Corporation 20074 Rehab. of Old Cagayan Valley Road 03/04/10 III 13.348 80 C 0.412 0.200 0.300 - - - 91.20 89.70%
V. Satisfactory
IM Construction Corporation 20074
Const./Conc. of Sections of the 3rd Bulacan Circumferential Rd. Network
Gen. Alejo Santos Highway to Jct. CVR via San Rafael
06/11/10 III 47.642 210 C 0.400 0.200 0.300 - - - 90.00 89.52% V. Satisfactory
IM Construction Corporation 20074
Rehab. (Slope Protection) of San Mateo-Rodriguez Rd. (Intermittent
Sect.), Km.33+000, Brgy. San Rafael06/09/10 IVA 4.804 45 C 0.357 0.200 0.300 - - - 85.70 85.70%
Satisfactory
IM Construction Corporation 20074 Rehabilitation of Sta. Rita-Camias
Road 09/07/09 III 19.046 110 C 0.448 0.133 0.300 - - - 88.10 92.12% V. Satisfactory
IM Construction Corporation 20074 Rehabilitation of Roads including
Drainage 05/27/09 NCR 9.504 120 C 0.402 0.200 0.300 - - - 90.20 *90.20% V. Satisfactory
IM Construction Corporation 20074 Const. of 3-Storey, 6-Classroom
School Building, Gen T. De Leon E/S 03/03/09 NCR 11.416 150 C 0.388 0.200 0.300 - - - 88.80 *88.80% Satisfactory
IM Construction Corporation 20074
Rehab., Reconst. of Damaged Paved (Concrete Blocking along EDSA, Quezon Ave. Annapolis, South
Bound
09/11/09 NCR 9.951 161 C 0.454 0.133 0.300 - - - 88.70 *88.70% Satisfactory
IM Construction Corporation 20074 Repair/Rehab. of Various Roads &
Alleys in Brgy. Baritan 09/17/09 NCR 0.475 60 C 0.433 0.133 0.300 - - - 86.60 *86.60% Satisfactory
IM Construction Corporation 20074 Conc. of Road of Fishermans Wharf,
(Phase 2), Brgy. La Huerta 09/03/09 NCR 0.953 30 C 0.331 0.133 0.300 - - - 76.40 *76.40% Unsatisfactory
IM Construction Corporation 20074
Completion of MPB (Package A) R. Medina Compound, Brgy. San
Dionisio09/03/09 NCR 0.997 60 O 0.305 0.203 0.150 0.030 0.023 0.025 73.60 -
IM Construction Corporation 20074 Const. of Batasan National High
School 03/01/10 NCR 11.563 264 C 0.387 0.200 0.300 - - - 88.70 88.70% Satisfactory
IM Construction Corporation 20074 Rehab./Reconst./Upgrading of
Damaged Pavement @ A. Mabini St. 05/31/10 NCR 14.828 90 C 0.449 0.200 0.300 - - - 94.90 94.90% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page198
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
IM Construction Corporation 20074
Rehab./Reconst./Upgrading of Damaged Paved (Concrete Blocking
and Asphalt Overlay of V. Luna Road)
05/27/10 NCR 5.322 30 C 0.432 0.200 0.300 - - - 93.20 93.20% V. Satisfactory
IM Construction Corporation 20074
Completion of Two (2) Storey, Four (4) Classroom Sch. Bldg. at
Bagbaguin Elementary School08/19/10 NCR 0.570 30 C 0.344 0.133 0.300 - - - 77.70 77.70%
Unsatisfactory
INC Builders 25351 Construction of Multi-Purpose Building 02/23/09 III 0.478 44 C 0.338 0.200 0.300 - - - 83.80 *83.80%
Satisfactory
Infra Builders & Sellers Phils. 9391
Conc. of Basud-Tagaytay-Baligang-Taladong-Comon-Inarado-
Peñafrancia Road, Comon-Inarado Road Section
05/27/09 V 19.100 240 O 0.319 0.300 0.150 0.023 0.035 0.033 86.00 -
Interior-Philoworks Construction (JV) JV-06-026 Const./Impvt. of Libon-Marocmoc-
Pantao Road 05/28/09 RRNDP 22.890 566 O 0.363 0.300 0.137 0.030 0.045 0.050 92.50 -
Interior-Philoworks Construction (JV) JV-06-026 Contract Package III, Libon-
Marocmoc, Pantao Road 03/07/09 RRNDP 212.890 566 O 0.374 0.300 0.137 0.030 0.056 0.050 94.70 -
Interior-Philoworks Construction (JV) JV-06-036 Const./Impvt. of Libon-Marocmoc-
Pantao Road 02/28/10 RRNDP 223.130 616 C 0.460 0.133 0.300 - - - 89.30 91.88% V. Satisfactory
IRA Construction 33159 Construction of Drainage System, Brgy. Buhangin 05/27/09 III 0.936 90 C 0.482 0.200 0.300 - - - 98.20 *98.20%
Outstanding
IRA Construction 33159 Concreting of Road Sitio Setan, Calabuanan 03/03/09 III 0.934 75 C 0.425 0.133 0.300 - - - 85.80 *85.80%
SatisfactoryIRA Construction / ZF
Construction (JV) JV-08-197 Concreting of Road from PCA to Cabitukulan, Brgy. Reserva 09/08/09 III 9.441 150 C 0.431 0.133 0.300 - - - 86.40 *86.40%
SatisfactoryIsabela EBC Builders &
Construction 26089 Restoration of Dammang West Revetment 04/11/11 II 5.790 90 C 0.400 0.133 0.300 - - - 83.30 *83.30%
Satisfactory
Isaga Builders 8652
Rehab./Reconst. of Damaged Paved National Road Abbut-Conner-
Kabugao Road (Gangat-Calafug Sect.)
04/02/11 CAR 9.814 388 O 0.378 0.237 0.150 0.030 0.048 0.050 89.30 -
Isaga Builders 8652Proposed Rehab./Impvt. along
Calanasan-Claveria Road, Magnas Section
02/27/09 CAR 9.272 416 O 0.282 0.287 0.150 0.030 0.043 0.033 82.50 -
Isaga Builders 8652Rehab. of National Road along Abbut-Conner-Kabugao Road (KO539+000 -
KO564+532)09/05/09 CAR 9.344 359 C 0.482 0.133 0.300 - - - 91.50 90.00%
V. Satisfactory
Isaga Builders 8652 Rehab. / Impvt. along of Calanasan-Claveria Road, Magnas Section 09/05/09 CAR 9.120 438 O 0.368 0.240 0.150 0.030 0.056 0.033 87.70 -
Isaga Builders 8652 Rehab. of Abbut-Conner-Kabugao Road (Calafug-Mabubua Section) 05/28/10 CAR 7.290 330 C 0.430 0.200 0.300 - - - 93.00 87.06%
Satisfactory
Isaga Builders 8652
Rehab./Reconst. of Damaged National Road Abbut-Conner-
Kabugao Road (Gangat-Calafug Section)
08/20/10 CAR 9.788 360 O 0.380 0.240 0.150 0.030 0.040 0.033 87.30 -
ISH Construction Construction of Three (3) Storey 15-Classroom School Bldg. (Building) 11/12/10 NHA 21.887 150 O 0.388 0.166 0.093 0.020 0.044 0.050 76.14 -
ISH Construction 30407 Construction of 3-Storey, 15-Classroom School Building 06/08/09 NHA 18.108 150 O 0.391 0.300 0.150 0.015 0.000 0.050 90.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page199
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
ISH Construction 30407Const. of Multi-Purpose Covered
Court, Function Hall and Day Care Center
07/24/09 NHA 14.742 120 O 0.379 0.259 0.150 0.030 0.070 0.050 93.80 -
ISH Construction 15757 Construction of One (1) Unit, Three Storey 15 Classroom School 09/22/10 NHA 19.906 195 C 0.48 0.20 0.30 - - - 98.00 92.80%
V. Satisfactory
ISH Construction Inc. 30407 Construction of Three-Storey School Building (12 Classrooms) 07/10/08 SLB 17.201 150 O 0.400 0.246 0.100 0.020 0.053 0.100 91.80 -
ISH Construction, Inc. 30407 San Isidro Resettlement Project 03/2-4/2010 NHA 13.266 150 O 0.3787 0.3000 0.1058 0.03 0.05 0.05 91.45 -
ISH Construction, Inc. 30407Const. of Multi-Purpose Covered
Court, Functional Hall and Day Care Center Building
10/22/09 NHA 14.409 120 C 0.500 0.200 0.300 - - - 96.17 96.17% Outstanding
Italian-Thai Development Public Company, Ltd. FC-05-009 Contract Package IV-A Suyo
Cervantes Road, ARLDP, Phase V 08/18/10 PJHL 1,184.170 1,268 C 0.408 0.200 0.300 - - - 90.80 94.22% V. Satisfactory
ITP Construction Inc. 9392 Const. of 3-Storey 15-Classroom School Building 07/30/09 NHA 18.111 150 O 0.400 0.299 0.150 0.030 0.058 0.050 98.70 -
ITP Construction Inc. 9392 Const. of one (1) Three-Storey School Building 12/11/09 NHA 19.920 195 C 0.500 0.200 0.300 - - - 99.09 99.09%
Outstanding
ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building 09/24/08 NHA 17.202 150 O 0.395 0.286 0.030 0.020 0.053 0.033 81.62 -
Ivahrick Contractors 13688 Riprapping of Creek along Tripa De Gallina, Brgy. 158 04/14/11 NCR 2.063 116 O 0.360 0.240 0.150 0.030 0.023 0.033 83.60 -
Ivahrick Contractors 13688 Const. of Flood Control 02/25/09 NCR 2.858 94 C 0.340 0.200 0.300 - - - 84.00 77.64% Unsatisfactory
Ivy Michelle Trading & Construction 24093
Road Upgrading (Conc.) of Jct. Paglaum-Bato Road, Sta.195+060 -
Sta.197+50004/01/11 IVB 34.800 160 C 0.444 0.135 0.300 - - - 87.90 84.45%
Satisfactory
Ivy Michelle Trading & Construction 24093 Conc. of Quezon-Aramaywan Road 03/29/11 IVB 31.966 268 C 0.347 0.194 0.300 - - - 84.10 82.96%
SatisfactoryIvy Michelle Trading &
Construction 24093 Conc. of QuezonAramaywan Road (Tabon Section) 09/11/09 IVB 24.965 224 C 0.411 0.200 0.300 - - - 91.10 88.37%
SatisfactoryIvy Michelle Trading &
Construction 24093 Conc. of PPSR Jct. Napsan-Apurawan Rd. 06/04/10 IVB 38.131 220 O 0.349 0.225 0.120 0.030 0.051 0.033 80.80 -
J & A Pimentel Construction 7953 Conc. of NRJ Cagwait-White Beach
Road inc. Bridge 04/04/11 XIII 19.254 180 C 0.317 0.200 0.300 - - - 81.70 85.18% Satisfactory
J & A Pimentel Construction 7953 Road Upgrading (Gravel to Concrete)
Jct. Gamut-San Miguel, Bayugan 04/04/11 XIII 19.255 180 C 0.401 0.133 0.300 - - - 83.40 83.22% Satisfactory
J & A Pimentel Construction 7953 Completion of MPB Brgy. Parang 03/02/10 XIII 0.920 90 C 0.473 0.133 0.300 - - - 90.60 90.60%
V.SatisfactoryJ & A Pimentel Construction 7953 Const. of Tandag Shore Protection 03/03/10 XIII 13.855 150 C 0.432 0.133 0.300 - - - 86.50 86.50%
SatisfactoryJ & A Pimentel Construction 7953 Const. of Multi-Purpose Bldg. 03/02/10 XIII 0.922 90 C 0.417 0.133 0.300 - - - 85.00 85.00%
SatisfactoryJ & A Pimentel Construction 7953 Impvt./Conc. of Telaje Road 06/09/10 XIII 6.470 120 O 0.381 0.240 0.150 0.030 0.040 0.033 87.40 -
J & A Pimentel Construction 7953 Completion of MPB Brgy. San Pedro 08/31/10 XIII 0.917 60 C 0.466 0.133 0.300 - - - 89.90 89.90%
V. SatisfactoryJ & A Pimentel Construction 7953 Impvt./Conc. of Telaje Road 09/02/10 XIII 6.470 150 C 0.404 0.200 0.300 - - - 90.40 88.60%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page200
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
J & A Pimentel Construction 7953 Construction of Balibadon 4 Bridge,
Balibadon 06/04/09 XIII 18.988 240 C 0.457 0.200 0.300 - - - 95.70 91.20% V. Satisfactory
J & A Pimentel Construction 7953 Const. of Tandag Shoreline
Protection Project (Ph. 2) 09/08/09 XIII 13.850 209 C 0.486 0.133 0.300 - - - 91.90 92.23% V.Satisfactory
J & A Pimentel Construction 7953 Conc. of Junction Cortes-Nurcia
Section (SDCR) 03/11/09 XIII 19.280 150 C 0.361 0.200 0.300 - - - 86.10 79.92% Unsatisfactory
J & A Pimentel Construction 7953 Construction of Tandag Shoreline
Protection Project (Phase II) 03/12/09 XIII 13.851 150 O 0.375 0.240 0.150 0.030 0.035 0.050 88.00 -
J D E Construction 19173 Const. of Two (2) unit CL @ West City Central School 08/23/08 X 0.932 75 C 0.371 0.200 0.300 - - - 87.10 82.62%
V. SatisfactoryJ L A Construction &
Supplies 24503 Construction of Multi-Purpose Building, Brgy. Sibulan 03/07/09 XI 2.854 110 C 0.365 0.200 0.300 - - - 86.50 *86.50%
SatisfactoryJ L V Construction and
Supply 9953 Impvt./Rehab. of Road 03/05/09 IV-A 9.645 30 C 0.476 0.133 0.300 - - - 90.90 *90.90% V. Satisfactory
J. C Baac Construction Corporation 25974
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase II,
Suyo-Tangadan Section03/04/09 CAR 47.214 360 O 0.385 0.296 0.150 0.030 0.032 0.033 92.60 -
J. C Baac Construction Corporation 25974
Impv't/Rehab Larion Alto-Cabbo-Baliuag Road (going to Callao
Alternate Route)02/27/09 II 19.143 230 O 0.328 0.300 0.116 0.030 0.550 0.033 135.70 -
J. C Baac Construction Corporation 25974 Impvt./Rehab. of Balbalan-Pinukpuk
Road 11/18/08 CAR 26.052 260 O 0.323 0.234 0.100 0.020 0.030 0.067 77.40 -
J. C. De la Vega Construction Supply 30160
Const. of Repair/Replacement of Nine (9) Sets of Mooring Fixtures
(Ports & Harbor)03/8-9/11 PPA 1.420 43 O 0.498 0.200 0.300 - - - 99.77 *99.77%
Outstanding
J. Cordon Construction & Supply 32982 Repair of School Bldg. at Leon
National High School 03/05/10 VI 1.440 90 O 0.296 0.300 0.150 0.015 0.027 0.033 82.10 -
J. Cordon Construction & Supply 32982 Repair of School Bldg., Leon
National High School 06/18/10 VI 1.440 90 C 0.450 0.133 0.300 - - - 88.30 83.96% Satisfactory
J. Cordon Construction & Supply 32982 Const. of 2-CL School Building, Leon
National High School 09/10/09 VI 0.925 60 C 0.441 0.099 0.300 - - - 84.00 *84.00% Satisfactory
J. Custorio Construction 16237 Const. of Catarman Bridge along Catarman-Laoang Road 05/26/09 VIII 9.419 150 O 0.360 0.240 0.150 0.030 0.050 0.033 86.30 -
J. Custorio Construction 16237Rehab./Reconst./Upgrading of
Damaged Paved National Roads, along Catarman-Calbayog Road
05/26/09 VIII 9.425 120 O 0.331 0.233 0.150 0.030 0.050 0.033 82.70 -
J. Custorio Construction 16237 Impvt./Rehab. of Dagansa-Libjo Road 03/07/09 VIII 4.797 60 O 0.314 0.300 0.050 0.020 0.037 0.050 77.10 -
J. Custorio Construction 16237 Const. of Catarman Bridge along Catarman-Laoang Road 09/14/09 VIII 9.419 172 O 0.345 0.240 0.150 0.030 0.045 0.033 84.30 -
J. Marbela Construction & Supply 24268 Construction of Administration
Building Ph.I 11/11/10 DOST 9.134 270 C 0.47 0.20 0.30 - - - 97.00 97.00% Outstanding
J. Simeon Construction 31867 Repair of Sch. Bldg. at Cayetano Arellano Elementary School 08/19/10 NCR 0.579 120 C 0.492 0.133 0.300 - - - 92.50 92.50%
V. Satisfactory
J.C Baac Construction Corporation 25974
Impvt./Rehab. of Larion Alto-Cabbo-Baliuag Peñablanca Road (going to
Callao Alternate Route)02/16/10 II 19.131 346 C 0.365 0.200 0.300 - - - 86.50 86.80%
Satisfactory
J.C Baac Construction Corporation 25974 Improvement/Rehabilitation of
Balbalan-Pinukpuk Road 05/28/09 CAR 26.052 260 C 0.376 0.200 0.300 - - - 87.60 81.48% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page201
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
J.C Baac Construction Corporation 25974
Impvt./Rehab. of Kalinga-Abra Road Km. 469+000-476+000 (with
exception)09/02/09 CAR 9.392 308 C 0.416 0.133 0.030 - - - 57.90 *84.90%
Satisfactory
J.C Baac Construction Corporation 25974
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase II,
Suyo-Tangadan Section02/23/10 CAR 47.214 437 C 0.438 0.140 0.300 - - - 87.80 90.68%
V. Satisfactory
J.C Baac Construction Corporation 25974
Impvt./Rehab. Larion Alto-Cabbo-Baliuag Road (Going to Callao
alternate Route)05/18/09 II 19.134 281 O 0.371 0.247 0.150 0.030 0.047 0.033 87.80 -
J.C. Ferrer Construction 11657 Const. of Sch. Bldg., Basista Central School 04/11/11 I 1.157 30 C 0.452 0.133 0.300 - - - 88.50 *88.50%
Satisfactory
J.D Legaspi Construction 9608 Const. of 616 L.M. Manukan Seawall 09/01/10 IX 47.732 511 O 0.228 0.300 0.150 0.030 0.047 0.050 80.50 -
J.D Legaspi Construction 9608
Rehab. of Daang Maharlika Highway, Package I, Section 4 (Allen-Malaga
Section) Km. 669+364.55-Km.674+560.55 with exceptions
03/04/10 VIII 120.582 175 C 0.437 0.133 0.300 - - - 87.00 87.00% Satisfactory
J.D Legaspi Construction 9608
CP-7: Impvt./Conc. of Surigao Del Sur-Davao Oriental Coastal Road, (Manay-Boston) Baganga Section,
Phase II
03/04/10 XI 191.766 597 C 0.351 0.200 0.300 - - - 85.10 86.03% Satisfactory
J.D Legaspi Construction 9608 Construction of Solano-Quezon Road 03/12/09 II 62.893 540 O 0.365 0.300 0.150 0.030 0.055 0.050 95.00 -
J.D Legaspi Construction 9608
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road, (Manay-
Boston) Baganga Section PhaseII, C P No 7
09/06/09 XI 191.035 597 O 0.380 0.300 0.150 0.030 0.042 0.033 93.50 -
J.D Legaspi Construction/VUC Engineering Joint
Venture
JV-08-148
Conc. of Bontoc-Tabuk-Tuguegarao Road (Package BLT-15a), Tinglayan Boundary-Lubuagan-Tabuk Sect. II,
Km. 475.719 - Km.483+500, Gawidan-Balani Sect.
05/30/10 CAR 175.945 427 C 0.357 0.200 0.300 - - - 85.70 85.16% Satisfactory
J.D Legazpi Construction 9608 Construction of Solano-Quezon Road 06/02/09 II 62.893 540 O 0.373 0.300 0.150 0.030 0.051 0.050 95.40 -
J.D. Legaspi Construction 9608 Const. of Sto. Tomas - Manabo
Bridge 04/14/11 CAR 96.009 380 C 0.440 0.196 0.300 - - - 93.60 *93.60% V. Satisfactory
J.D. Legaspi Construction 9608 Rehab./Upgrading along Laoag-
Sarrat-Piddig-Solsona Road 04/03/11 I 42.714 191 O 0.312 0.294 0.150 0.030 0.033 0.033 85.20 -
J.D. Legaspi Construction 9608 Const. of 616 L.M. Manukan Seawall 04/14/11 IX 47.732 542 O 0.393 0.240 0.150 0.024 0.029 0.033 86.90 -
J.D. Legaspi Construction / BHM Construction (JV)
JV-08-152
Conc. of Bontoc-Tabuk-Tuguegarao Rd. (Package BLT-13a) Tinglayan Bdry. Lubuagan-Tabuk Section II
Km.467+000 - Km.471+838 Cagaluan-Gaogao Section
04/04/11 CAR 94.203 484 C 0.456 0.133 0.300 - - - 88.90 83.90% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page202
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
J.D. Legaspi/Unitec (JV) JV-08-187
Const./Road Opening of Zamboanga West Coast Road, Sibuco-Sirawai Road (Phase II), Anongan-Cawit-
Cawit Section, Sta.19+000.00-Sta.25+320.00
03/31/11 IX 179.772 720 C 0.440 0.200 0.300 - - - 94.00 *94.00% V. Satisfactory
J.E Arradaza Construction and Supply 33256 Const. of Drainage System, Nasipit
Main Road going to Family Park 09/18/09 VII 1.152 89 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory
J.E Arradaza Construction and Suppy 33256 Const. /Repair/Impvt. of MPB at Brgy.
Pardo 09/02/10 VII 1.155 65 O 0.376 0.268 0.119 0.015 0.023 0.033 83.40 -
J.E Manalo and Company, Inc. 422 New Port of San Jose 05/04-06/11 PPA 148.337 514 O 0.365 0.292 0.150 0.030 0.070 0.050 95.70 -
J.E Manalo and Company, Inc. 422 New Port of San Jose 10/04-06/11 PPA 148.337 514 O 0.499 0.200 0.300 - - - 99.89 97.24%
OutstandingJ.E Manalo and Company, Inc. 422 Const. of Proposed New Port of San
Jose (Ports & Harbor) 02/8-10/11 PPA 148.336 514 O 0.353 0.300 0.150 0.030 0.070 0.050 95.24 -
J.E. Arradaza Construction and Supply 33256 Const./Repair/Impvt. of MPB at Brgy.
Pardo 04/14/11 VII 1.155 65 C 0.428 0.200 0.300 - - - 92.80 86.22% Satisfactory
J.G Garcia Construction 21054 Opening/Rehab of Farm to Market Road at Two Brgys. 03/09/09 I 0.964 30 C 0.418 0.200 0.300 - - - 91.80 *91.80%
V. Satisfactory
J.G Oranza Construction 33370 Const. of Multi-Purpose Building (Additional), Brgy. Poblacion 03/12/10 XII 1.412 60 C 0.483 0.144 0.300 - - - 92.70 92.70%
V. Satisfactory
J.G Oranza Construction 33370 Completion of Various MPB @ TESDA, Brgy. Lagao 06/17/10 XII 3.527 120 C 0.407 0.133 0.300 - - - 84.00 84.00%
Satisfactory
J.G Oranza Construction 33370 Construction of Multi-Purpose Building, Brgy. Poblacion 03/20/09 XII 0.847 60 C 0.475 0.200 0.300 - - - 97.50 *97.50%
Outstanding
J.G. Garcia Construction 21054 Const. of Sch. Bldg. @ Two (2) Brgy. Dagupan City, Bonuan Boquig NHS 04/12/11 I 1.184 30 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
J.G. Oranza Construction 33370 Const. of 4 CL School Bldg., Dadiangas North H/S, Brgy. North 04/14/11 XII 2.668 120 C 0.471 0.171 0.300 - - - 94.20 *94.20%
V. Satisfactory
J.G. Oranza Construction 33370 Const. of 4 CL School Building, Lanton E/S, Brgy. Apopong 04/14/11 XII 2.668 120 C 0.460 0.164 0.300 - - - 92.40 *92.40%
V. Satisfactory
J.H Pajara Construction Corp. 1890
CP 6, Restoration of Patapat Viaduct under the Arterial Road Links Dev.
Project, Phase V11/15/08 PJHL 187.597 395 O 0.379 0.300 0.100 0.030 0.070 0.100 97.90 -
J.H Pajara Construction Corp. 1890 Const. of Calaba Bridge &
Approaches (Phase I) 02/24/09 Sp. Bridges 177.680 1,002 O 0.396 0.289 0.000 0.030 0.055 0.033 80.30 -
J.I Etac Construction & Supply 32722 Repair of Salvacion E/S 03/07/09 VIII 0.254 90 C 0.417 0.133 0.300 - - - 85.00 *85.00%
SatisfacoryJ.I Etac Construction &
Supply 32722 Repair/Rehab. of San Antonio Seawall 03/07/09 VIII 1.918 180 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfacory
J.M Luciano Construction, Inc. 2083
Conc. of Surigao-Davao Coastal Road (Aras-asan-Marihatag
Subsection) along Cortes-Tandag-Marihatag Section
09/02/10 XIII 266.809 615 C 0.401 0.151 0.300 - - - 85.20 87.80% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page203
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
J.M Maligaya Construction &
Construction Supply15018 Repair/Rehab. of Tagaytay-Batangas
via Tuy Rd. 06/03/10 IVA 10.296 30 C 0.458 0.200 0.300 - - - 95.80 95.80% V. Satisfactory
J.M Maligaya Construction &
Construction Supply15018 Rehab./Reconst. of Noveleta-Naic-
Tagaytay Road 09/09/09 IVA 24.075 131 C 0.329 0.200 0.300 - - - 82.90 84.58% Satisfactory
J.M Maligaya Construction &
Construction Supply15018 Asphalt Overlay at Brgy. Poblacion 3 02/25/10 IVA 0.495 10 C 0.417 0.200 0.300 - - - 91.70 91.70%
V. Satisfactory
J.M Maligaya Construction &
Construction Supply15018
Road Opening/Const. of Aguinaldo-Magallanes-Nasugbu Road (East-
West), Gulod Section09/02/10 IVA 57.900 195 O 0.331 0.254 0.150 0.030 0.055 0.050 87.00 -
J.M Maligaya Construction &
Construction Supply15018
Rehab./Reconst. of Damaged Paved National Roads along Maragondon-
Magallanes-Amuyong Road09/02/10 IVA 4.810 90 C 0.346 0.200 0.300 - - - 84.60 84.60%
Satisfactory
J.M Maligaya Construction &
Construction Supply15018 Conc. of Noveleta-Naic-Tagaytay
Road 06/03/09 IV-A 28.880 150 C 0.440 0.133 0.300 - - - 87.30 88.32% Satisfactory
J.M. Luciano Construction, Inc.
(Formerly: J.M. Luciano Construction)
2083 Const./Impvt. along Surigao-Davao Coastal Road, Cortes-Lanuza Sect. 04/05/11 XIII 96.500 300 O 0.321 0.300 0.150 0.030 0.055 0.050 90.60 -
J.M. Luciano Construction, Inc.
(Formerly: J.M. Luciano Construction)
2083 Contract Package VII, Const./Impv't of Prosperidad-Lianga Road 03/31/11 RRNDP 419.755 622 C 0.315 0.200 0.300 - - - 81.50 85.22%
Satisfactory
J.M. Maligaya Construction &
Construction Supply15018 Conc. of FMR, Sitio Cay-apas
Barangay Medina 04/13/11 IVA 2.866 60 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory
J.M. Maligaya Construction &
Construction Supply15018
Road Opening/Const. of Aguinaldo-Magallanes-Nasugbu Road (East-
West Road), Gulod Sect.04/13/11 IVA 57.900 399 O 0.347 0.300 0.108 0.024 0.051 0.033 86.30 -
J.N Dela Torre Construction 24978 Rehab./Regravelling of Highway-
Panisiran FMR 03/02/10 IVB 0.949 90 C 0.353 0.200 0.300 - - - 85.30 85.30% Satisfactory
J.N Dela Torre Construction 24978 Const./Regravelling of Jagmis FMR 08/18/10 IVB 0.930 90 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
J.P Aquino & Bros. (Engineers, Developers,
Architects, Builders)13231 Concreting of Getha Road (College
of Holy Spirit) 05/23/09 III 1.504 60 C 0.260 0.200 0.300 - - - 76.00 *76.00% Unsatisfactory
J.P Aquino & Bros. (Engineers, Developers,
Architects, Builders)13231 Const. of 2 CL S.B. at Cristo Rey
High School 09/01/09 III 0.970 90 C 0.484 0.133 0.300 - - - 91.70 *91.70% V. Satisfactory
J.Q.G Construction 10530
Const. of Additional Work Items Contiguous to Traffic Management
along Manila North Road (MNR) Package I
06/02/09 III 16.518 119 C 0.368 0.200 0.300 - - - 86.80 *86.80%Satisfactory
J.R.C.F Construction 31641 Repair/Renovation of MPB at Brgy. Pinyahan 02/26/10 NCR 1.434 30 C 0.482 0.200 0.000 - - - 68.20 69.88%
Poor
J.S General Contractor 15258 Conc.of Tanza-Trece Martires City-Indang Road 09/09/09 IVA 9.630 120 C 0.323 0.200 0.300 - - - 82.30 84.70%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page204
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
J.S General Contractor 15258 Completion of MPB at Brgy. Sabutan 02/26/10 IVA 0.396 60 C 0.455 0.200 0.300 - - - 95.50 95.50% V. Satisfactory
J.S General Contractor 15258 Completion of Secondary School Building at Amadeo NHS 02/26/10 IVA 2.391 90 C 0.443 0.200 0.300 - - - 94.30 94.30%
V. Satisfactory
J.S General Contractor 15258 Concreting of Brgy. Bagong Tubig Road 02/26/10 IVA 6.726 179 C 0.386 0.200 0.300 - - - 88.60 88.60%
Satisfactory
J.S General Contractor 15258 Const. of MPB at Poblacion 7 09/01/10 IVA 0.498 120 C 0.477 0.133 0.300 - - - 91.00 91.00% V. Satisfactory
J.S General Contractor 15258Rehab./Reconst. of Damaged Paved Nat'l Roads along Tagaytay-Talisay
Road09/02/10 IVA 9.634 80 C 0.344 0.200 0.300 - - - 84.40 90.10%
V. Satisfactory
J.S General Contractor 15258 Const. of Flood Control Structures along Alulod Creek 06/03/09 IV-A 1.436 45 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
J.S General Contractor 15258 Const. of Canal Lining at Brgy. Limbon 06/03/09 IV-A 0.286 90 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V. Satisfactory
J.S General Contractor 15258 Concreting of Tanza-Trece Martirez City-Indang Road 06/03/09 IV-A 9.630 120 O 0.368 0.240 0.150 0.030 0.025 0.050 86.30 -
J.S General Contractor 15258 Const. of Canal Lining at Brgy. Poblacion 2 06/03/09 IV-A 0.287 90 C 0.425 0.133 0.300 - - - 85.80 *85.80%
Satisfactory
J.S. General Contractor 15258 Const. of San Agustin Bridge 04/13/11 IVA 19.281 168 C 0.471 0.200 0.300 - - - 97.10 89.12% V. Satisfactory
J.S. Layson & Co. Inc 2653 Proposed Repair of Iloilo Passenger Terminal Building 10/24-27/11 PPA 15.362 180 C 0.490 0.200 0.300 - - - 98.99 *98.99%
Outstanding
J.T Gamolo Construction 15759Road Upgrading (Gravel to Paved) Jct. Dologon-Kisanday-Guinoyoran
Road Sect.09/03/10 X 4.715 75 C 0.478 0.147 0.300 - - - 92.50 91.00%
V. Satisfactory
J.T Gamolo Construction 15759 Const. of Multi-Purpose Building, Baclayon 05/27/09 X 1.409 120 C 0.404 0.133 0.300 - - - 83.70 *83.70%
Satisfactory
J.T Gamolo Construction 15759 Completion of MPB @ Poblacion 03/04/09 X 1.412 90 C 0.363 0.200 0.300 - - - 86.30 *86.30% Satisfactory
J.T Gamolo Construction 15759Road/Upgrading (Gravel to Paved) of
Jct. S.H. Manolo Fortich-Libona-Indahag Road (Pob. Kihare Section)
09/04/09 X 19.219 150 C 0.461 0.150 0.300 - - - 91.10 91.76% V. Satisfactory
J.T. Gamolo Construction 15759 Const. of MPB 03/30/11 X 0.969 75 C 0.487 0.133 0.300 - - - 92.00 89.06% V. Satisfactory
J.T. Gamolo Construction 15759 Const. of MPB 03/30/11 X 3.753 210 O 0.267 0.300 0.150 0.030 0.048 0.050 84.50 -
J.T. Gamolo Construction 15759
Road Upgrading (Gravel to Concrete) of Jct. Maradugao-Camp Kibaritan-
Dominorog Road (Malinao Sect.) Sta.0+000 - Sta.0+910
04/01/11 X 18.952 202 C 0.397 0.133 0.300 - - - 83.00 *83.00% Satisfactory
J.T. Gamolo Construction 15759Access Roads to RORO Port Roads Central Nautical Highway Cagayan
de Oro City Domestic Port Road03/28/11 X 11.537 244 C 0.411 0.133 0.000 - - - 54.40 76.72%
Unsatisfactory
J.V Lagon Construction Corporation 11561
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Marbel-Makar Road06/06/09 R-XII 14.317 224 O 0.318 0.254 0.150 0.012 0.055 0.017 80.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page205
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
J.V Lagon Construction Corporation 11561
Rehab./Reconst. of Damaged Roads Dulawan-Marbel (Tacuromg-New
Carmen Section)06/02/09 R-XII 19.022 435 O 0.380 0.300 0.000 0.030 0.060 0.017 78.70 -
J.V Loreto Const. & Dev't. Corp. 13120 Rehab./Reconst./ Upgrading of
Pawing-Campetic Road 03/11/10 VIII 11.560 195 C 0.473 0.133 0.300 - - - 90.60 88.56% Satisfactory
J.V. Loreto Const. & Development,
Corp./Viguz Const. Corp. (JV)
JV-09-091 Rehab./Reconst. of Daang Maharlika Dulag-Mc-Arthur Road Section 09/09/10 VIII 47.233 192 C 0.463 0.133 0.300 - - - 89.60 89.84%
V. Satisfactory
J.Y.M Construction and Development
Corporation (Formerly: JYM Const. & Devt.
Enterprises)
9100
Rehab./Reconst. of Damaged Paved (Concrete Blocking along E.
Rodriguez Sr. Ave.) Araneta-Aurora Blvd.
09/11/09 NCR 9.600 161 C 0.434 0.133 0.300 - - - 86.70 *86.70% Satisfactory
J.Y.M Construction and Development
Corporation (Formerly: JYM Const. & Devt.
Enterprises)
9100Rehab./Reconst./Upgrading of
Damaged Paved (Concrete Blocking of East Ave.)
08/16/10 NCR 4.803 86 C 0.358 0.133 0.300 - - - 79.10 79.10% Unsatisfactory
Jadestress Builders 9753 Impvt. of Talobatib-Jose Panganiban Road, Brgy. Osmeña 06/04/09 V 9.390 200 C 0.360 0.200 0.300 - - - 86.00 86.48%
Satisfactory
Jadestress Builders 9753 Rehab./Impvt. of Inascan-Bubulusan Barangay Road 09/03/09 V 2.394 75 C 0.410 0.200 0.300 - - - 91.00 92.20%
V. Satisfactory
Jagon Builders 24748 Conc. of Roads with Drainage Impvt. P. Aquino St. Brgy. San Agustin 03/30/11 NCR 4.668 90 O 0.396 0.206 0.150 0.030 0.050 0.033 86.50 -
Jagon Builders 24748 Repair/Rehab./Reconst./Upgrading of North Bay Boulevard 03/30/11 NCR 15.342 181 C 0.442 0.133 0.300 - - - 87.50 82.28%
Satisfactory
Jagon Builders 24748 Const. of MPB Northville 1-B, Punturin 03/29/11 NCR 2.567 90 O 0.296 0.240 0.150 0.030 0.045 0.050 81.10 -
Jagon Builders 24748 Rehab./Reconst./Upgrading of P. Aquino St. 05/26/09 NCR 9.600 105 C 0.466 0.143 0.300 - - - 90.90 *90.90%
V. Satisfactory
Jagon Builders 24748 Completion of San Joaquin Elem. School 03/06/09 NCR 4.776 60 C 0.469 0.161 0.300 - - - 9,423.30 *93.00%
V.Satisfactory
Jagon Builders 24748 Conc. of Roads along Zone 16 03/02/10 NCR 1.900 60 C 0.271 0.200 0.300 - - - 77.10 77.10% Unsatisfactory
Jagon Builders 24748 Asphalt Overlay of C-3 Road, (R-10 Road to A. Bonifacio St.) 05/28/10 NCR 1.426 45 C 0.406 0.200 0.300 - - - 90.60 90.60%
V. Satisfactory
Jag-Vail Construction and Supply 24055 Gaba Port Development Project 06/06/09 DOTC 4.788 90 C 0.404 0.200 0.300 - - - 90.40 90.40%
V. Satisfactory
Jaime B. Ching Enterprises 4526 Rehab./Repair/Impv't. of Sitio-Odiong-
Manghanoy Road 04/01/11 VI 18.983 186 C 0.427 0.133 0.300 - - - 86.00 *86.00% Satisfactory
Jaime B. Ching Enterprises 4256 Const. of MPB (Covered Court) at
Pontevedra NHS, Phase I 03/10/10 VI 1.422 65 C 0.373 0.200 0.300 - - - 87.30 87.30% Satisfactory
Jaime B. Ching Enterprises 4256
Reconst. of Jct. Bagonawa-La Castellana-Isabela Rd., Sta.64+877.90
- Sta.65+703.60 w/ exception06/03/10 VI 9.453 96 O 0.372 0.240 0.150 0.022 0.047 0.033 86.40 -
Jaime B. Ching Enterprises 4256 Const. of Flood Control (Phase II),
Brgy. Laurel 09/01/09 IVA 0.959 35 C 0.326 0.200 0.300 - - - 82.60 *82.60% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page206
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Jaime B. Ching Enterprises 4256
Const. (Road Opening) of Rizal Bdry.-Famy, Laguna-Quezon Bdry. To
Marikina-Infanta Road via Sta. Maria08/20/10 IVA 48.217 149 O 0.357 0.223 0.150 0.030 0.047 0.050 85.70 -
Jaime B. Ching Enterprises 4256 Construction and Improvement of
Taloc Main Drainage 3/16-21/09 NIA 5.013 438 C 0.435 0.174 0.300 - - - 90.91 *90.91% V. Satisfactory
Jaime B. Ching Enterprises 4256 Rehabilitation of Taloc Main
Drainage 8/10-18/09 NIA 5.988 438 C 0.376 0.200 0.300 - - - 87.59 *87.59% Satisfactory
Jaime B. Ching Enterprises 4256 Rehab. of Bacolod South Road (Pilar-
Marina Section) 05/28/09 VI 9.484 116 O 0.373 0.240 0.150 0.015 0.045 0.033 85.60 -
Jaime B. Ching Enterprises 4256 Rehab. of Bacolod South Road (Pilar-
Marina Section) 09/15/09 VI 9.574 136 C 0.367 0.133 0.300 - - - 80.00 83.36% Satisfactory
Jaime B. Ching Enterprises 4256
Reconst. of Jct. Bagonawa-La Castellana-Isabela Road, Sta.
64+877.90 - Sta. 65+703.60 with exception
08/26/10 VI 9.453 96 C 0.442 0.133 0.300 - - - 87.50 86.84% Satisfactory
Jaime B. Ching Enterprises 4256
Road Upgrading of Isabela-Libas-Negros Occidental Bdry. Road, Km.85+500-Km.87+734.89 with
exception
08/26/10 VI 18.930 216 C 0.437 0.133 0.300 - - - 87.00 85.68% Satisfactory
Jakboa Builders 31563 Repair/Renovation of PTRI Main Building 06/09/09 DOST 2.964 85 C 0.414 0.200 0.000 - - - 61.40 *61.40%
Poor
Jam-C Builders 32870 Widening of Olongapo-Bugallon Rd., San Marcelino Sect. 05/29/10 III 4.725 30 C 0.449 0.133 0.300 - - - 88.20 88.20%
Satisfactory
Jam-C Builders 32870Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Rd. at Apo Rotonda
08/23/10 III 1.890 45 C 0.464 0.133 0.300 - - - 89.70 89.70% V. Satisfactory
Jameetrix Construction 19176 Road Upgrading/Conc. of Inawayan-Baracatan Rd. 08/29/10 XI 11.880 180 C 0.454 0.133 0.300 - - - 88.70 87.92%
Satisfactory
Jameetrix Construction 19176
Rehab./Reconst. Of Damaged Paved National Rds. At Davao City
Diversion Rd., Buhangin NHA-Davao River Bridge Sect.
09/08/10 XI 17.123 115 C 0.442 0.133 0.300 - - - 87.50 87.14% Satisfactory
Jameetrix Construction 19176 Completion of Two Storey Sch. Bldg. at Kabacan E/S, Brgy. Maa 09/17/09 XI 2.892 180 C 0.471 0.133 0.300 - - - 90.40 *90.40%
V. Satisfactory
Jann-Norris Construction and Supplies 31814 Const. of Careb Farm-to-Market Road 04/12/11 II 0.990 24 C 0.474 0.133 0.300 - - - 90.70 *90.70%
V. Satisfactory
Jann-Norris Construction and Supplies 31814 Conc. Of Pantabangan-Canili-Basal-
Baler Road, Lublub 04/15/11 II 10.518 180 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory
Jann-Norris Construction and Supplies 31814 Const. of Drainage Canal (L.B. Perez
St.) 04/11/11 II 0.495 24 C 0.451 0.133 0.300 - - - 88.40 *88.40% Satisfactory
Jann-Norris Construction and Supplies 31814 Sta. Cruz River Control, Barat
Section 04/13/11 II 4.330 60 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory
Jann-Norris Construction and Supplies 31814 Sta. Cruz River Control, Salinas
Section 04/13/11 II 4.330 60 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page207
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Jann-Norris Construction and Supplies 31814 Sta. Cruz River Control, San
Leonardo 04/13/11 II 6.743 60 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory
Jann-Norris Construction and Supplies 31814 Const. of Bonfal Multi-Purpose
Building 03/03/10 II 0.660 44 C 0.429 0.133 0.300 - - - 86.20 86.20% Satisfactory
Jann-Norris Construction and Supplies 31814 Const. of Flood Control Sta. Fe River
(Sabo Pilot Project) 09/01/10 II 14.473 180 C 0.437 0.200 0.300 - - - 93.70 89.74% V. Satisfactory
Japuz-Jansol Enterprises 22869 Const./Completion of MPB Lawigan (Phase II) 04/02/11 X 1.874 110 C 0.438 0.133 0.300 - - - 87.10 *87.10%
Satisfactory
Japuz-Jansol Enterprises 22869 Construction of Teruvian Dam & Canal System 04/13-18/09 NIA 4.178 90 O 0.352 0.180 0.150 0.030 0.064 0.050 82.55 -
Japuz-Jansol Enterprises 22869Completion of Two (2) Storey School
Building, Camiguin National High School
05/31/09 X 1.891 95 C 0.389 0.186 0.300 - - - 87.50 *87.50% Satisfactory
Japuz-Jansol Enterprises 22869 Concreting of Lagoon Road, Brgy. Benoni 05/31/09 X 1.887 199 C 0.440 0.102 0.300 - - - 84.20 *84.20%
Satisfactory
Japuz-Jansol Enterprises 22869 Const. of Soro-Soro MPB 03/07/09 X 2.383 130 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory
Japuz-Jansol Enterprises 22869 Const./Rehab. of MPB Catarman C/S 03/07/09 X 1.902 80 C 0.326 0.200 0.300 - - - 82.60 *82.60% Satisfactory
Japuz-Jansol Enterprises 22869 Construction of Multi-Purpose Building Mambajao-Phase IIB 09/05/09 X 5.240 130 C 0.410 0.200 0.300 - - - 91.00 *91.00%
V. SatisfactoryJapuz-Jansol Enterprises
/Angel & Sam Construction & General
Merchandise Joint Venture
SLI-SN-005401
Const./Completion of Multi-Purpose Building Phase II, Poblacion
Mambajao09/05/09 X 9.541 180 C 0.429 0.200 0.300 - - - 92.90 *92.90%
V. Satisfactory
Jargon Construction & Supply 23474 Const. of Additional Building of
DPWH Regional Office 09/12/09 XII 9.549 150 C 0.431 0.147 0.300 - - - 87.80 *87.80% Satisfactory
Jargon Construction & Supply 23474 Sarangani-Davao del Sur Coastal
Road, Bigwaay Section 09/17/09 XII 7.548 150 C 0.378 0.184 0.300 - - - 86.20 86.92% Satisfactory
Jargon Construction & Supply 23474 Const. of 2-CL School Building at
Maan NHS 03/06/10 XII 1.328 105 C 0.486 0.138 0.300 - - - 92.40 92.40% V. Satisfactory
Jargon Construction & Supply 23474
Road Upgrading of Isulan Hwy. Jct. Dukay-Bagumbayan-Sen. Ninoy Aquino Road (Tayugo Section)
03/03/10 XII 13.257 155 O 0.374 0.243 0.150 0.030 0.050 0.033 88.00 -
Jargon Construction & Supply 23474
Road Upgrading of Isulan Hwy. Jct. Dukay-Bagumbayan-Sen. Ninoy Aquino Road (Sitio Katipunan
Section)
03/03/10 XII 10.456 128 O 0.320 0.240 0.150 0.030 0.050 0.033 82.30 -
Jargon Construction & Supply 23478 Const. of MPB @ Manirub E/S, Brgy.
Pamantingan 06/08/10 XII 0.481 65 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
Jargon Construction & Supply 23474 Sarangani-Davao del Sur Coastal
Road (Gumasa Section) 06/15/10 XII 9.606 150 O 0.274 0.300 0.150 0.030 0.047 0.033 83.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page208
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Jargon Construction & Supply 23474
Road Upgrading of Isulan Highway Jct. Dukay-Bagumbayan-Sen. Ninoy
Aquino Road (Sitio Katipunan Section)
06/09/10 XII 10.456 128 C 0.412 0.133 0.300 - - - 84.50 83.18% Satisfactory
Jargon Construction & Supply 23474
Road Upgrading of Isulan Hwy. Jct. Dukay-Bagumbayan-Sen. Ninoy Aquino Road (Tayugo Section)
08/31/10 XII 13.257 155 C 0.429 0.133 0.300 - - - 86.20 87.28% Satisfactory
Jargon Construction & Supply 23474 Sarangani-Davao del Sur Coastal
Road (Gumasa Section) 09/07/10 XII 9.606 150 C 0.424 0.138 0.300 - - - 86.20 84.52% Satisfactory
Jargon Construction & Supply 23474 Road Upgrading (Gravel to Concrete)
Falls Section 06/03/09 R-XII 10.414 291 C 0.371 0.190 0.300 - - - 86.10 88.86% Satisifactory
Jargon Construction & Supply 23474
Conc. of Sarangani-Davao del Sur Coastal Road, Taluya-Gumasa
Section06/11/09 R-XII 14.145 220 C 0.361 0.195 0.300 - - - 85.60 88.78%
Satisifactory
Jargon Construction & Supply 23474 Completion of MPB at Brgy. Kernam
(Brgy. Hall) 03/13/09 XII 0.480 100 C 0.375 0.200 0.300 - - - 87.50 85.61% Satisfactory
Jargon Construction & Supply 23474 Contruction of Multi-Purpose
Building, Brgy. Talahik 03/15/09 XII 0.800 98 C 0.409 0.200 0.300 - - - 90.90 *90.90% V. Satisfactory
Jargon Construction & Supply 23474 Rehab. of Sarangani-Sultan Kudarat
Coastal Road (Malisbong Section) 03/18/09 XII 4.746 110 C 0.398 0.200 0.300 - - - 89.80 84.10% Satisfactory
Jargon Construction and Supply 23474 Completion of Maitum Public Market 04/11/11 XII 19.256 300 C 0.454 0.159 0.300 - - - 91.30 *91.30%
V. SatisfactoryJargon Construction and
Supply 23474 Const. of Health Center at Brgy. Lun Padidu 04/12/11 XII 4.812 150 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V. Satisfactory
Jargon Construction and Supply 23474
Const./Completion of Additional Office Bldg. Phase II, DPWH
Regional Office XII Compound04/10/11 XII 9.582 150 C 0.457 0.133 0.300 - - - 89.00 *89.00%
Satisfactory
Jaro Builders & Construction Supply 25560 Conc. of Road at Brgy. Pasi 1 09/02/10 IVB 0.997 45 C 0.439 0.053 0.300 - - - 79.20 79.20%
Unsatisfactory
Jaro Builders and Construction Supply 25560 Concreting of Road @ Patas 02/23/09 IV-B 1.443 50 C 0.439 0.133 0.300 - - - 87.20 *87.20%
Satisfactory
JASA Builders 31330 Completion of MPB, Gais-Guipe 04/12/11 I 1.728 90 C 0.411 0.133 0.300 - - - 84.40 *84.40% Satisfactory
Jasa Builders 31330 Construction of Multi-Purpose Building at Alos 03/10/09 I 0.475 40 C 0.425 0.200 0.300 - - - 92.50 *92.50%
V. SatisfactoryJasmig Construction
Supply 26069 Const./Rehab. of Road at Pinamucuan Ibaba 04/11/11 IVA 0.299 60 C 0.455 0.200 0.300 - - - 95.50 *95.50%
V. SatisfactoryJasmig Construction
Supply 26069 Const. of 1CL 7mx7m Sch. Bldg. at Prenza E/S 04/12/11 IVA 0.496 40 C 0.432 0.200 0.300 - - - 93.20 *93.20%
V. SatisfactoryJasmig Construction
Supply 26069 Const. of Sch. Bldg. at Batangas City East CS 04/11/11 IVA 1.168 60 C 0.427 0.200 0.300 - - - 92.70 *92.70%
V. SatisfactoryJasmig Construction
Supply 26069 Impvt./Rehab. of San Pedro Road 06/04/10 IVA 9.648 60 C 0.500 0.133 0.300 - - - 93.30 93.30% V. Satisfactory
Jasmig Construction Supply 26069 Restoration of Collapsed Riverwall
along Calumpang River 08/23/10 IVA 9.649 90 C 0.456 0.200 0.300 - - - 95.60 95.60% V. Satisfactory
Jasmig Construction Supply 26069
Rehab./Reconst./Upgrading of Damaged National Roads, Balayan-
Balibago Rd. incl. Drainage08/25/10 IVA 14.673 120 C 0.460 0.173 0.300 - - - 93.30 93.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page209
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Jasmig Construction Supply 26069 Impvt./Rehab. of Manila-Batangas
Road 03/05/09 IV-A 9.648 30 C 0.473 0.133 0.300 - - - 90.60 *90.60% V. Satisfactory
Jasmig Construction Supply 26069 Impvt./Rehab. of Road at Gulod Itaas 03/05/09 IV-A 9.648 30 C 0.477 0.194 0.300 - - - 97.10 *97.10%
Outstanding
Jasmin Construction 9561 Rehabilitation of Quezon-Carangonhan Road 05/20/09 V 2.871 232 C 0.426 0.122 0.300 - - - 84.80 83.90%
Satisfactory
Jasmin Construction 9561 Const. of Bislig Seawall 09/05/09 V 1.681 150 C 0.397 0.188 0.300 - - - 88.50 *88.50% Satisfactory
Jasmin Construction 9561 Rehab./Reconst. Of Damaged Paved Nat'l. Rds., Baras-Gigmoto Rd. 08/17/10 V 12.085 205 O 0.328 0.286 0.100 0.020 0.030 0.050 81.40 -
Jaykris Enterprises 30906
Rehab./Impvt. (Slope Protection) of Roads along Lanao-Pagadian-
Zamboanga City Road (Lumbog Sect.) Km.1743+216 - Km.1742+251
04/04/11 IX 5.279 120 C 0.413 0.133 0.300 - - - 84.60 *84.60% Satisfactory
Jaykris Enterprises 30906 Const. of Road at Poblacion Malangas 06/05/10 IX 1.906 85 C 0.423 0.133 0.300 - - - 85.60 85.60%
Satisfactory
Jay-Mar Builder 7900Repair/Rehab. of Industrial Arts
Room at Daniel Fajardo Elementary School
04/13/11 NCR 0.987 45 C 0.464 0.179 0.300 - - - 94.30 *94.30% V. Satisfactory
Jay-mar Builder 7900 Completion of Multi-Pupose Building (Phase 2) 02/24/09 NCR 1.906 60 C 0.371 0.169 0.300 - - - 84.00 *84.00%
SatisfactoryJB & Sons Trading &
Construction 30133 Const. of Multi-Purpose Pavement, So. Rizal, Mambalot 03/29/11 IVB 0.563 64 C 0.450 0.133 0.300 - - - 88.30 *88.30%
Satisfactory
JBGM Construction 19897
Conc./Impvt. along Cordon-Madella-Aurora Bdry. Rd. & its Related Roads
(Aurora West-Cajel Road) and its Related Roads
09/03/09 II 19.300 119 C 0.438 0.200 0.300 - - - 93.80 94.58% V. Satisfactory
JBGM Construction 19897
Road Impvt./Conc. along CDMA Bdry. Rd. & its related Roads (San
Marcos-Gamis Rd. & its related Roads)
06/05/10 II 19.280 150 C 0.448 0.133 0.300 - - - 88.10 88.10% Satisfactory
JBGM Construction 19897Impvt./Conc. along CDMA Boundary
Road and its related Roads (San Marcos and its related roads)
08/29/10 II 19.279 150 C 0.428 0.200 0.300 - - - 92.80 92.80% V. Satisfactory
JBGM Construction 19897Road Impv't along Cordon-Diffun-
Maddela-Aurora and its related Roads, Dumanisi-Pimentel Road
03/07/09 II 4.823 150 C 0.439 0.200 0.300 - - - 93.90 *93.90% V.Satisfactory
J-Bros Construction 27587 Land Development of Sto. Domingo Res. Project, Phase II 6/1-5/09 NHA 44.812 338 C 0.310 0.300 0.000 - - - 60.95 60.95%
Poor
J-Bros Construction 27587 Construction of 3-Storey 15-Classroom School Building 03/19/09 NHA 17.203 150 O 0.337 0.300 0.000 0.030 0.043 0.000 71.00 -
JC Pinon Construction, Inc. 20905 Repair of RC Platform's Deck/Slab
Project 05/10-11/11 PPA 23.301 250 O 0.472 0.200 0.300 - - - 97.20 *97.20% Outstanding
JCO Construction and Supply 32576 Const. of Multi-Purpose Building,
Brgy. Bautista 04/02-03/11 V 1.142 45 C 0.465 0.133 0.300 - - - 89.80 *89.80% V. Satisfactory
JCO Construction and Supply 32576 Const. of Bridge, Brgy. Kanluran 03/13/09 V 0.658 60 C 0.461 0.133 0.300 - - - 89.40 *89.40%
V. Satisfactory
JD Construction 30134 Concreting of Lictin-Yocti-Palawig Road 05/20/09 V 3.829 162 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page210
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
JD Construction 30134 Construction of Drainage System @ Lanao 02/24/10 V 1.635 120 C 0.403 0.133 0.300 - - - 83.60 83.60%
Satisfactory
JDC Builders - Branch 32048Repair of Pagsangaan Flood
Control Structures along Palompon-Isabele-Merida-Ormoc Road Section
02/26/10 VIII 6.690 402 C 0.432 0.018 0.000 - - - 45.00 63.60% Poor
JDC Builders Branch 32048 Construction of Multi-Purpose Pavement, Brgy. Linao 03/10/09 VIII 0.473 60 C 0.422 0.106 0.300 - - - 82.80 *82.80%
Satisfactory
JDC Builders Branch 32048Repair of Pagsangaan Flood Control
Structure along Palompon-Isabel-Merida-Ormoc Road Section
03/10/09 VIII 6.690 402 O 0.274 0.245 0.150 0.020 0.021 0.050 76.00 -
JDC Builders-Branch 32048 Construction of Multi-Purpose Pavement 05/30/09 VIII 0.948 60 C 0.495 0.133 0.300 - - - 92.80 *92.80%
V. SatisfactoryJecel Constructiion
Supply 21956 Construction of Multi-Purpose Building @ Poblacion Padada 05/29/09 XI 0.951 75 O 0.351 0.300 0.150 0.030 0.038 0.033 90.20 -
Jecel Construction Supply 21956 Const. of Multi-Purpose Building @
Poblacion 02/25/10 XI 0.951 236 C 0.470 0.133 0.300 - - - 90.30 89.29% V. Satisfactory
Jecel Construction Supply 21956 Completion of Multi-Purpose
Building at North San Juan 03/18/09 XI 0.510 60 C 0.437 0.133 0.300 - - - 87.00 *87.00% Satisfactory
Jeff Construction 14774 Const. of Naboongan Bridge, Approaches & Detour, Brgy. Daguit 06/04/09 V 15.665 726 C 0.433 0.133 0.300 - - - 86.60 86.33%
Satisfactory
Jegma Construction and Development Corporation
14775
Impvt./Conc. of Bogo-Curva-Medellin-Daan Bantayan Road Sta. 125+600-Sta. 127+368; Sta. 127+653.50-Sta.
128+300
09/03/09 VII 19.163 130 C 0.431 0.200 0.300 - - - 93.10 *93.10% V. Satisfactory
Jegma Construction and Development Corporation
14775Impvt./Conc. of Bogo-Curva-Medellin-Daan Bantayan Road Sta. 106+800-
Sta. 112+911.8009/03/09 VII 100.494 330 O 0.328 0.300 0.150 0.030 0.056 0.050 91.40 -
Jegma Construction & Development Corporation
14775Impvt./Conc. of Bogo-Curva-Medellin-
Daan Bantayan-Maya Rd. (Intermittent Sections)
04/09/11 VII 48.088 210 O 0.343 0.250 0.150 0.030 0.050 0.050 87.30 -
Jegma Construction & Development
Corporation / P.B. Obial Construction (JV)
JV-09-077
Widening of Arellano Blvd. From Legaspi Ext. to T. Padilla St., inc.
Reconst. of Arellano Tejero Bridge and Arellano-Palma Bridge
04/04/11 VII 62.984 270 O 0.361 0.240 0.150 0.030 0.050 0.050 88.10 -
Jegma Construction & Dev't. Corporation 14775 Conc. of Liloy, Zamboanga del Norte-
Ipil Zamboanga, Sibugay 11/21/08 IX 14.314 135 O 0.358 0.240 0.070 0.030 0.030 0.033 76.10 -
Jegma Construction and Development Corporation
14775Rehab./Reconst./Upgrading of
Damaged National Roads, Camp Lapu-Lapu Road
06/10/09 VII 2.830 60 C 0.470 0.200 0.300 - - - 97.00 *97.00% Outstanding
Jegma Construction and Development Corporation
14775 Rehab./Reconst. of Bogo-Curva-Medellin-Daan Bantayan-May Road 06/11/09 VII 39.563 205 C 0.452 0.200 0.300 - - - 95.20 *95.20%
V. Satisfactory
Jegma Construction and Development Corporation
14775 Improvement of Multi-Purpose Building, Brgy. Mambaling 06/09/09 VII 0.949 50 C 0.500 0.167 0.300 - - - 96.70 78.99%
Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page211
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Jegma Construction and Development Corporation
14775 Impvt./Conc. of Bogo-Curva-Medellin-Daan Bantayan-Maya Rd. 06/15/10 VII 60.795 300 O 0.306 0.237 0.150 0.030 0.060 0.050 83.30 -
Jegma Construction and Development Corporation
14775Conc. of Liloy Zamboanga Del Norte-
Ipil, Zamboanga Sibugay Road (Phase III)
03/05/09 IX 14.314 130 C 0.418 0.200 0.300 - - - 91.80 82.38% Satisfactory
Jegma Construction and Development Corporation
14775 Conc. of Titay-Ipil National Road,Kitabog Section 03/05/09 IX 9.533 120 C 0.390 0.200 0.300 - - - 89.00 *89.00%
Satisfactory
Jegma Construction and Development Corporation
14775 Improvement of Multi-Purpose Building 03/03/09 VII 0.949 50 O 0.319 0.173 0.150 0.020 0.019 0.033 71.40 -
Jegma Construction and Development Corporation
14775Impvt./Conc. Of Bogo-Curva-Medellin-
Daan Bantayan Rd. Sta. 106+800 - Sta. 112+911.80
09/04/10 VII 100.494 330 C 0.391 0.200 0.300 - - - 89.10 91.53% V. Satisfactory
Jegma Construction and Development Corporation
14775Impvt. Of Cebu-Balamban
TransCentral Highway, Sta. 20+000-Sta.30+000 (with exceptions)
09/03/10 VII 38.600 294 C 0.399 0.200 0.300 - - - 89.90 90.12% V. Satisfactory
Jegma Construction and Development Corporation
14775
Impvt./Conc. of Bogo-Curva-Medellin-Daan bantayan-Maya Road. Sta.
112+400 - Sta. 115+600 (Intermittent Sections)
09/04/10 VII 60.795 210 C 0.402 0.200 0.300 - - - 90.20 86.06% Satisfactory
Jejors Construction Corporation 5143
Rehab./Impvt. of CCR Guinsiliban Sect. (Km.20+680 - Km.21+920) w/
exception04/02/11 X 9.540 145 O 0.388 0.240 0.150 0.030 0.042 0.050 90.00 -
Jejors Construction Corporation 5143
Road Reconst./Upgrading (Asphalt-Concrete) of Jct. Manolo Fortich-
Libona-Indahag Road (Kiliog Section)
03/31/11 X 18.940 195 C 0.369 0.133 0.300 - - - 80.20 84.52% Satisfactory
Jejor's Construction Corporation 5143 Repair of Water System from Berth 6-
11 07/04-08/11 PPA 18.245 135 O 0.378 0.169 0.150 0.030 0.070 0.050 84.63 -
Jejor's Construction Corporation 5143
Repair/Rehab. of Camiguin Circumferential Road Selective of
Concrete Pavement05/31/09 X 4.797 241 C 0.304 0.102 0.300 - - - 70.60 74.38%
Poor
Jejor's Construction Corporation 5143
Rehab./Reconst. (Asphalt to Concrete) of Jct. S.H. Manolo Fortich Libona-Indahag Rd., (Gango Section)
09/04/09 X 19.217 180 O 0.388 0.254 0.150 0.030 0.047 0.033 90.20 -
Jejor's Construction Corporation 5143
Replacement of Hubangon Double Barrel Box Culvert to Hubangon
Bridge II03/01/10 X 9.516 180 C 0.447 0.133 0.300 - - - 88.00 88.00%
Satisfactory
Jela Construction 17092 Asphalting of Road at Sitio Kalangyawon, Napo 03/10/10 VII 4.836 102 C 0.398 0.127 0.300 - - - 82.50 84.00%
Satisfactory
Jelm Construction 33230 Const. of Library Hub, San Fernando Elementary School 09/08/10 VIII 3.855 119 C 0.485 0.133 0.300 - - - 91.80 91.52%
V. Satisfactory
Jelm Construction 33230 Completion of 1-CL SB, San Roque E/S 03/18/09 VIII 0.192 120 C 0.443 0.118 0.300 - - - 86.10 *86.10%
Satisfactory
Jemak Construction & Supply 32056
Road Opening/Const. of Quezon Eco Tourism Road (LUC-BATCR) inc. RROW, Phase II at Sitio Talipapa
Sect.
03/31/11 IVA 17.684 204 C 0.456 0.200 0.300 - - - 95.60 91.04% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page212
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Jemak Construction & Supply 32056
Road Opening/Const. of Quezon Eco Tourism Road (LUC-BATCR) inc.
RROW Phase II at Brgy. Manggalang Kiling-Bantilan
03/31/11 IVA 17.720 214 C 0.435 0.200 0.300 - - - 93.50 90.14% V. Satisfactory
Jemak Construction and Supply 32056 Conc. of Gumaca-Pitogo-Mulanay-
San Narciso Road 08/25/09 IVA 38.542 180 C 0.382 0.200 0.300 - - - 88.20 86.88% Satisfactory
Jemak Construction and Supply 32056
Conc. of Tayabas-Mauban-Sampaloc-Lucban Road (Sampaloc-Lucban
Section)08/29/09 IVA 48.218 200 C 0.428 0.133 0.300 - - - 86.10 *86.10%
Satisfactory
Jenzab Construction & Design 30654 Const. of 2 Classroom Sch. Bldg. at
Tamiao P/S 04/14/11 VII 1.209 80 C 0.487 0.133 0.300 - - - 92.00 85.21% Satisfactory
Jenzab Construction & Design 30654 Completion of School Canteen
(Building) 02/09/11 DOST 2.330 102 C 0.482 0.200 0.300 - - - 98.20 98.20% Outstanding
Jenzab Construction & Design 30654 Const. of Multi-Purpose Building
(Covered Gym), San Vicente 09/14/09 VII 1.769 90 C 0.450 0.200 0.300 - - - 95.00 *95.00% V. Satisfactory
Jenzab Construction & Design 30654 Road Concreting at Barangay
Poblacion 09/14/09 VII 1.764 75 C 0.425 0.200 0.300 - - - 92.50 *92.50% V. Satisfactory
Jenzab Construction & Design 30654 Road Concreting at Barangay
Sandayong Sur 09/14/09 VII 1.764 75 C 0.411 0.195 0.300 - - - 90.60 *90.60% V. Satisfactory
Jepa Construction and Supplies 30375 Const. of Water System at Jacoba
Subdivision, Brgy. Tuyo 02/19/10 III 2.338 56 C 0.420 0.196 0.300 - - - 91.60 91.60% V. Satisfactory
Jepa Construction and Supplies 30375 Conc. of Mabatang Vicinal Road 08/18/10 III 5.437 90 C 0.403 0.133 0.300 - - - 83.60 83.60%
SatisfactoryJepa Construction and
Supplies 30375 Conc. of Road, Mataas na Lupa, Brgy. Culis 08/18/10 III 0.473 60 C 0.393 0.133 0.300 - - - 82.60 82.60%
SatisfactoryJepa Construction and
Supplies 30375 Concreting of Road 02/25/09 III 0.628 60 C 0.322 0.200 0.300 - - - 82.20 *82.20% Satisfactory
Jepa Construction and Supplies 30375 Const. of Drainage Canal, Barangay
Sacrifice Valley 08/27/09 III 0.618 60 C 0.454 0.133 0.300 - - - 88.70 *88.70% Satisfactory
Jerry R. Santiago Construction 18453 Nueva Ecija-Aurora Rd. (Upgrading) 08/18/10 III 19.076 120 C 0.345 0.200 0.300 - - - 84.50 84.08%
SatisfactoryJerry R. Santiago
Construction 18453 Bongabon-Rizal-Aurora Road 06/02/09 III 17.369 45 C 0.397 0.200 0.300 - - - 89.70 *89.70% V. Satisfactory
Jerry S. Santiago Construction 18453
Const. of Multi-Purpose Bldg. at Nueva University of Science and
Technology09/05/09 III 7.283 150 C 0.464 0.133 0.300 - - - 89.70 85.64%
Satisfactory
Jervie Construction and Supply Corporation 7022 Repair/Rehab. of Mobo Bridge, Brgy.
Mobo 04/08/11 VI 1.926 90 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Jet Construction Supply 7063 Road Upgrading (Gravel to Paved) Mandurriao-Pakiad Rd. 05/31/10 VI 1.253 75 C 0.327 0.033 0.300 - - - 66.00 66.00%
Poor
Jet Construction Supply 7063 Road Upgrading (Gravel to Paved) Mandurriao-Jaro Rd. 05/31/10 VI 4.405 150 O 0.329 0.000 0.150 0.015 0.019 0.017 53.00 -
Jet Construction Supply 7063Rehab./Recons/Upgrading of
Guimaras Circumferential Road, Tumanda-Cabano Section
06/03/09 VI 18.970 135 C 0.404 0.200 0.300 - - - 90.40 *90.40% V. Satisfactory
Jet Construction Supply 7063Road Upgrading (Gravel to Paved) of Guimaras Central Road, Km. 61+000-
Km.63+000 with exceptions08/30/10 VI 9.104 130 C 0.375 0.200 0.300 - - - 87.50 87.44%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page213
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Jet Construction Supply 7063
Road Upgrading (Gravel to Paved) of Guimaras Central Road, San Miguel-Constancia-Cabano-Igcawayan Sect.,
Km. 56+000-Km.57+143 with exceptions
08/30/10 VI 9.069 130 C 0.353 0.200 0.300 - - - 85.30 86.14% Satisfactory
Jet Construction Supply 7063 Conc. of Sibalom-Pis-anan Road 09/02/10 VI 33.164 150 O 0.357 0.240 0.000 0.030 0.042 0.033 70.20 -
Jet Construction Supply 7063 Road Upgrading (Gravel to Paved) of Mandurriao-Jaro Road 09/08/10 VI 4.405 150 C 0.436 0.133 0.300 - - - 86.90 66.56%
PoorJetver Trading &
Construction 25501 Const. of Multi-Purpose Building, Brgy. Alfonso XIII 03/03/10 IVB 0.676 60 O 0.311 0.300 0.150 0.023 0.037 0.050 87.10 -
Jetver Trading & Construction 25501 Const. of MPB Brgy. Alfonso XIII 06/01/10 IVB 0.676 90 C 0.456 0.122 0.300 - - - 87.80 87.31%
SatisfactoryJetver Trading &
Construction 25501 Construction of (1CL) School Building Upper Lapu-Lapu PS 06/02/09 IV-B 0.494 120 C 0.344 0.200 0.300 - - - 84.40 *84.40%
Satisfactory
Jetver Trading & Construction 25501 Rehab./Impv't of Caguisan Brgy.
Stage 03/04/09 IV-B 0.470 90 C 0.481 0.092 0.300 - - - 87.30 *87.30% Satisfactory
JFAP Construction 21706 Improvement (Concreting) of Access Road to Ormoc Port 05/30/09 VIII 1.817 90 C 0.493 0.133 0.300 - - - 92.60 *92.60%
V. Satisfactory
JFAP Construction 21706Repair & Rehabilitation of Palo-
Carigara-Ormoc Road, Km 984+753-Km 985+503 w/ exceptions
03/10/09 VIII 4.819 150 C 0.355 0.191 0.300 - - - 84.60 *84.60%Satisfactory
JFJ Construction 32107 Rehabilitation of Sibud Main Drainage 8/10-18/09 NIA 6.446 381 C 0.420 0.200 0.300 - - - 92.01 *92.01%
V. Satisfactory
JGC Construction 29157 Const. of MPB, Sampaloc Site 2 Barangay B.F. Homes 06/02/09 NCR 3.815 75 C 0.473 0.133 0.300 - - - 90.60 *90.60%
V. SatisfactoryJhall Marketing &
Services 15760 Upgrading/Conc. of Capinang-San Dionisio Road 03/17/09 VI 9.545 180 C 0.390 0.187 0.300 - - - 87.70 86.02%
SatisfactoryJHI Construction and
Supply 19317 Construction of 2CL @ Torres NHS (7x9) 08/27/09 I 0.972 65 C 0.407 0.200 0.300 - - - 90.70 *90.70%
V. Satisfactory
JHI Construction and Supply 19317 Const. of Calasiao MPB (Municipal
Hall, Pedestrian Overpass) 06/03/10 I 3.858 180 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
JHJ Construction 3781 Road Upgrading of Passi-San Rafael-Lemery-Sara Road Bagacay Section 04/13/11 VI 14.324 240 C 0.433 0.133 0.300 - - - 86.60 84.98%
Satisfactory
JHJ Construction 3781Conc. of Passi-San Enrique Road,
Passi City, Km. 49+740 - Km. 52+659.60 with exception
09/05/10 VI 24.945 240 C 0.391 0.133 0.300 - - - 82.40 84.32% Satisfactory
Jimwen Construction & General Merchandise 33066 Talakag Irrigation Project 09/26-10/01/11 NIA 12.473 270 C 0.389 0.200 0.300 - - - 88.94 *88.94%
Satisfactory
Jirk Construction 29918
Rehab./Reconst./Upgrading of Cagayan Valley Road (Magapit-Jct.
Aparri Airport Section), Lal-lo, Cagayan Sect.
04/02/11 II 6.697 120 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfactory
Jits Construction Corp. 13232 Construction of 3-Storey, 15-Classroom School Building 07/29/10 NHA 19.912 195 C 0.475 0.147 0.30 - - - 92.20 79.64%
Unsatisfactory
Jits Construction Corp. 13232 Construction of 3-Storey 15-Classroom School Building 07/31/09 NHA 18.108 150 O 0.340 0.171 0.150 0.020 0.051 0.050 78.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page214
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
JJ & J Construction and General Supply 30231 Repair/Rehabilitation of Road 03/03/09 VII 0.711 60 C 0.257 0.182 0.300 - - - 73.90 *73.90%
PoorJJ & J Construction and
General Supply 30231 Impvt .of Multi-Purpose Building, Brgy. Carreta 09/16/09 VII 0.482 65 C 0.475 0.200 0.300 - - - 97.50 *97.50%
OutstandingJJA Construction and
Supply 22676 Completion of Bulanao Flood Control 05/27/09 CAR 5.739 120 C 0.401 0.200 0.300 - - - 90.10 *90.10%
V. Satisfactory
JL Construction 31720Const./Rehab./Replacement,
Completion & Repair of Holy Ghost Ext. PS
04/13/11 CAR 0.989 60 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
JLA Construction and Supplies 24503 Conc.of Roads at Abella Road 04/02/11 XI 1.881 120 C 0.360 0.200 0.300 - - - 86.00 *86.00%
SatisfactoryJLA Construction and
Supplies 24503 Conc./Impvt. of Calinan-Baguio-Cadalian Road 09/02/09 XI 4.795 120 C 0.409 0.200 0.300 - - - 90.90 89.88%
V. Satisfactory
JLP Construction & Supply 26983 Road Upgrading (Gravel to Paved),
Batac-Espiritu (Banna) Road 08/20/10 I 10.010 95 C 0.476 0.178 0.300 - - - 95.40 95.40% V. Satisfactory
JLP Construction & Supply 26983 Academic Building 3 05/14-15/09 DOST 8.294 120 O 0.383 0.295 0.150 0.030 0.062 0.050 97.00 -
JLP Construction & Supply 26983 Completion of Dormitory Building 03/2-3/10 DOST 23.192 425 C 0.4464 0.20 0.30 - - - 94.64 93.77%
V. SatisfactoryJLP Construction &
Supply 26983 Completion of Alaremil Building III 03/2-3/10 DOST 2.294 135 C 0.487 0.20 0.30 - - - 98.70 97.51% V. Satisfactory
JLP Construction & Supply 26983 Const. of Retro Fitting of Perimeter
Fence 03/8-9/11 DOST 2.226 135 C 0.467 0.200 0.300 - - - 96.69 96.69% Outstanding
JLP Construction & Supply 26983 Const. of Water Reservoir 03/8-9/11 DOST 4.006 225 C 0.426 0.168 0.300 - - - 89.40 89.40%
V. Satisfactory JLV Construction &
Supply 9953 Const. of Taliba-Tejero FMR 11/21/08 IV-A 0.949 80 C 0.250 0.300 0.300 - - - 85.00 *85.00% V. Satisfactory
JLV Construction and Supply (Formerly: JLV
Construction)9953
Conc. of Brgy. Road at Natunuan North, Natunuan South, Kaingin and
Antipolo, FMR06/04/10 IVA 4.821 60 C 0.458 0.133 0.300 - - - 89.10 89.10%
V. Satisfactory
JLV Construction and Supply (Formerly: JLV
Construction)9953 Const. of Masaguitsit-Banalo NHS
7m & 9m Academic Building 09/04/09 IVA 0.559 120 C 0.463 0.133 0.300 - - - 89.60 *89.60% V. Satisfactory
J-Marbel Construction and Supply 24268 Construction of Auditorium 03/19/09 DOST 13.961 169 O 0.350 0.293 0.062 0.030 0.053 0.033 82.05 -
J-Marbela Construction and Supply 24268 Construction of Auditorium 9/17/09 DOST 13.961 169 C 0.4772 0.1956 0.300 - - - 97.28 97.28%
Outstanding
J-Marbela Construction and Supply 24268 Land Development of Calabanga
Resettlement Project 6/30/09 07/3/09 NHA 9.902 170 C 0.393 0.264 0.300 - - - 95.68 95.68% V. Satisfactory
JMT Construction 14186 Const. of Water System, Brgy. Balite 03/01/10 XIII 0.943 120 C 0.462 0.133 0.300 - - - 89.50 89.50% V.Satisfactory
JMT Construction 14186 Const. of Malimoto MPB, Municipality of Malimoto 08/30/10 XIII 1.885 107 C 0.477 0.128 0.300 - - - 90.50 90.50%
V. Satisfactory
JMT Construction 14186 Upgrading of Agusan-Bukidnon National Road 08/23/10 XIII 10.557 180 C 0.411 0.133 0.300 - - - 84.40 84.34%
Satisfactory
JMT Construction 14186 Rd. Upgrading ( Gravel to Concrete) Surigao-San Juan Coastal Rd. 09/06/09 XIII 9.485 210 O 0.368 0.200 0.150 0.030 0.055 0.033 83.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page215
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
JMU Construction 6877 Construction of Multi-Purpose Building (Gym) 08/25/09 II 9.646 180 C 0.451 0.133 0.300 - - - 88.40 90.36%
V.SatisfactoryJ'ner Cepada Construction 30212 Const. of 7m x 7m Sto. School
Building @ Tabunok E/S 02/27/10 VIII 0.476 80 C 0.423 0.200 0.300 - - - 92.30 92.30% V.Satisfactory
J'ner Cepada Construction 30212 Concreting of Poblacion Road 02/28/10 VIII 0.990 60 C 0.375 0.200 0.300 - - - 87.50 87.50%
SatisfactoryJ'ner Cepada Construction 30212 Const. of Flood Control (Seawall),
Brgy. Poblacion 06/06/10 VIII 0.950 70 C 0.390 0.200 0.300 - - - 89.00 89.00% Satisfactory
J'ner Cepada Construction 30212
Maintenance/Rehab./Impvt. of National Arterial Secondary Rd.,
Macrohon-P.Burgos Rd., Km.1154+000 - Km.1170+000
06/07/10 VIII 9.543 180 O 0.372 0.300 0.060 0.030 0.037 0.033 83.20 -
J'ner Cepada Construction 30212 Bolod-Bolod Communal Irrigation
Project 7/13-17/09 NIA 6.636 210 C 0.460 0.120 0.300 - - - 87.98 *87.98% Satisfactory
J'ner Cepada Construction 30212 Badiangon-Tahusan Communal
Irrigation System 7/13-17/09 NIA 1.654 120 C 0.443 0.120 0.300 - - - 86.25 *86.25% Satisfactory
J'ner Cepada Construction 30212 Impvt. (Concreting) of Access Road
to Maasin Port 05/27/09 VIII 1.833 120 O 0.400 0.240 0.150 0.030 0.047 0.050 91.70 -
J'ner Cepada Construction 30212 Construction of Multi-Purpose
Building, Brgy. Anahawan 05/28/09 VIII 0.473 40 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfactory
J'ner Cepada Construction 30212 Concreting Road, Sta. Sofia-
Tangkaan Road 03/05/09 VIII 1.876 75 C 0.356 0.200 0.300 - - - 85.60 *85.60%Satisfactory
J'ner Cepada Construction 30212 Impvt. (Concreting) of Access Road
to Maasin Port 09/07/09 VIII 1.833 120 C 0.462 0.133 0.300 - - - 89.50 90.82% V. Satisfactory
J'ner Cepada Construction 30212 Const./Impvt. of MPB at Pob. (New
Boxing Gym) Poblacion, Maasin City 09/05/10 VIII 0.978 90 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory
Jobel Enterprises 19799
Widening of Alaminos-San Pablo City Sect. inc. Rehab. of Bridges and
Drainage Impvt. San Pablo City Sect., Bagong Bayan City Proper
Sect.
04/05/11 IVA 19.295 231 C 0.344 0.200 0.300 - - - 84.40 *84.40% Satisfactory
Jobel Enterprises 19799
Conc./Widening of Pagsawitan Intersection & other Related Activites
along CSCF Jct. Road, Brgy. Pagsawitan
09/01/09 IVA 1.922 69 C 0.399 0.141 0.300 - - - 84.00 *84.00% Satisfactory
Jobel Enterprises 19799
Widening of Alaminos-San Pablo City Sect. incl. Rehab. of Bridges
and Drainage Impvt,. Alaminos Sect., San Andres-San Juan Sect.
08/25/10 IVA 19.293 150 C 0.401 0.133 0.300 - - - 83.40 83.40% Satisfactory
Jobel Enterprises 19799 Completion of MPB (Phase 2), Brgy. Salac 02/28/09 IV-A 0.384 30 C 0.391 0.200 0.300 - - - 89.10 *89.10%
V. Satisfactory
Jocyn Construction 32401
Repair and Rehab. of Tagbilaran North Road (Talibon Section), km.
112+499-Km. 113+849 (with exceptions)
02/26/10 VII 9.253 30 C 0.409 0.200 0.300 - - - 90.90 90.90% V. Satisfactory
John Dee B. Bustamante Construction 30458 Conc. of Road in front of Baler
Sports Complex 02/27/10 III 0.932 60 C 0.483 0.133 0.300 - - - 91.60 91.60% V. Satisfactory
John Dee B. Bustamante Construction 30458 Construction of One (1) Unit Science
CL, Rizal, E/S 03/03/09 III 0.808 75 C 0.500 0.133 0.300 - - - 93.30 *93.30%V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page216
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
John Dee B. Bustamante Construction 30458 Completion of Multi-Purpose
Building, Brgy. 02 09/08/09 III 0.476 45 C 0.492 0.133 0.300 - - - 92.50 *92.50% V. Satisfactory
Jojenne Construction and Supply 22338 Completion/Const. of MPB, Davisol
E/S, Brgy. Manyayay 04/04/11 XIII 0.480 70 C 0.470 0.133 0.300 - - - 90.30 *90.30% V. Satisfactory
Jojo Construction & Dev't. Corp. (Formerly:
Jojo Const.)13174
Const. (Road Opening) of FMR with Drainage System @ Brgy. Ilayang
Iyam02/23/09 IV-A 1.148 40 C 0.483 0.117 0.300 - - - 90.00 *90.00%
V. Satisfactory
Jomar Builders & Supply 9138
Restoration of Damaged Embankment and Slope Protection
along Bagong Silang-Capalonga Road, Km.302+300 - Km.302+385 (B.
Silang II, Labo Section)
06/10/10 V 4.814 60 C 0.472 0.133 0.300 - - - 90.50 90.50% V. Satisfactory
Jomarcann General Construction 30599 Construction of Multi-Purpose
Building 03/13/09 CAR 9.631 897 C 0.299 0.200 0.300 - - - 79.90 *79.90% Unsatisfactory
Jomarcann General Construction 30599 Repair and Rehab. of DBM
Secretary's Cottage 09/10/09 CAR 6.229 90 C 0.499 0.133 0.300 - - - 93.20 *93.20% V. Satisfactory
Jomarcann General Construction 30599
Impvt. of Protection Works along Kennon Road Km.215+500 -
Km.215+850 (vs)06/10/10 CAR 9.650 169 C 0.410 0.200 0.300 - - - 91.00 89.56%
V. Satisfactory
Jomarcann General Construction 30599 Construction of Farm-to-Market
Road, Ambaracao Norte 02/25/09 I 1.924 60 C 0.279 0.200 0.300 - - - 77.90 *77.90%Unsatisfactory
Jometron Engineering & Construction 23147 Concreting of San Vicente Farm-to-
Market Road 05/22/09 V 0.936 90 C 0.420 0.133 0.300 - - - 85.30 *85.30% Satisfactory
Joni Construction 26023 Const./Impvt. of MPB @ Brgy. 45 04/14/11 VIII 0.959 60 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory
Joni Construction 26023 Construction of Brgy. Cagbonga-Brgy. Maypangdan, Brgy. Cagbonga 06/09/09 VIII 4.759 238 C 0.304 0.133 0.300 - - - 73.70 79.64%
Unsatisfactory
Jorviv's Construction 6527Road Upgrading (Gravel to Concrete)
Barandias-Dominorog Road (Nabaliwa Sect.)
04/01/11 X 9.490 135 O 0.324 0.236 0.003 0.030 0.042 0.033 66.80 -
Joselle Construction 16243Const./Compl. Of Northwest
Cabadbaran District Administrative Bldg., Tolosa E/S, Brgy. Tolosa
03/29/10 XIII 0.997 60 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory
Joselle Construction 16243 Concreting of Barangay Osmena-Magkiangkang Road 03/16/09 XIII 2.821 150 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V.Satisfactory
Joselle Construction 16243 Const. of Multi-Purpose Building (Covered Court), Brgy. Bit-os 09/16/09 XIII 2.242 120 C 0.480 0.133 0.300 - - - 91.30 93.12%
V.Satisfactory
JR Contractor 9638 Const./Rehab. of Water Supply 03/04/09 V 1.665 90 C 0.474 0.133 0.300 - - - 90.70 85.84% Satisfactory
JR Contractor 9638 Conc. of Batalay Bato Road leading to National Shrine 08/04/09 V 4.780 180 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
JR Contractor 9638 Const./Completion of 1-CL 7.0m x 9.0m Buyo Integrated School Bldg. 02/24/10 V 0.293 60 C 0.437 0.133 0.300 - - - 87.00 87.00%
Satisfactory
Jrald Construction and Trading 33079 Slope Protection along Porac River 02/16/10 III 4.786 44 C 0.375 0.200 0.300 - - - 87.50 87.50%
SatisfactoryJrald Construction and
Trading 33079 Const./Completion of Pampanga 2nd DEO Bldg. 08/18/10 III 1.911 60 C 0.481 0.112 0.300 - - - 89.30 89.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page217
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
JRALD Construction and Trading 33079
Const. of School Building at Floridablanca Integrated School, San
Antonio08/24/09 III 0.573 60 C 0.457 0.133 0.300 - - - 89.00 87.04%
Satisfactory
JRY Construction 10943 Repair of RoRo Ramp, Pavement , Gate and Port Ligthing System 05/23-27/11 PPA 18.700 360 O 0.396 0.287 0.150 0.030 0.070 0.050 98.30 -
JTA Builders 1801 Const. of 2-CL 7.0m x 1.0 m Dulong E/S 09/09/09 X 1.033 60 O 0.379 0.191 0.150 0.030 0.043 0.033 82.60 -
JUF Construction 17987Road Opening/Const. of
Cabangbang-Naga Section along Calbayog Diversion Road
09/01/10 VIII 19.296 150 C 0.311 0.200 0.300 - - - 81.10 85.72% Satisfactory
JUF Construction 17987 Const. of Calbayog Diversion Road, Sta. 9+960-Sta. 10+960 03/10/09 VIII 19.089 240 C 0.496 0.196 0.300 - - - 99.20 *99.20%
Outstanding
Juldan Builders 22810 Const. of MPB Army Reservist, Camp Tinio 02/26/10 III 0.983 45 C 0.490 0.133 0.300 - - - 92.30 92.30%
V.Satisfactory
Julita Builders 13936 Road Conc. of Brgy. Poblacion to Brgy. Patoc 02/22/10 VIII 1.888 120 C 0.395 0.200 0.300 - - - 89.50 89.50%
V. Satisfactory
Julita Builders 13936Impvt. of Multi-Purpose Building
(Student Center), College of Fisheries
06/09/09 VIII 4.823 150 C 0.419 0.133 0.300 - - - 85.20 *85.20% Satisfactory
Julita Builders 13936 Rehab./Impvt. of DPWH 2nd Leyte DEO Bldg. 08/23/10 VIII 4.747 120 C 0.454 0.133 0.300 - - - 88.70 86.39%
SatisfactoryJuncynth Const. & General Services 18385 Concreting of San Roque-San Isidro
Road 03/06/09 VIII 0.939 114 C 0.414 0.141 0.300 - - - 85.50 *85.50%Satisfactory
Junge Konstruct 21275 Const./Rehab. of Drainage System, Aplaya, Alabang 09/02/10 NCR 2.382 90 C 0.415 0.133 0.300 - - - 84.80 87.56%
Satisfactory
Junge Konstrukt 21275 Asphalting of Sunflower St., Brgy. Pasong Tamo 03/09/09 NCR 0.954 15 C 0.402 0.200 0.300 - - - 90.20 *90.20%
V.Satisfactory
Jupa Construction 23577 Construction of Water Supply, Brgy. Sangcol 05/29/09 VIII 2.373 90 C 0.400 0.133 0.300 - - - 83.30 *83.30%
Satisfactory
Jupa Construction 23577Rehab./Impvt. of Brgy. Pagsanghan-Lawaan-Ginagdanan Farm-to-Market
Road03/06/10 VIII 9.619 179 C 0.428 0.133 0.300 - - - 86.10 86.10%
Satisfactory
Jupa Construction 23577 Const. of National Highway - Brgy. 3 Poblacion 06/15/10 VIII 9.635 180 C 0.388 0.200 0.300 - - - 88.80 88.80%
Satisfactory
Jupa Construction 23577Conc. of Palapag-Mapanas-Gamay-Lapinig Road, Bag-ot Bridge-Gamay
Section08/25/10 VIII 10.631 150 O 0.338 0.300 0.150 0.030 0.025 0.033 87.60 -
JUPA Construction 23577 Lipata CIS 7/6-10/09 NIA 2.406 120 C 0.409 0.120 0.300 - - - 82.94 *82.94% Satisfactory
JUPA Construction 23577 Kinabrahan CIS 7/6-10/09 NIA 1.160 90 C 0.401 0.120 0.300 - - - 82.13 *82.13% Satisfactory
JV Lagon Construction Corporation 11561
Conc. of Sarangani-Davao Del Sur Coastal Road (Pangyan-Dungon
Sect.)09/17/09 XII 9.424 239 C 0.212 0.200 0.000 - - - 41.20 65.26%
Poor
JV Lagon Construction Corporation 11561
Sarangani-Davao Del Sur Coastal Road, Sapu Masla-Kapatan Section
Malapatan-Glan09/16/09 XII 7.010 90 O 0.350 0.000 0.000 0.010 0.015 0.000 37.50 -
JV Lagon Construction Corporation 11561
Rehab./Reconst. of Damaged Paved National Road along Marbel-Makar
Road03/05/10 XII 14.309 233 C 0.396 0.133 0.000 - - - 52.90 62.18%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page218
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
JV Lagon Construction Corporation 11561
Rehab./Reconst. of Damaged Roads Dulawan Marbel (Tacurong-New
Carmen Section)03/13/09 XII 19.022 435 O 0.365 0.300 0.099 0.030 0.035 0.050 87.90 -
JV Loreto Const. & Development Corp. /
Viguz Const. Corp. (JV)JV-09-091 Rehab./Reconst. of Daang Maharlika,
Dulag-McArthur Rd. Sect. 06/10/10 VIII 47.000 192 O 0.373 0.250 0.150 0.030 0.047 0.050 90.00 -
JYBL Construction and Trading 22516 Repair/Rehab. of Flora A. Ylagan
High School Brgy. Pinyahan 03/31/11 NCR 1.476 75 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory
JYBL Construction and Trading 22516 Impvt. of San Vicente E/S 08/16/10 NCR 1.425 60 C 0.434 0.133 0.300 - - - 86.70 86.70%
SatisfactoryJYP General Construction 32985 Repair/Rehab. of 3-Classrooms 05/22/09 CAR 0.237 35 C 0.376 0.200 0.300 - - - 87.60 *87.60%
SatisfactoryJYP General Construction 32985 Concreting of FMR, Barangay
Sebang 05/21/09 CAR 0.956 30 C 0.330 0.200 0.300 - - - 83.00 *83.00% Satisfactory
K V C C Construction 27179 Const./Rehab./Impvt. of DPWH Biliran DEO 04/07/11 VIII 2.882 120 C 0.487 0.133 0.300 - - - 92.00 87.52%
Satisfactory
Kajima Corporation FC-99-014 Masao River Impvt. & Const. of Urban Drainage System (S.A. No. 5) 03/11/10 CARBDP 130.000 360 C 0.432 0.200 0.300 - - - 93.20 95.42%
V.Satisfactory
Kajima Corporation FC-04-023Const. of Segment 3B-2, Subway
(Tunnel) Section at Cebu City, MCDP III, Cebu South Coastal Road
06/06/09 MCDP 1,367.069 1,247 O 0.357 0.300 0.150 0.030 0.070 0.050 95.70 -
Kajima Corporation FC-04-023 Const. of Cebu South Coastal Rd., Project Segment 3B-2 (Tunnel Sect.) 06/19/10 MCDP 1,625.321 1,367 O 0.299 0.300 0.000 0.030 0.070 0.050 74.90 -
Kalantas Construction & Development Corporation
23915 Conc. of San Jose Rd. (Bdry. Trento Rd. Sect.) 09/11/09 XIII 19.137 232 C 0.433 0.131 0.300 - - - 86.40 88.17%
Satisfactory
Kamagong Builders & Developers Corporation 1720
Const. of Daang Hari-Aguinaldo Blvd. (R1 Expressway) Extension
Link Road (Imus-Kawit)05/31/10 IVA 41.790 454 C 0.406 0.200 0.300 - - - 90.60 85.74%
Satisfactory
Kamagong Builders & Developers Corporation 1720
Impvt./Widening of Manila-Cavite Road (Kawit-Noveleta Diversion
Road) inc. RROW Acquisition, Brgy. Marulas Section
08/27/10 IVA 40.652 417 C 0.420 0.200 0.300 - - - 92.00 86.87% Satisfactory
Kamagong Builders & Developers Corporation 1720
Impvt./Widening of Manila-Cavite Road (Kawit-Noveleta Diversion
Road) inc. RROW Acquisition, Brgy. Batong Dalig Sect.
08/27/10 IVA 41.720 417 C 0.412 0.200 0.300 - - - 91.20 85.71% Satisfactory
Kane Construction, Inc. 2888
Impvt./Widening/Conc. of Bontoc-Tabuk, Tuguegarao Road, Phase V,
Pingao-Tomitangan Sect. Km.467+000 - Km.471+838 with
exception
05/31/10 CAR 47.250 325 C 0.373 0.133 0.300 - - - 80.60 84.14% Satisfactory
Karpa Builders and Trading 33003 Construction of Road, Camia Street,
Barangay Mabuco 05/20/09 III 0.475 60 C 0.416 0.200 0.300 - - - 91.60 *91.60%V. Satisfactory
Kasanga Construction and Supplies (Formerly:
Kasanga Const.)17024 Repair/Rehab. of MPB at Brgy. Suqui 05/28/10 IVB 1.442 80 C 0.500 0.133 0.300 - - - 93.30 93.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page219
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Kauie Builders and Construction Supplies 33841 Const. of MPB at PPA-DOJ
Community Correction Center 09/08/10 VIII 3.372 135 C 0.468 0.133 0.300 - - - 90.10 85.13% Satisfactory
KCS Construction & Supply 19641 Const./Impvt. of MPB (Municipal
Building) 06/07/10 V 2.867 120 C 0.445 0.133 0.300 - - - 87.80 87.80% Satisfactory
KCS Construction & Supply 19641 Conc. of Alianza Road 06/08/10 V 4.719 90 O 0.304 0.300 0.150 0.030 0.035 0.033 85.20 -
KCS Construction & Supply 19641 Conc. of Alianza Rd. 08/31/10 V 4.719 90 C 0.431 0.200 0.300 - - - 93.10 88.36%
SatisfactoryKCS Construction &
Supply 19641 Impv't. of Lagonoy-Presentacion Road 08/26/10 V 14.142 311 C 0.394 0.200 0.300 - - - 89.40 87.27%
SatisfactoryKCS Construction &
Supply 19641 Road Shouldering (Zone 2) 05/31/09 V 0.141 120 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory
KCS Construction & Supply 19641 Const./Rehab./Repair of Multi-
Purpose Buildings 09/02/09 V 0.479 30 C 0.407 0.195 0.300 - - - 90.20 *90.20% V. Satisfactory
KCS Construction & Supply 19641
Impvt. of Lagonoy-Presentacion Road, Km. 499+491-Km.528+00 with
exceptions09/09/09 V 14.142 231 O 0.346 0.240 0.150 0.030 0.042 0.050 85.80 -
KCS Construction & Supply 19641
Rehab./Reconst./Upgrading of Albay West Coast Road (Maonon-Basicao-
La Medalla Pioduran)09/03/09 V 14.425 120 C 0.434 0.133 0.300 - - - 86.70 84.48%
Satisfactory
KCS Construction and Supply 19641 Const. of Two (2) CL Sch. Bldg. Lupi
Iligan High School, Cabutagan 04/07/11 V 0.971 90 C 0.413 0.133 0.300 - - - 84.60 *84.60% Satisfactory
KCS Construction and Supply 19641
Road Upgrading Gravel to Paved Road, Rawis-Apud Section Albay
West Coast Road04/01/11 V 16.203 135 C 0.418 0.133 0.300 - - - 85.10 83.48%
Satisfactory
Kejamarenik Const. & Construction Supplies 33742 Const. of MPB, Airport Road 04/08/11 IVB 1.446 120 C 0.450 0.133 0.300 - - - 88.30 *88.30%
Satisfactory
Kejmarenik Construction & Construction Supplies 33742 Rehab. of Barangay Roads - Magbay 08/27/10 IVB 0.474 90 C 0.440 0.133 0.300 - - - 87.30 87.60%
Satisfactory
Kejmarenik Construction & Construction Supplies 33742 Rehab. of Barangay Roads - Bagong
Sikat 08/27/10 IVB 0.484 90 C 0.400 0.133 0.300 - - - 83.30 84.80% Satisfactory
Kenbe Construction & Supply 34290
Conc. of Access Road in Abkasa from Entrance connecting to other
Purok03/28/11 VI 2.721 104 O 0.392 0.236 0.150 0.030 0.042 0.050 90.00 -
Kenbe Construction & Supply 34290 Const. of Roads at Purok 3, Brgy.
Site La Granja 03/29/11 VI 1.840 70 C 0.455 0.133 0.300 - - - 88.80 *88.80% Satisfactory
Kent Construction 8655 Conc. Paving of Dapa-Union Rd. (one Lane) 02/26/10 XIII 5.732 135 C 0.405 0.200 0.000 - - - 60.50 62.24%
Poor
Kent Construction 8655 Concreting of Road Brgy. Canlanipa 05/28/09 XIII 1.526 156 C 0.472 0.130 0.300 - - - 90.20 *90.20% V. Satisfactory
Kent Construction 8655 Completion of Multi-Purpose Bldg., Brgy. Washington 09/06/09 XIII 2.411 105 C 0.456 0.133 0.300 - - - 88.90 *88.90%
Satisfactory
Kent Construction 8655 Concreting of Marga-Capayahan Rd. 09/06/09 XIII 1.363 119 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
Kent Construction 8655 Jct. Osmeña-Pilar Rd.,Maasin 09/03/09 XIII 5.787 381 C 0.461 0.200 0.300 - - - 96.10 78.52% Unsatisfactory
Kent Construction 8655 Siargao Airport Development Project 08/09/11 DOTC 23.844 180 C 0.398 0.200 0.300 - - - 89.80 92.20% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page220
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Kenwood Construction Enterprises 22168 Const. of MPB (TESDA) 04/14/11 I 24.120 180 C 0.475 0.133 0.300 - - - 90.80 *90.80%
V. Satisfactory
Kenwood Construction Enterprises 22186 Conc. of Road, Cadena de Amor Ext.
East, Brgy. Obong 04/11/11 I 0.491 30 C 0.437 0.133 0.300 - - - 87.00 *87.00% Satisfactory
Kenwood Construction Enterprises 22186 Improvement/Rehab. of DPWH Sub-
DEO 08/27/09 I 2.893 180 C 0.404 0.190 0.300 - - - 89.40 88.35% Satisfactory
Kenwood Construction Enterprises 22168
Widening/Conc.g of McArthur Highway (MNR) including Traffic
Mgt.03/05/10 I 9.845 323 C 0.302 0.200 0.300 - - - 80.20 78.64%
Unsatisfactory
Kenwood Construction Enterprises 22186 Const. of 1-CL School Building at
Lokeb Este E/S 06/04/10 I 0.498 45 C 0.427 0.200 0.300 - - - 92.70 92.70% V. Satisfactory
Kenwood Construction Enterprises 22168 Const. of MPB (Gym) Phase III 08/30/10 I 4.823 150 C 0.451 0.160 0.300 - - - 91.10 91.10%
V. Satisfactory
Kenwood Construction Enterprises 22186 Impvt./Rehab. of DPWH-Sub DEO 05/31/09 I 2.892 180 O 0.357 0.264 0.150 0.030 0.045 0.033 87.90 -
Kenwood Construction Enterprises 22186
Widening/Concreting of McArthur Highway (MNR) including Traffic
Management 05/19/09 I 10.060 138 O 0.350 0.201 0.000 0.030 0.050 0.033 66.40 -
Kenwood Construction Enterprises 22186 Construction of Water System at
Brgy. Leet 03/06/09 I 2.411 110 C 0.397 0.200 0.300 - - - 89.70 82.22%Satisfactory
Kez Enterprises (Formerly: Agripo
Construction)25556 Completion of MPB at Sinayawan 02/24/10 X 0.971 75 C 0.474 0.143 0.300 - - - 91.70 91.70%
V.Satisfactory
KEZ Enterprises (Formerly: I. Agripo
Construction)25556 Const. of Multi-Purpose Pavement,
Purok 17-C, Poblacion 05/26/09 X 0.233 45 C 0.475 0.200 0.300 - - - 97.50 *97.50% Outstanding
KEZ Enterprises (Formerly: I. Agripo
Construction)25556 Const. of Multi-Purpose Building,
Tugaya 05/26/09 X 0.935 90 C 0.451 0.139 0.300 - - - 89.00 *89.00% V. Satisfactory
KGD Builders 21960 Concreting of Road 03/20/09 XII 1.413 75 C 0.446 0.133 0.300 - - - 87.90 *87.90% Satisfactory
Kilusang Magkaibigan M. P. Cooperative (KMMPC) 31666 Improvement of the Laoag City
General Hospital 03/03/09 I 0.944 45 C 0.354 0.200 0.300 - - - 85.40 *85.40%Satisfactory
Kilusang Magkaibigan M. P. Cooperative (KMMPC) 31666 Const. of DPWH Davao Oriental 1st
District Engineering Office Bldg. 09/11/09 XI 2.885 150 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666 Const. of MPB (Covered Court) San
Miguel Municipality of Caraga 04/06/11 XI 2.313 300 C 0.487 0.133 0.300 - - - 92.00 *92.00% V. Satisfactory
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666 Const. of MPB, Lambajon E/S,
Lambajon 04/06/11 XI 0.991 75 C 0.486 0.133 0.300 - - - 91.90 86.65% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page221
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666
Road Upgrading (Gravel to Paved) along Mabunturan-Maragusan Road,
Manat and Kao Sect.04/08/11 XI 18.893 180 O 0.346 0.256 0.150 0.030 0.045 0.033 86.00 -
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666
Rehab./Reconst./Upgrading of Damaged Paved National Road, Nabunturan-Mainit Park Road
04/08/11 XI 75.373 282 C 0.402 0.150 0.300 - - - 85.20 84.96% Satisfactory
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666
Road Upgrading (Gravel to Paved) along Montevista-Compostela-New Bataan-Maragusan-Mati Bdry Road,
Liboton-Saddle Sect.
04/09/11 XI 39.340 282 C 0.330 0.147 0.300 - - - 77.70 84.42% Satisfactory
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666 Impv't./Widening along Tagum-
Panabo Circum. Road, Panabo Sect. 04/11/11 XI 18.857 154 C 0.337 0.200 0.300 - - - 83.70 *83.70% Satisfactory
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666 Completion of MPB Lambajon E/S,
Brgy. Lambajon 04/06/11 XI 1.460 100 O 0.364 0.240 0.150 0.030 0.018 0.025 82.70 -
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666 Const. of Flood Control (Laoag
River) Brgy. 34 02/23/10 I 4.820 96 C 0.409 0.133 0.300 - - - 84.20 84.20% Satisfactory
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666 Const. DPWH Davao Oriental 1st
DEO Bldg. 09/06/10 XI 2.825 150 C 0.500 0.133 0.300 - - - 93.30 90.29% V. Satisfactory
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666 Improvement of Highway Junction-
Lantog Bandera Road 06/08/09 XI 4.712 180 C 0.390 0.200 0.300 - - - 89.00 82.58% Satisfactory
Kilusang Magkaibigan M.P. Cooperative
(KMMPC)31666 Improvement of Brgy. San Isidro-
Brgy. Mabini Farm-to-Market Road 06/08/09 XI 1.882 120 C 0.478 0.200 0.300 - - - 97.80 82.38% Satisfactory
Kilusang Magkaibigan Multi-Purpose
Cooperative (KMMPC)31666 Renovation of Student Center-USC
House 07/08/09 U.P. 0.262 10 C 0.409 0.182 0.300 - - - 89.07 *89.07% V.Satisfactory
Kilusang Magkaibigan Multi-Purpose
Cooperative (KMMPC)31666 Renovation of E.B. Lopez Hall 07/08/09 U.P. 0.822 90 C 0.479 0.094 0.300 - - - 87.30 *87.30%
Satisfactory
Kilusang Magkaibigan Multi-Purpose
Cooperative (KMMPC)31666
Concreting of Montevista-Compostela-Mati Road, Araibo
Section09/09/09 XI 1.915 90 C 0.422 0.200 0.300 - - - 92.20 90.16%
V.Satisfactory
Kim-Harold Trading, Manufacturing &
Construction28019 Repair and Rehab. of Concrete Open
Drainage, Brgy. New Barbacan 06/04/09 IV-B 0.094 24 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory
King Gaspar Construction 29984 Construction of Happy Hallow, Farm-
to-Market Road 06/03/09 CAR 4.719 88 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
King Gaspar Construction 29984 Impvt. of Balenben-Irisan Barangay
FMR 09/02/10 CAR 2.887 60 C 0.436 0.156 0.300 - - - 89.20 89.20% V. Satisfactory
King's Builders & Development Corp. 29199
Conc. of CSR-ECR Bulalacao-Or./Occ. Boundary, Bulalacao Port
Section04/06/11 IVB 9.551 126 C 0.399 0.133 0.300 - - - 83.20 83.20%
Satisfactory
King's Builders & Development Corp. 29199
Completion of Mindoro Or./Occ. East Coastal Road, Lambok-San
Francisco Section02/18/10 IVB 27.583 288 C 0.400 0.200 0.300 - - - 90.00 84.90%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page222
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
King's Builders & Development Corp. 29199 Conc. of Bongabong River Front,
Poblacion 05/26/10 IVB 4.758 90 C 0.454 0.200 0.300 - - - 95.40 95.40% V. Satisfactory
King's Builders & Development Corp. 29199 Repair/Rehab. of MPB at Brgy.
Bayuin 05/28/10 IVB 0.399 45 C 0.440 0.133 0.300 - - - 87.30 87.30% Satisfactory
King's Builders & Development Corp. 29199 Impvt. of Bongabong River, Luna 08/30/10 IVB 4.750 140 C 0.461 0.168 0.300 - - - 92.90 88.04%
SatisfactoryKing's Builders &
Development Corp. 29199 Construction of Community Hospital 05/27/09 IV-B 2.842 150 C 0.405 0.200 0.300 - - - 90.50 84.69% Satisfactory
King's Builders & Development Corporation
29199 Const. of Hospital Building at Poblacion 08/21/08 IV-B 2.836 120 C 0.311 0.200 0.300 - - - 81.10 81.31%
V. Satisfactory
Kirskat Venture 32042
Conc. of Tapaz-Jamindan-Altavas Rd., Agambulong Sect. Km. 85+094.3
- Km. 85+562.8 and Km. 85+614.8 - Km. 86+825.8 with exception
03/02/10 VI 29.332 330 C 0.450 0.146 0.300 - - - 89.60 89.60% V.Satisfactory
Kirskat Venture 32042Conc. of Iloilo-Capiz Rd. (New Route)
Yabton-Ivisan Bdry. Rd. Section Km.103+613.50 - Km.104+087.50
06/14/10 VI 9.640 100 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory
Kirskat Venture 32042Conc. of Jct. National Road, Mianay-
Duyoc-Calaan-Panitan Road Km. 93+365-Km. 96+644
06/08/09 VI 11.869 150 C 0.461 0.200 0.300 - - - 96.10 *96.10% Outstanding
Kirskat Venture 32042 Concreting of Maayon-Cuartero Junction, Iloilo-Capiz Road 06/08/09 VI 27.432 180 C 0.441 0.200 0.300 - - - 94.10 *94.10%
V. Satisfactory
Kirskat Venture 32042Rehab./Const./Upgrading of Road
along Maayon Jct. Bailan Road (Km. 120+500-Km 131+100) with
08/31/10 VI 58.407 240 C 0.466 0.133 0.300 - - - 89.90 90.80% V. Satisfactory
Kirskat Venture 32042
Rehab./Reconst./Upgrading of Damaged Paved National Roads, Tapaz-Jamindan-Altavas Road
(Km.85+211-Km.88+342.40) with exception)
08/31/10 VI 56.956 300 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
Kirskat Venture 32042 Const. of Pob. Tabuc, Mambusao River Control 08/31/10 VI 4.812 150 C 0.400 0.133 0.300 - - - 83.30 86.78%
Satisfactory
Kirskat Venture 32042 Const. of Jamindan River Control 08/31/10 VI 4.809 150 C 0.400 0.133 0.300 - - - 83.30 85.34% Satisfactory
KJC Construction & Supply 33401
Const. of Rehabilitation of Aganan River Irrigation System (Irrigation &
Flood Control)06/04/10 NIA 4.469 120 O 0.347 0.300 0.150 0.020 0.032 0.050 89.89 -
KJC Construction & Supply 33041
Impvt./Widening of Bacolod -Murcia-D.S. Benedicto-San Carlos City Road
(Wawa Section)05/26/09 VI 4.520 104 C 0.383 0.200 0.300 - - - 88.30 86.98%
Satisfactory
KJC Construction & Supply 33041 Agana RIS (Rejabilitation of Aganan
RIS Lateral A Bench Flume) 01/10-15/11 NIA 4.469 120 O 0.2529 0.2400 - 0.0300 0.0445 0.0500 61.74 -
KLDS Trading & Construction 28091 Const. of MP Building in the
Municipality of General Trias 09/08/09 IVA 5.747 116 C 0.360 0.166 0.300 - - - 82.60 *82.60% Satisfactory
KLDS Trading & Construction 28091 Const. of MPB at Brgy. Salawag 08/26/10 IVA 4.819 90 C 0.449 0.155 0.300 - - - 90.40 92.57%
V. SatisfactoryKoronadal V & E Builders
& Construction Supply 22187 Const. of MPB, Brgy. Lambingi 04/08/11 XII 2.697 105 O 0.345 0.240 0.150 0.030 0.041 0.033 83.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page223
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Koronadal V & E Builders & Construction Supply 22187 Const. of MPB, Brgy. Moloy 04/08/11 XII 2.697 105 O 0.334 0.240 0.150 0.030 0.035 0.033 82.20 -
Koronadal V & E Builders & Construction Supply 22187 Const. of MPB, Traffic Management
Group (TMG) Building 04/08/11 XII 0.964 173 C 0.463 0.193 0.000 - - - 65.60 75.75% Unsatisfactory
Koronadal V & E Builders & Construction Supply 22187 Widening of Marbel-Makar Road,
Saravia-Carpenter Hill Sect. 04/08/11 XII 7.629 297 C 0.361 0.200 0.000 - - - 56.10 69.30% Poor
Koronadal V & E Builders and Construction Supply 22187
Rehab./Reconst. of Damaged Paved Road along Marbel-Makar Road Saravia-Carpenter Hill Section
06/06/09 XII 13.209 252 C 0.391 0.140 0.300 - - - 83.10 86.10% Satisfactory
Koronadal V & E Builders and Construction Supply 22187 Construction of Multi-Purpose
Building, Brgy. Lapuz (Bo.6) 06/05/09 XII 0.795 98 C 0.331 0.194 0.300 - - - 82.50 *82.50% Satisfactory
Krys-Jon Construction 24624 Construction of Classroom/School Bldg. at NEUST, Sumacab Este 03/04/09 III 0.567 45 C 0.407 0.133 0.300 - - - 84.00 *84.00%
Satisfactory
Krys-Jon Construction 24624 Agno River Integrated Irrigation Project 7/13-18/09 NIA 4.067 90 C 0.392 0.200 0.300 - - - 89.18 *89.18%
V. Satisfactory
KSS Hardware Consttruction and Supply 31239 Const. of Multi-Purpose Building at
Poblacion 03/13/09 XII 0.960 104 C 0.451 0.086 0.300 - - - 83.70 *83.70% Satisfactory
Kuntel Construction 10234Rehab./Reconst./Upgrading of
Bacolod North Rd., Km. 1+904 to Km. 4+293 with exceptions
03/06/10 VI 27.434 275 C 0.394 0.200 0.300 - - - 89.40 87.18% Satisfactory
KVC Construction 28959 Conc. of Acop Road, Kaponga 04/12/11 CAR 0.983 59 O 0.350 0.240 0.150 0.010 0.038 0.050 83.80 -
KVC Construction 28959 Conc. of Baguio-Itogon Road 03/12/09 CAR 14.308 195 C 0.370 0.192 0.300 - - - 86.20 80.26% Unsatisfactory
KVC Construction 28959 Construction of Upper Mesh Footpath 08/26/09 CAR 0.230 30 C 0.460 0.133 0.300 - - - 89.30 *89.30%
V. SatisfactoryKVC Construction /
Valley Construction & Aggregates (JV)
JV-09-247 Impvt. along Baguio City Limit - Sto. Tomas Rd. 04/12/11 CAR 28.248 292 C 0.443 0.186 0.300 - - - 92.90 *92.90%
V. Satisfactory
KVCC Construction 27179 Rehab. of Brgy. Imelda-Brgy. Poblacion Road 03/18/09 VIII 1.906 101 C 0.394 0.194 0.300 - - - 88.80 85.08%
Satisfactory
KVCC Construction 27179 Const./Rehab./Impvt. of DPWH Biliran DEO 08/26/10 VIII 2.882 120 O 0.361 0.240 0.150 0.030 0.042 0.033 85.60 -
Kwikbuilt Construction 24577 Const. of Cabatuan-New Lucena-Bga. Bante Road 04/12/11 VI 9.645 170 C 0.401 0.133 0.300 - - - 83.40 85.32%
Satisfactory
Kyro Builders 19567
Rehab./Reconst./Upgrading of Damaged Paved National road, Pias-Currimao-Balacad Road, Currimao-
Paoay
08/20/10 I 18.977 180 O 0.374 0.240 0.150 0.030 0.048 0.033 87.50 -
Kyro Builders 19567 Rehab./Reconst. Of San Jose-Lupao Road 03/01/10 III 28.087 90 C 0.381 0.200 0.300 - - - 88.10 88.10%
Satisfactory
Kyro Builders 19567 Rehab./Reconst. of Jct. Pinagpanaan-Rizal-Pantabangan Road 06/01/09 III 19.297 63 C 0.456 0.198 0.300 - - - 95.40 *95.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page224
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Kyro Builders 19567 Concreting of Bantug-Sapang Cawayan FMR 06/01/09 III 4.709 60 C 0.328 0.185 0.300 - - - 81.30 82.08%
Satisfactory
Kyro Builders 19567 Road Upgrading (Rehab./Impvt) of Munoz-Lupao Road 09/04/09 III 14.467 40 C 0.473 0.133 0.300 - - - 90.60 *90.60%
V. Satisfactory
L & L Construction 15108 Completion of MPB, Brgy. Lumbo 04/04/11 X 1.171 150 C 0.485 0.133 0.300 - - - 91.80 *91.80% V. Satisfactory
L & L Construction 15108 Conc. of FMR, Casulog, Salay 09/08/10 X 0.992 130 C 0.446 0.133 0.300 - - - 87.90 84.60% Satisfactory
L M D Construction 9410 Construction of Multi-Purpose Building at Dumalinao Pilot School 06/20/09 IX 4.595 180 O 0.380 0.240 0.150 0.020 0.042 0.050 88.20 -
L. Baltonado Const. & Development Corporation
25250 Const. of MPB (Covered Court) Phase I 06/05/10 VIII 1.779 60 C 0.389 0.200 0.300 - - - 88.90 88.90%
Satisfactory
L. C Ting Construction 23666 Repair/Rehab. of Sabang Steel Bridge 06/11/10 XIII 9.234 75 C 0.464 0.133 0.300 - - - 89.70 89.70%
V. Satisfactory
L. C Ting Construction 23666Rehab. of Gamut Steel Bridge along
Surigao-Davao Coastal Road (Alternate Road)
06/09/10 XIII 9.617 60 O 0.352 0.300 0.109 0.030 0.040 0.033 86.40 -
L. C Ting Construction 23666 Rehab. of Paypay Twin Bridge 06/01/10 XIII 19.266 270 O 0.400 0.180 0.150 0.030 0.045 0.033 83.80 -
L. C Ting Construction 23666
Rehab./Reconst. of Damaged Paved National Road (Asphalt Overlay) Daang Maharlika Road (Surigao-
Agusan Road)
06/07/10 XIII 14.077 90 O 0.355 0.240 0.150 0.023 0.035 0.033 83.60 -
L.A Arizola Construction & Supply 31060
Conc. of Kidapawan-Magpet-Pangao-an Rd., (Km. 1625+680.86-
Km.1625+977.30)09/04/09 XII 4.007 65 C 0.462 0.200 0.300 - - - 96.20 *96.20%
V. Satisfactory
L.A Arizola Construction & Supply 31060
Conc. of Kidapawan Magnet-Pangaon-an Road inc. Marbel Bridge
and Approaches03/09/09 XII 9.485 90 O 0.328 0.240 0.150 0.030 0.035 0.033 81.60 -
L.A Clamor Construction 26413 Const. of Multi-Purpose Building at Bukal Sur National High School 02/17/10 IVA 0.671 60 C 0.499 0.141 0.300 - - - 94.00 94.00%
V. Satisfactory
L.A Clamor Construction 26413 Const. of Spillway at Kinatihan II 02/17/10 IVA 0.479 45 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory
L.A Clamor Construction 26413 Const. of MPB at Tiaong Public Market 08/31/10 IVA 0.958 56 C 0.492 0.133 0.300 - - - 92.50 92.50%
V. Satisfactory
L.A Clamor Construction 26413 Const. of One Classroom Academic Building at Manuel Macasaet NHS 08/27/09 IVA 0.598 90 C 0.456 0.200 0.300 - - - 95.60 *95.60%
V. Satisfactory
L.A Digao Construction 15371 Conc. of Road, Brgy. Poblacion 03/01/10 XIII 0.942 90 C 0.491 0.133 0.300 - - - 92.40 92.40% V.Satisfactory
L.A Digao Construction 15371 Const. of MPB Brgy. Capayahan 03/01/09 XIII 0.877 90 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
L.A Digao Construction 15371 Const. of MPB Brgy. Motorpool, Tubod 03/01/10 XIII 2.352 104 C 0.479 0.133 0.300 - - - 91.20 86.23%
Satisfactory
L.A Digao Construction 15371 Const./Impvt./Renovation of Public Market 08/29/10 XIII 3.775 120 O 0.356 0.240 0.150 0.030 0.035 0.033 84.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page225
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.A Digao Construction 15371 Conc. of San Pablo - Songkoy Road 08/29/10 XIII 0.968 90 C 0.369 0.157 0.300 - - - 82.60 82.60% Satisfactory
L.A Digao Construction 15371 Const. of Multi-Purpose Bldg. Brgy. Capayahan 05/28/09 XIII 1.685 118 C 0.448 0.133 0.300 - - - 88.10 *88.10%
Satisfactory
L.A. Digao Construction 15371 Const./Impvt./Renovation of Public Market 04/06/11 XIII 3.774 150 C 0.474 0.144 0.300 - - - 91.80 86.62%
Satisfactory
L.C Construction 7024 Widening of Lanao-Zamboanga City Rd., Tiguma-Lumbia Sect. (Phase II) 06/08/10 IX 18.675 210 C 0.388 0.200 0.300 - - - 88.80 80.76%
Unsatisfactory
L.C Construction 7024
Repair/Rehab. along Dumalinao-Margosatubig Rd., K1685+200 -
K1686+500, Balongating-Dagohoy Sect. w/ exception
08/26/10 IX 4.820 160 C 0.426 0.133 0.300 - - - 85.90 85.90% Satisfactory
L.C Construction 7024 Construction/Rehabilitation/Repair of Multi-Purpose Building 06/05/09 IX 0.464 30 C 0.457 0.133 0.300 - - - 89.00 88.79%
Satisfactory
L.C Construction 7024 Improvement of Access Road, Pagadian City Airport (Lumbia Sect.) 06/05/09 IX 15.346 195 O 0.375 0.238 0.150 0.020 0.042 0.050 87.50 -
L.C Construction 7024 Const. of 1CL Modified Standard School Building 03/11/09 IX 0.476 40 C 0.462 0.175 0.300 - - - 93.70 *93.70%
V. Satisfactory
L.C Construction 7024 Const. of One (1) unit Modified Sch. Bldg., Lantian Elem. Sch. 11/29/08 IX 0.490 45 C 0.356 0.156 0.300 - - - 81.20 *81.20%
V. Satisfactory
L.C Construction 7024 Rehab. of Cagayan de Oro Port Road 03/03/09 X 0.490 14 O 0.275 0.240 0.042 0.020 0.027 0.050 65.40 -
L.C Construction 7024
Rehab./Reconst./Upgrading of Damaged Paved National Roads at
Kolambugan Section, Sta. 1569+000-Sta.1570+009 w/ exception
09/14/09 X 13.841 120 C 0.354 0.189 0.300 - - - 84.30 *84.30% Satisfactory
L.C Construction 7024 Rehabilitation of Cagayan De Oro Port Road 09/01/09 X 13.864 197 C 0.442 0.200 0.000 - - - 64.20 64.92%
Poor
L.C Ting Construction 23666
Rehab./Reconst. of Damaged Paved National Rds. Along Daang
Maharlika Rd. (Agusan-Davao Rd.) Tabon-Tabon-El Rio Section
02/23/10 XIII 45.220 327 C 0.461 0.133 0.300 - - - 89.40 89.40% V.Satisfactory
L.C Ting Construction 23666 Conc. of Butuan City-Pianing-Tandag Rd. 03/08/10 XIII 19.195 255 C 0.426 0.133 0.300 - - - 85.90 87.76%
Satisfactory
L.C Ting Construction 23666Rehab. of Gamut Steel Bridge along
Surigao-Davao Coastal Road (Alternate Route)
09/01/10 XIII 9.617 120 C 0.383 0.200 0.300 - - - 88.30 87.16% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page226
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.C Ting Construction 23666
Rehab./Reconst. of Damaged Paved National Road (Asphalt Overlay) Daang Maharlika Road (Surigao-
Agusan Road)
08/30/10 XIII 14.076 90 C 0.423 0.200 0.300 - - - 92.30 87.08% Satisfactory
L.C Ting Construction 23666 Rehab./Reconst. of Surigao City-San Juan Coastal Road 05/28/09 XIII 5.765 60 C 0.441 0.200 0.300 - - - 94.10 *94.10%
V. Satisfactory
L.C Ting Construction 23666 Const. of Mat-I Bridge & Approaches 05/27/09 XIII 11.822 485 C 0.444 0.200 0.300 - - - 94.40 92.36% V. Satisfactory
L.C Ting Construction 23666 Const. of Olave Bridge & Approaches, Brgy. Olave 05/27/09 XIII 18.338 560 C 0.405 0.200 0.300 - - - 90.50 85.16%
Satisfactory
L.C Ting Construction 23666 Conc. of Lake Mainit Circumferential Road 03/03/09 XIII 9.618 195 C 0.379 0.200 0.300 - - - 87.90 84.36%
Satisfactory
L.C Ting Construction 23666Rehab./Reconst. Along Daang
Maharlika(Surigao-Agusan Rd.) Surigao City-Alegria Sect.
09/06/09 XIII 54.901 210 C 0.480 0.133 0.300 - - - 91.30 *91.30% V.Satisfactory
L.C Ting Construction 23666 Rehab./Reconst. of Surigao-Agusan Rd., Jct. Bad-as-Sison Sect. 09/06/09 XIII 13.484 60 C 0.444 0.133 0.300 - - - 87.70 *87.70%
Satisfactory
L.C Ting Construction 23666 Conc. of Butuan City-Pianing-Tandag Rd. 09/14/09 XIII 19.195 255 O 0.282 0.281 0.150 0.030 0.060 0.033 83.60 -
L.C Ting Construction / Davao L.A. Parts &
Hardware Corporation Joint Venture
JV-07-102Impvt./Conc. of Surigao Del Sur-
Davao Oriental Coastal Road, (Manay-Boston) Manay Section
03/05/10 XI 47.218 332 C 0.384 0.200 0.000 - - - 58.40 70.28% POOR
L.C Ting Construction / Davao L.A. Parts &
Hardware Corporation JV-07-102
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-
Boston) Manay Section11/25/08 XI 47.225 166 O 0.272 0.298 0.100 0.030 0.055 0.067 82.20 -
L.C. Construction 7024Road Upgrading (Gravel to Paved), Lanao-Pagadian, Zamboanga City
Road04/08/11 IX 18.448 210 C 0.393 0.133 0.300 - - - 82.60 84.64%
Satisfactory
L.C. Ting Construction 23666 Rehab. of Patin-ay Bridge II, Patin-ay 04/01/11 XIII 18.246 280 C 0.452 0.200 0.300 - - - 95.20 93.64% V. Satisfactory
L.C. Ting Construction 23666 Rehab. of Paypay Twin Bridge 03/29/11 XIII 19.104 270 C 0.389 0.133 0.300 - - - 82.20 83.58% Satisfactory
L.D Barcelona Construction and Supply 20963
Conc. of Road along Prosperidad-Quezon-Cabaron Road, Cabaron
Section08/09/10 VI 14.234 135 C 0.430 0.133 0.300 - - - 86.30 86.30%
Satisfactory
L.G Lasacar Construction 11960 Const. of Road, Sitio Maubog, Balbagon 03/07/09 X 0.949 65 C 0.401 0.133 0.300 - - - 83.40 *83.34%
Satisfactory
L.G Lasacar Construction 11960 Const./Rehab. of Protection Works / Seawall, Looc Catarman 09/05/09 X 9.358 270 O 0.318 0.226 0.150 0.020 0.047 0.033 79.40 -
L.G Lasacar Construction 11960Const./Impvt. of Mambajao-Catarman-
Cross County Road (Phase 4) Mambajao-Catarman Section
09/05/09 X 9.483 225 O 0.296 0.236 0.000 0.030 0.037 0.017 61.60 -
L.G Lasacar Construction 11960Impvt./Rehab. of Camiguin
Circumferential Road Tangub Section
09/06/09 X 19.004 352 O 0.368 0.012 0.150 0.020 0.037 0.017 60.40 -
L.G Lasacar Construction 11960 Const./Rehab. of Protection Works/Seawall, Looc, Catarman 03/01/10 X 9.358 280 C 0.481 0.200 0.300 - - - 98.10 86.88%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page227
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.G Lasacar Construction 11960Const. of Std. Modified School Bldg. One (1) Classroom (7m x 9m) Brgy.
18A Primary School03/03/10 X 0.696 60 C 0.433 0.133 0.300 - - - 86.60 86.60%
Satisfactory
L.G. Lasacar Construction 11960 Continuation of Const. of MPB
(KPMFI), Brgy. 23 04/04/11 X 3.852 280 C 0.450 0.133 0.300 - - - 88.30 *88.30% Satisfactory
L.G. Lasacar Construction 11960
Const./Impvt. of CCR Slope Protection Works Alangilan (Km.30+400 - Km.30+900)
04/02/11 X 8.687 155 O 0.390 0.240 0.150 0.030 0.032 0.033 87.50 -
L.M.G Construction 5719
Impvt. of Gumaca-Pitogo-Mulanay-San Narciso National Rd.,
Km.249+500 - Km.271+000, Intermittent Sect.
05/26/10 IVA 19.259 35 C 0.474 0.133 0.300 - - - 90.70 90.70% V. Satisfactory
L.M.G Construction 5719Sarangani-Davao Del Sur Coastal Road-Glan Padidu-Glan Poblacion
Section09/16/09 XII 7.039 90 C 0.319 0.133 0.300 - - - 75.20 *75.20%
Unsatisfactory
L.M.G Construction 5719 Construction of Multi-Purpose Building (Health Center) 06/01/09 III 2.171 75 C 0.471 0.200 0.300 - - - 97.10 *97.10%
Outstanding
L.M.G Construction 5719 Daang Maharlika (LZ), Sta. 98+700 to Sta. 101+800 w/ exception 03/04/09 III 18.916 300 C 0.423 0.200 0.300 - - - 92.30 82.64%
Satisfactory
L.M.G Construction 5719 Completion of MPB, Brgy. Signal Village 05/29/09 NCR 7.675 120 C 0.448 0.200 0.300 - - - 94.80 85.28%
Satisfactory
L.M.G. Construction 5719 Const. of MPB at Old Balara E/S Annex, Laura Area, Brgy. Old Balara 03/31/11 NCR 4.773 120 O 0.394 0.192 0.150 0.030 0.052 0.050 86.80 -
L.M.G. Construction 5719 Const. of Pedestrian Overpass, Old Manila South Road, Km. 39+000 04/06/11 IVA 9.636 192 C 0.381 0.109 0.300 - - - 79.00 76.66%
Unsatisfactory
L.N Salvador Construction 16661 Conc. of Road at Barangay San Jose 02/16/10 IVB 3.857 75 C 0.321 0.200 0.300 - - - 82.10 82.10%
Satisfactory
L.N Salvador Construction 16661 Const. of Drainage at Brgy. Libis 09/01/10 IVB 1.635 75 C 0.469 0.099 0.300 - - - 86.80 86.80%
Satisfactory
L.N Salvador Construction 16661 Improvement (Concreting) of Access
Road, Calapan Airport Road 05/25/09 IV-B 0.979 45 C 0.411 0.200 0.300 - - - 91.10 *92.70% V. Satisfactory
L.N. Salvador Construction 1661 Rehab. of Calapan South Road, Sta.
Rita Section 04/06/11 IVB 19.232 260 C 0.430 0.127 0.300 - - - 85.70 *85.70% Satisfactory
L.P.O Enterprises 20730 Completion of 2-Storey 4-Classroom School Building @ Bugarin E/S 08/25/09 IVA 2.984 60 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
L.P.O Enterprises 20730 Const. of Two (2) Storey, 2-L School Building Pedro Guevarra MHHS 09/01/09 IVA 2.310 84 C 0.467 0.128 0.300 - - - 89.50 *89.50%
V. Satisfactory
L.P.O Enterprises 20730 Partial Const. of 2-Storey, 4-CL at Dr. Jose Tamayo MES 09/03/09 IVA 0.931 50 C 0.438 0.133 0.300 - - - 87.10 *87.10%
Satisfactory
L.P.O Enterprises 20730 Const. of MPB (Phase III) 02/23/10 IVA 0.985 50 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory
L.P.O Enterprises 20730 Construction of Road Brgy. Pinagbayanan 02/23/10 IVA 0.995 57 C 0.347 0.200 0.300 - - - 84.70 84.70%
Satisfactory
L.P.O Enterprises 20730 Const. of MPB (Phase II) 02/28/09 IV-A 1.442 75 C 0.472 0.133 0.300 - - - 90.50 *90.50% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page228
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.P.O Enterprises 20730 Const. of Sch. Bldg. At Santolan E/S Brgy. Santolan 06/02/10 NCR 7.513 148 C 0.417 0.200 0.300 - - - 91.70 91.70%
V. Satisfactory
L.P.O. Enterprises 20730 Const. of Academic Bldg. at Santolan E/S 04/05/11 NCR 15.325 180 C 0.479 0.101 0.300 - - - 88.00 87.16%
SatisfactoryL.R De Guzman
Construction 10264 Const. of MPB @ Brgy. Sto. Domingo 02/19/10 III 4.677 70 C 0.489 0.158 0.300 - - - 94.70 94.70%
V. Satisfactory
L.R De Guzman Construction 10264 Rehab./Impv't. of DPWH Bataan 2nd
DEO 08/20/10 III 4.763 58 C 0.456 0.126 0.300 - - - 88.20 88.20% Satisfactory
L.R Tiqui Builders, Inc. 13810
Asphalt Overlay along Daang Maharlika Rd., Km.236+611 -
Km.238+322, Banganan-Darapidap Sect. & Km.238+870 - Km.241+870
06/10/10 II 24.000 90 C 0.463 0.133 0.300 - - - 89.60 89.60% V. Satisfactory
L.R Tiqui Builders, Inc. 13810 Const. of Palilihan Bridge and Approaches (Phase IV) 02/18/10 III 24.992 150 O 0.368 0.300 0.150 0.030 0.042 0.050 94.00 -
L.R Tiqui Builders, Inc. 13810Rehab./Reconst./Upgrading of
Damaged Paved National Road at Pulilan-Calumpit Rd.
03/02/10 III 47.735 120 O 0.353 0.300 0.150 0.030 0.051 0.033 91.70 -
L.R Tiqui Builders, Inc. 13810
Rehab./Reconst./Upgrading of Damaged Paved National Road at
Bigaa-Plaridel via Bulacan & Malolos Rd.
06/09/10 III 28.694 110 O 0.389 0.300 0.150 0.015 0.032 0.033 91.90 -
L.R Tiqui Builders, Inc. 13810Rehab./Reconst. of Damaged Paved
National Roads, Pulilan-Calumpit Sect.
06/10/10 III 47.735 120 C 0.440 0.133 0.300 - - - 87.30 89.94% V. Satisfactory
L.R Tiqui Builders, Inc. 13810 Const. of Revetment along Angat River Baliuag & Bustos Sect. 06/09/10 III 9.563 140 C 0.455 0.133 0.300 - - - 88.80 88.80%
Satisfactory
L.R Tiqui Builders, Inc. 13810Rehab./Reconst./Upgrading of
Damaged Paved National Roads at Gen.Alejo Santos Highway
06/10/10 III 40.605 275 O 0.357 0.240 0.150 0.018 0.043 0.033 84.10 -
L.R Tiqui Builders, Inc. 13810Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Rd. at Bigaa-Plaridel via Bulacan and Malolos Rd.
08/26/10 III 28.694 110 C 0.496 0.123 0.300 - - - 91.90 91.90% V. Satisfactory
L.R Tiqui Builders, Inc. 13810 Const. of Palilihan Bridge and Approaches (Phase IV) 08/17/10 III 24.992 187 C 0.427 0.133 0.300 - - - 86.00 90.80%
V. Satisfactory
L.R Tiqui Builders, Inc. 13810Asphalt Overlay of Daang Maharlika (Poblacion Aritao-Darapirap Section
and Darapidap-Gabut Section)06/02/09 II 39.996 80 C 0.461 0.133 0.300 - - - 89.40 89.88%
V.Satisfactory
L.R Tiqui Builders, Inc. 13810 Asphalt overlay of Daang Maharlika 03/13/09 II 39.996 80 O 0.388 0.225 0.150 0.030 0.059 0.050 90.20 -
L.R Tiqui Builders, Inc. 13810
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan to
Mabalacat, Pampanga, Phase IV, Package I, Meycauayan-Marilao-
Bocaue Section
05/30/09 III 188.051 270 C 0.416 0.200 0.300 - - - 91.60 94.60%V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page229
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.R Tiqui Builders, Inc. 13810
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan to
Mabalacat, Pampanga, Phase IV, Package II, Balagtas-Guiguinto
Section
05/30/09 III 70.394 180 C 0.349 0.200 0.300 - - - 84.90 90.96%V. Satisfactory
L.R Tiqui Builders, Inc. 13810
Traffic Management along Manila North Road from Meycauayan, Bulacan-Mabalacat, Pampanga
(Package II)
06/02/09 III 138.317 269 O 0.315 0.300 0.150 0.030 0.060 0.050 90.50 -
L.R Tiqui Builders, Inc. 13810NCR-Bulacan Boundary-Bigte-Ipo
Dam Road Including Replacement of Kay Tialo Bridge
06/01/09 III 47.641 210 C 0.331 0.200 0.300 - - - 83.10 89.34%V. Satisfactory
L.R Tiqui Builders, Inc. 13810Impvt./Rehab. of Norzagaray-Bigte Road, Bulacan 3rd Congressional
District06/03/09 III 57.822 180 O 0.249 0.300 0.150 0.030 0.055 0.050 83.40 -
L.R Tiqui Builders, Inc. 13810Construction of Palihan Bridge #1
inc. Approaches and Road Right-of-Way along Roman Expressway
08/29/09 III 90.178 270 C 0.452 0.200 0.300 - - - 95.20 94.75% V.Satisfactory
L.R Tiqui Builders, Inc. 13810
Impvt./Widening of McArthur Highway (MNR)-Phase V,
Meycauayan (Bulacan) to Mabalacat (Pampanga)-Bocaue-Balgatas-
Guiguinto Sect.)-CP II
09/05/09 III 88.724 180 O 0.371 0.300 0.150 0.030 0.056 0.033 94.00 -
L.R Tiqui Builders, Inc. 13810Impvt./Widening/Concreting of
Manila North Road (MNR)-Phase V (Malolos-Calumpit Section)-CP I
09/05/09 III 110.823 240 O 0.361 0.300 0.150 0.030 0.056 0.033 93.00 -
L.R Tiqui Builders, Inc. 13810Impvt./Rehab. of General Alejo
Santos Highway inc. Niugan Bridge No. 3
09/09/09 III 62.146 230 O 0.358 0.300 0.150 0.030 0.056 0.033 92.70 -
L.R Tiqui Builders, Inc. 13810 Impvt./Rehab. of Norzagaray-Bigte Road 09/09/09 III 57.900 200 O 0.345 0.300 0.150 0.030 0.056 0.033 91.40 -
L.R Tiqui Builders, Inc. 13810 Rehab. of Meycauayan-Camalig Road 09/09/09 III 19.044 169 C 0.467 0.133 0.300 - - - 90.00 *90.00%
V.Satisfactory
L.R Tiqui Builders, Inc. 13810 Rehab. of Bocaue-San Jose Road 09/07/09 III 1.905 73 O 0.379 0.240 0.150 0.030 0.042 0.033 87.40 -
L.R Tiqui Builders, Inc. 13810
Const. of Palilihan Bridge # 1 including approaches and Road
Right-of-Way along Roman Expressway
02/27/09 III 90.181 240 O 0.351 0.300 0.150 0.030 0.056 0.050 93.70 -
L.R Tiqui Builders, Inc. 13810 Impv't. & Rehab. of Gen. Alejo Santos Highway 03/12/09 III 82.002 210 C 0.389 0.200 0.300 - - - 88.90 *88.90%
Satisfactory
L.R Tiqui Builders, Inc. 13810Impvt. (Widening/Conc.) of Mc Arthur
Highway (MNR) Meycauayan to Mabalacat Pampanga (Phase IV)
03/06/09 III 70.394 180 O 0.366 0.300 0.150 0.030 0.047 0.050 94.30 -
L.R Tiqui Builders, Inc. 13810NCR/Bulacan Bdry.-Bigte-Ipo Dam
Road inc. Replacement of Kay Tialo Bridge
03/10/09 III 47.641 210 O 0.366 0.300 0.150 0.030 0.038 0.050 93.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page230
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.R Tiqui Builders, Inc. 13810Const./Widening of San Marcelino
Bridge and Paredes Bridge Carmona-Dasmariñas Section
09/11/09 IVA 46.748 390 C 0.449 0.200 0.300 - - - 94.90 *94.90% V. Satisfactory
L.R Tiqui Builders, Inc. 13810Impvt./Widening of Aguinaldo
Highway and other related Road Phase
09/11/09 IVA 60.907 437 C 0.423 0.200 0.300 - - - 92.30 86.72% Satisfactory
L.R Tiqui Builders, Inc. 13810 Const. (Widening) of Pasong Buwaya II Bridge along CALA 08/31/10 IVA 21.661 180 C 0.444 0.133 0.300 - - - 87.70 87.70%
Satisfactory
L.R Tiqui Builders, Inc. 13810 Road Impvt. and Repair of Evangelista St., and Mambog 06/04/09 IV-A 14.395 15 C 0.474 0.133 0.300 - - - 90.70 *90.70%
V. Satisfactory
L.R Tiqui Builders, Inc. 13810Widening of Road (Biñan, Laguna to Carmona, Cavite Boundary) Laguna 1st District inc. RROW acquisition
06/01/09 IV-A 48.159 60 C 0.454 0.133 0.300 - - - 88.70 *88.70% Satisfactory
L.R Tiqui Builders, Inc. 13810
Impvt. (Widening/Conc.) of Mc Arthur Highway (MNR) Meycauayan to
Mabalacat, Pampanga (Phase IV) Package 1
11/21/08 III 188.051 270 O 0.376 0.300 0.100 0.030 0.060 0.100 96.60 -
L.R Tiqui Builders, Inc. 13810Impvt/Widening of Aguinaldo
Highway and other related road Phase II
11/11/08 IV-A 60.022 360 O 0.274 0.300 0.100 0.030 0.028 0.100 83.20 -
L.R Tiqui Builders, Inc. 13810 Rehab./Reconst./Upgrading along McArthur Highway 05/27/09 NCR 4.747 90 C 0.431 0.200 0.300 - - - 93.10 *93.10%
V. Satisfactory
L.R Tiqui Builders, Inc. 13810 Const. of MPB, Sacred Heart Subdivision, Brgy. Canumay 03/02/10 NCR 3.325 112 C 0.486 0.133 0.300 - - - 91.90 91.90%
V.Satisfactory
L.R Tiqui Builders, Inc. 13810Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near NLEX) near
Bdry. of Caloocan03/13/09 NCR 27.065 665 C 0.383 0.200 0.300 - - - 88.30 85.40%
Satisfactory
L.R Tiqui Builders, Inc. 13810Traffic Management along Manila
North Road, MNR from Meycauayan, (Package 2)
03/09/09 TEAM 138.317 239 O 0.371 0.300 0.150 0.030 0.060 0.050 96.10 -
L.R. De Guzman Construction 10263 Const. of Road @ Brgy. Alangan 04/02/11 III 3.205 88 O 0.280 0.293 0.150 0.011 0.015 0.017 76.60 -
L.R. Tiqui Builders, Inc. 13810 Const. of Balagtas and North Food Exchange Interchange 04/13/11 III 106.054 431 C 0.497 0.180 0.300 - - - 97.70 96.62%
Outstanding
L.R. Tiqui Builders, Inc. 13810
Pinatubo Hazard Urgent Mitigation Project Phase III, Loan Aggreement
No. PH-P241, Flood Mitigation Works in Guagua
03/31/11 MPE 181.834 517 O 0.329 0.293 0.150 0.024 0.037 0.033 86.60 -
L.S Visorde Construction & Trading 32026 Const. of Brgy. Hall & Day Care
Center (Part 2) at Brgy. 3 02/26/09 IVA 0.673 40 C 0.435 0.133 0.300 - - - 86.80 *86.80% Satisfactory
L.S.D Construction & Supplies 8980 Construction of Sports Center
Building 05/23/09 III 23.631 118 C 0.408 0.200 0.300 - - - 90.80 89.33% V. Satisfactory
L.S.D Construction & Supplies 8980 Construction (Concreting) of Munoz-
Lupao Road 03/02/09 III 46.812 150 C 0.332 0.200 0.300 - - - 83.20 *83.20%Satisfactory
L.S.D Construction & Supplies 8980 Construction/Rehab/Improvement of
Bamban Poblacion Road 03/09/09 III 19.036 150 C 0.340 0.200 0.300 - - - 84.00 *84.00%Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page231
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
L.S.D Construction & Supplies/R.R. Ricafort
Construction and Supplies Joint Venture
JV-08-241 Rehab/Reconst. and Improvement of Concepcion-Lapaz Road 09/01/09 III 28.657 150 C 0.465 0.133 0.300 - - - 89.80 85.30%
Satisfactory
L.S.D. Construction & Supplies 8980 Const. of MPB @ Brgy. Jefmin 04/06/11 III 9.176 120 O 0.383 0.300 0.150 0.022 0.041 0.050 94.60 -
L.S.D. Construction & Supplies 8980
Road Upgrading (Gravel to Concrete) along Isulan Hwy. Jct. Dukay-
Bagumbayan-Sen. Ninoy Aquino Road (Chua Section)
04/05/11 XII 19.005 202 C 0.326 0.200 0.000 - - - 52.60 68.14% Poor
LA Arizola Construction and Supply 31060
Conc. of Kidapawan-Magpet-Pangao-an Road, inc. Marbel Bridge and
Approaches05/29/09 R-XII 9.484 126 C 0.373 0.199 0.300 - - - 87.20 83.84%
Satisfactory
La Prueba Construction 9923Repair of Road Slipped at
Transcentral Highway, Km.18+091 (Phase I & II)
04/14/11 VII 4.445 119 C 0.463 0.133 0.300 - - - 89.60 84.20% Satisfactory
La Prueba Construction 9923 Construction of Flood Control and Drainage Facilities, Brgy. Tisa 06/09/09 VII 0.946 45 C 0.355 0.133 0.300 - - - 78.80 *78.80%
Unsatisfactory
La Prueba Construction 9923 Construction of Multi-Purpose Building at Brgy. Baliwagan 05/26/09 VII 4.766 120 C 0.302 0.133 0.300 - - - 73.50 61.88%
Poor
La Prueba Construction 9923 Const. of Footbridge at Brgy. Capt. Claudio 09/04/09 VII 2.958 144 C 0.408 0.195 0.300 - - - 90.30 79.26%
Unsatisfactory
LABB Construction 13524 Widening of Causeway, Jct. TER, Dauis-Panglao Rd. 03/29/11 VII 10.265 204 O 0.375 0.240 0.150 0.030 0.050 0.050 89.50 -
LABB Construction 13524Concreting of La Union-Candijay-
Mabini Rd. (sta. 166+670 Sta 166+840)
09/04/09 VII 2.636 130 C 0.432 0.192 0.300 - - - 92.40 90.66% V. Satisfactory
LABB Construction 13524 Const. of Bridge along Concepcion-Danao-Buenavista-Carmen Rd. 09/09/09 VII 13.914 559 C 0.448 0.200 0.300 - - - 94.80 89.32%
V. Satisfactory
Labb Construction 13524 Const. of Bridges along Concepcion-Danao-Buenavista Carmen Road 11/19/08 VII 9.564 350 O 0.343 0.238 0.100 0.030 0.037 0.100 84.80 -
Labb Construction 13524Concreting of La Union, Candijay-
Mabini Road (Sta. 166+670-Sta. 166+846)
06/05/09 VII 2.636 125 O 0.359 0.300 0.131 0.030 0.042 0.033 89.50 -
Labb Construction 13524 Const. of Bridge along Concepcion, Danao-Buenavista Carmen Road 06/06/09 VII 13.914 504 O 0.344 0.263 0.150 0.030 0.047 0.050 88.40 -
Labb Construction 13524 Completion of MPB/Completion of Municipal Hall 02/25/10 VII 0.929 240 C 0.400 0.133 0.300 - - - 83.30 84.70%
SatisfactoryLady of Assumption
Enterprises 25360 Const./Impvt. of MPB at Poblacion Tomas Oppus 02/28/10 VIII 1.888 120 C 0.468 0.133 0.300 - - - 90.10 90.10%
V. SatisfactoryLady of Assumption
Enterprises 25360 Const./Impvt. of Multi-Purpose Building at Tomas Oppus 05/26/09 VIII 1.876 240 C 0.437 0.133 0.300 - - - 87.00 84.93%
Satisfactory
Lakewood Construction Company 5294 Rehab. of DPWH Engineering Office 09/06/10 IX 3.817 150 C 0.429 0.133 0.300 - - - 86.20 87.53%
Satisfactory
Lakewood Construction Company 5294 Construction of Flood Control at
Brgy. Sanito 09/04/09 IX 9.495 572 C 0.431 0.200 0.300 - - - 93.10 76.40% Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page232
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Lanao Builder and Enterprises 15982
Conc of Iligan-Bukidnon Road, Bonbonon Sect., (Sta.1525+080 - Sta.1525+420), Brgy. Bonbonon
04/10/11 X 8.947 153 C 0.499 0.199 0.300 - - - 99.80 96.62% Outstanding
Lanao Builder and Enterprises 15982 Conc. of Iligan-Bukidnon Road,
Bonbonon Sect., Brgy. Bonbonon 04/10/11 X 18.150 259 C 0.478 0.178 0.300 - - - 95.60 *95.60% V. Satisfactory
Lanao Builder and Enterprises 15982
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads,
Linamon-Zamboanga Road04/09/11 X 30.126 179 C 0.409 0.133 0.300 - - - 84.20 86.06%
Satisfactory
Lanao Builder and Enterprises 15982 Rehab./Reconst./Upgrading of
Linamon-Zamboanga Road 06/03/10 X 30.126 179 O 0.385 0.240 0.150 0.023 0.045 0.033 87.60 -
Lanao Builder and Enterprises 15982
Rehab./Reconst./Upgrading of Damaged Paved National Roads,
Iligan City-Marawi City Road08/27/10 X 48.107 224 O 0.383 0.240 0.150 0.030 0.055 0.033 89.10 -
Lanao Builder and Enterprises 15982 Rehab. of Linamon-Zamboanga
Roads, Kauswagan Section 08/30/08 X 9.053 120 O 0.333 0.240 0.100 0.030 0.032 0.100 83.50 -
Lanao Builder and Enterprises 15982
Rehab./Reconst. of Damaged National Road along Linamon-
Zamboanga Road, Donggo-an Sect.06/05/09 X 17.145 281 C 0.469 0.167 0.300 - - - 93.60 90.78%
V. Satisfactory
Lanao Builder and Enterprises 15982
Widening of Kapatagan Poblacion Road along Linamon-Zamboanga
Road09/11/09 X 7.429 152 C 0.471 0.133 0.300 - - - 90.40 88.60%
Satisfactory
Lanao Builders and Enterprises 15982 Completion of ACA Bldg., I Phase
(Construction) 11/26/08 DOST 11.364 270 O 0.339 0.289 0.093 0.030 0.060 0.050 86.12 -
Lanao Builders and Enterprises 15982 Completion of ACA Building I
(Phase 3) 11/26/08 DOST 11.364 270 O 0.339 0.289 0.093 0.030 0.060 0.050 86.12 -
Landrock Construction 27541 Construction of Multi-Purpose Building, Litanville 06/08/09 R-XII 0.940 75 C 0.303 0.200 0.300 - - - 80.30 84.22%
SatisfactoryLano Builder and
Enterprises 15982 Rehab. of Linamon-Zamboanga Roads, Kauswagan Section 09/14/09 X 90.053 258 C 0.322 0.200 0.300 - - - 82.20 82.98%
Satisfactory
Laser's Builder 11817 Partial Const. of MPB, Barangay Longos 03/30/11 NCR 0.965 60 O 0.367 0.240 0.150 0.030 0.035 0.033 85.50 -
Laser's Builder 11817 Rehab./Impvt. of Multi-Purpose Building, Various Barangay 05/25/09 NCR 0.708 45 C 0.490 0.133 0.300 - - - 92.30 *92.30%
V. Satisfactory
Laser's Builder 11817 Repair/Rehab. of School Bldg. At C. Ramon Magsaysay E/S 09/14/09 NCR 1.458 45 C 0.457 0.133 0.300 - - - 89.00 *89.00%
Satisfactory
Laser's Builder 11817 Completion of MPB at Brgy. South Triangle 02/26/10 NCR 3.822 108 C 0.382 0.200 0.300 - - - 88.20 88.20%
Satisfactory
Laser's Builders 11817 Upgrading/Conc. of Roads with Drainage Improvement 03/04/09 NCR 0.956 60 C 0.361 0.200 0.300 - - - 86.10 *86.10%
SatisfactoryLaTorre Builders &
Construction 29538 Construction of Seawall Poblacion 02/24/10 VIII 0.950 90 C 0.354 0.200 0.300 - - - 85.40 85.40% Satisfactory
Latorre Builders & Construction 29538 Const. of Grouted Riprap @
Tangahas-Lirang Creek, Brgy. 59-B 04/14/11 VIII 0.962 83 C 0.339 0.200 0.300 - - - 83.90 *83.90% Satisfactory
Leadway Construction & Development Corp.
(LCDC)4378
Widening/Conc. of McArthur Highway (MNR), Meycauayan
(Bulacan) to Mabalacat (Pampanga)-Phase VI (Package 2), Pampanga 3rd
Congressional District
03/30/11 III 441.769 367 C 0.462 0.200 0.300 - - - 96.20 93.56% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page233
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Leadway Construction & Development Corp.
(LCDC)4378 Const. of Access Rd. to
Floridablanca Interchange 08/17/10 III 100.000 120 C 0.488 0.133 0.300 - - - 92.10 92.10% V. Satisfactory
Leadway Construction & Development Corp.
(LCDC)4378
Const. of Basa Air Base Access Rd. (Floridablanca) Leading to SCTEX
Interchange (Phase II)08/17/10 III 45.355 120 C 0.483 0.133 0.300 - - - 91.60 91.60%
V. Satisfactory
Leadway Construction & Development Corp.
(LCDC)4378
Const. of Basa Air Base Access Rd. (Floridablanca) Leading to SCTEX
Interchange08/17/10 III 93.566 240 C 0.457 0.133 0.300 - - - 89.00 91.31%
V. Satisfactory
Leadway Construction & Development Corp.
(LCDC)4378
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan,
Bulacan to Mabalacat, Pampanga, Phase IV Package VIII-Replacement
of Tulaoc-Sto.Domingo Bridge & Approaches
03/11/09 III 46.752 150 C 0.454 0.200 0.300 - - - 95.40 *95.40%V. Satisfactory
Leadway Construction & Development Corp.
(LCDC)4378
Impvt./Widening/Conc. of MNR-Phase V-Meycauayan, Bulacan to
Mabalacat, Pampanga-Completion of Tulaoc Bridge and Sto. Domingo Bridge and Approaches (CP VI)
08/28/09 III 31.028 171 O 0.361 0.300 0.150 0.030 0.050 0.050 94.10 -
Leadway Construction & Development Corp.
(LCDC)4378
Const. of BASA Airbase Access Road (Floridablanca) leading to
SCTEX Interchange08/25/09 III 93.566 240 O 0.369 0.300 0.150 0.030 0.051 0.033 93.30 -
Leadway Construction & Development Corp.
(LCDC)4378
Const. of Access Road (West Lateral Dike) connecting to Hacienda-
Dolores-Porac (SCTEX) Interchange, Hacienda
08/25/09 III 123.501 210 C 0.464 0.200 0.300 - - - 96.40 92.80% V. Satisfactory
Lechi Construction 24196 Construction of Flood Control (Seawall) 06/06/09 VIII 2.833 120 O 0.356 0.240 0.150 0.022 0.037 0.033 83.80 -
Leda Construction Incoporated 12229 Rehab. of Roads along Palo-Carigara-
Ormoc Road 09/01/09 VIII 18.891 150 C 0.388 0.200 0.300 - - - 88.80 86.04% Satisfactory
Leda Construction Incoporated 12229
Const. of Jaro-Dagami-Burauen-La Paz Road Jaro-Dagami-Burauen-La
Paz Road Sect.09/01/09 VIII 18.890 150 C 0.472 0.140 0.300 - - - 91.20 85.50%
Satisfactory
Leda Construction Incorporated 12229 Const. of Concepcion, Danao-
Buenavista, Carmen Rd. 03/31/11 VII 14.070 686 C 0.455 0.181 0.300 - - - 93.60 86.04% Satisfactory
Leda Construction Incorporated 12229 Jct. (LIR) Buenavista-Carmen-Danao-
Getafe Rd. 09/09/09 VII 12.184 450 O 0.344 0.240 0.150 0.030 0.037 0.033 83.40 -
Leda Construction Incorporated 12229
Const. Of Pontaas Bridge along Buenavista, Carmen- Concepcion
Danao Rd.02/27/10 VII 18.773 519 C 0.484 0.134 0.300 - - - 91.80 88.52%
Satisfactory
Leda Construction Incorporated 12229
Concrete Paving of Jct. (LIR) Buenavista-Carmen-Danao-Getafe
Road Poblacion Danao Section02/27/10 VII 9.614 308 C 0.425 0.139 0.300 - - - 86.40 87.03%
Satisfactory
Leda Construction Incorporated 12229 Impvt./Const. of Concepcion-Danao-
Buenavista-Carmen Road 02/23/10 VII 19.036 240 C 0.449 0.087 0.300 - - - 83.60 84.14% Satisfactory
Leda Construction Incorporated (Formerly:
Leda Const.)12229 Rehab./Impvt. of Seawall 03/04/09 VII 10.881 378 C 0.401 0.200 0.300 - - - 90.10 86.68%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page234
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Leda Construction Incorporated (Formerly:
Leda Const.)12229 Rehab. of Palo-Carigara-Ormoc Road 03/16/09 VIII 18.889 150 C 0.316 0.154 0.300 - - - 77.00 82.10%
Satisfactory
Leda Construction Incorporated (Formerly:
Leda Construction)12229 Jct. (LIR) Buenavista-Carmen-Danao-
Getafe Rd. 06/01/10 VII 13.216 390 C 0.341 0.200 0.300 - - - 84.10 86.18% Satisfactory
Leda Construction Incorporated (Formerly:
Leda Construction)12229
Upgrading of Tubigon-Jagna via Carmen-Sierra Bullones Rd.,
Sta.84+460 - Sta.86+46006/03/10 VII 48.170 210 O 0.279 0.254 0.150 0.030 0.050 0.050 81.30 -
Leda Construction Incorporated (Formerly:
Leda Construction)12229 Upgrading of Tubigon-Jagna Road
Via Carmen-Sierra Bullones 08/26/10 VII 48.170 210 O 0.370 0.243 0.150 0.030 0.047 0.050 89.00 -
Leda Construction Incorporated (Formerly:
Leda Construction)12229
Rehab./Reconst. of Palo-Carigara-Ormoc Rd., Palo-Carigara-Ormoc Rd.
Sect.05/31/10 VIII 11.194 120 O 0.400 0.300 0.069 0.030 0.037 0.033 86.90 -
Leda Construction Incorporated (Formerly:
Leda Construction)12229
Const. of Jaro-Dagani-Burauen-La Paz Road Jaro-Dagami-Burauen-La
Paz Section08/23/10 VIII 18.888 150 C 0.481 0.133 0.300 - - - 91.40 89.12%
V. Satisfactory
Leda Construction Incorporated (Formerly:
Leda Construction)12229 Road Upgrading (Gravel to Paved) to
Tigbao-Pulak-Sta. Fe Road 09/07/10 VIII 18.991 120 C 0.480 0.133 0.300 - - - 91.30 88.24% Satisfactory
Leda Construction Incorporated (Formerly:
Leda Construction)12229
Rehab./Reconst. of Palo-Carigara-Ormoc Road, Palo-Carigara-Ormoc
Road Section08/23/10 VIII 11.194 120 C 0.442 0.133 0.300 - - - 87.50 87.14%
Satisfactory
Leda Construction, Incorporated 12229 Road Reblocking Real St., Poblacion 02/22/10 VIII 0.944 75 C 0.379 0.200 0.300 - - - 87.90 87.90%
Satisfactory
Legacy Construction 22465 Conc. of Bacolod South Road, Culipapa Section Brgy. Culipapa 04/02/11 VI 9.398 184 O 0.382 0.246 0.150 0.030 0.042 0.050 90.00 -
Legacy Construction 22465Conc./Rehab. of National Road along Bacolod North Road, Victorias City
Sect.03/30/11 VI 18.903 145 C 0.325 0.200 0.000 - - - 52.50 67.74%
Poor
Legacy Construction 22465 Rehab./Recons./Upgrading of Dumaguete North Rd. (Calo Rd. Sec.) 09/12/09 VII 26.856 200 O 0.386 0.240 0.150 0.030 0.037 0.033 87.60 -
Legacy Construction 22465
Rehab./Reconst./Upgrading of Damaged National Roads,
Dumaguete North Rd., Calo Road Sect.
06/10/10 VII 26.880 260 C 0.422 0.153 0.300 - - - 87.50 82.55% Satisfactory
Legacy Construction 22465 Construction and Improvement of Punta Taytay Main Drainage 8/10-18/09 NIA 5.936 421 C 0.366 0.200 0.300 - - - 86.57 *86.57%
Satisfactory
Legacy Construction 22465 Rehabilitation and Improvement of Sibud Main Drainage 04/16-18/09 NIA 6.636 231 C 0.468 0.247 0.200 - - - 91.50 91.50%
V. SatisfactoryLegaspi Premium
Development Corporation
20701 Const. of the Extension of Tabaco City Public Market 05/28/10 V 11.568 159 C 0.488 0.133 0.300 - - - 92.10 89.93%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page235
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Legazpi Premium Development Corporation
20701 Const. of Pedestrian Overpass Sorsogon Pilot E/S 04/11/11 V 4.772 180 C 0.487 0.133 0.300 - - - 92.00 *92.00%
V. Satisfactory
Legazpi Premium Development Corporation
20701 Const. of Lamba Bridge 03/28/11 V 28.822 402 O 0.329 0.300 0.150 0.022 0.040 0.050 89.10 -
Legazpi Premium Development Corporation
20701
Upgrading of Aroroy (Masbate)-Masbate City-Cawayan port Road (Conc. of Aroroy-Baleno-Lagta-Masbate-Jct. Buenavista Road)
04/13/11 V 49.970 200 C 0.242 0.200 0.300 - - - 74.20 85.78% Satisfactory
Legazpi Premium Development Corporation
20701 Rehab./Impvt. of Tunga-Pajo Brgy. Road 04/03/11 V 19.285 120 O 0.313 0.300 0.150 0.022 0.033 0.033 85.10 -
Legazpi Premium Development Corporation
20701 Opening/Impv't./Const. of Guiamon-San Ramon Road, Phase XII 04/07/11 VI 44.384 420 C 0.497 0.189 0.300 - - - 98.60 *98.60%
Outstanding
Legazpi Premium Development Corporation
20701 Opening/Impv't./Const. of Bigaa-Lumbuyan Road, Phase III 04/07/11 VI 40.524 300 C 0.494 0.182 0.300 - - - 97.60 *97.60%
Outstanding
Legazpi Premium Development Corporation
20701 Opening/Impv't./Const. of Bigaa-Lumbuyan Road, Phase I 04/07/11 VI 33.768 360 C 0.487 0.082 0.300 - - - 86.90 *86.90%
Satisfactory
Legazpi Premium Development Corporation
20701 Opening/Impv't./Const. of Biga-a-Lumbuyan Road, Phase II 04/06/11 VI 43.419 420 C 0.485 0.069 0.300 - - - 85.40 *85.40%
Satisfactory
Legazpi Premium Development Corporation
20701 Opening/ Impvt. of Sitio Tina-Sitio Nauasan Rd. (Phase I) 02/27/10 VI 40.515 310 O 0.382 0.300 0.129 0.020 0.028 0.017 87.60 -
Legazpi Premium Development Corporation
20701 Widening/Imprv't. of Brgy. Luctoga- Brgy. Manika Rd. 02/27/10 VI 36.660 340 C 0.388 0.175 0.300 - - - 86.30 86.30%
Satisfactory
Legazpi Premium Development Corporation
20701 Widening/Imprv't. of Lupaan-Tigunhao rd., Sta. 6+140 - 7+800 02/26/10 VI 19.297 270 C 0.360 0.168 0.300 - - - 82.80 82.80%
Satisfactory
Legazpi Premium Development Corporation
20701 Desilting/Deepening of Cagboaya River 08/24/10 IVB 14.473 90 C 0.490 0.186 0.300 - - - 97.60 97.60%
Outstanding
Legazpi Premium Development Corporation
20701 Opening/Construction of Taladong-Caguiba Road (Phase II) 05/18/09 V 14.250 171 C 0.437 0.183 0.300 - - - 92.00 83.15%
Satisfactory
Legazpi Premium Development Corporation
20701 Viga Pilot Bridge and Approaches along Viga-Panganiban Road 09/05/09 V 17.346 820 C 0.476 0.172 0.300 - - - 94.80 83.39%
Satisfactory
Legazpi Premium Development Corporation
20701 Const. of the Extension of Tabaco City Public Market 02/22/10 V 11.568 159 O 0.380 0.240 0.150 0.030 0.040 0.050 89.00 -
Legazpi Premium Development Corporation
20701 Opening/Impvt. of Sitio Tina-Sitio Nausan Road (Phase I) 09/04/10 VI 40.515 360 C 0.489 0.192 0.300 - - - 98.10 91.80%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page236
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Lehci Construction 24196 Const. of Riprap Seawall, Brgy. West Visoria 02/23/10 VIII 1.889 120 C 0.331 0.200 0.300 - - - 83.10 83.10%
Satisfactory
Lehci Construction 24196 Const./Repair of 2-CL School Building, San Isidro E/S 06/09/09 VIII 1.249 90 C 0.491 0.184 0.300 - - - 97.50 *97.50%
Oustanding
Lehci Construction 24196 Impvt. (Conc.) of Access Road to Airport, Tacloban Airport Road 09/18/09 VIII 19.300 208 C 0.403 0.200 0.300 - - - 90.30 *90.30%
V. Satisfactory
Lehci Construction 24196 Construction of Flood Control (Seawall) 09/01/09 VIII 2.833 120 C 0.418 0.200 0.300 - - - 91.80 87.00%
Satisfactory
Leo-J Construction Services 27248
Asphalt Overlay along Olongapo-Bugallon Rd., Km.259+000 -
Km.259+34005/29/10 III 4.476 10 C 0.449 0.133 0.300 - - - 88.20 88.20%
Satisfactory
Leo-J Construction Services 27248
Const./Rehab./Replacement/Completion and Repair of Elementary & Secondary School Bldg., La Paz
08/02/09 III 9.506 120 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory
Leza Construction and Supply 25563 Const. of MPB at Magtaking (Phase
II) 03/01/10 I 1.526 150 C 0.408 0.200 0.300 - - - 90.80 90.80% V. Satisfactory
Leza Construction and Supply 25563 Const. of MPB Lilimasan (Phase II) 03/01/09 I 1.000 150 C 0.365 0.200 0.300 - - - 86.50 86.50%
SatisfactoryLeza Construction and
Supply 25563 Const. of MPB at Tandoc (Phase II) 03/01/10 I 1.526 150 C 0.364 0.200 0.300 - - - 86.40 86.40% Satisfactory
Leza Construction and Supply 25565 Construction of Drainage System at
Tuliao 03/06/09 I 4.822 120 C 0.434 0.200 0.300 - - - 93.40 82.24%Satisfactory
Leza Construction and Supply 25565 Construction/Completion/Repair of 1
Classroom, Doyong Malabago E/S 03/06/09 I 0.482 150 C 0.438 0.180 0.300 - - - 91.80 *91.80%V. Satisfactory
Leza Construction and Supply 25565 Const. of Drainage Canal System at
Tuliao 11/26/08 I 4.822 120 O 0.267 0.200 0.100 0.020 0.028 0.133 74.80 -
LGC Trucking and Construction 14464 Conc. of Sampaguita-Veruela Road 04/04/11 XIII 4.699 145 O 0.293 0.300 0.150 0.030 0.048 0.050 87.10 -
LGC Trucking and Construction 14464 Repair of Academic Classroom at
Mintabon E/S 06/17/10 X 0.588 120 C 0.419 0.133 0.300 - - - 85.20 84.15% Satisfactory
LGC Trucking and Construction 14464 Const. of MPB (SURSECO-1 Gym),
Brgy. San Fernando 03/04/10 XIII 1.903 165 O 0.387 0.240 0.150 0.030 0.047 0.033 88.70 -
LGC Trucking and Construction 14464 Rehab./Const. of Manapa Footbridge 02/22/10 XIII 1.925 105 C 0.445 0.133 0.300 - - - 87.80 87.80%
Satisfactory
LGC Trucking and Construction 14464
Const. of Flood Control Structures/Shoreline Protection,
Guava Jct., Brgy. Poblacion03/04/10 XIII 0.954 165 O 0.360 0.240 0.150 0.030 0.047 0.050 87.70 -
LGC Trucking and Construction 14464 Conc. of Road in Purok 1,2,3 & 5
Caramcam District 06/11/10 XIII 3.337 149 C 0.476 0.133 0.300 - - - 90.90 88.50% Satisfactory
LGC Trucking and Construction 14464
Completion/Repair/Rehab. of Flood Control Structures/Shoreline
Protection, Danipas, Brgy. Labisma06/11/10 XIII 0.950 148 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
LGC Trucking and Construction 14464
Const. of Flood Control Structures/Shoreline Protection,
Guava Jct., Brgy. Poblacion06/11/10 XIII 0.954 165 C 0.313 0.133 0.300 - - - 74.60 82.46%
Satisfactory
LGC Trucking and Construction 14464 Const. of MPB (SURSECO 1 Gym) 06/11/10 XIII 1.903 165 C 0.213 0.133 0.300 - - - 64.60 81.47%
Unsatisfactory
LGC Trucking and Construction 14464 Conc. of Talacogon-La Paz-Loreto-
Veruela-Sta. Josefa Marbon Section 06/09/09 XIII 9.483 382 C 0.409 0.200 0.300 - - - 90.90 86.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page237
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
LGC Trucking and Construction 14464 Const. of Tolosa-BLISS Rd. Tolosa 09/01/09 XIII 0.999 60 C 0.462 0.133 0.300 - - - 89.50 *89.50%
V.SatisfactoryLGC Trucking and
Construction 14464 Const. of Maparasan Primary School, San Roque 09/11/09 XIII 0.668 90 C 0.454 0.140 0.300 - - - 89.40 *89.40%
V.SatisfactoryLiberty Builders and
Development Corporation
7224 Restoration of the Burnt Bureau of Immigration Main Bldg. 03/10/09 Sp. Bldgs 30.029 645 C 0.467 0.000 0.300 - - - 76.70 83.56%
Satisfactory
Librius Construction & Supply Corporation (Formerly: Librius
Construction & Supply)
23580 Conc. of Brgy. Roads at Brgy. Maugat West (Ilaya) 06/07/10 IVA 1.974 120 C 0.431 0.133 0.300 - - - 86.40 86.40%
Satisfactory
Likayan Construction 32714 Const. of 2-CL, Rooms-Sayapot PS 05/23/09 CAR 0.866 100 C 0.466 0.116 0.300 - - - 88.20 *88.20% Satisfactory
Lim General Contractor 8482Conc. of Tablas Circ. Road, San Agustin-Calatrava Road (Can-Omiang-Cabulotan Section)
08/27/09 IVB 19.298 180 O 0.333 0.300 0.150 0.030 0.047 0.033 89.30 -
Lim General Contractor 8482Conc. of Tablas Circumferential
Road-San Agustin-Calatrava Road (Dakit-Dakit Section)
02/22/10 IVB 19.298 177 C 0.454 0.133 0.300 - - - 88.70 91.52% V. Satisfactory
Lim General Contractor 8482Conc. of Tablas Circumferential
Road, Alcantara-Looc Road (Tugdan Airport)
02/23/10 IVB 19.298 170 C 0.385 0.200 0.300 - - - 88.50 88.92% Satisfactory
Lim General Contractor 8482Conc. of Tablas Circumferential
Road, Calatrava-San Agustin Road (Salingsing Section)
02/22/10 IVB 19.298 150 C 0.448 0.133 0.300 - - - 88.10 87.98% Satisfactory
Lim General Contractor 8482Rehab./Reconst. of Tablas
Circumferential Road, Alcantara-Looc Section
05/22/09 IV-B 18.798 167 C 0.268 0.200 0.300 - - - 76.80 79.62% Unsatisfactory
Lim General Contractor 8482Rehab./Reconst. of Damaged
National Road along San Fernando North Rd., San Jacinto Section
03/01/09 V 18.898 233 C 0.437 0.133 0.300 - - - 87.00 72.30% Poor
Lim General Contractor 8482 Concreting of Masbate City-Cawayan Road Network 08/28/09 V 33.248 210 C 0.440 0.153 0.300 - - - 89.30 *89.30%
V. Satisfactory
Lim General Contractor Corporation 8482 Conc. of Guinhayaan-Jct. Malbog
National Secondary Road 04/11/11 IVB 19.298 180 O 0.344 0.284 0.150 0.030 0.006 0.033 84.70 -
Lim General Contractor Corporation 8482
Conc. of Tablas Circumferential Rd. (San Agustin-Calatrava Rd.) Can-
omiang Cabulotan Sect.06/10/10 IVB 19.298 180 C 0.367 0.180 0.300 - - - 84.70 87.46%
Satisfactory
Lim General Contractor Corporation (Formerly: Lim General Contractor)
8482Conc. of Tablas Circumferential
Road, San Agustin-Sta. Maria Road (San Agustin Sect.)
08/24/10 IVB 27.018 178 C 0.107 0.049 0.300 - - - 45.60 45.60% Poor
Limar Construction 10203Const. of Boulders Riprap and
Embankment, Bahay Creek, Brgy. Guindapunan
09/07/10 VIII 3.812 120 C 0.482 0.133 0.300 - - - 91.50 91.50% V. Satisfactory
Linear Construction Corp. 3575 Repair of Damaged Portion of Rip-
Rapping and Roadworks 12/16/10 NHA 3.354 90 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page238
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Linear Construction Corporation 3575
Conc. of Lublub-Calao-Rosario-Cansilayan Road, Km.274+560 - Km.281+000.50 with exception
04/12/11 VI 11.454 240 C 0.456 0.133 0.300 - - - 88.90 84.10% Satisfactory
Linear Construction Corporation 3575 Construction of Two-Storey Multi-
Purpose Center (Building) 10/05/10 NHA 4.988 90 C 0.490 0.200 0.300 - - - 99.00 94.50% V. Satisfactory
Linear Construction Corporation 3576 Construction of 1 unit 3-Storey, 15-
Classroom School Bldg. (Building) 10/05/10 NHA 21.647 368 C 0.495 0.200 0.300 - - - 99.50 88.30% Satisfactory
Linear Construction Corporation 3577 Construction of 1 unit 3-Storey, 15-
Classroom School Bldg. (Building) 10/05/10 NHA 22.107 150 C 0.499 0.200 0.300 - - - 99.90 89.19% V. Satisfactory
Linear Construction Corporation
Construction of One unit 3-Storey 15-Classroom School Building 01/25/11 NHA 22.853 150 C 0.458 0.200 0.300 - - - 95.80 *95.80%
V. Satisfactory
Linear Construction Corporation 3575 Construction of 1 unit 3-Storey, 15-
Classroom School Building 04/12/10 NHA 21.655 249 O 0.398 0.300 0.000 0.030 0.070 0.050 84.80 -
Linear Construction Corporation 3575 Construction of Two-Storey Multi-
Purpose Center 06/16/10 NHA 4.989 90 O 0.40 0.300 0.075 0.030 0.070 0.050 92.50 -
Linear Construction Corporation 3575 Construction of 1 unit 3-Storey, 15-
Classroom School Bldg. 06/16/10 NHA 22.107 150 O 0.396 0.30 0.00 0.03 0.07 0.05 84.60 -
Liong-Co Construction & Construction Supply 28361
Completion of Miputak-Turno By Pass Road with Drainage
Components03/18/09 IX 4.716 180 C 0.470 0.200 0.300 - - - 97.00 85.54%
Satisfactory
Lisa Construction 24134 Cabanatuan City-Carmen Road 06/02/09 III 28.570 120 O 0.391 0.206 0.150 0.020 0.030 0.050 84.70 -
Lisa Construction 24134 Rehab./Reconst & Impvt. of Cabanatuan City-Carmen Road 09/04/09 III 28.950 120 C 0.416 0.133 0.300 - - - 84.90 84.78%
Satisfactory
Liza Construction 24234
Regraveling/Completion of FMR in Brgy. Sta. Monica to San Eustacio La
Purisima to Pantoc, Bibiclat & Santiago to Magsaysay Road
03/02/09 III 46.812 150 C 0.344 0.200 0.300 - - - 84.40 *84.40%Satisfactory
LJPM Builders & Construction Supply 29981 Rehab./Impvt. of National Road along
Amaga-Liloan Road Section 11/21/08 VIII 3.735 180 O 0.380 0.240 0.100 0.020 0.037 0.100 87.70 -
LJPM Builders & Construction Supply 29981 Repair/Impv't of National Roads
along Amaga-Liloan Road Section 03/05/09 VIII 3.735 180 C 0.433 0.134 0.300 - - - 86.70 85.26%Satisfactory
Llaban Construction & Trucking 29504 Concreting of Kidapawan-Ilomavis
Tourist Road 09/05/09 XII 18.530 112 C 0.389 0.200 0.300 - - - 88.90 *88.90% Satisfactory
Llaban Construction & Trucking 29504 Completion of Multi-Purpose
Building @ Brgy. Poblacion 09/03/09 XII 0.956 75 C 0.441 0.133 0.300 - - - 87.40 *87.40% Satisfactory
Llaban Construction & Trucking 29504
Conc. of Makilala-Ala Junction Road, Cotabato-Maguindanao Boundary, along Makilala-Ala Junction Road
08/27/10 XII 12.100 108 C 0.422 0.133 0.300 - - - 85.50 84.90% Satisfactory
Llaban Construction & Trucking 29504
Rehab./Impvt. of Cotabato 2nd Eng'g. District Office Building &
Quarter05/28/09 R-XII 3.313 120 C 0.410 0.200 0.300 - - - 91.00 89.18%
V. Satisfactory
Llaban Construction & Trucking / Must Enterprises (JV)
JV-09-052Conc. of Paco-Roxas-Arakan Road, Ilustre Section along Paco-Roxas-
Arakan Valley Road04/01/11 XII 18.541 183 C 0.395 0.156 0.300 - - - 85.10 87.56%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page239
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
LLM Concrete Products 14235 Rehab./ Impvt. of DPWH Office Building, Region XI 04/15/11 XI 9.604 300 C 0.466 0.200 0.300 - - - 96.60 91.91%
V. Satisfactory
LLM Concrete Products 14235 Const. of Multi-Purpose Building @ Tuban E/S 02/25/10 XI 0.494 45 C 0.436 0.133 0.300 - - - 86.90 86.90%
Satisfactory
LLM Concrete Products 14235Completion of Multi-Purpose
Building @ Purok Villa Paraiso, Brgy. Visayan Village
02/27/10 XI 0.489 60 C 0.399 0.133 0.300 - - - 83.20 83.20% Satisfactory
LLM Concrete Products 14235 Const. of MPB, Brgy. Colonsabac 08/27/10 XI 2.765 110 C 0.474 0.133 0.300 - - - 90.70 90.70% V. Satisfactory
LLM Concrete Products 14235 Const. of Gazebo Building 09/01/10 XI 1.074 120 C 0.466 0.133 0.300 - - - 89.90 87.87% Satisfactory
LLM Concrete Products 14235 Const. of Multi-Purpose Building 03/06/09 XI 0.951 75 C 0.461 0.142 0.300 - - - 90.30 *90.30% V. Satisfactory
LM Construction and General Marketing 33227 Const. of MPB, Brgy. Patin-ay 03/31/11 XIII 0.995 90 O 0.400 0.300 0.000 0.000 0.038 0.000 73.80 -
LMD Construction 9410 Road Upgrading (Gravel to Paved) Jct. Aurora-Ozamiz City Road 04/07/11 IX 18.439 216 C 0.444 0.133 0.300 - - - 87.70 88.90%
Satisfactory
LMD Construction 9410 Const./Impvt. of MPB 04/05/11 IX 5.518 195 C 0.453 0.133 0.300 - - - 88.60 *88.60% Satisfactory
LMD Construction 9410 Constr. of Multi-Purpose Pavement 04/06/11 IX 5.978 150 C 0.466 0.133 0.300 - - - 89.90 88.46% Satisfactory
LMD Construction 9410 Road Upgrading (Gravel to Paved) Jct. Blancia-Molave-Josefina Road 04/08/11 IX 9.040 120 O 0.365 0.240 0.150 0.024 0.043 0.033 85.50 -
LMD Construction 9410Road Upgrading (Gravel to Paved),
Sindangan-Siayan-Dumingag-Mahayag Road
04/08/11 IX 9.050 90 O 0.338 0.240 0.150 0.030 0.048 0.033 83.90 -
LMD Construction 9410 Const. of MPB @ Dumalinao Pilot School 03/03/10 IX 4.595 180 C 0.380 0.200 0.300 - - - 88.00 88.38%
V.Satisfactory
LMD Construction 9410 Road Upgrading (Gravel to Concrete) at Jct. Aurora-Ozamis City Rd. 06/08/10 IX 20.466 224 C 0.459 0.133 0.300 - - - 89.20 87.94%
Satisfactory
LMD Construction 9410 Const. of Grandstand at Dumalinao Pilot School 08/25/10 IX 1.832 95 C 0.411 0.133 0.300 - - - 84.40 84.40%
Satisfactory
LMD Construction 9410 Construction and Completion of Multi-Purpose Building 06/02/09 IX 3.861 180 C 0.492 0.133 0.300 - - - 92.50 88.79%
Satisfactory
LMG Construction 5719 Repair & Rehab. of Roman Expressway, Lucanin Sect. 05/27/10 III 9.454 12 C 0.449 0.133 0.300 - - - 88.20 88.79%
Satisfactory
LMG Construction 5719 Repair & Rehab. of Roman Expressway, Brgy. Lamao 05/27/10 III 9.457 12 C 0.448 0.133 0.300 - - - 88.10 88.10%
Satisfactory
LNR Construction 14148 Repair of Damaged RC Pier/Wharf and PTB 04/11-15/11 PPA 10.797 180 O 0.496 0.200 0.300 - - - 99.56 *99.56%
OutstandingLong Island Builders &
Construction 31730 Road Upgrading/Conc. of Lanao-Pagadian-Zamboanga City Road 02/26/10 IX 3.649 220 C 0.408 0.151 0.300 - - - 85.90 86.80%
Satisfactory
Long Island Builders & Construction 31730 Const. of MPB at Brgy. Gacbusan,
Kabasalan, Zamboanga Sibugay 06/06/10 IX 0.473 202 C 0.484 0.133 0.300 - - - 91.70 91.70% V. Satisfactory
Long Island Builders & Construction 31730 Const. of MPB at Simbol, Kabasalan,
Zamboanga Sibugay 06/06/10 IX 0.284 140 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page240
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Longwide Builders 20196 Repair/Rehab. of Damaged Pavement of Quezon Airport Road 06/09/10 XIII 7.287 129 O 0.329 0.287 0.150 0.030 0.040 0.033 86.90 -
Longwide Builders 20196 Repair/Rehab. of Damaged Pavement of Quezon Airport Road 09/01/10 XIII 7.287 139 C 0.390 0.145 0.300 - - - 83.50 85.54%
Satisfactory
Longwide Builders 20196 Const. of Telaje Flood Control 09/08/09 XIII 4.565 195 C 0.396 0.185 0.300 - - - 88.10 88.22% Satisfactory
Lorenzo Construction & Development Corp. 4284 Impvt./Rehab. of Gapan-San
Fernando-Olongapo Road 09/05/09 III 42.155 180 O 0.224 0.300 0.150 0.030 0.050 0.033 78.70 -
Lorenzo Construction & Development Corporation
4284Const. San Angel Small Reservoir
Irrigation Project (Reservior/Earthfill Dam)
05/9-11/11 NIA 36.751 730 C 0.436 0.176 0.300 - - - 91.24 *91.24% V. Satisfactory
Lorenzo Construction and Development
Corporation4284 Impv't/Rehab. of Gapan-San
Fernando-Olongapo Road 04/12/11 III 38.302 180 C 0.406 0.200 0.300 - - - 90.60 *90.60% V. Satisfactory
Lorenzo Construction and Development
Corporation4284 Impvt./Rehab. of Gapan-San
Fernando-Olongapo Road 06/03/09 III 42.155 180 O 0.317 0.300 0.150 0.030 0.030 0.050 87.70 -
Lotiff Construction 21962Rehab. of Mainit Sect., Tanjay,
Dumaguete North Rd., Km.34+000 - Km.35+000
04/05/11 VII 19.270 247 O 0.325 0.257 0.150 0.023 0.055 0.050 86.00 -
Lo-Tone Construction & Supply 23385 Road Opening of Damacan-
Cagbulacao Road 05/19/09 V 28.493 240 C 0.475 0.195 0.300 - - - 97.00 94.96% V. Satisfactory
Lotrim Construction 12273 Construction of DOST Caraga S & T Center 06/18/09 DOST 14.233 345 O 0.367 0.208 0.130 0.030 0.060 0.030 82.50 -
Lotrim Construction 12273 Construction of DOST Caraga S&T Center 10/29/09 DOST 14.232 345 C 0.457 0.191 0.300 - - - 94.80 94.80%
V. SatisfactoryLotrim Construction
Incorporated (Formerly: Lotrim Construction)
12273 Conc./Impvt. of Eden-Tagurano Road 02/23/10 XI 1.922 90 C 0.373 0.200 0.300 - - - 87.30 87.30% Satisfactory
Lotrim Construction Incorporated (Formerly:
Lotrim Construction)12273 Rehab./Impvt. of DPWH Regional
Office XIII Building (Training Center) 09/09/10 XIII 9.599 240 O 0.364 0.279 0.150 0.030 0.050 0.050 92.30 -
Lotrim Construction Incorporated (Formerly:
Lotrim Construction)12273 Impvt./Conc. of Calinan-Bagiuo-
Cadalian Road 03/02/09 XI 18.801 210 C 0.352 0.200 0.300 - - - 85.20 84.54% Satisfactory
Lotrim Construction Incorporated (Formerly:
Lotrim Construction)12273 Rehab. of Davao-Cotabato Road
Kinuskusan Section 03/06/09 XI 19.279 210 C 0.378 0.200 0.300 - - - 87.80 82.52% Satisfactory
Lotrim Construction Incorporated (Formerly:
Lotrim Construction)12273 Rehab./Impvt. of DPWH Davao del
Sur 2nd DEO Bldg. 03/05/09 XI 9.449 120 C 0.452 0.200 0.300 - - - 95.20 82.18% Satisfactory
Lotrim Construction Incorporated (Formerly:
Lotrim Construction)12273
Rehab./Reconst./Upgrading of Damaged Paved National Roads at
Daang Maharlika (MN) Legaspi Section.
09/16/09 XI 9.642 180 C 0.482 0.133 0.300 - - - 91.50 90.72% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page241
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Lotrim Construction, Incorporated (Formerly:
Lotrim Construction)12273
Const. of Additional 2 lanes along Davao-Cotabato Road (Tres de Mayo
Sect.)04/02/11 XI 19.286 210 O 0.317 0.300 0.150 0.022 0.040 0.050 87.90 -
Lotrim Construction, Incorporated (Formerly:
Lotrim Construction)12273 Rehab./Impvt. of Calinan-Baguio-
Cadalian Road, Calinan District 03/29/11 XI 5.348 180 C 0.395 0.200 0.300 - - - 89.50 86.74% Satisfactory
Lourel Design & Construction 17099
Impvt./Rehab. of Lucban-Majayjay Rd., Km.128+363 - Km.123+428 (Lucban Side) with exception
05/28/10 IVA 4.824 36 C 0.464 0.133 0.300 - - - 89.70 89.70% V. Satisfactory
Lourel Design & Construction 17099
Impvt./Rehab. of Lucena-Tayabas-Lucban Rd., Km.146+900 -
Km.128+000 (Lucban Side) with exception
05/28/10 IVA 14.474 40 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory
Lourel Design & Construction 17099
Asphalt Overlay/Reblocking of Midsayap-Marbel Road, Km. Sta.
1779+000-Km. Sta. 1786+000, Dumadalig-New Iloilo Section
03/05/10 XII 9.649 110 O 0.306 0.300 0.150 0.023 0.050 0.033 86.20 -
Lourel Design & Construction 17099
Asphalt Overlay/Reblocking of Marbel-Makar Rd., Km. Sta. 1701+000-
Km. Sta. 1707+000, Sarawa - Bo. 6 Section
03/05/10 XII 9.644 110 O 0.314 0.286 0.150 0.023 0.050 0.033 85.60 -
Lourel Design & Construction 17099
Asphalt Overlay/Reblocking of Midsyap-Marvel Road, Km.1779+000 -Km.1786+000, Dumadalig-New Iloilo
Section, Phase II
06/11/10 XII 9.649 110 C 0.429 0.133 0.300 - - - 86.20 86.20% Satisfactory
Lourel Design & Construction 17099
Asphalt Overlay/Reblocking of Marbel-Makar Rd., Km.1701+000 -
Km.1707+000, Saravia-Bo.6 Section06/11/10 XII 9.644 110 C 0.341 0.200 0.300 - - - 84.10 85.00%
Satisfactory
LSD Construction & Supplies / Wizard
Trading & Construction Joint Venture
JV-08-238
Rehab./Reconst./Upgrading of Damaged Paved National Roads
(Rehab./Reconst. of Daang Maharlika Road)
05/25/09 III 48.249 67 C 0.407 0.200 0.300 - - - 90.70 *90.70% V. Satisfactory
LSD Construction & Supplies/Wizard Trading
& Construction (JV) JV-08-238 Rehab/Reconst./Upgrading of Daang
Maharlika Road 09/04/09 III 48.249 67 C 0.467 0.133 0.300 - - - 90.00 *90.00% V. Satisfactory
LSD Construction and Supplies / C.M Dancel
Construction and Supply Joint Venture
JV-08-315 Rehab./Reconst./Upgrading of Laoag-Sarrat-Piddig-Solsona Road 02/24/10 I 134.537 330 O 0.258 0.273 0.055 0.030 0.051 0.033 70.00 -
LTS Builders and Construction Supply 33473 Const. of 2 CL School Building with
toilet (7mx18m) Policarpio Dano H/S 09/05/09 VII 1.132 90 O 0.400 0.240 0.150 0.030 0.037 0.033 89.00 -
Lucban Builders & Construction Supply
Incorporated31336 Impv't. of DPWH Bldg. at Quezon 1st
DEO, Brgy. Abang 08/27/10 IVA 4.052 180 O 0.393 0.240 0.150 0.024 0.032 0.033 87.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page242
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Lucban Builders & Construction Supply
Incorporated31336 Const. of Multi-Purpose Bldg. @
Brgy. Ibabang Palsabangon 02/22/10 IVA 1.254 40 C 0.453 0.200 0.300 - - - 95.30 95.30% V. Satisfactory
Lucban Builders & Construction Supply
Incorporated31336 Const. of Multi-Purpose Bldg. @
Brgy. Nagsinamo (Phase II) 02/23/10 IVA 1.061 36 C 0.441 0.200 0.300 - - - 94.10 94.10% V. Satisfactory
Lucban Builders & Construction Supply
Incorporated31336 Impvt. of DPWH Building @ DPWH
Quezon 1st DEO Brgy. Abang 09/10/09 IVA 4.148 150 C 0.484 0.133 0.300 - - - 91.70 86.84% Satisfactory
Lucban Builders & Construction Supply
Incorporated31336 Const. of Farm-to-Market at Brgy.
Talipan 09/10/09 IVA 0.482 36 C 0.324 0.200 0.300 - - - 82.40 *82.40% Satisfactory
Lucban Builders & Construction Supply
Incorporated31336 Const. of DPWH Building @ DPWH
Quezon 1st DEO, Brgy. Abang 05/29/09 IV-A 4.148 150 O 0.360 0.240 0.150 0.030 0.023 0.033 83.60 -
Lucban Construction 4819 Const. of MPB @ Paaralang Sekondarya ng Lucban 02/26/09 IV-A 1.447 40 C 0.492 0.133 0.300 - - - 92.50 *92.50%
V. Satisfactory
Luck-Well Construction 17510 Paving of the Newly Constructed Back-up Area Project 04/20-23/10 PPA 47.305 300 O 0.3657 0.3000 0.1256 0.024 0.0600 0.0500 92.53 -
Lucky G18 Construction, Inc. 33695 Repair and Rehab. of Road I Sitio
Almonte, Brgy. Bari 04/12/11 I 0.498 28 C 0.437 0.133 0.300 - - - 87.00 *87.00% Satisfactory
Lug Square Construction 26623 Widening/Concreting along Banaue-Mayoyao Road (Tulaed Section) 03/06/09 CAR 1.888 348 C 0.339 0.157 0.000 - - - 49.60 62.26%
Poor
LVRO Construction & Supply 18116 Conc. of Punta-Ni Road 03/29/11 XIII 2.380 60 C 0.355 0.200 0.300 - - - 85.50 *85.50%
Satisfactory
LVRO Construction & Supply 18116
Rehab./Reconst. of Damaged Paved National Road, Daang Maharlika,
(Surigao-Agusan Road)03/29/11 XIII 19.285 210 C 0.339 0.200 0.300 - - - 83.90 85.40%
Satisfactory
LVRO Construction & Supply 18116 Upgrading of Buenavista-Bunaguit
Road 03/29/11 XIII 3.890 60 O 0.343 0.225 0.150 0.030 0.055 0.050 85.30 -
LVRO Construction & Supply 18116 Conc. of Agusan del Norte Circ.
Road (Lake Mainit Circ. Road) 03/29/11 XIII 19.285 195 C 0.323 0.200 0.300 - - - 82.30 85.09% Satisfactory
LVRO Construction & Supply 18116 Conc. of Road Brgy. Matin-ao 04/06/11 XIII 3.293 179 C 0.296 0.200 0.300 - - - 79.60 83.56%
Satisfactory
LVRO Construction & Supply 18116
Const. of Roads, Drainage & Embankment (Site Dev't. of Tubay
Housing Projects)02/22/10 XIII 6.682 120 C 0.460 0.133 0.300 - - - 89.30 89.30%
V.Satisfactory
LVRO Construction & Supply 18116 Const. of Seawall, Brgy. Ipil 03/01/10 XIII 2.351 116 C 0.454 0.133 0.300 - - - 88.70 84.86%
SatisfactoryLVRO Construction &
Supply 18116 Repair/Rehab. along Jct. Bolod-Bolod-Albor Road 06/03/10 XIII 9.613 231 C 0.386 0.200 0.300 - - - 88.60 88.60%
SatisfactoryLVRO Construction &
Supply 18116 Const./Rehab. of Aguntayan-Hilong-Hilong Road (Phase II) 08/24/10 XIII 4.720 90 C 0.417 - 0.500 - - - 91.70 89.24%
V. SatisfactoryLVRO Construction &
Supply 18116 Deepening/Rechanneling of Calibunan Creek Brgy. Calibunan 08/27/10 XIII 4.587 135 C 0.431 0.158 0.300 - - - 88.90 88.90%
SatisfactoryLVRO Construction &
Supply 18116 Const. of Lake wall 08/29/10 XIII 1.881 90 C 0.333 0.200 0.300 - - - 83.30 83.30% Satisfactory
LVRO Construction & Supply 18116 Repair/Rehab. Along Dinagat-Loreto
Road 11/19/08 XIII 9.649 160 O 0.307 0.168 0.100 0.023 0.038 0.100 73.60 -
LVRO Construction & Supply 18116 Concreting of Barangay Road 03/14/09 XIII 1.924 95 C 0.430 0.200 0.300 - - - 93.00 *93.00%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page243
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
LVRO Construction & Supply 18116 Rehab./Reconstruction of Damaged
Paved along Dinagat-Loreto Road 03/04/09 XIII 7.086 225 O 0.368 0.240 0.150 0.030 0.035 0.050 87.30 -
LVRO Construction & Supply 18116 Repair/Rehab. along Dinagat-Loreto
Road 03/04/09 XIII 9.649 190 O 0.372 0.282 0.082 0.030 0.035 0.033 83.40 -
LVRO Construction & Supply 18116 Const. of Aguntayan-Hilong-Hilong
FMR 05/26/09 XIII 8.473 175 O 0.390 0.274 0.150 0.030 0.047 0.033 92.40 -
LVRO Construction & Supply 18116 Dredging/Rechanneling of
Katugasan River 05/26/09 XIII 4.816 60 C 0.407 0.200 0.300 - - - 90.70 *90.70% V. Satisfactory
LVRO Construction & Supply 18116 Const./Rehab. of Aguntayan-Hilong-
hilong FMR 09/01/09 XIII 8.473 150 C 0.408 0.165 0.300 - - - 87.30 90.36% V.Satisfactory
LVRO Construction & Supply 18116 Rehab./Reconst. along Dinagat-
Loreto Rd.(Dinagat Sect.) 09/01/09 XIII 7.086 267 C 0.458 0.162 0.300 - - - 92.00 90.50% V.Satisfactory
LVRO Construction & Supply 18116 Const./Rehab. of Agutayan-Hilong-
hilong Rd.(Phase II) 09/01/09 XIII 4.720 90 O 0.388 0.215 0.150 0.030 0.060 0.033 87.60 -
LVRO Construction & Supply 18116 Const. of School Bldg. @ La Union
Integrated School 09/01/09 XIII 0.568 90 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
LVRO Construction & Supply 18116
Repair/Rehab. Along Dinagat-Loreto Rd.(Km.0+000toKm.30+000, with
excemptions)09/04/09 XIII 9.649 228 C 0.466 0.133 0.300 - - - 89.90 83.06%
Satisfactory
LXS Builders & Supplies 25172 Const. of Arenas NHS, Brgy. Ambayat 2nd 05/22/09 I 0.964 90 C 0.498 0.166 0.300 - - - 96.40 *96.40%
V.SatisfactoryM A M Construction &
Trading (Formerly: MAM Construction)
19915 Const. of One (1) CL at Sta. Cruz ES, Lubao West 08/24/09 III 0.479 60 C 0.412 0.133 0.300 - - - 84.50 *84.50%
Satisfactory
M F Construction 22192 Const. of 7m x 7m (1CL) SB, Tupas E/S 09/06/10 VII 0.488 90 C 0.485 0.133 0.300 - - - 91.80 91.80%
V. Satisfacgtory
M F Construction 22192 Const. of Banica River Control 09/03/10 VII 2.839 130 C 0.390 0.200 0.300 - - - 89.00 89.00% Satisfactory
M M Construction 12012
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Daang Maharlika (Balete-Namamparan Section)
08/28/09 II 18.902 116 C 0.410 0.200 0.300 - - - 91.00 89.32% V. Satisfactory
M M Construction 12012 Const. of Farm-to-Market Road (Tire Path), Bliss Kirang 03/04/10 II 0.397 30 C 0.369 0.200 0.300 - - - 86.90 86.90%
Satisfactory
M M Construction 12012
Rehab./Reconst./Upgrading of Damaged Paved National Rd. along Daang Maharlika Solano-Diadi Sect.
w/ exception
06/10/10 II 9.645 80 O 0.360 0.300 0.150 0.030 0.042 0.033 91.50 -
M M Construction 12012
Rehab./Reconst./Upgrading of Damaged Paved National Rd. along Daang Maharlika Villaros-Rosario
Sect. w/ exception
06/10/10 II 14.470 90 O 0.358 0.276 0.150 0.030 0.042 0.033 88.90 -
M M Construction 12012
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Daang Maharlika, Solano-Diadi Section
09/02/10 II 9.645 90 C 0.396 0.200 0.300 - - - 89.60 90.74% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page244
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
M M Construction 12012
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Daang Maharlika, Villaros-Rosario Section
09/02/10 II 14.470 96 C 0.375 0.200 0.300 - - - 87.50 88.34% Satisfactory
M M Construction 12012
Rehab./Reconst. of Damaged National Road KO 216+830 with exception, Poblacion Villaflores
Section
06/03/09 II 14.468 200 C 0.400 0.200 0.300 - - - 90.00 89.28% V. Satisfactory
M M Construction 12012 Conc. of Bambang-Kasibu-Quezon-Solano Road (Labni Section) 03/10/09 II 14.225 120 C 0.406 0.200 0.300 - - - 90.60 86.64%
Satisfactory
M M Construction 12012Rehab./Reconst. of Damaged
National Roads, Daang Maharlika, Poblacion Villaflores Section
03/11/09 II 14.468 200 O 0.355 0.300 0.150 0.030 0.050 0.033 91.80 -
M M Construction 12012Rehab./Reconst. of Damaged
National Roads, Daang Maharlika, Poblacion Villaflores Section
11/28/08 II 14.468 200 O 0.374 0.240 0.100 0.030 0.047 0.067 85.80 -
M M Construction 12012 Conc. of Jct. Nat'l Bitnong-Belance NV-Bdry. Road, Binuangan Sect. 04/15/11 II 9.645 240 C 0.426 0.133 0.300 - - - 85.90 85.00%
Satisfactory
M N Revelo Construction 24789 Reconst. of Lanao-Pagadian-2Z Road, Lumbog Sect. Km. 1743+900 02/26/10 IX 4.035 123 O 0.275 0.285 0.150 0.020 0.047 0.050 82.70 -
M N Revelo Construction 24789Reconst. of Lanao-Pagadian-2Z
Road, Diplahan Section, Km. 1739+200 - Km. 1798+900
02/26/10 IX 3.514 203 O 0.291 0.300 0.150 0.020 0.028 0.017 80.60 -
M. E. Baning Construction 22682
Const. of Sch. Bldg., Technological University of the Philippines,
Barangay Bungahan04/08/11 IVA 2.700 90 C 0.424 0.200 0.300 - - - 92.40 *92.40%
V. Satisfactory
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506
Asphalt Overlay of Butuan City-Cagayan de Oro City-Iligan City Road along Tambaling Sect., Sta.1453+224
- Sta.1453+829
09/01/10 X 9.600 45 C 0.429 0.200 0.300 - - - 92.90 92.90% V. Satisfactory
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506Rehab. of Damaged Paved National
Roads along Jct., Impalambong-Cadre Barracks Road
09/04/10 X 6.982 90 C 0.429 0.200 0.300 - - - 92.90 88.04% Satisfactory
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506 Const. of 135 L.M. Steel Bridge (Bridge Approaches) 09/03/10 X 22.665 401 C 0.350 0.200 0.300 - - - 85.00 85.60%
Satisfactory
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506
Rehab./Reconst./Upgrading of Damaged Paved National Roads Don Carlos-Kadilingan Road, Don Carlos-
Lalapoy Sect.
09/03/10 X 26.193 136 C 0.438 0.133 0.300 - - - 87.10 85.42% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page245
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506Road Upgrading (Gravel to Paved)
along Jct. SH Bangcud-Mailag Road (By-Pass Road)
06/15/10 X 16.923 150 O 0.348 0.240 0.150 0.030 0.055 0.033 85.60 -
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506Road Upgrading (Gravel to Paved) of
Jct. S.H. Aglayan-Alanib-Ticalaan Road
06/13/10 X 28.843 150 O 0.345 0.240 0.150 0.030 0.055 0.033 85.30 -
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506Rehab. of Damaged Paved National
Roads along Jct. Impalambong-Cadre Barracks Road
06/15/10 X 6.982 60 O 0.330 0.240 0.150 0.023 0.055 0.050 84.80 -
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506Rehab./Reconst./Upgrading of Don
Carlos-Kadingilan Road, Don Carlos-Lalapoy Sect.
06/14/10 X 25.926 120 O 0.335 0.240 0.150 0.030 0.055 0.033 84.30 -
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506
Rehab./Reconst./Upgrading of Damaged Paved National Rd. along
Maramag-Maradugao Rd. Sta. 1558+538 - Sta. 1576+850
02/25/10 X 7.400 90 C 0.446 0.133 0.300 - - - 87.90 85.50% Satisfactory
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6505
Road Upgrading/Gravel to Asphalt along Kibawe-Kadilingan Road (Sta.
1582+874-Sta. 1582+942.45 w/ exception) selective Sections, Kibawe-Kadilingan-Kalilangan
05/28/09 X 28.335 120 O 0.367 0.300 0.150 0.030 0.050 0.050 94.70 -
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Maramag-Maradugo Road, Sta. 1558+538-Sta.1576+850 selected
sections
05/29/09 X 6.731 120 O 0.310 0.245 0.150 0.030 0.054 0.050 83.90 -
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506 Const. of 135 L.M. Steel Bridge (Bridge Approaches) 05/28/09 X 22.665 240 O 0.306 0.260 0.150 0.030 0.040 0.050 83.60 -
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506 Const. of 135 lm Steel Bridge (Bridge Approaches 03/03/09 X 22.665 271 O 0.360 0.240 0.150 0.030 0.045 0.050 87.50 -
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506
Road Upgrading (Gravel to Concrete) based on GTRSTB (HDM4 Analysis) along Kibawe-Kadingilan-Kalilangan
Road
03/03/09 X 4.823 74 C 0.416 0.133 0.300 - - - 84.90 82.26% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page246
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506Road Upgrading (Gravel to Concrete) Jct. SH Impasugong-Patulangan By-
Pass Road (Patulangan Section)03/03/09 X 18.991 270 C 0.393 0.133 0.300 - - - 82.60 85.90%
Satisfactory
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506
Road Upgrading (Gravel to Asphalt) along Kibawe-Kadilingan-Kalilangan Road Sta. 1582+874-Sta. 1582+942.45
w/ exception Selective Sections
09/03/09 X 28.335 90 C 0.445 0.133 0.300 - - - 87.80 91.94% V. Satisfactory
M. Montesclaros Enterprises Inc.
(Formerly: Monteclaros Enterprises)
6506 Const. of 135 l.m. Steel Bridge (Bridge Approaches) 09/04/09 X 22.665 240 O 0.288 0.300 0.150 0.030 0.051 0.050 86.90 -
M. Montesclaros Enterprises, Inc.
(Formerly: M. Montesclaros Enterprises)
6506Road Upgrading (Gravel to Paved) of
Jct. S.H. Aglayan-Alanib-Ticalaan Road (Aglayan-Basak)
03/30/11 X 28.865 180 C 0.421 0.133 0.300 - - - 85.40 86.69% Satisfactory
M. Montesclaros Enterprises, Inc.
(Formerly: M. Montesclaros Enterprises)
6506 Road Upgrading (Gravel to Paved) of Don Carlos-Kadingilan Road 03/30/11 X 28.888 180 C 0.392 0.133 0.300 - - - 82.50 86.04%
Satisfactory
M. Montesclaros Enterprises, Inc.
(Formerly: M. Montesclaros Enterprises)
6506Road Upgrading (Gravel to Paved)
along Jct. S.H. Bangcud-Mailag Road (By-Pass Road)
03/30/11 X 16.923 180 C 0.364 0.133 0.300 - - - 79.70 83.36% Satisfactory
M.B Ang Const. & Supply 25001Conc. of Caibiran-Cabucgayan
National Circ. Road (Uson-Gamay Section)
11/18/08 VIII 3.725 160 O 0.337 0.240 0.100 0.030 0.042 0.100 84.90 -
M.B Ang Const. & Supply 25001Concreting of Caibiran,-Cabucgayan National Circumferential Road (Uson-
Gamay Section)03/13/09 VIII 3.725 160 C 0.303 0.035 0.300 - - - 63.80 76.46%
Unsatisfactory
M.C. Torio Construction 10534 Rehab./Impvt. of Cabagan-Sta. Maria Road 04/04/11 II 1.837 40 C 0.471 0.133 0.300 - - - 90.40 *90.40%
V. Satisfactory
M.C.B Zamora Construction & Supplies 32006 Const. of MPB at Barangay
Matungao 02/15/10 IVB 0.891 90 O 0.302 0.300 0.150 0.030 0.023 0.033 83.80 -
M.C.B Zamora Construction & Supplies 32006 Const. of MPB at Brgy. Zone II 05/28/10 IVB 0.897 90 O 0.388 0.298 0.000 0.030 0.041 0.017 77.40 -
M.C.B Zamora Construction & Supplies 32006 Const. of MPB @ Brgy. Matungao 09/02/10 IVB 0.891 90 C 0.406 0.200 0.300 - - - 90.60 85.84%
Satisfactory
M.C.B Zamora Construction & Supplies 32006 Const. of MPB @ Brgy. Zone II 09/02/10 IVB 0.897 90 C 0.448 0.200 0.300 - - - 94.80 82.62%
Satisfactory
M.E Baning Construction 22682 Const. of MPB @ Brgy. Emmanuel 03/09/09 IV-A 0.482 60 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory
M.G Cereno Construction 14979 Construction of Spillway 03/13/09 V 0.469 45 C 0.428 0.133 0.300 - - - 86.10 *86.10% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page247
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
M.G Francisco Construction 29831 Impvt. of School Building Calumpit
C/S 03/03/10 III 0.494 8 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory
M.G Francisco Construction 29831 Const. of One Classroom School
Bldg., Sta. Rita E/S 08/26/10 III 0.622 25 C 0.495 0.167 0.300 - - - 96.20 96.20% Outstanding
M.G Jacinto Construction 20617 Const. of Multi-Purpose Building 02/16/10 II 1.911 120 C 0.451 0.107 0.300 - - - 85.80 85.80% Satisfactory
M.G Jacinto Construction 20617 Const. of Farm to Market Road @ Candaanan-Ubong 08/20/10 II 2.409 150 C 0.389 0.146 0.300 - - - 83.50 83.50%
Satisfactory
M.G Jacinto Construction 20617 Construction of Multi-Purpose Building @ Camasi H/S 05/18/09 II 1.925 230 C 0.478 0.133 0.300 - - - 91.10 *91.10%
V. Satisfactory
M.G Salazar Const. Corp. 4072 Construction of Girls Dormitory Bldg. 05/28/09 DOST 30.572 285 O 0.352 0.260 0.150 0.030 0.048 0.050 89.00 -
M.G Salazar Const. Corp. 4072 Site Development Project 05/28/09 DOST 0.972 101 O 0.360 0.251 0.100 0.024 0.058 0.033 82.60 -
M.G Salazar Const. Corp. 4072 PSHS CVC Site Development Project 10/8/09 DOST 0.927 101 C 0.496 0.200 0.300 - - - 99.60 99.60% Outstanding
M.G Salazar Const. Corp. 4072Rehab/Reconst./Upgrading of Daang Maharlika Road (Baliuag & Plaridel
Section)05/29/09 III 42.945 228 O 0.325 0.240 0.150 0.030 0.040 0.050 83.50 -
M.G Salazar Const. Corp. 4072Rehab./Reconst./Upgrading at Daang Maharlika Road (Baliuag & Plaridel
Section)09/04/09 III 42.945 228 O 0.325 0.240 0.150 0.030 0.046 0.033 82.40 -
M.G Salazar Construction Corp. 4072 Construction of 3-Storey Girls
Dormitory 02/24/10 DOST 30.959 285 C 0.458 0.20 0.30 - - - 95.80 91.75% V. Satisfactory
M.G Villamin Construction 22521 Const. of Flood Control Pilot
Procject at Kinanliman River Control 09/10/09 IVA 4.820 140 C 0.387 0.200 0.300 - - - 88.70 87.02% Satisfactory
M.G. Francisco Construction 29831 Rehab. of Concepcion Road @
Concepcion 04/12/11 III 0.481 10 C 0.364 0.000 0.300 - - - 66.40 *66.40% Poor
M.H Southern Construction 5841 Sarangani Davao del Sur Coastal
Road, Cross Section 06/11/09 R-XII 7.457 150 O 0.297 0.249 0.150 0.024 0.045 0.050 81.50 -
M.H Southern Construction 5841
Conc. of Road and Reblocking, Marbel-makar Road, Matin-ao Silway
8, (Km. 1662+800 - Km. 1663+740)06/08/09 R-XII 14.167 195 O 0.301 0.300 0.000 0.030 0.055 0.033 71.90 -
M.H Southern Construction 5841 Conc. of Road & Reblocking, Marbel-
Makar Road, Matinao Silway 8 03/20/09 XII 14.169 180 O 0.346 0.300 0.150 0.030 0.040 0.050 91.60 -
M.P Villegas Construction 16683 Completion of Boys Dormitory 03/2-3/10 DOST 14.969 345 C 0.4875 0.20 0.30 - - - 98.75 98.75%
Outstanding
M.P Villegas Construction 16683
Construction of DOST Reg IV-A Food Safety & Quality Assurance
Laboratory Building05/26/09 DOST 9.379 120 C 0.492 0.200 0.300 - - - 99.17 99.17%
Outstanding
M.P Villegas Construction 16683 Construction of DOST Reg IV-A Food
Safety and Quality Assurance Lab. 5/26/09 DOST 9.379 180 C 0.491 0.200 0.300 - - - 99.10 99.10% Outstanding
M.P Villegas Construction 16683 Construction of DOST Reg IV-A Food
Safety and Quality Assurance Lab. 10/15/09 DOST 6.018 180 C 0.4591 0.187 0.300 - - - 94.61 94.61% V.Satisfactory
M.R Oribiana Gravel & Sand Dealer & Construction
26070 Const. of Multi-Purpose Building at Brgy. Adia Bitaog 02/19/10 IVA 0.287 60 C 0.475 0.150 0.300 - - - 92.50 92.50%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page248
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
M.R Vargas Construction 8215Tacloban Airport Development
Project (Renovation of Terminal Building)
01/27/11 DOTC 9.619 120 C 0.423 0.200 0.300 - - - 92.30 92.30% V. Satisfactory
M.R Vargas Construction 8215 M'lang Airport Development Project 03/13/09 DOTC 13.458 180 O 0.360 0.293 0.150 0.023 0.050 0.033 90.90 -
M.R.C Bechaida Construction & Supply 32821 Conc. of Masagongsong Bridge
Approaches 11/18/08 VIII 1.867 140 O 0.370 0.232 0.100 0.015 0.037 0.100 85.40 -
M.R.C Bechaida Construction & Supply 32821 Concreting of Masagongsong Bridge
Approaches 03/13/09 VIII 1.867 162 C 0.335 0.000 0.300 - - - 63.50 76.64%Unsatisfactory
M.R.C Bechaida Construction & Supply 32821 Const. of 2-CL 7mx9m Sch. Bldg,
Look Primary School, Brgy. Look 09/03/09 VIII 0.725 66 C 0.409 0.159 0.300 - - - 86.80 *86.80% Satisfactory
M.R.C Bechaida Construction & Supply 32821 Const. of MPB 08/26/10 VIII 0.964 90 C 0.442 0.133 0.300 - - - 87.50 87.50%
Satisfactory
M.S Ramos Construction 31684 Repair/Rehab. along OBR, Bulawen Section 02/19/10 III 9.458 20 C 0.408 0.200 0.300 - - - 90.80 90.80%
V. Satisfactory
M.S Ramos Construction 31684Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Roads at Guiguinto Service Rd.
08/26/10 III 10.519 86 C 0.438 0.136 0.300 - - - 87.40 87.40% Satisfactory
M.S Ramos Construction 31684 Rehab. of Veterans Park Access Road, Liyang 08/19/10 III 7.020 44 C 0.402 0.133 0.300 - - - 83.50 83.50%
Satisfactory
M.S Ramos Construction 31684 Rehab./Impv't. of Sibul-Biak na Bato Road 03/11/09 III 47.623 210 C 0.360 0.200 0.300 - - - 86.00 *86.00%
Satisfactory
M.S Ramos Construction 31684 Const. of School Building, Diosdado Macapagal HS (2-CL) 09/08/09 III 1.350 80 C 0.490 0.133 0.300 - - - 92.30 *92.30%
V. Satisfactory
M.S Ramos Construction 31684
Rehab./Impvt. of Drainage Canal along Gen. Alejo Santos Highway,
Poblacion Section, Km. 52+107-Km. 53+107
09/04/09 III 4.774 30 C 0.425 0.133 0.300 - - - 85.80 *85.80% Satisfactory
M.S Ramos Construction 31684
Rehab./Impvt. of Drainage Canal along Pulilan-Plaridel Diversion Road, Km. 41+100-Km.42+000 w/
exception
09/04/09 III 4.774 45 C 0.417 0.133 0.300 - - - 85.00 84.58% Satisfactory
M.S Ramos Construction 31684
Rehab./Impvt. of Drainage Canal along Bigaa-Plaridel Road via
Bulacan and Malolos Road (Panginay Section)
09/04/09 III 4.773 30 C 0.405 0.133 0.300 - - - 83.80 *83.80% Satisfactory
M.S Ramos Construction 31684 Const. of One (1) CL School Bldg. at BLISS Elem. School 02/26/10 IVA 0.396 45 C 0.461 0.200 0.300 - - - 96.10 96.10%
Outstanding
M.S Ramos Construction 31684 Const. of Multi-Purpose Building, Angono Gen. Hospital 02/16/10 IVA 0.959 60 C 0.456 0.200 0.300 - - - 95.60 95.60%
V. Satisfactory
M.S Ramos Construction 31684Const./Impvt. of P. Antonio St.
(Covered Walkway/Sidewalk/Curb & Gutter, Brgy. Ugong
09/10/09 NCR 5.254 90 O 0.398 0.225 0.150 0.020 0.035 0.050 87.80 -
M.S Ramos Construction 31684 Repair/Rehab./Const. of MPB @ Brgy. 150, District II 09/08/09 NCR 0.480 60 C 0.420 0.133 0.300 - - - 85.30 *85.30%
Satisfactory
M.S.C Construction / Persan Construction (JV)
SL2-SN-000820/JV-
07-158
Rehab./Impv't. of Gen. Alejo Santos Highway to CVR Junction via San
Rafael Road03/10/09 III 47.614 210 C 0.425 0.200 0.300 - - - 92.50 *92.50%
V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page249
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
M.S.D.L.R Construction 32266 Const./Conc. of Rd. Zone 2, Sitio Camarahan, Brgy. Pagatpat 02/22/10 X 0.970 175 C 0.396 0.133 0.300 - - - 82.90 82.90%
Satisfactory
M.S.D.L.R Construction 32266 Widening of CDO-Airport Road 09/01/09 X 9.444 120 C 0.438 0.133 0.300 - - - 87.10 70.72% Poor
M.V Caldo Engineering Construction & Supplies 16938 Proposed Const./Repair/Rehab/of
Multi-Purpose Bldg., Brgy. 776 02/26/09 NCR 0.962 30 C 0.382 0.038 0.300 - - - 72.00 *72.00% Poor
M.V Caldo Engineering Construction & Supplies 16938 Rehab./Reconst./Upgrading of
Moriones St. 08/25/10 NCR 11.570 90 C 0.384 0.200 0.300 - - - 88.40 88.40% Satisfactory
M.V Sabalburo Construction & Supply 32561
Rehab./Reconst./Upgrading of Damaged Paved National Road
Narvacan Section09/05/09 I 9.479 132 C 0.415 0.200 0.300 - - - 91.50 *91.50%
V. Satisfactory
M.V Sabalburo Construction & Supply 32561 Completion of MPB at Fuerte E/S 02/19/10 I 0.886 51 C 0.455 0.133 0.300 - - - 88.80 88.80
SatisfactoryM.V Sabalburo
Construction & Supply 32561 Const. of Drainage and Canal Around Plaza Burgos 02/19/10 I 0.951 151 C 0.392 0.133 0.300 - - - 82.50 82.50%
Satisfactory
M.V Sabalburo Construction & Supply 32561 Const. of Two (2) Classroom School
Building, Cabaroan E/S, Cabaroan 05/29/10 I 1.236 62 C 0.496 0.133 0.300 - - - 92.90 92.90% V. Satisfactory
M.V Sabalburo Construction & Supply 32561 Completion of School Bldg., Burgos
West Memorial School 05/29/10 I 2.273 72 C 0.406 0.133 0.300 - - - 83.90 83.90% Satisfactory
M.V Sabalburo Construction & Supply 32561 Construction of Sta. Catalina Seawall 06/02/09 I 4.754 110 C 0.445 0.133 0.300 - - - 87.80 *87.80%
Satisfactory
M.V. Sabalburo Construction and Supply 32561 Const. of MPB at Paraesus Verde 03/31/11 I 0.685 45 C 0.350 0.200 0.300 - - - 85.00 *85.00%
Satisfactory
M.Y Reyes Builders and Development Corp. 26386 Construction of Three-Storey 25-
Classroom School 12/10/09 NHA 18.112 150 C 0.4873 0.2000 0.3000 - - - 98.73 98.73% Outstanding
M.Y Reyes Builders and Development Corp. 26386
Construction of 3-Storey, 15-Classroom School Bldg., Pkg. 4 Southville 8, Brgy. San Isidro,
Rodriguez, Rizal
04/13-14/2011 NHA 26.261 150 C 0.4900 0.2000 0.3000 - - - 99.00 96.27% Outstanding
M2R Construction 13431 Const. of Sagpet Road 05/29/10 III 4.752 60 C 0.430 0.133 0.300 - - - 86.30 86.30% Satisfactory
M2R Construction 13431 Conc. of Consuelo-East Dinita Road 05/29/10 III 9.506 60 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory
M2R Construction 13431 Construction of Multi-Purpose Building, Brgy. San Guillermo 05/23/09 III 1.139 90 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
M2R Construction 13431 Rehab/Improvement of Paite-Maculcol Dike 05/26/09 III 9.515 60 C 0.418 0.133 0.300 - - - 85.10 *85.10%
Satisfactory
M3A Construction 32123 Conc. of San Jose West-San Jose East Road 04/06/11 V 3.841 90 C 0.402 0.133 0.300 - - - 83.50 *83.50%
Satisfactory
M3A Construction 32123 Construction of Pili-Tinangis Road 03/12/09 V 14.186 90 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
Ma. Gina M. Pador Construction 25600 Const. of Looc MPB 04/11/11 IVB 2.746 172 C 0.426 0.133 0.300 - - - 85.90 83.03%
Satisfactory
Ma-an Construction Corp. 28751
Asphalt Overlay at Bagong Silang, Bacoor and Buhay na Tubig, Molino
III Rd.06/01/10 IVA 0.958 7 C 0.328 0.200 0.300 - - - 82.80 82.80%
Satisfactory
Ma-an Construction Corp. 28751 Rehab./Impvt. of DPWH Leyte 2nd
DEO 03/16/09 VIII 4.746 180 C 0.427 0.139 0.300 - - - 86.60 82.40%Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page250
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mabrak Construction 33340 Conc. of Nueva Vizcaya-Ifugao-Mt. Province Road 05/26/09 CAR 3.782 40 O 0.400 0.300 0.000 0.030 0.029 0.033 79.20 -
Mabrak Construction 33340 Const. of Dep-Ed Ifugao Division MPB (Phase III) 09/01/09 CAR 0.952 80 C 0.363 0.200 0.300 - - - 86.30 *86.30%
Satisfactory
Mabrak Construction 33340 Conc. of Nueva Vizcaya-Ifugao-Mt. Province Road 02/25/10 CAR 3.782 167 C 0.431 0.133 0.300 - - - 86.40 82.08%
Satisfactory
Mac Builders 7249Rehab./Reconst. of Daang Maharlika Highway, Malaga-Calbayog Section,
Km.726+921 - Km.728+89704/02/11 VIII 96.481 200 C 0.434 0.133 0.300 - - - 86.70 90.00%
V. Satisfactory
Mac Builders 7249Road Reblocking of Palo-Carigara-
Ormoc Road Section (Asphalt Overlay) Km.842+265 - Km.944+003
04/08/11 VIII 11.612 170 O 0.347 0.240 0.150 0.030 0.050 0.050 86.70 -
Mac Builders 7249Rehab./Reconst./Upgrading of
Palompon-Isabel-Merida-Ormoc Road
04/10/11 VIII 19.199 245 C 0.421 0.133 0.300 - - - 85.40 86.69% Satisfactory
Mac Builders 7249
Road Upgrading (Gravel to Paved) of Villab-Leyte Road, Leyte,
Km.999+940 - Km.998+612 w/ exceptions, Km.1005+137 -
04/09/11 VIII 80.111 350 C 0.435 0.133 0.300 - - - 86.80 86.44% Satisfactory
Mac Builders 7249
Rehab. of Damaged Paved National Roads along Daang Maharlika, Abuyog-Mahaplag Road Sect.,
(Balinsasayao-Hilusig Road Sect.)
04/12/11 VIII 47.049 240 C 0.425 0.133 0.300 - - - 85.80 85.86% Satisfactory
Mac Builders 7249
Rehab. of Damaged Paved National Road along Daang Maharlika,
Mahaplag Road Sect., (Crossing-Mabunga Road Sect.)
04/12/11 VIII 39.223 182 C 0.415 0.133 0.300 - - - 84.80 85.76% Satisfactory
Mac Builders 7249Road Upgrading (Gravel to Paved) of
Calubian-Jct.-San Isidro-Tabango-Villaba-Palompon Road
04/09/11 VIII 37.207 320 C 0.441 0.133 0.300 - - - 87.40 85.30% Satisfactory
Mac Builders 7249
Rehab. of Damaged Paved National Roads along Daang Maharlika,
Abuyog-Mahaplag Road Section (Mabuhay-Pinamunuan Rd. Sect.)
04/12/11 VIII 47.041 240 C 0.407 0.133 0.300 - - - 84.00 84.30% Satisfactory
Mac Builders 7249
Rehab. of Damaged Paved National Road along Daang Maharlika, Abuyog-Mahaplag Road Sect.,
(Batug-Balocawehay Road Sect.)
04/12/11 VIII 47.049 240 C 0.408 0.133 0.300 - - - 84.10 83.68% Satisfactory
Mac Builders 7249 Conc. of Calubian Jct. San Isidro-Tabango-Villaba Palompon Road 02/24/10 VIII 55.888 330 C 0.342 0.200 0.300 - - - 84.20 85.92%
Satisfactory
Mac Builders 7249Road Upgrading (Gravel to Paved) of Cabungaan-Tabunok-Consuerga Rd.,
Km.1014+663 - Km.1015+51306/03/10 VIII 18.539 240 C 0.451 0.163 0.300 - - - 91.40 91.40%
V. Satisfactory
Mac Builders 7249Road Upgrading (Gravel to Paved) of Belen-Consuegra Rd., Km.981+940 -
Km.981+91006/04/10 VIII 18.540 240 O 0.334 0.300 0.150 0.030 0.037 0.033 88.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page251
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mac Builders 7249Concrete Paving of Critical Portion
along Caibiran-Cabucgayan Rd. (Pawikan-Bunga Sect.)
06/02/10 VIII 19.180 300 O 0.343 0.280 0.150 0.030 0.042 0.033 87.80 -
Mac Builders 7249Replacement of Old Ticud Bridge connecting Iloilo City-Dumangas
Coastal Road09/08/10 V I 47.804 140 O 0.360 0.240 0.150 0.030 0.037 0.033 85.00 -
Mac Builders 7249 Conc. of Calubian Jct., San Isidro-Tabango-Villaba-Palompon Road 06/02/09 VIII 55.351 330 O 0.364 0.240 0.150 0.030 0.035 0.050 86.90 -
Mac Builders 7249Conc. of Calubian-San Isidro-
Tabango-Villaba Road (Tabango-Tabing Sect.)
03/12/09 VIII 17.943 220 C 0.265 0.146 0.300 - - - 71.10 80.16%Unsatisfactory
Mac Builders 7249Completion of Calaguise Steel
Bridge, along Sambulawan-Calaguise-Calubian Road
09/05/09 VIII 37.485 330 C 0.454 0.172 0.300 - - - 92.60 *92.60% V. Satisfactory
Mac Builders 7249 Concreting of Basey-Sohoton Road 08/31/09 VIII 28.495 230 C 0.401 0.200 0.300 - - - 90.10 *90.10% V. Satisfactory
Mac Builders 7249Conc. of Calubian Jct. San Isidro-Tabango-Villaba-Palompon Road
Tabango-San Isidro09/05/09 VIII 55.351 330 O 0.357 0.245 0.150 0.030 0.040 0.050 87.20 -
Mac Builders 7249 Rehab. (Conc.) of Cabungaan-Tabunok-Consuegra Road 09/05/09 VIII 14.052 180 O 0.340 0.245 0.150 0.030 0.040 0.050 85.50 -
Mac Builders 7249 Widening/Upgrading/Rehab. of Access Road to Ormoc Port 08/31/10 VIII 9.117 145 C 0.461 0.133 0.300 - - - 89.40 89.40%
V. Satisfactory
Mac Builders 7249Road Upgrading (Gravel to Paved) of Belen-Consuegra Road, Km. 981+940
- Km. 981-91008/27/10 VIII 18.540 240 C 0.458 0.133 0.300 - - - 89.10 88.68%
Satisfactory
Mac Builders 7249Concrete Paving of Critical Portion
along Caibiran to Cabucgayan Road, Pawikan-Bunga Section
08/26/10 VIII 19.180 300 C 0.410 0.133 0.300 - - - 84.30 86.40% Satisfactory
Mac Builders 7249
Rehab. of Damaged Paved National Roads along Daang Maharlika
Abuyog Mahaplag Road Section (Balinsasayao-Hilusig Road Section)
09/02/10 VIII 47.049 240 O 0.364 0.240 0.150 0.030 0.042 0.033 85.90 -
MAC Builders / Ubas Construction (JV) JV-05-021
Impvt. of Allen-Malaga Section along Maharlika Highway, Ferry Terminal-
Allen08/30/08 VIII 46.652 260 O 0.354 0.240 0.000 0.022 0.054 0.067 73.70 -
MAC Builders/B.M. Marketing (JV) JV-07-117 Guiuan Airport Development Project 10/07/09 DOTC 0.105 180 C 0.462 0.200 0.300 - - - 96.20 *96.20%
Outstanding
Madyaw Construction & Dev. Corporation 29598
Const. of Cong. Jose C. Aquino, Sr. MPB (Training Center), Brgy.
Libertad04/12/11 XIII 9.581 254 C 0.368 0.191 0.300 - - - 85.90 89.68%
V. Satisfactory
Madyaw Construction & Dev. Corporation 29598
Conc. of Butuan City-Talacogon-La Paz-Loreto-Veruela-Sta. Josefa Road
(Talacogon Sect.)03/31/11 XIII 36.345 270 C 0.334 0.200 0.300 - - - 83.40 86.46%
Satisfactory
Madyaw Construction & Dev. Corporation 29598 Conc. of Manapa Provincial Road 05/31/10 XIII 28.877 300 C 0.420 0.200 0.300 - - - 92.00 89.36%
V. SatisfactoryMadyaw Construction &
Dev. Corporation 29598 Conc. of Brgy. Marbon along Jct. Secondary Road, Brgy. Marbon 09/07/10 XIII 4.714 168 C 0.341 0.200 0.300 - - - 84.10 84.10%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page252
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Madyaw Construction & Dev. Corporation 29598 Conc. of Manapa Provincial Rd. 02/23/10 XIII 28.879 300 O 0.379 0.239 0.150 0.030 0.045 0.033 87.60 -
Madyaw Construction & Dev. Corporation 29598 Completion of San Luis Footbridge,
Old Poblacion 12/01/08 XIII 5.722 210 O 0.324 0.300 0.100 0.030 0.032 0.100 88.60 -
Madyaw Construction & Dev. Corporation 29598
Completion of Philippine Normal University Multi-Purpose Bldg.
(Covered Court)06/08/09 XIII 1.872 150 C 0.445 0.200 0.300 - - - 94.50 *94.50%
V. Satisfactory
Madyaw Construction & Dev. Corporation 29598
Conc.of Talacogon-La Paz Road Section along Butuan City-
Talacogon-La Paz-Loreto Veruela-Sta. Josefa Road
06/09/09 XIII 19.247 416 O 0.350 0.300 0.150 0.030 0.051 0.050 93.10 -
Madyaw Construction & Dev. Corporation 29598
Const./Impvt. of Water Supply System (Hydrolic Ram Pump), Brgy.
M.J. Santos 06/11/09 XIII 1.856 133 O 0.339 0.300 0.150 0.030 0.048 0.050 91.70 -
Madyaw Construction & Dev. Corporation 29598 Completion of Azpetia Bridge along
NRJ-Awa-Prosperidad-Lianga Road 03/16/09 XIII 6.724 180 C 0.376 0.200 0.300 - - - 87.60 84.96% Satisfactory
Madyaw Construction & Dev. Corporation 29598 Const./Imprv't. of Water Supply
System, Brgy. M.J. Santos 09/16/09 XIII 1.856 133 C 0.475 0.908 0.300 - - - 168.30 91.34% V.Satisfactory
Madyaw Construction & Dev. Corporation 29598
Conc. of La Paz-loreto Rd. Sect. along Butuan city-Talacogon-La Paz-
Loreto-Veruela-Sta. Josefa Rd.09/14/09 XIII 19.242 432 C 0.430 0.150 0.300 - - - 88.00 89.62%
V.Satisfactory
Madyaw Construction & Dev. Corporation 29598
Conc. of Talacogon-La Paz Rd. Sect. along Butuan City-Talacogon-la Paz-
Veruela-Sta. Josefa Rd.09/14/09 XIII 19.247 320 C 0.395 0.135 0.300 - - - 83.00 88.55%
Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Const. of 2CL School Bldg., Leopoldo N. Lopez Sr. Memorial E/S,
Brgy. Matiao04/07/11 XI 0.991 100 C 0.448 0.181 0.300 - - - 92.90 *92.90%
V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Completion of DPWH Davao Oriental
2nd District Eng'g. Office Bldg. 04/07/11 XI 2.893 90 C 0.483 0.200 0.300 - - - 98.30 89.13% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Rehab./Reconst./Upgrading of Damaged Paved National Road Sect., Lipata (Surigao del Norte) Davao City
Highway through Daang Maharlika Road (Agusan to Davao Road)
04/11/11 XI 42.496 280 C 0.486 0.195 0.300 - - - 98.10 88.86% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
New Const./Compl./Continuation of On-Going Bridges, Surop Bridge
along Tibanban-Lavigan Sect.04/07/11 XI 11.569 165 C 0.471 0.167 0.300 - - - 93.80 88.16%
Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
New Const./Compl./Continuation of On-Going Bridges, Tagabebe Bridge
along Tibanban-Lavigan Road04/07/11 XI 19.278 190 C 0.448 0.165 0.300 - - - 91.30 83.68%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page253
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tibangan-
Lavigan Rd., Nangan Sect. 06/08/10 XI 9.639 100 O 0.385 0.240 0.150 0.030 0.045 0.033 88.30 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tibanban-
Lavigan Rd., Luzon-Tiblawan Sect. 06/08/10 XI 19.283 120 O 0.349 0.240 0.150 0.030 0.045 0.033 84.70 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Road Upgrading of Tibanban-Lavigan Rd., Tagabebe-Pundaguitan
Sect.06/08/10 XI 19.279 120 O 0.332 0.240 0.150 0.030 0.045 0.050 84.70 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Impvt./Rehab. of Agusan-Davao Road, Km. 1469+000 to Km.
1482+000 with exception Panabo-Carmen Section
02/27/10 XI 19.093 60 C 0.487 0.133 0.300 - - - 92.00 92.00% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Completion of Multi-Purpose
Building, Batobato 03/02/10 XI 2.055 90 C 0.466 0.133 0.300 - - - 89.90 89.90% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Const. of Gavino Dawang E/S
(Package: SB-09) 03/02/10 XI 1.061 90 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tibanban-
Lavigan Rd., Nangan Sect. 09/03/10 XI 9.639 100 C 0.435 0.133 0.300 - - - 86.80 87.70% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tibanban-
Lavigan Rd., Luzon-Tiblawan Sect. 09/03/10 XI 19.283 120 C 0.443 0.133 0.300 - - - 87.60 85.86% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Road Upgrading of Tibanban-Lavigan Rd. Tagabebe-Pundaguitan
Sect.09/03/10 XI 19.279 120 C 0.398 0.133 0.300 - - - 83.10 84.06%
Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Conc. of Tibanban-Lavigan Road
(Lilisan Sect.) 03/11/09 XI 19.282 148 C 0.335 0.145 0.300 - - - 78.00 84.66% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Construction of Multi-Purpose
Building 06/05/09 XI 4.723 230 O 0.387 0.266 0.150 0.030 0.043 0.033 90.90 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tibanban-
Lavigan Road 06/03/09 XI 48.233 150 C 0.446 0.149 0.300 - - - 89.50 *89.50% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262
Const. of Multi-Purpose Building A (10m x 18m Covered Court) with
Stage09/14/09 XI 4.723 230 C 0.414 0.133 0.300 - - - 84.70 89.04%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page254
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Road Upgrading of Tiban-Lavigan
Road, Tamban-Lilisan Sect. 09/14/09 XI 9.640 100 C 0.402 0.133 0.300 - - - 83.50 *83.50% Satisfactory
Mafil Enterprises 27226 Road Upgrading (Gravel to Paved) Jct. Dologon-Panadtalan Road 06/15/10 X 4.713 75 O 0.353 0.240 0.150 0.023 0.050 0.033 84.90 -
Mafil Enterprises 27226 Road Upgrading (Gravel to Concrete) Jct. Dologon-Panadtalan 09/03/10 X 4.713 126 C 0.404 0.151 0.300 - - - 85.50 85.14%
Satisfactory
Maghuyop Construction 21641 Const./Renovation/Completion/ Expansion of MPB 03/29/11 VII 0.481 150 O 0.356 0.268 0.150 0.030 0.064 0.050 91.80 -
Maghuyop Construction 21641 Const. of MPB Cogon Norte 02/24/10 VII 2.019 120 C 0.473 0.112 0.300 - - - 88.50 93.47% V. Satisfactory
Maghuyop Construction 21641 Rehab./Impvt. of FMR, Lintuan 08/24/10 VII 0.142 100 C 0.445 0.133 0.300 - - - 87.80 87.80% Satisfactory
Maghuyop Construction 21641 Rehab./Impvt. of FMR, (leading to Atabay Beach) Ubojan-Sandingan 08/24/10 VII 0.141 100 C 0.432 0.133 0.300 - - - 86.50 86.50%
Satisfactory
Maghuyop Construction 21641 Const. of 1-CL Datag E/S 06/09/09 VII 0.459 120 C 0.491 0.182 0.300 - - - 97.30 93.24% V. Satisfactory
Maghuyop Construction 21641Completion of Multi-Purpose
Building, CVSCAFT, Tagbilaran City Campus
03/04/09 VII 0.915 115 C 0.497 0.138 0.300 - - - 93.50 *93.50%V. Satisfactory
Maghuyop Construction 21641 Concreting of Multi-Purpose Pavement Tagbuane 03/03/09 VII 0.137 110 C 0.416 0.200 0.300 - - - 91.60 *91.60%
V. Satisfactory
Maghuyop Construction 21641 Construction of Multi-Purpose Pavement, Basac Dacu 03/03/09 VII 0.137 110 C 0.450 0.133 0.300 - - - 88.30 *88.30%
Satisfactory
Maghuyop Construction 21641 Reconstruction of Balilihan Central Elementary School 03/03/09 VII 3.525 180 C 0.494 0.181 0.300 - - - 97.50 96.31%
Outstanding
Mainroad Development & Trading Corporation 33347 Impvt. of MPB at Poblacion 06/04/10 IVA 0.398 60 C 0.469 0.129 0.300 - - - 89.80 89.80%
V. Satisfactory
Mak Jay Construction 19057 Road Upgrading (Gravel to Concrete) along Baguio-Bondoc Rd. 04/08/11 CAR 9.315 172 O 0.346 0.231 0.150 0.030 0.027 0.033 81.70 -
Mak-Jay Construction 19057 Concreting of Paykek-Kapangan Road 08/26/09 CAR 0.424 30 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
Mak-Jay Construction 19057 Conc. along Topinao FMR, Poblacion 06/07/10 CAR 0.288 60 C 0.345 0.200 0.300 - - - 84.50 84.50%
Satisfactory
Mak-well Enterprises 25003 Completion of MPB at Brgy. Malaban 05/27/10 IVA 1.054 30 C 0.484 0.141 0.300 - - - 92.50 92.50% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page255
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mamsar Construction and Industrial Corporation
15885 Const. of Balo-i Bridge 08/27/10 X 74.275 432 O 0.400 0.240 0.150 0.030 0.055 0.033 90.80 -
Mamsar Construction and Industrial Corporation
15885Const. of Shore Protection including
RC Pier /Wharf and Reclamation Area, DPWH, RES
03/09/10 XI 106.212 400 O 0.328 0.300 0.150 0.030 0.045 0.033 88.60 -
Mamsar Construction and Industrial Corporation
15885
Rehab./Reconst./Upgrading of Damaged Paved National Roads at Poblacion Section, Sta. 1524+000-
Sta. 1526+000 w/ exception
09/14/09 X 18.467 150 C 0.407 0.200 0.300 - - - 90.70 90.70% V. Satisfactory
Mamsar Construction and Industrial
Corporation (Formerly: Mamsar Enterprises Agro-
Industrial Corporation)
15885
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads along Misamis Oriental-Ma. Cristina Bdr.
Road Mahayahay Shell-Tubod-Bughaw-GSIS Sect., Sta.1526+411.1 -
Sta.1526+869
04/10/11 X 13.900 243 C 0.443 0.133 0.300 - - - 87.60 88.80% Satisfactory
Mamsar Construction and Industrial
Corporation (Formerly: Mamsar Enterprises Agro-
Industrial Corporation)
15885 Const. of Balo-i Bridge 04/08/11 X 74.275 462 O 0.350 0.240 0.080 0.030 0.054 0.033 78.70 -
Mamsar Construction and Industrial
Corporation (Formerly: Mamsar Enterprises Agro-
Industrial Corporation)
15885
Rehab./Reconst./Upgrading along Misamis Oriental-Ma.Cristina Bdry. Road Iligan City Central Section, Sta.1525+619.7 - Sta.1526+083.2
07/07/10 X 13.899 148 O 0.388 0.240 0.150 0.030 0.055 0.050 91.30 -
Mamsar Construction and Industrial
Corporation (Formerly: Mamsar Enterprises Agro-
Industrial Corporation)
15885Const. of Shore Protection including
RC Pier/Wharf and Reclamation Area, DPWH, RES
06/12/10 XI 106.212 400 O 0.363 0.240 0.150 0.030 0.051 0.033 86.70 -
Mamsar Construction and Industrial
Corporation (Formerly: Mamsar Enterprises Agro-
Industrial Corporation)
15885Const. of Shore Protection inc. RC Pier/Wharf and Reclamation Area,
DPWH, RES09/07/10 XI 106.212 400 O 0.357 0.240 0.150 0.030 0.041 0.033 85.10 -
Maningo Enterprises 13330Concreting of Road, 11th Street, Doña Rosario Village, Barangay
Labogon06/05/09 VII 2.033 75 C 0.360 0.200 0.300 - - - 86.00 *86.00%
Satisfactory
Manuel A. Dela Torre Jr. Builders 31024
Rehab./Reconst. of Damaged Paved National Roads at Pulilan-Calumpit
Rd.06/09/10 III 4.166 30 C 0.462 0.133 0.300 - - - 89.50 89.50%
V. Satisfactory
Manuel A. Dela Torre Jr. Builders 31024 Const. of Farm-to-Market Road at
Sapang Pahalang 09/08/09 III 4.758 90 C 0.448 0.133 0.300 - - - 88.10 85.70% Satisfactory
Map Alviola Construction 31951 Construction of Flood Control and Drainage Facilities 06/09/09 VII 0.946 45 C 0.431 0.133 0.300 - - - 86.40 *86.40%
Satisfactory
Map Alviola Construction 31951 Const. of MPB at Region Mobile Group (RMG) 08/24/10 VII 0.490 180 C 0.368 0.200 0.300 - - - 86.80 86.80%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page256
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Marbel Dynamic Builders 6150 Const. of Koronadal NCHS Annex, Bacongco Campus 03/14/09 XII 1.734 126 C 0.449 0.133 0.300 - - - 88.20 82.53%
Satisfactory
Marcbilt Construction, Inc. 21844
Conc. of Bontoc-Tabuk-Tuguegarao Rd. Bontoc-Tinglayan Bdry. Section I
Ampawilan to Malanas Sect. Km.411+140 - Km.416+055
04/10/11 CAR 156.133 515 C 0.386 0.169 0.300 - - - 85.50 86.58% Satisfactory
Marcbilt Construction, Inc. 21844
Widening of Gov. Drive, Carmona-Dasmariñas-TMC Road, Brgy.
Cabuco to Brgy. Tanauan04/14/11 IVA 38.558 171 C 0.337 0.200 0.300 - - - 83.70 82.23%
Satisfactory
Marcbilt Construction, Inc. 21844 Road Upgrading (Gravel to Paved) of
MWCR San Agustin-Pagasa Section 04/08/11 IVB 30.469 245 C 0.375 0.200 0.300 - - - 87.50 *87.50% Satisfactory
Marcbilt Construction, Inc. 21844
Road Upgrading (Gravel to Paved) of Mindoro West Coast Road (Iriron-
Ragara Sect.) Brgy. Iriron and Concepcion
04/04/11 IVB 48.239 328 C 0.407 0.133 0.300 - - - 84.00 83.34% Satisfactory
Marcbilt Construction, Inc. 21844
Const. (Opening/Widening/Conc.) of CALA-Daang Hari Rd. Bdry. (Pasong
Buwaya 2 Sect.05/31/10 IVA 37.952 215 O 0.349 0.300 0.150 0.030 0.045 0.033 90.70 -
Marcbilt Construction, Inc. 21844
Road Upgrading (gravel to paved), MWCR, Sablayan-Sta. Cruz
(Buenavista-Sto. Nino Section) KO 322+594- KO 323+465.65 to KO
323+622-KO 324+472
08/31/09 IVB 19.300 140 O 0.351 0.292 0.150 0.030 0.042 0.033 89.80 -
Marcbilt Construction, Inc. 21844
Road Upgrading (gravel to paved), MWCR, (San Francisco Section) KO
332+300- KO 334+75508/30/09 IVB 28.659 165 O 0.337 0.300 0.150 0.030 0.042 0.033 89.20 -
Marcbilt Construction, Inc. 21844
Road Upgrading of San Francisco Section (Gravel to Paved) MWCR
(San Francisco Section) KO 332+300 -KO 334+755
02/20/10 IVB 28.950 193 C 0.363 0.200 0.300 - - - 86.30 87.32% Satisfactory
Marcbilt Construction, Inc. 21844 Rehab./Reconstruction of Carmona
Diversion Road 09/08/09 IVA 23.957 109 C 0.438 0.200 0.300 - - - 93.80 90.20% V. Satisfactory
Marcbilt Construction, Inc. 21844
Const. (Opening/Widening/Conc.) of CALA-Daang Hari Road Bdry.
(Pasong Buwaya 2 Sect.)08/31/10 IVA 37.952 215 C 0.429 0.200 0.300 - - - 92.90 91.58%
V. Satisfactory
Marcbilt Construction, Inc. 21844 Road Upgrading (Gravel to Paved)
MWCR, (San Francisco Section) 05/29/09 IV-B 28.659 150 O 0.303 0.300 0.150 0.030 0.035 0.050 86.80 -
Marcbilt Construction, Inc. 21844
Road Upgrading (Gravel to Paved) MWCR, Sablayan-Sta. Cruz
(Buenavista-Sto. Nino Section)05/29/09 IV-B 19.112 140 O 0.305 0.290 0.150 0.030 0.025 0.050 85.00 -
Marcbilt Construction, Inc. 21844 Rehab./Reconst. (Conc.) of
Dasmariñas-Carmona Road 11/12/08 IV-A 28.920 180 O 0.341 0.202 0.100 0.030 0.037 0.100 81.00 -
Marcbilt Constructions, Inc. 21844 Rehab./Reconst. (Conc.) of
Dasmariñas-Carmona Road 03/11/09 IV-A 28.917 190 C 0.454 0.133 0.300 - - - 88.70 84.08% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page257
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Marcons Builder 8044
Const. (Road Opening) of Missing Links of National Road, Sallapadan-Tubo, Abra-Cervantes, Ilocos Sur,
Abra Side, Km.467+100 - Km.484+000
03/30/11 CAR 65.204 470 O 0.317 0.272 0.150 0.020 0.027 0.033 81.90 -
Marcons Builder 8044 Const. of DPWH Regional Office Building, Phase V 03/13/09 CAR 24.058 360 O 0.361 0.276 0.150 0.030 0.056 0.033 90.60 -
Marcons Builder 8044 Const. of DPWH Regional Office Building, Phase V 03/04/10 CAR 24.058 395 C 0.481 0.133 0.300 - - - 91.40 92.48%
V. Satisfactory
Marcons Builder 8044 Const. of DPWH Regional Office Building (Phase V) 08/29/08 CAR 24.059 360 O 0.376 0.300 0.100 0.030 0.047 0.100 95.30 -
Marcons Builder 8044 Impvt. of Benguet-Bontoc-Kalinga Road 08/15/08 CAR 12.707 180 C 0.318 0.100 0.000 - - - 41.80 58.56%
Poor
Marcons Builders 8044 Restoration of Road Cut along M. Roxas St., Km. 254+120-Km. 254+160 09/02/10 CAR 0.500 120 C 0.426 0.133 0.300 - - - 85.90 85.90%
Satisfactory
Marcphil Construction 10949 Concreting of San Aquilino-Baroc Road 02/26/09 IV-B 0.951 50 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Marcus Construction 12601Conc. of Banisilan-Guiling-Alamada-
Libungan Rd., Dry Creek-Camansi Sect. w/ exception
03/31/11 XII 31.857 170 O 0.330 0.300 0.150 0.030 0.055 0.033 89.80 -
Marcus Construction 12601 Restoration/Const. of Protection Dike, Kabakan River 04/02/11 XII 18.669 317 C 0.365 0.200 0.300 - - - 86.50 84.64%
Satisfactory
Marcus Construction 12601Rehab./Impvt. of Bukidnon-Cotabato National Road (Tambad Sect.), Brgy.
Tambad09/03/09 XII 57.136 289 O 0.368 0.300 0.150 0.030 0.033 0.033 91.40 -
Marcus Construction 12601Const. of Slope Protection Works
along Dualing-New Panay-Midsayap Road (Arizona Section)
09/04/09 XII 9.407 206 O 0.400 0.240 0.150 0.010 0.042 0.033 87.50 -
Marcus Construction 12601 Const. of Multi-Purpose Building at Midsayap Pilot Elementary School 02/26/10 XII 6.096 130 C 0.449 0.188 0.300 - - - 93.70 93.70%
V. Satisfactory
Marcus Construction 12601 Concrete Re-blocking along Davao-Cotabato Road 02/27/10 XII 6.378 110 C 0.407 0.133 0.300 - - - 84.00 84.00%
Satisfactory
Marcus Construction 12601Conc. of Banisilan-Alamada-
Libungan Road Wadya-Poblacion, Banisilan Section, with exception
08/26/10 XII 29.727 190 C 0.408 0.184 0.300 - - - 89.20 89.20% V. Satisfactory
Marcus Construction 12601Const. of Slope Protection Works
along Dualing-New Panay-Midsayap Road, Arizona Section
08/26/10 XII 9.430 209 C 0.423 0.133 0.300 - - - 85.60 85.60% Satisfactory
Marcus Construction 12601Proposed Conc. of Liloy-Siocon Road, Imelda-San Roque-Gutalac
Sect.03/09/09 IX 19.128 225 C 0.459 0.155 0.300 - - - 91.40 84.05%
Satisfactory
Marcus Construction 12601Repair/Rehab./Impv't. of Damaged
Road Section along Davao-Cotabato Road, Pikit-Midsayap Section
03/04/09 XII 9.435 125 C 0.477 0.200 0.300 - - - 97.70 *97.70% Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page258
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Road with Drainage & Shoulder, KO368+000 -
KO368+548, KO369+200 - KO370+150 (with exception) Dist. I, Dist. II &
Cabaruan
04/07/11 II 16.989 210 C 0.405 0.133 0.300 - - - 83.80 90.46% V. Satisfactory
Mar-Deb Construction & Development 6715 Restoration of Flood Control
Structure at Estrella 04/08/11 II 2.877 120 C 0.470 0.133 0.300 - - - 90.30 *90.30% V. Satisfactory
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Road with
widening (with exception), KO370+060 - KO370+550
04/07/11 II 15.104 180 C 0.423 0.133 0.300 - - - 85.60 90.13% V. Satisfactory
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Road,
KO364+000 - KO364+97204/07/11 II 11.581 120 C 0.423 0.133 0.300 - - - 85.60 88.96%
Satisfactory
Mar-Deb Construction & Development 6715 Restoration of Flood Control
Structure at San Roque 04/07/11 II 4.787 120 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
Mar-Deb Construction & Development 6715
Rehab. of Alicia-San Mateo Road, KO356+000-KO361+000, Alicia-San
Mateo Section04/07/11 II 17.807 120 C 0.411 0.133 0.300 - - - 84.40 *84.40%
Satisfactory
Mar-Deb Construction & Development 6715 Const. of Manili Bridge 04/10/11 II 13.882 330 C 0.463 0.200 0.000 - - - 66.30 82.92%
Satisfactory
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Roads w/
Widening, Daang Maharlika KO 368+056-KO366+756
08/26/09 II 13.387 132 C 0.439 0.200 0.300 - - - 93.90 *93.90% V. Satisfactory
Mar-Deb Construction & Development 6715 Const. of 2-CLSB, Cauayan National
H/S Ext. Research Minante I 08/26/09 II 0.920 90 C 0.447 0.153 0.300 - - - 90.00 *90.00% V. Satisfactory
Mar-deb Construction & Development 6715 Const. of Dioton Bridge Bank
Protection 02/24/10 II 0.950 90 C 0.427 0.133 0.300 - - - 86.00 86.00% Satisfactory
Mar-deb Construction & Development 6715 Completion of Multi-Purpose
Building at Carabbatan Chica 02/24/10 II 0.143 40 C 0.395 0.162 0.300 - - - 85.70 85.70% Satisfactory
Mar-Deb Construction & Development 6715 Restoration of Flood Control
Structure 06/05/10 II 7.658 120 C 0.429 0.200 0.300 - - - 92.90 92.90% V. Satisfactory
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Rd. w/
Widening KO 354+300 - KO354+390 w/ exception
06/05/10 II 9.085 90 C 0.424 0.200 0.300 - - - 92.40 92.40% V. Satisfactory
Mar-Deb Construction & Development 6715 Const. of Cagayan River Control
Baringin Sect. 06/02/10 II 19.293 180 C 0.481 0.133 0.300 - - - 91.40 91.40% V. Satisfactory
Mar-Deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Rd. KO
369+(-297) - KO 370+000 w/ exception
06/02/10 II 9.816 120 O 0.379 0.247 0.150 0.030 0.051 0.050 90.70 -
Mar-Deb Construction & Development 6715 Restoration of Flood Control
Structure at Loria 06/05/10 II 2.883 120 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page259
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mar-deb Construction & Development 6715
Rehab./Reconst.Upgrading of Damaged Paved National Road
KO369+(-)297 - KO370+000 (with exception)
08/26/10 II 9.816 150 C 0.430 0.200 0.300 - - - 93.00 91.62% V. Satisfactory
Mar-deb Construction & Development 6715
Rehab./Reconst./Upgrading of Damaged Paved National Road with
widening (with exception), KO353+000 to KO354+200, Mabini,
Alicia Section
08/26/10 II 16.061 150 C 0.393 0.200 0.300 - - - 89.30 89.30% V. Satisfactory
Mar-deb Construction & Development 6715 Conc. of Cauayan-Cabatuan Road
(Cabatuan Sect.) 03/04/09 II 9.563 150 C 0.439 0.200 0.300 - - - 93.90 91.68% V.Satisfactory
Mar-deb Construction & Development 6715 Widening of Cauayan-Cabatuan
Road (Luna Section) 03/04/09 II 3.344 120 C 0.442 0.200 0.300 - - - 94.20 92.04% V.Satisfactory
Mar-Deb Construction & Development 6715 Completion of Turod-Banquero
Concrete Overflow Bridge PhaseIII 08/14/08 II 9.879 300 O 0.351 0.260 0.000 0.030 0.037 0.100 77.80 -
Mar-Deb Construction & Development 6715 Rehab/Reconst. Of Santiago-
Tuguegarao Road 05/26/09 II 11.473 237 C 0.454 0.200 0.300 - - - 95.40 93.03% V. Satisfactory
Mar-Deb Construction & Development 6715 Completion of Turod-Banquero
Concrete Overflow Bridge Phase III 05/26/09 II 9.879 535 C 0.457 0.200 0.300 - - - 95.70 84.96% Satisfactory
Margarita Construction 20201 Const. of MPB Sta. Lucia, Phase 4 Punturin and CNAI Bignay 03/28/11 NCR 2.742 120 O 0.377 0.240 0.150 0.030 0.058 0.050 90.50 -
Margarita Construction 20201 Rehab. of Roads @ Calantipay 04/13/11 III 0.485 10 C 0.267 0.000 0.300 - - - 56.70 *56.70% Poor
Margarita Construction 20201Rehab. of Damaged Asphalt Pavement Marilao Bridge,
Km.22+054, MNR08/28/10 III 4.745 40 C 0.478 0.133 0.300 - - - 91.10 91.10%
V. Satisfactory
Margarita Construction 20201 Rehab. of Sta. Maria-By Pass Road 09/07/09 III 4.757 100 O 0.357 0.240 0.150 0.030 0.042 0.033 85.20 -
Markbilt Construction 12522 Const. of Small Reservoir Irrigation Project - Masidem Dam (Dam) 05/2-7/11 NIA 192.198 1,098 O 0.384 0.272 0.150 0.030 0.025 0.050 91.05 -
Marknest Construction and Builders (Formerly: Marknest Construction)
16818 Rehab/Reconst/Upgrading of Drainage along GSO Road 08/25/09 III 9.520 115 C 0.402 0.133 0.300 - - - 83.50 *83.50%
Satisfactory
Marknest Construction and Trading (Formerly:
Marknest Const.)16818 Road Upgrading of Mt. Arayat Park
Road 05/19/09 III 11.429 90 O 0.356 0.300 0.150 0.020 0.033 0.050 90.90 -
Marknest Construction and Trading (Formerly: Marknest Construction)
16818 Completion of MPB @ Don Luis Gonzales H/S, Pandacaqui 03/28/11 III 1.900 30 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Marknest Construction and Trading (Formerly: Marknest Construction)
16818 Road Upgrading of Mt. Arayat National Park Road 02/15/10 III 11.429 90 C 0.460 0.200 0.300 - - - 96.00 92.94%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page260
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Marknest Construction and Trading (Formerly: Marknest Construction)
16818 Const. of Gerry Rodriguez High School Divisoria 02/15/10 III 7.517 120 C 0.485 0.200 0.300 - - - 98.50 88.98%
Satisfactory
Marquin Construction 13332 Const. of 2-CL SB at Doña Milagros Osmeña NHS 04/14/11 VII 1.207 60 C 0.467 0.133 0.300 - - - 90.00 83.98%
Satisfactory
Marquin Construction 13332 Construction of MPB Maslog E/S 03/10/09 VII 0.902 70 C 0.335 0.200 0.300 - - - 83.50 *83.50% Satisfactory
Marquin Construction 13332 Road Concreting of Brgy. Bili 03/10/09 VII 0.454 70 C 0.377 0.200 0.300 - - - 87.70 *87.70% Satisfactory
Marquin Construction 13332 Road Concreting of Brgy. Tabunan-Brgy. Managase 03/10/09 VII 0.454 70 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Marquin Construction 13332 Const. of 2-CL SB on top of the existing SB at Compostela NHS 09/14/09 VII 2.234 120 O 0.383 0.240 0.150 0.030 0.035 0.025 86.30 -
Marquin Construction 13332 Construction of 2-CL SB at Mohon NHS 09/14/09 VII 1.212 120 O 0.332 0.240 0.150 0.030 0.035 0.025 81.20 -
Marquin Construction 13332 Const. of 2-CL SB on top of the existing SB at Compostela NHS 03/09/10 VII 2.234 120 C 0.476 0.097 0.300 - - - 87.30 86.60%
Satisfactory
Marquin Construction 13332 Const. of 2-CL SB at Mohon NHS 03/09/10 VII 1.212 120 C 0.481 0.102 0.300 - - - 88.30 83.33% Satisfactory
Marquin Construction 13332 Road Conc. of Brgy. Calumbuyan 08/31/10 VII 1.353 60 C 0.378 0.200 0.300 - - - 87.80 87.80% Satisfactory
Mar-vel Construction & Supply 23722 Const. of MPB at Brgy. San Cristobal 02/24/10 IVA 2.887 40 C 0.424 0.200 0.300 - - - 92.40 92.40%
V. Satisfactory
Mar-Vel Construction & Supply 23722
Const./Impvt. of Water Supply Project in Waterless Municipality of
Langgam06/01/09 IV-A 2.316 133 C 0.417 0.133 0.300 - - - 85.00 85.48%
Satisfactory
Mar-vel Construction & Supply 23722 Const. of MPB at Ospital ng Biñan 03/02/09 IV-A 4.801 55 C 0.492 0.185 0.300 - - - 97.70 *97.70%
Outstanding
Mar-vel Construction & Supply 23722
Const./Impvt. of Water Supply Projects in Waterless Municipality at
Langgam03/02/09 IV-A 2.316 133 O 0.400 0.200 0.150 0.030 0.028 0.050 85.80 *85.80%
Satisfactory
Mar-Vel Construction & Supply (Formerly: Mar-
Vel Construction)23722
Widening of Old MSR Road (Calamba Section) Brgy Parian (with
exception)04/06/11 IVA 19.203 90 C 0.418 0.200 0.300 - - - 91.80 *91.80%
V. Satisfactory
Mar-vel Construction & Supply (Formerly: Mar-
vel Construction)23722
Road Upgrading of Calamba-Tagaytay Rd., Brgy. Bunggo (with
exception)05/27/10 IVA 3.520 50 C 0.375 0.200 0.300 - - - 87.50 87.50%
Satisfactory
Mar-vel Construction & Supply (Formerly: Mar-
vel Construction)23722
Const. of Two Storey - Four CL School Bldg. at Cavite National High
School06/01/10 IVA 4.801 169 O 0.395 0.300 0.052 0.030 0.029 0.050 85.60 -
Mar-vel Construction & Supply (Formerly: Mar-
vel Construction)23722 Const. of Two (2) Storey Four (4)
Classroom Sch. Bldg. at Cavite NHS 08/27/10 IVA 4.801 169 C 0.449 0.131 0.300 - - - 88.00 86.32% Satisfactory
Mar-vel Construction & Supply (Formerly: Mar-
vel Construction)23722
Widening of Daang Maharlika (LZ), Calamba-Sto. Tomas Road, Brgy. Real to Turbina (with exception)
08/23/10 IVA 14.402 75 C 0.408 0.133 0.300 - - - 84.10 84.10% Satisfactory
Mar-vel Construction and Supply 23722 Const. (Opening/Conc.) Bucal By
Pass Road 09/02/09 IVA 28.890 120 C 0.376 0.200 0.300 - - - 87.60 *87.60% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page261
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mar-Vel Construction and Supply (Formerly: mar-
Vel Const.)23722
Repair/Maint. Asphalt Overlay of Daang Maharlika Road, Km. 132+500-
Km.135+000 with exception05/26/09 III 14.103 10 C 0.348 0.200 0.300 - - - 84.80 *84.80%
Satisfactory
Masulot Construction 10716Road Upgrading (Gravel to Paved) of Demoloc-Little Baguio-Alabel Road,
Bolila-Timog Section04/01/11 XI 9.598 200 C 0.463 0.200 0.300 - - - 96.30 85.32%
Satisfactory
Masulot Construction 10716Road Upgrading (Gravel to Paved) of Demoloc-Little Baguio-Alabel Road,
Sanghay Sect.04/01/11 XI 19.197 210 C 0.330 0.200 0.300 - - - 83.00 84.11%
Satisfactory
Masulot Construction 10716Road Upgrading (Gravel to Paved) of Demoloc-Little Baguio-Alabel Road,
Upper Tibolog Sect.04/01/11 XI 9.598 200 C 0.433 0.200 0.300 - - - 93.30 75.30%
Unsatisfactory
Masulot Construction 10716
Const. of Sabang Bridge along Arakan-Analopon-Napaliko-Katipunan Road (Steel Truss
Component to be supplied by others)
09/05/09 XII 9.217 150 O 0.336 0.300 0.000 0.010 0.028 0.033 70.70 -
Masulot Construction 10716 Const. of Kidapawan-Magpet-Pangao-An Road, Mateo-Gubatan Sect.) 09/05/09 XII 30.527 250 O 0.307 0.290 0.000 0.010 0.033 0.033 67.30 -
Masulot Construction 10716 Const. of Kidapawan-Magpet-Pangao-an Road, Mateo-Gubatan Section 06/05/10 XII 30.528 463 C 0.214 0.133 0.300 - - - 64.70 67.04%
Poor
Masulot Construction 10716 Const. of Kidapawan-Magpet-Pangao-an Road, Mateo-Gubatan Section 06/01/09 R-XII 30.528 250 O 0.292 0.300 0.000 0.024 0.050 0.033 69.90 -
Masulot Construction 10716Const. of Sabang Bridge along
Arakan-Anapolon-Napaliko-Katipunan Road
05/30/09 R-XII 9.218 150 O 0.308 0.300 0.000 0.018 0.035 0.033 69.40 -
Masulot Construction 10716
Const. (Opening) of Missing Links at Tubalan-Pangian-Pinalpalan-Alabel
Road, Malita-Jose Abad Santos Road, Tubalan Section
05/28/09 XI 19.089 115 O 0.400 0.300 0.150 0.022 0.028 0.033 93.30 -
Masulot Construction 10716 Road Upgrading of Mati-Maragusan Road (Buso-Taguibo Section) 06/05/09 XI 15.429 100 O 0.315 0.300 0.150 0.030 0.037 0.033 86.50 -
Masulot Construction 10716Road Upgrading of Mati-Maragusan Road (Don Martin Marundan-Menzi
Section)06/05/09 XI 19.289 120 O 0.313 0.300 0.150 0.030 0.037 0.033 86.30 -
Masulot Construction 10716
Rehab./Recons./Upgrading of Digos-Makar Road, Kiblagon-Tagansule
Section, Km. 1584+000-Km. 1584+750
05/28/09 XI 9.649 180 O 0.363 0.237 0.150 0.030 0.037 0.033 85.00 -
Masulot Construction 10716
Const. (Opening) of Missing Links of Tubalan-Pangian-Pinalpalan-Alabel Road Malita, Jose Abad Santos Rd.,
Tubalan Section
09/03/09 XI 19.089 115 C 0.467 0.193 0.300 - - - 96.00 94.38% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page262
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Masulot Construction 10716 Road Upgrading of Mati-Maragusan Road (Buso-Taguibo Sect.) 09/14/09 XI 15.429 100 C 0.453 0.152 0.300 - - - 90.50 88.10%
Satisfactory
Masulot Construction 10716
Rehab./Reconst./Upgrading of Damaged Paved National Road,
Digos-Makar Road-Baluyan-Sarangani Prov. Boundary Sect. Km.
1590+000-Km. 1591+650
09/03/09 XI 19.291 210 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfactory
Masulot Construction 10716Road Upgrading of Mati-Maragusan Road (Don Martin Marundan-Menzi
Section)09/14/09 XI 19.289 120 C 0.440 0.142 0.300 - - - 88.20 87.06%
Satisfactory
Masulot Construction 10716
Rehab./Reconst.Upgrading of Damaged Paved Nat'l Road Digos-
Makar Road Kiblagon Section Km.1584+000-Km.1584+750
09/03/09 XI 9.649 180 C 0.439 0.133 0.300 - - - 87.20 85.88% Satisfactory
Maverick & Wee Eng Joint Venture JV-07-105
CP 8: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-
Boston) Baganga-Cateel Section11/25/08 XI 191.290 597 O 0.381 0.240 0.100 0.030 0.060 0.100 91.10 -
Maverick & Wee Eng Joint Venture
SL1-SN-005102/JV-
07-105
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay
Boston) Banganga-Cateel Section06/09/09 XI 191.222 597 O 0.368 0.255 0.150 0.030 0.060 0.050 91.30 -
Maverick Builders Incorporated 14466
Conc. of Davao Oriental-Surigao Coastal Road (Intermittent Sections
in Banaybanay)04/07/11 XI 96.445 280 C 0.436 0.155 0.300 - - - 89.10 87.96%
Satisfactory
Maverick Builders Incorporated 14466
Rehab./Reconst.Upgrading of Damaged Paved Rd., Conc. Of Iba-Dumagnon Sect., Davao Oriental-
Surigao del Sur Coastal Rd.
09/03/10 XI 19.269 120 C 0.411 0.133 0.300 - - - 84.40 84.40% Satisfactory
Maverick Builders Incorporated 14460 Rehab./Impvt. of Manay-Mati Section
along Surigao Sur-Davao Oriental 06/05/09 XI 48.132 161 O 0.381 0.300 0.150 0.030 0.051 0.033 94.50 -
Maverick Builders Incorporated 14460
Rehab./Impvt. of Manay-Mati Section along Surigao Sur-Davao Oriental Coastal Road, (Dawan-Tagamot
Section)
06/05/09 XI 71.995 210 O 0.380 0.300 0.150 0.030 0.047 0.033 94.00 -
Maverick Builders Incorporated 14466
Rehab./Recons./Upgrading of Damaged Paved National Roads, for
Package 1-A: a) Matina-Harana Section
06/11/09 XI 19.284 210 O 0.360 0.300 0.150 0.030 0.051 0.033 92.40 -
Maverick Builders Incorporated 31666 Concreting of Compostela-Cateel
Road 06/08/09 XI 67.990 590 O 0.341 0.236 0.150 0.030 0.042 0.050 84.90 -
Maverick Builders, Incorporated 14460
Rehab./Impvt. of Manay-Mati Section along Surigao Sur-Davao Oriental
Coastal Road (Dawan-Tagamot Section)
03/02/10 XI 71.995 225 C 0.343 0.200 0.300 - - - 84.30 90.12% V. Satisfactory
Maverick Builders, Incorporated 14466 Conc. of Compostela-Cateel Road 03/03/10 XI 69.384 590 C 0.347 0.200 0.300 - - - 84.70 83.75%
Satisfactory
Maverick Builders, Incorporated 14460
Rehab./Impvt. of Manay-Mati Section along Surigao Sur-Davao Oriental Coastal Road, Badas-Baso Section
09/11/09 XI 48.132 164 C 0.450 0.133 0.300 - - - 88.30 92.98% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page263
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Maverick Builders, Incorporated 14466
Rehab./Reconst./Upgrading of Damaged Paved National Road @
Manatina-Harana Section 09/11/09 XI 19.284 210 C 0.434 0.200 0.300 - - - 93.40 92.80%
V. Satisfactory
Maverick Builders, Incorporated 14466 Road Upgrading at Fatima-Malabog
Road 09/16/09 XI 13.486 112 C 0.420 0.200 0.300 - - - 92.00 *92.00% V. Satisfactory
Maverick Builders, Incorporated 14466 Concreting of Compostela-Cateel
Road 09/12/09 XI 69.384 590 O 0.265 0.300 0.150 0.030 0.047 0.033 82.50 -
Maverick Builders, Incorporated (Formerly:
Maverick Builders)14466 Conc. of Compostela-Cateel Road 03/09/09 XI 67.990 590 O 0.266 0.300 0.150 0.030 0.032 0.050 82.80 -
Maverick Builders, Incorporated (Formerly:
Maverick Builders)14466
Rehab./Impv't. of Manay-Mati Sect. along Surigao Sur-Davao Oriental
Coastal Road, Badas-Baso Section03/11/09 XI 48.132 161 O 0.388 0.300 0.150 0.030 0.059 0.050 97.70 -
Maxnell Enterprises 7170 Const. of 2 CL Building at Lacaron Elementary School 02/25/10 VI 1.140 90 C 0.424 0.164 0.300 - - - 88.80 88.80%
Satisfactory
Maxnell Enterprises 7170 Completion of Public Market @ Brgy. San Pedro 09/02/09 VI 0.964 45 C 0.480 0.133 0.300 - - - 91.30 *91.30%
V. Satisfactory
Mayhaligue Construction and Supply 29586
Bagabag Airport Dev't Project (Repair/Rehabilitation of Terminal
Building)03/03/10 DOTC 4.802 120 C 0.463 0.200 0.300 - - - 96.30 96.30%
Outstanding
Mayhaligue Construction and Supply/B. Vicencio Const. (Joint Venture)
JV-08-023
Bagabag Airport Dev't Project (Completion of Concreting of
Runway, Concreting of Apron and Taxiway,Concreting of Vehicular Parking Area and Access Road
03/03/10 DOTC 72.214 300 C 0.432 0.200 0.300 - - - 93.20 93.20% V.Satisfactory
MBB Construction 11363 Bagar-San Agustin-Poblacion Road 03/30/11 I 21.920 367 C 0.342 0.194 0.300 - - - 83.60 83.82% Satisfactory
MBB Construction 11363 Rehabilitation/Reconstruction of Quirino-Pandan Road 09/07/09 I 9.510 148 C 0.397 0.200 0.300 - - - 89.70 *89.70%
V. Satisfactory
MBB Construction 11363Rehab./Reconst./Upgrading of
Damaged Paved National Road along MNR
05/27/10 I 19.103 157 O 0.390 0.225 0.057 0.030 0.047 0.017 76.60 -
MBB Construction 11363Rehab./Reconst./Upgrading of
Damaged Paved National Road along MNR, Sta. Maria Section
08/17/10 I 19.103 157 C 0.407 0.200 0.300 - - - 90.70 82.24% Satisfactory
MBB Construction 11363 Ilocos Sur 2nd District Engineering Office Building 05/29/09 I 14.140 413 C 0.460 0.091 0.300 - - - 85.10 70.26%
Poor
MBB Construction 11363 MNR, Candon-Santiago Section 05/30/09 I 18.920 200 C 0.426 0.068 0.300 - - - 79.40 66.74% Poor
MBB Construction 11363Rehab./Reconst. of Damaged
National Road, Candon-Salcedo Road
05/30/09 I 18.989 300 C 0.258 0.073 0.300 - - - 63.10 63.96% Poor
MBB Construction 11363 Sta. Maria- Burgos Road 02/27/09 I 1.698 124 C 0.339 0.200 0.000 - - - 53.90 65.54%Poor
MBB Construction 11363 Const. of Ilocos Sur 2nd DEO Bldg. 08/13/08 I 14.140 365 O 0.261 0.240 0.100 0.030 0.037 0.100 76.80 -
MBB Construction 11363 Const. of Ilocos Sur 2nd DEO Bldg. 11/12/08 I 14.140 365 O 0.251 0.115 0.030 0.022 0.025 0.067 51.00 -
MBB Construction 11363 MNR, Candon-Santiago Section 11/12/08 I 18.920 200 O 0.338 0.034 0.100 0.022 0.022 0.067 58.30 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page264
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
MBD General Construction 9991
Completion/Continuation of Berago Bridge, Oroquieta City-Plaridel-Calamba-Sapang Dalaga Road,
Oroquieta City- Calamba Mt. Road
04/07/11 X 21.197 330 O 0.361 0.240 0.000 0.030 0.037 0.050 71.80 -
MBD General Construction 9991
Road Upgrading (Gravel to Paved) along Oroquieta City-Calamba
Mt.Road Km.1761+271 - Km.1762+100 w/ exceptions
04/07/11 X 7.091 120 C 0.400 0.133 0.000 - - - 53.30 *53.30% Poor
MBD General Construction 9991
Rehabi./Reconst./Upgrading of Damaged Paved Nat'l. Roads,
Km.1750+773 - Km.1751+823 w/ exceptions, Oroquieta City - Calamba
Mt. Road
04/07/11 X 10.415 135 C 0.399 0.133 0.000 - - - 53.20 *53.20% Poor
MBD General Construction 9991
Rehab./Upgrading of Jimenez Port Road and Conc. of Shoulders inc.
Const. of Drainage Canal along Jimenez Old Route
06/02/10 X 13.349 180 C 0.313 0.200 0.000 - - - 51.30 74.40% Poor
MBD General Construction 9991
Const. of Two (2) Units Classroom, Ignacio Tan Memorial Integrated
Sch., Brgy. Bagumbang08/24/10 X 0.951 90 C 0.489 0.133 0.300 - - - 92.20 92.20%
V. Satisfactory
MBD General Construction 9991
Completion/Continuation of Berago Bridge, Oroquieta City-Plaridel-Calamba-Sapang Dalaga Road
08/25/10 X 21.197 270 O 0.372 0.300 0.083 0.030 0.050 0.033 86.80 -
MBD General Construction 9991 Conc. of Calamba-Baliangao Road 08/25/10 X 16.180 246 C 0.439 0.200 0.000 - - - 63.90 55.47%
PoorMBD General Construction 9991 Conc. of Calamba-Baliangao Road 11/29/08 X 16.180 180 O 0.312 0.000 0.050 0.023 0.035 0.100 52.00 -
MBD General Construction 9991 Conc. of Oroquieta-Calamba Mt.
Road 11/29/08 X 7.146 120 O 0.258 0.085 0.100 0.023 0.025 0.100 59.10 -
MBD General Construction 9991 Concreting of Oroquieta-Calamba Mt.
Road 06/08/09 X 7.146 120 O 0.292 0.300 0.000 0.010 0.011 0.000 61.30 -
MBD General Construction 9991 Concreting of Calamba-Baliangao
Road 06/08/09 X 16.180 180 O 0.256 0.200 0.000 0.010 0.011 0.000 47.70 -
MBD General Construction 9991 Conc. of Oroquieta-Calamba Mt.
Road 03/18/09 X 7.146 219 O 0.313 0.240 0.000 0.030 0.045 0.000 62.80 -
MBD General Construction 9991
Rehab./Upgrading od Jimenez Port Road and Concr. of Shoulders inc.
Const. of Drainage Canal along Jimenez Old Route
09/15/09 X 13.349 150 O 0.392 0.252 0.150 0.020 0.051 0.033 89.80 -
MBD General Construction 9991 Conc. of Oroquieta-Calamba Mt.
Road 09/15/09 X 7.146 120 O 0.253 0.244 0.000 0.030 0.028 0.033 58.80 -
MBD General Construction 9991
Rd. Upgrading (Gravel to Paved) Based on Gravel Rd. Strategies
Calamba-Baliangao Rd. Km. 1792+853 - Km. 1793+620
03/08/10 X 9.485 120 C 0.471 0.133 0.000 - - - 60.40 60.40% Poor
MBD General Construction 9991 Conc. of Oroquiteta-Calamba Mt. Rd. 03/08/10 X 7.600 246 C 0.438 0.133 0.000 - - - 57.10 59.14%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page265
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
MBD/LABB Joint Venture JV-08-259
Conc. of JCT TER, Jagna-Sierra Bullones Rd. Km. 76.526-
Km.77.681;Km77.9163-Km.78.94995&Km.79.19182-
Km.81.500
09/04/09 VII 88.829 270 O 0.351 0.255 0.150 0.030 0.042 0.033 86.10 -
MBD/LABB Joint Venture JV-08-259 Conc. of Jct. TER, Jagna-Sierra Bullones Road 02/23/10 VII 90.445 270 C 0.433 0.133 0.300 - - - 86.60 86.69%
Satisfactory
MC Angel Construction 28545 Conc. of Road, Brgy. Macasndig 02/22/10 X 2.332 119 C 0.370 0.193 0.300 - - - 86.30 86.30% Satisfactory
MCB Construction and Supply 12128
Repair of Bridge along Guimba-Cuyapo (Nueva Ecija)-Tarlac Road,
Brgy. San Jose09/03/09 III 4.330 177 C 0.487 0.133 0.300 - - - 92.00 *92.00%
V. Satisfactory
MCEE Construction Corporation 10951 Completion of Sports Complex
(Building) 02/09/11 DOST 8.722 200 C 0.486 0.200 0.300 - - - 98.60 98.60% Outstanding
MCGR Engineering Services 22202 Construction of Multi-Purpose
Building, Brgy. 44 06/10/09 VIII 0.963 70 C 0.411 0.133 0.300 - - - 84.40 *84.40% Satisfactory
MCGR Engineering Services 22202 Repair/Rehab./Impvt. of Leyte-Samar
Rd. 06/17/10 VIII 3.713 45 C 0.426 0.133 0.300 - - - 85.90 85.90% Satisfactory
MCGR Engineering Services 22202 Repair/Rehab. of Leyte-Samar Road,
Cabalawan to Tagpuro Road Section 06/10/09 VIII 9.635 141 C 0.486 0.133 0.300 - - - 91.90 *91.90% V. Satisfactory
MCGR Engineering Services 22202 Const. of Drainage System, Brgy. 43
& 43A 03/09/09 VIII 0.964 60 C 0.473 0.200 0.300 - - - 97.30 *97.30% Outstanding
MDEC Corporation Renovation of Service Wing Building 02/17/11 UP 8.989 180 O 0.303 0.300 0.150 0.015 0.000 0.050 81.80 -
MDM Construction 33828 Conc. of Lubang-Lubang Pawili Road 08/28/10 V 4.776 120 C 0.365 0.200 0.300 - - - 86.50 86.50%
SatisfactoryMeditech Trade &
Development 16545 Regravelling/Asphalt Overlay/Rehabilitation/Impv't along 03/05/09 II 19.238 120 C 0.475 0.200 0.300 - - - 97.50 *97.50%
OutstandingMel-Jean Construction
Corporation 16344 Const. of Multi-Purpose Building at Brgy. Balintawak 03/01/10 IVA 2.411 90 C 0.438 0.200 0.300 - - - 93.80 93.80%
V. Satisfactory
Mel-Jean Construction Corporation 16344
Rehab./Reconst./Upgrading of Damaged National Roads at Rosario-
San Juan Road05/28/09 IV-A 10.612 120 C 0.456 0.133 0.300 - - - 88.90 *88.90%
V. Satisfactory
Mel-Jean Construction Corporation 16344
Rehab./Reconst. of Damaged National Roads, Batangas-Lobo
Road, Bacao Section03/06/09 IV-A 19.298 150 C 0.473 0.133 0.300 - - - 90.60 87.90%
Satisfactory
Mel-Jean Construction Corporation 16344 Impvt./Upgrading of Sablayan-Penal
Colony Road, Tabtaban Section 03/01/09 IV-B 9.630 144 C 0.434 0.082 0.300 - - - 81.60 78.42% Unsatisfactory
Mel-Jean Construction Corporation (Formerly: Mel Jean Enterprises)
16344 Const. of MPB @ Brgy. Maraouy 04/07/11 IVA 4.822 140 C 0.444 0.200 0.300 - - - 94.40 91.25% V. Satisfactory
Mel-Jean Construction Corporation (Formerly: Mel Jean Enterprises)
16344
Rehab./Reconst./Upgrading of Damaged Roads along Manila-
Batangas Rd., Maraouy-Inosluban Sect.
06/07/10 IVA 7.419 90 O 0.355 0.225 0.150 0.015 0.050 0.050 84.50 -
Mel-Jean Construction Corporation (Formerly: Mel Jean Enterprises)
16344Rehab./Reconst./Upgrading of
Damaged Road along Batangas-Taysan-Lobo Rd.
08/19/10 IVA 5.991 137 O 0.340 0.300 0.150 0.030 0.037 0.033 34.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page266
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mel-Jean Construction Corporation (Formerly: Mel Jean Enterprises)
16344 Const. of MPB at Public College 08/18/10 IVA 4.820 45 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory
Mel-Jean Construction Corporation (Formerly: Mel Jean Enterprises)
16344
Rehab./Reconst./Upgrading of Damaged Roads along Manila-
Batangas Rd., Maraouy-Inosluban Sect.
08/18/10 IVA 7.419 90 C 0.425 0.200 0.300 - - - 92.50 87.70% Satisfactory
Mel-Jean Construction Corporation (Formerly: Mel-Jean Enterprises)
16344 Repair/ Rehab. of FMR at Brgy. San Sebastian 09/01/09 IVA 0.289 210 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
Melrobe Builders & Const. Supplies 29752 Const. of MPB CES under Package
1A, Brgy. Central 03/11/09 XI 2.143 183 C 0.478 0.200 0.300 - - - 97.80 78.13% Unsatisfactory
Melrobe Builders & Construction Supplies 29752
Construction of Multi-Purpose Building (Covered Court) Brgy.
Cabadiangan03/02/10 XI 2.362 90 C 0.471 0.133 0.300 - - - 90.40 92.29%
V. Satisfactory
Melrobe Builders & Construction Supplies 29752 Const. of Multi-Purpose Building
Covered Court) Brgy. Cabadiangan 06/10/09 XI 2.362 90 O 0.371 0.300 0.150 0.030 0.047 0.033 93.10 -
Melrobe Builders & Construction Supplies 29752 Construction of Water System @
Brgy. San Pedro 06/08/09 XI 0.944 180 C 0.437 0.133 0.300 - - - 87.00 *87.00% Satisfactory
Menjer Construction 22815Cluster VI: Const. of Six (6) MPBs, Brgy. Raw-an, Magpatao, Lanipao
and Abaga, Lala04/09/11 X 1.339 73 C 0.392 0.133 0.300 - - - 82.50 *82.50%
Satisfactory
Menjer Construction 22815 Construction of Perimeter Fence 11/26/08 DOST 8.853 180 O 0.349 0.242 0.150 0.018 0.025 0.033 81.70 -
Menjer Construction 22815 Construction of Perimeter Fence 11/26/08 DOST 8.853 180 O 0.349 0.242 0.150 0.018 0.025 0.033 74.10 -
MEP Construction 18759 Repair/Maintenance of DPWH Old Marcos Highway Bldg. 04/13/11 CAR 3.748 382 C 0.476 0.176 0.300 - - - 95.20 91.84%
V. Satisfactory
MEP Construction 18759 Continuation of MPB 03/03/10 CAR 3.801 90 C 0.500 0.143 0.300 - - - 94.30 94.30% V. Satisfactory
Messagon Engineering Builders 13749 Covered Pathwalk & Repair of
Comfort Rooms 07/09/09 U.P. 1.349 115 C 0.399 0.194 0.300 - - - 89.30 *89.30% V. Satisfactory
Meta Construction 28882 Const. of 2-CL School Building, Kakilingan E/S 08/27/09 II 0.875 90 C 0.446 0.167 0.300 - - - 91.30 *91.30%
V. Satisfactory
Meta Construction 28882 Const. of Flood Control Project, Brgy. I RC 03/01/10 II 4.812 90 C 0.433 0.133 0.300 - - - 86.60 86.60%
Satisfactory
Meta Construction 28882 Const./Comp./Repair of Multi-Purpose Building 03/01/10 II 0.840 150 C 0.421 0.133 0.300 - - - 85.40 85.40%
Satisfactory
Meta Construction 28882 Const./Comp./Repair of Multi-Purpose Building San Isidro 03/01/10 II 0.592 150 C 0.413 0.133 0.300 - - - 84.60 84.60%
Satisfactory
Meta Construction 28882 Const./Comp. of Multi-Purpose Bldg. 03/01/10 II 0.477 150 C 0.399 0.133 0.300 - - - 83.20 83.20% Satisfactory
Meta Construction 28882 Construction of Multi-Purpose Building, Dammang East 05/27/09 II 0.458 150 C 0.443 0.200 0.300 - - - 94.30 82.47%
Satisfactory
Meta Construction 28882 Construction of Multi-Purpose Building 03/05/09 II 0.458 80 O 0.240 0.300 0.150 0.023 0.028 0.033 77.40 -
Metrics Construction and Trading 18223 Const. of MPB MRB at Pilot Area,
Brgy. Commonwealth 04/07/11 NCR 4.208 120 O 0.394 0.203 0.150 0.030 0.035 0.033 84.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page267
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Metrics Construction and Trading 18223
Rehab./Reconst. of Damaged Paved (Concrete Blocking along 15th
Avenue)05/25/09 NCR 1.913 35 C 0.470 0.133 0.300 - - - 90.30 *90.30%
V. Satisfactory
Metrics Construction and Trading 18223 Repair/Rehab./Const. of MPB,
Domus Mariae 09/02/09 NCR 1.445 45 C 0.437 0.133 0.300 - - - 87.00 *87.00% Satisfactory
Metrics Construction and Trading 18223 Proposed Repair/Rehab./Const. of
MPB Brgy. 805 05/24/10 NCR 0.675 30 C 0.492 0.133 0.300 - - - 92.50 92.50% V. Satisfactory
Metrics Construction and Trading 18223
Prop. Repair/Rehab./Const. of MPB at Domus Mariae Building/Day Care
Center05/24/10 NCR 0.578 30 C 0.475 0.133 0.300 - - - 90.80 90.80%
V. Satisfactory
Metrics Construction and Trading 18223
Repair/Rehab. of Drainage System of Aurora Blvd. (from Araneta Ave. to
EDSA, East and West Bound)08/16/10 NCR 4.802 90 C 0.404 0.133 0.300 - - - 83.70 83.70%
Satisfactory
MF Construction 22192Const.of DPWH Siquijor District Engineering Office Building inc.
Quarters09/07/09 VII 2.892 189 O 0.373 0.240 0.150 0.030 0.037 0.033 86.30 -
MF Construction 22192Const.of DPWH Siquijor District Engineering Office Building inc.
Quarters03/06/10 VII 2.892 209 C 0.489 0.112 0.300 - - - 90.10 87.44%
Satisfactory
MGBJ Rising Construction & Land
Developer18656 Conc. of Road at Brgy. Labangal 04/14/11 XII 1.358 75 C 0.434 0.200 0.300 - - - 93.40 *93.40%
V. Satisfactory
MGBJ Rising Construction & Land
Developer18656
Rehab. of Asphalt Overlay along Tampakan-Koronadal Provincial
Road06/17/10 XII 4.533 75 C 0.421 0.133 0.300 - - - 85.40 85.40%
Satisfactory
MGBJ Rising Construction & Land
Developer18656 Asphalt Overlay/Upgrading of Digos-
Markar-Buayan Road 03/19/09 XII 9.433 120 C 0.478 0.200 0.300 - - - 97.80 *97.80% Outstanding
MGDJ Construction 29352 Const. of Roads @ Brgy. Poblacion 2 09/01/09 IVA 0.292 120 C 0.466 0.133 0.300 - - - 89.90 *89.90% V. Satisfactory
MGSR Construction 33446 Const. of Multi-Purpose Pavement, Purok 2, Bulanao 05/27/09 CAR 0.281 120 C 0.380 0.200 0.300 - - - 88.00 *88.00%
Satisfactory
MGT Builder's & Supply 33872 Const. of 2-CL Academic Building Bogna E/S, Bacon District 04/11/11 V 1.212 60 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V. Satisfactory
MGT Builder's & Supply 33872 Conc. Of Naspi-Lourdes Rd. 08/30/10 V 0.724 60 C 0.418 0.200 0.300 - - - 91.80 91.80% V. Satisfactory
MH Southern Construction 5841 Sarangani-Davao Del Sur Coastal
Road, Cross Section 09/17/09 XII 7.517 150 C 0.375 0.190 0.300 - - - 86.50 83.50% Satisfactory
Midnorth Luzon Construction and
Development Corporation
31783 Completion of Pospos Pathway, Caluttit 05/23/09 CAR 0.240 155 C 0.483 0.200 0.300 - - - 98.30 *98.30%
Outstanding
Miggs Construction and Supply 17993 Const. of Line Canal @ San Nicolas 02/17/10 III 2.869 60 C 0.367 0.200 0.300 - - - 86.70 86.70%
Satisfactory
Miggs Construction and Supply 17993 Repair of 6CL at Sasmuan
Elementary School 08/24/09 III 0.956 60 C 0.477 0.133 0.300 - - - 91.00 *91.00% V. Satisfactory
Min Construction 14656
Road Upgrading (Gravel to Concrete) at Sindangan-Siayan-Dumingag-Mahayag Road (Denoyan-Pob.-
Siayan Section)
04/13/11 IX 33.841 385 O 0.328 0.300 0.150 0.030 0.038 0.050 89.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page268
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Min Construction 14656
Road Upgrading (Gravel to Concrete) of Sindangan-Siayan to Dumingag to
Mahayag Road, Kalakas to Muñoz Section
04/15/11 IX 15.782 180 O 0.360 0.244 0.150 0.030 0.048 0.050 88.20 -
Min Construction 14656 Const. of Access Road @ Ipil Airport 04/04/11 IX 9.466 120 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory
Min Construction 14656
Const. of Liloy-Siocon Road inc. RCBC Dansalan-Labason Poblacion
ByPass Road (Km. 1983+390-Km. 1984+360)
06/01/09 IX 19.130 309 C 0.486 0.133 0.300 - - - 91.90 85.48% Satisfactory
Min Construction 14656Conc. of Liloy-Siocon Road, Kipit-
Gutalac Section, Kipit, Labason and La-Libertad
06/01/09 IX 19.125 372 C 0.430 0.133 0.300 - - - 86.30 83.18% Satisfactory
Min Construction 14656Impvt./Conc. Paving of Imelda-Alicia Road (Phase III) Guintolan-Lutiman
Section03/04/09 IX 33.460 359 C 0.434 0.200 0.300 - - - 93.40 83.14%
Satisfactory
Min Construction 14656 Impvt./Conc. Paving of Imelda-Alicia Road, Lutiman Section 03/04/09 IX 17.001 230 C 0.453 0.171 0.300 - - - 92.40 93.18%
V.Satisfactory
Min Construction 14656 Proposed Conc. of Liloy, Zamboanga del Norte-Ipil,Phase II 03/04/09 IX 14.309 180 C 0.427 0.147 0.300 - - - 87.40 83.02%
Satisfactory
Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) 08/28/08 IX 19.125 168 O 0.317 0.240 0.100 0.030 0.047 0.100 83.40 -
Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) 11/25/08 IX 19.125 213 O 0.327 0.239 0.100 0.030 0.025 0.067 78.80 -
Mindanao Rock 23479 Const. of Ozamiz Coastal By-Pass Road 04/06/11 X 45.099 180 C 0.499 0.133 0.300 - - - 93.20 90.98%
V. Satisfactory
Mindanao Rock 23479Const of Ozamiz City-Sinacaban Mountain Bypass Road, Ozamiz-
Clarin Sect. 04/06/11 X 18.891 180 C 0.400 0.133 0.300 - - - 83.30 *83.30%
Satisfactory
Mindanao Rock 23479 Const./Rehab. of Montes Balaon-Montes Callagan Rd. 05/31/10 IVA 14.340 60 C 0.425 0.133 0.300 - - - 85.80 85.80%
Satisfactory
Mindanao Rock 23479Impvt. of Gurel-Bokod-Kabayan Road Km. 318+00-Km. 330+000 (Selected
Portion)08/25/09 CAR 9.628 150 C 0.395 0.133 0.300 - - - 82.80 *82.80%
Satisfactory
Mindanao Rock 23479 Maasin Dev't Project (Upgrading of Apron and Taxiway) 03/19/10 DOTC 40.424 180 C 0.438 0.200 0.300 - - - 93.80 93.80%
V.Satisfactory
Mindanao Rock 23479
Ozamis Airport Dev't Project (Asphalt Overlay of Runway,
Shoulder Grade Correction and Construction of CHB Fence)
03/12/10 DOTC 45.829 150 C 0.449 0.200 0.300 - - - 94.90 92.10% V.Satisfactory
Mindanao Rock 23479
Ozamis Airport Dev't Project (Asphalt Overlay of Runway,
Construction of ATO Administration Building and Improvement of
Terminal Building)
03/12/10 DOTC 30.320 120 C 0.457 0.198 0.300 - - - 95.50 95.50% V.Satisfactory
Mindanao Rock 23479 Const. of Ozamis City Coastal By-Pass Road 06/09/09 X 42.951 240 O 0.309 0.258 0.150 0.020 0.043 0.050 83.00 -
Mindanao Rock 23479 Conc. of Casul Road, Casul 03/18/09 X 2.306 145 C 0.378 0.200 0.300 - - - 87.80 *87.80% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page269
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Mindanao Rock 23479 Impvt. of Ozamis-Oroquieta Road, Lapasan-Clarin-Tudela Section 03/16/09 X 2.892 310 C 0.388 0.200 0.000 - - - 58.80 73.14%
Poor
Mindanao Rock 23479 Const. of Ozamis City Coastal By Pass Road 09/16/09 X 42.950 240 O 0.308 0.257 0.150 0.030 0.051 0.033 82.90 -
Mindanao Rock 23479 Const. of Ozamiz City Coastal Bypass Rd. 03/06/10 X 42.950 240 C 0.482 0.133 0.300 - - - 91.50 86.37%
Satisfactory
Mindanao Rock 23479Const. of Two(2) Unit Classroom Ignacio Tan Memorial Integrated
School Bagumbang03/06/10 X 0.954 90 C 0.416 0.133 0.300 - - - 84.90 84.90%
Satisfactory
Minrock Multi-Builders 15845 Const. of Concrete Drainage at Brgy. Poblacion 4 03/29/11 XII 0.499 28 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Miracle Builders 28502Conc. with Drainage System &
Pathway along #52 Imperial St. Brgy. E. Rodriguez
02/26/10 NCR 0.483 30 C 0.462 0.133 0.300 - - - 89.50 89.50% V.Satisfactory
Mivico Builders and Developers 20551 Asphalt Overlay at Brgy. Mabini 02/26/10 III 1.479 30 C 0.456 0.133 0.300 - - - 88.90 88.90%
SatisfactoryMivico Builders and
Developers 20551 Upgrading of Nueva Ecija-Pangasinan Rd. 06/07/10 III 24.003 90 O 0.369 0.198 0.150 0.030 0.048 0.033 82.80 -
Mivico Builders and Developers 20551 Upgrading of Nueva Ecija-
Pangasinan Rd. 08/23/10 III 24.918 120 C 0.362 0.200 0.300 - - - 86.20 84.16% Satisfactory
Mivico Builders and Developers 20551 Rehab./Reconst./Upgrading of Daang
Maharlika Road 05/26/09 III 19.291 52 C 0.476 0.200 0.300 - - - 97.60 *97.60% Outstanding
Mivico Builders and Developers / A.M.P. Construction (JV)
JV-08-134 Improvement of Pentor-Balsik River Control (Sta. Isabel Section) 05/20/09 III 9.602 150 C 0.339 0.200 0.300 - - - 83.90 *83.90%
Satisfactory
MJB Corporation 18862Const. of Two (2) Storey, Six (6)
Classroom, Gov. Isidro Rodriguez MNHS
04/15/11 IVA 7.848 180 C 0.443 0.200 0.300 - - - 94.30 86.11% Satisfactory
MJB Corporation 18862 Completion of School Bldg., Hapay na Mangga Elementary School 06/08/10 IVA 7.201 150 C 0.472 0.200 0.300 - - - 97.20 97.20%
Outstanding
MJB Corporation 18862 Conc. of Roads, GSIS Ave., Brgy. Bagong Nayon 02/15/10 IVA 1.928 120 C 0.456 0.200 0.300 - - - 95.60 95.60%
V. Satisfactory
MJB Corporation 18862 Const. of MPB and Facilities, Mababang Parang 08/19/10 IVA 6.925 150 C 0.457 0.179 0.300 - - - 93.60 93.60%
V. SatisfactoryMJP Construction &
Development Corporation
30251 Repair & Rehab. of Pulilan-Calumpit Rd., Calumpit Sect. 06/10/10 III 4.779 6 C 0.464 0.133 0.300 - - - 89.70 89.70%
V. Satisfactory
MJP Construction & Development Corporation
30251Rehab. (Slope Protection) of
Marikina-Infanta Rd. Km.65+550, Brgy. Sampaloc
06/10/10 IVA 1.911 45 C 0.372 0.200 0.300 - - - 87.20 87.20% Satisfactory
MJP Construction & Development Corporation
30251 Regravelling of Daang Pare Road, Brgy. San Jose 08/26/09 IVA 4.797 169 C 0.452 0.200 0.300 - - - 95.20 90.40%
V. Satisfactory
MJP Construction & Development Corporation
30251 Repair/Rehab. of Sta Clara Norte Road, Brgy. Sta Clara Norte 08/20/10 IVA 4.773 120 C 0.327 0.200 0.300 - - - 82.70 82.70%
Satisfactory
MJP Construction & Development Corporation
30251 Repair/Rehab. of Concepcion-Mojon Road, Brgy. Concepcion 08/20/10 IVA 4.773 120 C 0.373 0.154 0.300 - - - 82.70 82.70%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page270
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
MJT Builders 24202 Additional Conc. of Road, Brgy. Mabuhay 04/14/11 XII 1.852 75 C 0.409 0.200 0.300 - - - 90.90 *90.90%
V. Satisfactory
MJT Builders 24202 Conc. of Road, Lagao-Conel Road, Brgy. Lagao 03/11/10 XII 1.410 60 C 0.358 0.200 0.300 - - - 85.80 85.80%
Satisfactory
MM Construction 12012
Rehab./Reconst./Upgrading of Damaged paved National Road
Generated from PMS (HDM-4) DM KO219+000-KO220+410 Baliling-
Balite Section
09/01/09 II 14.473 120 C 0.404 0.200 0.300 - - - 90.40 90.82% V. Satisfactory
MN Macato Builders 33448 Const. of MPB, Brgy. Pinamopoan 08/22/10 VIII 0.481 60 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
MN Revelo Construction 24789Reconst. of Lanao-Pagadian-
Zamboanga City Road, Lumbog Sect., Km.1743+900
04/04/11 IX 3.563 225 C 0.406 0.200 0.300 - - - 90.60 86.28% Satisfactory
MNG Builders and Development Corporation
16098 Const. of MPB at Marber NHS 04/03/11 XI 2.853 120 C 0.488 0.200 0.300 - - - 98.80 *98.80% Outstanding
Molte Aries Construction & Industries 3684 Conc. of San Fernando By-Pass
Road Extension 03/29/11 I 18.379 210 C 0.290 0.200 0.300 - - - 79.00 82.30% Satisfactory
Molte Aries Construction & Industries 3684 Road Upgrading of San Fernando-
Bagulin Road 09/02/09 I 14.114 400 O 0.353 0.300 0.150 0.030 0.060 0.033 92.60 -
Molte Aries Construction & Industries 3684 Road Upgrading of San Fernando-
Bagulin Road 02/26/10 I 14.114 400 C 0.361 0.133 0.300 - - - 79.40 83.78% Satisfactory
Molte Aries Construction & Industries 3684 Road Upgrading of San Fernando-
Bagulin Road 05/28/09 I 14.114 400 O 0.300 0.260 0.150 0.030 0.035 0.033 80.80 -
Moment Diagram Builders 33908 Completion of MPB at Quezon Hill
Proper Brgy 03/04/10 CAR 1.419 80 C 0.404 0.133 0.300 - - - 83.70 83.70% Satisfactory
Monolithic Construction & Concrete Product, Inc. 5733
Rehab./Reconst./Upgrading of Marinduque Circumferential Road,
Sibucao, Dili-Bangbang08/24-25/09 IVB 23.208 160 C 0.430 0.200 0.300 - - - 93.00 *93.00%
V. Satisfactory
Monolithic Construction & Concrete Product, Inc. 5733
Rehab./Conc. of Marinduque Circumferential Road (Intermittent
Section)08/25/09 IVB 82.951 360 O 0.370 0.282 0.150 0.030 0.051 0.033 91.60 -
Monolithic Construction & Concrete Product, Inc. 5733 Rehab./Conc. of Dr. Damian Reyes
Road (Boac Side) 08/24/09 IVB 64.662 280 C 0.450 0.168 0.300 - - - 91.80 89.97% V. Satisfactory
Monolithic Construction & Concrete Products Inc. 5733 Rehab. of Odiongan Bridge along
Cateel-Compostela Section 03/03/10 XI 52.910 240 C 0.358 0.200 0.300 - - - 85.80 86.70% Satisfactory
Monolithic Construction & Concrete Products, Inc. 5733 Rehab./Conc. of Dr. Damian Reyes
Mem. Road (Boac Side) 04/14/11 IVB 39.094 180 C 0.403 0.168 0.300 - - - 87.10 *87.10% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page271
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Monolithic Construction & Concrete Products, Inc. 5733 Road Upgrading (Gravel to Paved)
Babak-Samal-Kaputian Road 04/12/11 XI 29.920 178 C 0.393 0.169 0.300 - - - 86.20 87.13% Satisfactory
Monolithic Construction & Concrete Products, Inc. 5733
Rehab./Conc. Of Marinduque Circumferential Road (Intermittent
Section)02/24/10 IVB 82.951 360 C 0.396 0.200 0.300 - - - 89.60 88.94%
Satisfactory
Monolithic Construction & Concrete Products, Inc. 5733
Impvt./Concrete Paving of Jct. Baliguian-Nonoyan-Sta.Maria-Siocon Sect. Sta.2061+740 to Sta.2063+680
06/03/10 IX 47.488 681 C 0.455 0.133 0.300 - - - 88.80 84.99% Satisfactory
Monolithic Construction & Concrete Products, Inc. 5733
Rehab./Conc. of Marinduque Circumferential Road (Intermittent Section)
05/19/09 IV-B 82.951 360 O 0.353 0.300 0.150 0.030 0.033 0.050 91.60 -
Monolithic Construction & Concrete Products, Inc. 5733 Rehab./Conc. of Marinduque Circ.
Rd. (Intermittent Section) 03/11/09 IV-B 82.951 360 O 0.296 0.272 0.150 0.030 0.025 0.050 82.30 -
Monolithic Construction & Concrete Products, Inc. 5733
Impv't/Conc.Paving of Jct. Baliguian to Siocon Road, Jct. Baliguian-
Nonoyan-Sta. Maria Section03/07/09 IX 48.006 380 O 0.386 0.263 0.099 0.030 0.037 0.033 84.80 -
Monolithic Construction & Concrete Products, Inc. 5733 Rehabilitation of Odiongan Bridge
along Cateel-Compostela Section 06/08/09 XI 52.910 240 O 0.370 0.237 0.150 0.030 0.042 0.050 87.90 -
Monolithic Construction & Concrete Products, Inc. 5733 Rehab. of Odiongan Bridge along
Cateel-Compostela Sect. 09/11/09 XI 52.910 240 O 0.376 0.240 0.150 0.030 0.038 0.033 86.70 -
Monolithic Construction and Concrete Products,
Inc. 5733 Talibon Small Reservoir Irrigation
Project9/29/08 10/3/08 NIA 49.099 390 O 0.367 0.175 0.100 0.030 0.042 0.200 91.40 -
Monolithic Construction and Concrete Products,
Inc. / Jagon Builders (JV)JV-09-283
Widening/Conc. Of Commonwealth Ave. Incl. RROW, Sta.5+400 -
Sta.6+000 incl. Footbridge in front of COA Bldg.
09/03/10 NCR 40.826 108 O 0.254 0.300 0.150 0.030 0.045 0.033 81.20 -
Monolithic Construction and Concrete Products, Inc./Jagon Builders (JV)
JV-09-283
Widening/Conc. of Commonwealth Ave. inc. RROW Sta.5+400-
Sta.6+000 inc. Footbridge infront of COA Building
04/08/11 NCR 40.826 153 O 0.333 0.259 0.000 0.030 0.050 0.033 70.50 -
Montaño Construction & Development Corp. 19473 Const. of De Venta Perla Bridge &
Approaches (Phase II) 06/12/10 IX 27.869 293 O 0.353 0.240 0.000 0.030 0.035 0.050 70.80 -
Montaño Construction & Development Corporation
19473 Const. of De Venta Perla Bridge and Approaches - Completion 04/08/11 IX 27.399 584 C 0.447 0.200 0.300 - - - 94.70 *94.70%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page272
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Montaño Construction & Development Corporation
19473Const. of MPB (Phase III) at Jose Rizal Memorial State University
(JRMSU) Complex04/09/11 IX 19.248 90 C 0.447 0.200 0.300 - - - 94.70 *94.70%
V. Satisfactory
Montaño Construction & Development Corporation
19473
Const. of De Venta Perla Bridge and Approaches (Phase III), Sta.1873+900
to Sta.1873+340.64 (bridge), 1872+960-Sta.1873+190 (Approach
"A"), Sta.1873+340.64 - Sta.1873+500 (Approach "B")
04/08/11 IX 55.918 658 C 0.493 0.133 0.300 - - - 92.60 94.34% V. Satisfactory
Montaño Construction & Development Corporation
19473Const. of MPB (Phase II) at Jose Rizal Memorial State University
(JRMSU) Complex04/09/11 IX 19.247 90 C 0.395 0.200 0.300 - - - 89.50 *89.50%
V. Satisfactory
Montaño Construction & Development Corporation
19473 Const. of De Venta Perla Bridge and Approaches (Phase II) 04/08/11 IX 27.869 371 C 0.500 0.133 0.000 - - - 63.30 73.62%
Poor
Montaño Construction & Development Corporation
19473Road Upgrading (Gravel to Concrete)
along Ilaya-Isis Polanco Rd. (Isis Bridge Approaches)
08/30/10 IX 18.669 165 C 0.469 0.133 0.300 - - - 90.20 90.20% V. Satisfactory
Montaño Construction & Development Corporation
19473 Conc. of Polanco-Macleodes Road (Lebagon Section) 03/16/09 IX 16.712 299 C 0.478 0.200 0.300 - - - 97.80 91.02%
V. Satisfactory
Montaño Construction & Development Corporation
19473
Road Upgrading (Gravel to Concrete) Dipolog-Punta-Dansullan-Sergio
Osmeña, Zambo. Norte-Sur Bdry., Km. 1878+939-Km. 1879+689, De
Venta Perla Section
09/14/09 IX 14.030 130 C 0.444 0.200 0.300 - - - 94.40 94.40% V. Satisfactory
Montaño Construction & Development Corporation
19473
Road Upgrading (Gravel to Concrete) Dipolog-Punta-Dansullan-Sergio
Osmeña, Zambo. Norte-Sur Bdry., Km. 1869+888-Km. 1870+888, Dilawa
Section
09/14/09 IX 18.564 159 C 0.474 0.200 0.300 - - - 97.40 91.34% V. Satisfactory
Monte Construction & Supply 19474 Conc. of Bambang-Kasibu-Quezon-
Solano Rd., Bumolos Camp Sect. 06/07/10 II 9.645 180 O 0.371 0.240 0.150 0.030 0.042 0.033 86.60 -
Monte Construction & Supply 19474 Conc. Of Bambang-Kasibu-Quezon-
Solano, Bumulos Camp Sect. 08/31/10 II 9.645 180 C 0.393 0.143 0.300 - - - 83.60 85.40% Satisfactory
Monthphil Construction Corporation 24285 Const. of MPB (SK Building) @ Brgy.
San Nicolas 03/09/10 IX 0.945 80 C 0.359 0.200 0.300 - - - 85.90 85.90% Satisfactory
Montphil Construction Corporation 24285 Completion of MPB (Gym) 06/12/10 IX 1.905 110 O 0.397 0.240 0.150 0.030 0.029 0.050 89.60 -
Montphil Construction Corporation 24285 Completion of MPB (Gym) 08/31/10 IX 1.904 120 C 0.441 0.133 0.300 - - - 87.40 88.94%
SatisfactoryMontphil Construction
Corporation 24285 Concreting of Sta. Filomena Road going to Baybay Galas 06/10/09 IX 9.538 180 C 0.490 0.133 0.300 - - - 92.30 *92.30%
V. SatisfactoryMontphil Construction
Corporation 24285 Const./Completion of Multi-Purpose Building, Del Pilar 03/17/09 IX 0.945 100 C 0.383 0.200 0.300 - - - 88.30 *88.30%
SatisfactoryMorning Steel Construction 30698 Impvt. of Dipaculao-Maria Aurora
Road 02/27/10 III 9.443 180 C 0.441 0.133 0.300 - - - 87.40 88.36% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page273
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Morning Steel Construction 30698
Const./Repair/Rehab. of Quezon St. (12M Right-of-Way extension w/
Drainage Impvt.)06/05/10 III 9.402 150 O 0.365 0.239 0.150 0.030 0.054 0.033 87.10 -
Morning Steel Construction 30698
Const./Repair/Rehab. of Quezon St. (12m Right-of-Way extension w/
drainage improvement)08/21/10 III 9.402 150 C 0.432 0.153 0.300 - - - 88.50 87.66%
Satisfactory
Morning Steel Construction 30698
Construction of Dipaculao-Ma. Aurora Road, Brgy. Mucdol-Maligaya
Section03/03/09 III 4.769 120 C 0.406 0.133 0.300 - - - 83.90 *83.90%
Satisfactory
Morning Steel Construction 30698 Rehab./Improvement of Debucao-
Diome FTMR 09/08/09 III 4.717 150 O 0.359 0.228 0.150 0.030 0.050 0.033 85.00 -
Mountaineers Engineering & Const.
Services6154 Completion of DPWH Resthouse
(Rehab. of DPWH Field Office) 03/10/09 CAR 8.196 170 C 0.485 0.200 0.300 - - - 98.50 81.00% Unsatisfactory
Mountaineers Engineering &
Construction Services6154 Const. of 2-Storey, 4-CL Benguet
NHS-Beckel Annex 05/20/09 CAR 4.429 277 O 0.371 0.229 0.150 0.030 0.035 0.050 86.50 -
Mountaineers Engineering &
Construction Services6154 Const. of 2-Storey, 4-CL Benguet
NHS-Beckel Annex 03/01/10 CAR 4.429 277 C 0.431 0.155 0.300 - - - 88.60 87.13% Satisfactory
MPJR Builders Co. 20446 Completion of Two (2) Storey, Four (4) CL, Kabisig E/S 04/15/11 IVA 2.403 120 C 0.333 0.200 0.300 - - - 83.30 *83.30%
Satisfactory
MRB Construction and Supply 17701
Const. of Rehabilitation of Rock Causeway at Port of Dingalan,
Aurora Province (Ports & Harbor)02/21-25/11 PPA 16.279 180 O 0.364 0.299 0.010 0.030 0.065 0.033 80.15 -
MRB Construction and Supply 17701 Jagna Port Expansion Project 1/20-23/09 PPA 55.085 360 C 0.400 0.300 0.300 - - - 98.78 98.78%
Outstanding
MRB Construction and Supply 17701
Repair of Damaged Facilities (Conc. Pavement, Fence, Drainage and
Lighting System)03/1-4/11 PPA 12.883 136 O 0.397 0.300 0.150 0.030 0.070 0.050 99.65 -
MRJR Construction & Trading 28265 Repair/Rehab. of Sch. Bldg. at
Zapote E/S 04/13/11 NCR 0.953 70 C 0.462 0.196 0.300 - - - 95.80 *95.80% V. Satisfactory
MRJR Construction & Trading 28265 Repair/Rehab. of Sch. Bldg. at
Vergonville E/S 04/13/11 NCR 1.430 60 C 0.499 0.133 0.300 - - - 93.20 *93.20% V. Satisfactory
MRJR Construction & Trading 28265 Asphalt Overlay with squaring and
Patching of Road at Brgy. Talon 2 06/04/09 NCR 0.963 14 C 0.500 0.133 0.300 - - - 93.30 *93.30% V.Satisfactory
MRJR Construction & Trading 28265 Const./Rehab. of River Strainer at
Las Piñas & Zapote River 02/18/10 NCR 2.003 92 C 0.487 0.133 0.300 - - - 92.00 92.00% V.Satisfactory
MRJR Construction & Trading 28265 Const. of MPB & Facilities (Waste
Management), Brgy. Zapote 02/18/10 NCR 0.990 45 C 0.393 0.133 0.300 - - - 82.60 82.60% Satisfactory
MRJR Construction & Trading 28265 Completion of MPB, Pamplona 1 06/08/10 NCR 0.447 45 C 0.479 0.200 0.300 - - - 97.90 97.90%
Outstanding
MRRM Trading & Construction / Precious
Construction (JV)JV-08-094 Impvt. of Farm-to-Market Road,
Quinfermin-Bagbuga-San Jose Road 05/29/09 I 9.630 133 C 0.423 0.133 0.300 - - - 85.60 85.84% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page274
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
MRRM Trading & Construction / Precious
Construction Joint Venture
JV-08-094 Impvt. of Farm-to-Market Road, Quinfermin-Bugbuga-San Jose Road 02/17/10 I 9.630 133 C 0.355 0.065 0.300 - - - 72.00 80.40%
Unsatisfactory
MS Cruz Builders & Trading 33697 Const. of MPB @ Brgy. Poblacion 04/05/11 III 1.889 48 C 0.350 0.200 0.300 - - - 85.00 *85.00%
SatisfactoryMS Cruz Builders &
Trading 33697 Channeling/Impvt. of Lower Abacan River 04/05/11 III 9.502 72 C 0.000 0.150 0.300 - - - 45.00 *45.00%
PoorMS Cruz Builders &
Trading 33697 Conc. of Sta. Ines Brgy. Rd. 08/31/10 III 1.911 40 C 0.338 0.200 0.300 - - - 83.80 83.80% Satisfactory
MSB Construction & Trading 33019 Agno River Integrated Irrigation
Project 7/13-18/09 NIA 8.513 60 C 0.476 0.181 0.300 - - - 95.61 *95.61% V. Satisfactory
MSF Construction 25307 Construction of Binaratan Elementary School Building 06/05/09 I 0.904 38 C 0.489 0.133 0.000 - - - 62.20 *62.20%
Poor
Muaña Construction and Development Corp. 9354
Construction of Multi-Purpose Building, Brgy. Labangon and
Calamba06/08/09 VII 1.885 60 C 0.454 0.133 0.300 - - - 88.70 *88.70%
Satisfactory
Muaña Construction and Development Corp.
(Formerly: Muaña Const.)9354
Road Upgrading Gravel to Paved to Tabing-Kawayan-Sta. Rosa-Lawis-
Tabango Road04/09/11 VIII 18.540 240 C 0.437 0.133 0.300 - - . 87.00 87.09%
Satisfactory
Muaña Construction and Development Corp.
(Formerly: Muaña Const.)9354
Road Upgrading (Gravel to Paved) of Tabango-Catmon-La Fortuna-
Manlawaan-Gimarco Road, Km.1031+207 - Km.1031+847
04/09/11 VIII 20.970 240 C 0.428 0.133 0.300 - - - 86.10 86.04% Satisfactory
Muaña Construction and Development Corp.
(Formerly: Muaña Const.)9354 Const./Repair/Impvt. of MPB at Brgy.
Tisa 04/14/11 VII 1.158 93 C 0.488 0.200 0.300 - - - 98.80 82.63% Satisfactory
Muaña Construction Development Corp. 9354
Rehab. of Bacolod North Road, Km.96+700 - Km.97+800 with
exception03/31/11 VI 12.782 155 C 0.416 0.135 0.000 - - - 55.10 64.76%
Poor
Mulana Construction 30708 Construction of School Building Cawag P/S 09/10/09 VII 0.580 165 O 0.400 0.155 0.150 0.030 0.037 0.033 80.50 -
Mulana Construction 30708 Const. of School Building Cawag P/S 02/26/10 VII 0.580 165 C 0.442 0.133 0.300 - - - 87.50 82.60% Satisfactory
Mulaña Construction 30708Completion of Water Supply System
at Sitio Magdagook, Brgy. 3, Kalangahan
05/26/09 VII 4.771 90 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Must Enterprises 13336 Const. of School Building at Crossing Simuay 03/29/11 XII 4.323 135 C 0.470 0.133 0.300 - - - 90.30 *90.30%
V. Satisfactory
Must Enterprises 13336 Conc. of Kidapawan-Ilomavis Tourist Road, Mua-an-Ginatilan Section 04/01/11 XII 18.156 190 C 0.403 0.200 0.300 - - - 90.30 88.38%
Satisfactory
Must Enterprises 13336 Const./Concreting of Cotabato Airport @ Awang 09/01/09 XII 19.059 138 C 0.445 0.200 0.300 - - - 94.50 92.40%
V. Satisfactory
Must Enterprises 13336 Regravelling of Road at Rosay Heights 11 02/24/10 XII 0.940 18 C 0.375 0.200 0.300 - - - 87.50 87.50%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page275
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Must Enterprises 13336 Const. of MPB at Don E. Sero E/S 06/01/10 XII 1.920 79 O 0.329 0.240 0.150 0.030 0.035 0.033 81.70 -
Must Enterprises 13336 Const. of MPB at Tamontaka E/S 05/31/10 XII 1.929 50 C 0.384 0.130 0.300 - - - 81.40 81.40% Unsatisfactory
Must Enterprises 13336 Const. of MPB @ DepEd Div. Office 08/24/10 XII 1.929 50 C 0.460 0.133 0.300 - - - 89.30 89.30% V. Satisfactory
Must Enterprises 13336 Const. of MPB @ Don E. Sero Elem. School 08/24/10 XII 1.920 79 C 0.408 0.133 0.300 - - - 84.10 82.42%
Satisfactory
Must Enterprises 13336 Const./Conc. of Cotabato City Circ. Road (Western Section) inc. Bridge 08/24/10 XII 28.650 264 C 0.475 0.200 0.000 - - - 67.50 75.06%
Unsatisfactory
Must Enterprises 13336 Const./Conc. of Cotabato Airport at Awang 05/26/09 R-XII 19.058 138 O 0.342 0.300 0.150 0.030 0.055 0.033 91.00 -
Must Enterprises 13336 Impvt./Regravelling of Marbel-Midsayap Road 03/16/09 XII 9.642 65 C 0.372 0.133 0.300 - - - 80.50 *80.50%
Unsatisfactory
MWJ Construction 14882 Road Conc., Burauen-Albuera Road 04/08/11 VIII 8.337 120 O 0.332 0.300 0.150 0.030 0.055 0.050 91.70 -
MWJ Construction 14882 Rehab./Const./Upgrading of Damaged Pavement, Caibaan Road 06/10/09 VIII 9.640 90 C 0.418 0.133 0.300 - - - 85.10 *85.10%
Satisfactory
MWJ Construction 14882 Conc. of Burauen-Albuera Road 02/22/10 VIII 9.447 150 C 0.402 0.200 0.300 - - - 90.20 92.20% V. Satisfactory
MWJ Construction 14882 Upgrading of Tigbao-Pulak-Sta. Fe Road 09/18/09 VIII 5.780 100 C 0.450 0.144 0.300 - - - 89.40 88.50%
Satisfactory
MWJ Construction 14882 Construction of Burauen-Mahagnao Road 09/02/09 VIII 12.275 120 C 0.422 0.200 0.300 - - - 92.20 84.88%
Satisfactory
N.A Ibarra Construction (Formerly: Diocletian's
Const.)24742 Rehab. of Damaged Flood Control
Structures @ Brgy. Jordan 08/20/10 I 0.964 45 C 0.360 0.200 0.300 - - - 86.00 86.00% Satisfactory
N.A Ibarra Construction (Formerly: Diocletian's
Const.)24742 Rehab. of Damaged Flood Control
Structures, Brgy. Purag 08/20/10 I 0.964 70 C 0.350 0.200 0.300 - - - 85.00 85.00% Satisfactory
N.A Ibarra Construction (Formerly: Diocletian's
Const.)24742 Road Concreting, Brgy. Baracbac 02/28/09 I 0.855 18 C 0.367 0.200 0.300 - - - 86.70 *86.70%
Satisfactory
N.A. Ibarra Construction (Formerly: Diocletian's
Construction)24742 Conc. of FMR at Brgy. Cabangtalan 04/01/11 I 1.424 65 C 0.414 0.196 0.300 - - - 91.00 *91.00%
V. Satisfactory
N.B Avila Construction 13751 Repair/Rehab. of Labac Bridge 06/03/10 IVA 0.990 60 C 0.460 0.154 0.300 - - - 91.40 91.40% V. Satisfactory
N.B Avila Construction 13751 Conc. of Brgy. Road at Brgy. Bucal I 06/03/10 IVA 0.496 60 C 0.371 0.200 0.300 - - - 87.10 87.10% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page276
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
N.B Avila Construction 13751 Conc. of Sicat-Ezperanza FMR 06/03/10 IVA 0.496 60 C 0.339 0.200 0.300 - - - 83.90 83.90% Satisfactory
N.B Avila Construction 30983Road Upgrading (Gravel to Paved) of
Jct. MWCR San Jose Airport - Jct. Bubog Rd., Brgy. Bubog
05/25/10 IVB 5.394 90 O 0.390 0.238 0.150 0.030 0.060 0.033 90.10 -
N.B Avila Construction 30983 Rechanneling of Busuanga River, Pitogo 05/25/10 IVB 0.574 60 O 0.400 - 0.200 0.025 0.079 0.167 87.10 -
N.B Avila Construction 13751 Conc. of Dasmariñas-Trece Martirez City-Naic Road 09/09/09 IVA 4.775 90 C 0.450 0.200 0.300 - - - 95.00 89.42%
V. Satisfactory
N.B Avila Construction 13751 Conc. of Brgy. Biga I FMR 02/25/10 IVA 0.495 90 C 0.443 0.200 0.300 - - - 94.30 94.30% V. Satisfactory
N.B Avila Construction 13751 Const. of MPB at Mataas na Burol 02/26/10 IVA 0.495 60 C 0.439 0.200 0.300 - - - 93.90 93.90% V. Satisfactory
N.B Avila Construction 13751Reconst. of Damaged National
Roads along Noveleta-Naic-Tagaytay Road
09/02/10 IVA 9.577 120 C 0.428 0.140 0.300 - - - 86.80 86.80% Satisfactory
N.B Avila Construction 13751 Conc. of Brgy. Pob. 4 Brgy. Road 03/10/09 IV-A 0.381 25 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory
N.B Avila Construction 30983Road Upgrading (Gravel to Paved) of
Jct. MWCR San Jose Airport-Jct. Bubog Road, Brgy. Bubog
08/27/10 IVB 5.394 90 C 0.276 0.133 0.300 - - - 70.90 82.42% Satisfactory
N.B Garcia Construction/ F.A. Torres Construction
(JV)JV-08-288
Road Upgrading (gravel to paved), MWCR, Rizal-Calintaan (San Pedro-Mangat Section) KO 256+028- KO
256+733
08/31/09 IVB 9.646 164 O 0.345 0.298 0.150 0.030 0.037 0.033 89.30 -
N.B Garcia Construction/ F.A. Torres Construction
(JV)JV-08-288
Road Upgrading (Gravel to Paved) MWCR, Rizal-Calintaan (San Pedro-
Mangat Section)05/29/09 IV-B 9.565 90 O 0.281 0.300 0.150 0.030 0.033 0.050 84.40 -
N.B Salbo Construction 6091Road Upgrading (Gravel to Paved), Gingoog-Claveria-Villanueva Road,
Km.1379+967 - Km.1380+84008/31/10 X 18.120 195 O 0.329 0.240 0.150 0.030 0.055 0.033 83.70 -
N.B Salbo Construction 6091
Rehab./Reconst./Upgrading along Misamis Oriental-Ma.Cristina Bdry. Road, Dalipuga Centenial-Tag-ibo
Section, Sta.1514+000 - Sta.1514+781 w/ exceptions
06/07/10 X 13.912 120 O 0.366 0.240 0.150 0.030 0.055 0.050 89.10 -
N.B Salbo Construction 6091Road Upgrading (Gravel to Paved) of Gingoog-Claveria-Villanueva Road
Km.1362+580.794 - Km.1363+764.29406/10/10 X 19.297 105 O 0.374 0.235 0.150 0.023 0.050 0.033 86.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page277
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
N.B Salbo Construction 6091Rehab./Reconst./Upgrading of
Gingoog-Claveria-Villanueva Road, Km.1379+967 - Km.1380+840
06/10/10 X 18.120 195 O 0.368 0.236 0.150 0.023 0.050 0.033 86.00 -
N.B Salbo Construction 6091
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Misamis Oriental-Ma.Cristina Bdry. Road, Dalipuga Centennial-Tag-
ibo Section, Sta.1514+000 - Sta.1514+781 w/exceptions
08/28/10 X 13.912 120 C 0.433 0.200 0.300 - - - 93.30 90.78% V. Satisfactory
N.B Salbo Construction 6091Road Upgrading (Gravel to Paved), Gingoog-Claveria-Villanueva Road,
Km.1362+580.794 - Km.1363+764.29408/31/10 X 19.297 105 C 0.431 0.133 0.300 - - - 86.40 86.46%
Satisfactory
N.B Salbo Construction 6091 Completion of 4-CL @ Malapatan CES 03/09/10 XII 1.061 120 C 0.423 0.176 0.300 - - - 89.90 89.90%
V. Satisfactory
N.B Salbo Construction 6091 Const. of MPB @ Brgy. Kawas (Lying-in Building) 06/16/10 XII 0.394 60 C 0.456 0.133 0.300 - - - 88.90 88.90%
Satisfactory
N.B Salbo Construction 6091 Const. of MPB at Brgy. Kawas (PNP Building) 06/16/10 XII 0.294 60 C 0.400 0.133 0.300 - - - 83.30 83.30%
Satisfactory
N.B Salbo Construction 6091Rehab. / Reconst. of Damaged Road Sections along Linamon-Zamboanga
Road (Taguitic Section)11/28/08 X 19.212 455 O 0.251 0.300 0.100 0.024 0.045 0.100 82.00 -
N.B Salbo Construction 6091Road Upgrading (Gravel to Concrete) based on GTRSTB, Gingoog-Claveria-
Villanueva Road03/11/09 X 19.293 165 O 0.347 0.233 0.150 0.030 0.050 0.033 84.30 -
N.B Salbo Construction 6091
Rehab./Reconst. of Damaged National Road along Linamon-
Zamboanga (Taguitic Section) Km. 1622+080.40-Km. 1622+543.45
09/11/09 X 19.212 455 C 0.453 0.133 0.300 - - - 88.60 85.54% Satisfactory
N.B Salbo Construction 6091 Road Upgrading (Gravel to Concrete) Gingoog-Claveria-Villanueva Road 09/10/09 X 19.293 165 C 0.378 0.133 0.300 - - - 81.10 83.02%
Satisfactory
N.B Salbo Construction 6091 Const. of 2-CL (7m x 18m) Lugait NHS 03/10/10 X 1.249 60 C 0.409 0.143 0.000 - - - 55.20 55.20%
Poor
N.B. Avila Construction 13751Rehab./Const. (Road Opening) of Missing Links of National Road-
Const. of Maragondon By-Pass Road04/13/11 IVA 14.443 120 C 0.407 0.200 0.300 - - - 90.70 92.38%
V. Satisfactory
N.B. Garcia Construction / Marcbilt Construction,
Inc. (JV)JV-09-250
Road Upgrading (Gravel to Paved) of Mindoro Oriental/Occidental East
Coastal Road04/08/11 IVB 28.287 230 C 0.461 0.135 0.300 - - - 89.60 *89.60%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page278
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
N.B. Salbo Construction 6091
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads along
Linamon-Zamboanga Road, Liangan-Barongison Sect., Sta.1558+525.75 -
Sta.1560+307.5 w/ exception
04/10/11 X 9.275 105 C 0.288 0.200 0.300 - - - 78.80 83.36% Satisfactory
N.F Yamat Construction 5401 Repair of School Building, PNHS Annex, Brgy. Don Galo 02/24/09 NCR 0.948 75 C 0.321 0.160 0.300 - - - 78.10 *78.10%
Unsatisfactory
N.F Yamat Construction 5401 Completion of Tambo E/S Main, Barangay Tambo 06/07/10 NCR 0.260 60 C 0.450 0.200 0.300 - - - 95.00 95.00%
V. Satisfactory
N.F. Yamat Construction 5401 Repair/Rehab./Impvt. of Nemesio I. Yabut E/S 04/11/11 NCR 0.953 75 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
N.F. Yamat Construction 5401Partial Const. of Two (2) Storey Sch. Bldg. at Paranaque NHS, Don Galo
Annex04/11/11 NCR 4.563 124 C 0.477 0.080 0.300 - - - 85.70 *85.70%
Satisfactory
N.K Enterprise 29292 Rehab./Imprv't. of Various Brgy. Rds. At Villafont & Imparayan 02/25/10 VI 18.922 210 O 0.338 0.263 0.150 0.020 0.030 0.033 83.40 -
N.K Enterprise 29292 Const./Rehab./Impvt. of Various Brgy. Roads at Villafont & Imparayan 06/10/10 VI 18.922 210 C 0.370 0.157 0.300 - - - 82.70 83.12%
Satisfactory
N.K Enterprise 29292Conc. of Bantayan-San Pedro-Cubay
Raod, Km. 101+969.40-Km. 102+432.90
09/02/10 VI 4.988 120 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory
N.K. Enterprise 29292Conc. Of Odiong-Sibalom-San
Remegio-Leon Road, Km.119+166 - Km.120+1366
04/06/11 VI 18.970 282 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory
N.M.E Construction 22984Rehab./Reconst./Upgrading of
Damaged Paved National Road, Finance Road
09/02/09 NCR 9.640 30 C 0.390 0.133 0.300 - - - 82.30 *82.30% Satisfactory
N.M.E Construction 22984 Proposed Repair/Rehab. of Roads & drainage at Brgy. 605 02/16/10 NCR 1.927 60 C 0.499 0.133 0.300 - - - 93.20 93.20%
V.Satisfactory
N.M.E Construction 22984Proposed Repair/Rehab. of P.M.
Guazon St. (Otis Street) Km.0+721 - Km.1191 (with exception)
05/24/10 NCR 9.998 20 C 0.414 0.200 0.300 - - - 91.40 91.40% V. Satisfactory
N.M.E Construction 22984 Proposed Repair/Rehab./Const. of MPB, Brgy. 792 08/23/10 NCR 0.963 70 C 0.436 0.133 0.300 - - - 86.90 86.90%
Satisfactory
N.M.E Construction 22984Proposed
Rehab./Reconst./Upgrading of R. Delpan St.
08/23/10 NCR 4.819 20 C 0.373 0.133 0.300 - - - 80.60 80.60% Unsatisfactory
N.M.E. Construction 22984 Repair/Rehab./Reconst./Upgrading of M.H. Del Pilar St. 03/30/11 NCR 14.386 150 C 0.386 0.193 0.000 - - - 57.90 69.36%
Poor
N.M.E. Construction / Northern Builders (J.V.) JV-09-286
Widening/Conc. of Commonwealth Ave. inc. RROW (Footbridge at Villa
Beatriz Street)04/08/11 NCR 27.483 253 O 0.327 0.300 0.000 0.030 0.050 0.050 75.70 -
N.S Gambito Construction Services 31604 Conc. of Aritao-Quirino Road,
Bitnong Section 03/04/10 II 9.650 104 C 0.420 0.133 0.300 - - - 85.30 85.06% Satisfactory
N.S Gambito Construction Services 31640 Concreting of Aritao-Quirino Road,
Bitnong Section 06/04/09 II 9.650 104 O 0.328 0.240 0.150 0.030 0.051 0.050 84.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page279
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
N.T Tulabut Construction and Supply 15846 Const. of Calulut Multi-Purpose
Building 08/24/09 III 1.902 30 C 0.490 0.133 0.300 - - - 92.30 *92.30% V. Satisfactory
N.V Balbuena Const. 12055 Conc. of Road Purok Looban, Brgy. Layac 05/26/10 III 0.473 60 C 0.405 0.133 0.300 - - - 83.80 83.80%
Satisfactory
N.V Balbuena Const. 12055Repair and Rehab of Jct. Layac-
Balanga-Mariveles Port Road (Mabatang Section) Phase II
05/20/09 III 0.475 30 C 0.454 0.146 0.300 - - - 90.00 *90.00%V. Satisfactory
N.V Balbuena Const. 12055Repair/Rehabilitation of Junction-
Layac-Balanga-Mariveles Port Road (Mabatang Section)
02/24/09 III 0.474 30 C 0.354 0.200 0.300 - - - 85.40 *85.40% Satisfactory
N.V Balbuena Const. 12055Const. of One (1) Classroom School
Building at Lamao National High School, Brgy. Lamao
08/28/09 III 0.513 32 C 0.441 0.133 0.300 - - - 87.40 *87.40% Satisfactory
N.V Balbuena Const. 12055 Completion of Lined Canal, Brgy. San Pablo 08/27/09 III 0.475 60 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
N.V Balbuena Const. 12055 Construction of Box Culvert, Brgy. Cataning 08/27/09 III 0.809 75 C 0.396 0.133 0.300 - - - 82.90 *82.90%
SatisfactoryN.V. Balbuena Construction 12055 Completion of Const. of Drainage,
Barangay Omboy 04/01/11 III 1.330 90 C 0.430 0.124 0.300 - - - 85.40 *85.40% Satisfactory
N-22 Construction & Trading 25254 Impv't. of Sto.Tomas River Channel 05/25/10 III 1.901 45 C 0.375 - 0.500 - - - 87.50 *85.40%
SatisfactoryN-22 Construction &
Trading 25254 Construction of FMR at Brgy. Dela Paz 05/18/09 III 0.955 30 C 0.365 0.200 0.300 - - - 86.50 *86.50%
SatisfactoryNaga E.S Construction &
Supply 6593 Const./Completion of MPB, Concepcion Grande E/S 08/28/10 V 3.821 150 C 0.485 0.200 0.300 - - - 98.50 98.50%
OutsandingNaga E.S Construction &
Supply 6593 Construction of Multi-Purpose Gymnasium - Ph-I 11/11/10 DOST 19.754 240 C 0.497 0.20 0.30 - - - 99.70 99.70%
OutstandingNaga E.S Construction &
Supply 6593 Construction of Road, Hanawan-Sta. Cruz-Villa Florida Road 06/03/09 V 14.201 179 C 0.435 0.193 0.300 - - - 92.80 *92.80%
V. SatisfactoryNaga E.S Construction &
Supply 6593 Conc. of La Purisima Nuevo Road 03/12/09 V 5.617 90 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
Nale Construction 18552 Repair and Impvt. of FMR in Mayabon-Najandig 09/08/10 VII 0.452 120 C 0.448 0.133 0.300 - - - 88.10 88.10%
Satisfactory
Nale Construction 18552Rehab./Recons. of Dipolog-
Sindangan-Liloy Road, Dohinob Cemetary Sect.
09/17/09 IX 3.778 80 C 0.437 0.200 0.300 - - - 93.70 90.40% V. Satisfactory
Nascon Builders 14786
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads along Linamon-Zamboanga Road at Maigo Poblacion Sect., Sta.1561+093.50 -
Sta.1562+385 w/ exception
04/10/11 X 9.251 153 C 0.301 0.200 0.300 - - - 80.10 84.78% Satisfactory
Nascon Builders 14786 Const. of Multi-Purpose Building, Brgy. CP Garcia 06/02/09 X 1.060 75 O 0.374 0.276 0.110 0.030 0.019 0.033 84.20 -
Nascon Builders 14786 Conc. of FMR, Calangahan 03/12/09 X 0.962 45 C 0.376 0.200 0.300 - - - 87.60 *87.60% Satisfactory
Nascon Builders 14786 Impvt. of MPB 03/11/09 X 1.085 60 C 0.423 0.133 0.300 - - - 85.60 *85.60% Satisfactory
Nascon Builders 14786 Completion/Const./Rehab. of MPB 03/10/10 X 4.821 100 C 0.500 0.133 0.300 - - - 93.30 93.30% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page280
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Nascon Builders 14786 Const. of MPB Brgy. C.P. Garcia 03/10/10 X 1.060 75 C 0.444 0.133 0.300 - - - 87.70 85.60% Satisfactory
NBL Construction 30396
Const. of Bridge along Mabini Circ. Road inc. Road Approaches and other Impvts., Ph. I Malimatoc I-
Mainit Sect.
04/11/11 IVA 14.455 60 C 0.359 0.200 0.300 - - - 85.90 *85.90% Satisfactory
NBL Construction 30396Const. of Covered Line Canal along
National Highway, Brgy. San Francisco
02/27/10 IVA 9.645 90 C 0.452 0.133 0.300 - - - 88.50 88.50% Satisfactory
NBL Construction 30396 Const. of Brgy. Balanga Flood Control 02/24/10 IVA 5.350 30 C 0.366 0.200 0.300 - - - 86.60 86.60%
Satisfactory
NBL Construction 30396Restoration of Slope Protection and
Road Slip, Diokno Highway, Km.172+250, Tamayo
06/02/10 IVA 3.856 90 C 0.453 0.133 0.300 - - - 88.60 88.60% Satisfactory
NBL Construction 30396 Conc. of Brgy. Payapa, Ibaba Rd. 06/02/10 IVA 4.820 90 C 0.442 0.133 0.300 - - - 87.50 87.50% Satisfactory
NBL Construction 30396Rehab./Reconst./Upgrading of
Damaged National Road, Malimatoc II Sect.
08/23/10 IVA 9.645 75 C 0.475 0.133 0.300 - - - 90.80 90.80% V. Satisfactory
NBL Construction 30396Widening/Const. of Line Canal/Slope Protection at Bauan-Mabini National
Rd., San Teodoro Sect., Phase I08/23/10 IVA 19.274 60 C 0.409 0.160 0.300 - - - 86.90 86.90%
Satisfactory
NBL Construction 30396 Const. of Brgy. Calamias-San Francisco FMR 05/22/09 IV-A 1.928 60 C 0.416 - 0.500 - - - 91.60 *91.60%
V. Satisfactory
NBL Construction 30396
Rehab./Reconst. of Bauan-Mabini Road, Widening/Conc. of Bauan-
Mabini Circ. Road, Mainit Section, Phase I
05/22/09 IV-A 19.295 70 C 0.447 0.133 0.300 - - - 88.00 *88.00% Satisfactory
NBL Construction 30396Conc./Const./Rehab. of Bauan-Mabini Circ. Road, Malimotoc I
Section03/05/09 IV-A 19.295 180 C 0.450 0.133 0.300 - - - 88.30 86.44%
Satisfactory
NBL Construction Repainting of Road Lane Markers, Railings, Curb and Cyclone Wire Fence along Port Access Road
05/2-3/11 PPA 14.752 120 O 0.500 0.200 0.300 - - - 99.98 *99.98% Outstanding
NBL Construction / OP Reyes Builders & Supply
(JV)JV-08-239
Rehab./Reconst./Upgrading of Tagaytay-Nasugbu Road (Wawa
Sect.)09/05/09 IVA 9.858 90 C 0.425 0.133 0.300 - - - 85.80 *85.80%
Satisfactory
NBL Construction / Vicmar Construction, Inc.
Joint VentureJV-09-090 Conc./Widening/Impvt. of Bauan-
Mabini Circumferential Rd. 06/04/10 IVA 57.895 90 O 0.365 0.240 0.150 0.023 0.048 0.050 87.60 -
NCL Builders 11181 Conc. of Brgy. Road at Brgy. Mangolago 06/03/10 III 1.882 75 C 0.413 0.133 0.300 - - - 84.60 84.60%
Satisfactory
Nes-san Builders 25142 Const. of Two(2) CL Bldg. @ Laug E/S, Mexico South 03/28/11 III 0.858 60 C 0.332 0.200 0.300 - - - 83.20 *83.20%
Satisfactory
Nes-san Builders 25142 Const. of MPB Tinajero H/S Annex, Sta. Lucia Resettlement Center 02/23/10 III 3.810 60 C 0.499 0.133 0.300 - - - 93.20 93.20%
V. Satisfactory
Nes-san Builders 25142 Const./Conc./Completion of Paligui FMR 08/31/10 III 0.477 45 C 0.369 0.200 0.300 - - - 86.90 86.90%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page281
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Nes-san Builders 25142 Concreting of Road @ Avocado St., Brgy. San Francisco 02/25/09 III 0.475 15 C 0.221 0.133 0.300 - - - 65.40 *65.40%
Poor
Nes-san Builders 25142 Construction of Multi-Purpose Building @ Brgy. Duquit 02/25/09 III 0.525 30 C 0.440 0.133 0.300 - - - 87.30 *87.30%
Satisfactory
Nes-san Builders 25142Completion of two (2) CL Bldg. @
Mawaque Resett. E/S @ Brgy. Mawaque
08/26/09 III 0.390 30 C 0.456 0.133 0.300 - - - 88.90 *88.90% Satisfactory
Nes-san Builders 25142 Repair of Ten (10) CL Bldg at Camachilles H/S 08/26/09 III 0.509 45 C 0.438 0.133 0.300 - - - 87.10 *87.10%
Satisfactory
Nes-san Builders 25142 Construction of one (1) CL Bldg. @ Navaling E/S 08/26/09 III 0.487 30 C 0.424 0.133 0.300 - - - 85.70 *85.70%
Satisfactory
New Arcond Builders Incorporated (Formerly:
Arcond Builders)9614
Rehabilitation/Reconstruction of Damaged Paved (Concrete Blocking
along J.P. Rizal St.)05/25/09 NCR 2.877 45 C 0.450 0.133 0.300 - - - 88.30 *88.30%
Satisfactory
New Arcond Builders Incorporated (Formerly:
Arcond Builders)9614
Package 3: a) Asphalt Overlay along Timog Avenue (New Sct. Tobias to Sct. Tuazon) Km..9+480 - Km.9+523
b) Asphalt Overlay along Mother Ignacia (Near Sgt. Esguerra to near
Samar Ave.) Km.10+197 - Km.10+300
05/26/10 NCR 1.911 7 C 0.410 0.200 0.300 - - - 91.00 91.00% V. Satisfactory
New Arcond Builders Incorporated (Formerly:
Arcond Builders)9614 Rehab./Reconst.Upgrading of
Tandang Sora Flyover 08/18/10 NCR 5.247 60 C 0.411 0.133 0.300 - - - 84.40 84.40% Satisfactory
New Big Four J Construction Inc. 15104 Concreting of Roads, Sta. Lucia (Y),
Zaragoza to Santiago 03/03/09 III 0.946 25 C 0.370 0.190 0.300 - - - 86.00 *86.00%Satisfactory
New Big Four J Construction Inc. 15104 Completion of Silverio School
(Phase 2) 02/24/09 NCR 2.385 60 C 0.405 0.200 0.300 - - - 6,484.20 *90.50% V.Satisfactory
New Big Four J Construction, Inc. 15104 Concreting of Roads at Sta. Cruz 05/26/09 III 1.136 30 C 0.341 0.200 0.300 - - - 84.10 *84.10%
Satisfactory
New Big Four J Construction, Inc. 15104
Rehab./Reconst./Upgrading of Damaged National Roads along
Calamba-Sta. Cruz-Famy Jct. Road05/30/09 IV-A 28.939 120 C 0.495 0.133 0.300 - - - 92.80 *92.80%
V. Satisfactory
New Big Four J Construction, Inc. 15104 Construction of Multi-Purpose
Building 05/18/09 IV-A 19.248 180 C 0.471 0.133 0.300 - - - 90.40 *90.40% V. Satisfactory
New Big Four J Construction, Inc. 15104
Widening of Road at Old MSR Biñan Section, Laguna 1st District inc.
RROW acquisition06/01/09 IV-A 48.178 60 C 0.465 0.133 0.300 - - - 89.80 *89.80%
V. Satisfactory
New Big Four J Construction, Inc. 15104
Rehab./Reconst./Upgrading of Marikina-Victoria Valley-Antipolo
Road05/18/09 IV-A 19.209 180 O 0.389 0.240 0.150 0.020 0.030 0.050 87.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page282
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
New Big Four J Construction, Inc. (Formerly: Four J
Construction)
15104Repair/Maintenance (Conc.
Reblocking) along M.H. Del Pilar St. Brgy. Tugatog
03/03/10 NCR 1.448 45 C 0.457 0.133 0.300 - - - 89.00 89.00% Satisfactory
New Kanlaon Construction inc./ JE
Manalo & CO., Inc. (JV)896
Southern Philippines Irrigation Sector Project SPISP(Construction
of Binalawan Concrete Buttress Dam & Appurtenant Facilities)
06/12/10 NIA 167.797 378 O 0.382 0.211 0.00 0.030 0.033 0.017 67.30 -
New Kanlaon Construction, Inc. 896 Concreting of Barotac Nuevo-
Dumangas-Dacutan Wharf Road 06/11/09 VI 17.611 99 O 0.357 0.240 0.150 0.015 0.040 0.050 85.20 -
New Kanlaon Construction, Inc. 896
Upgrading of Guimaras Circ. Road, Salvacion-Lucmayan Section, Nueva Valencia, Guimaras, Km.84+000-Km.
89+000 with exception
09/01/09 VI 18.988 135 C 0.443 0.133 0.300 - - - 87.60 *87.60% Satisfactory
New Kanlaon Construction, Inc. 896 Conc. of Barotac Nuevo-Dumangas-
Dacutan Wharf Road 09/10/09 VI 17.611 115 C 0.403 0.147 0.300 - - - 85.00 85.12% Satisfactory
New Mindoreños Lumber, Hardware and General Merchandise
31745
Road Upgrading (gravel to paved) MWCR, Sablayan-Sta. Cruz (Pag-asa-
Amnay Section) KO 352+647-KO 354+004.5
08/30/09 IVB 19.158 179 O 0.365 0.296 0.150 0.030 0.042 0.033 91.60 -
New Mindoreños Lumber, Hardware and General Merchandise
31745
Road Upgrading (gravel to paved) MWCR, Sablayan-Sta. Cruz (San
Vicente-Cabacungan Section) KO 329+363-KO 330+921
08/30/09 IVB 19.175 182 O 0.350 0.300 0.150 0.030 0.042 0.033 90.50 -
New Mindoreños Lumber, Hardware and General Merchandise
31745
Road Upgrading (gravel to paved) MWCR, Sta. Cruz-Mamburao (Casoy-Balansay Section) KO 399+495-KO
400+872
09/01/09 IVB 19.292 185 O 0.348 0.300 0.150 0.030 0.042 0.033 90.30 -
New Mindoreños Lumber, Hardware and General Merchandise
31745
Road Upgrading (gravel to paved) MWCR, Sta. Cruz-Mamburao
(Pagbahan-Talabaan Section) KO 389+704-KO 391+157
08/30/09 IVB 14.471 191 O 0.368 0.300 0.101 0.022 0.042 0.033 86.60 -
New Mindoreños Lumber, Hardware and General Merchandise
31745Road Upgrading of Abra de Ilog-San Jose Road (Casoy-Mimping Section),
Brgy. Balansay08/28/10 IVB 6.850 90 C 0.346 0.200 0.300 - - - 84.60 82.02%
Satisfactory
New Mindorenos Lumber, Hardware and General Merchandise
31745Road Upgrading (Gravel to Paved) MWCR, Sablayan-Sta. Cruz (San
Vicente-Cabacungan Section)05/29/09 IV-B 19.176 140 O 0.351 0.300 0.150 0.030 0.037 0.033 90.10 -
New Mindorenos Lumber, Hardware and General Merchandise
31745Road Upgrading (Gravel to Paved)
MWCR, Sablayan-Sta. Cruz (Pag-asa Amnay Section)
05/29/09 IV-B 19.158 140 O 0.354 0.300 0.115 0.030 0.035 0.033 86.70 -
New Mindorenos Lumber, Hardware and General Merchandise
31745Road Upgrading (Gravel to Paved)
MWCR, Sta. Cruz-Mamburao (Casoy-Balansay Section)
05/30/09 IV-B 19.188 140 O 0.308 0.300 0.070 0.030 0.030 0.033 77.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page283
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
New Mindoreños Lumber, Hardware and General Merchandise
31745
Road Upgrading (Gravel to Paved) MWCR Sta. Cruz-Mamburao
(Pagbahan-Talabaan Sect) KO 389+704-KO 391+157 w/ exception
02/20/10 IVB 14.471 236 C 0.431 0.133 0.300 - - - 86.40 85.26% Satisfactory
New Mindoreños Lumber, Hardware and General Merchandise (Formerly: Mercedita
Benasas General Merchandise)
31745 Const. of Multi-Purpose Bldg. Mamburao Central School 05/24/10 IVB 1.915 120 C 0.455 0.114 0.300 - - - 86.90 86.90%
Satisfactory
New Mindoreños Lumber, Hardware and General Merchandise (Formerly: Mercedita
Benasas General Merchandise)
31745Road Upgrading of Abra de Ilog-San Jose Rd.(Casoy Mimping Sect.) Brgy.
Balansay05/24/10 IVB 6.753 90 O 0.322 0.238 0.130 0.030 0.050 0.033 80.30 -
New Mindoreños Lumber, Hardware and General Merchandise (Formerly: Mercedita
Benasas General Merchandise)
31745 Construction of Casague Multi-Purpose Building 02/28/09 IV-B 0.864 45 C 0.494 0.091 0.300 - - - 88.50 *84.37%
Satisfactory
New Mindoreños Lumber, Hardware and General Merchandise (Formerly: Mercedita
Benasas General Merchandise)
31745 Const. of Casague MPB 11/21/08 IV-B 0.864 45 O 0.329 0.240 0.100 0.030 0.027 0.100 82.60 -
New Rich General Contractor Services & Trading Company, Inc.
27629Const. of Three (3) Classroom
School Building at University of Rizal System
08/16/10 IVA 2.884 60 C 0.402 0.183 0.300 - - - 88.50 88.50% Satisfactory
New Rich General Contractor Services & Trading Company, Inc.
27629 Conc. of FMR, Brgy. Cabanbanan (Daang Bakal), Pagsanjan 08/20/10 IVA 2.864 55 C 0.253 0.200 0.300 - - - 75.30 75.30%
Unsatisfactory
New Rich General Contractor Services
Contractor Services & Trading Company, Inc.
27629 Const. of Multi-Purpose Building, Brgy. Poblacion V 02/23/10 IVA 0.493 40 C 0.445 0.200 0.300 - - - 94.50 94.5%
V. Satisfactory
New San Fabian Builders & Supplies 16348 Construction of Multi-Purpose Bldg.,
Aurora Nat'l Science High School 03/03/09 III 2.133 120 C 0.451 0.133 0.300 - - - 88.40 *88.40%Satisfactory
New TBP Construction & Development Corp. 29155 Const. of Cross Drainage Structures
along MNR 11/25/08 I 4.417 120 O 0.344 0.120 0.100 0.020 0.042 0.133 75.90 -
New TBP Construction & Development Corporation
29155 Construction of Cross Drainage Structures along MNR 08/25/09 I 4.417 337 O 0.358 0.265 0.150 0.030 0.045 0.033 88.10 -
Newadis Construction 23806
Road Upgrading (gravel to paved), MWCR, Calintaan-Sablayan
(Bulangcog-Iriron Section) KO 276+468- KO 277+141
08/31/09 IVB 9.650 192 O 0.344 0.294 0.150 0.030 0.037 0.033 88.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page284
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Newadis Construction 23806 Const. of 2 CL School Building, Claudio Salgado Elementary School 02/20/10 IVB 1.368 90 C 0.468 0.133 0.300 - - - 90.10 90.10%
V. Satisfactory
Newadis Construction 23806 Const. of MPB Paluan NHS 05/24/10 IVB 1.440 100 O 0.356 0.240 0.150 0.030 0.029 0.033 83.80 -
Newadis Construction 23806 Const. of MPB, Paluan National High School 08/28/10 IVB 1.440 100 C 0.452 0.090 0.300 - - - 84.20 83.92%
Satisfactory
Newadis Construction 23806Road Upgrading (Gravel to Paved)
MWCR, Calintaan-Sablayan (Bulangcog-Iriron Section)
05/30/09 IV-B 9.573 90 O 0.314 0.300 0.150 0.030 0.042 0.050 88.60 -
Newadis Construction 23806 Construction of Mamburao Seawall, Barangay 7 02/28/09 IV-B 2.683 120 C 0.433 0.069 0.300 - - - 80.20 *84.34%
SatisfactoryNewbig Four J
Construction Inc. (Formerly: Four J
15104Completion of MPB at Philippine
Drug Enforcement Agency (PDEA) Compound
04/07/11 NCR 9.543 201 O 0.392 0.300 0.150 0.030 0.041 0.033 94.60 -
Newbig Four J Construction Inc. (Formerly: Four J
Construction)
15104Const. of Two (2) Classroom School Bldg. at Baclaran E/S Central, Brgy.
Baclaran04/11/11 NCR 1.819 75 C 0.482 0.079 0.300 - - - 86.10 *86.10%
Satisfactory
Newbig Four J Construction Inc. (Formerly: Four J
Construction)
15104 Conc. of Majayjay-Lucban Road inc. Damaged Sect. at Dalitiwan Side 04/04/11 IVA 1.229 50 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
Newbig Four J Construction Inc. (Formerly: Four J
Construction)
15104
Repair/Rehab. of Damaged Pavement at Calamba-Sto.Tomas (MSR-Daang Maharlika Rd.) Sta. Km.51+000 - Sta.
Km.53+000
05/27/10 IVA 9.602 10 C 0.456 0.200 0.300 - - - 95.60 95.60% V. Satisfactory
Newbig Four J Construction Inc. (Formerly: Four J
Construction)
15104 Const. of Municipal Hall 06/01/10 IVA 33.705 210 O 0.388 0.300 0.150 0.030 0.052 0.033 95.30 -
Newbig Four J Construction Inc. (Formerly: Four J
Construction)
15104 Impv't./Rehab./Widening of Evangelista Rd., Talaba-Banalo 06/01/10 IVA 48.100 40 C 0.421 0.200 0.300 - - - 92.10 92.10%
V. Satisfactory
Newbig Four J Construction Inc. (Formerly: Four J.
Construction)
15104 Const. of two (2) Storey MPB, Brgy. Wack-Wack 06/02/10 NCR 19.106 180 C 0.465 0.200 0.300 - - - 96.50 96.50%
Outstanding
Newbig Four J Construction Inc. (Formerly: Four J.
Construction)
15104Upgrading/Conc. of Roads & Alleys along Dalag Street Brgy. Northbay
Boulevard, South (NBBS)05/28/10 NCR 6.720 90 C 0.414 0.200 0.300 - - - 91.40 91.40%
V. Satisfactory
Newbig Four J Construction, Inc. 15104
Const. of Concepcion, Danao-Buenavista Rd., Sta.69+605.57 -
Sta.72+861.0406/03/10 VII 58.733 240 O 0.309 0.300 0.150 0.030 0.040 0.033 86.20 -
NewBig Four J Construction, Inc. 15104 Const. of Municipal Hospital
Building 03/01/10 IVA 33.705 210 O 0.337 0.300 0.150 0.030 0.050 0.033 90.00 -
Newbig Four J Construction, Inc. (Formerly: Four J
Construction)
15104Const. of Concepcion, Danao-
Buenavista Road, Sta. 69+605.57-Sta. 72+861.04
08/26/10 VII 58.733 240 O 0.336 0.300 0.150 0.030 0.047 0.033 89.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page285
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Newbig Four J Construction, Inc. (Formerly: Four J
Construction)
15104 Const. of Municipal Hospital 08/27/10 IVA 33.705 210 C 0.467 0.133 0.300 - - - 90.00 91.86% V. Satisfactory
Newbig Four J Construction, Inc. (Formerly: Four J
Construction)
15104Rehab./Reconst. of Damaged
National Roads of Cavite-Batangas Road (Intermittent Section)
09/01/10 IVA 19.269 126 C 0.416 0.200 0.300 - - - 91.60 91.60% V. Satisfactory
Newbig Four J Construction, Inc. (Formerly: Four J
Construction)
15104Rehab./Reconst./Upgrading of
Damged Paved National Roads, Paete-Famy Poblacion Road
08/20/10 IVA 3.370 55 C 0.407 0.200 0.300 - - - 90.70 90.70% V. Satisfactory
NFH Construction & Supply 16055 Conc. Of Camp Bagong Ibalon
(Phase II) 08/19/10 V 12.720 180 C 0.442 0.200 0.300 - - - 94.20 94.20% V. Satisfactory
NFH Construction & Supply 16055 Repair/Impv't. of Legazpi City-Punta
de Jesus Road, Banquero Sect. 08/19/10 V 4.545 90 C 0.415 0.133 0.300 - - - 84.80 84.80% Satisfactory
NFH Construction & Supply 16055 Const. of Basag Bridge (Ligao-
Sabloyon Road) 03/02/09 V 23.780 487 O 0.335 0.239 0.150 0.030 0.061 0.050 86.50 -
NFH Construction & Supply 16055 Const. of Daguit 2 Bridge 03/13/09 V 19.650 714 O 0.341 0.240 0.000 0.030 0.056 0.050 71.70 -
NFH Construction & Supply 16055 Const. of Basag Bridge (Ligao-
Sabloyon Road) 09/03/09 V 23.780 487 C 0.388 0.200 0.300 - - - 88.80 87.27% Satisfactory
NFH Construction & Supply 16055 Road Upgrading of Ligao-Pioduran
Road 09/02/09 V 19.184 134 C 0.458 0.141 0.300 - - - 89.90 82.46% Satisfactory
NFH Construction & Supply 16055 Const. of Daguit 2 Bridge 08/28/08 V 19.650 330 O 0.342 0.300 0.070 0.030 0.028 0.067 83.70 -
NFH Construction & Supply (Formerly: NFH
Gravel and Sand)16055 Rehab./Reconst. of Naga City Bdry.
Calabanga-Balongay Rd. 06/08/10 V 33.940 90 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory
NFH Construction & Supply (Formerly: NFH
Gravel and Sand)16055 Construction of Daguit 2 Bridge 06/04/09 V 19.650 736 C 0.487 0.133 0.300 - - - 92.00 84.26%
Satisfactory
NFH Construction & Supply (Formerly: NFH
Gravel and Sand)16055 Rehab./Reconst. of Damaged
National Road, Lakandula Drive 05/27/09 V 32.610 120 O 0.343 0.240 0.150 0.023 0.035 0.050 84.10 -
Nirvana Construction and Supplies 18691 Const. of 2-CL School Building at
Basag NHS 03/06/10 XII 1.321 105 C 0.482 0.141 0.300 - - - 92.30 92.30% V. Satisfactory
Nirvana Construction and Supplies 18691 Sarangani-Davao del Sur Coastal
Road (Burias Section) 06/16/10 XII 9.394 150 O 0.316 0.237 0.150 0.030 0.047 0.050 83.00 -
Nirvana Construction and Supplies 18691 Sarangani-Davao del Sur Coastal
Road (Burias Section) 09/07/10 XII 9.394 168 C 0.406 0.133 0.300 - - - 83.90 83.36% Satisfactory
Nirvana Construction and Supplies 18691 Const. of MPB, Brgy. Zone 4 03/14/09 XII 1.429 161 C 0.472 0.133 0.300 - - - 90.50 84.97%
Satisfactory
Norm Construction 13754 Const. of Public Market Phase V, Poblacion 04/08/11 VII 0.999 30 C 0.423 0.133 0.300 - - - 85.60 *85.60%
Satisfactory
Norm Construction 13754 Conc. of Luyang-Poo-Lazi National Rd. (Km.17.620-Km.17.810) 09/07/09 VII 2.891 128 C 0.379 0.142 0.300 - - - 82.10 83.12%
Satisfactory
Norm Construction 13754 Repair & Rehab. of Brgy. Poblacion 06/01/10 VII 0.960 30 C 0.458 0.162 0.300 - - - 92.00 92.00% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page286
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Norm Construction 13754 Conc. of Brgy. Armenia Rd., Armenia 06/01/10 VII 0.970 30 C 0.349 0.200 0.300 - - - 84.90 84.90% Satisfactory
Norm Construction 13754 Const. of MPB at DENR 06/07/10 VII 1.446 169 O 0.262 0.296 0.138 0.030 0.041 0.033 80.00 -
Norm Construction 13754 Const. of MPB at DENR 08/31/10 VII 1.446 171 C 0.390 0.133 0.300 - - - 82.30 80.69% Unsatisfactory
Norm Construction 13754Repair/Rehab. of Brgy. Road @
Pisong A (Sta. 0+000-Sta. 0+480) Maria, Siquijor
06/02/09 VII 0.962 120 C 0.430 0.133 0.300 - - - 86.30 *86.30% Satisfactory
Norm Construction 13754 Completion of Multi-Purpose Building 03/10/09 VII 0.459 120 C 0.442 0.133 0.300 - - - 87.50 *87.50%
Satisfactory
Norm Construction 13754 Rehab. & Improvement of Municipal Roads 03/13/09 VII 1.431 30 C 0.456 0.133 0.300 - - - 88.90 *88.90%
SatisfactoryNorsam Builders &
Construction Supply 21184 Const. of Seawall Brgy. Urdaneta 03/31/11 VIII 4.792 120 O 0.300 0.300 0.150 0.030 0.029 0.033 84.20 -
Norsam Builders & Construction Supply 21184 Rehab./Upgrading of Catarman
Diversion Rd. II 06/14/10 VIII 7.518 100 O 0.363 0.240 0.150 0.030 0.037 0.033 85.30 -
Norsam Builders & Construction Supply 21184 Rehab./Upgrading of Catarman
Diversion Road II 08/27/10 VIII 7.518 100 C 0.433 0.133 0.300 - - - 86.60 85.82% Satisfactory
Norsam Builders & Construction Supply 21184 Macagtas IS 7/6-10/09 NIA 4.559 240 O 0.363 0.240 0.150 0.030 0.063 0.050 89.61 -
Norsam Builders & Construction Supply 2184 IRAWAHAN CIS 7/6-10/09 NIA 1.910 180 C 0.468 0.160 0.300 - - - 92.84 *92.84%
V. SatisfactoryNorsam Builders &
Construction Supply 2184 San Miguel CIS 7/6-10/09 NIA 4.005 150 O 0.365 0.240 0.150 0.030 0.063 0.050 89.77 -
Northern / DMJ Construction (JV) JV-08-115 Construction of Baler-Casiguan
Road CP3 03/06/09 III 505.307 450 O 0.394 0.300 0.150 0.030 0.033 0.033 94.00 -
Northern / DMJ Construction Joint
VentureJV-08-115 Const. of Baler-Casiguran Rd.
(Contract Package 3) 08/20/10 III 505.307 450 C 0.432 0.200 0.300 - - - 93.20 92.09% V. Satisfactory
Northern / Z M Construction (JV) JV-08-275
Const. (Road Opening) of Lubao By-Pass Road of San Fernando-Olongapo Road inc. RROW
05/19/09 III 135.396 180 O 0.318 0.272 0.150 0.030 0.051 0.050 87.10 -
Northern / ZM Construction (JV) JV-08-275
Const. (Road Opening) of Lubao By-Pass Road of San Fernando-Olongapo Road inc. RROW
05/27/10 III 135.392 389 C 0.470 0.133 0.300 - - - 90.30 89.25% V. Satisfactory
Northern / ZM Construction (JV) JV-07-148
Tarlac-Nueva Ecija-Dingalan Port Road, Sta. Rosa-Jct. Fort Magsaysay Road (Phase 2) & Gabaldon-Dingalan
Road (Phase 3)
03/04/09 III 238.983 300 O 0.367 0.300 0.150 0.030 0.032 0.050 92.90 -
Northern Builders 8789Conc. and Upgrading of Road,
Villapaz (Realigned to Conc. of Brgy. Road, Apsayan)
04/07/11 III 1.290 60 C 0.429 0.136 0.300 - - - 86.50 *86.50% Satisfactory
Northern Builders 8789 Road Upgrading of Bambang-Kasibu-Solano Road, Darruba Section 04/13/11 II 19.023 126 C 0.432 0.133 0.000 - - - 56.50 72.04%
Poor
Northern Builders 8789 Conc. of Inarayan Road, Barangay New Agutaya, Km.0+000 - Km.2+500 04/01/11 IVB 23.964 144 O 0.321 0.300 0.150 0.030 0.032 0.033 86.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page287
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Northern Builders 8789Concrete Paving/Impvt. of Jct.
National Road, Bitnong-Belance, Nueva Vizcaya Boundary Road
03/04/10 II 125.420 330 C 0.395 0.200 0.300 - - - 89.50 91.51% V. Satisfactory
Northern Builders 8789Completion of Jct. National Rd. Bitnong-Belance-Nueva Vizcaya
Bdry. Rd.06/09/10 II 96.453 180 C 0.466 0.200 0.300 - - - 96.60 96.60%
Outstanding
Northern Builders 8789Completion of the Asphalting of Jct. National Rd. Bitnong-Belance-Nueva
Vizcaya Bdry. Rd.06/09/10 II 96.474 185 C 0.475 0.146 0.300 - - - 92.10 92.10%
V. Satisfactory
Northern Builders 8789 Imprv't. of Access Rd., Bagabag Airport 06/09/10 II 15.810 45 C 0.475 0.133 0.300 - - - 90.80 90.80%
V. Satisfactory
Northern Builders 8789Const. of Tarlac-Nueva Ecija-
Dingalan Road (Jct. Fort Magsaysay-Laur Section), CP3
02/23/10 III 306.881 360 C 0.392 0.200 0.300 - - - 89.20 90.68% V. Satisfactory
Northern Builders 8789 Rehab./Reconst. Of Sicsican-Licab Road, Sta. 0+000-Sta. 18+620 03/01/10 III 287.016 210 C 0.372 0.200 0.300 - - - 87.20 88.04%
Satisfactory
Northern Builders 8789
Widening/Conc. of Manila North Road (MNR), Tarlac province Phase
VI (Package II), Tarlac 2nd Congressional District, Tarlac City &
Gerona Sect.
06/03/10 III 123.010 210 O 0.384 0.268 0.150 0.030 0.048 0.033 91.30 -
Northern Builders 8789
Widening/Conc. of MNR, Tarlac Province, Phase VI (Package II)
Tarlac 2nd Congressional District, Tarlac City & Gerona Sect.
08/30/10 III 123.010 210 C 0.425 0.200 0.300 - - - 92.50 91.78% V. Satisfactory
Northern Builders 8789Rehab./Reconst./Widening of Damaged Paved Nat'l. Roads
(Package II) at Gerona-Poblacion Rd.08/27/10 III 7.819 120 C 0.388 0.200 0.300 - - - 88.80 88.80%
Satisfactory
Northern Builders 8789 Const. of Togbongon River Control (Phase II) Brgy. Togbongon 06/07/10 XIII 14.399 180 C 0.433 0.200 0.300 - - - 93.30 93.30%
V. Satisfactory
Northern Builders 8789
Urgent Rehab. Works due to the Passage of Typhoon "Pepeng" in the
Province of Pangasinan under the Agno River Control Project
06/11/10 AFCS 5.790 45 O 0.353 0.240 0.150 0.030 0.047 0.050 87.00 -
Northern Builders 8789
Urgent Rehab. works due to Passage of Typhoon Peping in the Province
of Pangasinan under the Agno River Control Project
09/01/10 AFCS-PMO 5.790 45 C 0.407 0.200 0.300 - - - 90.70 88.48% Satisfactory
Northern Builders 8789
Widening/Conc. of Bontoc-Banaue Road, Talubin-Samoki Section
Bontoc, Km. 376+911-Km.385+000 (intermittent Section)
08/30/09 CAR 120.619 450 O 0.365 0.240 0.087 0.030 0.056 0.017 79.50 -
Northern Builders 8789Concrete Paving/Impvt. of Jct.
National Road, Bitnong-Belance, Nueva Vizcaya Boundary Road
06/01/09 II 125.420 540 O 0.347 0.300 0.150 0.030 0.051 0.050 92.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page288
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Northern Builders 8789 Asphalt overlay of Daang Maharlika 03/13/09 II 38.996 85 C 0.470 0.200 0.300 - - - 97.00 *97.00% Outstanding
Northern Builders 8789Concrete Paving/Impv't of Jct.
National Road, Bitnong-Belance, Nueva Vizcaya Bdry. Road
03/10/09 II 125.412 540 O 0.354 0.300 0.150 0.030 0.045 0.050 92.90 -
Northern Builders 8789 Rehab./Reconst./Upgrading of Tarlac-Maliwalo Road 05/26/09 III 13.822 60 C 0.474 0.200 0.300 - - - 97.40 *97.40%
Outstanding
Northern Builders 8789
Const. of Tarlac-Nueva Ecija-Dingalan Port Road (Jct. Fort
Magsaysay-Laur Section) Contract Package 3
05/30/09 III 299.894 360 O 0.337 0.300 0.150 0.030 0.042 0.050 90.90 -
Northern Builders 8789
Rehab./Reconst./Upgrading of Arayat-Magalang-Mabalacat Road, Km. 108+300 to Km. 111+500 (with
exception)
06/04/09 III 37.804 52 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory
Northern Builders 8789 Asphalt Overlay along Manila North Road 02/27/09 III 9.743 30 C 0.431 0.195 0.300 - - - 92.60 *92.60%
V. Satisfactory
Northern Builders 8789 Baliuag Boundary, Candaba Road 02/24/09 III 33.886 144 C 0.430 0.181 0.300 - - - 91.10 *91.10%V. Satisfactory
Northern Builders 8789Impvt./Widening/Conc. of McArthur
Highway (MNR) Tarlac Section Phase IV, Package II, Tarlac City Section
02/27/09 III 118.472 240 C 0.441 0.200 0.300 - - - 94.10 *94.10%V. Satisfactory
Northern Builders 8789 San Vicente-Apalit Road 02/24/09 III 31.463 140 C 0.452 0.192 0.300 - - - 94.40 *94.40%V. Satisfactory
Northern Builders 8789Const. of Tarlac-Nueva Ecija-Dingalan Port Road (Jct. Fort
Magsaysay-Laur Section) CP 309/07/09 III 299.894 360 O 0.379 0.300 0.150 0.030 0.050 0.033 94.20 -
Northern Builders 8789
Const. of Pres. C.P. Garcia (C-5) Ext., C.P. Garcia to Magsaysay Ave.,
Phase III (inc. Const. of Pedestrian Overpass) C.P. Garcia
09/03/10 NCR 22.185 255 C 0.479 0.200 0.300 - - - 97.90 82.06% Satisfactory
Northern Builders 8789 Construction of Togbongon River Control 05/28/09 XIII 9.585 149 C 0.384 0.186 0.300 - - - 87.00 86.58%
Satisfactory
Northern Builders 8789 Construction of Togbongon River Control 03/10/09 XIII 9.585 149 O 0.300 0.300 0.150 0.030 0.033 0.050 86.30 -
Northern Builders / Ferdstar Builders Contractors (JV)
JV-07-118 Rehab/Reconst. of Tulaoc-Sto. Domingo Road, Mexico Section 02/24/09 III 96.425 300 O 0.337 0.281 0.150 0.030 0.047 0.050 89.50 -
Northern Builders / Gampik Const. & Dev't.,
Inc. (JV)JV-09-203
Widening/Con. of McArthur Highway (MNR), Tarlac Province, Package V,
Traffic Eng'g and Management (TEAM) from Bamban to Gerona
04/07/11 III 253.167 270 C 0.460 0.145 0.300 - - - 90.50 90.36% V. Satisfactory
Northern Builders / Gonzalo Construction
(JV)1826
Rehab./Reconst. of Damaged Paved National Road along Acop Kapangan-
Kibungan-Bakun Road04/14/11 CAR 83.983 436 O 0.354 0.300 0.150 0.010 0.048 0.050 91.20 -
Northern Builders / New Big Four J Construction
(JV)JV-08-207 Impvt./Conc. of Jct. (TER), Jagna-
Sierra Bullones Rd. 06/03/10 VII 87.871 270 C 0.369 0.200 0.300 - - - 86.90 83.06% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page289
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Northern Builders / New Big Four J Construction
(JV)JV-08-207 Impvt./Conc. & Widening of Panglao
Island Central Spur Rd. 06/03/10 VII 111.090 300 O 0.258 0.300 0.000 0.030 0.060 0.050 69.80 -
Northern Builders / R.A. Pahati Gravel & Sand
(JV) JV-08-008
Rehab./Impvt./Widening of Tarlac-Nueva Ecija-Dingalan Port Road (Jct. Fort Magsaysay-Laur Road Section)
CP I
05/30/09 III 223.074 300 C 0.355 0.200 0.300 - - - 85.50 90.72% V. Satisfactory
Northern Builders / R.A. Pahati Gravel & Sand
(JV)JV-08-008
Rehab/Impvt./Widening of Tarlac-Nueva Ecija-Dingalan Port Road,
Phase I, Fort Magsaysay-Laur Road Section
03/04/09 III 223.075 300 O 0.388 0.300 0.150 0.022 0.032 0.050 94.20 -
Northern Builders / ZM Const. (JV) JV-07-685 Impvt./Upgrading/Widening of Jct.
Layac-Balanga-Mariveles Port Rd. 03/27/09 III 107.887 300 C 0.464 0.200 0.300 - - - 96.40 94.84% V. Satisfactory
Northern Builders/Ferdstar
Builders Contractor Joint Venture
JV-07-143
Completion/Continuation of Unfinished On-Going Bridge: Anao Bridge along San Jose Malino-Anao
Road
02/16/10 III 18.989 76 C 0.457 0.200 0.300 - - - 95.70 91.02% V. Satisfactory
Northern Builders/Ferdstar
Builders Contractor Joint Venture
JV-07-118 Rehab./Reconst. Of Tulaoc Sto. Domingo Rd., Mexico Section 02/16/10 III 96.425 300 C 0.402 0.200 0.300 - - - 90.20 88.88%
Satisfactory
Northern Builders/Ferdstar
Builders Contractor Joint Venture
JV-07-143
Completion/Continuation of Unfinished On-going Bridge: Anao
Bridge along San Jose Malino-Anao Road
05/18/09 III 18.988 60 O 0.307 0.300 0.150 0.030 0.042 0.050 87.90 -
Northern Builders/Ferdstar
Builders Contractor Joint Venture
JV-07-118 Rehab./Reconst. of Tulaoc Sto. Domingo Road, Mexico Sect. 05/18/09 III 96.425 300 O 0.298 0.300 0.150 0.030 0.037 0.050 86.50 -
Northern Builders/New Big Four J Const. Inc.
(Joint Venture) JV-08-207
Imprv't/Conc./widening of Panglao center Spur Rd. Sta. 3+120-to
Sta.3=500; Sta.3+700-Sta.5+200;Sta.5+540-Sta.6+200
09/03/09 VII 110.999 300 O 0.383 0.240 0.150 0.030 0.037 0.050 89.00 -
Northern Builders/New Big Four J Const. Inc.
(Joint Venture)JV-08-207
Imprv't./Conc. of Jct.(TER),Jagna-Sierra Bullones Rd. Km.86.283-
Km86.800;Km.87.020-Km.87.380;Km87.540-
Km.89.64550;Km.94.380-Km.95.680
09/04/09 VII 87.718 270 O 0.329 0.240 0.150 0.030 0.037 0.050 83.60 -
Northern Builders/New Big Four J Construction
Inc. Joint Venture JV-08-207
Impvt./Conc./Widening of Panglao Center Spur Road, Sta. 3+120-
Sta.3+500, Sta. 3+700-Sta. 5+200, Sta. 5+540-Sta. 6+200
06/10/09 VII 110.999 300 O 0.358 0.300 0.150 0.030 0.047 0.050 93.50 -
Northern/DMJ Construction Joint
Venture JV-08-115 Construction of Baler-Casiguran
Road (Contract Package 3) 05/28/09 III 505.307 450 O 0.337 0.300 0.150 0.030 0.037 0.033 88.70 -
Northern/ZM Construction Joint
Venture JV-07-148
Tarlac-Nueva Ecija-Dingalan Port Road, Sta. Rosa-Jct. Fort Magsaysay
Road (Phase 2) and Gabaldon-Dingalan Road (Phase 3)
05/30/09 III 241.076 360 C 0.429 0.200 0.300 - - - 92.90 92.90% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page290
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Northern/ZM Construction Joint
Venture JV-08-275
Const. of (Road Opening) of Lubao-By Pass Road of San Fernando-
Olongapo Road inc. RROW08/25/09 III 135.396 180 O 0.336 0.300 0.150 0.030 0.051 0.033 90.00 -
Nukaza Trading and Construction Services 32067 Const./Rehab./Completion of Flood
Control Project at Brgy. Cupang 02/18/10 NCR 2.381 101 O 0.342 0.240 0.150 0.030 0.029 0.033 82.40 -
Nukaza Trading and Construction Services 32067 Const./Rehab./Completion of Flood
Control Project @ Brgy. Cupang 06/08/10 NCR 2.381 101 C 0.428 0.200 0.300 - - - 92.80 86.56% Satisfactory
NVF Construction 13941 Conc. of Access Road, Causip 04/06/11 V 2.268 120 O 0.382 0.225 0.150 0.030 0.050 0.033 87.00 -
NVF Construction 13941 Conc. of FTMR in Sta. Lucias Baras 04/06/11 V 0.493 80 C 0.435 0.133 0.300 - - - 86.80 *86.80% Satisfactory
NVF Construction 13941 Const. of School Building, Causip 04/06/11 V 2.268 120 O 0.387 0.200 0.150 0.030 0.035 0.033 83.50 -
NY Construction and Supply 30388
Construction and Supply for the Catbalogan Port Rehabilitation
Project04/20-23/10 PPA 35.835 150 O 0.3960 0.3000 0.1500 0.0300 0.0700 0.0500 99.60 -
O.G Santos Construction 2050 Completion of MPB for Package 1 at Duterte NHS, Brgy. Talomo 03/10/10 XI 2.841 180 C 0.492 0.133 0.300 - - - 92.50 92.50%
V. Satisfactory
O.G Santos Construction 2050 Const./Impv't. of 5 Classroom Bldg. at New Maligaya ES, Brgy. Ising 09/01/10 XI 4.709 180 C 0.480 0.133 0.300 - - - 91.30 91.30%
V. Satisfactory
O.G Santos Construction 2050 Conc. of Mahayag-Dumingag Road Kaangayan Section 03/12/09 IX 4.645 166 C 0.467 0.150 0.300 - - - 91.70 *91.70%
V. Satisfactory
O.G Santos Construction 2050
Road Upgrading (Gravel to Paved) Manaman-Ticulon-Lagumit-Little Baguio Road App. "A", Kinangan
Bridge, Malita Km. 1655+605-Km.1656+355
09/04/09 XI 14.465 120 C 0.430 0.133 0.000 - - - 56.30 *56.30% Poor
O.G. Santos Construction 2050Road Upgrading (Gravel to Concrete) Dipolog City Road-Aurora-Josefina
Section04/07/11 IX 18.584 218 C 0.440 0.133 0.300 - - - 87.30 88.68%
Satisfactory
O.G. Santos Construction 2050 Const. (Opening) of Tubalan-Pinalpalan-Alabel Road Nawan Sect. 03/31/11 XI 19.147 210 C 0.486 0.197 0.300 - - - 98.30 *98.30%
Outstanding
O.G. Santos Construction 2050 Const. of Sch. Bldg. (SCL) @ Don Juan Dela Cruz C/E/S, Toril District 03/29/11 XI 3.765 150 C 0.444 0.170 0.300 - - - 91.40 *91.40%
V. Satisfactory
O.G. Santos Construction 2050Const. (Opening) of Tubalan-Pinalpalan-Alabel Road Sitio
Malagsong Sect.03/31/11 XI 19.147 90 C 0.430 0.035 0.000 - - - 46.50 75.78%
Unsatisfactory
O.L De Leon Construction 16194 Const. of Plaridel Flood Control,
Brgy. Plaridel 06/10/10 V 1.911 90 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
O.L. De Leon Construction 16194 Const. of Multi-Purpose Building,
Brgy. Masalong 04/02/11 V 1.141 45 C 0.419 0.133 0.300 - - - 85.20 *85.20% Satisfactory
O.L. De Leon Construction 16194 Const. of Drainage System at Pob. 1,
2 & 3 04/03/11 V 5.725 150 O 0.356 0.225 0.150 0.030 0.035 0.033 82.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page291
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
O.R Sarmiento Construction 1411
Rehab. of Daang Maharlika Highway, Package I, Section 2 (Allen-Malaga Road Section) Km. 63+359.55-Km.
667+644.55
03/04/10 VIII 99.950 180 C 0.462 0.200 0.300 - - - 96.20 96.20% Outstanding
O.R Sarmiento Construction 1411
Rehab. of Daang Maharlika Highway Package I, Section 5 (Allen-Malaga Road Section) Km. 674+560.55-Km.
660+366.55 w/ exceptions
03/11/10 VIII 120.574 210 C 0.419 0.133 0.300 - - - 85.20 85.20% Satisfactory
O.R Sarmiento Construction 1411
Repair/Impvt./Asphalt Paving of Bugko-Nenita-San Jose Rd., Km.760+000 - Km.779+000 (Mondragon-Silvino Rd.)
06/16/10 VIII 192.823 385 O 0.387 0.300 0.150 0.030 0.042 0.050 95.90 -
O.R Sarmiento Construction 1411 Talibon Small Reservoir Irrigation
Project9/29/08 10/3/08 NIA 11.574 343 O 0.350 0.157 0.100 0.030 0.047 0.200 88.40 -
O.R Sarmiento Construction 1411 Conc. of Junction (TER), Jagna-
Sierra-Bullones Road 08/29/08 VII 81.102 300 O 0.337 0.223 0.000 0.030 0.059 0.100 74.90 -
O.R Sarmiento Construction 1411
Const./Impv't (Concrete Paving) of Concepcion, Danao-Buenavista-
Carmen Road03/05/09 VII 9.592 620 C 0.429 0.144 0.300 - - - 87.30 88.56%
Satisfactory
O.R. Sarmiento Construction 1411 Const. of San Isidro-Lope de Vega-
San Isidro Road, Package I 03/30/11 VIII 66.729 360 C 0.427 0.133 0.300 86.00 92.30% V. Satisfactory
Ocean Construction Services 32220 Conc. of Bambang-Kasibu-Quezon-
Solano Road, Tubo Sect. 04/15/11 II 9.645 210 C 0.427 0.133 0.300 - - - 86.00 87.14% Satisfactory
Ocean Construction Services 32220 Const. of Lamo High School, 2
Storey School Building, Lamo 03/04/10 II 0.645 60 C 0.405 0.133 0.300 - - - 83.80 83.80% Satisfactory
O'hara Construction & Aggregates 33173 Const. of Pinsao Proper, Farm-to-
Market Road 06/03/09 CAR 4.725 112 C 0.375 0.200 0.300 - - - 87.50 *87.50% Satisfactory
O'hara Construction & Aggregates 33173 Proposed One Storey Two Class
room 7x7 (modified) Mamuyod E/S 08/26/09 CAR 1.025 82 O 0.344 0.240 0.118 0.030 0.043 0.033 80.80 -
O'hara Construction & Aggregates 33173 Proposed One Storey Two Class
room 7x7 (modified) Mamuyod E/S 03/01/10 CAR 1.025 82 C 0.401 0.179 0.300 - - - 88.00 82.96% Satisfactory
O'hara Construction and Aggregates 33173
Proposed Two Storey Four Classroom Balakbak Elementary
School06/04/10 CAR 4.296 222 C 0.380 0.200 0.300 - - - 88.00 88.00%
Satisfactory
OIC Construction & Supply 23727 Rehab./Reconst. Of Talisay-Laurel-
Agoncillo Rd. Laurel-Agoncillo Sect. 08/17/10 IVA 21.224 133 C 0.467 0.134 0.300 - - - 90.10 88.18% Satisfactory
OIC Construction & Supply (Formerly: OIC
Construction)23727 Const. Repair/Rehab. of Roads and
Bridges, Bangin 04/08/11 IVA 0.300 45 C 0.423 0.200 0.300 - - - 92.30 *92.30% V. Satisfactory
OIC Construction & Supply (Formerly: OIC
Construction)23727 Rehab./Reconst. of Talisay-Laurel-
Agoncillo Rd., Laurel-Agoncillo Sect. 06/10/10 IVA 21.225 120 O 0.384 0.225 0.150 0.023 0.054 0.033 86.90 -
OIC Construction & Supply / Rich Ads
Construction & Supply JV
JV-09-165 Road Upgrading of Talisay-Laurel-Agoncillo Rd. 06/10/10 IVA 29.948 180 O 0.344 0.240 0.150 0.023 0.048 0.050 85.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page292
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
OIC Construction & Supply/ Rich Ads
Construction & Supply (JV)
JV-09-165 Road Upgrading of Talisay-Laurel-Agoncillo Rd., Laurel Agoncillo Rd. 08/17/10 IVA 29.946 180 O 0.386 0.256 0.150 0.030 0.033 0.033 88.80 -
Olin Development Engineering and
Construction26271 Concreting of Purok Repolyo Road,
Brgy. Golden Ribbon 06/10/09 XIII 0.911 45 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory
Omengan Construction and Development
Corporation5119 Road Upgrading of Mt. Province
Bdry. Calanan-Pinukpuk Abbut Rd. 04/04/11 CAR 39.676 348 C 0.466 0.133 0.300 - - - 89.90 *89.90% V. Satisfactory
Omengan Construction and Development
Corporation5119 Reconst./Road Impv't along Kabugao-
Pudtol-Luna Road 03/31/11 CAR 19.505 360 C 0.397 0.200 0.300 - - - 89.70 87.42% Satisfactory
Omengan Construction and Development
Corporation5119
Road Upgrading of Bulo Nat'l Road (Agbannawag-Bulo-Callagdao
Section)04/05/11 CAR 15.094 250 C 0.410 0.200 0.300 - - - 91.00 87.34%
Satisfactory
Omengan Construction and Development
Corporation5119
Road Upgrading (Gravel to Concrete) along Tabuk-Banaue via Tanudan-
Barlig Road04/05/11 CAR 89.419 416 O 0.280 0.300 0.150 0.030 0.043 0.033 83.60 -
Omengan Construction and Development
Corporation5119
Widening/Conc. of Mt. Data-Bontoc Rd., Aw-awigan, Mabaay to Capinitan
Section, Bauko and Sabangan, Km.356+968 - Km.364+100
04/11/11 CAR 109.774 553 C 0.423 0.200 0.300 - - - 92.30 83.45% Satisfactory
Omengan Construction and Development
Corporation5119
Impv't./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase III,
Dao Bridge-Cobaet Bridge05/28/09 CAR 48.191 300 C 0.352 0.200 0.300 - - - 85.20 88.56%
Satisfactory
Omengan Construction and Development
Corporation5119 Conc. along Kabugao-Pudtol-Luna
Road, Mataguisi Section 06/01/09 CAR 18.868 277 O 0.322 0.300 0.150 0.030 0.050 0.033 88.50 -
Omengan Construction and Development
Corporation5119
Improvement/Widening/Concreting of Bontoc-Tabuk-Tuguegarao Road, Phase 1, Cobaet Bridge-Gonogon
Bridge
03/03/09 CAR 47.239 300 C 0.436 0.200 0.300 - - - 93.60 *93.60% V.Satisfactory
Omengan Construction and Development
Corporation5119
Improvement/Widening/Concreting of Bontoc-Tabuk-Tuguegarao Road, Phase III, Dao Bridge-Cobaet Bridge
03/03/09 CAR 47.241 300 O 0.362 0.288 0.150 0.030 0.045 0.033 90.80 -
Omengan Construction and Development
Corporation5119
Impvt./Widening/Conc. Of Bontoc-Tabuk-Tuguegarao Road, Phase VI, Mamaga Bridge-Basao Bridge, Km.
03/04/09 CAR 83.149 365 O 0.376 0.300 0.150 0.030 0.045 0.033 93.40 -
Omengan Construction and Development
Corporation5119 Conc. along Kabugao-Pudtol-Luna
Road, Matuguise Section 09/05/09 CAR 18.868 277 O 0.365 0.240 0.150 0.030 0.056 0.033 87.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page293
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Omengan Construction and Development
Corporation5119
Widening / Conc. of Mt. Data-Bontoc Road Sabangan Bridge, Poblacion to Malitep Bridge Section Balili Section,
Km. 374+233-Km 380+227
08/28/09 CAR 91.443 430 O 0.361 0.240 0.053 0.023 0.042 0.017 73.60 -
Omengan Construction and Development
Corporation5119 Conc. along Kabugao-Pudtol-Luna
Road, Matuguise Section 02/18/10 CAR 19.104 307 C 0.433 0.133 0.300 - - - 86.60 87.41% Satisfactory
Omengan Construction and Development
Corporation5119
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase VI,
Mamaga Bridge-Basao Bridge, Km.420+970 to Km.429+940 with
exception
05/31/10 CAR 84.806 365 C 0.333 0.133 0.300 - - - 76.60 83.05% Satisfactory
Omengan Construction and Development
Corporation5119
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase VI, Mamaga Bridge-Basao Bridge, Km.
420+970-Km.429+940
11/20/08 CAR 83.149 365 O 0.331 0.240 0.100 0.030 0.045 0.067 81.30 -
Omicron Construction 9575Const./Repair/Rehab. of Slope Protection along Porac River,
Carmen Sect.03/29/11 III 14.345 90 C 0.324 0.200 0.300 - - - 82.40 *82.40%
Satisfactory
Omnicon Builders 22816
Road Upgrading (Gravel to Paved) of Jct. Mindoro West Coast Road (San
Isidro)-Penal Colony-Jct. Yapang Road, Brgy. Malisbong
04/08/11 IVB 9.650 117 C 0.488 0.200 0.300 - - - 98.80 82.03% Satisfactory
Omnicon Builders 22816Completion of 2-Storey, 2-CL
Academic School Building at Bacoor Poblacion E/S
03/01/10 IVA 0.701 42 C 0.398 0.200 0.300 - - - 89.80 89.80% V. Satisfactory
On Top Construction 32696
Restoration of Road Cuts along Gurel-Bokod-Kabayan-Buguias-
Abatan Road Km.352+250 - Km.352+266
06/05/10 CAR 1.020 23 C 0.339 0.200 0.300 - - - 83.90 83.90% Satisfactory
OP Reyes Builders & Supply 32271 Const. of Flood Control System in
Brgy. 2 02/24/10 IVA 0.490 45 C 0.390 0.200 0.300 - - - 89.00 89.00% Satisfactory
OP Reyes Builders & Supply 82271 Conc. of Brgy. Malaruhatan-Kapito-
Humalagan Rd., Malaruhatan Sect. 06/02/10 IVA 4.820 90 C 0.430 0.133 0.300 - - - 86.30 86.30% Satisfactory
OP Reyes Builders & Supply 32271
Restoration of Collapsed River Bank, Palico-Balayan-Batangas Rd.,
Dacanlao Bridge, KO 111-629, Brgy. Pantay
08/24/10 IVA 2.892 60 C 0.492 0.133 0.300 - - - 92.50 92.50% V. Satisfactory
Open Builders and Supply 33342
Const./Rehab./Replacement/Completion and Repair of Elem. & Secondary
S/B projects @ Cababto-an E/S05/29/09 VIII 0.511 120 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
Open Builders and Supply 33342
Const./Rehab./Replacement/Completion and Repair of Elem. & Secondary
S/B Projects, La Perla NHS, Rawis NHS Annex
05/29/09 VIII 0.511 120 C 0.398 0.133 0.300 - - - 83.10 *83.10% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page294
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Open Builders and Supply 33342
Repair/Rehab. of Cadat-Olan Bridge Approach A along Catarman (Bdry.)
Rawis Rd.03/04/09 VIII 0.603 60 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V.Satisfactory
OQC Construction 22690Rehab./Reconst./Upgrading of Daang Maharlika, KO0209+570 - KO211+610,
Tarlac Sect.04/14/11 II 19.296 120 C 0.446 0.179 0.300 - - - 92.50 *92.50%
V. Satisfactory
OQC Construction 22690 Addalam River Irrigation Project 04/27/09 05/01/09 NIA 2.827 178 O 0.358 0.240 0.150 0.023 0.038 0.033 84.23 -
Orani Builders and Supply 5349
Repair & Rehab. of Gapan San Fernando-Olongapo Rd. (Layac
Sect.)05/26/10 III 0.479 30 C 0.440 0.133 0.300 - - - 87.30 87.30%
Satisfactory
Orani Builders Supply 5349Repair & Rehab. of Jct.-Layac-
Balanga-Mariveles Port Rd. (Lalawigan & Tabing Ilog Sect.)
08/18/10 III 0.479 30 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
Orani Builders Supply 5349 Conc. of Angeles-Porac-Floridablanca-Dinalupihan Rd. 08/18/10 III 9.261 120 C 0.349 0.133 0.300 - - - 78.20 78.20%
Unsatisfactory
Orani Builders Supply 5349 Asphalt Overlay of Tabacan-Poblacion Road 05/20/09 III 16.268 120 O 0.400 0.200 0.150 0.023 0.025 0.050 84.80 -
Orani Builders Supply 5349 Widening of Gapan-San Fernando-Olongapo Road 05/20/09 III 28.516 120 O 0.350 0.209 0.150 0.030 0.040 0.050 82.90 -
Orani Builders Supply 5349 Concreting of Mabatang-Vicinal Road 05/20/09 III 7.643 120 O 0.314 0.233 0.150 0.030 0.037 0.050 81.40 -
Orani Builders Supply 5349 Asphalt Overlay of Tabacan-Poblacion Road 08/27/09 III 16.268 120 C 0.466 0.133 0.300 - - - 89.90 86.84%
Satisfactory
Orani Builders Supply 5349 Widening of Gapan-San Fernando-Olongapo Road 08/27/09 III 28.516 120 C 0.408 0.133 0.300 - - - 84.10 83.38%
Satisfactory
Orani Builders Supply 5349 Concreting of Mabatang-Vicinal Road 08/27/09 III 7.643 120 C 0.427 0.133 0.300 - - - 86.00 83.24%
Satisfactory
Orient Star Const./Lumel Glenn Const. (JV) JV-09-001
Completion of Mindoro Oriental/Occidental East Coastal Road, Nasucob-Campasaan Sect.
09/04/09 IVB 14.281 200 O 0.336 0.300 0.150 0.022 0.020 0.033 86.10 -
Orient Star Constn./BCT Trading & Constn., JV JV-09-067 Bulalacao Port Development Project -
Phase 2 (Ports & Harbor) 05/02-04/11 PPA 70.837 449 O 0.380 0.298 0.121 0.024 0.070 0.050 94.32 -
Orient Star Construction 7183 Conc. of CSR-ECR Bulalacao-Or./Occ. Boundary, Tulali Section 04/06/11 IVB 22.640 265 C 0.417 0.135 0.300 - - - 85.20 86.58%
Satisfactory
Orient Star Construction / BCT Trading &
Construction, JVJV-09-067
Const. of Bulalacao Port Development Project -Phase 2 (Ports
& Harbor)02/7-10/11 PPA 70.838 403 O 0.386 0.300 0.137 0.030 0.065 0.033 95.10 -
Orient Star Construction/ Lumel Glenn
Construction (JV)JV-09-252 Conc. of CSR-ECR Bulalacao-
Or./Occ. Boundary, Lambok Section 04/06/11 IVB 19.122 207 C 0.353 0.200 0.300 - - - 85.30 83.56% Satisfactory
Oriental Sales Center & Contractor/Pangasinan New Wilson Lumber &
Construction (JV)
JV-07-149 Const. of San Vicente-Pugo Bridge (Phase I) 08/27/09 I 24.107 365 C 0.451 0.200 0.300 - - - 95.10 88.02%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page295
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Orientech Construction & Development Corporation
8874 Construction of Multi-Purpose Bldg.(Phase II) 09/04/09 XIII 14.470 210 O 0.386 0.240 0.150 0.030 0.043 0.033 88.20 -
P & V Construction & Sales 6533
Rehab. and Imprvt. of Concrete Revetment Pinulot Creek, Brgy.
Pinulot08/27/09 III 0.511 60 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
P. B. Grey Construction 13383 Const. of MPB at Divine Mercy, Brgy. Guitnang Bayan I 08/16/10 IVA 1.720 45 C 0.454 0.194 0.300 - - - 94.80 94.80%
V. Satisfactory
P. L Sebastian Construction 1076 Rehab./Reconst./Upgrading of
Tagum-Panabo Circumferential Road 09/07/09 XI 96.181 200 O 0.389 0.241 0.150 0.030 0.051 0.050 91.10 -
P. Obial Construction 16784Completion of Multi-Purpose
Building in Mandaue City Central School
06/05/09 VII 2.352 111 C 0.500 0.149 0.300 - - - 94.90 *94.90% V. Satisfactory
P.B Grey Construction 13383 Rehab./Impvt. of Angono Diversion Road 03/12/09 IVA 9.602 180 C 0.461 0.133 0.300 - - - 89.40 82.98%
Satisfactory
P.B Grey Construction 13383 Riprapping of Teresa River, Brgy. Dalig 03/03/09 IVA 0.959 30 C 0.464 0.200 0.300 - - - 96.40 *96.40%
Outstanding
P.B Grey Construction 13383Repair of Two (2) Four (4) CL Sch. Bldg. @ Manggahan National High
School08/24/09 IVA 2.880 60 C 0.457 0.200 0.300 - - - 95.70 *95.70%
V. Satisfactory
P.B Grey Construction 13383 Riprapping of a portion of Teresa Rvier Brgy. Dalig 08/25/09 IVA 0.479 30 C 0.478 0.133 0.300 - - - 91.10 *91.10%
V. Satisfactory
P.B Grey Construction 13383 Riprapping of Teresa River, Brgy. Dalig 02/17/10 IVA 0.493 30 C 0.413 0.200 0.300 - - - 91.30 91.30%
V. Satisfactory
P.B Obial Construction 16784Rehab./Reconst. of Dipolog-
Sindangan-Liloy Road (Magsaysay Section)
03/11/10 IX 3.377 151 C 0.352 0.200 0.300 - - - 85.20 83.82% Satisfactory
P.B Obial Construction 16784 Conc. along Liloy, ZN-Ipil, ZS (Phase IV) Sta. 2000+260 - Sta. 2001+010 02/25/10 IX 14.335 130 O 0.306 0.287 0.150 0.020 0.028 0.033 82.40 -
P.B Obial Construction 16784Conc. along Liloy, ZN-Ipil, ZS Rd.
(Phase IV) Sta.2000+260 to Sta.2001+010
06/06/10 IX 14.335 130 C 0.397 0.133 0.300 - - - 83.00 84.95% Satisfactory
P.B Obial Construction 16784 Const. of MPB at Palomoc, Titay 06/06/10 IX 3.344 100 O 0.346 0.240 0.150 0.030 0.029 0.050 84.50 -
P.B Obial Construction 16784 Const. of MPB at Palomoc, Titay 09/07/10 IX 3.344 100 C 0.445 0.133 0.300 - - - 87.80 85.49% Satisfactory
P.B Obial Construction 16784 Rehab./Const. of Dipolog-Sindangan-Liloy Road Magsaysay Section 06/01/09 IX 3.292 90 O 0.394 0.240 0.085 0.030 0.047 0.033 82.90 -
P.B Obial Construction 16784 Const. of Flood Control and Drainage System, Brgy. Mabolo 09/16/09 VII 0.964 50 C 0.422 0.133 0.300 - - - 85.50 *85. 50%
Satisfactory
P.B Obial Construction 16784Const. of Line Canal with Cover,
Arlington Pond Ext., Sitio San Roque, Sambag II
03/08/10 VII 0.586 85 C 0.498 0.067 0.300 - - - 86.50 86. 50% Satisfactory
P.B. Grey Construction 13383 Impvt./Widening of Angono Diversion Road 04/15/11 IVA 9.602 180 C 0.433 0.200 0.300 - - - 93.30 88.62%
Satisfactory
P.B. Obial Construction 16784 Completion of MPB, Tayud Elementary School 04/10/11 VII 1.403 45 C 0.481 0.133 0.300 - - - 91.40 *91.40%
V. Satisfactory
P.B. Obial Construction 16784 Const. of Single-Span Two Lanes RCDG Bridge, Brgy. Budlaan 04/12/11 VII 3.723 225 O 0.363 0.300 0.143 0.030 0.046 0.017 89.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page296
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
P.B. Obial Construction 16784 Const./Repair/Impvt. of MPB at Brgy. Bulacao 04/14/11 VII 2.412 75 C 0.486 0.133 0.300 - - - 91.90 85.04%
Satisfactory
P.B. Obial Construction 16784 Const. of Single-Span Two Lanes RCDG Bridge, Brgy. Agsungot 04/13/11 VII 3.898 229 O 0.331 0.284 0.125 0.030 0.047 0.033 85.00 -
P.E.R.R.C Construction & Development Corp. 23869 Const. of Sch. Bldg. At Hapay Na
Mangga 03/12/09 IVA 6.222 178 C 0.384 0.200 0.300 - - - 88.40 *88.40% Satisfactory
P.J Cruz Construction and Trading (Formerly:
P.J. Cruz Const.)14223 Completion of Multi-Purpose
Building, Phase 15, Brgy. Gulod 03/09/09 NCR 1.632 90 C 0.406 0.200 0.300 - - - 8,554.70 *90.60% V.Satisfactory
P.J Cruz Construction and Trading (Formerly:
P.J. Cruz Const.)14223 Completion of School Bldg. at Rosa
Susano-Novaliches E/S 09/14/09 NCR 11.463 152 O 0.343 0.227 0.150 0.020 0.047 0.033 82.00 -
P.J San Pedro Construction and Supply 14994
Rehab./Reconst. of Damaged Paved National Roads at Davao-Cotabato
Old Rd.06/16/10 XI 12.257 113 O 0.377 0.240 0.150 0.030 0.047 0.033 87.70 -
P.J San Pedro Construction and Supply 14994
Rehab./Reconst. Of Damaged Paved National Roads at Davao-Cotabato
Old Rd.09/08/10 XI 12.259 113 C 0.356 0.200 0.300 - - - 85.60 86.86%
Satisfactory
P.J San Pedro Construction and Supply 14994 Completion of Multi Purpose
Gymnasium 07/08/09 DOST 10.426 226 O 0.383 0.300 0.050 0.030 0.047 0.067 87.70 -
P.J San Pedro Construction and Supply 14994 Concreting/Impvt. of Bayabas-Eden
Road 05/25/09 XI 7.477 150 C 0.440 0.200 0.300 - - - 94.00 *94.00% V.Satisfactory
P.J San Pedro Construction and Supply 14994 Construction of Multi-Purpose
Building @ Brgy. Bato 05/25/09 XI 2.265 180 C 0.454 0.200 0.300 - - - 95.40 91.26% V.Satisfactory
P.J San Pedro Construction and Supply 14996 Construction of Multi-Purpose
Building, Brgy. Bato 03/02/09 XI 2.265 180 O 0.334 0.300 0.150 0.030 0.038 0.033 88.50 -
P.J San Pedro Construction and Supply 14994 Impvt./ Rehab. of Fatima-Malabog
Road 09/16/09 XI 9.451 150 C 0.417 0.200 0.300 - - - 91.70 *91.70% V. Satisfactory
P.J. San Pedro Construction and Supply 14994 Road Upgrading @ Bayabas-Eden
Road, Toril District 03/28/11 XI 0.800 90 C 0.448 0.200 0.300 - - - 94.80 *94.80% V. Satisfactory
P.J. San Pedro Construction and Supply 14994 Road Upgrading along Bayabas-
Eden Road, Toril District 03/29/11 XI 8.504 180 O 0.314 0.300 0.150 0.030 0.033 0.050 87.70 -
P.J. San Pedro Construction and Supply 14994 Conc. of Roads @ Brgy. Mintal,
Tugbok District 03/28/11 XI 9.443 180 C 0.372 0.200 0.300 - - - 87.20 *87.20% Satisfactory
P.L Sebastian Construction 1076
CP-9: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road, (Manay-
Boston) Cateel-Boston Section03/04/10 XI 197.681 615 C 0.372 0.200 0.300 - - - 87.20 90.86%
V. Satisfactory
P.L Sebastian Construction 1076
CP-2: Impvt/Conc. of Kapalong-Talaingod-Valencia, Bukidnon Road,
Brgy. Tiburcia to Brgy. Sto. Niño Section
02/26/10 XI 227.343 600 C 0.364 0.200 0.300 - - - 86.40 89.96% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page297
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
P.L Sebastian Construction 1076
Asphalt Overlay (50mm thick) along Surigao-Davao Coastal Rd.,
Km.1786+000 to Km.1787+004 Restation to Km.1815+645.3 to
Km.1815+797.7
06/04/10 XI 4.792 45 C 0.500 0.133 0.300 - - - 93.30 93.30% V. Satisfactory
P.L Sebastian Construction 1076
Asphalt Overlay (50mm thick) of Surigao Davao Coastal Rd.,
Km.1812+000 to Km.1813+000 Restation to Km.1815+492.9 to
Km.1815+645.3
06/04/10 XI 4.792 45 C 0.500 0.133 0.300 - - - 93.30 93.30% V. Satisfactory
P.L Sebastian Construction 1076
Asphalt Overlay (50mm thick) Km.1793+000 to Km.1794+000 Restation to Km.1815+000 to
Km.1815+492.9 Surigao-Davao Coastal Rd.
06/04/10 XI 4.793 56 C 0.493 0.133 0.300 - - - 92.60 92.60% V. Satisfactory
P.L Sebastian Construction 1076
Impvt./Widening of Agusan-Davao Rd. (Daang Maharlika) Poblacion
Carmen and Poblacion Panabo Sect.06/02/10 XI 30.240 180 O 0.366 0.240 0.150 0.030 0.051 0.033 87.00 92.60%
V. Satisfactory
P.L Sebastian Construction 1076 Baobo River Irrigation Project 10/21-24/08 NIA 224.599 631 O 0.368 0.162 0.070 0.030 0.042 0.200 87.17 -
P.L Sebastian Construction 1076
CP9: Impvt./Conc. of Surigao del Sur-Davao Oriental Coastal Road, (Manay-
Boston) Cateel-Boston Section)11/25/08 XI 197.331 615 O 0.393 0.271 0.100 0.030 0.065 0.100 95.90 -
P.L Sebastian Construction 1076
Impvt./Conc. of Kapalong-Talaingod-Valencia, Bukidnon Road, Brgy. Tiburcia -Brgy. Sto. Nino Section
06/03/09 XI 226.942 600 O 0.373 0.300 0.150 0.030 0.047 0.050 95.00 -
P.L Sebastian Construction 1076
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay Boston) Cateel-Boston Section
06/09/09 XI 197.331 615 O 0.378 0.279 0.150 0.030 0.060 0.050 94.70 -
P.L Sebastian Construction 1076 Rehab./Recons/Upgrading of Carmen-
Dapecol Compound Road 06/01/09 XI 67.346 180 O 0.356 0.278 0.150 0.030 0.047 0.050 91.10 -
P.L Sebastian Construction 1076 Rehab./Recons/Upgrading of Tagum-
Panabo Circumferential Road 06/01/09 XI 96.181 200 O 0.400 0.197 0.120 0.030 0.042 0.033 82.20 -
P.L Sebastian Construction 1076
Impv't/Conc. of Kapalong-Talaingod-Valencia Bukidnon Road, Brgy. Tiburcia to Brgy. Sto. Nino Sect.
03/14/09 XI 226.943 600 O 0.375 0.300 0.150 0.030 0.060 0.050 96.50 -
P.L Sebastian Construction 1076
CP-9: Imprvt./ Concreting of Surigao-Davao Oriental Coastal Road, (Manay-
Boston) Cateel-Boston Section09/11/09 XI 197.331 615 O 0.374 0.300 0.150 0.030 0.054 0.050 95.80 -
P.L Sebastian Construction 1076 Rehab./Reconst./Upgrading of
Carmen-Dapecol Compound Road 09/07/09 XI 67.347 180 O 0.347 0.300 0.150 0.030 0.047 0.050 92.40 -
P.L. Sebastian Construction 1076
Impv't./Widening of Agusan-Davao Road (Daang Maharlika) Pob.
Carmen and Pob. Panabo Sect.04/11/11 XI 30.240 280 C 0.351 0.200 0.300 - - - 85.10 85.31%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page298
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
P.M McCrann Construction & Trading 28126 Repair/Impvt. of School Bldg. at
EPZA Rest. High School 06/01/10 III 0.400 30 C 0.439 0.133 0.300 - - - 87.20 87.20% Satisfactory
P.S Labasbas Construction 6302 Bunacan CIP 06/1-6/09 NIA 2.125 150 C 0.447 0.120 0.300 - - - 86.68 *86.68%
SatisfactoryP.S Labasbas Construction 6302 Bunacan CIP 06/1-6/09 NIA 0.840 150 C 0.441 0.120 0.300 - - - 86.05 *86.05%
SatisfactoryPablo S. Labasbas
Construction 6302 Const./Impv't. of Pagsangahan Barangay Road 02/23/10 IVB 0.250 52 C 0.334 0.200 0.300 - - - 83.40 83.40%
SatisfactoryPablo S. Labasbas
Construction 6302 Construction of Gandara-Matuguinao Road 06/02/09 VIII 24.120 240 C 0.350 0.133 0.300 - - - 78.30 82.38%
Satisfactory
Pablo S. Labasbas Construction 6302 Const. of 1-Unit, 2-CL S/B (7mx18m),
Homonhon NHS (Sulangan Annex) 06/08/09 VIII 1.431 95 C 0.394 0.133 0.000 - - - 52.70 -
Pablo S. Labasbas Construction 6302 Const. of 1-Unit, 1-CL SB (7m x 9m)
at Tabo Elementary School 03/08/10 VIII 0.522 125 C 0.389 0.133 0.300 - - - 82.20 82.20% Satisfactory
Pablo S. Labasbas Construction 6302 Const. of 1 Unit 2 CL Sch. Bldg.,
Guiuan National High School 03/17/09 VIII 1.068 95 C 0.423 0.200 0.300 - - - 92.30 *92.30% V. Satisfactory
Pablo S. Labasbas Construction 6302 Const. of 1 Unit 2 CL Sch. Bldg.,
Maypangdan National High School 03/16/09 VIII 1.069 101 C 0.420 0.200 0.300 - - - 92.00 *92.00% V. Satisfactory
Pablo S. Labasbas Construction 6302 Const. of Gandara-Matuguinao Road 03/10/09 VIII 24.121 240 O 0.351 0.240 0.150 0.030 0.047 0.033 85.10 -
Pacer Construction & Development Corporation
4839 Repair/Rehabilitation of Roadway, Brgy. 110 06/10/09 VIII 2.890 100 C 0.347 0.200 0.300 - - - 84.70 *84.70%
Satisfactory
Pacer Construction & Development Corporation
4839 Rehab./Impvt. of Cabungaan-Tabunok-Consuega Road 08/22/08 VIII 7.115 180 C 0.350 0.200 0.300 - - - 85.00 80.86%
V. Satisfactory
Pacific Concrete Products, Inc. 17150 Rehab. of Daang Maharlika Highway,
Package II, Km.704+124-Km.726+921 04/02/11 VIII 562.889 300 C 0.402 0.200 0.300 - - - 90.20 90.92% V. Satisfactory
Pacific Star Erectors 14224 Construction of DPWH Regional Office Building, Phase VI 08/24/09 II 9.648 145 C 0.481 0.133 0.300 - - - 91.40 92.45%
V. Satisfactory
Pacific Star Erectors 14224 Const. of District Engineer's Lounge and DPWH Canteen, Regional Center 02/21/10 II 5.940 75 C 0.456 0.200 0.300 - - - 95.60 95.60%
V. Satisfactory
Pacific Star Erectors 14224 Construction of Shalom E/S 06/01/09 CAR 0.459 90 C 0.486 0.147 0.300 - - - 93.30 *93.30% V. Satisfactory
Pacific Star Erectors 14224 Const. of Apayao State College MPB (Phase IV) 05/30/09 CAR 4.717 180 O 0.343 0.292 0.150 0.030 0.029 0.033 87.70 -
Pacific Star Erectors 14224 Const. of Apayao State Multi-Purpose Building 05/30/09 CAR 2.370 151 C 0.444 0.181 0.300 - - - 92.50 82.21%
Satisfactory
Pacific Star Erectors 14224 Construction of Apayao State College Multi-Purpose Building 02/28/09 CAR 2.324 150 O 0.391 0.300 0.150 0.030 0.045 0.033 94.90 -
Pacific Star Erectors 14224 Construction of Pudtol MPB (Gymnasium) Phase IV 02/27/09 CAR 6.613 210 O 0.327 0.300 0.150 0.022 0.041 0.033 87.30 -
Pacific Star Erectors 14224Constrution/Improvement of
Calanasan - Ilocos Norte Road, Parina Section
02/26/09 CAR 13.826 620 C 0.436 0.200 0.300 - - - 93.60 90.96% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page299
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Pacific Star Erectors 14224 Construction of DPWH Regional Office Building, Phase VI 05/19/09 II 9.647 145 O 0.365 0.300 0.150 0.030 0.051 0.033 92.90 -
Pacific Star Erectors/A. De Guia Construction
(J.V.)JV-08-295
Road Upgrading of Abbut-Conner-Kabugao Road (Gravel to Concrete)
II: Section Phase II08/20/10 CAR 11.274 325 C 0.453 0.083 0.300 - - - 83.60 83.60%
Satisfactory
Pacific Stars Erectors 14224 Const. of DPWH Regional Office Building (Phase VII) Region II 04/03/11 II 10.605 300 O 0.386 0.300 0.150 0.023 0.037 0.033 92.90 -
Pacific Stars Erectors 14224 Construction of Pudtol MPB (Gymnasium) 09/04/09 CAR 6.613 266 O 0.396 0.240 0.150 0.030 0.056 0.033 90.50 -
Pacific Stars Erectors 14225 Construction of Apayao State College MPB (Phase IV) 09/04/09 CAR 4.712 199 O 0.393 0.240 0.150 0.030 0.056 0.033 90.20 -
Pacific Stars Erectors 14224 Construction of Apayao State College MPB (Phase IV) 02/21/10 CAR 4.712 199 C 0.423 0.184 0.300 - - - 90.70 89.48%
V. Satisfactory
Pacific Stars Erectors 14224 Construction of Pudtol MPB (Gymnasium) 02/18/10 CAR 6.906 266 C 0.422 0.185 0.300 - - - 90.70 89.44%
V. Satisfactory
Pacific Stars Erectors 14224Road Upgrading (Gravel to Concrete) of Abbut-Conner-Kabugao Road, Ili
Section (Phase I)02/20/10 CAR 7.463 330 C 0.408 0.133 0.300 - - - 84.10 84.10%
Satisfactory
Pader Construction 20213 Completion of MPB at (Covered Court 4 Span) Barangay Ugalingan 08/26/10 XII 3.036 110 C 0.403 0.133 0.300 - - - 83.60 83.60%
Satisfactory
Pader Construction and Supply 20213 Const. of Multi-Purpose Building
(Covered Court) @ Brgy. Liliongan 09/03/09 XII 3.795 110 C 0.395 0.133 0.300 - - - 82.80 *82.80% Satisfactory
Pader Construction and Supply 20213 Const. of Multi-Purpose Building at
Brgy. Demapaco 02/26/10 XII 2.940 110 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory
Pader Construction and Supply 20213 Concrete Re-blocking along Davao-
Cotabato Road 02/27/10 XII 2.822 89 C 0.429 0.133 0.300 - - - 86.20 86.20% Satisfactory
Pader Construction and Supply 20213 Const. of Multi-Purpose Pavement @
Sitio Pandaten, Brgy. Kibayao 06/02/10 XII 0.329 30 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
Pader Construction and Supply 20213 Const. of MPB @ Brgy. Poblacion 2 06/03/10 XII 2.276 90 C 0.413 0.133 0.300 - - - 84.60 84.60%
SatisfactoryPader Construction and
Supply 20213 Const. of 2-CL SB at Eliseo ES Brgy. Nalin 05/28/09 R-XII 1.047 70 C 0.449 0.200 0.300 - - - 94.90 91.54%
V. SatisfactoryPader Construction and
Supply 20213 Construction of 2 CL SB at Eliseo E/S 03/04/09 XII 1.047 70 O 0.353 0.300 0.150 0.030 0.035 0.033 90.10 -
Pagadian Aggregates & Marketing 14886 Conc. of Kimaya-Solana By-Pass
Road 03/11/09 X 4.820 145 C 0.400 0.200 0.000 - - - 60.00 70.38% Poor
Pagadian Aggregates & Marketing 14886 Rehab. of Carmen-Patag-Bulua Road 03/02/09 X 9.410 143 C 0.395 0.133 0.300 - - - 82.80 83.58%
Satisfactory
Palmares General Merchandise 24657
Const. of One (1) Unit One (1) Unit CL Academic SIB @ Don J.
Buencamino MPS09/09/09 XII 0.551 75 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
Palmares General Merchandise 24657 Completion of MPB at Brgy. Allah 06/02/09 R-XII 0.288 40 C 0.442 0.200 0.300 - - - 94.20 *94.20%
V. SatisfactoryPalmares General
Merchandise 24657 Const. of Multi-Purpose Building, Brgy. Ilian 03/13/09 XII 0.962 110 C 0.401 0.200 0.300 - - - 90.10 *90.10%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page300
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Palmares General Merchandise 24657
Road Upgrading (Gravel to Concrete) along Isulan Hwy. Jct. Dukay-Bagumbayan (Gapok Section)
08/18/10 XII 14.146 115 C 0.458 0.200 0.300 - - - 95.80 95.80% V. Satisfactory
Panay East Coast Construction & Supply 26469
Const. of Jalaur-Suage River Irrigation System (Irrigation & Flood
Control)06/04/11 NIA 3.307 120 C 0.413 0.160 0.300 - - - 87.30 85.70%
Satisfactory
Panay East Coast Construction & Supply 26469 Const. of Multi-Purpose Bldg. at
Brgy. Lapayon 03/05/10 VI 0.384 60 C 0.323 0.200 0.300 - - - 82.30 82.30% Satisfactory
Panay East Coast Construction & Supply 26469 Impvt. of Drainage System, Brgy.
Poblacion (along Plaza) 03/05/10 VI 0.481 60 O 0.347 0.300 0.044 0.010 0.023 0.033 75.70 -
Panay East Coast Construction & Supply 26469 Impvt. of Drainage System, Brgy.
Poblacion (along Plaza) 06/18/10 VI 0.481 60 C 0.476 0.200 0.300 - - - 97.60 84.46% Satisfactory
Panay East Coast Construction & Supply 26469 Reblocking of Pototan-Bangga Polot-
An Road 03/18/09 VI 4.255 105 C 0.408 0.200 0.300 - - - 90.80 87.56% Satisfactory
Panay East Coast Construction & Supply 26469 Jalaur-Suage River Irrigation System 01/10-15/11 NIA 3.307 224 O 0.3890 0.2407 0.0792 0.0300 0.0573 0.0500 84.62 -
Panay East Construction Supply 26469
Road Upgrading (Gravel to Paved) of Demoloc-Little Baguio-Alabel Road,
Kilalag Sect.04/01/11 XI 5.738 210 C 0.340 0.200 0.300 - - - 84.00 *84.00%
Satisfactory
Pangasinan New Wilson Lumber & Construction 8313 Const. of Modern Medical Laboratory 04/11/11 I 1.925 45 C 0.479 0.133 0.300 - - - 91.20 *91.20%
V. Satisfactory
Pangasinan New Wilson Lumber & Construction 8313 Const. of Drainage System, Sto. Niño
St., Brgy. Poblacion 03/03/10 I 1.927 40 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory
Pangasinan New Wilson Lumber & Construction 8313 Const. of MPB at Tawin-Tawin E/S 06/09/10 I 0.337 30 C 0.475 0.117 0.300 - - - 89.20 89.20%
V. Satisfactory
Pangasinan New Wilson Lumber & Construction 8313 Const. of Drainage System,
Barangay Basing 06/08/10 I 4.784 60 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
Pangasinan New Wilson Lumber & Construction 8313 Conc. of FMR @ Brgy. Quezon 08/30/10 I 0.434 110 C 0.379 0.171 0.300 - - - 85.00 85.00%
Satisfactory
Partido Construction & Supply 20631 Conc. of Road Sitio Culasisi, Brgy.
Bagong Sirang-Brgy. Lipilip 08/30/10 V 14.113 360 C 0.354 0.200 0.300 - - - 85.40 85.40% Satisfactory
Partido Construction & Supply 20631
Impvt. of Junction Digdigon (GOA)-Tinambac Road, (Balaynan-Tierra
Nevada Sect.)05/31/09 V 21.358 150 O 0.303 0.300 0.150 0.030 0.055 0.050 88.80 -
Partido Construction & Supply 20631 Conc. of Bagong Silang Capalonga
Road, Katabangan Sect. 06/04/09 V 6.021 180 O 0.366 0.240 0.150 0.030 0.050 0.050 88.60 -
Partido Construction & Supply 20631 Completion of Gubat-Tinawagan-
Libod Road 03/10/09 V 9.361 120 C 0.455 0.133 0.300 - - - 88.80 84.18% Satisfactory
Partido Construction & Supply 20631 Conc.of Goa-Tinambac Road,
Payatan-Tupi-Tierra Nevaion 03/10/09 V 4.704 165 O 0.388 0.240 0.150 0.030 0.056 0.050 91.40 -
Partido Construction & Supply 20631 Construction of Multi-Purpose
Building Phase II 03/10/09 V 0.935 60 C 0.484 0.133 0.300 - - - 91.70 *91.70% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page301
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Partido Construction & Supply 20631 Repair/Rehab. of Scoured
Embankment along Daang Maharlika 03/13/09 V 9.350 180 C 0.499 0.133 0.300 - - - 93.20 *93.20% V. Satisfactory
Partido Construction & Supply 20631
Conc. of Goa-Tinambac Road (Payatan-Lupi-Tierra Nevada
Section) Km. 500+045-Km.503+994.5 w/ exceptions
09/09/09 V 4.704 165 C 0.415 0.200 0.300 - - - 91.50 91.44% V. Satisfactory
Partido Construction & Supply 20631
Impvt. of Jct. Digdigon (GOA)-Tinambac Road, (Balaynan-Tierra
Nevada Section)09/09/09 V 21.358 175 O 0.318 0.300 0.150 0.030 0.051 0.050 89.90 -
Partido Construction & Supply 20631
Concreting of Bagong Silang-Capalonga Road, Katabangan
Section09/12/09 V 6.441 180 C 0.394 0.200 0.300 - - - 89.40 88.92%
Satisfactory
Partido Construction & Supply 20631
Impvt. of Jct. Digdigon (GOA)-Tinambac Road, Balaynan-Tierra
Nevada Section)03/01/10 V 21.358 175 C 0.400 0.133 0.300 - - `- 83.30 86.93%
Satisfactory
Partido Construction and Supply 20631 Impv't./Conc. Of Lagonoy-
Presentacion Road 04/08/11 V 18.235 210 C 0.398 0.133 0.300 - - - 83.10 87.60% Satisfactory
Patrick Construction 27780Rehab./Reconst./Upgrading at Luec
Bridge Approaches, Dugo San Vicente Road (DSVR)
04/01/11 II 4.820 188 C 0.403 0.133 0.300 - - - 83.60 *83.60% Satisfactory
Patrila Builders, Inc. 26628 Upgrading/Conc. of Ajuy-Concepcion Rd. 03/04/10 VI 9.233 324 C 0.458 0.200 0.300 - - - 95.80 91.08%
V. Satisfactory
Patrila Builders, Inc. 26628 Upgrading/Concreting of Ajuy-Concepcion Road 06/09/09 VI 9.233 240 O 0.373 0.300 0.150 0.030 0.050 0.050 95.30 -
Patrila Builders, Inc. 26628 Upgrading/Conc. of Ajuy-Concepcion Road 03/17/09 VI 8.394 180 O 0.362 0.300 0.150 0.030 0.055 0.050 94.70 -
Patrila Builders, Inc. 26628 Concreting of Dueñas Diversion Road 09/09/09 VI 12.539 90 C 0.420 0.200 0.300 - - - 92.00 89.90%
V. Satisfactory
Patrila Builders, Inc. 26658 Upgrading/Conc. of Ajuy-Concepcion Road 09/08/09 VI 9.233 240 O 0.322 0.286 0.000 0.030 0.050 0.050 73.80 -
Patrila Builders, Inc. 26628 Rehabilitation of San Miguel-Sebaste Road 08/15/11 PPA 25.649 30 O 0.399 0.300 0.150 0.024 0.070 0.050 99.30 -
Patrilla Builders Inc. 26628 Rehabilitation of San Miguel-Sebaste Road (Road) 06/10/11 Guimaras 28.021 30 O 0.400 0.300 0.150 0.030 0.070 0.050 100.00 -
Paula Mae Buhong Construction 26128 Construction of Ujah E/S 08/31/09 CAR 0.511 60 C 0.437 0.132 0.300 - - - 86.90 *86.90%
Satisfactory
Paula Mae Buhong Construction 26128
Widening/Concreting of Banaue-Hungduan-Tinoc-Benguet Bdry. Rd.,
Hwang Section02/25/10 CAR 4.739 349 O 0.356 0.240 0.150 0.030 0.030 0.033 83.90 -
Paula Mae Buhong Construction 26128
Widening/Conc. of Banaue-Hungduan-Benguet Bdry. Road,
Hiwang Sect. 06/03/10 CAR 4.739 429 C 0.353 0.200 0.300 - - - 85.30 84.46%
Satisfactory
Paula Mae Buhong Construction 26128 Const. of Lagawe Police Station,
Phase II 08/25/10 CAR 0.974 123 C 0.455 0.170 0.300 - - - 92.50 92.50% V. Satisfactory
Paula Mae Buhong Construction 26128 Const. of Kiangan Public Market,
Phase IV 08/25/10 CAR 1.895 136 C 0.427 0.134 0.300 - - - 86.10 86.10% Satisfactory
Paula Mae Buhong Construction / Wilper Construction Inc. (JV)
JV-08-337 Const. of Lagawe Public Market (Phase I) 04/08/11 CAR 19.195 319 C 0.436 0.200 0.300 - - - 93.60 *93.60%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page302
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Paula Mae Buhong Construction/PBO Construction (JV)
JV-07-152 Widening/Conc. of Banaue-Bontoc Road (Halsema Highway) 03/06/09 CAR 48.192 300 C 0.444 0.200 0.300 - - - 94.40 84.68%
Satisfactory
PBO Construction 18403Road Upgrading of Rizal National
Road (Romualdez-Santor-Calaocan-San Pascual Sect.)
04/05/11 CAR 16.330 190 C 0.409 0.200 0.300 - - - 90.90 88.08% Satisfactory
PBO Construction 18403 Road Upgrading (Gravel to Concrete) along Balbalan-Pinukpuk 04/04/11 CAR 52.708 330 C 0.433 0.131 0.300 - - - 86.40 86.82%
Satisfactory
PBO Construction 18403Impv't./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV,
Lubuagan-Cagaluan Sect. 05/23/09 CAR 47.185 300 C 0.381 0.200 0.300 - - - 88.10 84.02%
Satisfactory
PBO Construction 18403
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV,
Km. 461+000-Km. 467+000, Lubuagan-Cagaluan Section
03/04/09 CAR 47.185 300 O 0.255 0.285 0.150 0.030 0.041 0.050 81.10 -
PBO Construction 18403
Repair/Rehab. of Romualdez-Santor-Calaocan-San Pascual Section, Babalag-Kinama-San Francisco
Section
03/02/09 CAR 9.537 181 C 0.406 0.133 0.300 - - - 83.90 78.02% Unsatisfactory
PBO Construction 18403Widening/Concreting of Mayoyao-
Aguinaldo Road, Km. 399+000 - Km. 419+000 (w/ exception)
03/06/09 CAR 68.468 420 O 0.296 0.136 0.150 0.022 0.032 0.017 65.30 -
PBO Construction 18403Widening/Concreting of Mayoyao-
Aguinaldo Road, Km. 399+000 - Km. 419+000 (w/ exception)
02/24/10 CAR 68.441 473 O 0.348 0.240 0.144 0.030 0.045 0.033 84.00 -
PBO Construction 18403
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV,
Km. 461+000-Km. 467+000, Lubuagan-Cagaluan Section
11/19/08 CAR 47.185 300 O 0.305 0.240 0.100 0.030 0.040 0.100 81.50 -
PBO Construction / Wilper Construction, Inc.
(JV)JV-08-177
Conc. of Bontoc-Tabuk-Tuguegarao Rd. (Package BLT-12) Tinglayan Bdry. Lubuagan-Tabuk Section II
Km.461+000 - Km.467+000 Dinacan-Cagaluan Sect.
04/04/11 CAR 131.937 547 C 0.420 0.195 0.300 - - - 91.50 82.59% Satisfactory
Pearly Construction 5953 Const. of Multi-Purpose Bldg. at Brgy. Calumangan 03/10/10 VI 0.953 70 C 0.413 0.186 0.300 - - - 89.90 89.90%
V. Satisfactory
Pearly Construction 5953 Const. of MPB, Brgy. Hall at Brgy. Napoles 08/27/10 VI 0.955 60 C 0.493 0.133 0.300 - - - 92.60 92.60%
V. Satisfactory
Pentagon Industrial Development &
Construction Company Incorporated
12796
Widening/Conc. of McArthur Highway (MNR), Meycauayan
(Bulacan) to Mabalacat (Pampanga), Ph-VI (Package 1), Bulacan 1st
Congressional District (Malolos & Calumpit Sect.)
04/13/11 III 108.849 210 C 0.412 0.199 0.300 - - - 91.10 86.78% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page303
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Pentagon Industrial Development &
Construction Company, Inc.
12796
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan to
Mabalacat, Pampanga, Phase IV, Package III, Malolos-Calumpit
Section
05/29/09 III 53.990 180 C 0.427 0.200 0.300 - - - 92.70 90.54%V. Satisfactory
Pentagon Industrial Development &
Construction Company, Incorporated
12796
Impvt./Widening of McArthur Highway (MNR)-Phase V,
Meycauayan (Bulacan) to Mabalacat (Pampanga)-(Meycauayan-Marilao
Section)-CP III
09/09/09 III 47.235 150 O 0.376 0.300 0.150 0.030 0.042 0.033 93.10 -
Persan Construction Inc. 2852
Const./Conc. of Sect. Of the Third Bulacan Circum. Rd. Network Daang Maharlika-DRT Via San Ildefonso Rd.
(San Ildefonso Sect.)
03/04/10 III 47.642 210 O 0.367 0.300 0.150 0.030 0.047 0.050 94.40 -
Persan Construction Inc. 2852
Const./Conc. Of Sects. Of the Third Bulacan Circum. Rd. Network CVR-San Miguel-DRT-Angat Gen. Alejo
Santos Highway (Akle to DRT Sect.)
03/04/10 III 47.642 210 O 0.338 0.296 0.150 0.030 0.042 0.050 90.60 -
Persan Construction Inc. 2852Repair and Rehab. of Cavite-
Batangas Road Km. 23+000-Km. 24+000 with exception
03/01/10 IVA 9.974 51 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory
Persan Construction Inc. 2852 Conc. and Const. of Slope Protection of Pintong Bukawe FMR 02/18/10 IVA 19.230 120 O 0.333 0.300 0.150 0.030 0.050 0.033 89.60 -
Persan Construction Inc. (Formerly: Persan
Construction)2852 Repair/Rehab./Reconst./Upgrading of
General Luna St. 08/18/10 NCR 15.360 145 C 0.329 0.133 0.300 - - - 76.20 88.68% Satisfactory
Persan Construction, Inc. 2852 Rehab. of Daang Maharlika 06/11/10 III 38.022 110 C 0.448 0.200 0.300 - - - 94.80 94.80% V. Satisfactory
Persan Construction, Inc. 2852
Const./Conc. of Sect. of the Third Bulacan Circumferential Rd. Network
CVR-San Miguel-DRT-Angat Gen. Santos Highway (Akle to DRT Sect.)
06/11/10 III 47.642 210 C 0.411 0.200 0.300 - - - 91.10 90.80% V. Satisfactory
Persan Construction, Inc. 2852
Const./Conc. of Sect. of the 3rd Bulacan Circumferential Rd. Network
Daang Maharlika-DRT via San Ildefonso Rd. (San Ildefonso Sect.)
06/11/10 III 47.642 210 C 0.337 0.200 0.300 - - - 83.70 90.12% V. Satisfactory
Persan Construction, Inc. 2852Impvt./Rehab. of Daang Maharlika Road, Bulacan 3rd Congressional
District06/04/09 III 77.094 150 O 0.364 0.300 0.150 0.030 0.050 0.050 94.40 -
Persan Construction, Inc. 2852 Rehabilitation of Sibul-Biak Na Bato Road 06/01/09 III 14.299 110 O 0.372 0.239 0.150 0.030 0.051 0.050 89.20 -
Persan Construction, Inc. 2852 CVR-Junction-San Miguel-DRT-Angat-Gen.Alejo Santos Highway 03/11/09 III 47.605 210 C 0.439 0.200 0.300 - - - 93.90 *93.90%
V.Satisfactory
Persan Construction, Inc. 2852Impvt. & Rehab. of Daang Maharlika
Road, San Rafael-San Ildefonso Section
03/12/09 III 95.473 120 C 0.446 0.200 0.300 - - - 94.60 93.34% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page304
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Persan Construction, Inc. 2852 Improvement of Pintong-Bukawe Road 08/24/09 IVA 19.232 180 O 0.341 0.285 0.150 0.030 0.043 0.050 89.90 -
Persan Construction, Inc. 2852 Widening of Carmona Bridge (Phase I) inc. approaches 03/03/10 IVA 60.454 529 O 0.393 0.300 0.150 0.030 0.050 0.033 95.60 -
Persan Construction, Inc. 2852 Rehab. of Farm-to-Market Road, Brgy. Pintong Bukawe 06/05/09 IV-A 18.711 150 C 0.458 0.066 0.300 - - - 82.40 87.80%
Satisfactory
Persan Construction, Inc. 2852 Rehab. of FMR, Brgy. Pintong Bukawe 03/14/09 IV-A 18.711 150 O 0.375 0.276 0.150 0.030 0.033 0.050 91.40 -
Persan Construction, Inc. 2852Impvt. And Rehab. of Daang
Maharlika Road, San Rafael-San Ildefonso Section
11/21/08 III 95.473 120 O 0.370 0.300 0.100 0.018 0.037 0.100 92.50 -
Persan Construction, Inc. 2852 Impv't/Conc. of Kapalong-Talaingod Road 03/14/09 XI 53.764 625 C 0.468 0.200 0.300 - - - 96.80 91.67%
V. Satisfactory
Persan Construction, Inc. 2852 Impvt./Rehab. of Daang Maharlika Road 09/08/09 III 77.099 150 O 0.362 0.300 0.150 0.030 0.051 0.033 92.60 -
Persan Construction, Inc. 2852 Rehab. of Sibul-Biak na Bato Road 09/08/09 III 14.299 110 C 0.477 0.133 0.300 - - - 91.00 89.92% V. Satisfactory
Persan Construction, Inc. (Formerly: Persan
Construction)2852 Conc. and Const. of Slope Protection
of Pintong Bukawe FMR 06/09/10 IVA 19.230 120 C 0.277 0.200 0.300 - - - 77.70 84.84% Satisfactory
Persan Construction, Inc. (Formerly: Persan
Construction)2852 Widening of Carmona Bridge (Phase
I) inc. Approaches 08/31/10 IVA 60.454 529 C 0.497 0.133 0.300 - - - 93.00 94.56% V. Satisfactory
Persan Construction, Inc. (Formerly: Persan
Construction)2852 Widening (Completion) of Carmona
Bridge & Approaches 08/31/10 IVA 34.503 150 O 0.364 0.201 0.150 0.030 0.055 0.033 83.30 -
Persan Construction, Inc. (Formerly: Persan
Construction)2852 Repair/Rehab./Reconst./Upgrading of
Gen. Luna St. 06/28/10 NCR 15.360 145 O 0.385 0.300 0.150 0.030 0.055 0.050 97.00 -
Persan Construction, Inc. / Ulticon Builders, Inc.
(JV) JV-07-108
Impv't/Conc. of Kapalong-Talaingod Bdry. Valencia Bukidnon Road, Sitio
Napisulan to Highway Bdry.03/14/09 XI 738.154 780 O 0.399 0.300 0.150 0.022 0.055 0.050 97.60 -
Persan Construction, Incorporated / HG III
Construction and Development
Corporation (JV)
JV-08-038Implementation of Civil Works for
Const. of CP 2, Pantabangan-Canili Road Sect.
04/11/11 PJHL 579.000 499 O 0.339 0.300 0.150 0.030 0.042 0.050 91.10 -
Persan Construction/Ulticon
Builders, Inc. (JV)JV-07-108
Impvt./Conc. of Kapalong-Talaingod-Valencia, Bukidnon Road (Sitio
Napisulan to Highway Boundary, Valencia Section)
06/03/09 XI 738.153 780 O 0.394 0.300 0.150 0.030 0.042 0.050 96.60 -
Peter G. Chua Builders 25367 Concreting/Improvement of France St., Brgy. Don Bosco 06/02/09 NCR 6.231 89 C 0.490 0.133 0.200 - - - 82.30 *92.30%
V. Satisfactory
Peter G. Chua Builders 25367 Const. of MPB, Sunvalley E/S, Brgy. Sun Valley 02/17/10 NCR 3.834 70 C 0.488 0.133 0.300 - - - 92.10 92.10%
V.Satisfactory
Peter G. Chua Builders 25367 Rehab./Reconst./Upgrading of Osmeña Highway (South Bound) 08/25/10 NCR 9.539 40 C 0.386 0.200 0.300 - - - 88.60 88.60%
Satisfactory
Peter G. Chua Builders 25367Rehab./Reconst./Upgrading of Epifanio delos Santos Avenue
(EDSA)08/25/10 NCR 9.539 40 C 0.378 0.200 0.300 - - - 87.80 87.80%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page305
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Petrina Construction & General Merchandise
(Formerly: Petrina Grocers Marketing)
29695 Const. of Multi-Purpose Bldg. Bantuanon 02/24/10 X 0.971 75 C 0.398 0.133 0.300 - - - 83.10 83.10%
Satisfactory
PGM Construction and Plumbing Services 9997 Proposed Renovation of Auditorium
and Multipurpose Hall (Phase I) 08/25/10 U.P Manila 1.060 90 C 0.445 0.20 0.30 - - - 94.50 94.50 V. Satisfactory
PGO Construction 15153Rehab./Reblocking along Bacolod Road North Victorias Section Km.
35+901.5-Km. 37+000 with exception05/26/09 VI 9.231 220 C 0.375 0.200 0.300 - - - 87.50 86.27%
Satisfactory
PGO Construction 15153Rehab./Reblocking of Deteriorated
Conc. Pavement along Bacolod North Road
03/10/09 VI 9.231 220 O 0.331 0.300 0.150 0.030 0.060 0.033 90.40 -
PGO Construction 15153
Conc. of Road along Jct. National Road-Sagay-Bato-Dian-ay-Marcelo-
Balea Jct., National Road, Minapasok Section
08/29/10 VI 9.783 85 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory
PGO Construction 15153Rehab./Reblocking of Deteriorated
Conc. Pavement along Bacolod North Road
11/24/08 VI 9.231 220 O 0.343 0.225 0.100 0.022 0.048 0.067 80.50 -
Phil Manna Construction & Supply 10320 Conc. of Haring Canaman-Calauag,
Naga City Rd. 08/28/10 V 4.728 120 C 0.412 0.200 0.300 - - - 91.20 91.20% V. Satisfactory
Phil Manna Construction & Supply 10320 Conc. of Caanonangan Rd. 08/28/10 V 2.865 90 C 0.379 0.200 0.300 - - - 87.90 87.90%
SatisfactoryPhilip Construction of
Oroquieta City 7071 Gravelling of Roads-Barangay Mangidkid 04/07/11 X 1.870 120 C 0.478 0.133 0.300 - - - 91.10 *91.10%
V. SatisfactoryPhilippine Chemsteel
Industries, Inc. 16965 Impvt./Rehab. along Alupaye-Bantigue Road, Bantigue Section 04/01/11 IVA 9.649 36 C 0.355 0.200 0.300 - - - 85.50 *85.50%
Satisfactory
Philippine Chemsteel Industries, Inc. 16965 Impvt. of Tayabas-Mainit Road, Km.
148+000-Km. 168+210 with exception 02/22/10 IVA 19.297 40 C 0.467 0.200 0.300 - - - 96.70 96.70% Outstanding
Philippine Chemsteel Industries, Inc. 16965
Impvt. of Tayabas-Mainit-Mauban Road, Km. 155+000-Km. 166+000
with exception02/22/10 IVA 14.297 40 C 0.467 0.200 0.300 - - - 96.70 96.70%
Outstanding
Philippine Chemsteel Industries, Inc. 16965
Rehab./Repair (with Traffic Safety Devices) along Famy-Real Road &
Lucena-Tayabas-Lucban Road, Km. 122+000-Km. 130+000 & Km. 140+000-
Km. 143+000, with exception
02/22/10 IVA 14.474 40 C 0.407 0.200 0.300 - - - 90.70 90.70% V. Satisfactory
Philippine Chemsteel Industries, Inc. 16965
Impvt. of Famy-Real-Infanta-Dalahican Port Road, Km. 093+000-
Km. 114+000, with exception02/23/10 IVA 19.297 40 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
Philippine Chemsteel Industries, Inc. 16965
Impvt. of Famy-Real-Infanta-Dalahican Port Road, Km. 114+000-
Km. 149+000, with exception02/23/10 IVA 9.645 30 C 0.383 0.200 0.300 - - - 88.30 88.30%
Satisfactory
Philippines Chemsteel Industries, Inc. 16965 Roads on Various Brgys. 03/13/09 IVA 3.927 150 C 0.492 0.133 0.300 - - - 92.50 *92.50%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page306
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Philworks Construction & Supply / MWJ
Construction (JV)JV-09-087 Road Opening/Const. of Albuera-
Burauen Road inc. Bridges 04/08/11 VIII 94.970 313 C 0.474 0.200 0.300 - - - 97.40 92.42% V. Satisfactory
Philworks Construction and Supply 32103
Quinali-Talisay, Const./Upgrading of Quinali Embankment/Revetment & Channel/Widening of Talisay River
and Diking
04/01/11 V 67.200 210 C 0.443 0.168 0.300 - - - 91.10 *91.10% V. Satisfactory
Philworks Construction and Supply 32103
Const./Completion of San Vicente-Gutan-Lubac-Nangaramuan-Pozo
Robo Rd.08/17/10 II 109.800 365 O 0.330 0.275 0.150 0.015 0.030 0.033 83.30 -
Philworks Construction and Supply 32103 Impv't. of Tambo-Poblacion Rd.
(Conc. of Tambo to Poblacion Rd.) 08/31/10 V 9.458 150 C 0.388 0.200 0.300 - - - 88.80 88.80% Satisfactory
Philworks Construction and Supply 32103 Const. of MTRCB Bldg., Timog
Avenue 08/16/10 NCR 19.201 60 C 0.418 0.133 0.300 - - - 85.10 85.10% Satisfactory
Philworks Construction and Supply 32103 Road Opening/Upgrading of Uson-
Tampuhan-Mambayawas, Awayan 06/01/09 V 9.458 134 C 0.375 0.200 0.300 - - - 87.50 88.46% Satisfactory
Philworks Construction and Supply 32103 Const. of Revetment along Libmanan
Public Market 03/03/10 V 9.458 120 C 0.438 0.133 0.300 - - - 87.10 87.10% Satisfactory
Philworks Construction and Supply / MWJ Construction (JV)
JV-09-087Road Opening/Const. of Burauen Rd.
including Bridges (Sta.987+169 - Sta.990+269.40
05/31/10 VIII 94.970 300 O 0.386 0.240 0.150 0.030 0.047 0.033 88.60 -
Phranaret Construction 16878 Widening / concreting along Banaue-Hungduan-Benguet Boundary Road 08/31/09 CAR 7.645 260 C 0.458 0.133 0.300 - - - 89.10 89.28%
V. Satisfactory
PIBS Trading & Construction 14734 Rehab. of DPWH - Lanao del Norte
DEO Bldg. & Emloyees' Quarteer 03/12/09 X 2.814 181 C 0.437 0.133 0.300 - - - 87.00 84.62% Satisfactory
PIBS Trading And Construction 14734
Const. Tamparan Port Development Project (Ports, Harbors & Offshore
Eng'g)06/28/11 DOTC 0.963 60 C 0.389 0.200 0.300 - - - 88.90 88.90%
Satisfactory
PIBS Trading And Construction 14734
Const. of Lanao Ports Cluster Development Project (Ports, Harbors
& Offshore Eng'g)06/29/11 DOTC 5.740 120 C 0.392 0.200 0.300 - - - 89.20 89.20%
V. Satisfactory
Pibs Trading and Construction 14734
Rehab./Impvt./Const. of DPWH Buildings, Lanao del Norte 1st DEO
Building & Employee's Quarter06/04/10 X 3.733 180 C 0.494 0.133 0.300 - - - 92.70 88.50%
Satisfactory
Pibs Trading and Construction 14734
Rehab./Reconst./Upgrading of Camague-Ceanuri-Tominobo Section-
Sta.1527+950 - Sta.1529+342 w/ exception
06/09/10 X 9.257 105 O 0.349 0.240 0.150 0.030 0.045 0.050 86.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page307
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Pibs Trading and Construction 14734
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Misamis Oriental-Ma. Cristina Bdry. Road, Camague-Ceanuri-
Tominobo Section, Sta. 1527+950 - Sta.1529+342 w/exception
08/28/10 X 9.257 105 C 0.450 0.200 0.300 - - - 95.00 89.84% V. Satisfactory
Pibs Trading and Construction 14734
Rehab./Reconst./Upgrading of Kiwalan Section, Sta. 15717+180-Sta.
1518+108 with exception06/04/09 X 9.114 90 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Pibs Trading and Construction 14734
Rehab./Impvt. of DPWH Bldg. Lanao del Norte 1st District Engineering
Office and Employees Quarter06/05/09 X 3.733 180 O 0.376 0.273 0.150 0.030 0.005 0.033 86.70 -
Pins Construction 13630Impv't./Rehab. of Bachelor of Arts Building, Josefina H. Cerilles State
College04/05/11 IX 4.600 180 O 0.390 0.240 0.150 0.015 0.038 0.033 86.60 -
Pins Construction 13630 Impvt. of MPB at JHC State College 04/06/11 IX 2.295 120 O 0.358 0.240 0.150 0.030 0.038 0.033 84.90 -
Pins Construction 13630 Const./Rehab./Repair of Multi-Purpose Building 06/03/09 IX 0.460 30 C 0.437 0.133 0.300 - - - 87.00 *87.00%
Satisfactory
Pins Construction 13630 Const. of Multi-Purpose Building, DepEd Division 09/02/09 X 0.937 85 C 0.304 0.200 0.300 - - - 80.40 82.22%
SatisfactoryPirra Construction
Enterprises 10545 Const. of ACA Bldg. I & Dormitory Bldg. 04/16/09 DOST 24.290 180 O 0.356 0.271 0.150 0.030 0.044 0.050 90.10 -
PJ Construction & Supply 32305 Impvt./Regravelling of Pulot Center
FMR 03/02/10 IVB 0.950 90 C 0.392 0.133 0.300 - - - 82.50 82.50% Satisfactory
PJ San Pedro Const. And Supply 14994 Completion of Multi-Purpose
Gymnasium 07/08/08 DOST 10.426 226 O 0.383 0.300 0.050 0.030 0.047 0.067 87.70 -
PJ San Pedro Construction andSupply 14994
Tiling Works and Exterior & Interior Painting of Central Administration
Building07/08/09 U.P. 5.768 195 O 0.366 0.165 0.100 0.030 0.044 0.100 80.50 -
PJ San Pedro Construction andSupply 14994
Tiling Works and Exterior & Interior Painting of Central Administration
Building07/08/09 U.P. 5.768 195 C 0.471 0.173 0.300 - - - 94.40 94.4%
V. Satisfactory
Plano Builders 16409Proposed Construction of the
College of Arts and Communication (CAC) Buildings
01/20-22/2010 UP - Baguio 19.500 240 C 0.408 0.115 0.300 - - - 82.30 82.30% Satisfactory
Plano Builders 16409 Rehabiltation of Shaded Walk and Construction of Guard Post 01/20-22/2010 UP - Baguio 0.760 30 C 0.455 0.133 0.300 - - - 88.80 88.80%
Satisfactory
PLD Construction 1859Opening/Conc. of Cebu-Toledo
Wharf Road, Linao-Talisay-Minglanilla
08/20/08 VII 18.693 160 O 0.281 0.217 0.100 0.023 0.022 0.100 74.30 -
PLD Construction 1859Const. of Main Building, Cebu State
College of Science & Tecnology (CSCST) Bitoon Campus
03/13/09 VII 19.084 160 O 0.366 0.300 0.150 0.030 0.057 0.050 95.30 -
PLD Construction 1859Const. of Main Bldg., Cebu State College of Scince & Technology
(CSCST), Bitoon Campus09/08/09 VII 19.083 239 C 0.479 0.200 0.300 - - - 97.90 86.84%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page308
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
PLD Construction 1859 Asphalting of Road leading to Sitio Inayagan & Mahayahay, Tuyom 09/11/09 VII 4.822 45 C 0.339 0.200 0.300 - - - 83.90 *83.90%
Satisfactory
PLD Construction 1859Impv't./Rehab. of Toledo-
Pinamungajan-Aloguinsan Road, Km. 59+840-Km. 63+000
08/27/10 VII 19.290 65 C 0.368 0.200 0.300 - - - 86.80 86.80% Satisfactory
Polymer-Vic Const. 6157 Asphalt Overlay of Bataan Technological Park Inc. Road 05/20/09 III 19.030 90 O 0.396 0.200 0.150 0.030 0.025 0.050 85.10 -
Polymer-vic Construction 6157 Asphalt Overlay of Bataan Technological Park Inc. Road 02/18/10 III 19.030 90 C 0.375 0.200 0.300 - - - 87.50 86.06%
Satisfactory
Polymer-vic Construction 6157 Rehab./Reconst./Upgrading of Hermosa-Poblacion Rd. 08/18/10 III 8.437 120 C 0.401 0.133 0.300 - - - 83.40 83.40%
Satisfactory
Polymer-vic Construction 6157Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo
Road (Phase I)02/24/09 III 4.794 30 C 0.440 0.200 0.300 - - - 94.00 92.14%
V.Satisfactory
Polymer-vic Construction 6157Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo
Road (Phase II)02/24/09 III 4.794 30 C 0.366 0.200 0.300 - - - 86.60 91.16%
V.Satisfactory
Pon Construction and Trading 33667 Impvt. of Pentor-Balsik River Control
(Daang Bago Section) 02/18/10 III 4.728 120 O 0.367 0.220 0.150 0.020 0.038 0.050 84.50 -
Pon Construction and Trading 33667 Impv't. of Pentor-Balsik River Control
(Daang Bago Section) 05/26/10 III 4.728 120 C 0.417 0.133 0.300 - - - 85.00 84.70% Satisfactory
Postema Construction & Development 15283 Riprapping of Mabulo River at Brgy.
Mabulo 09/09/09 IVA 0.381 60 C 0.429 0.200 0.300 - - - 92.90 *92.90% V. Satisfactory
PPG Construction Corp. 20457Const. of MPB at Cuenca (Const. of One Storey Municipal Agriculturist
Building)03/03/10 IVA 0.999 90 C 0.468 0.133 0.300 - - - 90.10 90.10%
V. Satisfactory
PPG Construction Corporation 20457 Const. of Multi-Purpose Building 05/20/09 IV-A 0.963 60 C 0.460 0.133 0.300 - - - 89.30 *89.30%
V. Satisfactory
PRB Builders 26274 Construction/Rehabilitation of Road at San Miguel 02/26/10 IVA 0.399 30 C 0.463 0.133 0.300 - - - 89.60 89.60%
V. Satisfactory
Precious Construction 32995Improvement of Farm-to-Market Road, Quinfermin-Bugbuga-San
Jose Road02/26/09 I 9.630 133 O 0.315 0.300 0.150 0.020 0.025 0.050 86.00 -
Presli Deles Construction 22694Const. of Two (2) Classroom School Bldg., Dulop NHS, Bag-ong Valencia
Extension03/06/10 IX 1.138 65 C 0.418 0.200 0.300 - - - 91.80 91.80%
V.Satisfactory
Prime Mate Builders 32687 Const. of 2-Storey, 4-CL Balili E/S (Phase I) 05/20/09 CAR 4.163 268 O 0.348 0.275 0.150 0.030 0.029 0.050 88.20 -
Prime Mate Builders 32687 Const. of 2-Storey, 4-CL Balili E/S (Phase I), Balili 03/01/10 CAR 4.163 268 C 0.478 0.133 0.300 - - - 91.10 89.07%
V. Satisfactory
Prime Mate Builders 32687 Const. of Kesbeng MPB, Pob. 06/07/10 CAR 0.241 75 C 0.369 0.200 0.300 - - - 86.90 86.90% Satisfactory
Prime Mate Builders 32687Restoration of Slope Protection
along Acop-Kapangan-Kibungan-Bakun Road, Km.266+000
06/05/10 CAR 1.927 60 C 0.333 0.200 0.300 - - - 83.30 83.30% Satisfactory
Prismodial Construction 28345 Const. of MPB at Brgy. Holy Spirit 04/07/11 NCR 2.863 120 O 0.377 0.240 0.150 0.030 0.035 0.033 86.50 -
Prismodial Construction 28345 Const. of MPB 04/04/11 IVA 3.853 60 C 0.440 0.153 0.300 - - - 89.30 *89.30% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page309
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Prismodial Construction Corp. 28345 Construction of 3-Storey, 15-
Classroom School Building pkg.1A 06/25/10 NHA 19.808 210 C 0.4171 0.2000 0.3000 - - - 91.71 76.75% Unsatisfactory
Prismodial Construction Corp. 28345 Construction of 3-Storey, 15-
Classroom School Building pkg.1B 12/08/09 NHA 18.111 150 O 0.308 0.300 0.000 0.030 0.045 0.000 68.30 68.30% Poor
Prismodial Construction Corp. 28345 Construction of 3-Storey, 15-
Classroom School Building 09/03/09 NHA 18.107 150 O 0.360 0.276 0.000 0.030 0.055 0.000 63.60 -
Prismodial Construction/ RCDG Construction
Corporation (JV)JV-09-082 Rehab. of Manlipac-Mayaposi
Section 09/01/10 VII 57.850 240 O 0.338 0.300 0.150 0.030 0.042 0.033 89.30 -
Progressive Design and Construction 11826 Const. and Completion of School
Building - Napo Elem. School 09/07/09 I 0.952 150 C 0.482 0.157 0.300 - - - 93.90 *93.90% V. Satisfactory
Progressive Design and Construction 11826 Const. of School Building at
Laoingen E/S 02/19/10 I 1.239 60 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
Progressive Design and Construction 11826 Const. of Classroom Magsingal NHS 05/29/10 I 0.985 60 C 0.412 0.133 0.300 - - - 84.50 84.50%
SatisfactoryProgressive Design and
Construction 11826 Cocreting of Farm-to-Market Road, Brgy. Parada-Brgy. Paras 02/28/09 I 0.951 27 C 0.408 0.133 0.300 - - - 84.10 *84.10%
SatisfactoryP-Square Contracting &
Services 17963 Conc. of FMR at Brgy. Dayapan 06/07/10 IVA 0.999 75 C 0.425 0.133 0.300 - - - 85.80 85.80% Satisfactory
Pulsar Construction 24422Road Upgrading (Gravel to Concrete)
of Abbut-Conner-Kabugao Road, Gassud Section
04/02/11 CAR 23.056 388 O 0.360 0.236 0.150 0.010 0.043 0.033 83.20 -
Pulsar Construction 24422Rehab./Reconst./Upgrading of Santiago-Tuguegarao Road,
Maddarulug Norte Sect.03/29/11 II 22.183 187 C 0.456 0.133 0.300 - - - 88.90 *88.90%
Satisfactory
Pulsar Construction 24422
Rehab./Reconst./Upgrading of Damaged Paved Roads Apayao Rd.,
Sampaguita-Solano Section, KO499+500-KO501+100
09/10/09 II 19.423 145 C 0.446 0.133 0.300 - - - 87.90 89.46% V. Satisfactory
Pulsar Construction 24422 Cagayan River Flood Control Project (Enrile Section) 02/21/10 II 22.193 210 O 0.350 0.300 0.150 0.030 0.057 0.050 93.70 -
Pulsar Construction 24422 Construction of River Control Project 02/15/10 II 4.822 75 O 0.338 0.300 0.150 0.030 0.056 0.050 92.40 -
Pulsar Construction 24422 Const. of Lucban Flood Control Project, Phase 2 02/17/10 II 6.754 238 C 0.426 0.133 0.300 - - - 85.90 85.90%
Satisfactory
Pulsar Construction 24422Repair/Rehab. of Revetment Flood
Control at Enrile Sect. along Cagayan River
05/28/10 II 14.998 180 O 0.366 0.300 0.150 0.030 0.061 0.033 94.00 -
Pulsar Construction 24422 Const. of River Control Project 05/28/10 II 4.822 107 C 0.417 0.200 0.300 - - - 91.70 92.12% V. Satisfactory
Pulsar Construction 24422 Cagayan River Flood Control 05/28/10 II 22.193 210 O 0.373 0.240 0.150 0.030 0.061 0.050 90.40 -
Pulsar Construction 24422Repair/Rehab of Revetment Flood
Control at Enrile Section along Cagayan River
08/19/10 II 14.958 180 C 0.393 0.200 0.300 - - - 89.30 92.12% V. Satisfactory
Pulsar Construction 24422 Cagayan River Flood Control 08/19/10 II 22.193 218 C 0.403 0.200 0.300 - - - 90.30 91.35% V. Satisfactory
Pulsar Construction 24422 Upgrading of Abbut-Conner-Kabugao Road 05/30/09 CAR 13.990 330 O 0.388 0.242 0.110 0.030 0.040 0.050 86.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page310
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Pulsar Construction 24422 Upgrading of Abbut-Corner-Kabungao Road 02/28/09 CAR 13.991 428 O 0.400 0.300 0.150 0.030 0.037 0.033 95.00 -
Pulsar Construction 24422 Upgrading of Abbut-Conner-Kabugao Road 09/05/09 CAR 13.991 428 O 0.382 0.240 0.046 0.030 0.056 0.017 77.10 -
Pulsar Construction 24422 Upgrading of Abbut-Conner-Kabugao Road 02/21/10 CAR 13.991 502 C 0.414 0.200 0.300 - - - 91.40 88.18%
Satisfactory
Pulsar Construction 24422Road Upgrading (Gravel to Concrete)
of Abbut-Conner-Kabugao Road, Mayogyog Section
02/21/10 CAR 17.997 377 O 0.357 0.240 0.150 0.030 0.050 0.033 86.00 -
Pulsar Construction 24422 Rehab. of Abbut-Conner Road, Hanhan Section 05/28/10 CAR 10.681 375 C 0.457 0.200 0.300 - - - 95.70 95.70%
V. Satisfactory
Pulsar Construction 24422Road Upgrading (Gravel to Concrete)
Abbut-Conner-Kabugao Road, Mayogyog Section
05/28/10 CAR 17.967 390 C 0.381 0.200 0.300 - - - 88.10 86.84% Satisfactory
Pulsar Construction 24422
Rehab./Reconst./Upgrading of Damaged Paved National Roads
Cagayan-Apayao Road, Sampaguita-Solano Section,
05/18/09 II 19.289 120 O 0.379 0.240 0.150 0.030 0.056 0.050 90.50 -
Pulsar Construction 24422 Concrete Paving along JLLGR, San Pedro Section 05/21/09 II 19.290 240 C 0.486 0.133 0.300 - - - 91.90 88.12%
Satisfactory
Pulsar Construction 24422 Concrete Paving along JLLGR, San Pedro Section 02/23/09 II 19.291 240 O 0.328 0.300 0.150 0.023 0.040 0.050 89.10 -
Pulsar Construction 24422 Addalam River Irrigation Project 04/27/09 05/01/09 NIA 7.952 227 O 0.330 0.259 0.150 0.023 0.038 0.033 83.30 -
Pyramid Consolidated Builders & Gen.
Merchandise15599 Conc./Repair of Road, Brgy.
Nazareth 03/29/11 X 4.721 120 C 0.441 0.133 0.300 - - - 87.40 *87.40% Satisfactory
Pyramid Consolidated Builders & Gen.
Merchandise15599 Const. of Drainage Canal, Taboc 04/13/11 X 0.988 105 C 0.400 0.133 0.300 - - - 83.30 *83.30%
Satisfactory
Pyramid Consolidated Builders & Gen.
Merchandise15599 Const. of Seawall, San Alonzo,
Balingoan 09/08/10 X 0.489 119 C 0.417 0.133 0.300 - - - 85.00 84.76% Satisfactory
Pyramid Consolidated Builders & Gen.
Merchandise15599
Const. of Two (2) Classroom Modified Standard (7.0m x 9.0m) School Building Mahayag NHS
06/04/09 IX 0.949 90 C 0.420 0.133 0.300 - - - 85.30 85.51% Satisfactory
Pyramid Consolidated Builders & Gen.
Merchandise15599 Const. of 2-Cl Modified Standard
School Buildin Mahayag NHS 03/12/09 IX 0.949 90 O 0.349 0.247 0.150 0.030 0.030 0.050 85.60 -
Pyramid Consolidated Builders & Gen.
Merchandise15599 Concreting of Roads, Brgy. Nazareth 05/25/09 X 1.869 90 C 0.447 0.146 0.300 - - - 89.30 *89.30%
V. Satisfactory
Pyramid Consolidated Builders & Gen.
Merchandise15599 Const. of Seawall, San Alonzo,
Balingoan 03/03/10 X 0.447 119 O 0.329 0.240 0.150 0.030 0.047 0.050 84.60 -
Pyramid Consolidated Builders & Gen.
Merchandise15599 Const. DPWH Misamis Oriental 2nd
DEO Bldg. 03/10/09 X 5.785 120 C 0.479 0.133 0.300 - - - 91.20 *91.20% V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page311
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
QM Builders 30743Repair/Rehab./Impvt. of Toledo-
Pinamungajan-Alog-Mantalongon Rd., Km.78+499 - Km.79+500
04/11/11 VII 14.346 105 C 0.433 - 0.500 - - - 93.30 *93.30% V. Satisfactory
QM Builders 30743 Upgrading of Cebu-Toledo Wharf Road 04/11/11 VII 28.750 230 C 0.451 0.162 0.300 - - - 91.30 89.56%
V. Satisfactory
QM Builders 30743 Const. of Revetment Wall at Tamogong River, Barangay II 04/05/11 VII 4.743 185 C 0.438 0.133 0.300 - - - 87.10 85.66%
Satisfactory
QM Builders 30743Rehab./Reconst./Upgrading of Santander-Barili-Toledo Rd.
(Dumanjug Section)04/08/11 VII 18.813 45 C 0.352 0.200 0.300 - - - 85.20 *85.20%
Satisfactory
QM Builders 30743 Road Upgrading (Gravel to Concrete), Cebu-Toledo Wharf Road 06/03/09 VII 19.308 40 C 0.489 0.195 0.300 - - - 98.40 *98.40%
Outstanding
QM Builders 30743Road Rehab./Reconst./Upgrading along Sibonga-Dumanjug Road,
Balagytiki Section05/29/09 VII 14.037 75 O 0.392 0.300 0.150 0.030 0.050 0.050 97.20 -
QM Builders 30743
Const. of Roadway Realignment /Widening of Cebu-Balamban-
Transcentral Road Km. 37+910-Km. 37+960, Sitio Kurus-Kurus
05/26/09 VII 9.524 120 O 0.400 - 0.200 0.050 0.071 0.250 97.10 -
QM Builders 30743 Rehab., Reconst. of Cebu-Toledo Wharf Road 06/01/09 VII 19.321 45 C 0.483 0.186 0.300 - - - 96.90 *96.90%
Outstanding
QM Builders 30743 Road Upgrading (Gravel to Paved) along Sibonga-Dumanjug Road 05/29/09 VII 18.718 75 O 0.377 0.300 0.150 0.030 0.050 0.050 95.70 -
QM Builders 30743Reconst. of Toledo-Pinamungahan-Aloguinsan-Mantalongon Road Km. 86+000-Km. 87+803.2, Barili Section
05/27/09 VII 19.071 140 C 0.455 0.200 0.300 - - - 95.50 *95.50% V. Satisfactory
QM Builders 30743 Imprv't.(Conc.) of Access Rd., Bais Port Access Rd. 09/12/09 VII 19.168 200 O 0.252 0.300 0.150 0.030 0.047 0.050 82.90 -
QM Builders 30743Rehab. of Natalio Bacalso Ave., Km. 48.852-Km.50.360 Carcar-Sibonga
Sect. (Phase II)03/10/10 VII 9.454 105 C 0.441 0.112 0.300 - - - 85.30 86.98%
Satisfactory
QM Builders 30743
Road Widening of Toledo-Pinamungajan-Mantalongon Rd.
Km.77+320 - Km.78+400, Aloguinsan Sect.
06/12/10 VII 16.338 120 O 0.400 0.300 0.150 0.030 0.037 0.033 95.00 -
QM Builders 30743Road Widening of Toledo-
Pinamungajan-Mantalongon Rd. Km.86+987.10 - Km.87+721.24
06/12/10 VII 13.554 120 O 0.348 0.297 0.150 0.030 0.035 0.033 89.30 -
QM Builders 30743 Rehab. of Simala-Lindogon Rd. 06/17/10 VII 1.923 140 C 0.389 0.180 0.300 - - - 86.90 86.90% Satisfactory
QM Builders 30743 Const. of Flood Control (Water Breaker, Seawall, Shore Protection) 03/03/09 VII 1.903 30 C 0.383 0.147 0.300 - - - 83.00 *83.00%
Satisfactory
QM Builders 30743Preventive Maint./Impv't. of Sibonga-
Dumanjug National Road Tubod-Dugo-an, Balagytiki Section
03/13/09 VII 9.979 30 C 0.374 0.200 0.300 - - - 87.40 *87.40% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page312
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
QM Builders 30743 Rehab./Reconstruction of Cebu-Toledo Wharf Road 03/16/09 VII 21.217 150 O 0.372 0.300 0.000 0.022 0.027 0.050 77.10 -
QM Builders 30743 Repair/Rehab. of Road at Perrelos 03/16/09 VII 1.841 60 C 0.438 0.200 0.300 - - - 93.80 *93.80% V. Satisfactory
QM Builders 30743
Const. of Roadway Realignment/Widening of Cebu-
Balamban-Transcentral Road (Km 37+910-Km 37+960, Sitio Kurus-
Kurus, Brgy. Bayong
09/04/09 VII 9.524 120 C 0.458 - 0.500 - - - 95.80 96.58% Outstanding
QM Builders 30743Rehab,/Reconst./Upgrading along
Sibonga-Dumanjug Road, Balagytiki Section
09/08/09 VII 14.038 75 C 0.458 0.191 0.300 - - - 94.90 96.28% Outstanding
QM Builders 30743 Road Upgrading (Gravel to Paved) along Sibonga-Dumanjug Road 09/08/09 VII 18.718 75 C 0.470 0.182 0.300 - - - 95.20 95.20%
V. Satisfactory
QM Builders 30743Repair/Rehab. of Brgy. Upper
Tunghaan to Sitio Maria Respondo FMR
09/10/09 VII 14.410 120 O 0.341 0.240 0.150 0.030 0.040 0.050 85.10 -
QM Builders 30743Repair/Rehab. of Brgy. Upper
Tunghaan to Sitio Maria Respondo FMR
03/10/10 VII 14.413 150 C 0.311 0.200 0.300 - - - 81.10 83.50% Satisfactory
QM Builders 30743 Rehab./Reconst. of Cebu-Toledo Wharf Road 03/10/10 VII 21.217 301 C 0.485 0.133 0.300 - - - 91.80 82.98%
Satisfactory
QM Builders 30743
Road Widening of Toledo-Pinamungajan-Aloguinsan-
Mantalongon Road, Km. 77+329 - Km. 78+400, Aloguinsan Section
08/27/10 VII 16.338 120 C 0.453 0.144 0.300 - - - 89.70 92.88% V. Satisfactory
QM Builders 30743Repair/Rehab. Of Natalio Bacalso Ave., Km. 45+700-Km.46+050 with
exception08/24/10 VII 7.472 30 C 0.405 0.200 0.300 - - - 90.50 90.50%
V. Satisfactory
QM Builders 30743Upgrading (Conc.) of Toledo-
Pinamungajan-Mantalongon Road, Km. 86+987.10-Km. 87+721-24
08/27/10 VII 13.554 150 C 0.363 0.200 0.300 - - - 86.30 88.10% Satisfactory
Quezon Victory General Contractor 6631 Const. of MPB 03/28/11 IVA 0.497 60 C 0.350 0.200 0.300 - - - 85.00 *85.00%
Satisfactory
Quezon Victory General Contractor 6631
Const. of Quezon Eco-Tourism Road (LUC-BATCR) inc. RROW Phase II -
Conc. of Sitio Duluhan Road03/31/11 IVA 17.711 178 C 0.304 0.200 0.300 - - - 80.40 83.97%
Satisfactory
Quezon Victory General Contractor 6631
Const. of Quezon Eco-Tourism Road (LUC-BATCR) inc. RROW Phase II - Conc. of Brgy. Manggalang Sect.
03/31/11 IVA 17.723 173 C 0.278 0.200 0.300 - - - 77.80 83.44% Satisfactory
Quezon Victory General Contractor 6631 Const. of MPB (Covered Court) @
Tayabas East Central School 02/22/10 IVA 2.412 40 C 0.435 0.200 0.300 - - - 93.50 93.50% V. Satisfactory
Quezon Victory General Contractor 6631 Rehab./Impv't. of San Pablo-Dolores
Rd., San Pablo Sect. 05/28/10 IVA 19.292 25 C 0.361 0.200 0.300 - - - 86.10 86.10% Satisfactory
Quezon Victory General Contractor 6631 Road Upgrading (Gravel to Paved)
MSR Jct.-Lopez-Hondagua Port Road 05/31/10 IVA 21.515 90 O 0.384 0.225 0.150 0.030 0.050 0.050 88.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page313
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Quezon Victory General Contractor 6631 Road Upgrading (Gravel to Paved)
MSR Jct. Lopez-Hondagua Port Rd. 08/26/10 IVA 21.515 120 C 0.464 0.133 0.300 - - - 89.70 89.22% V. Satisfactory
Quezon Victory General Contractor 6631 Const. of School Bldg. at Villa Padua
P/S, Gumaca East 08/26/10 IVA 0.492 30 C 0.436 0.133 0.300 - - - 86.90 86.90% Satisfactory
Quezon Victory General Contractor 6631 Const. of 1 CL School Building at
Brgy. Calwit E/S 08/25/09 IVA 0.524 90 C 0.483 0.133 0.300 - - - 91.60 *91.60% V. Satisfactory
Quezon Victory General Contractor 6631 Rehab./Reconst. of Gumaca-Pitogo-
Mulanay-San Narciso Road 08/24/09 IVA 14.474 120 C 0.397 0.200 0.300 - - - 89.70 88.56% Satisfactory
Quezon Victory General Contractor 6631 Rehab./Reconst.. of Tiaong - San
Antonio Road 08/27/09 IVA 9.590 139 C 0.392 0.200 0.300 - - - 89.20 88.42% Satisfactory
Quezon Victory General Contractor 6631
Const./Conc. of Candelaria By-Pass Road inc. RROW @ Brgy. Mangilag
Sur08/27/09 IVA 17.658 99 C 0.361 0.200 0.300 - - - 86.10 85.62%
Satisfactory
Quezon Victory General Contractor 6631
Installation of New Traffic Signs/Application Markings/Other Road Safety Devices & Lighting
Impvts. Along MSR, Daang Maharlika, Pagbilao Section
05/28/09 IV-A 4.997 30 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Quezon Victory General Contractor 6631 Rehab./Reconst. of Tiaong-San
Antonio Road 05/25/09 IV-A 9.590 139 O 0.384 0.240 0.150 0.030 0.025 0.050 87.90 -
Quezon Victory General Contractor 6631 Concreting of Gumaca-Pitogo-
Mulanay-San Narciso Road 05/26/09 IV-A 14.473 146 O 0.393 0.240 0.150 0.020 0.025 0.050 87.80 -
Quezon Victory General Contractor 6631
Const./Conc. of Candelaria-By-Pass Road inc. RROW at Brgy. Mangilag
Sur05/25/09 IV-A 17.658 99 O 0.358 0.240 0.150 0.030 0.025 0.050 85.30 -
Quirante Construction 32827 Construction of Multi-Purpose Building, Poblacion (Fence) 06/01/09 VII 0.464 120 C 0.426 0.198 0.300 - - - 92.40 86.31%
Satisfactory
Quirante Construction 32827 Construction of Multi-Purpose Building in Tabunoc (Fire Station) 06/01/09 VII 0.468 120 C 0.472 0.133 0.300 - - - 90.50 85.53%
Satisfactory
Quirante Construction 32827 Construction of Multi-Purpose Building, Poblacion (SWAT) 06/01/09 VII 0.922 120 C 0.454 0.133 0.300 - - - 88.70 84.71%
Satisfactory
Quirante Construction 32827 Const. of Ocaña Flood Control Structures 03/10/10 VII 4.760 60 C 0.390 0.133 0.300 - - - 82.30 85.42%
Satisfactory
Quirante Construction 32827 Const./Rehab. of Brgy. Ocaña, Sitio Lagang 06/17/10 VII 0.960 60 C 0.381 0.152 0.300 - - - 83.30 -
Quirante Construction 32827 Conc. of Brgy. Road at South Poblacion 08/24/10 VII 0.099 180 C 0.378 0.200 0.300 - - - 87.80 87.80%
Satisfactory
R C S Construction 12458Repair/Rehab. of One (1) Classroom School Building @ M.P. Cuaderno
Sr., ES, Brgy. Sibacan08/28/09 III 0.490 53 O 0.384 0.240 0.150 0.020 0.037 0.033 86.40 -
R C S Construction 12458 Rehab. of Flood Control Canal @ Brgy. Tenejero 02/19/10 III 0.747 28 C 0.466 0.163 0.300 - - - 92.90 92.90%
V. Satisfactory
R C S Construction 12458 Construction of Multi-Purpose Bldg. @ Mt. View ES Polaries 02/25/09 III 0.470 28 C 0.479 0.200 0.300 - - - 97.90 *97.90%
Outstanding
R C S Construction 12458 Rehabilitation of Drainage Facility at Brgy. Wakas 02/25/09 III 0.231 28 C 0.416 0.200 0.300 - - - 91.60 *91.60%
V.Satisfactory
R N V Construction 12570 Conc. of Parpagoha (Marigondon) Binoog Road 04/11/11 IVB 14.470 100 C 0.454 0.200 0.000 - - - 65.40 66.60%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page314
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R N V Construction 12570 Const./Imprv't of Brgy. Poblacion Line Canal-San Andres 02/22/10 IVB 1.466 100 O 0.274 0.300 0.150 0.030 0.048 0.033 83.50 -
R N V Construction 12570 Rehab./Impvt. of Romblon Engineering District Office 05/21/09 IV-B 4.692 146 C 0.442 0.200 0.300 - - - 94.20 88.25%
Satisfactory
R N V Construction 12570 Rehab./Impvt. of Romblon DEO 11/24/08 IV-B 4.693 146 O 0.355 0.240 0.100 0.030 0.032 0.100 85.70 -
R. Allosa Construction 12964
Repair of Various Roadslip along Calubian-San Isidro-Tabango-Villaba-
Palompon Road, Km. 1007+030, Km.1009+500, Km.1013+600,
Km.1026+080 & Km. 1027+751
08/28/10 VIII 3.078 90 C 0.390 0.133 0.300 - - - 82.30 82.30% Satisfactory
R. D Interior Jr. Const./Brostan Const.
Dev't (JV)JV-08-002 Pagadian Airport Development
Project 03/23/09 DOTC 174.361 360 O 0.377 0.300 0.150 0.030 0.056 0.050 96.30 -
R. D Policarpio Co., Inc. 4414 Tacloban Airport Development Project 10/08/09 DOTC 0.126 180 O 0.365 0.300 0.040 0.030 0.042 0.050 82.70 -
R. Semilla Construction and Marketing 9263 Const./Repair of Multi-Purpose
Pavement, Brgy Camaman-an 03/29/11 X 1.594 120 C 0.468 0.133 0.300 - - - 90.10 *90.10% V. Satisfactory
R. Semilla Construction and Marketing 9263 Impvt./Widening of Cainta-
Kaytickling-Atnipolo-Teresa Road 08/26/09 IVA 4.806 120 C 0.360 0.200 0.300 - - - 86.00 86.54% Satisfactory
R. Semilla Construction and Marketing 9263
Rehab./Impvt. of DPWH Davao del Sur 1st DEO inc. Employees
Quarters03/07/09 XI 7.700 24 C 0.476 0.200 0.300 - - - 97.60 92.07%
V. Satisfactory
R. V Construction 6110 Ozamis Airport Development Project 05/23/09 DOTC 4.793 120 C 0.466 0.200 0.300 - - - 96.60 96.60% Outstanding
R. V Construction 6110 San Antonio Airport Development Project 05/29/09 DOTC 4.755 90 C 0.452 0.200 0.300 - - - 95.20 95.20%
V. Satisfactory
R. V Construction 6110 San Antonio Airport Development Project 05/29/09 DOTC 2.880 60 C 0.435 0.200 0.300 - - - 93.50 93.50%
V. Satisfactory
R. V Construction 6110 San Antonio Airport Development Project 05/29/09 DOTC 4.702 90 C 0.427 0.200 0.300 - - - 92.70 92.70%
V. SatisfactoryR..V Rieta Trading & Gen.
Construction 28671 Const. of 2-Storey, 2-CL School Building @ Carmona NHS 09/08/09 IVA 2.397 95 C 0.476 0.091 0.300 - - - 86.70 *86.70%
SatisfactoryR.A Del Rosario
Construction 4636 Rehab./Reconst. of Dasmariñas-TMC-Naic Rd. (Intermittent Sect.) 06/02/10 IVA 33.775 185 O 0.378 0.300 0.101 0.030 0.040 0.033 88.20 -
R.A Del Rosario Construction 4636 Rehab./Reconst. (Concreting) of
Indang-Alfonso via Luksuhin Rd. 09/10/09 IVA 39.525 256 C 0.444 0.200 0.300 - - - 94.40 90.14% V. Satisfactory
R.A Del Rosario Construction 4636
Rehab./Reconst. of Damaged National Roads of Dasmariñas-TMC-
Naic Road (Intermittent Section)08/27/10 IVA 33.775 185 O 0.380 0.225 0.150 0.030 0.055 0.033 87.30 -
R.A Del Rosario Construction 4636 Const. of Multi-Purpose Building 06/04/09 IV-A 4.777 90 C 0.500 0.133 0.300 - - - 93.30 83.78%
SatisfactoryR.A Del Rosario
Construction 4636 Const. of MPB, Brgy. San Agustin III 11/10/08 IV-A 4.778 90 O 0.322 0.231 0.100 0.015 0.029 0.100 79.70 -
R.A Del Rosario Construction 4636
Rehab./Reconst. (Concreting) of Indang-Alfonso via
Luksuhin Rd.11/13/08 IV-A 39.525 210 O 0.325 0.300 0.100 0.020 0.028 0.100 87.30 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page315
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.A Ignacio Construction 29977 Asphalt Overlay along Surigao Wharf Road (50mm thk) Borromeo St. 06/07/10 XIII 3.854 60 C 0.406 0.133 0.300 - - - 83.90 83.90%
Satisfactory
R.A Pahati Gravel & Sand 22495 Rehab./Repair of Pangasinan-Tarlac Road, Km. 186+120-Km. 199+930 05/23/09 I 5.789 38 C 0.485 0.179 0.300 - - - 96.40 *96.40%
V.Satisfactory
R.A Pahati Gravel & Sand 224431Construction of Punta 2 Linear Park cum Ferry Terminal (Construction of
Ferry Terminal)02/08/11 PRRC 28.73 240 C 0.362 0.170 0.300 - - - 83.20 83.20%
Satisfactory
R.A Pahati Gravel and Sand 22495 Repair & Rehab. of Daang Maharlika
Rd., Km. 125+450-Km. 127+450 05/26/09 III 9.363 7 C 0.455 0.200 0.300 - - - 95.50 *95.50% V. Satisfactory
R.A Pahati Gravel and Sand 22495 Conc. of Oscar Villones St., Brgy.
Mahabang Parang 02/16/10 IVA 2.010 90 C 0.451 0.200 0.300 - - - 95.10 95.10% V. Satisfactory
R.A. Construction & General Merchandise 33060
Const. of River Bank Protection (Revetment) at Sitio Bacan, Brgy.
Guintubhan04/01/11 VI 9.404 240 C 0.413 0.133 0.300 - - - 84.60 *84.60%
Satisfactory
R.A. Del Rosario Construction 4636
Widening of Governor's Drive (Carmona-Dasmariñas-Trece
Martires City Road) Brgy. Bukal - Brgy. Langkaan
04/14/11 IVA 38.558 215 C 0.401 0.200 0.300 - - - 90.10 85.96% Satisfactory
R.A. Del Rosario Construction 4636
Rehab./Reconst. of Dasmariñas-Carmona Road inc. shoulder
(Intermittent Sect.)04/14/11 IVA 30.171 171 C 0.308 0.200 0.300 - - - 80.80 82.42%
Satisfactory
R.A. Pahati Gravel and Sand 22495 Conc./Impvt. of FMR, Sitio Bantug,
Brgy. Marawa 04/12/11 III 2.787 75 C 0.350 0.000 0.300 - - - 65.00 *65.00% Poor
R.A. Pahati Gravel and Sand 22495 Const. of Galintuja-Lublub-Abuyo
Road, Alfonso 04/15/11 II 19.290 166 C 0.434 0.133 0.300 - - - 86.70 87.30% Satisfactory
R.A.M Builders 10549
Const. of Quezon Eco-Tourism Road (LUC-BATCR incl. RROW, Phase I,
Guisguis, Talaan Section, Sitio Taiwanak
02/17/10 IVA 17.703 160 C 0.434 0.200 0.300 - - - 93.40 90.70% V. Satisfactory
R.A.M Builders 10549Const. (Road Opening) of Quezon Eco-Tourism Rd., inc. RROW, Sitio
Central-Castanas, Phase I05/24/10 IVA 16.178 150 C 0.454 0.137 0.300 - - - 89.10 89.10%
V. Satisfactory
R.A.M Builders 10549 Const. of Flood Control at Camatian River 05/27/10 IVA 4.823 40 C 0.409 0.140 0.300 - - - 84.90 84.90%
Satisfactory
R.A.M Builders 10549Rehab./Reconst./Upgrading at San
Juan-Candelaria-Bolboc Rd. KO 119+417 - KO 130+326 with exception
08/31/10 IVA 38.902 150 C 0.477 0.133 0.300 - - - 91.00 91.00% V. Satisfactory
R.A.M Builders 10549 Rehab./Impvt. of Lucena-Tayabas Road, Gulang-gulang Sect. 02/23/09 IVA 19.209 190 C 0.497 0.123 0.300 - - - 92.00 89.18%
V.Satisfactory
R.A.M Builders 10549 Rehab./Impvt. of MSR-Old Route 02/24/09 IVA 14.328 277 C 0.432 0.200 0.300 - - - 93.20 89.18% V.Satisfactory
R.A.M Builders 10549 Rehab./ Reconst. of MSR - Diversion Road 08/27/09 IVA 27.964 114 C 0.456 0.133 0.300 - - - 88.90 86.38%
Satisfactory
R.A.M Builders 10549
Const./Road Opening of Quezon Eco-Tourism Road (LUC-BATCR) inc. RROW Phase II, Brgy. Bignay II-
Manggalang Kiling
08/27/09 IVA 17.689 114 C 0.446 0.133 0.300 - - - 87.90 85.44% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page316
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.A.M Builders 10549 Rehab./Reconst. of MSR-Diversion Road 05/26/09 IV-A 27.964 114 O 0.352 0.240 0.150 0.030 0.025 0.050 84.70 -
R.A.M Builders 10549
Const. (Road Opening) of Quezon Eco-Tourism Road (LUCBATCR) inc.
RROW, Phase II, Brgy. Bignay II, Maggalang Kiling
05/25/09 IV-A 17.689 114 O 0.343 0.240 0.150 0.030 0.025 0.050 83.80 -
R.A.M Builders 10549
Const. of Quezon Eco-Tourism Road (LUC-BAT CR) incl. RROW: Phase I,
Guisguis-Talaan Sect., Conc. Of Guisguis Section
11/18/08 IV-A 17.780 206 O 0.337 0.300 0.100 0.030 0.037 0.100 90.40 -
R.A.M. Builders/ L.S. Abelar Const. (JV) JV-08-229
Impvt. of Quirino-Andaya Highway (Quezon Side/Camarines Sur/
Camarines Norte, Quirino Highway, Quezon) Brgy. Silang II-Sto. Nino-
San Diego (inc. Road slip) Guinayang & Tangkawayan Sect.
08/26/09 IVA 33.765 90 C 0.393 0.133 0.300 - - - 82.60 83.32% Satisfactory
R.A.M. Builders/L.S. Abelar Construction JV JV-08-229
Impvt. of Quirino-Andaya Highway, Quezon Side, Brgy. Silang II-Sto.
Niño-San Diego05/28/09 IV-A 33.765 90 O 0.333 0.240 0.150 0.030 0.035 0.050 83.80 -
R.B Candare Construction 8819 Const.of Sampaguita St., Jct. Capitol-
Bonbon Rd. at Brgy. Villakanangga 03/10/10 XIII 1.905 60 C 0.483 0.133 0.300 - - - 91.60 91.60% V.Satisfactory
R.B Candare Construction 8819 Construction of Multi-Purpose Bldg.
(Covered Court), Brgy. Imadejas 06/10/09 XIII 2.240 120 C 0.490 0.133 0.300 - - - 92.30 *92.30% V. Satisfactory
R.B Candare Construction 8819 Conc. and Gravelling of Brgy.
Camayahan-Basag Road 06/10/09 XIII 1.817 60 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory
R.B Ombao Construction 17042 Concreting of Street Canals, Brgy. A. Rivera 08/27/09 III 0.477 60 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
R.B Ombao Construction 17042 Rehab. of Multi-Purpose Building @ Brgy. Gen. Lim 08/28/09 III 0.228 24 C 0.413 0.133 0.300 - - - 84.60 *84.60%
Satisfactory
R.B Soriano Construction 22635 Re-Roofing and Water Proofing of the PSHS-MPG 04/15/10 DOST 5.984 90 C 0.499 0.20 0.30 - - - 99.90 99.90%
OutstandingR.B. Candare Construction 8819 Impv't./Rehab. of Brgy. Road, Brgy.
La Union 03/29/11 XIII 2.859 45 C 0.472 0.133 0.300 - - - 90.50 *90.50% V. Satisfactory
R.B. Candare Construction 8819 Const. of Public Market Barangay
Sto. Rosario 03/29/11 XIII 4.744 60 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory
R.B. Ombao Construction 17042 Const. of Road @ Brgy. Lucanin 04/02/11 III 0.486 34 C 0.328 0.200 0.300 - - - 82.80 *82.80% Satisfactory
R.B. Soriano Renovation of GAB 202, College of Arts & Sciences (Building) 02/16/11 UP 0.806 75 C 0.396 0.200 0.300 - - - 89.62 *89.62%
V. Satisfactory
R.B. Uriarte Construction 7518Rehab. of Bacolod South-
Kabankalan Road, Bacolod-Bago Sect., Km.18+237.80 Rotunda
03/30/11 VI 6.120 52 C 0.352 0.133 0.000 - - - 48.50 54.38% Poor
R.C Tagala Construction 11597Rehab./Impvt. of Jct. PPSR-
Apurawan Road, Km. 57+000-Km. 60+000 (intermittent section)
09/11/09 IVB 18.761 210 C 0.482 0.171 0.300 - - - 95.30 *95.30%V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page317
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.C Tagala Construction 11597
Road Upgrading (gravel to paved) Conc. of MOOECR (Calawag-
Caguray Br. And Talaba Section) KO 219+141- KO 221+141 to KO 224+456 -
KO 224+740
09/01/09 IVB 19.300 176 O 0.341 0.300 0.129 0.030 0.051 0.033 88.40 -
R.C Tagala Construction 11597Road Upgrading (gravel to paved)
Conc. of MOOECR KO 210+760 - KO 212+248
08/30/09 IVB 33.688 219 O 0.341 0.300 0.129 0.030 0.051 0.033 88.40 -
R.C Tagala Construction 11597
Road Upgrading (gravel to paved) MWCR, Sta. Cruz-Mamburao
(Mulawin-San Vicente Section) KO 383+519-KO 385+002.5
08/31/09 IVB 19.260 186 O 0.357 0.298 0.150 0.022 0.023 0.033 88.30 -
R.C Tagala Construction 11597Const./Completion of Macagua Bridge along Brookes Point-Rio
Tuba Road09/09/09 IVB 17.950 180 O 0.355 0.283 0.150 0.030 0.028 0.033 87.90 -
R.C Tagala Construction 11597Road Upgrading (gravel to paved)
Project, Concreting of MOOECR KO 210+760-KO 212+248
02/19/10 IVB 33.775 180 C 0.325 0.200 0.300 - - - 82.50 86.04% Satisfactory
R.C Tagala Construction 11597Const./Completion of Macagua
bridge along Brookes Point-Rio Tuba Road
03/02/10 IVB 17.950 180 C 0.446 0.133 0.300 - - - 87.90 85.59% Satisfactory
R.C Tagala Construction 11597
Road Upgrading (gravel to paved) Concreting of Calauag-Caguray
Bridge & Talaba Sect. KO219+900 - KO221+141 to KO224+456 -
KO224+740
02/19/10 IVB 19.300 245 C 0.349 0.200 0.300 - - - 84.90 85.26% Satisfactory
R.C Tagala Construction 11597Rehab./Reconst./Upgrading of
Dumaguete North Rd., Tapon Norte-Tandayag Rd. Sect.
09/12/09 VII 28.787 200 O 0.377 0.240 0.150 0.030 0.037 0.033 86.70 -
R.C Tagala Construction 11597Rehab./Reconst./Upgrading of
Dumaguete North Rd.,CAB-Sta. Cruz Sec.
09/12/09 VII 28.796 200 O 0.350 0.240 0.150 0.030 0.037 0.033 84.00 -
R.C Tagala Construction 11597
Rehab./Reconst./Upgrading of Damaged National Roads HDM-4,
Dumaguete North Road Tapon Norte-Tandayag Road Section
03/02/10 VII 28.800 250 C 0.357 0.200 0.300 - - - 85.70 85.34% Satisfactory
R.C Tagala Construction 11597Rehab./Reconst./Upgrading of
Dumaguete North Road, CAB-Sta. Cruz Road Section
03/02/10 VII 28.800 255 C 0.336 0.200 0.300 - - - 83.60 84.71% Satisfactory
R.C Tagala Construction 11597Road Upgrading (Gravel to Paved)
MWCR, Sta. Cruz-Mamburao (Mulawin-San Vicente Section)
05/30/09 IV-B 19.205 140 O 0.331 0.239 0.123 0.030 0.030 0.050 80.30 -
R.C Tagala Construction 11597Const./Completion of Macagua
Bridge aling Brooke's Point-Rio Tuba Road
06/02/09 IV-B 17.950 180 O 0.337 0.222 0.150 0.023 0.020 0.050 80.20 -
R.C Tagala Construction 11597 Const. of Abra de Ilog-Puerto Galera Rd. (Occ/Or. Mindoro Bdry) 02/28/09 IV-B 19.108 120 C 0.475 0.191 0.300 - - - 96.60 *96.60%
Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page318
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.C Tagala Construction 11597 Impvt. of Quezon-Punta Baja Road 03/03/09 IV-B 18.950 252 C 0.378 0.133 0.300 - - - 81.10 80.65% Unsatisfactory
R.C Tagala Construction 11597 Repair/Rehab. of Dumaguete North Road, Km. 15.090-Km. 17.0775 05/26/09 VII 20.194 105 O 0.361 0.240 0.000 0.030 0.051 0.033 71.50 -
R.C Tagala Construction 11597 Repair/Rehab. of Dumaguete North Road, Km. 15.090-Km. 17.0775 03/02/10 VII 20.194 151 C 0.479 0.200 0.300 - - - 97.90 82.06%
Satisfactory
R.C. Tagala Construction 11597 Conc. of Quezon-Punta Baja Road 03/29/11 IVB 76.993 394 O 0.334 0.289 0.111 0.030 0.050 0.033 84.70 -
R.C. Tagala Construction 11597 Conc. of Poras FMR 04/15/11 IVB 0.400 185 C 0.336 0.200 0.300 - - - 83.60 *83.60% Satisfactory
R.C. Tagala Construction 11597 Conc. of Lupac FMR 04/15/11 IVB 0.399 185 C 0.341 0.190 0.300 - - - 83.10 83.10% Satisfactory
R.C. Tagala Construction 11597Rehab. of Tabla-Sta. Cruz Sect.,
Tanjay, Dumaguete North Rd., Km. 35.183 - Km. 36.183
04/05/11 VII 19.200 240 O 0.343 0.300 0.150 0.030 0.050 0.050 92.30 -
R.D Cobacha Construction 8878
Rehab./Const./Upgrading of Damaged Pavement Calanipawan
Road06/10/09 VIII 4.820 120 C 0.395 0.133 0.300 - - - 82.80 *82.80%
Satisfactory
R.D Interior Jr. Const./Brostan Const.
Dev't. (JV)JV-08-002 Pagadian Airport Development
Project 09/04/09 DOTC 0.174 360 C 0.400 0.195 0.300 - - - 89.50 89.50% V. Satisfactory
R.D Interior Junior Construction 6483 Upgrading/Improvement of Magapit-
Mission Road 09/09/09 II 96.491 330 O 0.360 0.300 0.150 0.030 0.042 0.050 93.20 -
R.D Interior Junior Construction 6482 Improvement of Access Road,
Bagabag Airport 08/28/09 II 35.416 89 C 0.476 0.133 0.300 - - - 90.90 90.42% V. Satisfactory
R.D Interior Junior Construction 6483 Upgrading/Impvt. of Magapit-Mission
Road 02/19/10 II 96.491 330 C 0.422 0.133 0.300 - - - 85.50 89.44% V. Satisfactory
R.D Interior Junior Construction 6483
Impvt./Rehab. of Daang Maharlika, Km. 338+400-Km. 341+200 w/
exception03/01/10 II 9.618 45 C 0.425 0.133 0.300 - - - 85.80 85.80%
Satisfactory
R.D Interior Junior Construction 6483 Road Upgrading (Gravel to Paved) of
Lala-Salvador-Tubod Road 06/03/10 X 19.138 121 O 0.363 0.240 0.150 0.030 0.045 0.033 86.10 -
R.D Interior Junior Construction 6483
Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies,
Lala-Salvador-Tubod Road08/27/10 X 19.138 121 C 0.429 0.138 0.300 - - - 86.70 86.34%
Satisfactory
R.D Interior Junior Construction 6483
Impv't./Conc. of Bislig-Manay Rd. (Boston-Bislig Section) with Monkag
& San Vicente Bridge03/05/10 XIII 289.498 710 C 0.434 0.200 0.300 - - - 93.40 91.58%
V.Satisfactory
R.D Interior Junior Construction 6483
Conc. of Surigao-Davao Coastal Road, Hinatuan-Bislig-Lingig Sub-
Section with Two (2) Bridges & One (1) RCBC
06/11/10 XIII 259.779 479 C 0.437 0.200 0.300 - - - 93.70 90.34% V. Satisfactory
R.D Interior Junior Construction 6483
Rehab./Impvt. along SDCR: Bislig-Manay Sect. (Hinatuan-Bislig-Lingig
Section)09/03/10 XIII 96.500 345 O 0.364 0.240 0.150 0.030 0.055 0.033 87.20 -
R.D Interior Junior Construction 6483 Rehab./Reconst. of Daang Maharlika,
KO 313+000 - KO 314+000 05/27/09 II 15.434 115 C 0.493 0.133 0.300 - - - 92.60 *92.60% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page319
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.D Interior Junior Construction 6483
Upgrading/Improvement of Magapit-Mission Road, Lal-lo and Sta.
Teresita05/19/09 II 96.491 330 O 0.385 0.240 0.150 0.030 0.056 0.050 91.10 -
R.D Interior Junior Construction 6483 Improvement of Access Road,
Bagabag Airport 06/01/09 II 35.416 74 O 0.375 0.240 0.150 0.030 0.056 0.050 90.10 -
R.D Interior Junior Construction 6483
Conc. of SDCR, Marihatag-Hinatuan-Bislig Section, (Tagbina-Hinatuan
Subsection)11/27/08 XIII 282.908 345 O 0.331 0.300 0.100 0.030 0.050 0.100 91.10 -
R.D Interior Junior Construction 6483
Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkag &
San Vicente Bridge)11/27/08 XIII 289.168 570 O 0.342 0.300 0.100 0.030 0.055 0.100 92.70 -
R.D Interior Junior Construction 6483
Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Section with Monkag
& San Vicente Bridge)06/06/09 XIII 289.168 570 O 0.374 0.300 0.106 0.030 0.056 0.050 91.60 -
R.D Interior Junior Construction 6483
Concreting of Surigao-Davao Coastal Road, Marihatag-Hinatuan Bislig
Section (Tagbina-Hinatuan Subsection)
06/06/09 XIII 232.908 345 O 0.381 0.300 0.055 0.030 0.061 0.050 87.70 -
R.D Interior Junior Construction 6483
Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkag &
San Vicente Bridge)03/14/09 XIII 289.168 570 O 0.370 0.300 0.106 0.030 0.061 0.033 90.00 -
R.D Interior Junior Construction 6483
Conc. of Surigao-Davao Coastal Rd./ Hinatuan-Bislig-Lingig Subsection,
w/ 2 Bridges & 1 RCBC09/10/09 XIII 259.760 420 O 0.388 0.300 0.083 0.030 0.060 0.033 89.40 -
R.D Interior Junior Construction 6483
Conc. of Surigao-Davao Coastal Rd., Marihatag-Hinatuan-Bislig
Sect.,(Tagbina-Hinatuan Subsection)09/18/09 XIII 232.908 375 O 0.371 0.300 0.027 0.030 0.060 0.033 82.10 -
R.D Policarpio Inc 4414
Tacloban Airport Development Project (Continuation of Asphalt
Overlay of Runway and Construction of Shore Protection with Shoulder
Grade Correction)
01/27/11 DOTC 405.044 330 O 0.348 0.300 0.150 0.030 0.042 0.050 92.00 -
R.D Policarpio Inc. 4414
Impv't./Widening/Conc. of MNR Phase V - Meycauayan, Bulacan to
Mabalacat, Pampanga, Replacement of Del Pilar Bridge and Approaches
09/02/10 III 74.184 240 C 0.427 0.167 0.300 - - - 89.40 88.68% Satisfactory
R.D Policarpio Inc. 4414
CP-6: Impvt./Conc. of Surigao del Sur-Davao Oriental Coastal Road, (Manay-Boston) Baganga Section,
Phase I
03/04/10 XI 157.076 522 C 0.372 0.200 0.300 - - - 87.20 88.00% Satisfactory
R.D Policarpio Inc. 4414 Tacloban Airport Development Project 12/12/09 DOTC 0.126 180 O 0.390 0.300 0.150 0.030 0.042 0.050 96.20 -
R.D Policarpio Inc. 4414
Impvt. (Widening/Conc. of McArthur Highway (MNR) Meycauayan
(Bulacan) to Mabalacat (Pampanga) Ph-IV Package VII, Replacement of
Tinajero Bridge & App.
03/11/09 III 45.805 180 C 0.460 0.200 0.300 - - - 96.00 92.64%V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page320
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.D Policarpio Inc. 4414
Impvt./Widening of McArthur Highway (Manila North Road) Phase
V Meycauayan Bulacan) to Mabalacat (Pampanga), (City of San Fernando
Section Contract Package II)
08/28/09 III 48.066 160 O 0.354 0.300 0.150 0.030 0.050 0.050 93.40 -
R.D Policarpio Inc. 4414
Impv./Widening/Conc. of MNR-Phase V-Meycuayan, Bulacan to Mabalacat, Pampanga-Replacement of Del Pilar
Bridge and Approaches
08/28/09 III 68.686 210 O 0.362 0.240 0.150 0.030 0.050 0.050 88.20 -
R.D Policarpio Inc. 4414Impvt. (Widening/Conc. of McArthur
Highway (MNR) Meycauayan (Bulacan) to Mabalacat (Pampanga)
11/11/08 III 45.805 180 O 0.373 0.240 0.100 0.030 0.061 0.100 90.40 -
R.D Policarpio Inc. 4414CP 6: Impvt./Conc. of Surigao Sur-
Davao Oriental Coastal Road (Manay-Boston) Baganga Section Phase I
11/25/08 XI 157.077 492 O 0.339 0.240 0.100 0.030 0.055 0.100 86.40 -
R.D Policarpio Inc. 4414Impvt./Conc. of Surigao Sur-Davao
Oriental Coastal Road (Manay-Boston) Baganga Section, Phase I
06/09/09 XI 157.077 492 O 0.371 0.254 0.150 0.030 0.056 0.033 89.40 -
R.D Policarpio Inc. 4414
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road, (Manay-
Boston) Baganga Section Phase I, CP No. 6
09/11/09 XI 157.076 522 O 0.365 0.300 0.150 0.030 0.056 0.033 93.40 -
R.D Sadsad Const. & Trading 19240 Completion/Const./Rehab./Impvt. of
MPB at Brgy. Sta. Lucia 02/17/10 III 4.014 90 C 0.447 0.147 0.300 - - - 89.40 89.40% V. Satisfactory
R.D Sadsad Const. & Trading 19240 Rehab./Impvt. of Acli Camuning and
Eden Roads 05/25/10 III 6.720 40 C 0.410 0.133 0.300 - - - 84.30 84.30% Satisfactory
R.D Sadsad Const. & Trading 19240 Proposed Reconst. of Ricardo P.
Rodriguez Memorial Hospital 08/31/10 III 25.445 120 C 0.407 0.200 0.300 - - - 90.70 90.70% V. Satisfactory
R.D Sadsad Const. & Trading 19240 Rehab./Impv't. of MPB at Capitol
Compound 08/31/10 III 1.905 45 C 0.448 0.148 0.300 - - - 89.60 89.60% V. Satisfactory
R.D Sadsad Const. & Trading 19240 Concreting of Barangay San Isidro,
Phase II 06/01/09 III 5.709 120 C 0.375 0.200 0.300 - - - 87.50 *87.50%Satisfactory
R.D Sadsad Const. & Trading 19240
Widening of Olongapo-Bugallon Road, San Marcelino Section,
Rehab./Reconst./Upgrading of San Marcelino-San Antonio-San Narciso
Road
05/23/09 III 9.638 30 C 0.423 0.133 0.300 - - - 85.60 *85.60%Satisfactory
R.D Sadsad Const. & Trading 19240 Repair/Rehab. of Gapan-San
Fernando-Olongapo Road 03/04/09 III 9.653 90 C 0.430 0.200 0.300 - - - 93.00 87.36% Satisfactory
R.D Sadsad Const. & Trading 19240 Const. of Multi-Purpose Building at
Calulut 08/24/09 III 5.239 98 O 0.393 0.240 0.150 0.030 0.051 0.050 91.40 -
R.D Sadsad Const. & Trading 19240 Construction of Pathwalk, Brgy.
Malaya 02/17/10 IVA 0.594 30 C 0.333 0.200 0.300 - - - 83.30 83.30% Satisfactory
R.D Sadsad Const. & Trading 19240 Repair/Rehab., Gapan-San Fernando-
Olongapo (GSO) 08/18/08 III 9.653 90 O 0.348 0.200 0.100 0.030 0.058 0.100 83.60 -
R.D Sadsad Construction & Trading 19240
Construction of 1 Multi-Purpose Center, 2-Units Health/Day Care
Centers and 2 units Police Centers11/22/10 NHA 8.912 127 C 0.493 0.200 0.300 - - - 99.30 99.30%
Outstanding
R.D. Cobacha Construction 8878 Const./Rehab. of Drainage System @
Brgy. 79 04/14/11 VIII 1.926 93 C 0.434 0.133 0.300 - - - 86.70 *86.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page321
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.D. Interior Junior Construction 6483
Const./Replacement of Canao Bridge, Bontoc, Tabuk-Tuguegarao
Rd., Tinglayan Bdry. Lubuagan-Tabuk Section II, Km.496+233
04/05/11 CAR 168.667 588 C 0.476 0.200 0.300 - - - 97.60 93.01% V. Satisfactory
R.D. Interior Junior Construction 6843 Const. of Maguiling Bridge Across
Chico River 03/28/11 II 109.138 479 C 0.459 0.133 0.300 - - - 89.20 91.00% V. Satisfactory
R.D. Interior Junior Construction 6483
Const. of Slope Protection along Malabang-Dobleston-Tukuran
National Road, Pitikul Sect., SND04/09/11 X 37.867 174 O 0.389 0.240 0.150 0.030 0.047 0.033 88.90 -
R.D. Interior Junior Construction 6483
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads,
Malabang-Dobleston-Tukuran Road04/09/11 X 19.123 170 C 0.445 0.133 0.300 - - - 87.80 *87.80%
Satisfactory
R.D. Interior Junior Construction 6483
Road Impvt. and Rehab. of Central Mindanao Road Project (Junction-
Awang-North Upi Road), CP I03/30/11 XII 566.394 750 C 0.469 0.133 0.300 - - - 90.20 87.67%
Satisfactory
R.D. Mandanas Construction 32114 Const. of Sch. Bldg. at Dr. Lorenzo
Ziga MHS Pasacao CS 04/04/11 V 0.626 120 C 0.421 0.133 0.300 - - - 85.40 *85.40% Satisfactory
R.F Varquez Construction 24302 Completion of Municipal Multi-
Purpose Building 03/10/09 XIII 2.341 90 C 0.450 0.168 0.300 - - - 91.80 *91.80% V. Satisfactory
R.F Varquez Construction 24302
Rehab./Reconst. of Damaged Paved National Road along Dinagat-Loreto
Road, Loreto Sect. 06/02/09 XIII 6.270 288 C 0.429 0.133 0.300 - - - 86.20 *86.20%
Satisfactory
R.G Diaz Builders & Trading 23814 Construction of Concepcion Public
Market at San Nicolas Poblacion 03/09/09 III 5.721 150 C 0.471 0.141 0.300 - - - 91.20 *91.20%V. Satisfactory
R.G Erillo Construction Incorporated (Formerly: R.G. Erillo Construction
& Supply)
932
Rehab./Reconst./Upgrading of Bacolod Circumferential Rd. Km.
11+552 (South) top Km. 4+567 (North) w/ exceptions
03/06/10 VI 14.466 250 C 0.460 0.200 0.300 - - - 96.00 90.48% V. Satisfactory
R.G Erillo Construction Incorporated (Formerly: R.G. Erillo Construction
& Supply)
932
Rehab./Reconst./Upgrading of Bacolod Circumferential Road Km.
11+552 (South) to Km. 4+567 (North) w/ exceptions
09/12/09 VI 14.466 250 O 0.298 0.300 0.150 0.030 0.040 0.050 86.80 -
R.G Tabin Construction & Supply 26830 Agno River Integrated Irrigation
Project 7/13-18/09 NIA 3.880 90 C 0.363 0.279 0.150 0.015 0.042 0.050 89.88 *89.88% V. Satisfactory
R.G. Diaz Builders & Trading 23814 Conc. & Drainage Impvt. of Matutum
St. Brgy. Manresa 04/07/11 NCR 1.890 90 O 0.341 0.240 0.150 0.030 0.023 0.033 81.70 -
R.G. Diaz Builders & Trading 23814 Const. of Sch. Bldg. (2nd Floor
Level), C.M. Recto Ict H/S 04/05/11 III 3.310 60 O 0.264 0.300 0.150 0.022 0.035 0.050 82.10 -
R.J Ibarra Construction 23538 Rehab./Reconst./Upgrading of Damaged Paved National Road 05/29/10 III 9.450 30 C 0.458 0.133 0.300 - - - 89.10 89.10%
V. Satisfactory
R.J Ibarra Construction 23538Const. of MPB, Bureau of Jail Management Penology Brgy.
Barretto05/29/10 III 3.743 90 C 0.444 0.133 0.300 - - - 87.70 89.10%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page322
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.J Ibarra Construction 23538 Repair/Rehab. of 12-CL of Kalalake National High School, Brgy. Kalalake 08/23/10 III 1.900 90 C 0.433 0.133 0.300 - - - 86.60 86.60%
Satisfactory
R.J Ibarra Construction 23538Const. of 2-CL of New Cabalan Elementary School, Brgy. New
Cabalan08/23/10 III 0.985 90 C 0.434 0.098 0.300 - - - 83.20 83.20%
Satisfactory
R.J Ibarra Construction 23538Construction of DPWH-Zambales 2nd District Engineering Office
Building05/23/09 III 18.901 180 O 0.368 0.239 0.150 0.030 0.029 0.050 86.60 -
R.J Ibarra Construction 23538 Completion of Multi-Purpose Building, Brgy. Magsaysay 03/04/09 III 0.476 45 C 0.478 0.195 0.300 - - - 97.30 *97.30%
Outstanding
R.J Ibarra Construction 23538 Const of 2 Classroom School Building Secondary 03/04/09 III 2.062 90 C 0.353 0.200 0.300 - - - 85.30 80.12%
Unsatisfactory
R.J Ibarra Construction 23538 Const. of DPWH-Zambales 2nd District Engineering Office Building 09/01/09 III 18.901 180 C 0.409 0.133 0.300 - - - 84.20 85.88%
Satisfactory
R.J Ibarra Construction 23538 Partial Completion of Gordon Heights National High School 09/01/09 III 1.958 90 O 0.320 0.240 0.150 0.030 0.048 0.033 82.10 -
R.J Ibarra Construction 23538 Const. of 2 CL Sch. Bldg. Secondary 11/12/08 III 2.062 90 O 0.260 0.266 0.100 0.030 0.023 0.100 77.90 -
R.J. Ibarra Construction 23538 Repair of Eight (8) CL Sch. Bldg., Gordon Hts. E/S, Brgy. Gordon Hts. 04/04/11 III 0.961 90 C 0.353 0.187 0.300 - - - 84.00 *84.00%
Satisfactory
R.K.X Odiamar Construction 16107 Conc. of Lumapog-Binanuaanan
Norte Rd. 08/28/10 V 4.776 120 C 0.380 0.200 0.300 - - - 88.00 88.00% Satisfactory
R.K.X Odiamar Construction 16107 Conc. of Nabua-Balatan Road 09/09/09 V 4.777 120 C 0.436 0.133 0.300 - - - 86.90 *86.90%
Satisfactory
R.L Colico Construction 24914 Const. of Day Care Center @ Barangay Ikirin 02/22/10 IVA 1.447 40 C 0.454 0.200 0.300 - - - 95.40 95.40%
V. SatisfactoryR.M Dela Cruz Construction 15895 Const./Repair & Rehab. of FMR at
Brgy. San Nicolas (Isabel) 02/25/10 III 0.482 60 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory
R.M Dela Cruz Construction 15895 Concreting/Improvement of Virgen
delos Remedios-Ligaya Road 06/10-11/09 BCDA 9.951 60 C 0.343 0.300 0.200 - - - 84.28 84.28% Satisfactory
R.M Dela Cruz Construction 15895
Const., Repair, Rehab. and Completion of Multi-Purpose Building at Brgy. Sto. Niño
05/20/09 III 2.377 90 C 0.359 0.200 0.300 - - - 85.90 *85.90% Satisfactory
R.M Dela Cruz Construction 15895
Const. of Barangay Aranguren Farm to Market Road Sta.0+000 to Sta.
0+16303/09/09 III 0.945 30 C 0.352 0.200 0.300 - - - 85.20 *85.20%
Satisfactory
R.M Dela Cruz Construction 15895
Const., Repair, Rehab. and Completion of MPB at Brgy. Sta.
Lucia03/09/09 III 2.378 90 C 0.451 0.146 0.300 - - - 89.70 *89.70%
V. Satisfactory
R.M Dela Cruz Construction 15895
Repair/Rehab. of Road at Brgy. San Nicolas Poblacion, Sta. 0+000-Sta.
0+332 (Road 1)09/01/09 III 2.789 30 C 0.484 0.133 0.300 - - - 91.70 *91.70%
V. Satisfactory
R.M Nuñez Construction 26206Const./Rehab. of Road inc. Drainage at Brgy. Alabang (Santan St. and it's
vicinity)02/18/10 NCR 1.427 45 C 0.488 0.133 0.300 - - - 92.10 92.10%
V. Satisfactory
R.M Nuñez Construction 26206 Road Impvt./Rehab. of G.G. Cruz St. Brgy. Baclaran 02/17/10 NCR 3.832 15 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page323
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.M Padillo Builders 31206 Rehab. of Roadway @ Barangays 65 03/01/10 VIII 0.964 115 C 0.404 0.133 0.300 - - - 83.70 83.70% Satisfactory
R.M Padillo Builders 31206Const./Repair of Multi-Purpose
Building (San Isidro Parish MPC), Poblacion
05/26/09 VIII 0.709 90 C 0.389 0.133 0.300 - - - 82.20 84.02% Satisfactory
R.M Padillo Builders 31206 Const./Repair/Rehab of MPB (San Isidro Parish MPC), Poblacion 03/05/09 VIII 0.710 90 O 0.336 0.272 0.150 0.015 0.025 0.050 84.80 -
R.M Padillo Builders 31206 Completion of MPB, Malibago 09/04/10 VIII 1.432 90 C 0.41 0.133 0.300 - - - 84.30 84.30% Satisfactory
R.M Vitug Construction 9227 Upgrading of Lubao Diversion Road 05/18/09 III 28.663 100 O 0.315 0.240 0.150 0.030 0.040 0.050 82.50 -
R.M Vitug Construction 9227 Upgrading of Lubao Diversion Road 08/25/09 III 28.663 121 C 0.457 0.133 0.300 - - - 89.00 85.10% Satisfactory
R.M Vitug Construction 9227Const. of MPB Olongapo City
Engineering Compound West Bajac Bajac
09/01/09 III 0.940 27 C 0.392 0.133 0.300 - - - 82.50 *82.50% Satisfactory
R.M. Padillo Builders 31206Const. of Four (4) Classroom, 2-Storey Sch. Bldg. @ San Pablo
Elementary School04/10/11 VIII 2.214 120 O 0.378 0.240 0.150 0.020 0.047 0.050 88.50 -
R.M. Vitug Construction 9227 Completion of MPB 03/28/11 III 1.419 45 C 0.482 0.195 0.300 - - - 97.70 *97.70% Outstanding
R.N.G.M Construction 20281 Concreting of Brgy. Ipil to Laboy to Mucdol FTMR 05/27/09 III 1.874 90 C 0.453 0.200 0.300 - - - 95.30 *95.30%
V. Satisfactory
R.N.G.M Construction 20281 Construction of Real Bridge, Brgy. Real 03/03/09 III 2.575 180 C 0.466 0.133 0.300 - - - 89.90 *89.90%
V. Satisfactory
R.N.G.M. Construction / B.M.K. Construction (JV) JV-09-116 Const. of Classroom, Reserva ES,
Brgy. Reserva 04/09/11 III 19.003 240 C 0.488 0.153 0.300 - - - 94.10 90.29% V. Satisfactory
R.O Builders & Dev. Corp. 22393
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Maharlika (Ngasabaran-Balete Section)
08/28/09 II 18.904 116 C 0.396 0.200 0.300 - - - 89.60 91.16% V. Satisfactory
R.O Builders & Dev. Corp. 22393 Repair/Rehab. of Daang Maharlika, K
209+000 - K 212+000 w/ exception 06/07/10 II 7.711 30 C 0.481 0.133 0.300 - - - 91.40 91.40% V. Satisfactory
R.O Builders & Dev. Corp. 22393
Rehab./Reconst./Upgrading of Damaged Paved National Rd. along Daang Maharlika Namamparan-Diadi
Poblacion Sect.
06/10/10 II 19.280 105 O 0.334 0.300 0.150 0.030 0.047 0.033 89.40 -
R.O Builders & Dev. Corp. 22393
Rehab./Reconst./Upgrading of Damaged Paved National Road along Daang Maharlika, Namamparan-Diadi
Poblacion Section
09/02/10 II 19.280 105 C 0.328 0.200 0.300 - - - 82.80 86.76% Satisfactory
R.O Builders & Dev. Corp. 22393
Rehab./Reconst./Upgrading of Damaged Paved National Road along
Maharlika (Nagsabaran-Balete Section)
06/01/09 II 18.904 90 O 0.358 0.300 0.150 0.030 0.051 0.033 92.20 -
R.O Builders & Dev. Corp. 22393 Concreting of Aritao-Dupax-Kasibu-
Quirino Road, (Mangayang Section) 06/03/09 II 16.182 150 C 0.431 0.200 0.300 - - - 93.10 90.49% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page324
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.O Builders & Dev. Corp. 22393
Rehab.Reconst../Upgrading of Damaged Paved National Road KO
220+486 - KO 222+106, Balite, Sta. Fe-Calitlitan, Aritao Section
06/03/09 II 19.259 30 C 0.457 0.133 0.300 - - - 89.00 *89.00% V. Satisfactory
R.O Builders & Dev. Corp. 22393 Conc. of Aritao-Dupax-Kasibu-
Quirino Road, Mangayang Section 03/11/09 II 16.182 150 O 0.345 0.300 0.150 0.030 0.050 0.050 92.50 -
R.O Builders & Dev. Corp. 22393 Conc. of Aritao-Dupax-Kasibu-
Quirino Road, Mangayang Section 11/28/08 II 16.182 150 O 0.351 0.279 0.100 0.020 0.033 0.067 85.00 -
R.O. Builders & Dev. Corp. 22393
Rehab./Reconst./Upgrading of Daang Maharlika, KO236+616 - KO240+500,
Banganan-Darapidap Sect.04/14/11 II 19.290 120 C 0.484 0.133 0.300 - - - 91.70 *91.70%
V. Satisfactory
R.O. Builders & Dev. Corp. 22393
Rehab./Reconst./Upgrading of Daang Maharlika, KO211+610 - KO213+300, Perez Park Section
04/14/11 II 19.287 120 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory
R.O. Builders & Dev. Corp. 22393
Rehab./Reconst./Upgrading along Daang Maharlika, Nagsabaran-Balete
Section04/12/11 II 24.115 149 C 0.346 0.133 0.300 - - - 77.90 87.32%
Satisfactory
R.O.M Builders 28654 Conc. of Road in Brgy. Munting Coral 02/25/10 IVA 0.497 45 C 0.434 0.200 0.300 - - - 93.40 93.40%
V. Satisfactory
R.O.M Builders 28654 Const. of Flood Control System in Brgy. Caloocan 02/25/10 IVA 0.497 45 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
R.O.M Builders 28654 Const./Rehab. of Road at Malalim 02/26/10 IVA 0.299 30 C 0.466 0.133 0.300 - - - 89.90 89.90% V. Satisfactory
R.O.M Builders 28654 Const. of School Building in Poblacion 6, 02/25/10 IVA 0.494 60 C 0.463 0.133 0.300 - - - 89.60 89.60%
V. Satisfactory
R.O.M Builders 28654 Const./Impvt. of Multi-Purpose Building at Brgy. Padre Castillo 09/03/09 IVA 0.480 60 C 0.443 0.133 0.300 - - - 87.60 *87.60%
Satisfactory
R.P Inducil Construction 8984 Rehab./Reconst./Upgrading of Gov. A. Pascual St. 05/26/09 NCR 4.794 90 C 0.459 0.140 0.300 - - - 89.90 *89.90%
V. Satisfactory
R.R David Construction and Electrical Services 25577
Const. of Various Farm-to-Market Road @ Capas and Concepcion,
Brgy. Malupa05/21/09 III 2.380 30 C 0.371 0.200 0.300 - - - 87.10 *87.10%
Satisfactory
R.R Encabo Construction and Traders 14716 LTO-LETAS Office Building Project 10/29/09 DOTC 24.864 300 C 0.455 0.200 0.300 - - - 95.50 95.50%
V. Satisfactory
R.R Encabo Construction and Traders 14716 Ipil Development Project ( Extension
of Runway) 11/11/10 DOTC 43.348 180 C 0.436 0.200 0.300 - - - 93.60 93.60% V. Satisfactory
R.R Encabo Construction and Traders 14716 Ipil Development Project ( Upgrading
and Concreting of Runway) 11/11/10 DOTC 38.504 210 C 0.456 0.200 0.300 - - - 95.60 95.60% V. Satisfactory
R.R Encabo Constructors and Traders 14716
Alaminos Airport Dev't Project (Construction of Runway Strip -
Phase I)4/1/2011 DOTC 96.342 210 O 0.363 0.300 0.150 0.030 0.062 0.017 92.20 -
R.R Ricafort Construction 14402 Const./Repair & Rehab. of MPB 02/25/10 III 2.412 90 C 0.433 0.200 0.300 - - - 93.30 93.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page325
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.R Ricafort Construction 14402 Restoration of Revetment/Desilting
of Baket-Baket Creek 06/03/10 III 9.407 100 C 0.441 0.137 0.300 - - - 87.80 87.80% Satisfactory
R.R Ricafort Construction 14402
Rehab. of Daang Maharlika Highway, Package I, Section 3 (Allen-Malaga Road Section) Km. 667+644.55-Km.
669+364.55 w/ exceptions
03/04/10 VIII 41.205 150 C 0.470 0.133 0.300 - - - 90.30 90.30% V. Satisfactory
R.R Ricafort Construction 14402
Const./Repair, Rehab. and Completion of MPB (Covered Court),
Brgy. Bantog05/21/09 III 2.384 90 C 0.371 0.200 0.300 - - - 87.10 *87.10%
Satisfactory
R.R Ricafort Construction 14402 Concreting of Sta. Cruz-Lubigan
Road (Widening) at Brgy. Lubigan 05/23/09 III 0.940 60 C 0.094 0.200 0.300 - - - 59.40 *59.40% Poor
R.R Ricafort Construction 14402
Conc. of Sta. Cruz-Villa Aglipay Road (Completion) going to Eco-Tourism
Park02/27/09 III 2.820 90 C 0.359 0.200 0.300 - - - 85.90 *85.90%
Satisfactory
R.R Ricafort Construction 14402
Const./Impvt. of Eco-Tourism Road, Sta. 125+009 to Sta. 127+637, with
exception03/09/09 III 14.104 150 C 0.352 0.200 0.300 - - - 85.20 *85.20%
Satisfactory
R.R Ricafort Construction 14402 Construction of Multi-Purpose
Building at Burgos, San Jose 02/27/09 III 3.004 90 C 0.461 0.200 0.300 - - - 96.10 82.03%Satisfactory
R.R Ricafort Construction 14402 Concreting of Brgy. Road at Sitio
Ambuklao, Brgy. Pinasling 09/02/09 III 1.219 60 C 0.438 0.200 0.300 - - - 93.80 *93.80% V. Satisfactory
R.R Seismundo Construction & Supply 10961
Conc. of Compostela Cateel Road-Osmeña Sect., Sitio Nursery Sec. &
Spur II-Pansansalan Sec.03/16/09 XI 46.270 330 O 0.283 0.288 0.150 0.030 0.038 0.033 82.20 -
R.R Seismundo Construction & Supply 10961
Conc. of Compostela-Cateel Road, Osmena Section, Sitio Nursery Section and Spur II-Panansalan
Section
09/10/09 XI 46.270 330 C 0.448 0.133 0.300 - - - 88.10 84.56% Satisfactory
R.R. Ricafort Construction & Supplies
/ A.C. Soliven Construction & Gen.
Merchandise (JV)
Completion/Const./Rehab./Impvt. of MPB 03/05/10 I 9.647 120 C 0.430 0.133 0.300 - - - 86.30 86.30%
Satisfactory
R.R. Ricafort Construction and
Supplies (Formerly: R.R. Ricafort Construction)
14402 Conc. Of Road Poblacion Sur-Calabtangan 04/07/11 III 2.468 70 C 0.370 0.200 0.300 - - - 87.00 *87.00%
Satisfactory
R.R. Ricafort Construction and
Supplies (Formerly: R.R. Ricafort Construction)
14402 Const. of MPB, Brgy. Burgos 11/14/08 III 3.004 90 O 0.302 0.240 0.100 0.000 0.018 0.100 76.00 -
R.R. Seismundo Construction & Supply 10961
Rehab./Reconst./Upgrading of Damaged Paved National Road
Section, Tagum-Panabo Circ. Road04/11/11 XI 24.598 180 C 0.442 0.200 0.300 - - - 94.20 89.22%
V. Satisfactory
R.S Mesa Construction Corporation 22218 Repair/Impvt. of Cainta Elementary
School 08/19/10 IVA 2.344 150 C 0.367 0.200 0.300 - - - 86.70 86.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page326
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.S Reyna Construction 9648Repair of Brgy. Roads, Brgy.
Balocawehay-Katipunan-Ulhay-Tambis
02/26/10 VIII 1.915 82 C 0.460 0.133 0.300 - - - 89.30 82.52% Satisfactory
R.S Reyna Construction 9648Repair of Brgy. Roads, Brgy.
Balocawehay-Katipunan-Ulhay-Tambis
05/28/09 VIII 1.915 25 O 0.320 0.200 0.150 0.030 0.047 0.033 78.00 -
R.S Reyna Construction 9648 Const. of Bridge (Phase II), Union 09/02/10 VIII 0.951 80 C 0.487 0.133 0.300 - - - 92.00 92.00% V. Satisfactory
R.S Reyna Construction 9648 Const. of FMR 09/02/10 VIII 1.410 35 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory
R.S. Sepian Construction & Trucking 20519
Road Upgrading of Mt. Province - Ilocos Sur Road, Tue-Balaoa &
Otucan-Dawaic Sect.04/09/11 CAR 33.038 330 C 0.444 0.154 0.300 - - - 89.80 *89.80%
V. Satisfactory
R.S. Sepian Construction & Trucking 20519 Road Upgrading of Abra-Ilocos Norte
Road, Km.412+000 - Km.431+000 03/29/11 CAR 28.369 218 O 0.322 0.263 0.150 0.010 0.032 0.050 82.70 -
R.S. Sepian Construction & Trucking 20519
Road Opening/Construction of Missing Links of National Road, Abra-
Ilocos Norte Road, Km.424+000 - Km.452+100
03/29/11 CAR 46.543 683 O 0.294 0.289 0.150 0.010 0.032 0.033 80.80 -
R.T Morabe Construction 11377Concreting of Laoang-Lapinig-Arteche Road Km. 965+515.00-
Km.966+645.0006/08/09 VIII 19.138 150 O 0.331 0.235 0.150 0.030 0.045 0.050 84.10 -
R.T Morabe Construction 11377 Const./Rehab. of Drainage System, Brgy. 85, 06/11/09 VIII 0.963 70 C 0.249 0.133 0.000 - - - 38.20 -
R.T Morabe Construction 11377 Conc. of Laoang-Lapinig-Arteche Road, Km. 965+515 - Km. 966+645 03/11/10 VIII 19.139 150 C 0.387 0.139 0.300 - - - 82.60 83.50%
Satisfactory
R.T Morabe Construction 13377 Const. of La Paz-Javier-Bito Rd., La Paz-Javier-Bito Rd. Sect. 05/31/10 VIII 14.167 120 O 0.377 0.300 0.104 0.030 0.042 0.017 87.00 -
R.T Morabe Construction 13377Conc. of Tabango-Catmon (La
Fortuna) -Manlawaan-Gimarco Rd. Km.1039+540 - Km.1040+000
06/03/10 VIII 9.353 336 C 0.423 0.200 0.300 - - - 92.30 82.73% Satisfactory
R.T Morabe Construction 11377 Concreting of Tabango-Catmon- (La Fortuna) Manlawaan-Gimarco Road 06/02/09 VIII 9.353 336 O 0.343 0.300 0.150 0.030 0.037 0.050 91.00 -
R.T Morabe Construction 11377 Construction of Footbridge, Brgy. Marao 05/28/09 VIII 0.285 30 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
R.T Morabe Construction 11377Concreting of Tabango-Catmon (La Fortuna) Manlawaan-Gimarco Road
Km 1039+540-Km 1040+00003/12/09 VIII 9.353 180 O 0.341 0.026 0.150 0.030 0.037 0.033 61.70 -
R.T Morabe Construction 13377 Const. of La Paz-Javier-Bito Road, La Paz-Javier-Bito Rd. Section 08/24/10 VIII 14.167 120 O 0.473 0.133 0.300 - - - 90.60 88.44%
Satisfactory
R.T.E Construction 15937 Construction of Farm-to-Market Road at Brgy. Macabacle 05/19/09 III 0.952 25 C 0.376 0.200 0.300 - - - 87.60 *87.60%
Satisfactory
R.T.Y Construction 10341 Const. of Bridge at Brgy. Laguna (Footbridge) 02/19/10 IVA 0.200 40 C 0.469 0.133 0.300 - - - 90.20 90.20%
V. Satisfactory
R.T.Y Construction 10341
Roads to Complete the Nautical Highways Eastern Nautical Highway 1. Daang Maharlika (LZ) A. Rehab. of
Brgy. Ikirin-Brgy. Binahaan Sect.
05/31/10 IVA 14.470 60 C 0.411 0.133 0.300 - - - 84.40 84.40% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page327
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.T.Y Construction 10341Restoration of Damaged Flood
Control Structures along Pagbilao-Atimonan Rd. Km.137 - Km.138
08/27/10 IVA 1.928 30 C 0.434 0.186 0.300 - - - 92.00 92.00% V. Satisfactory
R.T.Y Construction 10341
Repair and Rehab. of Daang Maharlika Rd., Atimonan Sect.
Km.0162+465 - Km.0163+770 with exception
08/26/10 IVA 9.646 40 C 0.487 0.133 0.300 - - - 92.00 92.00% V. Satisfactory
R.T.Y Construction 10341
Roads to Complete the Nautical Highways, Eastern Nautical
Highways, Daang Maharlika (LZ) Rehab. of Brgy. Malicboy-Brgy.
Catalina, Pagbilao-Atimonan Sect.
08/26/10 IVA 14.470 60 C 0.477 0.139 0.300 - - - 91.60 91.60% V. Satisfactory
R.T.Y Construction 10341Road Safety Devices, MSR, Jct.
Lopez-Catanauan Rd. Km.0217+890 - Km.0236+128 with exception
08/26/10 IVA 1.998 30 C 0.414 0.200 0.300 - - - 91.40 91.40% V. Satisfactory
R.T.Y Construction 10341
Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies, Abuyon-Buenavista Rd. (Abuyon Sect.), Sta.267+049 - Stta.267+477
08/28/10 IVA 9.123 139 C 0.406 0.200 0.300 - - - 90.60 90.60% V. Satisfactory
R.T.Y Construction 10341Road Safety Devices, MSR, Jct.
Lopez-Buenavista Rd. Km.0218+808 - Km.0236+988 with exception
08/26/10 IVA 4.996 60 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
R.T.Y Construction 10341 Road Upgrading of Dr. Damian Reyes Memorial Road (Torrijos Side) 08/25/09 IVB 47.275 210 O 0.344 0.250 0.150 0.030 0.051 0.050 87.50 -
R.T.Y Construction 10341Rehab./Conc. of Dr. Damian Reyes
Road (Torrijos Side), Sibuyao-Maranlig Section
08/25/09 IVB 48.245 254 C 0.462 0.113 0.300 - - - 87.50 84.77%Satisfactory
R.T.Y Construction 10341 Road Upgrading of Dr. Damian Reyes Memorial Road (Torrijos Side) 02/24/10 IVB 47.275 210 C 0.398 0.200 0.300 - - - 89.80 88.42%
Satisfactory
R.T.Y Construction 10341 Const. of TESDA Training Center 02/24/10 IVB 14.395 180 C 0.392 0.200 0.300 - - - 89.20 86.82% Satisfactory
R.T.Y Construction 10341 Conc. of Biga FMR 06/08/10 IVB 0.400 150 C 0.486 0.133 0.300 - - - 91.90 91.90% V. Satisfactory
R.T.Y Construction 10341 Conc. of Bangcuangan FMR 06/09/10 IVB 0.400 150 C 0.482 0.133 0.300 - - - 91.50 91.50% V. Satisfactory
R.T.Y Construction 10341 Conc. of Hupi FMR 06/08/10 IVB 0.400 150 C 0.477 0.133 0.300 - - - 91.00 91.00% V. Satisfactory
R.T.Y Construction 10341 Conc. of Bayakbakin FMR 06/08/10 IVB 0.400 150 C 0.469 0.133 0.300 - - - 90.20 90.20% V. Satisfactory
R.T.Y Construction 10341 Conc. of Baliis FMR, Baliis 06/08/10 IVB 0.400 150 C 0.425 0.133 0.300 - - - 85.80 85.80% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page328
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.T.Y Construction 10341Rehab./Reconst.of San Juan -
Candelaria Jct. - Candelaria -Bolboc incl. Bantilan Bridge
08/27/09 IVA 19.195 114 C 0.460 0.133 0.300 - - - 89.30 89.06% V. Satisfactory
R.T.Y Construction 10341 Conc. of San Narciso- San Andres Road, San Andres Sect 08/25/09 IVA 23.505 160 C 0.445 0.133 0.300 - - - 87.80 *87.80%
Satisfactory
R.T.Y Construction 10341Const. (Road Opening) of Quezon Eco Tourism Road, (LUC-BATCR) inlc. RROW Phase II, Sitio Puntor
08/27/09 IVA 16.202 114 C 0.338 0.200 0.300 - - - 83.80 *83.80% Satisfactory
R.T.Y Construction 10341Rehab./Reconst. of San Juan-
Candelaria Jct.-Candelaria-Bolboc Road, inc. Bantilan Bridge
05/25/09 IV-A 19.195 114 O 0.394 0.240 0.150 0.030 0.025 0.050 88.90 -
R.T.Y Construction 10341 Const. of San Roque I Bridge Approaches 05/25/09 IV-A 13.429 54 C 0.448 0.133 0.300 - - - 88.10 *88.10%
Satisfactory
R.T.Y Construction 10341 Rehab./Reconst./Upgrading of MSR Diversion Road 05/28/09 IV-A 9.647 90 C 0.448 0.133 0.300 - - - 88.10 *88.10%
Satisfactory
R.T.Y Construction 10341 Const. of 1 CL Sch. Bldg. At Brgy. Ajos E/S, Brgy. Ajos 02/24/09 IV-A 0.558 45 C 0.493 0.100 0.300 - - - 89.30 *89.30%
V. Satisfactory
R.T.Y Construction 10341 Impvt./Rehab. of Quirino Highway 02/27/09 IV-A 19.015 30 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory
R.T.Y Construction 10341 Construction of TESDA Training Center 05/18/09 IV-B 14.395 213 O 0.343 0.289 0.150 0.030 0.012 0.050 87.40 -
R.T.Y Construction 10341 Rehab./Conc. of Dr. Damian Reyes Road (Torrijos Side) 05/18/09 IV-B 48.247 254 O 0.351 0.259 0.150 0.030 0.023 0.050 86.30 -
R.T.Y Construction 10341 Construction of TESDA Training Center 03/11/09 IV-B 14.395 180 O 0.390 0.204 0.150 0.030 0.018 0.050 84.20 -
R.T.Y Construction 10341 Rehab./Conc. of Dr. Damian Reyes Road (Torrijos Side) 03/11/09 IV-B 48.245 240 O 0.362 0.179 0.150 0.030 0.025 0.050 79.60 -
R.T.Y. Construction 10341Const. of Quezon Eco-Tourism Road
(LUC-BATCR) inc. RROW, Phase I, Conc. of Brgy. Castanas Road
03/31/11 IVA 24.870 178 C 0.372 0.200 0.300 - - - 87.20 88.79% Satisfactory
R.T.Y. Construction 10341
Conc. of San Narciso-San Andres Road, Sitio Bagakay Sect.,
Km.388+245.20 - Km.389+293.82 (inc. Length of Bridge and Approach
Slabs=77.62 l.m.)
03/29/11 IVA 27.631 210 C 0.432 0.200 0.300 - - - 93.20 88.70% Satisfactory
R.T.Y. Construction 10341
Rehab./Reconst./Upgrading of Quezon-Batangas Road inc. Quipot Bridge KO99+095 - KO100+460 (w/
exception)
03/31/11 IVA 38.433 239 C 0.389 0.200 0.300 - - - 88.90 88.48% Satisfactory
R.T.Y. Construction 10341
Road Upgrading (Gravel to Concrete) Based on Gravel Road Strategies,
San Francisco-San Andres-San Narciso Road (Brgy. San Juan
Section) Km.389+293.82 - Km.390+795.82
03/29/11 IVA 37.674 200 C 0.369 0.200 0.300 - - - 86.90 87.62% Satisfactory
R.T.Y. Construction 10341
Conc. of San Narciso-San Andres Sect., Sitio Sarahan Sect.,
Km.386+559.80 - Km.388+245.20 (inc. width of Box Culvert = 2.40 l.m.)
03/30/11 IVA 45.158 241 C 0.376 0.200 0.300 - - - 87.60 87.54% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page329
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.T.Y. Construction 10341 Rehab. of Riverbank at Barangay Duwat 03/28/11 IVA 1.442 60 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
R.T.Y. Construction 10341
Road Upgrading (Gravel to Concrete), San Francisco-San
Andres-San Narciso Road (Sitio Tambo Sect.), Km.390+795.82 -
Km.392+209.02 (inc. Length of Box Culvert = 7.20l.m.)
03/29/11 IVA 37.386 229 C 0.347 0.200 0.300 - - - 84.70 85.60% Satisfactory
R.T.Y. Construction 10341
Conc of San Narciso-San Andres Road (Sitio Dating Bayan Sect.), Km.382+640 - Km.384+614 (inc.
Length of Bahay Bridge and Approaches = 34 l.m.)
03/30/11 IVA 47.209 210 C 0.252 0.200 0.300 - - - 75.20 83.78% Satisfactory
R.T.Y. Construction 10341
Conc. of San Narciso-San Andres Sect., Sitio Aromahan Sect.,
Km.384+614 - Km.386+559.80 (inc. width of Box Culvert)
03/30/11 IVA 47.254 210 C 0.308 0.200 0.300 - - - 80.80 82.54% Satisfactory
R.T.Y. Construction 10341 Road Upgrading of Dr. Damian Memorial Road (Torrijos Side) 04/15/11 IVB 39.065 235 C 0.403 0.151 0.300 - - - 85.40 *85.40%
Satisfactory
R.T.Y. Construction 10341Rehab./Reconst./Upgrading of
Marinduque Circ. Road (Buyabod-Tawiran Section)
04/15/11 IVB 36.656 165 C 0.352 0.193 0.300 - - - 84.50 *84.50% Satisfactory
R.U Aquino Construction and Development
Corporation23507 Construction of UP Baguio Library
Extension 01/20-22/2010 UP - Baguio 7.227 180 C 0.486 0.200 0.300 - - - 98.60 98.60% Outstanding
R.U Aquino Construction and Development
Corporation23507 Construction of UP Baguio
Basement 01/20-22/2010 UP - Baguio 0.953 45 C 0.427 0.200 0.300 - - - 92.70 92.70% V. Satisfactory
R.U Aquino Construction and Development
Corporation / RCDG Construction Corporation
Joint Venture
JV-08-130Widening/Concreting of Mt. Data-
Bontoc Road, Malitep Bridge, Balili to Amsolong Bridge Alab Section
05/23/09 CAR 114.942 450 O 0.380 0.240 0.150 0.030 0.060 0.033 89.30 -
R.U Aquino Construction and Development
Corporation / RCDG Construction Corporation
JV-08-131
Widening/Conc. of Mount Data-Bontoc Road Amsolong Alab
Poblacion Sectiopn. Km. 385+350-Km 391+457
08/28/09 CAR 99.305 450 O 0.369 0.240 0.087 0.023 0.047 0.017 78.30 -
R.U Aquino Construction and Development
Corporation / RCDG Construction Corporation
Joint Venture
JV-08-157
Conc. of Bontoc-Tabuk-Tuguegarao Road (Package BLT-16), Tinglayan
Boundary Section I Tocucan to Betwagan Sect., Km. 401+300-Km.
406+200 with exception
08/29/09 CAR 128.685 425 O 0.351 0.240 0.004 0.023 0.056 0.017 69.10 -
R.V Construction 6110Masbate Ports Cluster Development Project (Construction of Seawalls at San Fernando and Iniwaran Ports)
4/14/2011 DOTC 1.914 45 C 0.414 0.200 0.300 - - - 91.40 91.40% V. Satisfactory
R.V Construction 6110 Construction of Multi-Purpose Building, Brgy. Obrero 06/01/09 VIII 1.929 120 C 0.423 0.133 0.300 - - - 85.60 90.50%
V. Satisfactory
R.V Construction 6110 Const. of Multi-Purpose Building, Brgy. Maguinoo 03/03/10 VIII 1.929 90 C 0.434 0.113 0.300 - - - 84.70 84.70%
Satisactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page330
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.V Construction 6110 Zamboanga Airport Development Project 04/29/09 DOTC 5.738 180 C 0.466 0.200 0.300 - - - 96.60 96.60%
Outstanding
R.V Construction 6110Cotabato Airport Development
Project ( Continuation of Rehabilitation of Terminal Buildings)
08/27/10 DOTC 4.800 60 C 0.454 0.200 0.300 - - - 95.40 95.40% V. Satisfactory
R.V Construction 6110 Rehabilitation of DPWH Building, Biliran District Engineering Office 06/03/09 VIII 0.948 90 C 0.434 0.133 0.300 - - - 86.70 *86.70%
Satisfactory
R.V Construction 6110 Const. of MPB @ Brgy. Obrero 03/10/09 VIII 1.929 120 O 0.400 0.263 0.150 0.030 0.033 0.050 92.60 -
R.V Construction 6110 Const./Impvt. Of DPWH Leyte 1st DEO, Pawing 09/08/10 VIII 3.798 210 C 0.462 0.133 0.300 - - - 89.50 89.50%
V. Satisfactory
R.V Laborte Builders 20459Const./Conc. of Candelaria-By-Pass Road, Brgy. Malabanban Sur, incl.
RROW02/17/10 IVA 17.680 240 O 0.355 0.300 0.150 0.030 0.042 0.050 92.70 -
R.V Laborte Builders 20459 Const./Conc. of Candelaria-By-Pass Road, Brgy. Masin Sur, incl. RROW 02/17/10 IVA 17.676 180 O 0.353 0.300 0.150 0.020 0.042 0.033 89.80 -
R.V Laborte Builders 20459 Const./Conc. of Candelaria-By-Pass Road, Brgy. Bukal Sur, incl. RROW 02/17/10 IVA 17.668 180 C 0.439 0.200 0.300 - - - 93.90 88.14%
Satisfactory
R.V Laborte Builders 20459Const./Conc. of Candelaria-By-Pass
Rd., Brgy. Malabanban Sur, including RROW
05/24/10 IVA 17.680 240 C 0.446 0.151 0.300 - - - 89.70 90.96% V. Satisfactory
R.V Laborte Builders 20459
Roads to Complete the National Highways Eastern Nautical
Highways 1. Rehab. of Quirino Highway A, Quezon Side,
Tagkawayan Sect. Inc. Road Slip
05/31/10 IVA 33.768 90 C 0.463 0.133 0.300 - - - 89.60 89.60% V. Satisfactory
R.V Laborte Builders 20459 Const./Conc. of Candelaria-By-Pass Rd., Brgy. Masin, inc. RROW 05/24/10 IVA 17.676 260 C 0.370 0.200 0.300 - - - 87.00 88.41%
Satisfactory
R.V Laborte Builders 20459
Const./Completion/Continuation of Unfinished/On-going Bridge, Canda Bridge along Quezon-Eco Tourism
Rd.
09/01/10 IVA 38.308 120 C 0.485 0.149 0.300 - - - 93.40 93.40% V. Satisfactory
R.V Laborte Builders 20459
Impvt. of Quirino -Andaya Highway (Quezon Side) Camarines
Sur/Camarines Norte, Quirino Highway, Brgy. San Francisco-San
Vicente (inc. Road Slip), Tagkawayan Sect.
08/26/09 IVA 33.765 90 C 0.425 0.200 0.300 - - - 92.50 *92.50% V. Satisfactory
R.V Laborte Builders 20459 Conc. of Mulanay - San Francisco Road, (Sitio Divisoria Section) 08/25/09 IVA 19.137 150 C 0.360 0.200 0.300 - - - 86.00 *86.00%
Satisfactory
R.V Laborte Builders 20459 Const. Olongtao Multi-Purpose Building, Brgy. Olongtao 05/27/09 IV-A 3.370 90 C 0.475 0.133 0.300 - - - 90.80 88.00%
Satisfactory
R.V Laborte Builders 20459
Concrete Paving of Mulanay-San Francisco Road (Mulanay Side),
Amoguis-San Isidro Road Sect. inc. Amoguis Bridge
05/27/09 IV-A 18.566 180 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfaactory
R.V Laborte Builders 20459 Completio of Olongtao MPB 11/11/08 IV-A 3.370 90 O 0.325 0.300 0.100 0.020 0.023 0.100 86.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page331
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R.V Rieta Trading & Gen. Construction 28671
Const. of Two Way R.C. Bridge at the Boundary of Brgys. Bucal and
Malabag06/02/09 IV-A 4.754 150 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
R.V Rieta Trading & Gen. Construction 28671
Repair/Rehab. of Zapote-Salawag-Salitrann Road Km. 15+230-Km.
16+140 (with exception)06/04/09 IV-A 6.955 14 C 0.492 0.133 0.300 - - - 92.50 *92.50%
V. Satisfactory
R.V Rieta Trading & Gen. Construction 28671 Const. of 2-Storey MP Building at
Tabon II 06/04/09 IV-A 0.575 148 C 0.497 0.133 0.300 - - - 93.00 84.32% Satisfactory
R.V Rieta Trading & Gen. Construction 28671 Const. of 2 Storey MPB 08/26/08 IV-A 0.575 120 O 0.295 0.263 0.100 0.030 0.018 0.100 80.60 -
R.V. Construction 6110 Const. of Samar 1st DEO Bldg. incl. Quarters & Motorpool 04/02/11 VIII 4.818 140 C 0.456 0.133 0.300 - - - 88.90 89.95%
V. Satisfactory
R.V. Laborte Builders 20459
Road Opening/Const. of Quezon Eco-Tourism Road (LUC-BATCR) inc.
RROW Phase II at Brgy. Manggalang Kiling
03/31/11 IVA 17.708 214 C 0.482 0.200 0.300 - - - 98.20 90.52% V. Satisfactory
R.V. Laborte Builders / Jemak Construction and
Supply Joint VentureJV-09-088 Const. of Bantilan Bridge II along
Quezon Eco-Tourism Road Phase II 03/31/11 IVA 31.875 240 C 0.338 0.200 0.300 - - - 83.80 89.80% V. Satisfactory
R.V. Laborte Builders / Tonn Builders (Philippines)
Construction Inc. Joint Venture
JV-09-200 Const. of Quiapo Bridge 03/31/11 IVA 76.970 300 C 0.451 0.200 0.300 - - - 95.10 94.14% V. Satisfactory
R.Z Roncal Construction and Trading 22219
Rehab./Impv't./Widening of Tarlac-Nueva Ecija-Dingalan Port, Jct. of
Fort Magsaysay-Laur Sect.08/18/10 III 9.504 45 C 0.433 0.133 0.300 - - - 86.60 86.60%
Satisfactory
R.Z Roncal Construction and Trading 22219 Const. of DHVCAT Student
Dormitory, DHVCAT 09/01/10 III 19.107 150 C 0.353 0.200 0.300 - - - 85.30 85.30% Satisfactory
R.Z. Roncal Construction and Trading 22219
Geometric Impvt. of Sta. Rosa Intersection along the Jct. of
Maharlika Road & Sta. Rosa-Tarlac Road
04/12/11 III 19.057 136 C 0.496 0.039 0.300 - - - 83.50 *83.50% Satisfactory
RA Ignacio Construction 29977 Const. of MPB, Brgy. Marilag 02/26/10 NCR 2.865 90 C 0.473 0.133 0.300 - - - 90.60 90.60% V.Satisfactory
RA Ignacio Construction 29977
Rehab./Reconst./Upgrading of Damaged Paved Road (Asphalt
Overlay of Camp Aguinaldo Road Network)
05/26/10 NCR 9.606 33 C 0.443 0.200 0.300 - - - 94.30 94.30% V. Satisfactory
Rabbit Construction & Development Corporation
8545Rehab./Reconst./Upgrading of
Damaged Paved National Roads Gov. Lim Ave.
05/31/10 IX 2.826 380 C 0.473 0.133 0.300 - - - 90.60 90.60% V. Satisfactory
Rabbit Construction & Development Corporation
8545 Reconstruction of Zamboanga City-Labuan-Limpapa Road 05/25/09 IX 46.600 365 C 0.454 0.133 0.300 - - - 88.70 88.70%
Satisfactory
Rabbit Construction & Development Corporation
8545Concreting of Zamboanga City-Labuan-Limpapa Road (Upper
Labuan Section)05/25/09 IX 18.874 185 O 0.343 0.240 0.150 0.030 0.056 0.050 86.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page332
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Rabbit Construction & Development Corporation
8545 Reconst. of Zamboanga City-Labuan-Limpapa Road 03/03/09 IX 46.600 365 O 0.346 0.243 0.150 0.030 0.060 0.050 87.90 -
Rabbit Construction & Development Corporation
8545Conc. of Zamboanga City-Labuan-
Limpapa Road (Upper Labuan Section)
09/01/09 IX 18.874 185 O 0.366 0.300 0.150 0.030 0.060 0.033 93.90 -
Rabbit Construction & Development Corporation
8545 Reconst. of Zamboanga City-Labuan-Limpapa Road 11/18/08 IX 46.600 365 O 0.320 0.300 0.100 0.030 0.045 0.100 89.50 -
Rabbit Construction and Development Corporation
8545 Zamboanga Airport Access Road (San Roque Sect.) 02/22/10 IX 4.713 165 C 0.386 0.200 0.300 - - - 88.60 88.60%
V.Satisfactory
Rachel Faye Construction 30339 Conc. of FMR at Amgaleyguey 06/05/10 CAR 0.330 36 C 0.411 0.200 0.300 - - - 91.10 91.10%
V. SatisfactoryRachel Faye Construction 30339 Restoration of Klondyke Flood
Control, Sta. 0+000-Sta. 0+026 08/29/10 CAR 4.824 53 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory
Rachki Enterprises (Formerly: Geto Construction)
17689 Improvement of FMR in Sto. Niño, Pagrai, Brgy. Mayamot 05/18/09 IV-A 4.804 169 O 0.383 0.240 0.150 0.020 0.025 0.033 85.10 -
Racso Construction 14601Preventive Maint. Along Nueva
Vizcaya-Ifugao-Mt. Province Bdry. Road
03/06/09 CAR 4.572 80 C 0.393 0.200 0.300 - - - 89.30 79.40% Unsatisfactory
Radd Construction 9649 Construction of Multi-Purpose Building 03/03/09 III 0.715 75 C 0.481 0.133 0.300 - - - 91.40 *91.40%
V. Satisfactory
RADD Construction 9649 Const. of Multi-Purpose Building, Brgy. San Joaquin 09/08/09 III 2.386 120 C 0.485 0.133 0.300 - - - 91.80 *91.80%
V. SatisfactoryRadiance Traders &
Builders 32891 Const. of 2-CL School Building, A.V. Mijares E/S 02/27/10 III 1.185 75 C 0.421 0.200 0.300 - - - 92.10 92.10%
V. SatisfactoryRadiance Traders &
Builders 32891 Const. of Alcala-Cabituculan East FTMR 02/27/10 III 0.936 118 C 0.408 0.200 0.300 - - - 90.80 88.10%
Satisfactory
Radiance Traders & Builders 32891
Road Upgrading (Gravel to Paved) Nueva Ecija-Aurora Rd. (Baler-
Cemento Sect.)08/22/10 III 5.562 120 C 0.405 0.151 0.300 - - - 85.60 85.60%
Satisfactory
Radiance Traders & Builders 32891 Repair of DPWH Bodega 05/27/09 III 0.960 120 C 0.407 0.200 0.300 - - - 90.70 *90.70%
V. SatisfactoryRadiance Traders &
Builders 32891 Construction of Two (2) CL School Building, Gupa E/S, Brgy, Gupa 03/03/09 III 1.189 90 C 0.474 0.149 0.300 - - - 92.30 *92.30%
V. SatisfactoryRadiance Traders &
Builders 32891 Const. of Alcala-Cabituculan East FTMR 09/08/09 III 0.936 118 O 0.300 0.300 0.150 0.030 0.050 0.033 86.30 -
Rain Construction 15959 Rehab./Reconst./Upgrading of Pres. Garcia Avenue 06/03/09 NCR 9.545 60 C 0.440 0.133 0.300 - - - 87.30 *87.30%
Satisfactory
Rain Construction 15959Const. of Slope Protection of Ridge
along Kalayaan Ave. Cor. C.P. Garcia Ave.
09/03/09 NCR 9.587 60 C 0.433 0.133 0.300 - - - 86.60 *86.60% Satisfactory
Rain Construction 15959 Repair/Rehab. at Muntinlupa E/S 02/18/10 NCR 0.985 45 C 0.425 0.133 0.300 - - - 85.80 85.80% Satisfactory
Rain Construction 15959Rehab./Reconst./Upgrading of Epifanio Delos Santos Avenue
(EDSA)06/07/10 NCR 4.769 25 C 0.441 0.200 0.300 - - - 94.10 94.10%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page333
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Rain Construction 15959 Rehab./Reconst./Upgrading of C.P. Garcia Ave. (C-5) 09/01/10 NCR 14.313 45 C 0.408 0.133 0.300 - - - 84.10 84.10%
Satisfactory
Ramarplus Incorporated 8092 Construction of Cagraray Eco Park (Phase III) 09/02/09 V 28.502 270 C 0.366 0.178 0.300 - - - 84.40 *84.40%
Satisfactory
Ramarplus Incorporated (Formerly: Ramar
Enterprises)8092 Road Opening of Pinagdapugan
Cotmon Road 05/31/10 V 19.204 90 C 0.267 - 0.500 - - - 76.70 76.70% Unsatisfactory
Ramijo Construction 10963 Repair/Rehab. of Road 03/04/09 VII 0.712 75 C 0.459 0.200 0.300 - - - 95.90 *95.90% V. Satisfactory
Ramijo Construction 10963 Repair/Rehab. of Road 03/04/09 VII 0.711 75 C 0.355 0.199 0.300 - - - 85.40 *85.40% Satisfactory
Ramijo Construction 10963 Const. of Multi-Purpose Pavement at Buhisan-Toong Road 09/02/10 VII 2.888 75 C 0.433 0.134 0.300 - - - 86.70 86.70%
Satisfactory
Ramona Construction & Enterprises 14661 Rehab./Impvt. of DPWH, Zamboanga
del Sur 1st DEO Building 04/08/11 IX 4.594 133 C 0.432 0.133 0.300 - - - 86.50 91.82% V. Satisfactory
Ramona Construction & Enterprises 14661
Rehab. of Lanao-Pagadian City-Zamboanga City Road, Anonang
Section Sta. 1623+000 - Sta. 1623.42003/05/10 IX 4.635 140 C 0.396 0.200 0.300 - - - 89.60 88.76%
V.Satisfactory
Ramona Construction & Enterprises 14661
Rehab. of Lanao-Pagadian City-Zamboanga City Road, Anonang Section (Sta. 1625+770 - 1628+35)
03/05/10 IX 4.645 130 C 0.333 0.200 0.300 - - - 83.30 83.30% Satisfactory
Ramona Construction & Enterprises 14661
Rehab. of Lanao-Pagadian City-Zamboanga City Road Anonang
Section Sta. 1625+340 - Sta. 1625+570
03/05/10 IX 4.637 120 C 0.333 0.200 0.300 - - - 83.30 83.30% Satisfactory
Ramona Construction & Enterprises 14661
Rehab./Const. of MPB at Brgy. Poblacion Buug, Zamboanga
Sibugay06/05/10 IX 0.934 120 C 0.483 0.133 0.300 - - - 91.60 91.60%
V. Satisfactory
Ramona Construction & Enterprises 14661 Const. of Usugan River Control (Jct.
Aurora-Ozamiz Nat'l. Highway) 08/28/10 IX 4.621 90 C 0.431 0.133 0.300 - - - 86.40 86.40% Satisfactory
Ramona Construction & Enterprises 14661
Asphalt Overlay along Pagadian City-Zamboanga City Rd. Rizal Ave. 2
Sect. (Km.1667+000 - Km.1668+000) 50mm thk.
08/28/10 IX 6.281 53 C 0.422 0.133 0.300 - - - 85.50 85.50% Satisfactory
Ramona Construction & Enterprises 14661
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Rds.,
Pagadian City Wharf Rd.08/27/10 IX 6.491 60 C 0.420 0.133 0.300 - - - 85.30 85.30%
Satisfactory
Ramona Construction & Enterprises 14661
Repair/Rehab. of Pagadian-Zamboanga City Rd. Km.1666+389 - Km.1667+000 w/ exceptions (Rizal
Ave. 4, Pagadian Sect.)
08/28/10 IX 4.637 59 C 0.406 0.133 0.300 - - - 83.90 83.90% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page334
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ramona Construction & Enterprises 14661
Asphalt Overlay along Pagadian City-Zamboanga City Rd. Rizal Ave. 1
Sect. Km.1665+427 - Km.1667+000 (50mm thk.)
08/28/10 IX 6.281 68 C 0.391 0.133 0.300 - - - 82.40 82.40% Satisfactory
Ramona Construction & Enterprises 14661
Asphalt Overlay along Pagadian City-Zamboanga City Rd. Tiguma-Tuburan Sect. Km.1663+000 -
08/28/10 IX 5.381 62 C 0.390 0.133 0.300 - - - 82.30 82.30% Satisfactory
Ramona Construction & Enterprises 14661
Rehab./Impvt. of DPWH Zamboanga del Sur 1st District Engineering
Building09/11/09 IX 0.920 70 C 0.406 0.191 0.300 - - - 89.70 86.13%
Satisfactory
Ramona Construction and Enterprises 14661
Siquijor Airport Dev't Project (Concrete Paving of Runway
Building)01/21/10 DOTC 9.594 90 C 0.444 0.200 0.300 - - - 94.40 94.40
V. Satisfactory
Ramona Construction and Enterprises 14661 Concreting of Poblacion Malangas
Road 03/04/09 IX 0.933 35 C 0.375 0.200 0.300 - - - 87.50 *87.50% Satisfactory
Ramsa Construction 25580 Const. of Calungbuyan Bridge 03/30/11 I 2.853 271 C 0.265 0.170 0.300 - - - 73.50 56.16% Poor
Ramsa Construction 25580Restoration of Road Slip/Slope
Protection, Bussawit Section, Manila North Road
02/19/10 I 0.965 43 C 0.339 0.200 0.300 - - - 83.90 83.90% Satisfactory
Ramsa Construction 25580 Impvt. of DPWH Ilocos Sur 1st DEO Building 05/29/10 I 4.756 250 O 0.364 0.240 0.150 0.022 0.029 0.033 83.80 -
Ramsa Construction 25580 Impvt. of DPWH Ilocos Sur 1st DEO Building and Quarters 09/21/10 I 4.756 250 C 0.498 0.133 0.300 - - - 93.10 86.59%
SatisfactoryRaykin Construction and
Supply 14404 Compostela-Cateel Road, Malibago Section 04/05/11 XI 18.840 195 C 0.478 0.177 0.300 - - - 95.50 86.17%
Satisfactory
RB Soriano Construction 22635 Thermal Moisture Protection (Re-roofing & Waterproofing) 08/26/10 U.P Manila 2.011 90 O 0.35 0.24 0.15 0.03 0.05 0.05 87.00 -
RBI Engineering & Construction 25310 Const./Impvt. of FMR Brgy.
Santissimo-Brgy. Atisan 02/19/10 IVA 4.824 75 C 0.410 0.200 0.300 - - - 91.00 91.00% V. Satisfactory
RCDG Construction Corporation / MJP Const.
& Development Corporation (JV)
JV-09-284
Widening/Conc. Of Commonwealth Ave. Incl. RROW (South Bound) incl.
Footbridge in front of Commonwealth E/S
09/03/10 NCR 27.324 108 O 0.321 0.240 0.150 0.030 0.045 0.033 81.90 -
RCDG Construction Corporation/MJP Const.
& Development Corporation (JV)
JV-09-284
Widening/Conc. of Commonwealth Ave. inc. RROW Sta.6+200 to Sta.6+400 (South Bound inc.
Footbridge infront of Commonwealth E/S)
04/08/11 NCR 29.859 189 O 0.377 0.232 0.000 0.030 0.045 0.050 73.40 -
RCDS Construction & Supply 32331
Repair/Rehab. of two (2) Rooms School Building, Pres. Quirino High
School, Brgy. Quirino03/31/11 NCR 1.428 60 C 0.460 0.133 0.300 - - - 89.30 *89.30%
V. Satisfactory
RCDS Construction & Supply 32331 Concreting of Sitio Dumalwa Road,
Incarizan 05/22/09 V 0.950 120 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory
RCDS Construction & Supply 32331 Construction of River Control Brgy.
San Francisco 05/29/09 V 4.777 113 C 0.368 0.200 0.300 - - - 86.80 *86.80% Satisfactory
R'Cel Gen. Contractor & Gen. Merchandise 13385
Widening of Alaminos-San Pablo City Section inc. Rehab. of Bridges
and Drainage Impvt. San Pablo Sect., Poblacion-San Francisco Sect.
04/05/11 IVA 14.471 171 C 0.447 0.200 0.300 - - - 94.70 89.12% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page335
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
R'Cel Gen. Contractor & Gen. Merchandise 13385
Widening of Alaminos-San Pablo City Section inc. Rehab. of Bridges
and Drainage Impvt. Alaminos Sect., San Agustin-San Benito Sect.
04/05/11 IVA 19.294 155 C 0.375 0.200 0.300 - - - 87.50 86.42% Satisfactory
R'Cel Gen. Contractor & Gen. Merchandise 13385 Repair/Rehab. of Municipal Library,
Brgy. San Jose 05/25/10 IVA 0.988 45 C 0.459 0.133 0.300 - - - 89.20 89.20% V. Satisfactory
R'Cel Gen. Contractor & Gen. Merchandise 13385 Rehab./Impvt. of Roads, Green Valley 05/28/10 IVA 24.118 24 C 0.355 0.200 0.300 - - - 85.50 85.50%
Satisfactory
R'Cel Gen. Contractor & Gen. Merchandise 13385
Impvt./Rehab./Asphalt Overlay of Lucena-Tayabas-Lucban Rd. along
Tiawe Sect.05/28/10 IVA 24.123 30 C 0.406 0.130 0.300 - - - 83.60 83.60%
Satisfactory
R'Cel Gen. Contractor & Gen. Merchandise 13385
Roads to Complete the Nautical Highways Eastern Nautical Highway
1. Rehab. of Quirino Highway (A) Quezon Side, Quezon 4th DEO 1. Guinayangan Sect. Inc. Road Slip
05/31/10 IVA 38.593 120 C 0.391 0.133 0.300 - - - 82.40 82.40% Satisfactory
R'cel Gen. Contractor & Gen. Merchandise 13385 Completion of Classroom Bldg. AT
Prudencia D. Fule Mem. NHS 02/19/10 IVA 1.876 80 C 0.453 0.200 0.300 - - - 95.30 95.30% V. Satisfactory
R'cel Gen. Contractor & Gen. Merchandise 13385
Rehab./Reconst./Upgrading of Damaged Nat'l Roads at Calamba-Sta. Cruz-Famy Road (Intermittent
Section)
02/19/10 IVA 38.580 150 C 0.416 0.200 0.300 - - - 91.60 91.60% V. Satisfactory
R'cel Gen. Contractor & Gen. Merchandise 13385 Completion of Classroom Bldg. at
San Pablo City NHS 02/19/10 IVA 0.263 80 C 0.410 0.200 0.300 - - - 91.00 91.00% V. Satisfactory
R'cel Gen. Contractor & Gen. Merchandise 13385
Widening of Alaminos-San Pablo City Sect. incl. Rehab. of Bridges
and Drainage Impvt., San Pablo City Sect., San Nicolas-San Rafael Sect.
08/25/10 IVA 19.295 150 O 0.317 0.293 0.150 0.030 0.023 0.033 #REF! -
R'Cel Gen. Contractor & Gen. Merchandise 13385 Const. of MPB at Brgy. Pob. 1 03/03/09 IV-A 1.337 60 C 0.461 0.155 0.300 - - - 91.60 *91.60%
V. SatisfactoryR'Cel Gen. Contractor &
Gen. Merchandise 13385 Rehab. Reconst. of MSR San Pablo Section 03/03/09 IV-A 19.254 15 C 0.477 0.131 0.300 - - - 90.80 *90.80%
V. Satisfactory
R'cel Gen. Contractor and Gen. Merchandise 13385 Const./Repair/Rehab. of Farm-to-
Market Road, Brgy. San Roque 09/04/09 IVA 0.480 25 C 0.458 0.200 0.300 - - - 95.80 *95.80% V. Satisfactory
R'cel Gen. Contractor and Gen. Merchandise 13385 Const./Repair/Rehab. of Farm-to-
Market Road, Brgy. San Rafael 09/04/09 IVA 0.478 30 C 0.445 0.133 0.300 - - - 87.80 *87.80% Satisfactory
RD Cobacha Construction 8878 Rehab. of Drainage System @ Brgy.
62-A 01/12/09 VIII 1.445 75 C 0.498 0.139 0.300 - - - 93.70 *93.70% V. Satisfactory
RD Pimentel Construction 19487 Rehab./Conc. Of Road at Holy Ghost
Proper Barangay 03/03/10 CAR 0.663 30 C 0.352 0.200 0.300 - - - 85.20 85.20% Satisfactory
Rden Construction & Supply 33707 Const. of 2-CL School Building at
Nabalawag HS, Brgy. Nabalawag 03/31/11 XII 1.215 70 C 0.452 0.133 0.300 - - - 88.50 *88.50% Satisfactory
RDG Construction & Supply (Formerly: RDG
Construction)19488 Conc. of Road at San Isidro Bridge,
Brgy. San Isidro 04/13/11 XI 0.971 75 C 0.436 0.200 0.300 - - - 93.60 *93.60% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page336
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
RDG Construction & Supply (Formerly: RDG
Construction)19488 Road Upgrading/Conc. of Eden-
Tagurano Rd. 06/01/10 XI 1.887 120 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
Readycon Trading & Const. Corp. 15452 Asphalt Overlay along P. Burgos-
Pototanin Jct. Road 02/24/09 IV-A 12.124 15 C 0.429 0.200 0.300 - - - 92.90 *92.90% V. Satisfactory
Readycon Trading & Const. Corp. 15452 Impvt./Rehab. of San Juan-Laiya
Road, Calubcub Section 03/06/09 IV-A 12.537 181 C 0.470 0.133 0.300 - - - 90.30 *90.30% V. Satisfactory
Readycon Trading & Construction Corporation 15452 Impvt./Rehab./Asphalting of Rosario-
San Juan Road, Calit-Calit Section 03/02/10 IVA 19.644 60 C 0.472 0.196 0.300 - - - 96.80 96.80% Outstanding
Readycon Trading & Construction Corporation 15452
Impvt./Rehab./Asphalting of Manila-Batangas Road, Banay-Banay
Section03/01/10 IVA 19.296 90 C 0.472 0.195 0.300 - - - 96.70 96.70%
Outstanding
Readycon Trading & Construction Corporation 15452
Asphalt Overlay/Impvt./Rehab. of Manila-Batangas Road, Calansayan-
Aguila Section03/01/10 IVA 19.294 90 C 0.470 0.196 0.300 - - - 96.60 96.60%
Outstanding
Readycon Trading & Construction Corporation 15452
Asphalt Overlay/Impvt./Rehab. of Manila-Batangas Road, Sabang
Section03/01/10 IVA 19.293 90 C 0.470 0.196 0.300 - - - 96.60 96.60%
Outstanding
Readycon Trading & Construction Corporation 15452 Asphalt Overlay/Impvt./Rehab. of
Manila-Batangas Road, Sico Section 03/01/10 IVA 19.294 90 C 0.471 0.194 0.300 - - - 96.50 96.50% Outstanding
Readycon Trading & Construction Corporation 15452 Impvt./Rehab./Asphalting of Rosario-
San Juan Road, Palahanan 03/02/10 IVA 19.644 60 C 0.467 0.196 0.300 - - - 96.30 96.30% Outstanding
Readycon Trading & Construction Corporation 15452 Impvt./Rehab./Asphalting of Lipa-
Rosario Road, Pinagkawitan Section 03/02/10 IVA 14.711 60 C 0.467 0.195 0.300 - - - 96.20 96.20% Outstanding
Readycon Trading & Construction Corporation 15452 Impvt./Rehab./Asphalting of Lipa-
Rosario Road, San Felipe Section 03/02/10 IVA 14.711 60 C 0.467 0.195 0.300 - - - 96.20 96.20% Outstanding
Readycon Trading & Construction Corporation 15452 Impvt./Rehab./Asphalting of Rosario-
San Juan Road, Maraykit Section 03/02/10 IVA 19.681 60 C 0.466 0.195 0.300 - - - 96.10 96.10% Outstanding
Readycon Trading & Construction Corporation 15452
Asphalt Overlay/Impvt./Rehab. of Rosario-San Juan Road, Calicanto &
Sico Section03/02/10 IVA 19.292 90 C 0.465 0.195 0.300 - - - 96.00 96.00%
V. Satisfactory
Rebcor Construction 18427 Const. of Multi-Purpose Building at Gabaldon Central School 06/02/09 III 2.459 75 C 0.438 0.200 0.300 - - - 93.80 *93.80%
V. Satisfactory
Rebcor Construction 18427 Const. of NOGROCOMA Brgy. Rizal 03/04/09 III 2.325 90 C 0.400 0.161 0.300 - - - 86.10 *86.10%Satisfactory
Red Car Trading & Construction 27368 Completion of 3 Storey, 12 CL (Ph II),
Muntinlupa High School 09/05/09 NCR 4.406 75 C 0.494 0.133 0.300 - - - 92.70 *92.70% V. Satisfactory
Red Scorpion Construction & Supply 32045 Completion of Barangay Hall At
Ampid 08/24/09 IVA 1.920 60 C 0.453 0.180 0.300 - - - 93.30 *93.30% V. Satisfactory
Red Scorpion Construction & Supply 32045 Const. of MPB at Phase I-D,
Kasiglahan Village, Brgy. San Jose 02/18/10 IVA 2.410 30 C 0.450 0.200 0.300 - - - 95.00 95.00% V. Satisfactory
Red Scorpion Construction & Supply 32045 Const. of Road, Brgy. Poblacion 06/05/09 IV-A 0.952 30 C 0.453 0.133 0.300 - - - 88.60 *88.60%
Satisfactory
Red Scorpion Construction & Supply 32045 Const. of Drainage System, Brgy.
Mag-ampon 06/05/09 IV-A 0.476 56 C 0.423 0.133 0.300 - - - 85.60 *85.60% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page337
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Redcar Trading & Construction 27368 Repair/Rehab. of Sch. Bldg. at Las
Piñas Central E/S 04/13/11 NCR 1.905 60 C 0.484 0.200 0.300 - - - 98.40 *98.40% Outstanding
Redcar Trading & Construction 27368 Const./Rehab. of Road inc. Drainage
at Brgy. Putatan 09/02/10 NCR 1.430 70 C 0.422 0.133 0.300 - - - 85.50 85.50% Satisfactory
Reggibuilt Construction & Supply 32988 Completion of MPB (Hall of Justice)
Brgy. 76-A 03/10/10 XI 5.669 150 C 0.474 0.200 0.300 - - - 97.40 92.57% V. Satisfactory
Reggibuilt Construction & Supply 32988 Impv't./Completion of Hall of Justice
Bldg. 09/08/10 XI 11.632 150 C 0.492 0.133 0.300 - - - 92.50 92.50% V. Satisfactory
Regional Infrastructure Development Corporation
26373 Conc. of NRJ Bayugan-Calaitan-Tandag Road 03/30/11 XIII 33.519 300 C 0.440 0.133 0.300 - - - 87.30 87.66%
Satisfactory
Regional Infrastructure Development Corporation
26373 Conc. of NRJ Cuevas-Bislig Road 03/31/11 XIII 19.279 220 C 0.379 0.178 0.300 - - - 85.70 85.91% Satisfactory
Regional Infrastructure Development Corporation
26373
Const./Conc. of Butuan City-Talacogon-La Paz-Veruela-Sta.
Josefa Road (Bacay-Veruela-Ihawan River-Nueva Gracia, Loreto Sect.)
04/01/11 XIII 47.950 403 C 0.363 0.200 0.300 - - - 86.30 85.22% Satisfactory
Regional Infrastructure Development Corporation
26373 Regravelling of Unpaved Rd. Surface along NRJ Cuevas-Bislig Road 03/31/11 XIII 9.430 210 C 0.350 0.200 0.300 - - - 85.00 *85.00%
Satisfactory
Regional Infrastructure Development Corporation
26373 Completion of Bacay Bridge along Veruela-Loreto Rd. 03/09/10 XIII 7.669 395 C 0.387 0.200 0.300 - - - 88.70 88.70%
Satisfactory
Regional Infrastructure Development Corporation
26373 Rehab./Gravelling of NRJ Karaos-Lapag-Sumogbong Rd. 03/07/10 XIII 2.354 105 O 0.384 0.228 0.150 0.030 0.042 0.033 86.70
Regional Infrastructure Development Corporation
26373Conc. of Sta. Josefa Boundary Veruela Section along National
Secondary Rd.03/09/10 XIII 4.765 160 C 0.425 0.133 0.300 - - - 85.80 86.40%
Satisfactory
Regional Infrastructure Development Corporation
26373Repair/Completion of the Sta. Maria
Flood Control Project along NRJ-Cuevas-Bislig Road
06/12/10 XIII 4.712 105 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory
Regional Infrastructure Development Corporation
26373 Rehab./Gravelling of NRJ-Karaos-Lapag-Sumogbong Road 06/12/10 XIII 2.354 105 C 0.367 0.200 0.300 - - - 86.70 86.70%
Satisfactory
Regional Infrastructure Development Corporation
26373 Restoration to Wawa Slip 06/08/09 XIII 3.973 150 C 0.454 0.200 0.300 - - - 95.40 *95.40% V. Satisfactory
Regional Infrastructure Development Corporation
26373 Const. of Earth Canal @ Talacogon-Lapaz Road 06/09/09 XIII 3.733 187 C 0.417 - 0.500 - - - 91.70 89.06%
V. Satisfactory
Regional Infrastructure Development Corporation
26373Const. of Earth Canal at Talacogon-La Paz Road, along Circumferential
Road 03/17/09 XIII 3.733 120 O 0.333 - 0.200 0.050 0.040 0.250 87.30 -
Regional Infrastructure Development Corporation
26373Concreting of Sta. Josefa Bdry.-
Veruela Sect. along National Secondary Rd.
09/14/09 XIII 4.764 145 O 0.376 0.225 0.139 0.030 0.065 0.033 86.80 -
Regional Infrastructure Development Corporation
26373 Conc. of NRJ-Calaitan-Tandag Rd. (Calaitan Sect.) 09/14/09 XIII 9.621 195 O 0.346 0.248 0.150 0.030 0.055 0.033 86.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page338
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Regional Infrastructure Development Corporation
26373Conc. of Sampaguita-Bdry. Sta.
Josefa Sect., along national Secondary Rd.
09/14/09 XIII 4.774 145 C 0.435 0.126 0.300 - - - 86.10 *86.10% Satisfactory
Regional Infrastructure Development Corporation
26373 Conc. of La Fortuna Main Brgy. Sect. along Circumferential Rd. 09/14/09 XIII 4.774 145 C 0.418 0.135 0.300 - - - 85.30 *85.30%
Satisfactory
Regional Planners and Builders 13636 Suclaran Port Development Project 04/25/09 DOTC 4.791 120 C 0.463 0.200 0.300 - - - 96.30 96.30%
OutstandingRely Construction &
Supply 10433 Conc. of Juction Lingig-Trento Road 11/27/08 XIII 28.878 230 O 0.342 0.212 0.100 0.030 0.043 0.100 82.70 -
Rely Construction & Supply 10433 Asphalt Overlay Jct.-Malalag, Davao
del Sur 03/05/09 XI 4.750 60 C 0.470 0.140 0.300 - - - 91.00 *91.00% V. Satisfactory
Rely Construction & Supply 10433
Impv't/Widening of Agusan-Davao Road, Daang Maharlika, Pob.
Carmen and Pob. Panabo03/13/09 XI 38.575 270 O 0.337 0.252 0.150 0.030 0.043 0.050 86.20 -
Rely Construction & Supply 10433 Conc. of Juction Lingig-Trento Road 03/14/09 XIII 28.878 230 O 0.329 0.300 0.150 0.030 0.037 0.050 89.60 -
Rely Construction and Supply 10433 Compostela-Cateel Road,
Dispatching-Mahilaya Sect. 04/05/11 XI 18.835 195 C 0.440 0.180 0.300 - - - 92.00 88.13% Satisfactory
Rely Construction and Supply 10433
Impvt./Rehab. along Babak-Samal-Kaputian Road Km. 1512+050-Km.
1524+000, Penaplata Kaputian Section
02/27/10 XI 19.185 120 C 0.438 0.133 0.300 - - - 87.10 87.10% Satisfactory
Rely Construction and Supply 10433
Impvt./Rehab. of New Katipunan-Poblacion Sto. Tomas, Km. 1488+000-
Km. 1495+000 (w/ exception) along Tagum-Panabo Circumferential Road
02/27/10 XI 19.183 60 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
Rely Construction and Supply 10433
Impvt./Rehab. along Babak-Samal-Kaputian Road, Km. 1502+000-Km. 1512+000 Babak-Penaplata Section
02/27/10 XI 19.186 120 C 0.346 0.133 0.300 - - - 77.90 77.90% Unsatisfactory
Rely Construction and Supply 10433
Imprv't./Const. of Baganga-New Bataan Road Sect., Baganga-
Tigabawan-Binondo Sect.06/07/10 XI 27.197 280 C 0.450 0.133 0.300 - - - 88.30 87.04%
Satisfactory
Rely Construction and Supply 10433 Compostela-Cateel Rd. Dispatching-
Mahilaya Sect. 06/06/10 XI 18.042 180 O 0.373 0.225 0.150 0.030 0.045 0.033 85.60 -
Rely Construction and Supply 10433
Rehab./Reconst./Upgrading of Damaged Paved National Rd. Sect.,
Lipata (Surigao Del Norte) Davao City Highway through Daang
Maharlika Rd. (Agusan to Davao Rd.)
06/02/10 XI 47.219 180 O 0.332 0.240 0.150 0.030 0.050 0.050 85.20 -
Rely Construction and Supply 10433
Rehab./Reconst./Upgrading of Damaged Paved National Rd. Sect.,
Lipata (Surigao del Norte) Davao City Highway Through Daang Maharlika
Rd. (Agusan to Davao Rd.)
09/01/10 XI 47.219 180 C 0.434 0.133 0.300 - - - 86.70 85.80% Satisfactory
Rely Construction and Supply 10433 Impvt./Rehab. of Agusan-Davao
Road,Guadalupe-Carmen Section 06/01/09 XI 9.434 60 C 0.400 0.200 0.300 - - - 90.00 *90.46% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page339
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Rely Construction and Supply 10433
Impvt./Widening of Agusan-Davao Road (Daang Maharlika), Pob.
Carmen and Pob. Panabo06/01/09 XI 38.574 270 C 0.483 0.133 0.300 - - - 91.60 88.36%
Satisfactory
Rely Construction and Supply 10433 Impvt./ Rehab. of Indangan-Acasia
Road 09/16/09 XI 19.289 90 C 0.457 0.200 0.300 - - - 95.70 *97.50% Outstanding
Rely Construction and Supply 10433
Impvt./Const. of Baganga-New Bataan Road Section, Baganga-
Tigabauan-Binondo Section09/12/09 XI 27.199 280 O 0.311 0.300 0.150 0.030 0.038 0.033 86.20 -
Rely Construction and Supply 10433 Conc. of Junction-Lingig-Trento
Road 06/05/09 XIII 28.877 260 C 0.401 0.200 0.000 - - - 60.10 75.73% Unsatisfactory
Remigio General Construction 2298 Repair/Restoration of Batac-Pinili
Road (Phase I) 04/04/11 I 4.813 65 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory
Remigio General Construction 2298 Repair/Rehab. of Road along Batac-
Pinili Road Km.473+030-Km.48+350 04/04/11 I 6.751 85 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory
Remigio General Construction 2298 Const. of 2-CL School Building,
Calioet Primary School 02/23/10 I 1.350 82 C 0.424 0.133 0.300 - - - 85.70 85.70% Satisfactory
Remigio General Construction 2298 Conc. of Brgy. Darat-Malate Road 02/22/10 I 1.922 40 C 0.231 0.200 0.300 - - - 73.10 73.10%
PoorRemigio General
Construction 2298 Repair & Completion of 2CL School Building Paayas E/S 06/01/10 I 0.482 26 C 0.403 0.133 0.300 - - - 83.60 83.60%
SatisfactoryRemigio General
Construction 2298 Rehab. of Quiaoit River Control, Brgy. Barani & Ben Agan 08/20/10 I 4.820 60 C 0.416 0.133 0.300 - - - 84.90 84.90%
SatisfactoryRemigio General
Construction 2298 Concreting of Farm-to-Market Road, Brgy. Talugtog 03/02/09 I 1.925 55 C 0.331 0.200 0.300 - - - 83.10 *83.10%
SatisfactoryRemjie's Construction
Development 13768 Const. of MPB, Reyes Compound, Brgy. San Antonio 02/17/10 NCR 1.907 60 C 0.465 0.133 0.300 - - - 89.80 89.80%
V.Satisfactory
Remp Enterprises 25196Asphalt Overlay along Olongapo-
Bugallon Rd., Km.138+469 - Km.139+299
05/20/10 III 4.880 30 C 0.415 0.133 0.300 - - - 84.80 84.80% Satisfactory
REMP Enterprises 25916 Asphalting of Mars St., Coral St., & Osmundson St., Gordon Heights 05/23/09 III 1.907 30 C 0.333 0.200 0.000 - - - 53.30 60.62%
Poor
Rend Enterprises & Gen. Contractor/ Northern
Builders (JV)JV-08-136
Asphalt Overlay w/ Rehab. Works PGMA Nautixal Highways,
Bongabong Section05/27/09 IV-B 19.053 101 C 0.236 0.200 0.300 - - - 73.60 -
Rend Enterprises & General Contractor 32382 Const./Completion/Continuation of
Lisap Bridge along CSR 04/06/11 IVB 28.727 207 C 0.400 0.200 0.300 - - - 90.00 88.50% Satisfactory
Revere Construction & Supply 17426
Rehab./Reconst./Upgrading of Damaged National Road, San Juan -
Laiya Road09/01/09 IVA 48.238 180 C 0.403 0.200 0.300 - - - 90.30 88.50%
Satisfactory
Revere Construction & Supply 17426
Rehab./Reconst./ Upgrading of Talisay - Laurel-Agoncillio Road
(Laurel-Agoncillo Sect.) (Intermittent Section)
09/02/09 IVA 48.239 120 C 0.408 0.200 0.300 - - - 90.80 88.28% Satisfactory
Revere Construction & Supply 17426 Road Upgrading of Talisay-Laurel-
Agoncillo Road 03/09/09 IV-A 13.506 150 C 0.481 0.133 0.300 - - - 91.40 89.72% V. Satisfactory
Revere Construction and Supply 17426 Widening of Balintawak Bridge
(including Redecking) 04/07/11 IVA 24.125 180 C 0.486 0.200 0.300 - - - 98.60 90.98% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page340
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Revere Construction and Supply 17426
Road Widening of Manila-Batangas City Road, Sto. Tomas-Malvar
Section04/08/11 IVA 48.242 190 C 0.404 0.200 0.300 - - - 90.40 86.47%
Satisfactory
Revere Construction and Supply 17426
Impvt. of Drainage and other Related Structures of Manila-Batangas City
Road, Sto. Tomas-Malvar Sect.06/10/10 IVA 11.574 90 O 0.374 0.225 0.150 0.015 0.050 0.033 84.70 -
Revere Construction and Supply 17426
Widening of Manila-Batangas Rd., Brgy. Maraouy, Lipa City Sect.
(Phase I)06/07/10 IVA 24.625 120 O 0.345 0.225 0.150 0.023 0.045 0.050 83.80 -
Revere Construction and Supply 17426
Restoration of Damaged Slope Protection, Daang Maharlika, San
Miguel08/16/10 IVA 1.929 90 C 0.456 0.133 0.300 - - - 88.90 88.90%
Satisfactory
Revere Construction and Supply 17426
Restoration of Collapsed Stone Masonry, Flood Control & Drainage,
San Vicente08/16/10 IVA 4.824 120 C 0.453 0.133 0.300 - - - 88.60 88.60%
Satisfactory
Revere Construction and Supply 17426
Impv't. of Drainage and Other Related Structures of Manila-
Batangas City Rd., San Tomas-Malvar Sect.
08/16/10 IVA 11.574 90 C 0.458 0.148 0.300 - - - 90.60 87.06% Satisfactory
Revere Construction and Supply 17426 Widening of Manila-Batangas Rd.,
Brgy. Maraouy Sect. (Phase I) 08/18/10 IVA 24.625 120 C 0.411 0.133 0.300 - - - 84.40 84.04% Satisfactory
Revere Construction and Supply 17426 Repair and Rehab. along Daang
Maharlika (LZ) of Batangas 05/20/09 IV-A 9.995 60 C 0.469 0.133 0.300 - - - 90.20 *90.20% V. Satisfactory
Revere Construction and Supply 17426
Rehab./Reconst./Upgrading of Damaged National Roads, Manila-
Batangas Road05/28/09 IV-A 9.818 120 C 0.454 0.133 0.300 - - - 88.70 *88.70%
Satisfactory
Revere Construction and Supply 17426
Rehab./Reconst./Upgrading of Damaged National Roads at San
Juan-Laiya Road05/28/09 IV-A 48.238 180 O 0.373 0.240 0.150 0.030 0.030 0.050 87.30 -
Revere Construction and Supply 17426
Rehab./Reconst./Upgrading of Damaged of Talisay-Laurel-Agoncillo
Road (Laurel-Agoncillo Section)05/22/09 IV-A 48.242 120 O 0.366 0.240 0.150 0.030 0.030 0.050 86.60 -
Rey Rose Construction & Supply 22934 Const. of Seawall, Purok 7, Brgy.
Tolosa 03/29/11 XIII 4.259 120 O 0.228 0.300 0.150 0.030 0.035 0.050 79.30 -
Rey Rose Construction & Supply 22934 Const./Completion of MPB (Day Care
Center) Brgy. Leon Kilat 06/16/10 XIII 0.520 60 C 0.461 0.171 0.300 - - - 93.20 93.20% V. Satisfactory
Reydan Builders 13059Road Upgrading (Gravel to Paved)
Cotabato-Marbel Road, Banga Section
04/08/11 XII 10.933 212 C 0.382 0.200 0.300 - - - 88.20 90.54% V. Satisfactory
Reydan Builders 13059 Const. of 2-CL Silway 8 NHS 09/15/09 XII 0.927 60 C 0.442 0.155 0.300 - - - 89.70 *89.70% V. Satisfactory
Reydan Builders 13059 Const. of School Building @ Polomolok National High School 06/17/10 XII 0.964 60 C 0.456 0.133 0.300 - - - 88.90 88.90%
Satisfactory
Reydan Builders 13059 Rehab./Reconst. of Damaged Paved, Makar-Tupi Rd., Polonuling 09/09/10 XII 18.670 144 C 0.423 0.200 0.300 - - - 92.30 92.30%
V. Satisfactory
Reydan Builders 13059Const. of School Building @ San Vicente (Bo.6), Brgy. Nat'l High
School06/05/09 R-XII 0.469 70 C 0.463 0.200 0.300 - - - 96.30 *96.30%
Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page341
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Reydan Builders 13059 Construction of Multi-Purpose Building, Brgy. Laconon 06/05/09 R-XII 0.801 98 C 0.418 0.200 0.300 - - - 91.80 *91.80%
V. Satisfactory
Reydan Builders 13059Concerting of Road & Reblocking Markel-Makar, Crossing Rubber
Section03/20/09 XII 11.332 120 C 0.459 0.200 0.300 - - - 95.90 *95.90%
V. Satisfactory
Reydan Builders 13059 Construction of Multi-Purpose Building, Brgy. M. Roxas 03/15/09 XII 0.800 98 C 0.449 0.200 0.300 - - - 94.90 *94.90%
V. Satisfactory
Reyrose Construction 20742Rehab./Reconst./Upgrading along
DSVR, Simpatuyo Bridge Approaches
04/01/11 II 4.822 197 C 0.433 0.133 0.300 - - - 86.60 *86.60% Satisfactory
Reyrose Construction 20742Rehab./Reconst./Upgrading of Dalaya Bridge Approaches #2
(DSVR)04/01/11 II 4.821 210 C 0.414 0.133 0.300 - - - 84.70 *84.70%
Satisfactory
Reyrose Construction 20742 Improvement (Concreting) of Access Road at Aparri Airport, Phase II 09/09/09 II 2.121 90 C 0.399 0.186 0.300 - - - 88.50 87.12%
Satisfactory
Reyrose Construction 20742 Conc. of Barangay Road at Mission 08/17/10 II 0.700 120 C 0.393 0.133 0.300 - - - 82.60 82.60% Satisfactory
Reyrose Construction & Supply 22934 Const. of Rd. along Boundaries of
Brgy. Pangbugan & Villakanaga 03/10/10 XIII 1.903 60 C 0.443 0.133 0.300 - - - 87.60 87.60% Satisfactory
RFN Construction & Development Corp. 8722 Construction of Livehood,
Production & Training Center 03/16/10 NHA 5.442 90 C 0.4679 0.1573 0.3000 - - - 92.52 92.52 V. Satisfactory
RFN Construction & Development Corp. 8722 Construction of one (1) Three-Storey
School Building 12/15/09 NHA 19.880 45 C 0.490 0.200 0.000 - - - 69.00 88.10% Satisfactory
RFN Construction & Development Corp. 8722 Const. of Livelihood, Production &
Training Center 02/18/10 NHA 4.992 90 O 0.3966 0.2550 0.150 0.030 0.050 0.050 93.16 -
RFN Construction & Development Corp. 8722 Construction of One (1) unit Three-
Storey School Building 09/18/09 NHA 18.108 150 O 0.375 0.300 0.150 0.030 0.058 0.050 96.33 -
RFN Construction and Development Corporation
8722
Construction of One (1) Unit Three-Storey, 15-Classroom School
Building at Southville 6 Housing Project (Building)
02/01/11 NHA 24.055 195 C 0.493 0.200 0.300 - - - 99.30 90.60% V. Satisfactory
RG & K Construction and General Merchandise 33021 Conc. of FMR, Natumulan 04/13/11 X 0.989 166 C 0.430 0.133 0.300 - - - 86.30 *86.30%
Satisfactory
RG & K Construction and General Merchandise 33021 Const. of School Building at MSU-IIT 06/10/10 X 1.063 150 C 0.482 0.133 0.300 - - - 91.50 91.50%
V. Satisfactory
RG & K Construction and General Merchandise 33021 Rehabilitation of Multi-Purpose
Building, Brgy. Poblacion 09/09/09 X 0.240 30 C 0.480 0.133 0.300 - - - 91.30 84.30% Satisfactory
RG & K Construction and General Merchandise 33021 Rehab./Impvt. of DPWH-Misamis
Oriental 2nd DEO Building 06/03/09 X 1.919 75 C 0.461 0.182 0.300 - - - 94.30 *94.30% V. Satisfactory
RG & K Construction and General Merchandise 33021 Concreting of Brgy. Road to Divine
Mercy, Ulaliman 06/03/09 X 1.444 62 C 0.404 0.144 0.300 - - - 84.80 82.70% Satisfactory
RG & K Construction and General Merchandise 33021 Rehab. of MPB, Brgy. Poblacion 03/11/09 X 0.240 30 C 0.421 0.133 0.300 - - - 85.40 *85.40%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page342
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
RGP Builders 20680
Road Upgrading (Gravel to Concrete) Based on Gravel road Strategies,
Talaba-Summit-Panaon Road, Km.188+097 - Km.188+499
03/29/11 IVA 9.296 194 C 0.450 0.200 0.300 - - - 95.00 88.16% Satisfactory
RGP Builders 20680 Const. of Multi-Purpose Building 02/15/10 IVA 2.120 30 C 0.492 0.133 0.300 - - - 92.50 92.50% V. Satisfactory
RGP Builders 20680 Const. of MPB (Covered Court) and Const. of Public Comfort Room 02/15/10 IVA 4.821 120 C 0.484 0.133 0.300 - - - 91.70 91.70%
V. Satisfactory
RGP Builders 20680 Const. of MPB, Padre Burgos Municipal Bldg. 02/15/10 IVA 4.819 120 C 0.415 0.200 0.300 - - - 91.50 91.50%
V. Satisfactory
RGP Builders 20680 Const. of MPB (Stage) at Dulong Bayan Elementary School 02/15/10 IVA 1.735 30 C 0.477 0.133 0.300 - - - 91.00 91.00%
V. Satisfactory
RGP Builders 20680 Impvt. of Dulong Bayan Elementary School Sports Facilities 02/16/10 IVA 1.928 30 C 0.381 0.200 0.300 - - - 88.10 88.10%
Satisfactory
RGP Builders 20680 Const. of 1-CL School Building Dulong Bayan E/S 08/25/09 IVA 0.524 90 C 0.451 0.133 0.300 - - - 88.40 *88.40%
SatisfactoryRhodwill Parts and
Hardware 18871 Compostela-Cateel Road, Mabuyong Section 04/05/11 XI 18.769 195 C 0.452 0.178 0.300 - - - 93.00 87.24%
SatisfactoryRhodwill Parts and
Hardware 18871 San Jose River Control 03/03/10 XI 4.714 120 O 0.400 0.240 0.150 0.023 0.049 0.050 91.20 -
Rhodwill Parts and Hardware 18871 San Jose River Control 06/07/10 XI 4.714 120 C 0.440 0.133 0.300 - - - 87.30 89.64%
V. SatisfactoryRhodwill Parts and
Hardware 18871 Conc. of Mati-Maragusan Road (Buso Section) 03/11/09 XI 19.298 145 C 0.402 0.200 0.300 - - - 90.20 85.40%
Satisfactory
Rhyes Builders & Supply 22115 Const. of School Building @ Aguadahan Elementary School 03/05/10 VIII 0.578 150 C 0.423 0.133 0.300 - - - 85.60 85.60%
Satisfactory
Rhyes Builders & Supply 22115 Conc. of Roads, Brgy. Buenos Aires 03/07/09 VIII 0.959 80 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory
Rhyes Builders & Supply 22115 Impvt./Rehab. of Caragas-Baribadon Road 03/07/09 VIII 1.439 120 C 0.419 0.200 0.300 - - - 91.90 *91.90%
V. Satisfactory
Rhyes Builders & Supply 22115 Const. of Lope de Vega-Bonifacio Road 09/14/09 VIII 19.015 180 C 0.454 0.194 0.300 - - - 94.80 94.80%
V. SatisfactoryRicafort Construction
and Supplies 14402 Construction of Multi-Purpose Building @ Brgy. Bantog 05/22/09 III 0.520 45 C 0.378 0.200 0.300 - - - 87.80 *87.80%
V. SatisfactoryRich Ads Construction &
Supply 31157 Const./Repair/Rehab. of Roads and Bridges, Darasa 04/08/11 IVA 0.449 45 C 0.346 0.200 0.300 - - - 84.60 *84.60%
Satisfactory
Rich Ads Construction & Supply 31157
Restoration of Road Slip & Collapsed Embankment Diokno
Highway, Mahabang Dahilig Sect.08/24/10 IVA 38.308 90 C 0.459 0.133 0.300 - - - 89.20 89.20%
V. Satisfactory
Richmark Construction 14227 BIP No. 06-2011 Construction of Open canal and Canal Structures 09/10/11 NIA 10.446 120 C 0.416 0.141 0.300 - - - 85.70 85.70%
Satisfactory Richpil Builders, Inc.
(Formerly: Richpil Builders)
30923 Rehab. of Manila East Rd. (Rosario-Cainta Rd.) 08/26/10 NCR 17.135 120 C 0.339 0.200 0.300 - - - 83.90 83.90%
Satisfactory
RIM Construction 15938 Rehab. of Cervantes-Sabangan Road 04/09/11 CAR 28.606 366 C 0.317 0.200 0.000 - - - 51.70 56.32% Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page343
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Rim Construction 15938 Rehab./Impvt. of Mountain Province-Ilocos Sur Road via Tue 03/09/09 CAR 19.012 369 O 0.351 0.300 0.150 0.030 0.050 0.050 93.10 -
Rim Construction 15938 Rehab./Impvt. of Mountain Province-Ilocos Sur Road via Tue 08/28/09 CAR 19.011 460 O 0.367 0.240 0.061 0.015 0.042 0.017 74.20 -
Rim Construction 15938 Rehab./Impvt. Of Mountain Province-Ilocos Sur Road via Tue 02/26/10 CAR 19.300 621 C 0.453 0.200 0.300 - - - 95.30 88.31%
Satisfactory
Rism Designer's and General Merchandise & Engineering Services
32830
Const. of One (1) unit Two (2) Classroom School Building at
Enriqueta Montilla National High School
03/10/10 VI 1.090 90 C 0.369 0.200 0.300 - - - 86.90 86.90% Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Completion of Opol Building 06/09/09 X 0.952 180 O 0.400 0.225 0.150 0.010 0.011 0.033 82.90 -
Ritche-Nathalie Builders and General Merchandise 27501 Tangub-Polao By-Pass Road 03/16/09 X 8.581 189 C 0.353 0.133 0.000 - - - 48.60 73.86%
Poor
Ritche-Nathalie Builders and General Merchandise 27501 Completion of Opol Bridge, Brgy.
Maningcol 09/16/09 X 0.951 204 C 0.357 0.200 0.300 - - - 85.70 84.02% Satisfactory
Ritchie-Nathalie Builders and General Merchandise 27501 Const./Completion/Repair of Sch.
Bldgs., Tudela NHS 04/06/11 X 0.564 90 C 0.451 0.133 0.300 - - - 88.40 *88.40% Satisfactory
Ritchie-Nathalie Builders and General Merchandise 27501 Regravelling of Labo-Calube Road 04/07/11 X 2.772 120 O 0.394 0.300 0.048 0.030 0.037 0.050 85.90 -
Ritchie-Nathalie Builders and General Merchandise 27501
Impvt./Extension of Carriageway along National Road Pagadian-Ozamiz Road, Km.1683+500 - Km.1685+000 with exception
06/01/10 X 7.718 60 C 0.443 0.200 0.300 - - - 94.30 94.30% V. Satisfactory
Ritchie-Nathalie Builders and General Merchandise 27501
Impv't./Expansion of Carriageway along Ozamis-Oroquieta Rd. Km.
1700+680 - Km. 1721+442 with exceptions
03/06/10 X 14.473 120 C 0.465 0.133 0.300 - - - 89.80 89.80% V. Satisfactory
RITVIT Construction & Development Corp.
Renov. Of Acct., Budget, HRD, Legal, UPMDFI, Provident Offices & Social
Hall (Building)02/17/11 UP 14.019 150 O 0.342 0.300 0.150 0.020 0.057 0.050 91.90 -
Ritvit Construction & Development Corporation
9426Renovation of Budget, Accounting,
HRDO, Legal, UPMDFI Provident Offices & Social Hall
08/26/10 U.P Manila 14.091 150 O 0.40 0.30 0.08 0.03 0.07 0.05 91.00 -
Ritz Commercial 19132Impvt./Rehab./Repair of Daang
Maharlika, KO209+000 - KO215+000, Tarlac - Poblacion Section
04/15/11 II 9.642 60 C 0.449 0.133 0.300 - - - 88.20 *88.20% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page344
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ritz Commercial 19132Impvt./Rehab./Repair of Daang
Maharlika, KO225+000 - KO231+000, Calitlitan-Bone North Section
04/14/11 II 9.643 60 C 0.439 0.133 0.300 - - - 87.20 *87.20% Satisfactory
Ritz Commercial 19132 Repair/Impvt. of MSR, Lopez-Calauag-Bicol Section (Intermittent) 03/28/11 IVA 9.284 60 C 0.405 0.200 0.300 - - - 90.50 *90.50%
V. Satisfactory
Ritz Commercial 19132 Repair/Impvt. of MSR, Gumaca-Lopez Section (Intermittent) 03/28/11 IVA 9.284 60 C 0.323 0.200 0.300 - - - 82.30 *82.30%
Satisfactory
Ritz Commercial 19132 Restoration/Impvt./Repair along Santiago-Baluarte-Quirino Bdry. Rd. 06/04/10 II 9.645 60 C 0.480 0.133 0.300 - - - 91.30 91.30%
V. Satisfactory
Ritz Commercial 19132Impvt./Rehab. of Mulanay-San
Francisco National Rd., Km.277+500 -Km.279+100, Intermittent Sect.
05/26/10 IVA 9.631 25 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
RLK Construction and Builders 32194 Const. of S/B @ Panganiban NHS 03/04/10 I 0.626 100 C 0.406 0.133 0.300 - - - 83.90 83.90%
SatisfactoryRLK Construction and
Builders 32194 Construction of Drainage at San Vicente 03/05/09 I 0.478 26 C 0.428 0.200 0.300 - - - 92.80 *92.80%
V. SatisfactoryRLK Construction and
Builders 32194 Agno River Integrated Irrigation Project 7/13-18/09 NIA 3.306 90 C 0.392 0.200 0.300 - - - 89.15 *89.15%
V. Satisfactory
RND Construction 7035 Agno River Integrated Irrigation Project 7/13-18/09 NIA 3.806 90 O 0.345 0.300 0.150 0.015 0.038 0.033 88.11 -
RNS Construction Engineering 34046 Const. of MPB @ Broce Elementary
School Awang 08/24/10 XII 1.914 50 C 0.440 0.133 0.000 - - - 57.30 57.30% Poor
RNT Construction 33490 Conc. of Casay-Inlagadian Road 05/24/10 V 4.709 90 C 0.347 0.200 0.300 - - - 84.70 84.70% Satisfactory
RNT Construction 33490 Conc. Of GK Drainage Canal 08/27/10 V 0.942 60 C 0.419 0.200 0.300 - - - 91.90 91.90% V. Satisfactory
RNV Construction 12570 Concreting of Parpagoha (Marigondon) Binoog Road 04/11/11 IV-B 14.470 100 C 0.454 0.200 0.000 - - - 65.40 66.60%
Poor
RNV Construction 12570 Const./Impvt. of Brgy. Poblacion Line Canal 08/24/10 IVB 1.446 130 C 0.434 0.200 0.300 - - - 93.40 87.46%
Satisfactory
Road Edge Trading & Development Services 33140
Impvt. / Rehab. of Roads along Manila-Batangas Road, Sto. Tomas
Sect., K0061+051-K0072+41909/09/09 IVA 4.823 60 C 0.480 0.133 0.300 - - - 91.30 *91.30%
V. Satisfactory
Road Edge Trading & Development Services 33140
Impvt. of Butuan-Cagayan de Oro City-Iligan Road, Km.1295+000 - Km.1296+363, Bonifacio Section
04/04/11 X 4.823 60 C 0.378 0.200 0.300 - - - 87.80 *87.80% Satisfactory
Road Edge Trading & Development Services 33140
Impvt. of Butuan-Cagayan de Oro City-Iligan Road, Km.1359+000 -
Km.1360+000, Panabol Sect.04/04/11 X 4.823 60 C 0.378 0.200 0.300 - - - 87.80 *87.80%
Satisfactory
Road Edge Trading & Development Services 33140
Rehab./Impv't. of Tabon Drainage Km. 1470+000 - Km. 1474+000
(Intermittent)03/04/10 XIII 4.815 85 C 0.497 0.133 0.300 - - - 93.00 93.00%
V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page345
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Road Edge Trading & Development Services 33140
Rehab./Impv't. of SDCR San Vicente-Bislig Drainage Km. 1454+000 to Sta.
1459+000 (Intermittent)03/04/10 XIII 4.815 60 C 0.480 0.133 0.300 - - - 91.30 91.30%
V.Satisfactory
Road Edge Trading & Development Services 33140
Repair/Rehab. of San Benito-Sta. Monica-Burgos-San Isidro Rd. San
Benito-Sta. Monica-Burgos-San Isidro Rd. Section
02/26/10 XIII 9.630 90 C 0.380 0.200 0.300 - - - 88.00 88.00% Satisfactory
Road Edge Trading & Development Services 33140 Repair/Rehab. of Dapa-General Luna
Rd., Dapa-General Luna Rd. Section 02/26/10 XIII 9.635 90 C 0.333 0.200 0.300 - - - 83.30 83.30% Satisfactory
Road Edge Trading & Development Services 33140
Impvt./Repair of San Benito-Sta. Monica-Burgos Rd. along Del
Carmen-San Benito-Sta. Monica-Burgos Rd. Sect.
09/03/09 XIII 4.815 120 C 0.414 0.150 0.300 - - - 86.40 *86.40% Satisfactory
Roadtech Construction 17580
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Urdaneta Jct.-Dagupan Road, Km.203+459 - Km. 206+777 w/
exception
04/07/11 I 15.589 150 O 0.390 0.240 0.150 0.018 0.037 0.033 86.80 -
Roadtech Construction 17580 Rehab./Reconst./Upgrading of Damaged Road, Calasiao Old Road 08/27/09 I 9.640 120 C 0.385 0.200 0.300 - - - 88.50 86.04%
Satisfactory
Roadtech Construction 17580Asphalt Overlay along Urdaneta Jct.-
Dagupan Road, Km. 196+877-Km. 197+977
03/01/10 I 9.263 30 C 0.384 0.200 0.300 - - - 88.40 88.40% Satisfactory
Roadtech Construction 17580
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Urdaneta Jct.-Dagupan Road, Km.203+064 - Km.203+423
06/03/10 I 3.705 12 C 0.460 0.133 0.300 - - - 89.30 89.30% V. Satisfactory
Roadtech Construction 17580Rehab./Reconst./Upgrading of Pangasinan-Nueva Ecija Road,
Rosales Section06/11/10 I 20.149 65 C 0.444 0.133 0.300 - - - 87.70 87.70%
Satisfactory
Roadtech Construction 17580Rehab./Reconst./Upgrading of Urdaneta Junction Dagupan
Lingayen Road, Urdaneta Section08/26/10 I 19.295 30 C 0.394 0.195 0.300 - - - 88.90 88.90%
Satisfactory
Roadtech Construction 17580Repair/Rehab. of Pangasinan-Nueva
Vizcaya Road, Km. 171+138-Km. 204+550, Tayug-Sn. Nicolas Section
08/27/10 I 11.977 29 C 0.381 0.191 0.300 - - - 87.20 87.20% Satisfactory
Roadtech Construction 17580 Rehab./Reconst./Upgrading of Binalonan-Asingan-Sta. Maria Road 05/19/09 I 9.640 28 C 0.483 0.133 0.300 - - - 91.60 *91.60%
V.Satisfactory
Roadtech Construction 17580Rehab/Replacement of Calvo Bridge
(Span 4 & 5), Carmen-Jctn.-Bayambang-San Carlos-Manat Road
03/07/09 I 48.245 506 C 0.468 0.159 0.300 - - - 92.70 82.59%Satisfactory
Robeth Gen. Mdse. Const. & Supplies -
Isulan Branch23175 Const. of One (1) Unit (1) Cl
Academic S/B @ Busok NHS 09/09/09 XII 0.552 75 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page346
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Robeth Gen. Mdse., Const. & Supplies-Isulan
Branch23175
Repair/Rehab. of National Roads along Isulan Hwy. Jct. Dukay-
Bagumbayan-Sen. Ninoy Aquino Road (Biwang-Sarmiento Section)
06/09/10 XII 5.741 50 C 0.420 0.133 0.300 - - - 85.30 85.30% Satisfactory
Robeth Gen. Mdse., Const. & Supplies-Isulan
Branch23175
Road Upgrading (Gravel to Concrete) along Isulan Hwy. Jct. Dukay-
Bagumbayan-Sen. Ninoy Aquino Rd. (Campo Cuatro Sect.)
08/31/10 XII 14.267 154 C 0.474 0.133 0.300 - - - 90.70 90.70% V. Satisfactory
Robeth Gen. Mdse., Const. & Supplies-Isulan
Branch23175 Road Upgrading (Gravel to Concrete)
Gamasil Section 06/03/09 R-XII 14.048 238 C 0.434 0.178 0.300 - - - 91.20 87.90% Satisfactory
Robeth Gen. Mdse., Const. & Supplies-Isulan
Branch23175 Road Upgarding, Gamasil Section 11/26/08 XII 14.048 225 O 0.161 0.300 0.100 0.030 0.043 0.100 73.40 -
Robeth Gen. Mdse., Const. & Supplies-Isulan
Branch23175 Road Upgrading, Gamasil Section 03/13/09 XII 14.048 225 O 0.390 0.300 0.150 0.030 0.060 0.050 8,918.30 -
Rockstone Construction Services & Supply 22702
Const. of Multi Purpose Pavement (Driveway and Drainage System)
Alabel National High School09/06/10 XII 0.738 84 C 0.462 0.133 0.300 - - - 89.50 89.50%
V. Satisfactory
Rockstone Construction Services & Supply 22702 Const. of Cuyapo Box Culvert along
Cotabato-General Santos Road 09/02/10 XII 2.860 140 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
Rockstone Construction Services and Supply 22702 Const. of 2-CL School Building at
Sinolon E/S 04/09/11 XII 1.061 105 O 0.373 0.239 0.150 0.030 0.035 0.050 87.70 -
Rockstone Construction Services and Supply 22702 Construction of Multi-Purpose Bldg.,
Brgy. Alegria 06/10/09 R-XII 0.469 90 C 0.373 0.156 0.300 - - - 82.90 *82.90% Satisfactory
Rockstone Construction Services and Supply 22702 Const. of MPB, Lugan National High
School 03/15/09 XII 0.754 105 C 0.500 0.133 0.300 - - - 93.30 84.83% Satisfactory
Rockstone Construction Services and Supply 22702
Const. of Sch. Bldg., Siodina Elementary School, Brgy. Gen.
Paulino Santos 03/15/09 XII 0.470 70 C 0.485 0.200 0.300 - - - 9,685.90 *98.50%
Outstanding
Rockworld Industries 7582 Const. of Burauen-Mahagnao Rd. 05/31/10 VIII 10.713 120 O 0.371 0.300 0.104 0.030 0.042 0.033 88.00 -
Rockworld Industries 7582 Construction of the Diversion Works of Tagbawto CIS - Phase 5 11/15-20/2010 NIA 4.022 90 C 0.456 0.160 0.300 - - - 91.56 91.56%
V. Satisfactory
Rockworld Industries 7582 Const./Impvt./Rehab. of Daang Maharlika, Maharlika Highway 09/09/09 VIII 14.159 180 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Rockworld Industries 7582 Rehab. of Daang Maharlika Road, Daang Maharlika Section 09/02/09 VIII 28.343 180 C 0.430 0.077 0.300 - - - 80.70 85.14%
Satisfactory
Rockworld Industries 7582 Concrete Paving of Biliran Circ. Road (Pawikan-Baso Section) 09/04/09 VIII 9.511 120 C 0.381 0.154 0.300 - - - 83.50 83.50%
Satisfactory
Rockworld Industries 7582 Const. of Burauen-Mahagnao Road 08/24/10 VIII 10.713 120 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page347
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Rocky 5 G Builders 32506Restoration along Benguet-Nueva Vizcaya Road, Km. 255+033-Km.
255+07308/29/10 CAR 1.946 120 C 0.350 0.183 0.300 - - - 83.30 83.30%
Satisfactory
Roda Construction and General Supply 19674 Conc. of Ariman-Bulusan Lake Road 05/26/10 V 19.200 82 O 0.352 0.237 0.150 0.030 0.035 0.033 83.70 -
Roda Construction and General Supply 19674 Conc. Of Ariman-Bulusan Lake Rd. 08/26/10 V 19.200 82 C 0.339 0.200 0.300 - - - 83.90 83.78%
Satisfactory
Roda Construction and General Supply 19674 Concreting of Farm-to-Market Road,
Magallanes St., Brgy. Zone 5 05/23/09 V 0.960 99 C 0.409 0.200 0.300 - - - 90.90 *90.90% V. Satisfactory
Roda Construction and General Supply 19674 Const. of Multi-Purpose Building,
Brgy. Camcaman 05/23/09 V 0.576 99 C 0.456 0.133 0.300 - - - 88.90 *88.90% Satisfactory
Roda Construction and General Supply 19674 Conc. of Pathway 02/26/09 V 0.480 99 C 0.434 0.200 0.300 - - - 93.40 *93.40%
V.SatisfactoryRoda Construction and
General Supply 19674 Const. of Multi-Purpose Pavement 02/26/09 V 0.288 99 C 0.482 0.133 0.300 - - - 91.50 *91.50% V. Satisfactory
Roda Construction and General Supply 19674 Rehab./Impvt. of Sitio Wawa-Brgy.
Lajong Road 08/26/09 V 1.920 60 O 0.314 0.269 0.150 0.030 0.047 0.050 86.00 -
Roda Construction and General Supply 19674 Completion of Multi-Purpose
Building, Brgy. N. Roque 02/16/10 V 0.960 60 C 0.476 0.133 0.300 - - - 90.90 90.90% V. Satisfactory
Roda Construction and General Supply 19674 Rehab./Impvt. of Sitio Pawa-Brgy.
Lajong Road 02/16/10 V 1.920 91 C 0.420 0.133 0.300 - - - 85.30 85.72% Satisfactory
Roim Builders & Construction Supply 20226
Regravelling of Unpaved Road Surface along NRJ Pulang Lupa-Sta.
Josefa Road03/31/11 XIII 4.696 150 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
Roim Builders & Construction Supply 20226 Conc. of Poblacion Bayugan,
Banaba Street 03/31/11 XIII 1.884 111 O 0.375 0.225 0.150 0.022 0.043 0.033 84.80 -
Roim Builders & Construction Supply 20226 Repair of Footbridges, Brgy. La
Caridad, Patin-ay 03/31/11 XIII 1.881 90 O 0.320 0.225 0.150 0.030 0.051 0.050 82.60 -
Roim Builders & Construction Supply 20226 Conc. of Provincial Road (NRJ
Bayugan-Bucac-Marcelina Road) 03/30/11 XIII 4.715 164 O 0.353 0.225 0.150 0.022 0.043 0.033 82.60 -
Roim Builders & Construction Supply 20226 Concreting of Brgy. Hubang 03/07/10 XIII 1.877 110 C 0.453 0.133 0.300 - - - 88.60 88.30%
SatisfactoryRoim Builders &
Construction Supply 20226 Completion of Bayugan 2, Apogan Road 06/08/09 XIII 2.797 160 C 0.467 0.133 0.300 - - - 90.00 85.02%
Satisfactory
Roim Builders & Construction Supply 20226 Rehab. Along Roxas Ave. & Imprv't.
of concrete Rd. @ Brgy. 3 09/12/09 XIII 1.885 120 C 0.389 0.173 0.300 - - - 86.20 *86.20% Satisfactory
Rola Construction 6813 Road Upgrading, Roxas City Boundary, Panitan-Bailan Rd. 03/01/10 VI 19.099 238 O 0.332 0.300 0.150 0.010 0.028 0.033 85.30 -
Rola Construction 6813Road Upgrading, Roxas City Bdry., Panitan-Bailan Rd. Km.121+000 -
Km.123+00006/15/10 VI 19.100 238 C 0.309 0.200 0.300 - - - 80.90 83.54%
Satisfactory
Rola Construction 6813 Construction of Road, Casuray-Ponong Road 06/03/09 V 8.129 89 C 0.425 0.190 0.300 - - - 91.50 *91.50%
V. SatisfactoryRolando M. Villasencio
Construction 24797 Const. of Four (4) CL Sch. Bldg. (7m x 36m), Cogon NHS 04/10/11 VIII 2.890 120 C 0.472 0.133 0.300 - - - 90.50 *90.50%
V. SatisfactoryRolingbel Construction &
Trading 32543 Slope Protection along Porac River, Valdez 02/17/10 III 4.782 45 C 0.411 0.200 0.300 - - - 91.10 91.10%
V. SatisfactoryRol-Mar Developer and
Enterprises 26151 Concreting of Road, Brgy. Consolacion 05/25/09 X 0.774 100 C 0.323 0.133 0.300 - - - 75.60 *75.60%
Unsatisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page348
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Romanjo Construction 32485 Concreting of Roads, Brgy. Burabod to San Rafael 06/01/09 V 0.936 90 C 0.445 0.133 0.300 - - - 87.80 *87.80%
SatisfactoryRonwood Construction &
Supply 25311 Completion of MPB, Brgy. 01 04/04/11 X 0.219 150 C 0.451 0.133 0.300 - - - 88.40 *88.40% Satisfactory
Ronwood Construction & Supply 25311
Const. of One (1) Unit Two (2) Storey Academic Bldg., Libertad NHS, Brgy.
Libertad04/12/11 XIII 2.137 120 O 0.339 0.276 0.150 0.030 0.047 0.050 89.20 -
Ronwood Construction & Supply 25311 Del Carmen-Sta. Monica-San Isidro
Rd. Sta. Monica-San Isidro Section 02/26/10 XIII 7.715 150 C 0.446 0.133 0.300 - - - 87.90 90.72% V. Satisfactory
Ronwood Construction & Supply 25311 Const. of Drainage System along
Purok 3 & 4, Brgy. Diego Silang 03/10/10 XIII 1.904 60 C 0.456 0.133 0.300 - - - 88.90 88.90% Satisfactory
Ronwood Construction & Supply 25311 Completion of Mahogany Bridge,
Brgy. Mahogany 03/10/10 XIII 2.435 75 C 0.437 0.133 0.300 - - - 87.00 87.00% Staisfactory
Ronwood Construction & Supply 25311 Jct. Osmeña-Pilar Road 02/26/10 XIII 13.239 225 C 0.484 0.133 0.300 - - - 91.70 86.12%
Satisfactory
Ronwood Construction & Supply 25311
Jct. Del Carmen-San Benito-Burgos Rd., Del Carmen-San Benito Rd.
Section02/26/10 XIII 17.126 261 O 0.371 0.240 0.104 0.030 0.047 0.033 82.50 -
Ronwood Construction & Supply 25311 Jct. Del Carmen-San Benito-Burgos
Road 06/05/10 XIII 17.126 261 C 0.434 0.189 0.300 - - - 92.30 88.40% Satisfactory
Ronwood Construction & Supply 25311 Completion of the Channel of
Osmeña-Dapa Flood Control 06/05/10 XIII 9.645 180 O 0.304 0.300 0.150 0.030 0.040 0.033 85.70 -
Ronwood Construction & Supply 25311
Jct. Cancohoy-Pilar Road Caridad-Pilar Section (Jt. Cancohoy-Pilar
Road Section)06/05/10 XIII 16.584 210 O 0.353 0.286 0.089 0.030 0.050 0.033 84.10 -
Ronwood Construction & Supply 25311 Jct. Cancohoy-Pilar Road, Caridad-
Pilar Section 08/28/10 XIII 16.584 210 O 0.352 0.300 0.150 0.023 0.050 0.033 90.80 -
Ronwood Construction & Supply 25311 Completion of the Channel of
Osmeña-Dapa Flood Control 08/28/10 XIII 9.645 240 O 0.345 0.266 0.150 0.008 0.045 0.050 86.40 -
Ronwood Construction & Supply 25311 Const. of Catangan-Cabitoonan-
Libertad Road & Bridges 11/21/08 XIII 9.644 180 O 0.284 0.213 0.100 0.030 0.032 0.100 75.90 -
Ronwood Construction & Supply 25311 Const. of Drainage System 08/19/08 XIII 0.928 45 C 0.381 0.300 0.300 - - - 98.10 93.48%
Outstanding
Ronwood Construction & Supply 25311 Dela Carmen-San Benito-San Isidro
Road along Cancohoy Section 11/21/08 XIII 7.718 145 O 0.307 0.272 0.100 0.030 0.032 0.100 84.10 -
Ronwood Construction & Supply 25311 Impvt./ (Conc.) of Access Road Jct.
BCIR to Balingoan Port Road 06/01/09 X 2.603 120 O 0.333 0.240 0.133 0.020 0.065 0.033 82.40 -
Ronwood Construction & Supply 25311 Impvt. (Concrete) of Access Roads
Junction BCIR, Balingoan Port Road 09/08/09 X 2.603 120 C 0.474 0.133 0.300 - - - 90.70 85.72% Satisfactory
Ronwood Construction & Supply 25311 Const. of Drainage System @ Brgy.
Datu Silongan 06/10/09 XIII 0.912 45 C 0.447 0.133 0.300 - - - 88.00 *88.00% Satisfactory
Ronwood Construction & Supply 25311 Cancohoy-San Isidro-Pilar Road, San
Isidro-Pilar Section 05/29/09 XIII 6.752 150 O 0.390 0.201 0.150 0.030 0.051 0.050 87.20 -
Ronwood Construction & Supply 25311 Conc. of SAFRAGEMC Subdivision
Road, San Isidro 06/08/09 XIII 2.825 150 O 0.427 0.133 0.300 - - - 86.00 84.98% Satisfactory
Ronwood Construction & Supply 25311 Del Carmen-Sta. Monica-San Isidro
Rd., Sta Monica-San Isidro Sect. 09/03/09 XIII 7.715 150 O 0.364 0.289 0.150 0.030 0.060 0.033 92.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page349
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ronwood Construction & Supply 25311
Jct. del Carmen-San Benito-Burgos Rd., Del Carmen-San Benito Rd.
Sect09/03/09 XIII 17.126 240 O 0.355 0.263 0.150 0.030 0.060 0.033 89.10 -
Ronwood Construction & Supply 25311 Cancohoy-San Isidro-Pilar Rd., San
Isidro-Pilar Rd. Sect. 09/03/09 XIII 6.752 150 C 0.409 0.133 0.300 - - - 84.20 86.00% Satisfactory
Ronwood Construction & Supply 25311 Jct. Osmeña-Pilar Rd. 09/03/09 XIII 13.239 210 O 0.326 0.225 0.150 0.030 0.060 0.033 82.40 -
Ronwood Construction & Supply 25311 Const. of Catngan-Cabitoonan-
Libertad Rd. & Bridge 09/09/09 XIII 9.644 244 C 0.367 0.200 0.000 - - - 56.70 71.01% Poor
Ronwood Construction & Supply 25311 Concohoy-San Isidro-Pilar Road 03/07/09 XIII 5.787 143 C 0.479 0.149 0.300 - - - 92.80 *92.80%
V. SatisfactoryRonwood Construction &
Supply 25311 Concreting of SAFRAGEMC Subdivision Road 03/17/09 XIII 2.825 150 O 0.324 0.252 0.150 0.030 0.037 0.050 84.30 -
Ronwood Construction & Supply 25311 Const. of Catangan-Cabitoonan-
Libertad Road & Bridges 03/07/09 XIII 9.644 194 O 0.353 0.237 0.150 0.030 0.032 0.050 85.20 -
Ronwood Construction & Supply 25311 Del Carmen-San Benito-San Isidro
Road along Cancohoy Section 03/07/09 XIII 7.718 165 C 0.409 0.144 0.300 - - - 85.30 84.58% Satisfactory
Roprim Construction 8546 Conc. of Pototan-Dingle-Tabugon Rd. 02/24/10 VI 43.380 240 O 0.334 0.284 0.150 0.030 0.033 0.050 88.10 -
Roprim Construction 8546 Conc. of Pototan-Dingle-Tabugon Rd. 06/17/10 VI 43.380 240 C 0.325 0.200 0.300 - - - 82.50 85.86%
Satisfactory
Roprim Construction 8546Rehab. of Capiz-Aklan Rd.
Km.324+000 - Km.328+905.50 w/ exception
06/14/10 VI 27.802 250 O 0.325 0.240 0.150 0.030 0.042 0.050 83.70 -
Roprim Construction 8546 Reblocking of Pototan-Mina-Janiuay Road 06/11/09 VI 9.545 232 C 0.433 0.200 0.300 - - - 93.30 88.41%
Satisfactory
Roprim Construction 8546 Reblocking of Pototan-Mina Janiuay Road 03/18/09 VI 9.545 232 O 0.348 0.300 0.150 0.030 0.060 0.050 93.80 -
Roprim Construction 8546Rehab. of Capiz-Aklan Road, Km.
324+000 - Km. 328+905.50 with exception
08/31/10 VI 27.802 250 C 0.424 0.133 0.300 - - - 85.70 84.50% Satisfactory
Roprim Construction 8546 Reblocking of Pototan-Mina Janiuay Road 12/04/08 VI 9.546 120 O 0.293 0.225 0.100 0.015 0.032 0.100 76.50 -
Rosand Builders 15781 Const. of MPB at Brgy. Mahayag 04/13/11 XI 0.583 60 C 0.466 0.200 0.300 - - - 96.60 *96.60% Outstanding
Rosand Builders 15781 Concreting of Road at Brgy. Atan-Awe 02/23/10 XI 1.125 90 C 0.375 0.200 0.300 - - - 87.50 87.50%
Satisfactory
Rosand Builders 15781 Road Upgrading/Conc. of Calinan-Baguio-Cadalian Rd. 05/31/10 XI 6.579 180 C 0.461 0.133 0.300 - - - 89.40 89.40%
V. Satisfactory
Rosand Builders 15781Rehab./Reconst. of Damaged Paved
National Roads at Davao City Diversion Rd. Ma-a-Shrine Rd. Sect.
06/16/10 XI 14.474 90 O 0.384 0.237 0.150 0.030 0.047 0.033 88.10 -
Rosand Builders 15781Rehab./Reconst. Of Damaged Paved
National Roads at Davao City Diversion Rd., Ma-a Shrine Rd. Sect.
09/09/10 XI 14.477 120 C 0.476 0.133 0.300 - - - 90.90 89.22% V. Satisfactory
Rosand Builders 15781Rehab./Reconst. of Damaged paved
Concrete Blocking along N. Domingo St., (Salapan Creek to Aurora Blvd.)
05/25/09 NCR 4.731 75 C 0.458 0.133 0.300 - - - 89.10 *89.10% V. Satisfactory
Rosand Builders 15781 Riprapping along Lagarian Creek, Brgy. West Kamias 03/02/09 NCR 2.276 45 C 0.000 0.150 0.300 - - - 45.00 *45.00%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page350
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Rosand Builders 15781
Riprapping/Dredging of Buaya-Evangelista Creek (Lagarian Creek to
Kalantian St.) Transversing Brgy. Tagumpay, Brgy. Bagumbuhay and
Brgy. Mangga
02/26/10 NCR 4.788 90 C 0.478 0.153 0.300 - - - 93.10 93.10% V.Satisfactory
Rosand Builders 15781 Construction of 3-Storey, 15 Classroom School Buildings 01/20/10 NHA 21.615 150 O 0.391 0.300 0.006 0.030 0.055 0.050 83.20 -
Rosand Builders 15781 Construction of Two-Storey Multi-Purpose Center 02/25/10 NHA 3.492 90 O 0.388 0.300 0.150 0.030 0.070 0.050 98.80 -
Rosand Builders 15781 Construction of 3-Storey, 15 Classroom School Building 04/14/10 NHA 21.605 350 O 0.397 0.300 0.150 0.030 0.050 0.050 99.70 -
Rosand Builders 15781 Rehabilitation/Reconstruction of Bayabas-Eden Road 05/25/09 XI 4.848 120 C 0.411 0.200 0.300 - - - 91.10 *91.10%
V. Satisfactory
Rosand Builders 15781
Rehab./Reconst./Upgrading of Damaged Paved National Roads at
Ma-a Road, Junction Maa Radio Station, Junction Jem Village Sect
09/16/09 XI 19.287 150 C 0.484 0.133 0.300 - - - 91.70 *91.70% V. Satisfactory
Rostel Construction & Supply 26934 Upgrading of Buenavista-Bunaguit
Road (Malpoc-Rizal Section) 03/29/11 XIII 10.563 180 C 0.379 0.200 0.300 - - - 87.90 86.49% Satisfactory
Rostel Construction & Supply 26934 Upgrading of Buenavista-Bunaguit
Road (Malpoc-Rizal Section) 05/31/10 XIII 10.663 135 O 0.374 0.249 0.150 0.023 0.035 0.033 86.40 -
Rostel Construction & Supply 26934 Upgrading of Buenavista-Bunaguit
Road (Malpoc-Rizal Section) 08/23/10 XIII 10.563 180 O 0.344 0.245 0.150 0.030 0.045 0.033 84.70 -
Rovilla Construction 19514 Conc. of Brgy. Road at Brgy. Pooc 04/09/11 VII 2.366 65 C 0.348 0.200 0.300 - - - 84.80 *84.80% Satisfactory
Rowies Construction 23595 Const. of Road, Cagwait 03/03/10 XIII 3.699 120 C 0.473 0.133 0.300 - - - 90.60 90.60% V.Satisfactory
Rowie's Construction 23595 Const. of MPB Surigao del Sur State University Fisheries Department 04/04/11 XIII 1.375 90 C 0.419 0.133 0.300 - - - 85.20 *85.20%
Satisfactory
Rowie's Construction 23595 Const. of MPB Surigao del Sur State University Main Campus 04/04/11 XIII 5.500 150 O 0.339 0.225 0.150 0.030 0.051 0.050 84.50 -
Rowie's Construction 23595 Const. of Water System 04/04/11 XIII 1.149 120 O 0.371 0.225 0.150 0.022 0.025 0.033 82.60 -
Rowie's Construction 23595 Rehab./Improvement of DPWH Surigao del Sur 1st DEO Bldg. 06/03/09 XIII 1.923 90 O 0.357 0.300 0.150 0.030 0.030 0.050 91.70 -
Rowie's Construction 23595Impvt. of Road Slip/Slope protection along Surigao-Davao Coastal Road
(SDCR), Daniog Road Section03/11/09 XIII 4.790 89 C 0.453 0.125 0.300 - - - 87.80 *87.80%
Satisfactory
Rowie's Construction 23595Impvt. of Road Slip/Slope protection along Surigao-Davao, Coastal Road
(SDCR), Antao Road Section, 03/11/09 XIII 4.790 99 C 0.438 0.133 0.300 - - - 87.80 *87.10%
Satisfactory
Rowie's Construction 23595Rehab./Imprv't. of DPWH Surigao del
Sur 1st Dist. Engineering Office Building
09/08/09 XIII 1.923 90 C 0.383 0.200 0.300 - - - 88.30 90.23% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page351
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Royal Crown Monarch Construction & Supplies
Corp. (Formerly: R.C. Miranda Const. &
Supplies)
9036 Asphalt Overlay along Romulo Highway, San Clemente Sect. 08/26/10 III 18.810 60 C 0.393 0.200 0.300 - - - 89.30 89.30%
V. Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation9036 Impvt./Rehab. along Cordon-Diffun-
Maddela-Aurora Bdry. Road 02/25/10 II 14.475 120 C 0.441 0.152 0.300 - - - 89.30 89.30% V. Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation9036 Rehab./Reconst./Upgrading of
Damaged Paved along Anao-Ramos 06/03/10 III 18.888 60 C 0.487 0.133 0.300 - - - 92.00 92.00% V. Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation9036
Rehab./Reconst./Upgrading of Damaged Paved along Romulo
Highway06/03/10 III 9.405 45 C 0.434 0.133 0.300 - - - 86.70 86.70%
Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation9036
Rehab./Reconst./Upgrading of Damaged Paved along Paniqui-
Poblacion06/03/10 III 9.339 60 C 0.428 0.133 0.300 - - - 86.10 86.10%
Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation9036
Concreting of Capas-Botolan Road, Km. 122+528-Km. 124+628, Capas
Section05/20/09 III 28.686 150 O 0.375 0.214 0.150 0.020 0.030 0.050 83.90 -
Royal Crown Monarch Construction & Supplies
Corporation9036 Const. of Multi-Purpose Building at
Tarlac College of Agriculture 09/02/09 III 9.355 150 O 0.358 0.300 0.150 0.030 0.056 0.050 94.40 -
Royal Crown Monarch Construction & Supplies
Corporation9036
Impvt./Widening/Conc. of McArthur (MNR) Phase V (Moncada San
Manuel Sect. CP1)09/02/09 III 61.461 150 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
Royal Crown Monarch Construction and
Supplies Corporation (Formerly: R.C. Miranda
Construction & Supplies)
9036 Const. of MPB at Tarlac College of Agriculture 02/24/10 III 9.355 164 C 0.468 0.200 0.300 - - - 96.80 91.62%
V. Satisfactory
Royal Sea Bees Construction 30099 Construction of Rizal Deepwells 09/03/09 CAR 2.769 140 C 0.333 0.200 0.300 - - - 83.30 *83.30%
Satisfactory
Royal Sea Bees Construction 30099 Implementation of Various Projects
under Package 15 11/17/08 CAR 0.933 120 O 0.241 0.214 0.100 0.030 0.030 0.067 68.20 -
RP Parayno Construction 32862 Dredging/Desilting & Const. of Drainage @ Zone I, III & Calomboyan 05/20/09 I 1.435 122 C 0.494 0.067 0.300 - - - 86.10 81.18%
Unsatisfactory
RPBJ Trading and Construction 30006 Impvt. of Drainage System @ Brgy.
#73 03/19/09 VIII 0.964 70 C 0.475 0.200 0.300 - - - 97.50 *97.50% Outstanding
RPParayno Construction 32862 Const. of MPB @ Poblacion East 08/31/10 I 0.482 105 C 0.462 0.133 0.300 - - - 89.50 89.50% V. Satisfactory
RPParayno Construction 32862 Impvt. of Main Building at PSU 08/30/10 I 0.578 105 C 0.448 0.133 0.300 - - - 88.10 88.10% Satisfactory
RRL Builders Corporation 23454 Construction of Academic Building
Extension - DOST 22.461 240 C 0.463 0.20 0.30 - - - 96.28 92.02% V. Satisfactory
RRL Builders Corporation 23454 Construction of Student Leaving
Center 06/23/10 DOST 16.032 240 C 0.489 0.20 0.30 - - - 98.90 92.11% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page352
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
RRMD Construction & Supply (Formerly: RRMD
Const.)23615 Conc. of Iligan-Bukidnon Road 03/15/09 X 8.939 212 C 0.366 0.133 0.300 - - - 79.90 84.04%
Satisfactory
RRMD Construction and Supply 23615
Rehab./Reconst./Upgrading of Damaged Paved National Roads,
Along Misamis Oriental-Ma.Cristina Bdry. Road Mandulog-Tambo-IIT
Section, Sta.1520+962 - Sta.1524+094
08/28/10 X 13.935 120 C 0.464 0.200 0.300 - - - 96.40 92.74% V. Satisfactory
RRMD Construction and Supply 23615
Rehab./Reconst./Upgrading of Damaged Paved National Rd., along Overton Buru-un Road at Buru-un Poblacion Section, Sta.1535+067 -
Sta 1535+803 50 w/exception
08/28/10 X 9.284 105 C 0.444 0.200 0.300 - - - 94.40 91.64% V. Satisfactory
RRMD Construction and Supply 23615
Rehab./Reconst./Upgrading of Damaged Paved National Road @
Bacolod Municipality Section, Sta.1549+000-Sta. 1551+000 w/
exception
09/14/09 X 18.464 150 C 0.339 0.200 0.300 - - - 83.90 *83.90% Satisfactory
RRMD Construction and Supply (Formerly: RRMD
Construction)23615
Conc. of Iligan-Bukidnon Road at Dodiongan Sect., Sta.1526+023 -
Sta.1526+365, Brgy..Digkilaan04/10/11 X 9.285 282 C 0.422 0.133 0.300 - - - 85.50 *85.50%
Satisfactory
RRMD Construction and Supply (Formerly: RRMD
Construction)23615
Rehab./Reconst./Upgrading along Misamis Oriental-Ma. Cristina Bdry. Road Mandulog-Tambo-IIT Section,
Sta.1520+962 - Sta.1524+094
06/07/10 X 13.935 120 O 0.378 0.240 0.150 0.030 0.055 0.050 90.30 -
RRMD Construction and Supply (Formerly: RRMD
Construction)23615
Rehab./Reconst./Upgrading along Overton Buru-un Road at Buru-un - Poblacion Section, Sta.1535+067 -
Sta.1535+803.50 w/ exception
06/10/10 X 9.284 105 O 0.373 0.240 0.150 0.030 0.055 0.050 89.80 -
RRMD Construction and Supply (Formerly: RRMD
Construction)23615
Conc. of Iligan-Bukidnon Rd. at Bonbonon Sect. (Sta. 1523+150 to
1523+385) Brgy. Bonbonon03/05/10 X 9.118 140 C 0.478 0.150 0.300 - - - 92.80 91.24%
V.Satisfactory
RSP Enterprises, Inc. 16795Completion of School Bldg. University of South Eastern Philippines, Mintal Campus
06/16/10 XI 9.435 170 C 0.485 0.133 0.300 - - - 91.80 91.73% V. Satisfactory
RSP Enterprises, Inc. 16795 Repair/Maintenance of DPWH Regional Office XI Quarters 06/12/10 XI 6.256 181 C 0.484 0.133 0.300 - - - 91.70 91.70%
V. Satisfactory
RSP Enterprises, Inc. 16795
Rehab./Reconst./Upgrading of Damaged Paved National Roads at Davao-Cotobato Old Road Libby
Section
09/16/09 XI 5.545 120 C 0.490 0.133 0.300 - - - 92.30 92.96% V. Satisfactory
RT Morabe Construction 11377 BIP No. 11-2011 Construction of Open canal and Canal Structures 09/06/11 NIA 7.071 105 O 0.359 0.258 0.150 0.023 0.057 0.050 89.74 -
Ruby Jade Construction 19202 Construction of Dinadiawan Road, Brgy. Dinadiawan 05/28/09 III 4.703 120 C 0.418 0.200 0.300 - - - 91.80 *91.80%
V. SatisfactoryRuby Lim Const. &
Supplies, Inc. 11685 Concreting of San Fernardo South Road 03/07/09 V 16.000 195 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Ruby-Jade Construction 19202 Rehab. of Lobbot Street 06/06/10 III 4.688 120 O 0.394 0.241 0.150 0.030 0.032 0.033 88.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page353
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ruby-Jade Construction 19202 Rehab. of Lobbot Street 08/21/10 III 4.688 120 C 0.363 0.200 0.300 - - - 86.30 87.32% Satisfactory
Ruby-Jade Construction 19202 Construction of Brgy. Lobbot Road 03/03/09 III 4.703 150 O 0.329 0.300 0.124 0.023 0.018 0.033 82.70 -
Ruby-Jade Construction 19202 Construction of Brgy. Lobbot Road 09/08/09 III 4.703 175 C 0.378 0.200 0.300 - - - 87.80 84.74% Satisfactory
Ruby-Jade Construction 19202 Rehab. of Mabini Rd. Km.7+185 - Km.8+585 08/19/10 NCR 9.975 120 C 0.421 0.133 0.300 - - - 85.40 85.40%
SatisfactoryRubylim Construction &
Supplies, Inc. 11685 Impvt. of San Fernando South Road, San Fernando Section 02/17/10 V 11.340 240 O 0.346 0.232 0.150 0.030 0.040 0.033 83.10 -
Rubylim Construction & Supplies, Inc. (Formerly: Ruby Lim Construction &
Supplies)
11685 Impv't. of San Fernando South Rd., San Fernando Sect. 08/24/10 V 11.340 240 C 0.375 0.200 0.300 - - - 87.50 84.86%
Satisfactory
Rubylim Construction & Supplies, Inc. (Formerly: Ruby Lim Construction &
Supplies)
11685 Road Upgrading of San Fernando South Rd. (Pinamoghaan Sect.) 08/24/10 V 19.100 170 O 0.292 0.300 0.150 0.020 0.035 0.033 83.00 -
Rudhil Construction & Enterprises, Inc./Jaykris
Enterprises (JV)JV-09-181
Concrete Paving of Junction-Imelda-Alicia Rd., Sta.1761+312 -
Sta.1761+873.6804/04/11 IX 13.682 285 C 0.470 0.133 0.300 - - - 90.30 *90.30%
V. Satisfactory
Ruiz Engineering Construction 16643 Completion of MPB (Covered Court),
Brgy. Bobon 04/12/11 XIII 0.944 45 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory
Ruiz Engineering Construction 16643 Construction of Multi-Purpose
Building (Covered court) 03/18/09 XIII 2.242 120 C 0.393 0.200 0.300 - - - 89.30 *89.30% V.Satisfactory
Rumil Construction 13484 Completion of MPB (Mangagoy Gymnasium) 03/04/10 XIII 2.858 92 C 0.500 0.133 0.300 - - - 93.30 85.44%
SatisfactoryRusmen Builders &
Development Corporation
10674Rehab./Reconst. /Upgrading of
Damaged National Road, Batangas - Lobo Road
09/01/09 IVA 48.240 180 C 0.475 0.133 0.300 - - - 90.80 89.96% V. Satisfactory
Rusmen Builders & Development Corporation
10674
Rehab./Reconst./Upgrading of Banay-banay-Cuena-Mojon Road
(Intermittent Sect.), Cuenca and Alitagtag
09/09/09 IVA 42.456 120 C 0.477 0.133 0.300 - - - 91.00 89.92% V. Satisfactory
Rusmen Builders & Development Corporation
10674Rehab./Reconst./Upgrading of
Damaged National Road at Batangas-Lobo Road
05/22/09 IV-A 48.240 180 O 0.384 0.240 0.150 0.030 0.040 0.050 89.40 -
Rusmen Builders & Development Corporation
10674Rehab./Reconst./Upgrading of
Damaged National Roads of Banay-banay-Cuenca-Mojon Road
05/20/09 IV-A 42.456 120 O 0.392 0.240 0.150 0.030 0.030 0.050 89.20 -
Rusmen Builders & Development
Corporation (Formerly: Rusmen Builders)
10674 Rehab. of Daang Maharlika, Sta. Anastacia-San Bartolome Section 06/10/10 IVA 19.299 90 C 0.482 0.143 0.300 - - - 92.50 92.50%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page354
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Rusmen Builders & Development
Corporation (Formerly: Rusmen Builders)
10674 Conc. of Brgy. Matipok-Brgy. Tamayo Rd. 06/02/10 IVA 4.822 90 C 0.468 0.133 0.300 - - - 90.10 90.10%
V. Satisfactory
Rusmen Builders & Development
Corporation (Formerly: Rusmen Builders)
10674 Const. of Roads, Brgy. Dayap-Brgy. Butucan 03/04/09 IV-A 9.549 120 C 0.479 0.133 0.300 - - - 91.20 *91.20%
V. Satisfactory
Rusmen Builders & Development
Corporation (Formerly: Rusmen Builders)
10674 Rehab./Reconst. of Banay-Banay-Mojon Road, Cuenca Rd. Section 1 03/07/09 IV-A 19.295 150 C 0.440 0.200 0.300 - - - 94.00 *94.00%
V. Satisfactory
S and CU Construction 13128Conc./Widening of Road, Jct. Sta. Fe-Magtangtang Leading to the Danao
Adventure Park03/31/11 VII 9.414 256 C 0.392 0.133 0.000 - - - 52.50 74.64%
Poor
S and CU Construction 13128 Const. of School Building, San Jose National High School 09/10/09 VII 1.042 175 O 0.400 0.257 0.150 0.030 0.042 0.033 91.20 -
S and CU Construction 13128 Completion of Multi-Purpose Building 09/01/09 VII 0.918 120 C 0.462 0.133 0.300 - - - 89.50 *89.50%
V. Satisfactory
S and CU Construction 13128 Const. of School Building, San Jose National High School 02/26/10 VII 1.042 175 C 0.457 0.175 0.300 - - - 93.20 91.80%
V. Satisfactory
S.M Castro Management & Construction Services 18216 Rehab./Impvt. Of Jct. Osmeña-Pilar-
Magpupungko Road 06/05/10 XIII 19.289 120 C 0.467 0.122 0.300 - - - 88.90 88.90% Satisfactory
S.M Castro Management & Construction Services 18216
Impv't/Rehab./Conc. of Butuan City-Malaybalay Road, Sta.1239+832-
Sta.1272+248 with exception, 03/18/09 XIII 9.626 150 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V.Satisfactory
S.M Castro Management & Construction Services 18216 Rehab./Impvt. of General Luna-Dapa-
Sayak Airport Road 03/07/09 XIII 19.290 120 C 0.441 0.133 0.300 - - - 87.40 *87.40% Satisfactory
S.T Hidalgo Construction 22498 Const. of Flood Control Brgy. Linao 02/26/10 VIII 4.745 198 C 0.421 0.178 0.300 - - - 89.90 84.53% Satisfactory
S.T Hidalgo Construction 22498 Construction of Flood Control, Brgy. Linao 05/28/09 VIII 4.745 90 O 0.310 0.240 0.150 0.022 0.030 0.033 78.50 -
S.T Hidalgo Construction 22498 Construction of Flood Control 03/04/09 VIII 4.745 90 O 0.312 0.300 0.150 0.020 0.019 0.033 83.40 -
Sabutan Construction 5520
Road Support Peace & Dev't in Mindanao & Other Conflict affected Area, Quirino Highway, Sto. Niño-
Sta. Monica-Sta. Cecilia (Int. Section)
02/27/09 IVA 47.701 148 C 0.474 0.133 0.300 - - - 90.70 *90.70% V. Satisfactory
Saint Bernard Construction 28386 Rehab. of Napolidan Spillway 08/30/10 V 5.650 120 C 0.389 0.200 0.300 - - - 88.90 88.90%
SatisfactorySaint Bernard Construction 28368 Concreting of Roads, Brgy.
Colacling 06/07/09 V 1.418 120 C 0.377 0.200 0.300 - - - 87.70 *87.70% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page355
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Saint Bernard Construction 28368 Concrete Pedestrian Bridge 03/12/09 V 0.947 112 C 0.420 0.200 0.300 - - - 92.00 *92.00%
V. SatisfactorySaint Bernard Construction 28368 Construction of Luban-Cagmanaba-
Pawili Road 03/22/10 V 4.777 120 C 0.422 0.160 0.300 - - - 88.20 88.20% Satisfactory
SAL Construction 34646 BIP No. 11-2011 Construction of Open canal and Canal Structures 09/06/11 NIA 6.977 105 O 0.360 0.260 0.150 0.023 0.057 0.050 90.00 -
Sammi Construction Company Ltd. FC-05-008
CP IV, Const./Impvt of Looc-Odiongan-San Andres Road Rural
Road Network Development Project05/21/09 RRNDP 646.871 890 O 0.347 0.300 0.074 0.030 0.037 0.050 83.80 -
Sammi Construction Company Ltd. FC-05-008 CP IV, Const./Impvt. of Looc-
Odiongan-San Andres Road 08/30/09 RRNDP 698.808 980 O 0.348 0.240 0.149 0.030 0.051 0.033 85.10 -
Sammi Construction Company Ltd. FC-05-008
Contract Package IV, Const./Impvt. of Looc-Odiongan-San Andres Road,
Km 101+965.00 - Km. 143+560.6802/22/10 RRNDP 646.871 750 O 0.359 0.300 0.150 0.030 0.061 0.050 95.00 -
Sammi Construction Company Ltd. FC-05008 CP IV, Const./Impvt. of Looc-
Odiongan-San Andres Road 08/29/08 IV-B 649.871 750 O 0.400 0.300 0.050 0.030 0.070 0.067 91.70 -
Sammi Construction Company Ltd. FC-05-008 CP IV, Const./Impvt. of Looc-
Odiongan-San Andres Road 11/25/08 IV-B 649.871 750 O 0.365 0.300 0.030 0.030 0.070 0.067 86.20 -
San Fernando Builders 21295 Construction of 2-CL School Building @ Bacnotan NHS Annex 09/02/09 I 1.254 80 C 0.452 0.200 0.300 - - - 95.20 *95.20%
V. Satisfactory
San Fernando Builders 21295 Const. of MPB (Phase V) 02/26/10 I 0.975 120 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
San Guillermo Construction and Trading
Corporation25661
Rehab. (Slope Protection) along Sagbat-Pililla Diversion Rd., Pililla
Bridge I, Km.57+20806/10/10 IVA 0.960 30 C 0.428 0.200 0.300 - - - 92.80 92.80%
V. Satisfactory
San Guillermo Construction and Trading
Corporation25661 Rehabilitation of Alley Area 1 & 2,
Balubad, Brgy. Nangka 05/28/09 NCR 1.805 90 C 0.328 0.200 0.300 - - - 82.80 *82.80% Satisfactory
San Marusco Builders 24527 Construction of School Canteen 9/10/09 DOST 0.445 60 C 0.480 0.188 0.300 - - - 96.80 96.80% Outstanding
San Narciso Builders 24527 Construction of Sports Complex Building 04/07/10 DOST 6.279 180 C 0.495 0.20 0.30 - - - 99.52 97.05%
Outstanding
San Narciso Builders 24527 Const. of Academic Hub (Building) 02/09/11 DOST 4.628 192 C 0.490 0.200 0.300 - - - 99.00 99.00% Outstanding
San Narciso Builders 24527 Const. of Academic Building 2 02/09/11 DOST 18.741 480 C 0.472 0.193 0.300 - - - 96.50 94.22% V. Satisfactory
Sandstrom Construction 23411 Const./Completion of Multi-Purpose Structure in Brgy. Bucal 09/05/09 IVA 0.399 30 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. SatisfactorySanlahi Group of
Builders Inc. 11874 Rehabilitation/Reconstruction of Calapan South Road 09/03/09 IVB 12.545 100 C 0.424 0.200 0.300 - - - 92.40 91.50%
V. SatisfactorySanlahi Group of
Builders Inc. 11874 Conc. of Calapan North Road (Calapan-Puerto Galera Section) 09/03/09 IVB 48.162 370 O 0.332 0.292 0.150 0.030 0.047 0.033 88.40 -
Sanlahi Group of Builders Inc. 11874 Rehabilitation/Reconstruction of
Calapan South Road Section 05/25/09 IV-B 12.544 90 O 0.338 0.286 0.150 0.030 0.055 0.050 90.90 -
Sanlahi Group of Builders Inc. 11874 Conc. of Calapan North Road
(Calapan-Puerto Galera Section) 05/24/09 IV-B 48.152 295 O 0.327 0.297 0.150 0.030 0.045 0.033 88.20 -
Sanlahi Group of Builders Inc. 11874 Conc. of Calapan North Road
(Calapan-puerto Galera Sec.) 02/25/09 IV-B 48.152 270 O 0.251 0.223 0.150 0.030 0.042 0.050 74.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page356
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sanlahi Group of Builders, Inc. / 811
Trading & Construction (JV)
JV-09-248 Rehab. of Calapan South Road, Tiguisan Section 04/06/11 IVB 20.019 200 C 0.431 0.135 0.300 - - - 86.60 *86.60%
Satisfactory
Sanlahi Group of Builders, Inc./811 Trading
& Construction (JV) JV-08-360
Completion of Mindoro Oriental/Occidental East Coastal
Road, Maujao-Gawad Kalinga Sect.02/18/10 IVB 44.785 318 C 0.450 0.133 0.300 - - - 88.30 85.42%
Satisfactory
Sanlahi Group of Builders, Inc./811 Trading
& Construction (JV) JV-08-277
Road Upgrading (Gravel to paved) Concreting of MOOECR KO205+894-
KO207+93702/19/10 IVB 43.425 200 C 0.335 0.200 0.300 - - - 83.50 83.50%
Satisfactory
Sanlahi Group of Builders, Inc./811 Trading
& Construction Joint Venture
JV-09-253Road Upgrading (Gravel to Paved) of
Jct. MWCR Labangan-Murtha-Jct., Iriron Road
08/27/10 IVB 38.600 250 O 0.349 0.046 0.150 0.030 0.030 0.033 63.80 -
Sanrho Construction and Supplies 24213
DM Jct.-Legazpi-Sto. Domingo-Tabaco-Tiwi-Cam. Sur Bdry. Road, Sto. Domingo, Bacacay & Malilipot
Section
02/22/10 V 9.634 150 C 0.460 0.133 0.300 - - - 89.30 89.30% V. Satisfactory
Sanrho Construction and Supplies/3RB
Construction and Supply Joint Venture
JV-09-063 Dredging of Tagas River (Basud-Cobo-Barangawon Section) 05/28/10 V 14.395 75 C 0.342 - 0.500 - - - 84.20 84.20%
Satisfactory
Santech Builders 16797Conc. of Lake Mainit Circumferential
Rd., Tagbuyawan-Mansayao Rd. Section
03/01/10 XIII 9.143 328 C 0.380 0.200 0.300 - - - 88.00 86.14% Satisfactory
Santech Builders 16797 Impvt. of Kinabutan River Control 11/24/08 XIII 4.765 90 O 0.357 0.200 0.050 0.015 0.035 0.200 85.70 -
Santech Builders 16797 Impvt. of Kinabutan River Control, Brgy. Rizal 05/28/09 XIII 4.765 432 C 0.375 0.200 0.300 - - - 87.50 87.22%
Satisfactory
Santech Builders 16797 Impvt. of Kinabutan River Control 03/09/09 XIII 4.765 331 O 0.347 0.300 0.111 0.030 0.037 0.033 85.80 -
Santech Builders 16797 Conc. of Lake Mainit Circ. Rd. Tagbuyawan-Mansayao Rd. Sect. 09/06/09 XIII 9.143 238 O 0.348 0.233 0.150 0.030 0.055 0.033 84.90 -
Sapdoy Enterprises (Formerly: William
Sapdoy Enterprises)21995 Rehab. & Conc. of Road at Upper
Market 06/08/10 CAR 1.419 55 C 0.335 0.200 0.300 - - - 83.50 83.50% Satisfactory
Sarangani Rockmixer 6549Sarangani-Davao Del Sur Coastal
Road, Glan-Poblacion-Taluya Section
09/16/09 XII 18.828 150 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfactory
Sarangani Rockmixer 6549 Sarangani-Davao del Sur Coastal Road (Malapatan-Glan Section) 06/15/10 XII 14.856 120 O 0.318 0.240 0.150 0.030 0.047 0.050 83.50 -
Sarangani Rockmixer 6549 Sarangani, Davao del Sur Coastal Road (Malapatan-Glan Section) 09/07/10 XII 14.856 120 C 0.438 0.133 0.300 - - - 87.10 84.94%
Satisfactory
Sarangani Rockmixer 6549Asphalt Overlay/Upgrading of Digos-Makar Road (Ligaya Section), Brgy.
Katangawan06/09/09 R-XII 18.880 180 C 0.419 0.200 0.300 - - - 91.90 93.76%
V. Satisfactory
Sarca Estate Development Corporation
20520 Const. of Polangyuta-Caitican-Songkolan Rd. 04/04/11 VII 19.205 416 C 0.412 0.200 0.300 - - - 91.20 91.20%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page357
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sarca Estate Development Corporation
20520 Const. of Bolos-Cang-Adieng-Caipilan Road 08/31/10 VII 19.299 406 O 0.358 0.300 0.150 0.030 0.028 0.033 89.90 -
Sarca Estate Development Corporation
20520 Asphalt Overlay along Tayabas-Mainit-Mauban Rd. 02/26/09 IV-A 14.461 20 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
Sarex Builders 23734 Const. of MPB, Brgy. Poblacion 04/12/11 XII 1.538 90 C 0.423 0.150 0.300 - - - 87.30 *87.30% Satisfactory
Sarex Builders 23734 Sarangani-Davao Del Sur Coastal Road, Cablalan-Baliton Sect. 09/17/09 XII 9.450 180 C 0.418 0.200 0.300 - - - 91.80 89.10%
V. Satisfactory
Sarex Builders 23734Const./Completion/Continuation of Unfinished RCDG Bridge @ Upper
Tacupan 09/03/09 XII 3.790 90 C 0.443 0.133 0.300 - - - 87.60 *87.60%
Satisfactory
Sarex Builders 23734 Const. of Multi-Purpose Building @ Libungan Central Elem. School 09/02/09 XII 3.791 110 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
Sarex Builders 23734 Const. of Multi-Purpose Building at Baguer 02/26/10 XII 1.511 80 C 0.469 0.200 0.300 - - - 96.90 96.90%
Outstanding
Sarex Builders 23734 Repair of MPB at Brgy. Kilagasan 06/03/10 XII 0.285 40 C 0.442 0.133 0.300 - - - 87.50 87.50% Satisfactory
Sarex Builders 23734 Const. of MPB @ Brgy. Bangilan 06/03/10 XII 0.404 40 C 0.351 0.200 0.300 - - - 85.10 85.10% Satisfactory
Sarex Builders 23734 Rehab./Impvt. of DPWH Sarangani DEO Building 06/16/10 XII 4.695 150 O 0.350 0.240 0.074 0.030 0.045 0.033 77.20 -
Sarex Builders 23734Const. of MPB, Phase I, Covered Court, Agriculture Department,
University of Southern Mindanao08/26/10 XII 0.470 60 C 0.440 0.133 0.300 - - - 87.30 87.30%
Satisfactory
Sarex Builders 23734 Const./Impvt. of Lun Padidu River Flood Control 09/06/10 XII 9.599 160 C 0.435 0.133 0.300 - - - 86.80 86.80%
Satisfactory
Sarex Builders 23734 Sarangani-Davao del Sur Coastal Road (Gumasa-Cablalan Section) 09/07/10 XII 9.597 150 C 0.410 0.128 0.300 - - - 83.80 83.80%
Satisfactory
Sarex Builders 23734 Rehab./Impvt. of DPWH Sarangani DEO Building 09/06/10 XII 4.695 150 C 0.489 0.176 0.300 - - - 96.50 82.99%
Satisfactory
Sarex Builders 23734Conc./Widening of Bukidnon-
Cotabato Road, Poblacion-General Luna Section
05/28/09 R-XII 9.447 95 C 0.455 0.200 0.300 - - - 95.50 *95.50% V. Satisfactory
Sarex Builders 23734 Const. of School Building at Kabacan Central School 05/28/09 R-XII 0.475 30 C 0.379 0.200 0.300 - - - 87.90 *87.90%
Satisfactory
Sarex Builders 23734Rehab./Conc. of Road along Davao-Cotabato Road, Manuangan-Panatan
Section03/04/09 XII 9.472 204 C 0.482 0.200 0.300 - - - 98.20 *98.20%
Outstanding
Satrap Construction Company Inc. 2526 Upgrading of Manila North Road 05/29/10 I 25.670 340 O 0.396 0.240 0.150 0.030 0.059 0.050 92.50 -
Satrap Construction Company Inc. 2526
Asphalt Overlay along Manila North Road and National Secondary Road,
Km.406+180 - Km.407+55005/29/10 I 4.797 73 C 0.489 0.133 0.300 - - - 92.20 92.20%
V. Satisfactory
Satrap Construction Company Inc. 2526 Upgrading of Manila North Road 08/20/10 I 25.670 340 O 0.379 0.240 0.150 0.030 0.050 0.050 89.90 -
Satrap Construction Company Inc. 2526 Replacement of Quirino Bridge 08/02/10 I 20.434 550 O 0.366 0.240 0.150 0.030 0.050 0.033 86.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page358
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Satrap Construction Company Inc. 2526 Improvement of San Fernando
Airport 01/26-29/09 BCDA 471.406 615 C 0.382 0.300 0.300 - - - 98.21 98.21% Outstanding
Satrap Construction Company Inc. 2526
Rehabilitation/Reconstruction of Manila North Road, Sto. Domingo-
Magsingal Section02/27/09 I 28.931 150 C 0.454 0.133 0.300 - - - 88.70 *88.70%
Satisfactory
Satrap Construction Company Inc. 2526 Replacement of Bantaoay Bridge
along Manila North Road 02/27/09 I 21.240 437 C 0.468 0.155 0.300 - - - 92.30 90.23%V. Satisfactory
Satrap Construction Company, Inc. 2526 Replacement of Quirino Bridge 03/31/11 I 20.434 550 O 0.321 0.240 0.150 0.030 0.047 0.033 82.10 -
Satrap Construction Company, Inc. 2526
Vigan Airport Development Project (Asphalt Overlay of Runway with
Shoulder Grade Correction, Concreting of Apron and Taxiway,
Construction of Access Road, Extension of Runway Strip and
Construction of Drainage Canal and Barbed Wire Fence)
04/08/10 DOTC 120.419 210 C 0.478 0.200 0.300 - - - 97.80 97.80% Outstanding
SB & T Construction 25313 Improvement of Multi-Purpose Building, Brgy. Pari-an 06/08/09 VII 0.475 65 C 0.382 0.102 0.300 - - - 78.40 76.09%
Unsatisfactory
SB & T Construction 25313 Const. of Multi-Purpose Building, Brgy. Sto. Nino 09/08/09 VII 0.480 75 C 0.494 0.141 0.300 - - - 93.50 *93.50%
V. Satisfactory
SB & T Construction 25313 Completion/Impvt. of Multi-Purpose Building Brgy. T. Padilla 09/16/09 VII 0.770 75 C 0.499 0.133 0.300 - - - 93.20 *93.20%
V. SatisfactorySBB Construction &
Supply 31238 Conc. of Roads at Brgy. San Jose-San Miguel 04/02/11 XI 1.875 120 C 0.461 0.200 0.300 - - - 96.10 *96.10%
Outstanding
SBB Construction & Supply 31238 Const. of MPB at Lapu-Lapu E/S,
Brgy. Lapu-Lapu 04/13/11 XI 1.801 105 C 0.442 0.200 0.300 - - - 94.20 *94.20% V. Satisfactory
SBB Construction & Supply 31238 Road Upgrading at Davao Regional
Medical Training Center 06/16/10 XI 4.023 88 O 0.388 0.240 0.150 0.030 0.042 0.033 88.30 -
SBB Construction & Supply 31238
Protection Works at Upstream Approach "B" of Maniki Jumbo
Bridge along Libuganon Major River Basin, T-A-K-ST-D-P Circumferential
Rd.
06/02/10 XI 4.720 45 C 0.438 0.133 0.300 - - - 87.10 87.10% Satisfactory
SBB Construction & Supply 31238 Road Upgrading at Davao Regional
Medical Training Center 09/08/10 XI 4.023 88 C 0.495 0.133 0.300 - - - 92.80 90.10% V. Satisfactory
SBB Construction & Supply 31238 Construction of Multi-Purpose
Building, Digos CES 03/07/09 XI 2.375 110 C 0.469 0.149 0.300 - - - 91.80 *91.80% V. Satisfactory
SBB Construction & Supply 31238 Const. of 4-CL, 1-Storey Building at
Waan NHS Brgy. Buhangin District 09/16/09 XI 2.368 112 C 0.494 0.133 0.300 - - - 92.70 *92.70% V. Satisfactory
SC Balinagay Builders 32249 Asphalt Overlay at Bangad-Forrt Magsaysay Road 03/04/09 III 4.751 20 C 0.444 0.200 0.300 - - - 94.40 *94.40%
V. Satisfactory
SCP Construction 8797 Balingasag River Irrigation Project 09/26-27/11 NIA 199.249 465 O 0.339 0.245 0.109 0.024 0.056 0.033 80.62 -
SCP Construction 8797Rehab./Reconst. of Damaged Paved National Roads along Butuan City-
Cagayan de Oro City-Iligan City Road11/24/08 X 18.867 210 O 0.365 0.240 0.100 0.030 0.035 0.067 83.70 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page359
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
SCP Construction 8797Conc. of SDCR, (Tagasaka-Bislig
Subsection) along Hinatuan-Bislig-Boston Section
11/28/08 XIII 158.872 375 O 0.278 0.184 0.100 0.030 0.030 0.100 72.20 -
SCP Construction 8797Rehab./Reconst. of Damaged Paved National Roads along Butuan City-
Cagayan de Oro City-Iligan City Road03/09/09 X 18.867 234 O 0.327 0.240 0.055 0.030 0.045 0.033 73.00 -
SCP Construction 8797 Completion of DPWH-MOFDEO Building, Brgy. 26 09/08/09 X 3.814 180 C 0.483 0.185 0.300 - - - 96.80 *96.80%
Outstanding
SCP Construction 8797Rehab./Reconst. of Damaged Paved National Roads, along Butuan City-
Cagayan de Oro City-Iligan City Road 09/08/09 X 18.867 240 C 0.447 0.200 0.300 - - - 94.70 84.89%
Satisfactory
SCP Construction 8797 Conc. of By-Pass Road Water Fall 03/02/10 X 4.206 194 C 0.385 0.133 0.000 - - - 51.80 54.08% Poor
SCP Construction 8797Conc. of Surigao-Davao Coastal
Road (Tagsaka-Bislig Subsection) along Hinatuan-Bislig-Section
06/06/09 XIII 156.872 405 O 0.379 0.300 0.150 0.030 0.061 0.050 97.00 -
SCP Construction 8797Conc. of Surigao-Davao Coastal Rd.(Tagsaka-Bislig Subsection)
along Hinatuan-Bislig-Boston Sect.09/10/09 XIII 156.872 433 O 0.378 0.238 0.130 0.030 0.060 0.033 86.90 -
SCP Construction 8797Conc. of Surigao-davao Coastal Rd. (Tagasaka-Bislig Subsection) along
Hinatuan-Bislig-Boston Section)03/06/10 XIII 156.872 555 O 0.231 0.300 0.071 0.030 0.047 0.050 72.90 -
Sercher Development Corporation 26332 Impvt. of Multi-Purpose Building,
Brgy. Pahina Central 09/16/09 VII 0.770 65 C 0.495 0.169 0.300 - - - 96.40 *96.40% Outstanding
Serra Ty Construction 7373Rehab./Reconst. of Damaged Paved
along Jct. Gamut-San Miguel-Bayugan Road
04/05/11 XIII 19.274 150 C 0.092 0.133 0.000 - - - 22.50 53.40% Poor
Serra Ty Construction 7373Conc. of East/West Lateral Road,
(Tandag-Gamut-San Miguel-Bayugan Road)
03/12/09 XIII 19.274 209 C 0.426 0.200 0.300 - - - 92.60 82.58% Satisfactory
Settlers Builder 21643 Conc. of Atabay-Inabasan Road 04/06/11 VI 5.804 90 C 0.462 0.133 0.300 - - - 89.50 *89.50% V. Satisfactory
Settlers Builder 21643 Const. of 2-CL Bldg. at Apgahan Elem. School 02/25/10 VI 0.888 80 O 0.352 0.300 0.150 0.000 0.022 0.033 85.70 -
Settlers Builder 21643Repair/Rehab. of Iloilo-Antique Road,
Km. 72+000 to Km.78+000 (with exception)
09/02/10 VI 3.550 158 C 0.482 0.133 0.300 - - - 91.50 91.50% V. Satisfactory
Seven Digit Construction & Supplies 25471
Rehab./Impv't. of Inarayan Road, Barangay New Agutaya, Km.0+000 -
Km.2+38004/01/11 IVB 4.770 84 C 0.442 0.140 0.300 - - - 88.20 *88.20%
Satisfactory
Seven Digit Construction & Supplies 25471
Repair/Maintenance of Puerto Princesa North Road (PPNR) km.
140+284-km. 271+44609/08/09 IVB 9.513 156 C 0.207 0.127 0.000 - - - 33.40 61.06%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page360
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Seven Digit Construction & Supplies 25471
Puerto Princesa North Road (PPNR) Junction Taytay Poblacion Road
(Const. of Drainage and Sidewalk)03/04/10 IVB 10.443 233 C 0.404 0.200 0.300 - - - 90.40 85.30%
Satisfactory
Seven Digit Construction & Supplies 25471 Rehab./Impvt. of New Rizal-Dumarao-
Iradan Rd. 06/02/10 IVB 2.324 76 C 0.491 0.133 0.300 - - - 92.40 92.40% V. Satisfactory
Seven Digit Construction & Supplies 25471 Const. of 1-CL San Isidro E/S, Brgy.
San Isidro 06/02/10 IVB 0.681 95 C 0.380 0.200 0.300 - - - 88.00 88.00% Satisfactory
Seven Digit Construction & Supplies 25471
Puerto Princesa North Road (PPNR) Junction Taytay Poblacion Road
(Const. of Drainage and Sidewalk)06/03/09 IV-B 10.443 233 O 0.321 0.300 0.100 0.030 0.035 0.033 81.90 -
Seven Digit Construction & Supplies 25471 Concreting of Road, Barangay 3
(Infront of DEO) 03/06/09 IV-B 0.473 50 C 0.458 0.133 0.300 - - - 89.10 *89.10% V.Satisfactory
Seven Digit Construction & Supplies 25471 Const. of Pre-Stress Conc. of Bridge,
Talog Bridge 03/06/09 IV-B 9.348 646 C 0.442 0.137 0.300 - - - 87.90 84.18% Satisfactory
SGSS Construction 27502 Const. of MPB at Tambo, Lipa City 06/07/10 IVA 1.927 90 C 0.471 0.133 0.300 - - - 90.40 90.40% V. Satisfactory
SGSS Construction 27502 Const. of Road @ Brgy. Tipas 09/01/09 IVA 0.289 120 C 0.415 0.133 0.300 - - - 84.80 *84.80% Satisfactory
Shak Construction and Supply 28289 Repair/Rehab. of Road Poblacion 04/05/11 VI 4.986 90 O 0.350 0.237 0.150 0.030 0.037 0.033 83.70 -
Shak Construction and Supply 28289 Const. of Passenger Cargo Terminal
Roof Shed, Sto. Rosario 03/11/09 VI 2.711 90 C 0.442 0.200 0.300 - - - 94.20 *94.20% V. Satisfactory
Shak Construction and Supply 28289
Rehab./Reconst./Upgrading of Guimaras Circ. Road, San Antonio
Igdarapdap Section, Km. 74+000-Km. 78+500 with exception
09/01/09 VI 10.310 135 C 0.446 0.133 0.300 - - - 87.90 *87.90% Satisfactory
Shear Construction and Supply 34027 Const. of 4CL Two Storey Sch. Bldg.
at Moreno Integrated School 04/03/11 V 4.177 90 C 0.482 0.133 0.300 - - - 91.50 *91.50% V. Satisfactory
Shear Construction and Supply 34027 Const. of 1-CL Secondary School
Bldg., Basud NHS 09/01/10 V 0.661 30 C 0.475 0.200 0.300 - - - 97.50 97.50% Outstanding
Sheen-Sheen Construction 29015 Impvt./Conc. of San Roque-NHA
Road 04/02/11 X 4.748 185 C 0.363 0.200 0.300 - - - 86.30 *86.30% Satisfactory
Sheen-Sheen Construction 29015
Rehab./Const. of Water Works System, Mambajao Water Works
System04/02/11 X 6.070 120 C 0.333 0.200 0.300 - - - 83.30 *83.30%
Satisfactory
Sheen-Sheen Construction 29015 Impvt./Rehab. of CCR Maac-
Kalipagas Section 05/31/09 X 9.536 197 C 0.375 0.133 0.300 - - - 80.80 83.50% Satisfactory
Sheen-Sheen Construction 29015 Impvt./Concreting of Cabadiangan
Road, Bacnit 05/31/09 X 1.410 90 C 0.414 0.107 0.300 - - - 82.10 *82.10% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page361
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sheen-Sheen Construction 29015 Rehab. of CCR, Maac-Kalipagas
Section 03/07/09 X 9.536 197 O 0.360 0.240 0.150 0.030 0.040 0.033 85.30 -
Sheen-Sheen Construction 20915
Impvt./Const. of Road leading to St. Peter's Village (Vicente Reyes) Sitio
Lamok, Benoni09/05/09 X 1.733 110 O 0.383 0.300 0.000 0.030 0.051 0.017 78.10 -
Shen Construction 31067Rehab./Reconst. of Damaged Paved
along 20th Ave. (P. Tuazon-B. Serrano Road)
02/26/10 NCR 9.463 120 C 0.328 0.200 0.300 - - - 82.80 82.80% Satisfactory
Sherf Builders 33672Proposed/Repair/Rehab./Replacement of Academic Bldg., Manila High
School04/14/11 NCR 5.230 135 C 0.496 0.133 0.300 - - - 92.90 *92.90%
V. Satisfactory
Sherf Builders 33672 Completion of MPB, Meralco Village, Brgy. San Juan 06/07/10 IVA 3.828 150 C 0.493 0.153 0.300 - - - 94.60 94.60%
V. Satisfactory
Shinsung Engineering & Construction Co., Ltd. FC-08-001
Widening of Gapan-San Fernando-Olongapo Road and Emergency
Dredging Project05/19/09 III 1198.643 730 O 0.374 0.300 0.141 0.030 0.061 0.033 93.90 -
Shinsung Engineering & Construction Co., Ltd. FC-08-001
Widening of Gapan-San Fernando-Olongapo Road and Emergency
Dredging Project 8/26/2009 III 1,198.643 730 O 0.40 0.30 0.08 0.03 0.06 0.02 88.10 -
Shinsung Engineering & Construction Co., Ltd. FC-08-001
Widening of Gapan-San Fernando-Olongapo Rd. and Emergency
Dredging Project09/01/10 KEDCF-
PMO 1,198.644 927 O 0.375 0.300 0.150 0.030 0.050 0.050 95.50 -
Silk & Steel Construction 25314 Const. of MPB @ Brgy. Alang-Alang 04/04/11 VIII 4.785 245 C 0.473 0.133 0.300 - - - 90.60 87.76% Satisfactory
Silk & Steel Construction 25314 Installation of Water System, Brgy. Cabarasan Guti 06/08/10 VIII 0.689 45 C 0.459 0.133 0.300 - - - 89.20 89.20%
V. Satisfactory
Silk & Steel Construction 25314 Const. of MPB at Brgy.Alang-Alang 09/06/10 VIII 4.785 244 O 0.368 0.240 0.150 0.030 0.018 0.033 83.90 -
Silk & Steel Construction 25314 Conc. of Road Shoulders @ Brgy. 101 03/18/09 VIII 0.964 50 C 0.421 0.200 0.300 - - - 92.10 *92.10%
V. Satisfactory
Silver Dragon Construction & Lumber &
Glass Supply30835
Rehab./Reconst./Upgrading of Bacolod North Road Escalante
Section, Km.98+000 - Km.100+940 with exception
03/29/11 VI 47.462 205 C 0.422 0.200 0.300 - - - 92.20 88.42% Satisfactory
Silver Dragon Construction & Lumber &
Glass Supply30835
Rehab./Reconst./Upgrading Sum-ag-Abuanan Road, Km.10+820 - Km.420
with exception03/30/11 VI 33.415 190 C 0.394 0.176 0.300 - - - 87.00 *87.00%
Satisfactory
Silver Dragon Construction & Lumber &
Glass Supply30835
Rehab./Reconst./Upgrading of Bacolod South Road, Ko022+840 - KO023+235.8 with exception (Lag-
03/30/11 VI 40.475 280 C 0.416 0.133 0.300 - - - 84.90 83.67% Satisfactory
Silver Dragon Construction & Lumber &
Glass Supply30835
Rehab./Reblocking of Bacolod Circumferential Rd. from Brgy.
Pahanocoy to Brgy. Banago Sect. w/ exception
06/07/10 VI 38.198 275 O 0.326 0.240 0.150 0.030 0.051 0.033 83.00 -
Silver Dragon Construction & Lumber &
Glass Supply30835 Rehabilitation and Improvement of
Sibud Main Drainage 04/16-18/09 NIA 6.683 267 C 0.449 0.300 0.200 - - - 94.90 94.90% V. Satisfactory
Silver Dragon Construction & Lumber &
Glass Supply30835 Const. of Slaughter House (Phase I) 09/19/09 VI 1.919 104 C 0.497 0.171 0.300 - - - 96.80 *96.80%
Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page362
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Silver Dragon Construction & Lumber &
Glass Supply30835
Rehab./Reblocking of Bacolod Circ. Road from Brgy. Pahanocoy Sect. to Brgy. Banago Sect. with exception
08/23/10 VI 38.195 275 C 0.484 0.133 0.300 - - - 91.70 86.48% Satisfactory
Sixteen Enterprises - Calapan Branch 18187 Completion of Calapan South Road,
Tuklong-San Roque Section 09/05/09 IVB 38.110 238 O 0.378 0.240 0.150 0.030 0.051 0.050 89.90 -
Sixteen Enterprises - Calapan Branch 18187
Rehab./Reconst./Upgrading of Damaged National Road @ Calapan
North Road (Intermittent Section)02/16/10 IVB 19.285 143 C 0.388 0.146 0.300 - - - 83.40 84.96%
Satisfactory
Sixteen Enterprises - Calapan Branch 18187 Road Upgrading @ CNR KM.59+081-
KM. 60+504 (Intermittent Section) 02/24/09 IV-B 14.204 120 C 0.436 0.130 0.300 - - - 86.60 *86.60% Satisfactory
Sixteen Enterprises / Thunderheads Const.
(JV)JV-08-302 Completion of Calapan South Road,
Nasucob Section 09/05/09 IVB 19.060 224 O 0.359 0.245 0.150 0.030 0.051 0.050 88.50 -
Sixteen Enterprises / Thunderheads Const.
Corp. (JV) JV-08-302 Completion of Calapan-South Road,
Nasucob Section 02/17/10 IVB 19.060 253 C 0.363 0.200 0.300 - - - 86.30 87.17% Satisfactory
Sixteen Enterprises-Calapan Branch 18187
Completion of Aninuan Bridge (Phase I), Puerto Galera along
Calapan North Road04/05/11 IVB 14.454 120 C 0.435 0.133 0.300 - - - 86.80 90.28%
V. Satisfactory
Sixteen Enterprises-Calapan Branch 18187 Conc. of Ipil Road, Brgy. Ipil 04/05/11 IVB 3.348 54 C 0.428 0.133 0.300 - - - 86.10 *86.10%
Satisfactory
So Construction 17714 Concreting of Nueva-Ecija-Aurora Road, Baler Cemento Section 05/27/09 III 6.004 120 C 0.442 0.200 0.300 - - - 94.20 *94.20%
V. Satisfactory
Socor Construction Corporation 8020 Repair/Rehab. of Hernan Cortes
Road 04/10/11 VII 4.600 14 C 0.431 0.133 0.300 - - - 86.40 *86.40% Satisfactory
Solid M construction 33991 BIP No. 10-2011 Construction of Open Canal Canal Structures 09/5-10/11 NIA 7.892 105 C 0.435 0.139 0.300 - - - 87.40 *87.40%
Satisfactory
Solid Merchandising 31609 Const. of San Jose-Monlaque Road Brgy. Monlaque 04/08/11 VI 1.926 50 C 0.412 0.133 0.300 - - - 84.50 *84.50%
Satisfactory
Solid Merchandising 31609 Const. of Spurdike along Ibajay River Brgy. San Jose 04/08/11 VI 1.923 70 C 0.334 0.189 0.300 - - - 82.30 *82.30%
Satisfactory
Solid Rock Construction 8958
Const. of Don Mariano Marcos Ave., Ext. Project under Metro-Manila
Urban Transport Integration Project (MMURTIP)
04/02/11 URPO 65.898 285 O 0.357 0.300 0.145 0.030 0.060 0.050 94.20 -
Solid Rock Construction 8958 Const. of MPB at Paranaque E/S -Central, Brgy. San Dionisio 04/11/11 NCR 4.551 90 C 0.499 0.093 0.300 - - - 89.20 *89.20%
V. Satisfactory
Solid Rock Construction 8958 Widening/Conc. of Commonwealth Avenue 03/12/09 NCR 96.608 240 C 0.418 0.200 0.300 - - - 8,585.00 *91.80%
V.Satisfactory
Solid Rock Construction 8958 Conc. of Congressional Ave. Ext. (Phase II) 09/14/09 NCR 28.754 210 O 0.341 0.244 0.150 0.023 0.050 0.050 85.80 -
Solid Rock Construction 8958 Conc. of Congressional Ave. Extension (Phase II) 03/01/10 NCR 28.754 597 C 0.345 0.200 0.300 - - - 84.50 85.28%
SatisfactorySophia Construction and
Supply 33484 Const. of MPB, Brgy. Spring 04/11/11 XII 1.927 150 C 0.479 0.137 0.300 - - - 91.60 *91.60% V. Satisfactory
Southern Dawn Dev't Company 12294
Const. of 2 Storey Acad. Bldg. w/ 2 Seater Attached Toilet & Septic Vault
at Bocohan E/S02/25/09 IVA 2.147 60 C 0.479 0.163 0.300 - - - 94.20 *94.20%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page363
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Soy Eng Construction 15533 Const. of Multi-Purpose Building @ JRMSC 03/08/10 IX 3.781 179 C 0.288 0.200 0.300 - - - 78.80 78.80%
Unsatisfactory
Spring Star Construction & Supply 20240
Rehab./Reconst./Upgrading of Damaged Paved National (South
Bound Road Nagtahan Link Road)05/18/09 NCR 6.730 30 C 0.472 0.200 0.300 - - - 97.20 *97.20%
Outstanding
Spring Star Construction & Supply 20240 Const. of Calzada Tipas Bridge 02/24/10 NCR 14.399 308 O 0.313 0.208 0.150 0.022 0.037 0.033 76.30 -
Spring Star Construction & Supply 20240 Rehab. of MPB, Bagumbayan 06/03/10 NCR 3.360 208 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. SatisfactorySpring Star Construction
& Supply 20240 Const. of Calzada Tipas Bridge 08/08/10 NCR 14.399 332 C 0.346 0.200 0.300 - - - 84.60 79.62% Unsatisfactory
Square Cube Construction 25120 Const. of Boracay Roads (Bulabog-
Tulubhan Section) Boracay Island 04/08/11 VI 28.905 260 C 0.441 0.135 0.300 - - - 87.60 89.25% V. Satisfactory
Square Cube Construction 25120 Const. of Maasin Seawall 04/13/11 VIII 19.102 300 C 0.417 0.133 0.300 - - - 85.00 87.94%
Satisfactory
Square Cube Construction 25120 Road Upgrading (Gravel to Paved) of
Kananga-Tungonan-Hot Spring Road 04/10/11 VIII 18.225 254 C 0.445 0.133 0.300 - - - 87.80 86.72% Satisfactory
Square Cube Construction 25120 Road Upgrading (Gravel to Paved) of
Ormoc-Lake Imelda Road 04/10/11 VIII 18.224 254 C 0.434 0.133 0.300 - - - 86.70 86.70% Satisfactory
Square Cube Construction 25120 Impvt. of National Road along San
Juan-Anahawan Road 04/13/11 VIII 9.540 240 C 0.432 0.133 0.300 - - - 86.50 *86.50% Satisfactory
Square Cube Construction 25120 Const./Rehab./Impvt. of Nahaong-
Makabaan FTM Roads 04/13/11 VIII 19.090 200 C 0.401 0.158 0.300 - - - 85.90 85.78% Satisfactory
Square Cube Construction 25120 Road Upgrading San Ricardo-Bilatan
Road 03/31/11 VIII 22.032 270 C 0.451 0.133 0.300 - - - 88.40 85.34% Satisfactory
Square Cube Construction 25120 Road Upgrading Junction
Himayangan-Silango-Abuyog Road 04/13/11 VIII 36.700 360 C 0.429 0.133 0.300 - - - 86.20 84.52% Satisfactory
Square Cube Construction 25120 Rehab. of Nautical Highway,
Mahaplag-Liloan Road Section 04/13/11 VIII 47.230 425 O 0.363 0.240 0.125 0.015 0.045 0.017 80.50 -
Square Cube Construction 25120 Dapa-Del Carmen Road 06/04/10 XIII 16.57 266 C 0.430 0.133 0.300 - - - 86.30 85.34%
Satisfactory
Square Cube Construction 25120 Jct. Cancohoy-Del Carmen Road 06/04/10 XIII 16.735 266 C 0.409 0.133 0.300 - - - 84.20 82.88%
Satisfactory
Square Cube Construction 25120 Jct. Osmeña-Pilar Road, Osmeña-
Maasin-Mabini Section 08/28/10 XIII 15.750 210 O 0.319 0.300 0.107 0.023 0.045 0.033 82.70 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Slope Protection at Cataning River along Roman Expressway 02/19/10 III 4.724 58 C 0.364 0.200 0.300 - - - 86.40 86.40%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page364
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Construction of Flood Control and Drainage Facilities, Brgy. Inayawan 06/10/09 VII 0.948 45 C 0.469 0.000 0.300 - - - 76.90 *76.90%
Unsatisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Const. of Maasin Seawall 06/07/10 VIII 19.102 300 O 0.343 0.300 0.150 0.030 0.037 0.050 91.00 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120
Rehab./Impvt. of National Roads in Eastern Samar Taft Borongan Sect.
(inc. Thermoplastic Pavement Markings) Km.877+000 - Km.928+100
w/ exceptions
06/10/10 VIII 9.535 50 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory
Square Cube Construction (Formerly: 25120 Rehab./Reconst. of National Roads
along Wright-Taft Road, Camp 5 09/05/10 VIII 19.130 75 C 0.401 0.161 0.300 - - - 86.20 86.20% Satisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Const./Impvt. of San Ricardo-Bil-atan Road 02/28/10 VIII 19.087 200 C 0.410 0.193 0.300 - - - 90.30 87.90%
Satisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Road Upgrading (Gravel to Pave)
Based on Gravel Road, Ormoc-Lake Imelda Road
02/25/10 VIII 18.230 239 C 0.415 0.200 0.300 - - - 91.50 85.86% Satisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Rehab./Reconst./Upgrading of
Damaged Paved National Rd., Ormoc Baybay Southern Leyte Bdry. Rd.
06/04/10 VIII 15.501 249 C 0.408 0.200 0.300 - - - 90.80 90.74% V. Satisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Road Upgrading (Gravel to Paved) at Cotabato Old Rd. at Libby Sect. 09/09/10 XI 19.300 143 C 0.405 0.200 0.300 - - - 90.50 89.00%
Satisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120
Road Upgrading (Gravel to Paved ) at Davao-Cotabato Old Road
National Roads Davao-Cotabato at Libby Sect.
06/16/10 XI 19.300 113 O 0.363 0.240 0.150 0.030 0.047 0.050 88.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page365
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Const. of 2-CL School Bldg. (2-7 x 9)
Gen. Luna National High School, Gen. Luna
02/27/10 XIII 1.112 120 C 0.465 0.133 0.300 - - - 89.80 89.80% V.Satisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Dapa-Del Carmen Road 02/26/10 XIII 16.570 266 O 0.383 0.240 0.114 0.030 0.047 0.033 84.70 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Jct. Cancohoy-Del Carmen Rd. 02/26/10 XIII 16.735 266 O 0.361 0.240 0.109 0.030 0.047 0.033 82.00 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Const. of One (1) Unit 1 CL
Standard/Modified Sch. Bldg. at Kagay E/S
09/05/09 VII 0.626 110 O 0.366 0.240 0.150 0.030 0.035 0.050 87.10 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Const. of One (1) Unit 2-CL
Standard/Modified School Building at Gregoria E/S
09/04/09 VII 1.254 65 C 0.485 0.079 0.300 - - - 86.40 *86.40% Satisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Const. of One (1) Unit 2-CL Standard / Modified School Building at Kagay
E/S09/05/09 VII 0.626 110 O 0.348 0.240 0.150 0.030 0.035 0.050 85.30 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Const. of One (1) Unit-2CL Standard / Modified School Building at Nangka
E/S09/04/09 VII 1.254 109 O 0.303 0.214 0.150 0.030 0.023 0.050 77.00 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Const. of One (1) Unit 1 CL
Standard/Modified Sch. Bldg. at Kagay E/S
03/11/10 VII 0.626 241 C 0.488 0.102 0.300 - - - 89.00 87.67% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page366
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Const. of One (1) Unit 2-CL Standard / Modified School Building at Kagay
NHS03/11/10 VII 0.626 241 C 0.488 0.102 0.300 - - - 89.00 86. 41%
Satisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Const. of One (1) Unit-2CL Standard / Modified School Building at Nangka
E/S03/11/10 VII 1.254 241 C 0.492 0.153 0.300 - - - 94.50 82.25%
Satisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Road Upgrading, Junction Himay-angan-Silago-Abuyog Road 09/04/10 VIII 36.700 300 O 0.340 0.236 0.148 0.030 0.047 0.033 83.40 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Road to complete Nautical Highway,
Rehab. Of Nautical Highway, Mahaplag-Liloan Road Section
09/04/10 VIII 47.230 350 O 0.364 0.251 0.113 0.030 0.042 0.033 83.30 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Road Upgrading (Gravel to Paved) of Kananga-Tungonan Hot Spring Road 08/31/10 VIII 18.225 254 O 0.366 0.239 0.150 0.030 0.042 0.033 86.00 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Const./Improv't. of Multi-Purpose Building at Liloan 03/05/09 VIII 0.937 75 C 0.335 0.181 0.300 - - - 81.60 *81.60%
Unsatisfactory
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Construction/Improvement of San Ricardo-Bil-atan Road 05/26/09 VIII 19.087 200 O 0.335 0.251 0.150 0.030 0.047 0.050 86.30 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120 Road Upgrading (Gravel to Paved) Ormoc-Lake Imelda Road 05/30/09 VIII 18.230 225 O 0.297 0.257 0.150 0.030 0.037 0.050 82.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page367
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120Road Upgrading (Gravel to Paved)
Kananga-Tungonan Hot Spring Road, Brgy. Rizal Road Section,
05/30/09 VIII 12.755 180 O 0.241 0.300 0.150 0.030 0.042 0.050 81.30 -
Square Cube Construction (Formerly: Square Cube Trading & Construction Division-
Mandaue Branch)
25120
Rehab./Reconst./Upgrading of Damaged Paved National Road, Ormoc-Baybay, Southern Leyte
Boundary Road
09/06/09 VIII 15.501 249 O 0.357 0.300 0.150 0.015 0.035 0.050 90.70 -
Square Cube Construction (Formerly:
Square Cube Trading Division & Const. Division-Mandaue
Branch)
25120Road Upgrading/Widening of Cebu-
Balamban Transcentral Rd., Km.38+440 - Km.38+740
04/12/11 VII 35.652 180 C 0.383 - 0.500 - - - 88.30 85.00% Satisfactory
St. Raymund Construction, Inc. 19242 Conc. of Bacolod South Road, Pook
Section Brgy. Pook 04/01/11 VI 9.388 150 O 0.373 0.240 0.150 0.030 0.033 0.033 85.90 -
St. Raymund Construction, Inc. 19242
Const. of Flood Control/River Bank Protection at Canmoros-Nabuswang
River, Brgy. Canmoros08/26/10 VI 9.335 190 C 0.454 0.133 0.300 - - - 88.70 85.88%
Satisfactory
St. Raymund Construction, Inc. 19242
Const. of Flood Control / River Bank Protection at Canmoros-Nabuswang
River Brgy. Canmoros06/03/10 VI 9.335 190 O 0.280 0.300 0.150 0.030 0.047 0.033 84.00 -
St. Raymund Construction, Inc. /
Wilkinson Construction (JV)
Conc. of Kabankalan-Jct.-Salong-Tapi-Dacongcogon-Bantayan Road,
Salong Section, Sitio San Jose, Brgy. Salong
04/02/11 VI 31.933 360 C 0.429 0.133 0.300 - - - 86.20 82.15% Satisfactory
Sta. Cruz Construction and Services 32289 Repair of Ro-Ro No. 2, Port Access
Road and Security Fence 04/11-13/11 PPA 16.807 180 O 0.399 0.299 0.150 0.030 0.070 0.050 99.80 *99.80% Outstanding
Stay Construction 23323 Road Upgrading of Abra-Kalinga Road, Km.439+000 - Km.464+000 03/30/11 CAR 31.792 467 C 0.428 0.200 0.000 - - - 62.80 73.99%
Poor
Stay Construction 23323 Road Upgrading of Abra-Ilocos Norte Road, Km.424+000 - Km.429+000 03/29/11 CAR 21.869 418 C 0.271 0.200 0.000 - - - 47.10 67.65%
Poor
Stay Construction 23323 Repair & Rehab. along Kennon Road 05/19/09 CAR 6.454 200 O 0.304 0.291 0.150 0.010 0.032 0.033 82.00 -
Stay Construction 23323 Concreting of Acop-Kapangan-Kibungan Road 05/21/09 CAR 19.168 180 O 0.297 0.300 0.065 0.010 0.025 0.033 73.00 -
Stay Construction 23323Conc. along Itogon-Dalupirip-San
Manuel Boundary Road, Km. 267+00 -274+055 (vs)
03/12/09 CAR 19.021 207 C 0.378 0.200 0.300 - - - 87.80 77.54% Unsatisfactory
Stay Construction 23323 Concreting along Baguio-Bua-Itogon Road 08/26/09 CAR 12.720 200 O 0.384 0.240 0.150 0.030 0.051 0.033 88.80 -
Stay Construction 23323Conc. of Acop-Kapangan-Kibungan
Road Km. 263+000- Km. 266+700 (v.s.)
08/26/09 CAR 19.168 229 O 0.356 0.240 0.150 0.015 0.042 0.033 83.60 -
Stay Construction 23323 Rehab. of Benguet National Road 08/25/09 CAR 4.718 200 O 0.379 0.194 0.067 0.015 0.042 0.017 71.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page368
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Stay Construction 23323 Concreting along Baguio-Bua-Itogon Road 03/02/10 CAR 13.413 244 C 0.378 0.161 0.300 - - - 83.90 86.84%
Satisfactory
Stay Construction 23323 Repair & Rehab. along Kennon Road 03/02/10 CAR 6.454 200 C 0.428 0.133 0.300 - - - 86.10 83.64% Satisfactory
Stay Construction 23323Conc. of Acop-Kapangan-Kibungan
Road Km. 263+000- Km. 266+700 (v.s.)
03/01/10 CAR 19.168 268 C 0.398 0.200 0.300 - - - 89.80 82.90% Satisfactory
Stay Construction 23323 Rehab. of Benguet National Road 03/02/10 CAR 4.826 314 C 0.455 0.158 0.300 - - - 91.30 79.36% Unsatisfactory
Stay Construction 23323Road Upgrading along Kennon-Agat
Road, Km. 216+648-Km. 217+723 (v.s.)
08/29/10 CAR 9.693 120 C 0.377 0.200 0.300 - - - 87.70 87.70% Satisfactory
Stay Construction/Vymeah
Construction (JV)JV-08-036 Const. of Tabuk-Tanudan-Banaue
Road, Banaue Section 05/25/09 CAR 19.126 284 O 0.361 0.145 0.100 0.015 0.040 0.033 69.40 -
Steel City Fabricators Corporation 27035 Const./Rehab./Replacement,
Completion/Repair Kalasungay E/S 09/02/09 X 6.486 75 O 0.318 0.037 0.150 0.030 0.047 0.033 61.50 -
Steven Construction & Supply 21987 Const. of MPB (Public Market) 08/19/10 V 0.960 105 C 0.435 0.200 0.300 - - - 93.50 93.50%
V. SatisfactorySteven Construction &
Supply 21987 Const. of Conc. Pavements, Rizal Ave. Ext. 03/12/09 VIII 0.700 60 C 0.486 0.000 0.300 - - - 78.60 *78.60%
Unsatisfactory
Sto. Cristo Construction and Trading (Formerly:
Sto. Cristo Construction)26096 Rehab./Impvt. of Dolores-Piring and
Sta. Maria Roads 02/16/10 III 4.725 50 C 0.445 0.173 0.300 - - - 91.80 91.80% V. Satisfactory
Sto. Cristo Construction and Trading (Formerly:
Sto. Cristo Construction)26096
Rehab./Reconst./Upgrading of Damaged Paved Mt. Arayat Nat'l.
Park08/31/10 III 6.416 30 C 0.356 0.200 0.300 - - - 85.60 85.60%
Satisfactory
Sto. Cristo Construction and Trading (Formerly:
Sto. Cristo Construction)26096 Impvt. of MP Bldg. at DHVCAT Annex
San Juan 05/18/09 III 5.703 40 C 0.488 0.200 0.300 - - - 98.80 *98.80% Outstanding
Sto. Nino Construction 4867Road Upgrading (Gravel to
Concrete), Tubod-Lakewood Road, Sta.1710+283-Sta.1711+060
04/06/11 IX 26.028 210 C 0.446 0.133 0.300 - - - 87.90 84.90% Satisfactory
Sto. Nino Construction 4867 Const. of Multi-Purpose Building (Phase IV) 03/03/10 IX 4.595 180 C 0.413 0.200 0.300 - - - 91.30 93.82%
V.Satisfactroy
Sto. Nino Construction 4867 Const./Completion of Grandstand (Bleacher 2) Dumalinao Pilot School 06/10/10 IX 5.971 180 C 0.448 0.133 0.300 - - - 88.10 88.10%
Satisfactory
Sto. Nino Construction 4867 Const. of Flood Control Project along Dipolo River, Tambulig 06/08/10 IX 9.285 429 C 0.447 0.133 0.300 - - - 88.00 86.08%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page369
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sto. Nino Construction 4867
Asphalt Overlay along Jct. Dumalinao-Margosatubig Rd. (using
Instapave Surface Treatment) K1678+688 - K1680+917, Camanga-
Sebucao Sect.
08/26/10 IX 7.942 180 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory
Sto. Nino Construction 4867Concreting of Jct. Tubod-Lakewood
Road, Sta. 1701+818.70-Km. 1710+320 (with exceptions)
06/02/09 IX 68.948 508 O 0.378 0.240 0.150 0.030 0.047 0.050 89.50 -
Sto. Nino Construction 4867Concreting of Lanao-Pagadian-
Zamboanga City Road, Pagadian-Dumalinao (Intermittent Section)
06/05/09 IX 27.850 413 O 0.359 0.240 0.150 0.030 0.047 0.050 87.60 -
Sto. Nino Construction 4867Road Upgrading (Gravel to Concrete)
Dipolog-Punta-Dansullan-Sergio Osmeña
06/10/09 IX 15.259 210 O 0.367 0.240 0.150 0.030 0.037 0.050 87.40 -
Sto. Nino Construction 4867 Construction of River Control, Salug Diut River 05/05/09 IX 9.310 420 O 0.374 0.240 0.150 0.010 0.042 0.050 86.60 -
Sto. Nino Construction 4867Concreting of Jct. Blancia-Molave-Josefina Road, Mahayag-Josefina
(Bag-ong Argao)06/04/09 IX 18.549 344 C 0.466 0.133 0.300 - - - 89.90 86.24%
Satifactory
Sto. Nino Construction 4867 Construction of Flood Control Projects along Dipolo River 06/05/09 IX 9.285 180 O 0.356 0.240 0.150 0.010 0.042 0.050 84.80 -
Sto. Nino Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road, Molave-Mahayag Section
06/04/09 IX 18.550 348 C 0.455 0.133 0.300 - - - 88.80 84.18% Satisfactory
Sto. Nino Construction 4867Impvt./Concrete Paving of Ilmelda-
Alicia Road, Naga-naga Section, Sta. 1767+380-Sta. 1767+764
05/30/09 IX 10.491 160 O 0.326 0.240 0.150 0.030 0.042 0.050 83.80 -
Sto. Nino Construction 4867Reconstruction of Jct. Blancia-Molave-Josefina Road, Blancia
Section06/04/09 IX 16.690 348 C 0.430 0.133 0.300 - - - 86.30 82.66%
Satisfactory
Sto. Nino Construction 4867Reconstruction of Jct. Blancia-
Josefina Road, Blancia-Mahayag Section
06/04/09 IX 18.550 348 C 0.461 0.133 0.300 - - - 89.40 82.64% Satisfactory
Sto. Nino Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road (Molave-Mahayag Section)
03/12/09 IX 18.550 348 O 0.372 0.244 0.150 0.030 0.035 0.050 88.10 -
Sto. Nino Construction 4867 Conc. of Jct. Blancia-Poblacion-Molave-Josefina Road 03/12/09 IX 18.550 332 C 0.435 0.154 0.300 - - - 88.90 83.14%
Satisfactory
Sto. Nino Construction 4867Conc. of Pagadian City-Buug Rd.
(Kamalarang Section), Pagadian-Ipil Road
03/14/09 IX 27.550 340 C 0.431 0.200 0.300 - - - 93.10 83.14% Satisfactory
Sto. Nino Construction 4867 Const. of River Control @ Salug Diut River 03/12/09 IX 9.310 340 O 0.382 0.240 0.150 0.030 0.035 0.050 88.70 -
Sto. Nino Construction 4867 Construction of Multi-Purpose Building 03/04/09 IX 0.465 40 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V. Satisfactory
Sto. Nino Construction 4867Impvt./Conc. Paving of Aurora-Dipolog City Road, Mahayag-
Josefina Section11/28/09 IX 18.450 254 C 0.345 0.300 0.000 - - - 64.50 72.78%
Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page370
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sto. Nino Construction 4867 Impvt./Conc. Paving of Imelda-Alicia Road, (Phase II), Guintolan Section 03/04/09 IX 33.916 350 C 0.439 0.200 0.300 - - - 93.90 83.01%
Satisfactory
Sto. Nino Construction 4867
Reconst. of Jct. Dumalinao-Margosatubig Road, Sta. 1678+158-
Sta. 1719+799.00 (Intermittent Section)
09/10/09 IX 34.911 337 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
Sto. Nino Construction 4867 Rehab./Reconst./Upgrading of Pagadian City Wharf Road 09/11/09 IX 13.938 203 O 0.345 0.300 0.150 0.023 0.035 0.033 88.60 -
Sto. Nino Construction 4867Road Upgrading (Gravel to Concrete)
Dipolog-Punta-Dansullan-Sergio Osmeña
09/17/09 IX 15.259 210 O 0.329 0.300 0.150 0.030 0.040 0.033 88.20 -
Sto. Nino Construction 4867Conc. of Lanao-Pagadian-
Zamboanga City Road, Pagadian-Dumalinao (Intermittent Section)
09/12/09 IX 27.850 413 C 0.390 0.200 0.300 - - - 89.00 88.16% Satisfactory
Sto. Nino Construction 4867Impvt./Concrete Paving of Imelda-Alicia Road, Naga-Naga Sect., Sta.
1766+590-Sta. 1766+93109/04/09 IX 9.535 160 C 0.437 0.200 0.300 - - - 93.70 87.70%
Satisfactory
Sto. Nino Construction 4867Conc. of Jct. Tubod-Lakewood Road (Sta. 1701+818.70-Sta.1710+320 with
exceptions)09/10/09 IX 68.948 508 C 0.326 0.200 0.300 - - - 82.60 86.74%
Satisfactory
Sto. Nino Construction 4867 Construction of River Control, Salug Diut River 09/12/09 IX 9.310 421 C 0.375 0.200 0.300 - - - 87.50 85.20%
Satisfactory
Sto. Nino Construction 4867Impvt./Concrete Paving of Imelda-
Alicia Road, Naga-Naga Section, Sta. 1767+380-Sta. 1767+764
09/04/09 IX 10.491 160 C 0.340 0.200 0.300 - - - 84.00 83.88% Satisfactory
Sto. Nino Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road (Molave-Mahayag Section)
08/29/08 IX 18.550 150 O 0.237 0.223 0.100 0.030 0.042 0.100 73.20 -
Sto. Nino Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road (Molave-Mahayag Section)
11/29/08 IX 18.550 150 O 0.340 0.220 0.100 0.030 0.030 0.100 82.00 -
Sto. Nino Construction 4867 Const. of River Control @ Salug River 08/29/08 IX 9.310 150 O 0.272 0.120 0.100 0.030 0.035 0.200 75.70 -
Sto. Nino Construction 4867 Impvt./Conc. Paving of Imelda-Alicia Road, (Phase III), Guintolan Section 08/22/08 IX 33.916 320 O 0.295 0.235 0.100 0.030 0.042 0.100 80.20 -
Sto. Nino Construction 4867 Conc. of Loguilo By-Pass Road 03/11/09 X 8.679 160 C 0.380 0.133 0.300 - - - 81.30 82.74% Satisfactory
Sto. Nino Construction 4867 Rehab. of Oroquieta City-Calamba Mt. Road 11/29/08 X 15.675 150 O 0.373 0.260 0.000 0.023 0.038 0.067 76.10 -
Sto. Nino Construction 4867 Rehab. of Oroquieta City-Calamba Mt. Road 09/15/09 X 15.675 150 C 0.428 0.200 0.000 - - - 62.80 67.90%
Poor
Sto. Nino Construction 4867
Road Upgrading (Gravel to Paved) Based on Gravel Strategies,
Oroquieta City-Calamba Mt. Rd. Km. 1761+120 - Km. 1761+210
03/08/10 X 0.500 60 C 0.450 0.133 0.300 - - - 88.30 88.30% Satisfactory
Sto. Niño Construction 4867Road Upgrading (Gravel to Paved)
Sindangan-Siayan-Dumingag-Mahayag Rd.
04/07/11 IX 27.629 240 C 0.429 0.179 0.300 - - - 90.80 88.34% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page371
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sto. Niño Construction 4867 Road Upgrading (Gravel to Paved) Jct. Blancia-Molave-Josefina Road 04/07/11 IX 32.002 300 C 0.450 0.133 0.300 - - - 88.30 84.91%
Satisfactory
Stone Throw Construction & Ent. 33723 Const. of MPB @ Malubal 02/27/10 IX 0.427 45 C 0.380 0.200 0.300 - - - 88.00 88.00%
SatisfactoryStone Throw
Construction & Ent. 33723 Const. of MPB at Dalangin 06/06/10 IX 0.471 250 C 0.417 0.133 0.300 - - - 85.00 88.00% Satisfactory
Stoneline Construction (Formerly: Abubakar
Engineering Exponent)13132 Const. of Highway-Lambayao FMR 03/29/11 XII 4.756 45 C 0.420 0.133 0.300 - - - 85.30 *85.30%
Satisfactory
Stoneline Construction (Formerly: Abubakar
Engineering Exponent)13132 Repair/Rehab. of Magsalong-Sitio
Lintukan FMR 03/29/11 XII 1.899 20 C 0.420 0.133 0.300 - - - 85.30 *85.30% Satisfactory
Stoneline Construction (Formerly: Abubakar
Engineering Exponent)13132 Const. of Multi-Purpose Building,
Brgy. Sarmeinto, Parang 03/02/09 XII 1.889 65 C 0.298 0.133 0.300 - - - 73.10 73.10% Poor
Struktura Teknika Services Company 16646 Completion/Impvt. of MPB (Navotas
Sports Complex) 03/30/11 NCR 3.836 90 C 0.495 0.120 0.300 - - - 91.50 *91.50% V. Satisfactory
Struktura Teknika Services Company 16646 Const. of School Building at Natatas
Elementary School 03/03/10 IVA 1.929 90 C 0.467 0.133 0.300 - - - 90.00 90.00% V. Satisfactory
Struktura Teknika Services Company 16646 Const. of 1 Unit Sch. Bldg. @
PILMES, Poblacion 03/06/09 IVA 0.964 60 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Struktura Teknika Services Company 16646 Conc. of Farm-to-Market Road, Brgy.
Balibago 09/05/09 IVA 9.543 120 C 0.343 0.200 0.300 - - - 84.30 *84.30% Satisfactory
Struktura Teknika Services Company 16646 Const. of FTMR @ Tagurtor -
Lipahan 09/01/09 IVA 1.940 60 C 0.398 0.133 0.300 - - - 83.10 *83.10% Satisfactory
STX Enterprises / Northern Builders (JV) JV-08-234 Conc. of Calapan South Road 09/02/09 IVB 162.022 270 O 0.318 0.300 0.150 0.030 0.051 0.033 88.20 -
STX Enterprises / Northern Builders (JV) JV-08-234 Concreting of Calapan South Road 02/15/10 IVB 162.920 270 O 0.327 0.300 0.150 0.030 0.054 0.033 89.40 -
STX Enterprises / Northern Builders (JV) JV-08-234 Conc. of Calapan South Road 09/03/10 IVB 162.920 450 C 0.297 0.200 0.300 - - - 79.70 85.78%
Satisfactory
STX Enterprises / Tokwing Construction
(JV)JV-09-201
Western Nautical Highway-Rehab. of Calapan South Road or Calapan
(Mindoro Oriental)-Roxas04/05/11 IVB 422.204 660 O 0.339 0.300 0.150 0.030 0.053 0.050 92.20 -
Subcon Corporation 25079 Conc. of Payapa St., Brgy. Sta.Rita 05/29/10 III 1.371 45 C 0.408 0.133 0.300 - - - 84.10 84.10% Satisfactory
Subcon Corporation 25079 Const. of Classroom Bldg. at Sta.Rita H/S 05/30/10 III 2.340 90 O 0.367 0.214 0.150 0.030 0.021 0.033 81.50 -
Subcon Corporation 25079 Const. of Classroom Bldg. Sta. Rita High School, Brgy. Sta. Rita 08/23/10 III 2.340 90 C 0.450 0.099 0.300 - - - 84.90 82.52%
Satisfactory
Subcon Corporation 25079 Const. of Multi-Purpose Building 03/04/09 III 2.056 90 C 0.335 0.188 0.300 - - - 82.30 *82.30% Satisfactory
Sumitomo Construction Co. Ltd. FC-04-010 CP V, Agas-Agas Bridge Project 03/07/09 PJHL 995.037 990 O 0.367 0.298 0.150 0.030 0.070 0.050 96.50 -
Sumitomo Construction Co. Ltd. FC-04-010 CP V, Agas-Agas Bridge Project 08/30/08 PJHL 869.429 780 O 0.386 0.300 0.100 0.030 0.070 0.100 98.60 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page372
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sunriser Construction 12688Const./Rehab./Replacement/Completion and repair of Elem. & Secondary
S/B projects @ Dale P/S05/29/09 VIII 0.190 120 C 0.411 0.133 0.300 - - - 84.40 *84.40%
Satisfactory
Sunstone Construction 11122Rehab. of Kapayawe Bridge at Banisilan-Guiling Alamanda-Libungan Road, Kapayawe
03/31/11 XII 1.884 75 C 0.357 0.200 0.300 - - - 85.70 *85.70% Satisfactory
Sunstone Construction 11122 Const. of Multi-Purpose Pavement at Brgy. Nasapian 06/02/10 XII 0.326 30 C 0.417 0.133 0.300 - - - 85.00 85.00%
Satisfactory
Sunstone Construction 11122 Const. of Box Culvert at Purok Rose, Brgy. Malu-ao 08/26/10 XII 1.605 165 C 0.476 0.133 0.300 - - - 90.90 90.90%
V. Satisfactory
Sunstone Construction 11122Conc. of Dualing-New Panay-
Midsayap Road, Sitio Saguing Sect. Upper Bulanan
05/27/09 R-XII 9.445 160 C 0.395 0.200 0.300 - - - 89.50 *89.50% V. Satisifactory
Sunstone Construction 11122Conc. of Dualing-New Panay-
Midsayap Road (New Leon-New Panay Sect.)
03/05/09 XII 9.437 165 C 0.439 0.200 0.300 - - - 93.90 88.44% Satisfactory
Sunstone Construction 11122 Concreting of Road @ Brgy. Nasapian 03/05/09 XII 4.727 60 C 0.439 0.200 0.300 - - - 93.90 *93.90%
V. Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906Widening/Regravelling of San
Andres-Calatrava Rd. (Agpudios Sect.)
06/10/10 IVB 41.685 280 C 0.487 0.196 0.300 - - - 98.30 98.30% Outstanding
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Const. of Puro Rock Causeway 08/16/10 V 48.088 270 C 0.408 0.200 0.300 - - - 90.80 90.38% V. Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Construction of Puro Rock Causeway 05/28/10 V 48.088 270 O 0.381 0.240 0.150 0.030 0.050 0.050 90.10 -
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Asphalt Overlay at Topaz-Palsong Road 06/02/10 V 47.767 190 C 0.417 0.133 0.300 - - - 85.00 86.44%
Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Asphalt Overlay of Balaogan-Casugad Road 06/02/10 V 47.767 148 C 0.407 0.133 0.300 - - - 84.00 85.68%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page373
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Asphalt Overlay of Palsong-Balaogan Road 06/02/10 V 47.768 124 C 0.411 0.133 0.300 - - - 84.40 84.76%
Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906
Bulan Airport Development Project (Construction of Apron and Taxiway,
Initial Concrete Paving of Runway and Construction of Perimeter
Fence)
07/15/10 DOTC 81.889 270 C 0.454 0.200 0.300 - - - 95.40 93.20 V.Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906
Bulan Airport Development Project (Apron Expansion, Runway
Extension, Continuation of Concrete Paving of Runway and Construction
of Terminal Building)
07/15/10 DOTC 57.802 180 O 0.378 0.300 0.150 0.030 0.047 0.050 95.50 -
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906Bicol (New Legaspi) Int'l Airport
Development Project (Construction of Airstrip)
07/16/10 DOTC 289.240 330 O 0.347 0.300 0.150 0.030 0.070 0.050 94.70 -
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906Bicol (New Legaspi) Int'l Airport
Development Project (Continuation of Construction of Airstrip)
07/16/10 DOTC 289.188 330 O 0.351 0.300 0.150 0.030 0.070 0.050 95.10 -
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Legaspi Airport Development Project 11/04/09 DOTC 59.212 180 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Desilting/Deepening of Tuguis River Control 08/25/10 IVB 24.120 180 C 0.487 0.186 0.300 - - - 97.30 97.30%
Outstanding
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Widening/Regravelling of Malbog - Sta. Fe Provincial Road 05/21/09 IV-B 19.297 180 C 0.475 0.194 0.300 - - - 96.90 *96.90%
Outstanding
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
15906 Pio Duran Port Development Project 03/9-12/10 PPA 60.399 300 O 0.389 0.300 0.150 0.030 0.056 0.050 97.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page374
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Proposed Davao Port Expansion 1/13-16/09 PPA 396.089 720 C 40.000 30.000 30.000 - - - 99.39 99.39% Outstanding
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Const. of Dapdap Bridge (Phase I) 09/08/09 V 33.257 270 C 0.406 0.200 0.300 - - - 90.60 *90.60% V. Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Const. of Impvt. of Mapulang Daga-Malobago Road, Cagsaray Island 05/18/09 V 14.407 180 C 0.347 0.200 0.300 - - - 84.70 *84.70%
Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Asphalt Overlay of Lapu-Lapu St. Elizondo St., 02/23/09 V 19.206 60 C 0.429 0.133 0.300 - - - 86.20 *86.20%
Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Opening / Impv't of Roads in Magallang-Sagrada Road 03/06/09 V 19.226 120 C 0.450 - 0.500 - - - 95.00 *95.00%
V. Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Replacement of Bubulusan Bridge 03/06/09 V 17.328 310 C 0.451 0.200 0.300 - - - 95.10 89.82% V. Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Restoration of Yawa Flood Control (Phase I) 03/03/09 V 19.103 240 C 0.439 0.200 0.300 - - - 93.90 *93.90%
V.Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Road Opening/Improvement of Caricot Sagrada Road 03/04/09 V 19.107 105 C 0.479 - 0.500 - - - 97.90 *97.90%
Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page375
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Road Opening/Improvement of Caricot-Montenegro Road 03/09/09 V 19.107 110 C 0.437 0.500 - - - - 93.70 *93.70%
V. Satisfactory
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Asphalt Overlay Topas-Palsong Road 02/27/10 V 47.767 190 O 0.359 0.240 0.150 0.030 0.045 0.050 87.40 -
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Asphalt Overlay of Balaogan-Casugad Road 02/27/10 V 4.767 149 O 0.354 0.239 0.150 0.030 0.045 0.050 86.80 -
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction &
Supply)
15906 Asphalt Overlay of Palsong-Balaogan Road 02/27/10 V 47.768 148 O 0.337 0.238 0.150 0.030 0.045 0.050 85.00 -
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction
and Supply)
15906
Const./Road Opening of Camarines Sur-Albay Diversion (San Fernando-Oas Section of Phil. Pan Highway)
Camarines Sur Section-Bula-Nabua- Bato Section
04/05/11 V 514.200 660 O 0.340 0.300 0.145 0.030 0.047 0.050 91.20 -
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction
and Supply)
15906Upgrading of Balud-Tawad-Milagros-Aroroy Road (Paraiso Section), 2nd
District04/13/11 V 96.193 390 O 0.326 0.300 0.120 0.030 0.056 0.050 88.20 -
Sunwest Construction and Development
Corporation (Formerly: Sunwest Construction
and Supply)
15906 Const. of San Isidro Bridge 03/30/11 V 48.031 397 O 0.325 0.300 0.109 0.030 0.065 0.033 86.20 -
Superpower Construction 17149 Const. of One (1) CL Sch. Bldg. at
Brgy. Calangcang E/S 02/24/09 IV-A 0.554 45 C 0.479 0.075 0.300 - - - 85.40 *85.40% Satisfactory
Sydglen Builders and Enterprises 28848
Repair/Rehab. of Taft-Borongan Road, Km. 891+324-Km. 912+200 w/
exceptions,03/08/10 VIII 4.707 45 C 0.388 0.200 0.300 - - - 88.80 88.80%
Satisfactory
T. M. Abad Construction 2272 Construction of Multi-Purpose Covered Court (Building) 04/01/11 NHA 5.412 90 O 0.378 0.284 0.000 0.020 0.032 0.000 71.40 -
T. Solomon Construction 10046 Impvt./Rehab.of Brgy. 3, Sitio Kapalaran Road 03/03/10 IVA 8.683 90 C 0.472 0.133 0.300 - - - 90.50 90.50%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page376
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
T. Solomon Construction 10046 Rehab./Reconst. of Tanauan-Talisay-Tagaytay Rd. 06/10/10 IVA 14.474 90 C 0.458 0.133 0.300 - - - 89.10 89.10%
V. Satisfactory
T. Solomon Construction 10046 Impv't./Rehab. of Road, Bilog-Bilog-Cale Rd. 08/17/10 IVA 9.647 90 C 0.475 0.133 0.300 - - - 90.80 90.80%
V. Satisfactory
T. Solomon Construction 10046Impv't/Rehab. of Road inc.
Installation of Road Safety Devices Tanauan-Talisay Rd.
08/17/10 IVA 19.297 120 C 0.449 0.133 0.300 - - - 88.20 88.20% Satisfactory
T. Solomon Construction 10046 Impvt. of Multi-Purpose Building @ Brgy. Balele 09/08/09 IVA 2.893 120 C 0.389 0.200 0.300 - - - 88.90 *88.90%
Satisfactory
T. Square Builders 14268 Sarangani-Sultan Kudarat Coastal Rd., Malalag-Kalaong Sect. 04/12/11 XII 9.397 225 C 0.422 0.189 0.300 - - - 91.10 *91.10%
V. Satisfactory
T. Square Builders 14268Const. of Gen.l Santos City
Circ.Road (Road Upgrading), Western Section, Brgy. Apopong
04/14/11 XII 18.641 134 O 0.365 0.275 0.150 0.030 0.045 0.033 89.80 -
T. Square Builders 14268 Conc. of Roads at La Fortuna Roads 05/29/09 XI 4.718 60 O 0.367 0.300 0.150 0.030 0.033 0.050 93.00 -
T. Square Builders 14268Impvt./Concreting of Road at
Bansalan-Mt. Apo National Park Road
05/30/09 XI 28.919 270 C 0.432 0.200 0.300 - - - 93.20 84.59% Satisfactory
T.A.D Construction 14098 Completion of Covered Court @ Brgy. Ibabang Palale (Phase III) 02/22/10 IVA 0.965 40 C 0.468 0.133 0.300 - - - 90.10 90.10%
V. Satisfactory
T.A.D Construction 14098 Widening/Const. of Luyang-Poo-Lazi Road 08/31/10 VII 14.473 369 O 0.400 0.300 0.150 0.023 0.033 0.033 93.90 -
T.A.D. Construction 14098 Const. of MPB (Covered Court) at Barangay Silangang Malicboy 04/01/11 IVA 0.482 36 C 0.442 0.200 0.300 - - - 94.20 *94.20%
V. SatisfactoryT.J Velasco Construction
& Supply 10560 Administration Building 05/14-15/09 DOST 4.895 165 C 0.395 0.293 0.300 - - - 98.80 98.80% Outstanding
T.M.G General Contractor 21624Const. of Water System, Installation of Pipes, Pumps and Tanks at Brgy.
Baliwag06/03/10 IVA 0.893 45 C 0.454 0.094 0.300 - - - 84.80 84.80%
Satisfactory
T.M.G General Contractor 21624Const. of Water System, Installation of Pipes, Pumps and Tanks at Bregy.
Kaytitinga 202/25/10 IVA 0.692 75 C 0.457 0.200 0.300 - - - 95.70 95.70%
V. Satisfactory
T.N.J Buhong Construction 19687
Widening/Conc. of Poblacion-Banaue-Brgy. Bangaan, Awaan-
Banagan Section03/06/09 CAR 23.084 270 O 0.369 0.295 0.150 0.022 0.037 0.033 90.60 -
T.N.J Buhong Construction 19687
Widening/Conc. of Pob. Bnaue-Brgy. Bangaan, Banaue (Intermittent Sections from Awaan-Bangaan
Sections) KM. 342+00-KM 354+045 (IS)
08/31/09 CAR 23.084 457 O 0.335 0.240 0.150 0.030 0.056 0.033 84.40 -
T.N.J Buhong Construction 19687
Widening/Conc. of Pob. Banaue-Brgy. Bangaan (Intermittent
Sections) from Awaan-Bangaan Section KM. 342+400-KM 354+045
02/25/10 CAR 23.084 457 C 0.442 0.200 0.300 - - - 94.20 83.38% Satisfactory
T.N.J Buhong Construction 19687
Widening/Conc. of Poblacion-Banaue-Brgy. Bangaan, Awaan-
Banagan Section11/16/08 CAR 23.123 270 O 0.268 0.126 0.070 0.008 0.030 0.033 53.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page377
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Tacloban Ras Construction Corporation 17184
Repair/Rehab. of National Road along Jct. Taft-Arteche Road
(Reblocking), Km. 891+802-Km. 921+000 w/ exception
06/08/09 VIII 7.645 95 O 0.224 0.240 0.150 0.030 0.045 0.033 72.20 -
Tacloban Ras Construction Corporation 17184 Asphalt Overlay along Borongan-San
Julian Road 06/09/09 VIII 9.553 138 O 0.371 0.240 0.000 0.030 0.035 0.000 67.60 -
Tacloban Ras Construction Corporation 17184 Asphalt Overlay along Borongan-San
Julian Road 03/09/10 VIII 9.552 138 C 0.363 0.133 0.000 - - - 49.60 60.40% Poor
Tacloban Ras Construction Corporation 17184 Concreting of Sambulawan-Jct.
Calaguise-Calubian Road 06/02/09 VIII 18.734 240 O 0.400 0.232 0.150 0.022 0.037 0.050 89.10 -
Tacloban Ras Construction Corporation 17184 Conc. of Tabing-Kawayan-Sta. Rosa-
Lawis-Tabango Road 09/05/09 VIII 18.737 240 O 0.367 0.245 0.150 0.018 0.040 0.033 85.30 -
Tam Construction & Supplies 33510 Completion of Multi-Purpose
Building, Brgy. Campokpok 02/24/10 VIII 0.475 30 C 0.354 0.200 0.300 - - - 85.40 85.40% Satisfactory
Tam Construction & Supplies 33510 Const. of MPB, Municipal Grain
Center 08/27/10 VIII 1.335 60 C 0.420 0.133 0.300 - - - 85.30 85.30% Satisfactory
Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber & Const.
Supply)
7255
Const. of Eco-Tourism Road (LUC-BAT CR) inc. RROW: Phase II,
Guisguis-Bantilan Sect., Conc. of Bignay II Sect.
02/23/09 IV-A 9.770 115 C 0.464 0.152 0.300 - - - 91.60 *91.60% V. Satisfactory
Tarifa Construction & Supplies 23239 Const. of Roads Block 4 & 5, Brgy.
San Rafael 04/07/11 III 1.086 50 C 0.424 0.146 0.300 - - - 87.00 *87.00% Satisfactory
Tarifa Construction & Supplies 33239
Const./Repair & Rehab. of Various FMR (Cluster 3) of Brgys. Sta. Lucia
& Sta. Juliana02/25/10 III 0.952 60 C 0.435 0.200 0.300 - - - 93.50 93.50%
V. Satisfactory
Tarifa Construction & Supplies 33239 Conc. Of Brgy. Road at Brgy.
Calibungan (Phase I) 02/24/10 III 2.807 90 C 0.421 0.200 0.300 - - - 92.10 92.10% V. Satisfactory
Tarifa Construction & Supplies 33239 Const. of Multi-Purpose Pavement at
Brgy. Banaba 02/24/10 III 0.893 50 C 0.402 0.200 0.300 - - - 90.20 90.20% V. Satisfactory
Tarifa Construction & Supplies 33239 Upgrading of Capas-Botolan Rd.
(Capas Sect.) 06/02/10 III 1.470 90 C 0.480 0.133 0.300 - - - 91.30 91.30% V. Satisfactory
Tarifa Construction & Supplies 33239 Const./Repair & Rehab. of MPB at
Brgy. San Agustin (Murcia) 08/28/10 III 2.387 90 C 0.445 0.133 0.300 - - - 87.80 87.80% Satisfactory
Tarifa Construction & Supplies 33239 Conc. of Brgy. Road, Sitio Paltok,
Brgy. San Fernando (Phase I) 08/27/10 III 0.945 60 C 0.370 0.200 0.300 - - - 87.00 87.00% Satisfactory
Tarifa Construction & Supplies 33239 Construction of Multi-Purpose
Building at Brgy. Palacpac 05/22/09 III 2.361 88 C 0.054 0.141 0.300 - - - 49.50 64.48% Poor
Tarifa Construction & Supplies 33239 Concreting of Farm to Market Road,
Brgy. San Francisco 02/27/09 III 1.879 75 C 0.327 0.200 0.300 - - - 82.70 *82.70%Satisfactory
Tarifa Construction & Supplies 33239 Construction of Multi-Purpose
Building at Brgy. Palacpalac 02/27/09 III 2.361 75 O 0.205 0.239 0.150 0.030 0.035 0.050 70.90 -
Tarifa Construction & Supplies 33239 Const. of MPB @ Barangay
Calingcuan (Completion) 09/02/09 III 0.701 45 C 0.496 0.133 0.300 - - - 92.90 *92.90% V. Satisfactory
Tarifa Construction & Supplies 33239 Const. of 2CL S.B. at Sta. Juliana
NHS (O'Donnel H/S-Annex) 09/01/09 III 0.974 90 C 0.496 0.133 0.300 - - - 92.90 *92.90% V. Satisfactory
Teckcon Construction 33214 Const. of MPB 04/10/11 CAR 4.822 282 C 0.461 0.117 0.000 - - - 57.80 70.47% Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page378
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Teddie Construction Development Inc. 6313 Impvt./Rehab. of Gov. Camins Road 02/22/10 IX 26.819 288 C 0.489 0.200 0.300 - - - 98.90 82.13%
Satisfactoty
Teddie Construction Development Inc. 6313 Conc. of Montevista-Compostela-
Mati Road, Liboton-Maddle Section 03/01/10 XI 50.960 300 C 0.339 0.133 0.300 - - - 77.20 87.58% Satisfactory
Teddie Construction Development Inc. 6313
Const. of Flood Control along Davao-Cotabato Road at a) Sambas Section
and b) Power Section02/25/10 XI 4.723 90 O 0.354 0.239 0.150 0.030 0.045 0.050 86.80 -
Teddie Construction Development Inc. 6313
Const. of Flood Control along Davao-Cotabato Rd. at a) Sambas Sect. and
b) Power Sect.06/10/10 XI 4.723 90 C 0.473 0.133 0.300 - - - 90.60 88.32%
Satisfactory
Teddie Construction Development Inc. 6313 Zamboanga Airport Development
Project 04/29/09 DOTC 61.672 150 C 0.476 0.200 0.300 - - - 97.60 97.60% Outstanding
Teddie Construction Development Inc. 6313 Improvement/Rehabilitation of Gov.
Camins road 05/26/09 IX 26.653 196 O 0.381 0.180 0.000 0.010 0.047 0.000 61.80 -
Teddie Construction Development Inc. 6313 Improvement/Rehabilitation of Gov.
Camins Road 09/02/09 IX 26.653 227 O 0.383 0.300 0.000 0.030 0.055 0.033 80.10 -
Teddie Construction Development Inc. 6313
Const. (New Opening) of Zamboanga West Coast Road, Sirawai-Sibuco
Road, Bitugan-Tapanayan-Talabiga Section
08/19/08 IX 32.446 340 O 0.160 0.043 0.000 0.030 0.042 0.100 37.50 -
Teddie Construction Development Inc. 6313 Conc. of Montevista-Compostela-
Mati Road, Liboton-Saddle Section 06/04/09 XI 50.960 300 O 0.400 0.300 0.150 0.020 0.033 0.033 93.60 -
Teddie Construction Development Inc. 6313 Conc. of Montevista-Compostela-
Mati Road, Liboton-Maddle Section 09/09/09 XI 50.960 300 O 0.397 0.286 0.150 0.024 0.047 0.050 95.40 -
Teddie Construction Development Inc./Wee Eng Const., Inc. (J.V.)
JV-07-116 Zamboanga Airport Development Project 04/30/09 DOTC 105.729 300 O 0.398 0.300 0.150 0.020 0.054 0.033 95.50 -
Teddie Construction Development, Inc. 6313
Const./Opening of Zamboanga West Coast Road, Tapanayan-Talabiga-Pogos Sect. Sta.5+600 - Sta.7+600
03/31/11 IX 48.060 563 C 0.434 0.133 0.300 - - - 86.70 83.85% Satisfactory
Teddie Construction Development, Inc./Wee Eng Construction, Inc.
(JV)
JV-07-116 Zamboanga Airport Development Project 8/6-7/09 DOTC 0.105 300 O 0.387 0.300 0.150 0.020 0.044 0.050 95.10 -
Tessa Construction & Trading 26437
Rehab./Reconst. of Damaged National Road along Naic Jct.
Caylabne Rd.06/04/10 IVA 9.636 30 C 0.421 0.200 0.300 - - - 92.10 92.10%
V. Satisfactory
Tessa Construction & Trading 26437
Asphalt Overlay along Surigao-Davao Coastal Road, Km. 1454+431-
Km. 1457+005 (50mm thk)06/11/10 XIII 4.471 45 C 0.463 0.133 0.300 - - - 89.60 89.60%
V. Satisfactory
Tessa Construction & Trading 26437
Asphalt Overlay along Surigao-Davao Coastal Road, Km. 1461+000-
Km. 1459+000 (50 mm thk)06/11/10 XIII 9.856 60 C 0.425 0.133 0.300 - - - 85.80 85.80%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page379
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Tessa Construction & Trading 26437
Asphalt Overlay along Surigao-Davao Coastal Road, Km. 1462+012-
Km. 1462+378 (50 mm thk)06/11/10 XIII 3.724 45 C 0.406 0.133 0.300 - - - 83.90 83.90%
Satisfactory
The Steadfast Builders 8176 Impv't./Rehab. of Paglilingojan Creek 06/08/10 IVA 4.801 150 C 0.439 0.200 0.300 - - - 93.90 93.90% V. Satisfactory
The Steadfast Builders 8176 Rehab./Reconst./Upgrading of Felix Avenue (Formerly Imelda Ave.) 08/26/09 IVA 38.426 180 C 0.405 0.200 0.300 - - - 90.50 89.24%
V. Satisfactory
The Steadfast Builders 8176 Impvt./Widening of Cabrera-Kaytickling-Antipolo Road 02/15/10 IVA 9.615 150 C 0.381 0.200 0.300 - - - 88.10 88.10%
Satisfactory
The Steadfast Builders 8176 Rehab./Reconst./Upgading of Felix Ave. (Formerly Imelda Ave.) 05/18/09 IV-A 38.426 180 O 0.389 0.240 0.150 0.030 0.025 0.050 88.40 -
The Steadfast Builders 8176 Rehab. of MPB at Brgy. Nayong Kanluran (Covered Court) 03/10/09 NCR 2.697 111 C 0.316 0.198 0.300 - - - 81.40 82.17%
Satisfactory
The Steadfast Builders 8176 Rehab./Reconst./Upgrading of Abad Santos Avenue 08/24/10 NCR 14.424 60 C 0.431 0.133 0.300 - - - 86.40 86.40%
Satisfactory
The Tuscan Structures & Supplies 18257
Concrete Paving of Biliran Circumferential Road (Bilwang-
Mapuyo Sect.)02/23/10 VIII 19.142 200 C 0.330 0.200 0.300 - - `- 83.00 83.48%
Satisfactory
The Tuscan Structures & Supplies 18257
Concrete Paving of Biliran Circumferential Road (Look-Habuhab
Section)02/23/10 VIII 19.160 200 C 0.379 0.133 0.300 - - - 81.20 83.06%
Satisfactory
The Tuscan Structures & Supplies 18257
Concrete Paving of Biliran Circumferential Road, (Guindapunan-
Pinamihagan Section)02/23/10 VIII 19.155 200 C 0.402 0.133 0.300 - - - 83.50 82.84%
Satisfactory
The Tuscan Structures & Supplies 18257
Concrete Paving of Biliran Circumferential Road, Look-Habuhab
Section06/04/09 VIII 19.160 200 O 0.356 0.240 0.150 0.030 0.037 0.033 84.60 -
The Tuscan Structures & Supplies 18257
Concrete Paving of Biliran Circumferential Road, Guindapunan-
Pinamihagan Section06/04/09 VIII 19.155 200 O 0.311 0.240 0.150 0.030 0.037 0.033 80.10 -
The Tuscan Structures & Supplies 18257
Const./Rehab./Completion/Repair of Elementary & Secondary Sch. Bldg.,
Brgy. Oquendo03/10/09 VIII 0.520 60 C 0.363 0.200 0.300 - - - 86.30 *86.30%
Satisfactory
The Tuscan Structures & Supplies 18257
Const./Rehab./Completion/Repair of Elementary & Secondary Sch. Bldg.,
Pilar National High Sch. 03/10/09 VIII 0.517 60 C 0.423 0.200 0.300 - - - 92.30 *92.30%
V. Satisfactory
The Tuscan Structures & Supplies 18257 Rehab. of Naga to Mombon Sect.
along Calbayog Diversion Road 03/11/09 VIII 9.630 179 C 0.389 0.158 0.300 - - - 84.70 84.58% Satisfactory
The Tuscan Structures & Supplies 18257 Impvt. (Conc.) of Access Road to
Naval Port, (Naval-Caibiran Road) 09/04/09 VIII 4.799 80 C 0.469 0.133 0.300 - - - 90.20 *90.20% V. Satisfactory
The Tuscan Structures & Supplies 18257 Concrete Paving of Biliran Circ.
Road (Baganito-Madao Section) 09/03/09 VIII 9.465 120 C 0.416 0.133 0.300 - - - 84.90 *84.90% Satisfactory
The Tuscan Structures & Supplies 18257
Concrete Paving of Biliran Circ. Road, (Guindapunan-Pinamihagan
Sect.) 09/03/09 VIII 19.155 200 O 0.344 0.240 0.150 0.030 0.050 0.033 84.70 -
The Tuscan Structures & Supplies 18257 Concrete Paving of Biliran Circ.
Road, (Look-Habuhab Sect.) 09/03/09 VIII 19.160 200 O 0.337 0.240 0.150 0.030 0.050 0.033 84.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page380
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
The Tuscan Structures & Supplies 18257 Concrete Paving of Biliran Circ.
Road, (Bilwang-Mapuyo Section) 09/03/09 VIII 19.142 200 O 0.348 0.256 0.150 0.006 0.045 0.033 83.80 -
The Tuscan Structures and Supplies 18257 Concrete Paving of Biliran Circ.
Road (Looc-Bariis Sect.) 04/07/11 VIII 10.450 180 O 0.366 0.240 0.150 0.030 0.040 0.033 85.90 -
The Tuscan Structures and Supplies 18257 Conc. of FMR (Cabibihan to Pob.) 04/07/11 VIII 4.820 150 C 0.430 0.133 0.300 - - - 86.30 85.88%
Satisfactory
The Tuscan Structures and Supplies 18257
Concrete Paving of Biliran Circ. Road Masagaosao-Bulalacao
Section, Kawayan (Km.1046+017 - Km.1047+227)
04/07/11 VIII 24.915 340 C 0.420 0.133 0.300 - - - 85.30 85.24% Satisfactory
The Tuscan Structures and Supplies 18257 Concrete Paving of Biliran Circ.
Road (Tomalistis-Cabibihan) 04/07/11 VIII 8.160 180 O 0.345 0.240 0.150 0.030 0.040 0.033 83.80 -
The Tuscan Structures and Supplies / Jupa Construction (JV)
JV-09-134Conc. of Palapag-Mapanas-Gamay-
Lapinig Road, Anito-Libertad Section, with exception
08/25/10 VIII 18.802 200 O 0.305 0.300 0.150 0.030 0.025 0.033 84.30 -
The Tuscan Structures and Supplies / Jupa Construction (JV)
JV-09-133Conc. of Palapag-Mapanas-Gamay-Lapinig Road, Manaybanay-Mambot
Section with exception08/25/10 VIII 18.703 200 C 0.336 0.200 0.300 - - - 83.60 83.60%
Satisfactory
The Tuscan Structures and Supplies / Jupa Construction (JV)
JV-09-135Conc. of Palapag-Mapanas-Gamay-
Lapinig Road, Anito - Bag-ot Section, with exception
08/25/10 VIII 18.830 200 O 0.295 0.300 0.150 0.030 0.025 0.033 83.30 -
The Tuscan Stuctures & Supplies 18257
Rehab./Impvt. of Biliran Circumferential Road, Km.1025+500-
Km.1026+000 (with exceptions)08/25/10 VIII 4.800 90 C 0.484 0.133 0.300 - - - 91.70 91.70%
V. Satisfactory
The Tuscan Stuctures & Supplies 18257 Conc. Paving of Biliran Circ. Road
(Masagaosao-Bulalacao Section) 08/26/10 VIII 24.915 340 O 0.356 0.236 0.150 0.030 0.047 0.033 85.20 -
Thel Construction & Supplies 17671 Const./Completion of Multi-Purpose
Bldg., Brgy. San Mateo 09/03/09 XII 0.474 60 C 0.395 0.133 0.300 - - - 82.80 *82.80% Satisfactory
Thel Construction & Supplies 17671 Concreting of Road at Brgy.
Poblacion 05/28/09 R-XII 9.422 90 C 0.410 0.200 0.300 - - - 91.00 86.20% Satisfactory
Three W Builders Inc. / Jasmig Construction
Supply (JV)JV-09-152
Impv't. of Drainage and Other Related Structure at Manila-Batangas
City Rd.08/23/10 IVA 46.377 120 C 0.445 0.200 0.300 - - - 94.50 94.50%
V. Satisfactory
Three W Builders, Inc 10722 Riprapping & Desilting of Pansipit River 06/02/10 IVA 14.469 150 C 0.466 0.177 0.300 - - - 94.30 94.30%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page381
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Three W Builders, Inc 10722Asphalt Overlay/Impvt./Rehab. of
Manila-Batangas Rd. (Km.80+000 - Km.81+720)
06/07/10 IVA 24.115 60 C 0.462 0.133 0.300 - - - 89.50 89.50% V. Satisfactory
Three W Builders, Inc 10722Asphalt Overlay/Impvt./Rehab. of
Manila-Batangas Rd. (Km.81+480 - Km.86+000)
06/07/10 IVA 24.114 60 C 0.461 0.133 0.300 - - - 89.40 89.40% V. Satisfactory
Three W Builders, Inc 10722Asphalt Overlay/Impvt./Rehab. of
Manila-Batangas Rd. (Km.90+241 - Km.91+480)
06/07/10 IVA 24.116 90 C 0.458 0.133 0.300 - - - 89.10 89.10% V. Satisfactory
Three W Builders, Inc 10722Asphalt Overlay/Impvt./Rehab. of
Manila-Batangas Rd. (Km.80+720 -Km.81+480)
06/07/10 IVA 24.114 60 C 0.442 0.133 0.300 - - - 87.50 87.50% Satisfactory
Three W Builders, Inc 10722 Repair/Rehab. of FMR, Brgy. Lokilokon-Brgy. Calapi 06/11/10 VIII 4.674 120 C 0.386 0.200 0.300 - - - 88.60 88.60%
Satisfactory
Three W Builders, Inc 10722 Const. of Road, Maligaya to 8 ID Headquarters 09/02/10 VIII 9.346 120 O 0.339 0.276 0.150 0.030 0.025 0.033 85.30 -
Three W Builders, Inc 10722Asphalt Overlay Daang Maharlika Road (80mm thk) Surigao-Agusan
Road Section)06/07/10 XIII 14.812 120 C 0.408 0.133 0.300 - - - 84.10 84.10%
Satisfactory
Three W Builders, Inc 10722
Impvt. of Quirino-Andaya Highway (Quezon Side) Camarines
Sur/Camarines Norte, Quirino Highway, Brgy. San Luis I-II, Bagong
Silang I, Guinayangan Sect.
08/26/09 IVA 38.590 90 C 0.403 0.200 0.300 - - - 90.30 86.10% Satisfactory
Three W Builders, Inc 10722 Rehab./Reconst. of Tanza-TMC-Indang Road 09/08/09 IVA 19.175 90 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Three W Builders, Inc 10722 Repair/Rehab. of Senator Montano Hall 03/01/10 IVA 14.452 150 C 0.487 0.200 0.300 - - - 98.70 93.17%
V. Satisfactory
Three W Builders, Inc 10722Impvt. of Quirino-Andaya Highway,
Quezon Side, Brgy. San Luis II-Bagong Silang I
05/28/09 IV-A 38.590 90 O 0.348 0.240 0.150 0.020 0.025 0.050 83.30 -
Three W Builders, Inc 10722
Road Support Peace & Dev't in Mindanao & Other Conflict affected Area, Quirino Highway, San Luis I &
II
02/27/09 IV-A 38.318 148 C 0.473 0.133 0.300 - - - 90.60 *90.60% V. Satisfactory
Three W Builders, Inc 10722Rehab./Reconst. Selective Conc. Paving & Asphalt, along Ozamis-
Pagadian Road06/09/09 X 38.659 240 O 0.292 0.300 0.000 0.030 0.043 0.033 69.80 -
Three W Builders, Inc 10722Rehab./Reconst. (Selective Concrete
Paving & Asphalt) along Ozamis-Pagadian Road
03/17/09 X 38.659 240 O 0.330 0.300 0.150 0.030 0.045 0.050 90.50 -
Three W Builders, Inc 10722Rehab./Reconst. of Selective
Concrete Paving & Asphalt along Ozamis-Pagadian Rd.
03/06/10 X 39.449 534 C 0.418 0.200 0.300 - - - 91.80 84.81% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page382
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Three W Builders, Inc. 10722 Rehab./Reconst. of Damaged Roads along San Juan-Laiya Road 04/07/11 IVA 57.098 258 C 0.370 0.200 0.300 - - - 87.00 89.16%
V. Satisfactory
Three W Builders, Inc. 10722
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Roads along Ozamiz-Pagadian Road, Bonifacio
Sect.
04/06/11 X 26.029 210 C 0.435 0.133 0.000 - - - 56.80 74.68% Poor
Three-in-One Construction & Trading 14695
Road Safety Devices along San Fernando-Gapan Rd. Km.69+573 -
Km.96+120 w/ exception05/24/10 III 2.475 30 C 0.403 0.133 0.300 - - - 83.60 83.60%
Satisfactory
Thunder Construction 17247 Rehab./Reconst. of Damaged Paved National Road Bangued-Cadre Rd. 03/30/11 CAR 6.221 100 C 0.392 0.171 0.300 - - - 86.30 84.50%
Satisfactory
Thunder Construction 17247Repair and Maint. of National Road
Abra-Ilocos Sur Road, Km. 388+150 - Km. 388+653 (part of Package)
02/24/09 CAR 4.770 18 C 0.362 0.190 0.300 - - - 85.20 *85.20% Satisfactory
Thunder Construction 17247 Road Upgrading , Abra-Cervantes Road, Km. 430+450 - Km. 445+450 02/25/09 CAR 14.268 208 O 0.126 0.224 0.120 0.030 0.022 0.017 53.90 -
Thunder Construction 17247 Road Upgrading , Abra-Cervantes Road, Km. 430+450 - Km. 445+450 02/25/10 CAR 14.267 206 C 0.372 0.200 0.300 - - - 87.20 67.22%
Poor
Thunderheads Construction Corporation 22420 Conc. of San Aquilino-Roma Road,
Brgy. San Aquilino 04/06/11 IVB 1.375 45 C 0.431 0.133 0.300 - - - 86.40 *86.40% Satisfactory
Thunderheads Construction Corporation 22420 Const. of MPB at Brgy. Kalinisan 09/02/10 IVB 0.897 90 C 0.398 0.200 0.300 - - - 89.80 89.80%
Satisfactory
Thunderheads Construction Corporation 22420 Concreting of Brgy. Road @
Clarendon 05/27/09 IV-B 0.945 54 C 0.396 0.193 0.300 - - - 88.90 *88.90% Satisfactory
Tibaraw Construction 22710 Cagbonga CIS 06/1-6/09 NIA 3.467 150 C 0.435 0.120 0.300 - - - 85.46 *85.46% Satisfactory
Tibaraw Construction 22710 Mantang CIP 06/1-6/09 NIA 2.147 90 C 0.425 0.120 0.300 - - - 84.49 *84.49% Satisfactory
Tibaraw Construction 22710 San Gabriel CIS 06/1-6/09 NIA 2.224 150 C 0.424 0.120 0.300 - - - 84.43 *84.43% Satisfactory
Tiger Valley Builders 33063 Construction of Multi-Purpose Building, Anguiray H/S 09/10/09 II 1.914 150 C 0.424 0.133 0.300 - - - 85.70 *85.70%
Satisfactory
Tiger Valley Builders 33063 Repair/Restoration of Santiago-Tuguegarao Rd. Maddarulug Sect. 05/28/10 II 2.412 130 O 0.369 0.240 0.150 0.024 0.042 0.033 85.80 -
TJT Construction 10047 Repair/Rehab. of Pasong Tamo E/S 04/07/11 NCR 1.909 60 C 0.482 0.127 0.300 - - - 90.90 83.97% Satisfactory
TJT Construction 10047 Completion of Multi-Purpose Building 03/02/09 NCR 1.625 30 C 0.412 0.158 0.300 - - - 87.00 *87.00%
Satisfactory
TKS Builders & Supply 23415 Concreting/Improvement of Davao-Bukidnon Road, Tugbok District 05/25/09 XI 2.630 120 C 0.364 0.200 0.300 - - - 86.40 *86.40%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page383
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
TKS Builders and Supply 23415Const. of DPWH Davao City Sub DEO Bldg. incl. Materials Quality
Control Bldg.03/29/11 XI 4.695 180 C 0.484 0.200 0.300 - - - 98.40 92.38%
V. Satisfactory
Tokwing / Z.M. Construction (JV) JV-09-173
Widening/Conc. of McArthur Highway (MNR), Meycauayan
(Bulacan) to Mabalacat (Pampanga), Pampanga 4th Congressional
District, Phase VI-Package 3, Apalit-San Simon-Minalin-Sto. Tomas Sect.
03/29/11 III 315.723 300 C 0.362 0.200 0.300 - - - 86.20 88.48% Satisfactory
Tokwing / ZM Construction (JV) JV-08-274
Const./Replacement of Bucao Bridge and Approaches along Iba-South
Road over Bucao River02/20/10 III 144.750 265 C 0.422 0.200 0.300 - - - 92.20 92.84%
V. Satisfactory
Tokwing / ZM Construction (JV) JV-08-274
Const./Replacement of Bucao Bridge and Approaches along Iba-South
Road over Bucao River09/03/09 III 144.750 250 O 0.381 0.300 0.150 0.030 0.047 0.033 94.10 -
Tokwing / ZM Construction(JV) JV-08-075
Const. of Tarlac-Nueva Ecija-Dingalan Port Road (Jct.-Fort
Magsaysay-Laur Section) Contract Package 2, Fort Magasaysay-Laur
Road Section
02/23/10 III 299.123 390 C 0.443 0.200 0.300 - - - 94.30 93.36% V. Satisfactory
Tokwing Construction 9650 Rehab. of Mallig Bridge along Santiago-Tuguegarao Road 04/06/11 II 27.017 240 C 0.498 0.133 0.300 - - - 93.10 92.02%
V. Satisfactory
Tokwing Construction 9650Const. (Road Opening) of Missing
Link of National Roads, Sallapadan, Tubo, Abra-Cervantes Ilocos Sur
02/16/10 CAR 47.503 272 C 0.377 0.240 0.300 - - - 91.70 91.70% V. Satisfactory
Tokwing Construction 9650
Const. (Road Opening) of Missing Link of National Road, Abra-Ilocos
Norte Side, Km. 433+000 - Km. 452+620
02/16/10 CAR 47.656 494 O 0.349 0.262 0.150 0.020 0.033 0.033 84.70 -
Tokwing Construction 9650
Const. (Road Opening) of Missing Link of National Roads, Abra-Ilocos
Norte, Abra Side, Km.433+000 - Km.452+620
05/25/10 CAR 47.656 494 O 0.303 0.000 0.150 0.022 0.035 0.033 54.30 -
Tokwing Construction 9650 Const. of Calaba Bridge and Approaches (Phase 2), Brgy. Calaba 09/07/09 PMO 157.810 630 O 0.352 0.240 0.150 0.030 0.056 0.033 86.10 -
Tokwing Construction 9650 Construction of Calaba Bridge and Approaches (Phase II) 02/24/09 Sp. Bridges 143.959 510 O 0.355 0.235 0.150 0.022 0.040 0.033 83.50 -
Tokwing Construction 9650 Const. of Mindanao Ave. Extension (Segment C) 11/28/08 NCR 161.879 360 O 0.375 0.180 0.100 0.030 0.042 0.067 79.40 -
Tokwing Construction 9650 Ormoc Airport Development Project 09/10/11 DOTC 64.548 270 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory
Tokwing/ZM Construction (JV) JV-08-274
Const./Replacement of Bucao Bridge and Approaches along Iba South
Road over Bucao River05/27/09 III 144.750 250 O 0.384 0.253 0.150 0.030 0.051 0.050 91.80 -
Tokwing/ZM Construction (JV) JV-08-075
Const. of Tarlac-Nueva-Ecija-Aurora-Dingalan Port Road (Jct. Fort
Magsaysay-Laur Section) Contract Package 2
05/30/09 III 298.974 360 O 0.364 0.300 0.150 0.030 0.040 0.050 93.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page384
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Tokwing/ZM Construction (JV) JV-08-075
Const. of Tarlac-Nueva Ecija-Aurora-Dingalan Port Road (Jct. Fort
Magsaysay-Laur Section) Contract Package 2
09/07/09 III 298.974 360 O 0.388 0.300 0.150 0.030 0.040 0.050 95.80 -
Toledo Const. Corp./ Advanced Foundation
Const. System Corp. (JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3, Skyway
Ramps 2 & 308/28/08 URPO 721.651 1,543 O 0.330 0.300 0.000 0.030 0.047 0.100 80.70 -
Tonka Construction 4064 Conc. and Rehab. of Babasukan Road (Babo Sacan) 02/17/10 III 28.810 90 C 0.390 0.200 0.300 - - - 89.00 89.00%
Satisfactory
Tonka Construction 4064Asphalt Overlay of Angeles-Porac-Dinalupihan Road Km. 86+850- Km.
96+761 with exception02/24/09 III 19.085 32 C 0.418 0.126 0.300 - - - 84.40 *84.40%
Satisfactory
Tonn Builders (Philippines)
Construction, Inc.5815
Completion of Santisima Cruz Bridge (Santisima/Sto. Angel Bridge) and
Approaches04/04/11 IVA 38.574 300 C 0.471 0.200 0.300 - - - 97.10 90.86%
V. Satisfactory
Tonn Builders (Philippines)
Construction, Inc.5815
Const. (Widening) of Soro-soro Bridge, MSR-Rizal Bdry. San Pedro-
Calamba Section06/01/09 IV-A 28.940 655 C 0.470 0.133 0.300 - - - 90.30 85.35%
Satisfactory
Top Most Development & Marketing Corporation 13361 Completion of Pociento Bridge,
Brgy. Canipayan 02/25/10 VI 4.767 120 O 0.320 0.300 0.150 0.020 0.032 0.050 87.20 -
Top Most Development & Marketing Corporation 13361 Rehab./Reconst./Upgrading of Iloilo-
Capiz Rd. (Old Route) 06/18/10 VI 4.236 30 C 0.374 0.200 0.300 - - - 87.40 87.40% Satisfactory
Top Most Development & Marketing Corporation 13361 Completion of Pociento Bridge,
Canipayan 06/10/10 VI 4.767 120 C 0.375 0.200 0.300 - - - 87.50 87.32% Satisfactory
Top Most Development & Marketing Corporation 13361
Iloilo City LTFRB Regional Office Dev't Project (Const. of Perimeter Fence, Gates and Parking Area)
02/05/10 DOTC 1.927 150 C 0.428 0.200 0.300 - - - 92.80 92.80% V. Satisfactory
Top Most Development & Marketing Corporation 13361 Road Upgradingof Oton-Mambog-
Cabolo-An-Abilay-San Jose Road 06/10/09 VI 9.461 150 O 0.355 0.300 0.150 0.030 0.060 0.050 94.50 -
Top Most Development & Marketing Corporation 13361 Road Upgrading of Oton-Mambog-
Cabolo-An-Abilay-San Jose Road 09/10/09 VI 9.461 180 O 0.358 0.300 0.150 0.030 0.050 0.050 93.80 -
Top Most Development & Marketing Corporation 13361
Const. of Pociento Bridge & Approaches, Phase II, Brgy.
Canipayan03/13/09 VI 2.712 163 C 0.385 0.200 0.300 - - - 88.50 *88.50%
Satisfactory
Top Most Development and Marketing Corporation
13361 Reconst. of Passi Bridge 04/14/11 VI 5.071 120 O 0.374 0.240 0.150 0.022 0.037 0.050 87.30 -
Top Most Development and Marketing Corporation
13361Upgrading/Conc.of Iloilo-Antique
Road, Crossing Dapuyan to Ginot-an Sect. leading to Miag-ao
04/04/11 VI 9.512 180 O 0.361 0.238 0.150 0.022 0.050 0.050 87.10 -
Top Most Development and Marketing Corporation
13361Conc. of Lambunao-Inca Road,
(Km.49+257 - Km.59+793.70) with exception
04/12/11 VI 7.801 195 C 0.424 0.133 0.300 - - - 85.70 87.02% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page385
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Top Tech Trading and Construction 25522 Binambang River Control, Brgy.
Santol 06/02/10 IVA 4.822 90 C 0.400 0.133 0.300 - - - 83.30 83.30% Satisfactory
Top Tech Trading and Construction 25522 Sinisian West Flood Control along
Palico-Balayan-Batangas Rd. 08/24/10 IVA 4.822 90 C 0.441 0.133 0.300 - - - 87.40 87.40% Satisfactory
Topform Builders, Inc. 31760 Rehab. of M. Paterno St. 03/06/09 NCR 6.687 60 C 0.402 0.190 0.300 - - - 8,787.00 *89.20% V.Satisfactory
Topmost Development and Marketing Corp. 13361
Conc. of Lambunao-Inca Road, Km. 49+257 - Km. 59 +793.70 with
exception09/05/10 VI 7.091 150 O 0.375 0.240 0.150 0.030 0.051 0.033 87.90 -
Toreja's Construction Supply Corporation 15453 Impvt. of MPB at Brgy. Balaytique 04/12/11 IVA 0.999 90 C 0.403 0.200 0.300 - - - 90.30 *90.30%
V. SatisfactoryToreja's Construction Supply Corporation 15433 Const. of Multi-Purpose Building at
Batangas City 02/26/10 IVA 4.820 90 C 0.487 0.170 0.300 - - - 95.70 95.70% V. Satisfactory
Toreja's Construction Supply Corporation 15453
Palico-Balayan-Batangas Rd. inc. Bridges, Palico-Balayan-Batangas
Rd.06/02/10 IVA 28.950 180 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
Toreja's Construction Supply Corporation 15453 Asphalt Overlay/Rehab./Impvt. of
Batangas Port Access Rd. Phase I 06/04/10 IVA 19.292 30 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
Toreja's Construction Supply Corporation 15453 Asphalt Overlay/Rehab./Impvt. of
Manila-Batangas Rd. 06/04/10 IVA 19.292 30 C 0.443 0.133 0.300 - - - 87.60 87.60% Satisfactory
Toreja's Construction Supply Corporation 15453
Road Upgrading along Lobo Malabrigo-San Juan Rd., Sawang
Sect.08/23/10 IVA 3.886 60 C 0.418 0.200 0.300 - - - 91.80 91.80%
V. Satisfactory
Toreja's Construction Supply Corporation 15453
Restoration of Collapsed Slope Protection, Bagbag Bridge,
Km.101+25608/25/10 IVA 4.820 90 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
Toreja's Construction Supply Corporation 15453 Conc. of Roads, Brgy. Putat-Brgy.
Dayap (Brgy. Putat Sect.) 03/04/09 IVA 9.548 120 C 0.460 0.126 0.300 - - - 88.60 *88.60% Satisfactory
Toreja's Construction Supply Corporation 15453 Asphalt Overlay and Impvt. of
Poblacion -Bayanan Road 09/09/09 IVA 19.290 60 C 0.476 0.133 0.300 - - - 90.90 *90.90% V. Satisfactory
Toreja's Construction Supply Corporation 15453 Rehab./Reconst. of Batangas-Lobo
Road, Paharang East-Bilogo Section 05/29/09 IV-A 19.290 80 C 0.461 0.133 0.300 - - - 89.40 *89.40% V. Satisfactory
Toreja's Construction Supply Corporation 15453 Rehab./Reconst. of Batangas-Lobo
Road, Bilogo-San Jose Sico Section 05/29/09 IV-A 15.432 80 C 0.424 0.133 0.300 - - - 85.70 *85.70% Satisfactory
Toyo / Tobishima (JV) FC-06-034CP II Urgent Bridges Const. Project for Rural Development (Sta. Clara
Bridge)09/02/09 UBCPRD 23.388 8 mos. C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
Toyo / Tobishima (JV) FC-06-034CP II Urgent Bridges Construction
Project for Rural Development (Bacao Bridge)
09/02/09 UBCPRD 23.103 21 mos. C 0.458 0.200 0.000 - - - 65.80 78.37% Unsatisfactory
Toyo / Tobishima (JV) FC-06-034CP III Urgent Bridge Construction
Project for Rural Development (Ilijan 2)
08/28/09 UBCPRD 20.125 13mos. C 0.393 0.133 0.000 - - - 52.60 *52.60% Poor
Toyo Construction Co. LTD / Tobishima Corporation (JV)
FC-06-034 CP IV, Urgent Bridges Const. Project for Rural Devt., Quinoguitan Bridge 03/31/11 UBCPRD 61.123 24 Months O 0.393 0.240 0.000 0.030 0.042 0.033 73.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page386
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Toyo Construction Co. LTD / Tobishima Corporation (JV)
FC-06-034 CP IV, Urgent Bridges Const. Project for Rural Devt., Moawa Bridge 03/31/11 UBCPRD 46.073 24 Months O 0.372 0.240 0.000 0.030 0.042 0.033 71.70 -
Toyo Construction Co., Ltd. FC-09-006
Pinatubo Hazard Urgent Mitigation Project-Phase III, CP No.4 (Dredging
and Channel Excavation of Major River)
03/31/11 MPE 922.421 780 O 0.400 0.300 0.150 0.030 0.051 0.025 95.60 -
Toyo Construction Co., Ltd. - The Project for Flood Disaster
Mitigation in Camiguin Island 04/02/11 MFCP II Y 780.000 550 O 0.361 0.300 0.150 0.030 0.070 0.050 96.10 -
Toyo-Nippon-Miyaji (JV) SL2-SN-000843
Const. of CP-1 UBCPRD (Construction of Pantal Bridge),
Brgy. Kabayan Central05/21/09 UBCPRD 26.777 28 mos. O 0.391 0.300 0.150 0.030 0.050 0.033 95.40 -
Toyo-Nippon-Miyaji (JV) SL2-SN-000843
Const. of CP-1 UBCPRD (Construction of Ellet Bridge), Brgy.
Eddet, Kabayan Central05/21/09 UBCPRD 26.777 273 O 0.371 0.300 0.150 0.030 0.060 0.033 94.40 -
Toyo-Tobishima (JV) FC-06-034CP-IV, Urgent Bridges Const. Project
for Rural Dev't., Const. of Marao Bridge
04/11/11 UBCPRD 35.755 730 C 0.465 0.133 0.300 - - - 89.80 92.44% V. Satisfactory
Toyo-Tobishima (JV) FC-06-034CP IV, Urgent Bridges Const. Project
for Rural Dev't., Const. of Abisang Bridge
04/11/11 UBCPRD 23.234 730 C 0.436 0.133 0.300 - - - 86.90 91.16% V. Satisfactory
Toyo-Tobishima (JV) FC-06-034Panamitan Bridge (CP-III Urgent Bridges Construction Project for
Rural Development)08/28/09 IVA 33.072 1,125 C 0.448 0.200 0.300 - - - 94.80 *94.80%
V. Satisfactory
Toyo-Tobishima (JV) FC-06-034Malamok Bridge (CP-III Urgent
Bridges Construction Project for Rural Development
08/28/09 UBCPRD 42.304 1,125 C 0.479 0.200 0.300 - - - 97.90 *97.90% Outstanding
Toyo-Tobishima (JV) FC-06-034 Const. of Tagbalidbid 2 Bridge, Cagwait 09/01/10 UBCPRD 20.500 10 mos. C 0.476 0.198 0.300 - - - 97.40 95.30%
V. Satisfactory
Toyo-Tobishima (JV) FC-06-034 Const. of Tagbalidbid 2 Bridge Cagwait 03/03/10 UBCPRD 20.450 300 O 0.354 0.300 0.150 0.030 0.055 0.050 93.90 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges
Const. Projects for Rural Devt. (Bacao Bridge)
11/28/08 UBCPRD 23.103 10 mos. O 0.320 0.300 0.100 0.030 0.037 0.100 88.70 -
TR Construction 11697 Const. of 2-CL School Buildings at Rawis NHS 05/22/09 V 1.238 150 C 0.419 0.133 0.300 - - - 85.20 *85.20%
Satisfactory
Tracsom Builders Incorporated (Formerly:
Tracsom Builders)5935
Const. of 4-Storey, 36 CL Sch. Bldg. at Eulogio Rodriguez Integrated
School (Phase III) Barangay Hagdan Bato Itaas
04/06/11 NCR 19.109 180 C 0.496 0.085 0.300 - - - 88.10 85.23% Satisfactory
Tracsom Builders Incorporated (Formerly:
Tracsom Builders)5935
Construction of 4-Storey, 16 Classroom School Building @ Sta.
Lucia H/S03/06/09 NCR 23.864 210 O 0.348 0.285 0.000 0.030 0.047 0.033 74.30 -
Tracsom Builders Incorporated (Formerly:
Tracsom Builders)5935 Const. of Four Storey Sixteen
Classroom Sch., Sta. Lucia H/S 05/28/09 NCR 23.864 332 C 0.445 0.133 0.300 - - - 87.80 78.35% Unsatisfactory
Tracsom Builders Incorporated (Formerly:
Tracsom Builders)5935
Const. of Industrial Arts & Home Economics Bldg. of the Mataas na
Paaralang Neptali A. Gonzales, including ground improvement
02/24/10 NCR 9.553 134 C 0.445 0.133 0.300 - - - 87.80 87.80% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page387
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Trans-Aurora Construction 11388 Road Upgrading (Gravel to Paved)
Baler-Cemento via Dicaloyungan 06/05/10 III 20.639 160 O 0.378 0.234 0.150 0.030 0.055 0.033 88.00 -
Trans-Aurora Construction 1138 Road Upgrading (Gravel to Paved)
Baler-Cemento via Dicaloyungan 08/21/10 III 20.639 160 C 0.466 0.133 0.300 - - - 89.90 88.76% Satisfactory
Trans-Aurora Construction / B.M.K.
Construction (JV) JV-07-144 Concreting/Improvement of Baler-
Cemento Road via Dicaloyungan 03/03/09 III 22.425 240 C 0.398 0.200 0.300 - - - 89.80 *89.80%V. Satisfactory
Triad A Construction 30840 Const. of Drainage System @ Brgy. 51-A & 2 03/18/09 VIII 0.961 90 C 0.486 0.200 0.300 - - - 98.60 *98.60%
Outstanding
Triad A Construction 30840 Const. of Multi Purpose Pavement at Brgy. Crossing 08/27/10 VIII 0.482 60 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
Tri-Dom Trading & Construction 10843 Conc. Of Brgy. Rd., San Isidro
Village 08/18/10 V 1.149 120 C 0.334 0.200 0.300 - - - 83.40 85.50% Satisfactory
Tri-Dom Trading & Construction 10843 Marilima Port Development Project
(Construction of Seawall) 02/19/10 DOTC 4.774 90 C 0.445 0.200 0.300 - - - 94.50 94.50% V. Satisfactory
Tri-Dom Trading & Construction 10843 Virac Airport Development Project 07/10/09 DOTC 4.261 120 C 0.424 0.200 0.300 - - - 92.40 92.40%
V. SatisfactoryTri-Dom Trading &
Construction 10843 Virac Airport Development Project 07/11/09 DOTC 4.773 120 C 0.426 0.200 0.300 - - - 92.60 92.60% V. Satisfactory
Tri-Dom Trading & Construction 10843 Virac Airport Development Project 07/10/09 DOTC 4.777 90 C 0.445 0.200 0.300 - - - 94.50 94.50%
V.SatisfactoryTri-Dom Trading &
Construction 10843 Codon Port Development Project 07/10/09 DOTC 4.776 90 C 0.421 0.200 0.300 - - - 92.10 92.10% Satisfactory
Tri-Dom Trading & Construction 10843 Repair of Multi-Purpose Building,
Bato Municipal Building 05/21/09 V 1.900 150 C 0.321 0.133 0.300 - - - 75.40 -
Tri-Dom Trading & Construction 10843 Road Opening of Dagui-Wala-
Simamla Road 03/04/09 V 3.986 150 C 0.492 0.186 0.300 - - - 97.80 91.98% V. Satisfactory
Tri-Dom Trading & Construction 10843 Concreting of Barangay Road, San
Isidro Village 02/24/10 V 1.149 120 O 0.364 0.240 0.150 0.030 0.035 0.050 86.90 -
Trilex Builders Construction and Supply 26590 Const. of MPB at the Albert E/S
(Phase I) 08/14/08 NCR 1.919 90 O 0.231 0.300 0.100 0.030 0.047 0.100 80.80 -
Trinity Construction and Development 27755 Const. of 3-CL SB, (97m x 9 m) at
Bais City NHS Manlipac Annex 09/13/09 VII 1.352 100 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Trinity Construction and Development 27755 Const. of 1 unit 2 CL S/B at
Salingkubong PS 03/06/10 VII 0.852 100 O 0.392 0.217 0.150 0.030 0.045 0.050 88.40 -
Trinity Construction and Development 27755 Const. of 1 unit 2 CL S/B at Apolinar
Macias MHS (Casili NHS) 03/05/10 VII 0.527 100 C 0.475 0.095 0.300 - - - 87.00 87.00% Satisfactory
Triparco Development Corporation 23327
Asphalt Overlay along Daang Maharlika, Agusan-Davao Sect., 50
mm. thk, Km. 1266+381-Km. 1268+050, with exceptions
06/12/10 XIII 9.231 120 C 0.420 0.200 0.300 - - - 92.00 92.00% V. Satisfactory
Triple 8 Construction & Supply 10684 Channel Impvt. of Parua River
(Balutu-Calius Gueco Sect.) 06/02/10 III 32.241 60 C 0.438 - 0.500 - - - 93.80 93.80% V. Satisfactory
Triple 8 Construction & Supply 10684 Flood Control Angat River Paltao 06/10/10 III 4.772 105 O 0.389 0.240 0.150 0.015 0.053 0.033 88.00 93.80%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page388
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Triple 8 Construction & Supply 10684
Rehab./Impv't. of Roads, Tarlac Province (Package I), Gerona-Pura-
Nueva Ecija Bdry.08/27/10 III 8.935 192 C 0.352 0.200 0.300 - - - 85.20 85.20%
Satisfactory
Triple 8 Construction & Supply 10684 Flood Control Angat River Paltao 08/26/10 III 4.772 105 C 0.444 0.133 0.300 - - - 87.70 87.88%
Satisfactory
Triple 8 Construction & Supply 10684
Contract Package I, Const. of Slope Protection along Daang Maharlika,
Calbiga-Tacloban Rd. Sect., Km.849+475 - Km.866+904 w/
exceptions
06/17/10 VIII 37.711 95 O 0.358 0.300 0.150 0.030 0.042 0.033 91.30 -
Triple 8 Construction & Supply 10684 Riprapping and Dredging of Angono
River 08/19/10 IVA 2.402 90 C 0.389 0.200 0.300 - - - 88.90 88.90% Satisfactory
Triple 8 Construction & Supply 10684 Repair/Rehab. of Angono Diversion
Road 05/18/09 IV-A 9.937 120 C 0.457 0.133 0.300 - - - 89.00 *89.00% V. Satisfactory
Triple 8 Construction & Supply 10684 Rehab. of Calbiga-Tacloban Road
with exception 09/18/09 VIII 47.511 300 C 0.402 0.133 0.300 - - - 83.50 *83.50% Satisfactory
Triple P Construction 31616 Construction of NVGCHS Annex, 1CL Dep Ed Type 03/10/09 II 0.502 92 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V.Satisfactory
Triumph Builders & Steel Inc. 2272
Construction of One(1) Unit Three-Storey, 15-Classrooms School
Building at Southville 7 Housing Project
12/2-3/10 NHA 23.980 150 C 0.459 0.200 0.300 - - - 95.90 95.90% V. Satisfactory
Triumph Builders & Steel Inc. 2272 Const. of MPB South Elem. School 05/29/09 IV-A 2.701 60 C 0.424 0.133 0.300 - - - 85.70 89.41%
V. SatisfactoryTriumph Builders & Steel
Inc. 2272 Const. of MPB at Mauban South Elem. School 02/26/09 IV-A 2.701 60 O 0.343 0.300 0.150 0.030 0.037 0.050 91.00 -
Triumph Builders & Steel Inc. 2272 Construction of 3-Storey, 15
Classroom School Bldg. 4/19/2010 NHA 21.886 150 O 0.3657 0.3000 0.1500 0.0150 0.0470 0.0500 92.77 -
Triumph Builders & Steel Inc. 2272 Construction of 3-Storey 15-
Classroom School Building 06/18/09 NHA 18.113 150 O 0.381 0.252 0.150 0.024 0.047 0.050 90.36 -
TRM Construction and Development Corp. 30731 Construction of Livelihood,
Production & Training Center 3/12/2010 NHA 4.990 90 O 0.359 0.287 0.113 0.024 0.035 0.033 85.10 -
TRM Construction and Development Corp. 30731 Construction of 3-Storey, 15
Classroom School Bldg. 2/3/2010 NHA 19.018 279 C 0.483 0.200 0.300 - - - 83.30 83.85 Satisfactory
TRM Construction and Development Corp. 30731 Construction of 3-Storey School
Building 09/23/08 NHA 17.200 150 O 0.283 0.300 0.000 0.030 0.032 0.100 74.51 -
TRM Construction and Dev't. Corporation 30731 Construction of Three (3) Storey 15-
Classroom School Bldg. (Building) 04/13/11 NHA 23.979 242 C 0.459 0.200 0.300 - - - 95.90 88.55% Satisfactory
Tryst Builders Enterprises 31164 Const./Rehab. of Gibraltar Barangay
Road 04/13/11 CAR 2.361 60 C 0.455 0.133 0.300 - - - 88.80 *88.80% Satisfactory
T-Square Builders 14268Const. of Additional 2 Lanes along Davao-Cotabato Road (Poblacion
Bansalan Sect.)04/02/11 XI 9.638 150 O 0.385 0.300 0.150 0.030 0.035 0.050 95.00 -
T-Square Builders 14268Road Upgrading of General Santos Circ. Road (Western Section), Brgy.
Apopong09/15/09 XII 17.343 120 C 0.406 0.200 0.300 - - - 90.60 *90.60%
V. Satisfactory
T-Square Builders 14268 Const. of MPB (JLC Memorial Bldg.) 03/10/10 XII 5.759 180 C 0.446 0.133 0.300 - - - 87.90 86.78% Satisfactory
T-Square Builders 14268 Sarangani-Sultan Kudarat Coastal Road (Teneb Section) 09/06/10 XII 9.395 150 C 0.402 0.133 0.300 - - - 83.50 83.50%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page389
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
T-Square Builders 14268 Concreting of Road & Reblocking, Marbel-Makar Road, Palian Section 06/09/09 R-XII 15.101 195 C 0.363 0.192 0.300 - - - 85.50 86.28%
Satisfactory
T-Square Builders 14268 Impvt./Conc. of Road at Bansalan-Mt. Apo National Park Road 03/06/09 XI 28.919 270 O 0.274 0.273 0.150 0.030 0.054 0.033 81.40 -
T-Square Builders 14268 Conc. of Roads at La Fortunata Road 09/05/09 XI 4.718 60 C 0.469 0.133 0.300 - - - 90.20 92.24% V. Satisfactory
T-Square Builders 14268 Impvt./Conc. of Road at Bansalan-Mt. Apo National Park Road 11/19/08 XI 28.919 270 O 0.214 0.279 0.100 0.030 0.040 0.100 76.30 -
T-Square Builders 14268 Conc. of Road & Reblocking, Marbel-Makar Road, Palian Section 03/20/09 XII 15.102 180 O 0.363 0.240 0.150 0.030 0.035 0.050 86.80 -
Tuchar Construction 13644Proposed Partial Const. of Three (3) Storey, Fifteen (15) Classroom Bldg.
at Quirino E/S, Anonas St.03/31/11 NCR 14.412 195 C 0.457 0.133 0.300 - - - 89.00 *89.00%
Satisfactory
Turquoise Construction & Trading 21801 Construction of Multi-Purpose
Building (Phase III & IV) 03/05/09 I 14.472 120 C 0.352 0.200 0.300 - - - 85.20 *85.20%Satisfactory
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road 03/11/10 VIII 14.160 520 C 0.425 0.133 0.300 - - - 85.80 79.11%
Unsatisfactory
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road 03/03/09 VIII 14.160 467 O 0.251 0.225 0.070 0.030 0.037 0.050 66.30 -
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road 08/31/08 VIII 14.160 270 O 0.344 0.225 0.050 0.030 0.032 0.067 74.80 -
UKC Builders, Inc. 10759 Cebu North Coastal Road, Phase 1 (Sta. 0+094.25-Sta. 1+300) 03/02/09 VII 43.189 410 C 0.450 0.200 0.300 - - - 95.00 88.52%
Satisfactory
UKC Builders, Inc. 10759 Cebu North Coastal Road, Phase I 09/03/08 VII 43.189 228 O 0.380 0.225 0.070 0.030 0.037 0.100 84.20 -
UKC Builders, Inc./ Equi-parco Construction. Co.,
Inc - JVJ.V. -09-097 Cagayan de Oro Improvement
Project (Ports & Harbor) 09/05-09/11 PPA 187.898 540 O 0.467 0.200 0.300 - - - 96.74 -
UKC Builders, Inc./ Equi-parco Construction. Co.,
Inc - JVJ. V.-09-097
Const. of Cagayan de Oro Improvement Project (Ports &
Harbor)02/2-5/11 PPA 187.898 540 O 0.355 0.298 0.150 0.030 0.070 0.050 95.36 -
UKC-Equi-Parco (JV) 0624S Backup Area for the Newly Constructed Wharf 2/3-6/09 PPA 429.380 720 C 0.396 0.300 0.300 99.64 99.64%
Outstanding
Ulticon Builders Inc. 17267 Rehab./Reconst. of Sayre Highway (Kisolon-Lumbo Section) 06/14/10 X 189.228 300 C 0.397 0.179 0.300 - - - 87.60 88.05%
Satisfactory
Ulticon Builders Inc. 17267
Rehab./Reconst./Upgrading of Damaged Paved National Roads
along Sayre Highway, Alae-Dicklum Section
09/08/10 X 163.249 300 O 0.381 0.300 0.150 0.030 0.055 0.033 94.90 -
Ulticon Builders Inc. 17267Rehabilitation/Improvement of
National Road along Daang Maharlika
02/27/10 XI 144.738 270 O 0.368 0.300 0.150 0.030 0.055 0.050 95.30 -
Ulticon Builders Inc. 17267Const./Impvt. of Davao Del Sur-
Sarangani Coastal Road, Meybio-Glan Bdry. Section
02/24/10 XI 96.289 280 O 0.338 0.300 0.150 0.030 0.056 0.050 92.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page390
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ulticon Builders Inc. 17267CP 10: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-
Boston) Boston Section03/04/10 XI 286.477 600 C 0.353 0.200 0.300 - - - 85.30 89.18%
V. Satisfactory
Ulticon Builders Inc. 17267Rehab./Reconst./Upgrading of
Damaged National Road/Concreting along Surigao-Davao Coastal Road
03/01/10 XI 167.402 300 C 0.383 0.200 0.300 - - - 88.30 88.30% Satisfactory
Ulticon Builders Inc. 17267Rehab./Reconst./Upgrading of
Damaged Paved National Road along Daang Maharlika
03/05/10 XI 192.020 540 C 0.348 0.200 0.300 - - - 84.80 86.15% Satisfactory
Ulticon Builders Inc. 17267 Conc. of San Ildefonso-Hulid Sect. along Cateel-Compostela Rd. 03/03/10 XI 62.856 300 O 0.309 0.240 0.150 0.030 0.055 0.050 83.40 -
Ulticon Builders Inc. 17267 Rehab./Impvt. of National Rd. along Daang Maharlika 06/01/10 XI 144.736 270 C 0.493 0.133 0.300 - - - 92.60 94.22%
V. Satisfactory
Ulticon Builders Inc. 17267 Rehab. of Diwalwal Road Network 06/05/10 XI 95.736 606 C 0.433 0.200 0.300 - - - 93.30 94.22% V. Satisfactory
Ulticon Builders Inc. 17267Const./Impvt. of Davao Del Sur-
Sarangani Coastal Rd., Meybio-Glan Bdry. Sect.
06/15/10 XI 96.289 280 C 0.445 0.133 0.300 - - - 87.80 90.56% V. Satisfactory
Ulticon Builders Inc. 17267 Repair/Rehab./Impvt. of Daang Maharlika Rd. 06/04/10 XI 88.226 180 O 0.374 0.284 0.102 0.030 0.051 0.033 87.40
Ulticon Builders Inc. 17267 Conc. of San Alfonso-Hulid Sect. along Cateel-Compostela Rd. 06/06/10 XI 62.856 330 O 0.326 0.234 0.150 0.030 0.056 0.050 84.60 -
Ulticon Builders Inc. 17267 Repair/Rehab./Impv't. of Daang Maharlika 09/01/10 XI 88.226 243 C 0.456 0.133 0.300 - - - 88.90 88.00%
Satisfactory
Ulticon Builders Inc. 17267Rehab./Impv't./Conc. Of Surigao del
Sur-Davao Oriental Coastal Rd. (Manay-Boston Sect.)
09/07/10 XI 73.588 390 O 0.364 0.293 0.106 0.030 0.043 0.033 86.90 -
Ulticon Builders Inc. 17267 Conc. Of San Alfonso-Hulid Sect. along Cateel-Compostela Rd. 09/06/10 XI 62.856 330 C 0.460 0.127 0.300 - - - 88.70 85.88%
Satisfactory
Ulticon Builders Inc. 17267 Rehab./Reconst. of Sayre Highway (Kisolon-Lumbo Section) 09/04/09 X 189.228 300 O 0.286 0.290 0.150 0.030 0.051 0.033 84.00 -
Ulticon Builders Inc. 17267Impvt./Conc. of Surigao Sur-Davao
Oriental Coastal Road (Manay Boston) Boston Section
06/09/09 XI 286.479 600 O 0.367 0.300 0.150 0.030 0.065 0.050 96.20 -
Ulticon Builders Inc. 17267 Rehab./Reconst./Upgrading of Digos Diversion Road 05/30/09 XI 46.834 220 O 0.365 0.300 0.150 0.030 0.042 0.050 93.70 -
Ulticon Builders Inc. 17267CP-10: Imprvt./ Conc. of Surigao-
Davao Oriental Coastal Road, (Manay-Boston) Boston Section
09/11/09 XI 286.477 600 O 0.373 0.300 0.150 0.030 0.054 0.033 94.00 -
Ulticon Builders Inc. 17267 Improvement of Monkayo-Diwalwal Road 09/10/09 XI 92.877 505 C 0.443 0.174 0.300 - - - 91.70 91.37%
V. Satisfactory
Ulticon Builders Inc. 17267Rehab./Reconst./Upgrading of
Damaged Paved National Road along Daang Maharlika
09/07/09 XI 192.020 540 O 0.373 0.240 0.150 0.030 0.059 0.050 90.20 -
Ulticon Builders Inc. 17267 Rehab./Upgrading of Digos Diversion Road 09/05/09 XI 46.834 220 O 0.374 0.240 0.150 0.030 0.054 0.050 89.80 -
Ulticon Builders Inc. 17267CP 10: Impv't./Conc. of Surogao Sur-Davao Oriental Coastal Road (Manay-
Boston) Boston Section11/26/08 XI 286.479 600 O 0.345 0.284 0.100 0.030 0.060 0.100 91.90 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page391
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ulticon Builders, Inc. 17267Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Roads along Bukidnon-Davao City Road
03/30/11 X 78.872 350 C 0.429 0.133 0.300 - - - 86.20 90.58% V. Satisfactory
Ulticon Builders, Inc. 17267Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Roads along Sayre Highway, Alae-Dicklum Sect.
04/01/11 X 163.249 390 O 0.376 0.240 0.150 0.030 0.047 0.050 89.30 -
Ulticon Builders, Inc. 17267Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Roads along Sayre Highway
03/30/11 X 96.441 350 C 0.398 0.133 0.300 - - - 83.10 84.18% Satisfactory
Ulticon Builders, Inc. 17267
Opening/Impv't of Davao del Sur-Sarangani Coastal Road, Meybio-
Jose Abad Santos-Glan Bdry. Section
03/31/11 XI 94.997 500 C 0.469 0.200 0.300 - - - 96.90 93.87% V. Satisfactory
Ulticon Builders, Inc. 17267 Rehab./Reconst./Upgrading of Digos Diversion Road 04/02/11 XI 19.089 239 C 0.469 0.200 0.300 - - - 96.90 90.36%
V. Satisfactory
Ulticon Builders, Inc. 17267
Rehab./Reconst./Upgrading of Damaged Paved National Road along Surigao Sur-Davao Oriental Coastal
Road (Pantukan Sect.)
04/12/11 XI 89.702 375 C 0.381 0.200 0.300 - - - 88.10 89.42% V. Satisfactory
Ulticon Builders, Inc. 17267Rehab./Impv't./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-
Boston Sect.)04/04/11 XI 373.049 448 O 0.346 0.300 0.057 0.030 0.055 0.033 82.10 -
Ultron Construction and Supply 30275 Const. of Flood Control at Maapon
River 05/27/10 IVA 4.821 40 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory
Uni Construction 13198 Repair of School Building Lupi H/S 08/31/10 V 0.246 90 C 0.375 0.200 0.300 - - - 87.50 87.50% Satisfactory
Uni Construction 13198Const. of MPB (Brgy. Covered Court and Perm. Roofing over the Social
Hall in front of Stage)03/09/09 V 0.954 120 C 0.476 0.200 0.300 - - - 97.60 89.86%
V. Satisfactory
Unitec Builder Inc. 4803 Proposed Widening of Sinunuc Bridge and Approaches, Phase II 02/22/10 IX 11.878 545 O 0.383 0.300 0.150 0.030 0.047 0.050 96.00 -
Unitec Builder Inc. 4803 Impvt./Rehab. of RT Lim Boulevard 02/22/10 IX 18.661 300 C 0.282 0.200 0.300 - - - 78.20 82.73% Satisfactory
Unitec Builder Inc. 4803Proposed Widening of Sinunuc
Bridge and Approaches (Phase II) along Zamboanga City-Labuan Rd
08/23/10 IX 12.222 575 C 0.440 0.133 0.300 - - - 87.30 92.52% V. Satisfactory
Unitec Builder Inc. 4803 Rehab./Impvt. of Balite-Seven Hills-Happy Valley Section 05/22/09 VIII 19.176 180 C 0.435 0.200 0.300 - - - 93.50 83.96%
Satisfactory
Unitec Builder Inc. 4803
Rehab. of Daang Maharlika Highway, Package I, Section 1 (Allen-
Malaga Road Section) Km. 658+804.55-Km. 663+359.55 w/
exceptions
03/04/10 VIII 99.961 180 C 0.464 0.200 0.300 - - - 96.40 96.40% Outstanding
Unitec Builder Inc. 4803 Conc. of Bobon-Acerida National Road 03/05/10 VIII 19.276 240 C 0.388 0.133 0.300 - - - 82.10 82.22%
Satisfactory
Unitec Builder Inc. 4803
Rehab. of Daang Maharlika Highway, Sect. 8, Allen-Malaga Rd. Sect.,
Km.687+366.55 - Km.690+866.55 w/ exceptions
06/16/10 VIII 96.441 200 O 0.357 0.300 0.150 0.030 0.042 0.033 91.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page392
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Unitec Builder Inc. 4803
Rehab. of Daang Maharlika Highway, Sect 7, Allen-Malaga Rd. Sect.,
Km.683+866.55 - Km.687+366.55 w/ exceptions
06/16/10 VIII 96.435 200 O 0.354 0.300 0.150 0.030 0.042 0.033 90.90 -
Unitec Builder Inc. 4803Rehab./Const./Upgrading of
Damaged Paved National Rd. along Catarman-Laoang Rd.
06/14/10 VIII 47.963 150 O 0.350 0.240 0.150 0.030 0.042 0.050 86.20 -
Unitec Builder Inc. 4803
Rehab. of Daang Maharlika Highway, Package 1, Section 7, Allen-Malaga
Road Section, Km.683+866.55 - Km.687+366.55, with exceptions
09/10/10 VIII 96.434 230 C 0.438 0.196 0.300 - - - 93.40 91.90% V. Satisfactory
Unitec Builder Inc. 4803
Rehab. of Daang Maharlika Highway, Package 1, Section 8, Allen-Malaga
Road Section, Km.687+366.5 - Km.690+866.55, with exceptions
09/10/10 VIII 96.440 230 C 0.425 0.200 0.300 - - - 92.50 91.72% V. Satisfactory
Unitec Builder Inc. 4803 Sanga-Sanga Airport Development Project 08/08/09 DOTC 31.769 180 C 0.457 0.200 0.300 - - - 95.70 95.70%
V. Satisfactory
Unitec Builder Inc. 4803 Improvement/Rehabilitation of R.T. Lim Boulevard 05/26/09 IX 18.661 270 O 0.343 0.240 0.150 0.010 0.042 0.050 83.50 -
Unitec Builder Inc. 4803Widening of Sinunuc Bridge and
Approaches, Phase I along Zamboanga City-Labuan Road
09/03/09 IX 21.668 436 C 0.459 0.200 0.300 - - - 95.90 86.60% Satisfactory
Unitec Builder Inc. 4803 Improvement/Rehabilitation of R.T. Lim Boulevard 09/02/09 IX 18.661 300 O 0.311 0.300 0.150 0.023 0.045 0.033 86.20 -
Unitec Builder Inc. 4803 Rehab./Impvt. of Balite-Seven Hills-Happy Valley Section 03/07/09 VIII 19.176 180 O 0.294 0.205 0.150 0.030 0.047 0.050 77.60 -
Unitec Builder Inc. 4803 Construction / Extension of Catarman River Control 09/14/09 VIII 9.627 120 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
Unitec Builder Inc. 4803 Concreting of San Jose-Mandugang National Road 09/14/09 VIII 19.277 180 O 0.337 0.240 0.150 0.030 0.050 0.033 84.00 -
Unitec Builder Inc. 4803 Widening of Sinunuc Bridge &
Approaches, Phase I, along Zamboanga City-Labuan Road
11/18/08 IX 21.668 436 O 0.354 0.289 0.100 0.030 0.045 0.100 91.80 -
Unitec Builder Inc. 4803Proposed Widening of Sinunuc
Bridge & Approaches, Phase I, along Zamboanga City-Labuan Road
08/21/08 IX 21.672 436 O 0.311 0.240 0.000 0.030 0.042 0.067 69.00 -
Unitec Builder, Inc. 4803
Const./Opening of Zamboanga West Coast Road, Tapanayan-Talabiga-
Pogos Section, Sta.7+600.00 to Sta.9+700.00
03/31/11 IX 56.927 385 C 0.434 0.133 0.300 - - - 86.70 *86.70% Satisfactory
Uy Construction & Development 12336
Rehab. of Bacolod South Road, Km.33+420 - Km.36+482 (Tabao-Roman Section) with exception
03/30/11 VI 47.614 280 C 0.446 0.133 0.300 - - - 87.90 87.90% Satisfactory
Uy Construction & Development 12336
Rehab. (Asphalt Overlay) of Kabankalan-Bais Road, Km.97+500 -
Km.99+50004/02/11 VI 36.813 220 O 0.374 0.240 0.150 0.030 0.033 0.050 87.70 -
Uy Construction & Development 12336
Rehab./Reconst./Upgrading of Guimaras Circ. Road-Salvacion-
Lucmayan Sect., Km.84+000 -04/05/11 VI 24.179 360 C 0.431 0.133 0.300 - - - 86.40 87.00%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page393
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Uy Construction & Development 12336
Rehab. (Asphalt Overlay) of Kabankalan-Bais Road, Km.95+1989 -
Km.97+50004/02/11 VI 41.553 200 O 0.380 0.240 0.150 0.030 0.033 0.033 86.60 -
Uy Construction & Development 12336 Repair/Rehab. of Balabag-Sulangan
Road, Km.27+950 - Km.33+950 04/11/11 VI 31.271 282 O 0.365 0.187 0.150 0.024 0.060 0.050 83.60 -
Uy Construction & Development 12336 Reconst./Replacement of Juan Colon
Bridge, Brgy. Mayabon 09/15/09 VII 26.141 389 O 0.390 0.240 0.150 0.030 0.042 0.050 90.20 -
Uy Construction & Development 12336
Imprv't/Concrete Paving of Dumaguete South Rd. Sta.0+859-
Sta.1+100 and Sta. 1+900-Sta.5+38009/15/09 VII 61.645 240 O 0.400 0.240 0.150 0.030 0.037 0.033 89.00 -
Uy Construction & Development 12336 Imprv't. of Bayawan-Kabankalan Rd.
Sta. 1+250-Sta.3+020 09/16/09 VII 29.868 210 O 0.385 0.240 0.150 0.030 0.033 0.033 87.10 -
Uy Construction & Development 12336 Reconst./Replacement of Juan Colon
Bridge, Brgy. Mayabon 03/05/10 VII 28.751 404 C 0.479 0.133 0.300 - - - 91.20 91.32% V. Satisfactory
Uy Construction & Development 12336 Impvt. of Bayawan-Kabankalan Rd.
Sta. 1+250-Sta.3+020 03/05/10 VII 30.402 220 C 0.450 0.133 0.300 - - - 88.30 87.58% Satisfactory
Uy Construction & Development 12336
Rehab./Reconst./Upgrading of Damaged National Rd. Dumaguete
South Rd. Giligaon Sect.06/09/10 VII 11.214 160 O 0.336 0.293 0.150 0.030 0.025 0.033 86.70 -
Uy Construction & Development 12336
Impvt./Concrete Paving of Dumaguete South Road, Sta. 0+859-Sta. 1+100 and Sta. 1+900-Sta. 5+380
09/01/10 VII 61.645 270 C 0.418 0.200 0.300 - - - 91.80 91.17% V. Satisfactory
Uy Construction & Development 12336 Rehab. of Dumaguete South Road 09/03/10 VII 17.309 240 O 0.386 0.224 0.150 0.030 0.051 0.050 89.10 -
Uy Construction & Development 12336
Rehab./Reconst./Upgrading of Damaged National Roads:
Dumaguete South Road, Giligaon09/08/10 VII 11.214 160 C 0.462 0.133 0.300 - - - 89.50 87.82%
Satisfactory
Uy Construction & Development 12336 Impvt. of Bais-Kabankalan Road, Sta.
50+400-Sta. 52+603.60 03/02/10 VII 54.039 260 C 0.456 0.133 0.300 - - - 88.90 89.62% V. Satisfactory
Uy Construction & Development 12336 Dumaguete Airport Development
Project 02/20/09 DOTC 81.824 150 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfctory
Uy Construction & Development 12336 Dumaguete Airport Dev't Project
(Asphalt Overlay of Runway) 01/20/10 DOTC 9.594 60 C 0.466 0.200 0.300 - - - 96.60 96.60% V.Satisfactory
Uy Construction & Development 12336 Rehab./Reconst. of Iloilo East Coast
Capiz Road, Barotac Viejo Section 09/08/09 VI 38.180 150 C 0.410 0.185 0.300 - - - 89.50 85.84% Satisfactory
Uy Construction & Development 12336
Rehab./Reconst./Upgrading of Guimaras Circ. Road, Salvacion-Lucmayan Section, Km.84+000-
Km.88+643 with exceptions
08/30/10 VI 24.179 360 O 0.372 0.238 0.150 0.030 0.051 0.033 87.40 -
Uy Construction & Development 12336 Rehab./Recons. of Iloilo East Coast
Capiz Road, Barotac Viejo Section 06/09/09 VI 38.180 150 O 0.351 0.240 0.150 0.008 0.035 0.050 83.40 -
Uy Construction & Development 12336 Re-const./Replacement of Juan
Colon Bridge Brgy. Mayabon 05/27/09 VII 26.141 389 O 0.345 0.300 0.150 0.030 0.051 0.050 92.60 -
Uy Construction & Development 12336 Concreting of Bais-Kabankalan Road
(Intermittent Section) 05/27/09 VII 94.413 369 O 0.343 0.238 0.150 0.030 0.051 0.050 86.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page394
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Uy Construction & Development 12336 Conc. of Dumaguete South Road
(DSR) 03/12/09 VII 21.739 190 O 0.389 0.225 0.150 0.030 0.061 0.033 88.80 -
Uy Construction & Development 12336 Conc. of Bais-Kabankalan Road
(Intermittent Section) 03/02/10 VII 95.830 527 C 0.430 0.133 0.300 - - - 86.30 86. 24% Satisfactory
Uy Construction & Development 12336 Conc. of Dumaguete South Road
(DSR) 11/26/08 VII 21.705 160 O 0.380 0.300 0.100 0.030 0.038 0.100 94.80 -
Uy Construction & Development/ARN
Builders (JV)JV-07-001 Conc. of Bais-Kabankalan Road @
Intermittent Section 08/20/08 VII 95.268 300 O 0.295 0.221 0.070 0.030 0.065 0.100 78.10 -
Uy Construction and Development 12336 Widening/Upgrading/Rehab. of
Access Rd. to RORO Port 04/06/11 VII 6.814 160 C 0.461 0.133 0.300 - - - 89.40 *89.40% V. Saisfactory
Uy Construction and Development 12336
Rehab./Reconst./Upgrading of Damaged Paved Nat'l. Road:
Bayawan-Kabankalan Rd.04/06/11 VII 10.593 40 C 0.433 0.133 0.300 - - - 86.60 *86.60%
Satisfactory
Uy Construction and Development 12336
Road Upgrading (Gravel to Paved) of Jct. SH. Manolo Fortich-Libona-
Indahag Road (Camp 9-Poblacion Sect.)
03/31/11 X 14.984 172 O 0.368 0.225 0.054 0.030 0.042 0.050 76.90 -
V.B Gines Construction 21993
Rehab./Reconst./Upgrading of Damaged paved National Road along Daang Maharlika, KO 263+131.75-KO
263+782.40
06/02/09 II 3.469 44 C 0.446 0.133 0.300 - - - 87.90 *87.90% Satisfactory
V.B Manubay Construction 32705 Magat River Flood Control
(Camarunggayan Sect.) 05/31/10 II 4.821 120 O 0.368 0.300 0.150 0.018 0.042 0.033 91.10 -
V.B Manubay Construction 32705 Magat River Flood Control (Kalabaza
Sect.) 05/31/10 II 4.823 120 O 0.343 0.300 0.150 0.024 0.042 0.033 89.20 -
V.B Manubay Construction 32705 Magat River Flood Control (Apiat
Sect.) 05/31/10 II 4.823 120 O 0.342 0.300 0.150 0.024 0.042 0.033 89.10 -
V.B Manubay Construction 32705 Magat River Flood Control
(Camarunggayan Section) 08/24/10 II 4.821 120 C 0.382 0.150 0.300 - - - 83.20 87.94% Satisfactory
V.B Manubay Construction 32705 Magat River Flood Control (Kalabaza
Section) 08/24/10 II 4.823 120 C 0.384 0.150 0.300 - - - 83.40 86.88% Satisfactory
V.B Manubay Construction 32705 Magat River Flood Control (Apiat
Section) 08/24/10 II 4.823 120 C 0.335 0.142 0.300 - - - 77.70 84.54% Satisfactory
V.B. Manubay Construction 32705 Baramban Creek Flood Control
(Sotero Nuesa E/S Section) 04/06/11 II 4.821 143 C 0.433 0.133 0.300 - - - 86.60 *86.60% Satisfactory
V.B. Manubay Construction 32705 Baramban Creek Flood Control
(Sotero Nuesa Section) 04/06/11 II 4.821 150 C 0.350 0.200 0.300 - - - 85.00 *85.00% Satisfactory
V.B. Manubay Construction 32705 Siffu River Control (Qui-Bur Bridge
Section) 04/06/11 II 4.821 120 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory
V.B. Manubay Construction 32705 Siffu River Control (Qui-Bur Bridge
Section) 04/06/11 II 4.821 150 C 0.400 0.133 0.300 - - - 83.30 *83.30% Satisfactory
V.M Jhek Builders 33639 Impv't. of Flood Control of Bulacan River and Creeks 06/10/10 III 4.777 89 C 0.458 0.123 0.300 - - - 88.10 -
V.M Jhek Builders 33639 Impv't. of Flood Control Of Guiguinto River and Creeks 08/26/10 III 4.776 80 C 0.400 0.133 0.300 - - - 83.30 83.30%
SatisfactoryV.O Chupuico Construction 17585 Completion of Umapad Road 06/05/09 VII 1.107 60 C 0.397 0.200 0.300 - - - 89.70 *89.70%
V. Satisfactory
V.R Patron Builders & Developers 13487
Rehab./Reconst./Upgrading of Damaged National Roads along Bauan-Mabini Rd., Bauan Side
06/04/10 IVA 19.295 120 O 0.390 0.225 0.150 0.023 0.060 0.050 89.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page395
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
V.R Patron Builders & Developers 13487 Conc. of Brgy. Toong-Mataywanak
Rd. 06/02/10 IVA 4.824 90 C 0.432 0.133 0.300 - - - 86.50 86.50% Satisfactory
V.R Patron Builders & Developers 13487
Rehab./Reconst./Upgrading of Damaged National Road along Bauan-Mabini Rd., Bauan Side
08/23/10 IVA 19.295 154 C 0.442 0.200 0.300 - - - 94.20 91.56% V. Satisfactory
V.R Patron Builders & Developers 13487 Rehab./Reconst. Of Banay-Banay-
Mojon-Cuenca Road 08/17/10 IVA 10.974 120 C 0.466 0.146 0.300 - - - 91.20 91.20% V. Satisfactory
V.R Patron Builders & Developers 13487 Const. of Pedestrian Overpass, San
Rafael 08/17/10 IVA 5.789 180 C 0.442 0.190 0.300 - - - 93.20 89.90% V. Satisfactory
V.R Patron Builders & Developers 13487 Const. / Replacement of Pinagtung-
Ulan Bridge 09/02/09 IVA 33.762 240 C 0.435 0.200 0.300 - - - 93.50 *93.50% V. Satisfactory
V.R Patron Builders & Developers 13487
Rehab./Reconst./Upgrading of Damaged National Roads at Banaybanay-Cuenca Road
05/28/09 IV-A 19.593 120 C 0.441 0.133 0.300 - - - 87.40 *87.40% Satisfactory
V.R Patron Builders & Developers 13487
Rehab./Reconst. of Damaged National Roads, Manila-Batangas
Road, Lipa Section 03/06/09 IV-A 19.292 150 C 0.478 0.133 0.300 - - - 91.10 90.08%
V. Satisfactory
V.R. Patron Builders & Developers 13487 Const./Replacement of Malaking Ilog
Bridge (4 lanes), Phase 1 04/07/11 IVA 47.285 283 C 0.483 0.200 0.300 - - - 98.30 *98.30% Outstanding
V.R. Patron Builders & Developers 13487
Road Opening/Const. of Missing Links of National Road, Aguinaldo-
Magallanes-Nasugbu Road, Magallanes Boundary, Nasugbu
Section
04/12/11 IVA 9.647 129 C 0.433 0.200 0.300 - - - 93.30 93.30% V. Satisfactory
V.R. Patron Builders & Developers 13487 Const./Replacement of Malaking Ilog
Bridge (4 lanes), Phase 2 04/07/11 IVA 29.905 120 C 0.428 0.198 0.300 - - - 92.60 *92.60% V. Satisfactory
V.R.D.J Construction 19837 Construction of Sto. Tomas Multi-Purpose Building 05/23/09 II 3.818 137 C 0.484 0.133 0.300 - - - 91.70 82.88%
Satisfactory
V.R.D.J Construction 19837 Const. of Sto. Tomas MPB 11/18/08 II 3.818 120 O 0.317 0.240 0.100 0.030 0.037 0.067 79.10 -
V.R.D.J. Construction 29837 Const. of School Building, Fermeldy National H/S, Fermeldy 04/04/11 II 0.995 90 C 0.449 0.133 0.300 - - - 88.20 *88.20%
SatisfactoryValley Construction &
Aggregates 14315 Impvt. of the Acop-Kapangan-Kibungan National Road 03/10/09 CAR 18.822 253 C 0.454 0.200 0.300 - - - 95.40 86.73%
SatisfactoryValley Construction &
Aggregates 14315 Rehab. Along Acop-Kapangan-Kibungan Road 03/10/09 CAR 19.100 229 C 0.473 0.200 0.300 - - - 97.30 87.76%
Satisfactory
Valley Construction & Aggregates 14315
Restoration of Road Cuts & Road Slips along Acop-Kapangan-
Kibungan-Bakun Road, Km. 264+000-Km. 288+000
08/31/10 CAR 11.277 260 C 0.481 0.085 0.300 - - - 86.60 86.60% Satisfactory
Valley Construction & Aggregates 14315 Impvt. of the Acop-Kapangan
National Road 08/13/08 CAR 18.822 240 O 0.321 0.240 0.100 0.023 0.030 0.100 81.40 -
Valley Construction and General Merchandise 13777
Construction of Metrology Laboratory & DOST Regional Office
Building12/08/10 DOST 19.799 215 C 0.48 0.20 0.30 - - - 98.00 94.08%
V. Satisfactory
Vannie General Merchandise 27335
Completion of Excavation & Riprap of Drainage Floodway at Banago Creek, Brgy. Banago (Phase III)
03/29/11 VI 5.640 195 C 0.453 0.115 0.300 - - - 86.80 86.74% Satisfactory
Vannie General Merchandise 27335 Expansion of 2-Storey DOST-VI Rstl
Building 03/17/10 DOST 4.537 215 C 0.462 0.20 0.30 - - - 96.20 96.20% Outstanding
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page396
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Vannie General Merchandise 27335 Construction of Damaged Canal,
Purok Riverside, Brgy. Binago 06/01/09 VI 5.793 564 C 0.414 0.200 0.300 - - - 91.40 85.70% Satisfactory
Vannie General Merchandise 27335 Const. of 425 ln.m. Drainage Canal,
Purok Riverside 03/03/09 VI 5.793 564 O 0.281 0.300 0.150 0.030 0.042 0.050 85.30 -
Vannie General Merchandise 27335 Const. of Two (2) CL School
Building, Pototan NCHS 09/09/09 VI 0.884 60 C 0.482 0.177 0.300 - - - 95.90 *95.90% V. Satisfactory
Vannie General Merchandise 27335 Const. of Pototan Flood Control
Suage River Brgy. Poblacion 09/09/09 VI 2.895 180 O 0.383 0.240 0.150 0.015 0.050 0.033 87.10 -
Vannie General Merchandise 27335 Const. of 425 ln.m. Drainage Canal 11/18/08 VI 5.738 154 O 0.320 0.200 0.070 0.030 0.032 0.133 78.50 -
Vanvi Construction 29387 Completion of MPB for Package 2-B at Brgy. V. Duterte 03/10/10 XI 1.855 150 C 0.400 0.133 0.300 - - - 83.30 83.30%
Satisfactory
Vanvi Construction 29387 Const. of MPB at Digos City National High School, Zone II, Digos City 06/10/10 XI 0.949 75 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
Vanvi Construction 29387 Const. of MPB at Girl Scout of the Philippines (GSP) Bldg. 08/27/10 XI 0.950 103 C 0.419 0.133 0.300 - - - 85.20 85.20%
Satisfactory
Vanvi Construction 29387 Construction of MPB, Brgy. Poblacion 09/16/09 XII 0.286 75 O 0.364 0.300 0.150 0.030 0.052 0.050 94.60 -
Vanvi Construction 29387 Concreting of Road @ Pangyan 05/25/09 XI 0.656 75 C 0.451 0.133 0.300 - - - 88.40 *88.40% Satisfactory
Vanvi Construction 29387 Const. of Multi-Purpose Building at Purok San Vicente 03/18/09 XI 0.419 60 C 0.438 0.200 0.300 - - - 93.80 *93.80%
V. Satisfactory
Various Construction 26640 Conc. of Road at Purok Idugan, Irisan Barangay 06/08/10 CAR 1.892 60 C 0.334 0.200 0.300 - - - 83.40 83.40%
Satisfactory
VC Varin Construction & Hardware Supply 12475
Restoration of Damaged Embankment & Slope Protection along Bagong Silang-Capalonga
Road Km. 309+800 - Km. 309+820, Brgy. Tanawan
06/10/10 V 0.965 60 C 0.477 0.133 0.300 - - - 91.00 91.00% V. Satisfactory
VC Varin Construction & Hardware Supply 12475 Rehab./Reconst. of Bagong Silang-
Capalonga Rd. 09/01/10 V 4.906 90 C 0.359 0.200 0.300 - - - 85.90 85.90% Satisfactory
VCD Construction 13949 Construction of 2-Storey Building @ San Nicolas E/S 09/08/09 I 1.483 147 C 0.368 0.200 0.300 - - - 86.80 84.00%
Satisfactory
VCD Construction 13949 Construction of 2-Storey School Building @ San Nicolas E/S 06/04/09 I 1.348 132 O 0.325 0.240 0.150 0.030 0.050 0.033 82.80 -
VCH Construction & Trading 32050 Repair and Rehab. of Brgy. Roads,
San Isidro 06/03/09 IV-B 0.474 38 C 0.337 0.200 0.300 - - - 83.70 *83.70% Satisfactory
VCH Construction and Trading 32050 Const. of 1-CL Bagong Bayan NHS 04/01/11 IVB 0.586 80 C 0.420 0.133 0.300 - - - 85.30 *85.30%
SatisfactoryVCH Construction and
Trading 32050 Completion of MPB Poblacion 04/01/11 IVB 2.385 120 O 0.362 0.300 0.010 0.030 0.040 0.000 74.20 -
VCO Construction 14120 Const. of Slope Protection / Seawall / Riverwalls at Brgy. Bucana 04/12/11 IVA 0.499 90 C 0.333 0.200 0.300 - - - 83.30 *83.30%
Satisfactory
VCO Construction 14120 Const./Impvt. of Multi-Purpose Building at Brgy. Tunggal 09/02/09 IVA 0.474 60 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V. Satisfactory
Ven Ray Construction 18310 Road Conc. at Tagaytay, Calero 04/14/11 VII 0.950 45 C 0.370 0.200 0.300 - - - 87.00 *87.00% Satisfactory
Ven Ray Construction 18310Rehab. of Liloan-Borbon-Bogo
Section, Sta.42+000 - Sta.51+000 (Intermittent Sections)
04/14/11 VII 49.292 210 C 0.373 0.200 0.300 - - - 87.30 84.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page397
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ven Ray Construction 18310 Road Upgrading (Gravel to Paved) along Argao-Moalboal Road 05/29/09 VII 18.717 75 C 0.489 0.185 0.300 - - - 97.40 *97.40%
Outstanding
Ven Ray Construction 18310 Construction of 4-CL SB Masaba E/S 06/08/09 VII 1.864 90 C 0.489 0.166 0.300 - - - 95.50 *95.50% V. Satisfactory
Ven Ray Construction 18310Reconst./Rehab. of Cebu North
Hagnaya Wharf Road, Km. 67.000-Km. 77.044 (Intermittent Section)
06/08/09 VII 57.819 110 C 0.451 0.200 0.300 - - - 95.10 *95.10% V. Satisfactory
Ven Ray Construction 18310 Road Upgrading (Gravel to Paved) along Argao-Ronda Road (Argao-
Ronda Sect.)05/29/09 VII 18.718 75 O 0.388 0.288 0.150 0.030 0.055 0.033 94.40 -
Ven Ray Construction 18310 Concreting of Roads, Sitio Sta. Cruz, Brgy. Dunggo-an 06/08/09 VII 0.245 90 C 0.474 0.180 0.300 - - - 95.40 69.24%
Poor
Ven Ray Construction 18310 Construction of MPB Suba E/S 06/08/09 VII 2.647 114 C 0.421 0.200 0.300 - - - 92.10 67.04% Poor
Ven Ray Construction 18310 Concreting of Roads Brgy. Tuburan Sur to Sandayong Sur 06/08/09 VII 0.637 90 C 0.462 0.200 0.300 - - - 96.20 60.26%
Poor
Ven Ray Construction 18310Rehab./Reconst. of Siquijor Circ. Rd.
Km. 2.000-Km.2.8306;Km.4.100-Km.5.080;Siquijor-Larena Rd. Sect.
09/08/09 VII 31.418 428 C 0.414 0.141 0.300 - - - 85.50 84.62% Satisfactory
Ven Ray Construction 18310Rehab./Reconst. of Siquijor Circ. Rd,
.Km.22.860-Km.25.268, Larena -E. Villanueva-Maria Rd. Sect.
09/08/09 VII 47.680 515 O 0.353 0.244 0.150 0.030 0.033 0.033 84.30 -
Ven Ray Construction 18310Rehab./Reconst. of Siquijor Circ. Rd.
Km.10.475-Km.13.020, Larena-E. Villanueva Rd. Sect.
09/08/09 VII 47.085 459 O 0.345 0.247 0.150 0.030 0.033 0.033 83.80 -
Ven Ray Construction 18310Concrete Paving of Siquijor Circ.Rd.
San Juan Rd. Sec. Km. 61.820-Km.62.883
09/08/09 VII 18.685 326 O 0.344 0.246 0.150 0.030 0.033 0.033 83.60 -
Ven Ray Construction 18310
Conc. of Siquijor Circ. Rd. Km.72.707-Km.74.427 San Juan Siquijor Rd.
Sect. Km. 13.020-Km. 14.22-Larena E. villanueva Rd. Sect.
09/07/09 VII 52.030 270 O 0.325 0.242 0.150 0.030 0.033 0.050 83.00 -
Ven Ray Construction 18310Concrete Paving of Siquijor Circ.Rd.
San Juan Rd. Sec. Km. 61.820-Km.62.883
03/06/10 VII 18.915 364 C 0.432 0.133 0.300 - - - 86.50 84.76% Satisfactory
Ven Ray Construction 18310Rehab./Reconst. Of Siquijor Circ. Rd,
Km.22.860-Km.25.268, Larena - E. Villanueva-Maria Rd. Sect.
03/06/10 VII 47.680 600 C 0.300 0.200 0.300 - - - 80.00 82.58% Satisfactory
Ven Ray Construction 18310Rehab./Reconst. Of Siquijor Circ. Rd.
Km.10.475-Km.13.020, Larena-E. Villanueva Rd. Sect.
03/06/10 VII 47.613 527 C 0.300 0.200 0.300 - - - 80.00 80.57% Unsatisfactory
Ven Ray Construction 18310 Rehab. of Cebu North Hagnaya Wharf Rd., Mandaue Sect. 06/14/10 VII 18.555 73 C 0.237 0.133 0.300 - - - 67.00 67.00%
Poor
Ven Ray Construction 18310
Rehab./Reconst./Upgrading (Conc./Asphalting) of Cebu-Toledo Wharf Rd., Km.29+135 - Km.55+990
(w/ exception)
06/12/10 VII 19.090 280 C 0.220 0.133 0.300 - - - 65.30 65.30% Poor
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page398
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ven Ray Construction 18310 Conc. of Luyang-Poo-Lazi National Road, Km. 16+080-Km. 17+700 08/31/10 VII 34.330 776 C 0.394 0.133 0.300 - - - 82.70 82.70%
Satisfactory
Ven Ray Construction 18310Rehab./Reconst. of Siquijor
Circumferential Road, Siquijor, -Larena Road Section
06/02/09 VII 31.724 351 O 0.255 0.300 0.150 0.030 0.051 0.050 83.60 -
Ven Ray Construction 18310Conc. of Toledo-Pinamungajan-
Aloguinsan Barili Na'tl. Road Km. 84+450 - Km. 85+891
03/12/09 VII 19.093 180 O 0.205 0.040 0.000 0.010 0.016 0.050 32.10 -
Ven Ray Construction 18310
Concreting of Antonio Y. De Pio Highway (Tigbawan-Olivo-Luyang
Section, Tabuelan-San Remigio Section)
03/06/09 VII 14.155 90 C 0.175 0.139 0.300 - - - 61.40 68.18% Poor
Ven Ray Construction 18310 Concreting of Roads Sitio Sta. Cruz 03/09/09 VII 0.245 90 O 0.273 0.000 0.150 0.015 0.030 0.050 51.80 -
Ven Ray Construction 18310 Const. of 2 CL Sch. Bldg. @ Liloan NHS 03/09/09 VII 1.936 70 C 0.436 0.181 0.300 - - - 91.70 87.85%
Satisfactory
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Larena-Enrique Villanueva Rd. Sect. 03/10/09 VII 46.671 368 O 0.319 0.219 0.150 0.023 0.033 0.033 77.70 -
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Siquijor-Larena Rd. Sect. 03/10/09 VII 31.733 328 O 0.340 0.222 0.150 0.030 0.047 0.033 82.20 -
Ven Ray Construction 18310Road Upgrading (Gravel to Paved) along Argao-Ronda Road (Argao-
Ronda Section)09/08/09 VII 18.718 88 C 0.460 0.191 0.300 - - - 95.10 94.68%
V. Satisfactory
Ven Ray Construction 18310Rehab./Reconst./Upgrading of
Natalio Bacalso Ave. (Cebu South Rd.)
08/24/10 VII 42.357 225 C 0.393 0.200 0.300 - - - 89.30 89.30% V. Satisfactory
Ven Ray Construction 18310Impvt./Rehab. of Toledo-
Pinamungajan-Aloguinsan Road, Km. 64+400-Km. 65+300
08/27/10 VII 19.285 65 C 0.346 0.200 0.300 - - - 84.60 84.60% Satisfactory
Ven Ray Construction 18310Repair/Rehab. of Cebu North
Hagnaya Wharf Road, Km. 21+844-Km.25+947 with exceptions
08/31/10 VII 4.864 8 C 0.300 0.200 0.300 - - - 80.00 80.00% Unsatisfactory
Ven Ray Construction 18310
Rehab./Reconst. of Siquijor Circumferential Road, Km. 10.475-Km.13.020, Larena, E. Villanueva
Road Section
06/03/09 VII 47.085 428 O 0.220 0.300 0.150 0.030 0.047 0.050 79.70 -
Ven Ray Construction 18310Impvt. of Cagayan de Oro-Talakag-
Camp Kabaritan Sto. Niño Dagumbaan-Basak Road
09/17/09 X 66.400 270 O 0.400 0.300 0.034 0.030 0.047 0.017 82.80 -
Ven Ray Construction 18310 Conc. of Antonio de Pio Highway, (Tigabawan-Olivio-Luyang Section) 09/02/08 VII 14.154 90 O 0.295 0.300 0.000 0.010 0.022 0.100 72.70 -
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Larena-Enrique Villanueva Rd. Sect. 11/22/08 VII 46.671 330 O 0.331 0.246 0.100 0.022 0.027 0.100 82.60 -
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Siquijor-Larena Rd. Sect. 11/22/08 VII 31.737 313 O 0.363 0.238 0.100 0.030 0.032 0.100 86.30 -
Ven Ray Constuction 18310 Widening of Cagayan de Oro Airport Road 04/13/11 X 28.886 150 C 0.418 0.133 0.300 - - - 85.10 84.56%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page399
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Ven Ray Constuction 18310Road Upgrading (Gravel to Paved)
along Junction Sayre Highway, Aglayan-Zamboanguita Road
03/31/11 X 47.327 330 C 0.398 0.133 0.300 - - - 83.10 83.70% Satisfactory
Ven Ray Constuction 18310Road Upgrading (Gravel to Concrete) Barandias-Dominorog Road (Madaya
Sect.)04/01/11 X 9.473 135 O 0.361 0.240 0.000 0.030 0.042 0.033 70.60 -
Vertical Builders 14029Const. of Gen. Santos City Circ.Road (Road Upgrading), Northern Section,
Brgy. Mabuhay04/14/11 XII 18.690 120 O 0.362 0.278 0.150 0.030 0.045 0.033 89.80 -
Vertical Builders 14029 Construction of Multi-Purpose Building 03/20/09 XII 1.882 90 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
Verzontal Builders 31579 Conc. of FTMR, Angustia Zone 1-7 04/06/11 V 0.475 40 C 0.422 0.133 0.300 - - - 85.50 *85.50% Satisfactory
Vesa Engineering & Construction 32334 Const./Rehab./Impvt. of Dumaguete-
Valencia Road 09/02/10 VII 1.930 90 C 0.395 0.133 0.300 - - - 82.80 82.80% Satisfactory
Vesa Engineering & Construction 32334
Dumaguete Airport Dev't Project (Continuation of Improvement of
Terminal Building)01/21/10 DOTC 2.878 75 C 0.431 0.193 0.300 - - - 92.40 92.40%
V. Satisfactory
Vesa Engineering and Construction 32334 Rehab. of Dumaguete South Rd.,
Km.0.867 - Km. 1+100 04/05/11 VII 5.777 150 O 0.357 0.300 0.150 0.030 0.055 0.050 94.20 -
VF Construction 10048 Const. of One (1) Storey MPB 02/18/10 III 1.419 75 C 0.446 0.200 0.300 - - - 94.60 88.18% Satisfactory
Vicente T. Lao Construction 7040
Const./Opening of Zamboanga West Coast Road, Sibuco-Sirawai Rd. Panganuran-Montivoh-Anongan Section, Zamboanga del Norte, Sta.32+495.00-Sta.25+320.00 w/
exceptions
03/30/11 IX 273.406 912 O 0.355 0.300 0.150 0.030 0.059 0.033 92.70 -
Vicente T. Lao Construction 7040
Preventive Maint. (Asphalt Overlay) and Application of Reflective
Thermoplastic Pavement Markings along Dipolog-Sindangan-Liloy
Road, Irasan-Dohinob Sect.
04/13/11 IX 19.983 78 C 0.454 0.200 0.300 - - - 95.40 91.86% V. Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Unpaved Shoulder/Impvt. along Jct.
Dumalinao-Margosatubig Road, K1706+500 - K1719+900 with exception, Molum-Poblacion,
Margosatubig Section
04/06/11 IX 43.377 150 C 0.480 0.133 0.300 - - - 91.30 *91.30% V. Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Unpaved Shoulder/Impvt. along Jct.
Dumalinao-Margosatubig Rd., K1692+500 - K1706+500 w/
exception, Bugwak-Molum Sect.
04/06/11 IX 36.629 120 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Shoulder/Improvement along Jct. Dumalinao-Margosatubig Road,
K1712+000 -K1719+900, Limbatong-Margosatubig Section with exception
04/06/11 IX 19.284 120 C 0.463 0.133 0.300 - - - 89.60 *89.60% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page400
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Vicente T. Lao Construction 7040
Regravelling of Unpaved Shoulder/Impvt. along Maluso-Sumisip-Tumahubong Road @
Km.45+000 to Km.63+000 w/ exception, Maluso-Sumisip-
Tumahubong
03/29/11 IX 10.256 120 C 0.462 0.133 0.300 - - - 89.50 *89.50% V. Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Shoulder/Impvt. along Jct. Dumalinao-Margosatubig
Rd., K1686+500 - K1694+000, Dagohoy-Limonan Sect. with
exception
04/06/11 IX 19.287 120 C 0.461 0.133 0.300 - - - 89.40 *89.40% V. Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Unpaved Shoulder/Impvt. along Jct.
Dumalinao-Margosatubig Rd., K178+122 - K1692+500 with
exception, Camanga-Bugwak Section
04/06/11 IX 40.499 120 C 0.455 0.133 0.300 - - - 88.80 *88.80% Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Unpaved Shoulder/Impvt. along Maluso-Sumisip-Tumahubong Road at
Km.29+800 to Km.42+000 w/ exception
03/29/11 IX 18.483 150 C 0.453 0.133 0.300 - - - 88.60 *88.60% Satisfactory
Vicente T. Lao Construction 7040
Impvt. of Zamboanga West Coast Road, Gutalac-Jct. Baliguian-Siocon-
Sirawai-Sibuco Road, Upper Kauswagan Section, Sta.2019+600-
Sta.2063+910 w/ exception
03/31/11 IX 668.190 876 O 0.353 0.300 0.109 0.030 0.054 0.033 87.90 -
Vicente T. Lao Construction 7040
Const. of Slope Protection along Dapitan-Dakak-Rizal Coastal Loop
Road, Taguilon-Dakak Section04/11/11 IX 47.538 360 C 0.400 0.200 0.300 - - - 90.00 87.66%
Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Unpaved Shoulder/Impvt. along Isabela-Lamitan Road at Km.3+300 to
Km.9+000 w/ exception
03/29/11 IX 22.008 147 C 0.442 0.133 0.300 - - - 87.50 *87.50% Satisfactory
Vicente T. Lao Construction 7040 Conc. of FMR, Mananum Daan-Labas
Pagsama 04/04/11 X 4.713 185 C 0.381 0.200 0.300 - - - 88.10 *88.10% Satisfactory
Vicente T. Lao Construction 7040
Reconst. of Baganga Bridge and Approaches along Davao Oriental -
Surigao del Sur Coastal Road04/05/11 XI 144.986 390 O 0.378 0.300 0.150 0.030 0.040 0.033 93.10 -
Vicente T. Lao Construction 7040
Reconst. of Baganga Bridge and Approaches along Davao Oriental -
Surigao Sur Coastal Road04/05/11 XI 280.540 630 C 0.437 0.200 0.300 - - - 93.70 90.10%
V. Satisfactory
Vicente T. Lao Construction 7040 Const. of Sadsalan Bridge II 04/04/11 XII 48.170 359 C 0.443 0.133 0.300 - - - 87.60 *87.60%
SatisfactoryVicente T. Lao Construction 7040 Const. of Flood Control at Allah
River Basin 04/06/11 XII 66.997 377 C 0.360 0.200 0.300 - - - 86.00 *86.00% Satisfactory
Vicente T. Lao Construction 7040 Const. of Ozamiz Port Expansion
(Ports & Harbor) 03/7-11/11 PPA 150.033 819 O 0.399 0.299 0.150 0.030 0.059 0.050 98.70 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page401
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Vicente T. Lao Construction 7040
Repair/Asphalt Overlay along Titay-Ipil Kitabog Sect. Km. 2004+457 to Km. 2005+457 length 1000 meters
02/27/10 IX 19.286 110 C 0.422 0.200 0.300 - - - 92.20 92.68% V.Satisfactory
Vicente T. Lao Construction 7040
Rehab./Reconst./Upgrading of Damaged Road of Dipolog-Polanco-
Oroquieta Road03/10/10 IX 10.490 180 C 0.395 0.172 0.300 - - - 86.70 87.39%
Satisfactory
Vicente T. Lao Construction 7040
Proposed Const. of Slope Protection and River Control along Sindangan-Liloy-Ipil Road (Bogabongan Sect.
Phase III) Km. 1940+000 w/ exception
03/02/10 IX 19.288 200 C 0.360 0.200 0.300 - - - 86.00 86.00% Satisfactory
Vicente T. Lao Construction 7040
Upgrading/Improvement/Rehab. of National Road along Sindangan-
Liloy- Ipil National Road Section Km. 1961+050 - Km. 1987+000 w/
exception
03/03/10 IX 37.150 95 O 0.292 0.300 0.150 0.022 0.037 0.050 85.10 -
Vicente T. Lao Construction 7040
Proposed Const. of Slope Protection along Sindangan-Liloy-Ipil Rd.
Bogabongan Sect. Phase II & IV (Km.1939+000 - Km.1940+000) w/
exception
06/03/10 IX 38.588 360 C 0.409 0.200 0.300 - - - 90.90 90.90% V. Satisfactory
Vicente T. Lao Construction 7040
Impvt. of Zamboanga West Coast Rd., Gutalac-Jct. Baliguian-Siocon-
Sirawai-Sibuco Rd., Upper Kauswagan Sect., Sta.2019+600 to
Sta.2063+910 w/ exceptions
06/03/10 IX 668.190 700 O 0.299 0.240 0.150 0.030 0.042 0.033 79.40 -
Vicente T. Lao Construction 7040
Preventive Maintenance (Asphalt Overlay) and Application of
Reflective Thermoplastic Pavement Markings along Dipolog-Sindangan-Liloy Rd., San Antonio-Villaramos
Sect.
09/01/10 IX 16.887 37 C 0.467 0.133 0.300 - - - 90.00 90.00% V. Satisfactory
Vicente T. Lao Construction 7040
Impv't./Conc. Paving of Gutalac-Jct. Baliguian-Siocon-Sirawai-Sibuco
Rd., Sta.2006+389 - Sta.2019+600 w/ exception, Gutalac-Panganuran Sect.
09/04/10 IX 462.031 700 C 0.394 0.133 0.300 - - - 82.70 87.62% Satisfactory
Vicente T. Lao Construction 7040
Impv't. of Zamboanga West Coast Rd., Gutalac-Jct. Baliguian-Siocon-
Sirawai-Sibuco Rd., Upper Kauswagan Sect. Sta.2019+600 -
Sta.2063+910 w/ exception
09/03/10 IX 668.190 773 O 0.372 0.226 0.150 0.030 0.042 0.050 87.00 -
Vicente T. Lao Construction 7040
Upgrading/Impv't./Rehab. of Nat'l. Rd. along Sindangan-Liloy-Ipil Nat'l.
Rd. Sect. Km.1961+050 - Km.1987+000 w/ exception
09/03/10 IX 37.150 95 C 0.370 0.200 0.300 - - - 87.00 85.86% Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Unpaved Shouldering/Rehab. along Jaro-
Dagami-Burauen-La Paz Rd., Jaro Sect.
06/01/10 VIII 14.170 180 C 0.417 0.200 0.300 - - - 91.70 91.70% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page402
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Vicente T. Lao Construction 7040 Const. of Badyang River Control,
Brgy. Manloy (Phase I & II) 05/31/10 VIII 14.457 180 C 0.379 0.200 0.300 - - - 87.90 87.90% Satisfactory
Vicente T. Lao Construction 7040 Road Upgrading/Asphalting of Don
Carlos-Kadingilan Road 06/15/10 X 38.171 120 C 0.462 0.144 0.300 - - - 90.60 88.77% Satisfactory
Vicente T. Lao Construction 7040
Rehab./Impvt./Asphalt Overlay of Digos-Makar Road, Laurel-Banate
Section03/09/10 XII 18.887 120 C 0.465 0.200 0.300 - - - 96.50 96.50%
Outstanding
Vicente T. Lao Construction 7040
Regravelling of Shoulder/Impvt. of Banisilan-Guiling-Alamada-Libungan
Rd., Barangiran-Dry Creek Section w/ exception
02/26/10 XII 19.122 150 C 0.439 0.200 0.300 - - - 93.90 91.26% V. Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Shoulder/Impvt. along Marbel-Allah Valley-Cotabato
Rad., Km. 1764+639.75-Km. 1768+591.90 w/ exception
03/04/10 XII 19.276 150 C 0.412 0.200 0.300 - - - 91.20 91.20% V. Satisfactory
Vicente T. Lao Construction 7040
Repair/Rehab. of Allah River Flood Control, Bank Protection at Brgy.
Lilit03/04/10 XII 19.253 379 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
Vicente T. Lao Construction 7040
Repair/Rehab. of Allah River Flood Control, Bank Protection at Brgy.
Kabulakan03/04/10 XII 19.253 292 C 0.400 0.200 0.300 - - - 90.00 90.00%
V. Satisfactory
Vicente T. Lao Construction 7040
Regravelling of Shoulder/Impvt. along Kidapawan-Allah Jct. Rd. Km.
1664+997-Km. 1670+000 w/ exception03/04/10 XII 19.276 150 C 0.399 0.200 0.300 - - - 89.90 89.90%
V. Satisfactory
Vicente T. Lao Construction 7040
Rehab./Impvt. of Sarangani-Davao Del Sur Rd., Malapatan Poblacion
Section03/09/10 XII 19.290 100 C 0.396 0.200 0.300 - - - 89.60 89.60%
V. Satisfactory
Vicente T. Lao Construction 7040
Rehab./Impvt. of Sarangani-Davao Del Sur Coastal Road, Glan Padidu-
Ilaya Section03/09/10 XII 19.281 100 C 0.391 0.200 0.300 - - - 89.10 89.10%
V. Satisfactory
Vicente T. Lao Construction 7040
Repair/Rehab. of Alah River Flood Control, Bank Protection at Brgy.
Kabulakan, Phase II03/04/10 XII 19.247 371 C 0.372 0.200 0.300 - - - 87.20 87.20%
Satisfactory
Vicente T. Lao Construction 7040
Const. of Allah River Bank Protection/River Control along Colongolo-Centralla Section
03/06/10 XII 18.152 140 O 0.276 0.300 0.150 0.030 0.035 0.033 82.40 -
Vicente T. Lao Construction 7040
Const. of Allah River Bank Protection/River Control along
Colongolo-Centrala Section06/11/10 XII 18.152 140 C 0.380 0.200 0.300 - - - 88.00 84.64%
Satisfactory
Vicente T. Lao Construction 7040
Asphalt Overlay along R. Rabago St. -De Mazenod Avenue - ND Avenue -
Quezon Avenue (50mm THK) Km.0+(-) 123 - Km.0+437 with exception
06/01/10 XII 4.471 35 C 0.340 0.200 0.300 - - - 84.00 84.00% Satisfactory
Vicente T. Lao Construction 7040
Asphalt Overlay along Davao-Cotabato Road (50mm thickness)
Junction-Digos-Cotabato Rd. Katidtuan Boundary km.1644+(-232) - km.1645+(-002) w/ exception (346m)
08/26/10 XII 5.250 45 C 0.500 0.133 0.300 - - - 93.30 93.30% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page403
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Vicente T. Lao Construction 7040
Asphalt Overlay along Davao-Cotabato Road (50mm thickness)
Poblacion Kabacan Section, km.1648+000 - km.1649+003
08/26/10 XII 5.253 45 C 0.489 0.133 0.300 - - - 92.20 92.20% V. Satisfactory
Vicente T. Lao Construction 7040
Asphalt Overlay along R. Rabago St. De Mazenod Ave. - ND Ave. - Quezon
Ave., Km.0+(-123) - Km.0+437 w/exception
08/23/10 XII 4.471 35 C 0.469 0.133 0.300 - - - 90.20 90.20% V. Satisfactory
Vicente T. Lao Construction 7040
Impv't. of Seguil Flood Control along Sarangani-Sultan Kudarat Coastal
Road09/06/10 XII 19.282 140 C 0.406 0.133 0.300 - - - 83.90 83.90%
Satisfactory
Vicente T. Lao Construction 7040
Regraveling of Shoulder/Impvt. along Dualing-New Panay-Midsayap
Road, Katalicanan-Lawili Section w/exception
08/26/10 XII 15.296 120 C 0.405 0.133 0.300 - - - 83.80 83.80% Satisfactory
Vicente T. Lao Construction 7040
Regraveling of Shoulder/Impvt. of Banisilan-Guling-Libungan Highway Boundary-Calawag, Malinao Sect. W/
exception
08/26/10 XII 19.119 140 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory
Vicente T. Lao Construction 7040 Cotabato Airport Development
Project 03/11/09 DOTC 14.404 75 C 0.443 0.200 0.300 - - - 94.30 94.30% V. Satisfactory
Vicente T. Lao Construction 7010 Laguindingan Airport Development
Project 06/25/09 DOTC 17.846 390 C 0.457 0.200 0.300 - - - 95.70 95.70% V. Satisfactory
Vicente T. Lao Construction 7040 Pagadian Airport Development
Project 05/23/09 DOTC 28.846 150 C 0.432 0.200 0.300 - - - 93.20 93.20% V. Satisfactory
Vicente T. Lao Construction 7040 Pagadian Airport Development
Project 05/23/09 DOTC 54.878 300 C 0.460 0.200 0.300 - - - 96.00 96.00% V. Satisfactory
Vicente T. Lao Construction 7040
Slope Protection along Dipolog-Punta-Dansullan-Sergio Osmeña
Road (Macleodes Section)06/08/09 IX 9.092 210 C 0.470 0.133 0.300 - - - 90.30 92.28%
V. Satisfactory
Vicente T. Lao Construction 7040
Slope Protection along Dipolog-Punta-Dansullan-Sergio Osmeña
Road (Dilawa Section)06/08/09 IX 19.092 210 C 0.470 0.133 0.300 - - - 90.30 91.80%
V. Satisfactory
Vicente T. Lao Construction 7040
Regravelling of shoulder/Impvt. of National Road along Poblacion Buug-Goling, Diplahan Road Section (Km.
1723+445-Km. 1730+445)
05/29/09 IX 14.465 120 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory
Vicente T. Lao Construction 7040
Rehab./Reconst./Upgrading of Damaged Road of Dipolog-Polanco-
Oroquieta Road06/10/09 IX 10.490 180 O 0.389 0.240 0.150 0.030 0.047 0.050 90.60 -
Vicente T. Lao Construction 7040
Impvt./Concrete Paving of Gutalac-Baliguian-Siocon Road, Nonoyan-
Sta. Maria Section05/28/09 IX 48.156 732 O 0.388 0.240 0.150 0.030 0.047 0.050 90.50 -
Vicente T. Lao Construction 7040
Regravelling of shoulder/Impvt. of National Road along Bayugan Bdry.-
Poblacion Buug Section (Km. 1723+445-Km. 1730+445) with
exception
05/29/09 IX 14.462 120 C 0.452 0.133 0.300 - - - 88.50 *88.50% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page404
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Vicente T. Lao Construction 7040
Rehab./Reconst./Upgrading of Damaged Paved National Road
Junction, Polo-Dapitan Park Road06/09/09 IX 15.268 126 O 0.391 0.240 0.150 0.020 0.037 0.033 87.10 -
Vicente T. Lao Construction 7040 Impvt. of Access Road Leading to
Dipolog Airport, Minaog 06/10/09 IX 4.762 100 O 0.357 0.240 0.150 0.030 0.047 0.033 85.70 -
Vicente T. Lao Construction 7040 Rehab./Reconst./Upgrading of
Junction Pulauan Port Road 06/09/09 IX 15.268 130 O 0.386 0.240 0.150 0.010 0.037 0.033 85.60 -
Vicente T. Lao Construction 7040
Impvt./Concrete Paving of Gutalac-Baliguian-Siocon Road, Nonoyan-
Sta. Maria Section03/07/09 IX 48.156 539 O 0.378 0.261 0.150 0.030 0.047 0.050 91.60 -
Vicente T. Lao Construction 7040
Impv't/Conc. Paving of Dipolog-Punta-Dansullan-S. Osmeña Road
(Dilawa Section)03/16/09 IX 19.092 210 O 0.368 0.300 0.150 0.030 0.030 0.050 92.80 -
Vicente T. Lao Construction 7040
Impv't/Conc. Paving of Dipolog-Punta-Dansullan-S. Osmeña Road,
Macleodes Sect.03/16/09 IX 19.092 210 O 0.376 0.300 0.150 0.030 0.030 0.050 93.60 -
Vicente T. Lao Construction 7040 Repair/Aspahlt Overlay along Titay-
Ipil Road, Poblacion Ipil Section 03/05/09 IX 4.960 75 C 0.479 0.144 0.300 - - - 92.30 *92.30% V. Satisfactory
Vicente T. Lao Construction 7040
Repair/Asphalt Overlay along Titay-Ipil, Kitabog Section, Km. 2004+457-
Km. 2005+457 09/04/09 IX 19.286 110 O 0.367 0.300 0.150 0.030 0.050 0.033 93.00 -
Vicente T. Lao Construction 7040
Repair/Asphalt Overlay along Titay-Ipil, Kitabog Section, Km. 2005+457-
Km. 2008+197 length 1000 meters09/04/09 IX 19.286 160 O 0.350 0.300 0.150 0.030 0.050 0.033 91.30 -
Vicente T. Lao Construction 7040
Rehab./Reconst./Upgrading of Damaged paved National Road,
Junction Polo-Dapitan Park Road09/15/09 IX 15.267 126 C 0.454 0.200 0.300 - - - 95.40 90.42%
V. Satisfactory
Vicente T. Lao Construction 7040
Rehab./Reconst./Upgrading of Damaged Paved National Road, Jct.
Pulauan Port Road09/15/09 IX 15.268 130 C 0.436 0.200 0.300 - - - 93.60 88.80%
Satisfactory
Vicente T. Lao Construction 7040 Impvt. of Access Road Leading ot
Dipolog Airport, Minaog 09/16/09 IX 4.762 100 C 0.432 0.200 0.300 - - - 93.20 88.70% Satisfactory
Vicente T. Lao Construction 7040
Impvt.Concrete Paving of Sindangan-Siayan-Dumingag Road, Sta.
13+26.00-Sta. 15+248.00, Pob. Siayan Section
09/17/09 IX 28.949 665 C 0.460 0.200 0.300 - - - 96.00 85.53% Satisfactory
Vicente T. Lao Construction 7040
Rehab./Reconst./Upgrading of Damaged Road of Dipolog-Polanco-
Oroquieta Road09/16/09 IX 10.490 180 O 0.298 0.300 0.150 0.030 0.040 0.033 85.10 -
Vicente T. Lao Construction 7040 Laguindingan Resettlement Project,
Phase II 05/18-22/09 NHA 40.606 355 C 0.371 0.300 0.300 - - - 97.06 97.06% Outstanding
Vicente T. Lao Construction 7040
Rehab./Impvt. of Sarangani-Davao del Sur Coastal Road, Lun Masla
Section06/10/09 R-XII 9.640 120 C 0.424 0.200 0.300 - - - 92.40 *92.40%
V. Satisfactory
Vicente T. Lao Construction 7040
Impvt./Rehab. of Carcar-Barili Road, Km. 39+281 - Km. 49+000, with
exception)08/24/10 VII 48.238 145 C 0.370 0.200 0.300 - - - 87.00 87.00%
Satisfactory
Vicente T. Lao Construction 7040 Road Upgrading/Asphalting of Don
Carlos-Kadingilan Road 09/03/09 X 38.171 120 O 0.378 0.245 0.150 0.003 0.051 0.050 87.70 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page405
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Vicente T. Lao Construction 7040 Asphalting of Don Carlos -
Kadilingan Road 09/03/09 X 48.250 210 O 0.310 0.300 0.000 0.030 0.056 0.050 74.60 -
Vicente T. Lao Construction 7040 Impvt./Conc. Paving of Sindangan-
Siayan-Dumingag Road 09/04/08 IX 28.546 475 O 0.304 0.240 0.000 0.030 0.042 0.100 71.60 -
Vicente T. Lao Construction 7040 Impvt./Conc. Paving of Sindangan-
Siayan-Dumingag Road 12/04/08 IX 28.948 345 O 0.345 0.240 0.100 0.030 0.040 0.100 85.50 -
Vicente T. Lao Construction 7040
Impvt./Concrete Paving of Gutalac-Baliguian-Siocon Road, Sta. Maria
Section08/26/08 IX 48.156 290 O 0.270 0.252 0.000 0.030 0.042 0.100 69.40 -
Vicente T. Lao Construction 7040 Proposed Ozamis Port Expansion
Project 08/5-8/11 PPA 150.034 729 O 0.394 0.300 0.101 0.030 0.065 0.050 94.02 -
Vicmar Construction , Incorporated 28997 Repair of Damaged Facilities 05/2-3/11 PPA 24.196 240 O 35.711 25.203 15.000 3.000 7.000 5.000 90.91 *90.91%
V. Satisfactory
Vicmar Construction / Jinco Construction, JV
Repair of Damaged Portion of Old Wharf at Berths 1 - 4 03/24-25/11 PPA 11.741 210 O 0.293 0.300 0.150 0.030 0.053 0.050 87.60 *87.60%
Satisfactory
Vicmar Construction Inc. 28997 Widening of Calansayan Bridge at Manila-Batangas Rd. 08/20/10 IVA 3.855 120 C 0.416 0.200 0.300 - - - 91.60 91.60%
V. Satisfactory
Vicmar Construction Inc. 28997Road Upgrading (Gravel to Paved)
along Batangas-Tabangao-Lobo Rd. (Talahib-Pandayan Sect.)
08/23/10 IVA 9.645 85 C 0.402 0.200 0.300 - - - 90.20 87.32% Satisfactory
Vicmar Construction Inc. 28997 Widening of Calansayan Bridge at Manila-Batangas City Rd. 08/23/10 IVA 3.855 120 C 0.361 0.200 0.300 - - - 86.10 86.10%
Satisfactory
Vicmar Construction Inc. 28997
Road Upgrading (Gravel to Paved) along Batangas-Tabangao-Lobo Rd.
(Talahib-Pandayan Sect.) Km.140+402 - Km.140+853 with
06/04/10 IVA 9.645 85 O 0.347 0.225 0.150 0.023 0.059 0.050 85.40 -
Vicmar Construction Inc. 28997
Restoration of Collapsed Embankment and Slope Protection,
Nasugbu-Ternate Rd., Brgy. Natipuan
06/02/10 IVA 4.822 90 C 0.417 0.133 0.300 - - - 85.00 85.00% Satisfactory
Vicmar Construction Inc. 28997 Const. of Baywalk Facilities, Foreshore Area, Phase 3, Brgy. 11 03/04/09 IV-A 9.594 150 C 0.495 0.133 0.300 - - - 92.80 90.63%
V. Satisfactory
Vicmar Construction Inc. 28997 Const. of MPB @ Balayan West E/S 03/04/09 IV-A 1.431 90 C 0.467 0.165 0.300 - - - 93.20 *93.20% V. Satisfactory
Vicmar Construction Inc. 28997 Rehab./Impvt. of Batangas-Lobo Road 03/05/09 IV-A 6.803 60 C 0.437 0.200 0.300 - - - 93.70 92.32%
V. Satisfactory
Vicmar Construction Inc. 28997
Rehab./Impvt. of Damaged National Road at Batangas-Tabangao-Lobo
Road, Pulot Aplaya-Talahib Pandayan Section
03/05/09 IV-A 19.295 90 C 0.461 0.181 0.300 - - - 94.20 92.22% V. Satisfactory
Vicmar Construction Inc. 28997Conc. of Batangas-Tabangao-Lobo
Road, Pulot Aplaya Talahib Pandayan Section
05/22/09 IV-A 9.644 70 C 0.453 0.133 0.300 - - - 88.60 *88.60% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page406
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Vicmar Construction Inc. 28997Conc. of Batangas-Tabangao-Lobo Road, Talahib Pandayan Banalo-
Masaquitsit Section05/22/09 IV-A 12.537 70 C 0.405 0.133 0.300 - - - 83.80 *83.80%
Satisfactory
Vicmar Construction Inc. 28997 Conc. of Palapag-Mapanas Gamay-Lapinig Road 03/03/09 VIII 77.044 298 O 0.349 0.237 0.150 0.030 0.047 0.050 86.30 -
Vicmar Construction, Inc. 28997Rehab./Reconst./Upgrading of
Damaged National Road at Batangas-Tabangao-Lobo Road
04/11/11 IVA 24.120 166 C 0.295 0.200 0.300 - - - 79.50 84.90% Satisfactory
Vicmar Construction, Inc. / NBL Construction (JV) JV-09-090 Conc./Widening/Impvt. of Bauan-
Mabini Circ. Road 04/11/11 IVA 57.895 154 C 0.369 0.197 0.300 - - - 86.60 88.28% Satisfactory
Vicmar Construction, Inc. / Rich Ads Construction
& Supply (JV)JV-09-010 Lemery-Agoncillo Rd., Lemery Sect. 06/02/10 IVA 28.645 150 C 0.439 0.133 0.300 - - - 87.20 87.20%
Satisfactory
Vicmar Construction, Inc. / V.R. Patron Builders &
Developers Joint VentureJV-09-169
Const./Restoration of Cacauan Bridge along Tagaytay-Nasugbu
Road, Tuy Section04/12/11 IVA 38.585 300 C 0.455 0.200 0.300 - - - 95.50 93.52%
V. Satisfactory
Victor M. Daet Construction & Supply 15621
Legaspi Airport Development Project (Continuation of Upgrading of
Runway Shoulder and Repair of DOTC Staffhouse)
04/22/10 DOTC 2.888 60 C 0.462 0.200 0.300 - - - 96.20 96.20% Outstanding
Victor M. Daet Construction & Supply 15621 Masbate Airport Development
Project 07/20/09 DOTC 2.892 60 C 0.479 0.200 0.300 - - - 97.90 97.90% Outstanding
Victor M. Daet Construction & Supply 15621 Legaspi Airport Development Project 07/09/09 DOTC 7.672 60 C 0.461 0.200 0.300 - - - 96.10 96.10%
OutstandingVictor M. Daet
Construction & Supply 15621 Virac Airport Development Project 07/11/09 DOTC 4.803 120 C 0.418 0.200 0.300 - - - 91.80 91.80% V. Satisfactory
Victor M. Daet Construction & Supply 15621 San Andres Port Development
Project 07/10/09 DOTC 4.780 90 C 0.457 0.200 0.300 - - - 95.70 95.70% V. Satisfactory
Victor M. Daet Construction & Supply 15621 Legaspi City LTFRB Regional Office
Building Project 11/04/09 DOTC 3.193 150 C 0.475 0.200 0.300 - - - 97.50 97.50% Outstanding
Victor M. Daet Construction & Supply 32638 Rehabilitation of Riprap Seawall 06/02/09 VIII 0.944 90 C 0.438 0.133 0.300 - - - 87.10 *87.10%
SatisfactoryVictor M. Daet
Construction & Supply 32638 Repair/Impv't of Multi-Purpose Building, Brgy. Pob. Del Norte 03/11/09 VIII 0.188 40 C 0.494 0.035 0.300 - - - 82.90 *82.90%
Satisfactory
Victor M. Daet Construction and Supply 15621 Legaspi Airport Dev't Project
(Construction of Terminal Building) 4/13/2011 DOTC 8.168 120 C 0.431 0.200 0.300 - - - 93.10 93.10% V. Satisfactory
Victoriano C. Lim Construction 25318 Gravelling of Lumipac-Magsaysay
Road 04/07/11 X 2.784 120 O 0.279 0.300 0.150 0.030 0.042 0.050 85.10 -
Victoriano C. Lim Construction 25318 Regravelling of Batibut-Libertad,
Sapang Ama, Caluya Road 04/07/11 X 4.640 175 O 0.277 0.300 0.150 0.030 0.037 0.033 82.70 -
Victoriano C. Lim Construction 25318
Rehab./Impvt. of Pagadian-Ozamiz Road, Digson-Sumirap Section, Km.1666+000 - Km.1672+000 w/
06/01/10 X 13.472 60 C 0.455 0.133 0.300 - - - 88.80 88.80% Satisfactory
Victoriano C. Lim Construction 25318
Rehab. of Ozamiz-Oroquieta Road, Km.1702+000 - Km.1702+335.50 w/
exception08/24/10 X 6.409 120 C 0.481 0.133 0.300 - - - 91.40 91.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page407
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Victoriano C. Lim Construction 25318
Rehab. of Bagacay-Cadre Road, Km.1698+224 - Km.1698+568
w/exception08/24/10 X 5.275 120 C 0.408 0.133 0.300 - - - 84.10 84.10%
Satisfactory
Victoriano C. Lim Construction 25318 Ozamis Airport Development Project 05/22/09 DOTC 28.851 180 C 0.432 0.200 0.300 - - - 93.20 93.20%
V. SatisfactoryVictoriano C. Lim
Construction 25318 Ozamis Airport Development Project 05/23/09 DOTC 3.855 120 C 0.469 0.200 0.300 - - - 96.90 96.90% Outstanding
Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon Road
(Maluko Slip Section) 03/06/09 X 14.457 400 C 0.373 0.133 0.000 - - - 50.60 66.98% Poor
Vicvera Builders, Inc. 13903Const./Rehab. of Road (along Umali
and Espeleta Pantalan) Brgy. Poblacion
06/08/10 NCR 2.856 213 C 0.414 0.200 0.300 - - - 91.40 89.78% V. Satisfactory
Vicvera Builders, Inc. 13903 Const./Rehab. of Road at Riverside Purok I 09/02/10 NCR 1.199 45 C 0.410 0.133 0.300 - - - 84.30 84.30%
SatisfactoryVigan Fortune Construction 3887 Restoration of Damaged Shore
Protection, MNR 03/30/11 I 19.691 281 C 0.393 0.200 0.300 - - - 89.30 86.63% Satisfactory
Vigan Fortune Construction 3887
Rehab./Reconst./Upgrading of Damaged Paved National Road along
MNR03/30/11 I 19.099 235 C 0.373 0.200 0.300 - - - 87.30 85.08%
Satisfactory
Vigan Fortune Construction 3887
Rehab./Reconst./Upgrading of Damaged Paved National Roads,
Tagudin Section09/04/09 I 19.090 222 O 0.338 0.300 0.150 0.022 0.040 0.033 88.30 -
Vigan Fortune Construction 3887
Rehab./Reconst./Upgrading of Damaged National Roads, Tagudin
Section02/17/10 I 19.089 225 C 0.293 0.200 0.300 - - - 79.30 84.70%
Satisfactory
Vigan Fortune Construction 3887 Candon - Salcedo Road, Candon &
Calimuyod 05/29/09 I 18.922 270 C 0.316 0.133 0.300 - - - 74.90 67.92% Poor
Vigan Fortune Construction 3887 Rehab/Replacement of Paing Bridge
2 along MNR 02/28/09 I 8.473 486 C 0.333 0.200 0.300 - - - 83.30 83.63%Satisfactory
Vigan Fortune Construction & Supply 3887 Const. of Boys Dormitory Phase II
(Building) 03/8-9/11 DOST 11.919 330 C 0.451 0.164 0.300 - - - 91.50 82.61% Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Road Upgrading (Gravel to Pave)
Libungao-Matag-ob, Palompon Road 02/25/10 VIII 18.225 256 C 0.443 0.150 0.300 - - - 89.30 87.38% Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Road Slip along Liloan-Sogod Road
Section 05/26/09 VIII 9.542 270 O 0.382 0.238 0.150 0.030 0.047 0.033 88.00 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Road Upgrading (Gravel to Paved),
Libungao-Matag-ob-Palompon Road 05/30/09 VIII 18.225 225 O 0.367 0.239 0.150 0.030 0.042 0.033 86.10 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Widening of Carigara Wharf 06/06/09 VIII 1.885 120 O 0.381 0.240 0.150 0.022 0.033 0.033 85.90 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178
Const. of Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Road, Barugo-
Carigara Road Section06/06/09 VIII 18.887 150 O 0.340 0.240 0.150 0.030 0.037 0.033 83.00 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page408
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Viguz Construction Corporation (Formerly:
Viguz Construction)8178
Rehab./Reconst./Upgrading of Palompon-Isabel-Merida-Ormoc
Road05/30/09 VIII 12.764 180 O 0.341 0.237 0.105 0.030 0.033 0.017 76.30 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Construction of Multi-Purpose
Building (ABC Bldg.) Phase 1 03/16/09 VIII 0.945 120 C 0.423 0.133 0.300 - - - 85.60 *85.60%Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Rehabilitation along Maharlika
Highway (Paril Section Km 986+280) 03/04/09 VIII 7.130 222 O 0.343 0.226 0.000 0.030 0.025 0.050 67.40 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Road Slip along Liloan-Sogod Road
Section 03/05/09 VIII 9.542 240 O 0.320 0.246 0.150 0.030 0.030 0.050 82.60 -
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Widening of Carigara Wharf 09/01/09 VIII 1.885 120 C 0.479 0.133 0.300 - - - 91.20 88.02%
Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Raod Slip along Liloan-Sogod
Section 09/09/09 VIII 9.542 270 C 0.450 0.133 0.300 - - - 88.30 86.50% Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Const. of Bagahupi-Babatngon-Sta.
Cruz-Barugo-Carigara Road 09/01/09 VIII 18.887 150 C 0.424 0.133 0.300 - - - 85.70 84.08% Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Widening of Carigara Wharf 08/23/10 VIII 2.360 87 C 0.485 0.133 0.300 - - - 91.80 91.80%
V. Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Construction)8178 Const. of Seawall, Brgy. West
Visoria 09/09/10 VIII 9.447 120 C 0.467 0.133 0.300 - - - 90.00 90.00% V. Satisfactory
Viking Construction &Supplies 18129 Sabangan-San Esteban Road 02/17/10 I 14.223 180 C 0.347 0.200 0.300 - - - 84.70 84.70%
SatisfactoryViking Construction
&Supplies 18129 Sta. Lucia-Salcedo Road 09/09/09 I 9.457 102 C 0.297 0.200 0.300 - - - 79.70 65.24% Poor
Viking Construction &Supplies 18129
Rehab./Reconst./Upgrading of Damaged Paved National Road along
MNR, Sta. Cruz Section05/27/10 I 19.105 56 C 0.429 0.133 0.300 - - - 86.20 86.20%
Satisfactory
Viking Construction & Supplies 18129
Rehab./Reconst./Upgrading of Damaged Paved National Road,
Tagudin-Sta. Cruz Sect.03/30/11 I 19.105 56 C 0.448 0.152 0.300 - - - 90.00 *90.00%
V. Satisfactory
Viking Construction and Supplies 18129 San Juan-San Antonio-Darapidap
Flood Control 03/30/11 I 9.844 285 C 0.336 0.200 0.300 - - - 83.60 82.49% Satisfactory
Viking Construction and Supplies / B.M.K. Construction (JV)
JV-09-199
Rehab./Reconst./Upgrading of Badoc-Currimao-Batac-San Nicolas along
MNR, Badoc, Currimao, Batac City & San Nicolas
04/02/11 I 178.280 360 C 0.405 0.199 0.300 - - - 90.40 *90.40% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page409
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Virgo Construction 31068 Const. of MPB Cadlan 04/07/11 V 0.995 100 C 0.389 0.133 0.300 - - - 82.20 *82.20% Satisfactory
Virlo Construction 5765Repair/Rehab.of Mactan Circ. Rd.,
Cordova Sect. (Km.25+700 - Km.27+000)
04/10/11 VII 4.670 18 C 0.424 0.133 0.300 - - - 85.70 *85.70% Satisfactory
Virlo Construction 5765 Conc. of Bacolod South Road (Su-ay Section) 03/06/09 VI 22.306 319 O 0.231 0.300 0.150 0.030 0.060 0.050 82.10 -
Virlo Construction 5765Conc. of Bacolod South Road (Su-ay
Section) Sta. 80+700.70-Sta. 83+400.70
09/16/09 VI 24.531 394 C 0.441 0.079 0.300 - - - 82.00 80.68% Unsatisfactory
Virlo Construction 5765 Conc. of Antonio de Pio Highway, Luyang-Victoria-Kinawahan Sect. 03/06/09 VII 30.402 185 C 0.327 0.133 0.300 - - - 76.00 76.78%
Unsatisfactory
Virlo Construction 5765 Impv't/Conc. of JCT.LIR Carmen-Sagbayan-Bacani Road 03/07/09 VII 23.600 252 O 0.388 0.200 0.150 0.030 0.047 0.033 84.80 -
Virlo Construction 5765 Impv't/Conc. of JCT.LIR Carmen-Sagbayan-Bacani Road 02/23/10 VII 23.600 252 C 0.361 0.133 0.300 - - - 79.40 82.64%
Satisfactory
Virlo Construction 5765 Conc. of Bacolod South Road (Su-ay Section) 11/21/08 VI 22.306 319 O 0.335 0.225 0.100 0.010 0.038 0.067 77.50 -
Vites Construction & Development
Corporation (Formerly: Vites Trading & Const.)
9444 Proposed Const./Repair/Rehab. of School Bldg. Manila Science H/S 02/16/10 NCR 4.819 116 O 0.364 0.240 0.150 0.022 0.041 0.050 86.70 -
Vites Construction & Development
Corporation (Formerly: Vites Trading & Const.)
9444 Proposed Repair/Rehab./Const. of Multi-Purpose Bldg. Brgy.737 02/15/10 NCR 0.963 137 C 0.470 0.133 0.300 - - - 90.30 78.68%
Unsatisfactory
Vites Construction & Development
Corporation (Formerly: Vites Trading & Const.)
9444Proposed Const./Repair/Rehab. of School Bldg., Manila Science High
School08/23/10 NCR 4.819 116 C 0.443 0.133 0.300 - - - 87.60 86.97%
Satisfactory
Vivid Construction 21115 Rehab./Reconst./Upgrading of
Damaged Paved National Road along Ayala Boulevard
05/18/09 NCR 9.640 20 C 0.474 0.133 0.300 - - - 90.70 *90.70% V. Satisfactory
Vivid Construction 21115 Proposed Rehab. of Roads and Drainage, Brgy. 874 / 875 02/26/09 NCR 1.927 60 C 0.367 0.166 0.300 - - - 83.30 *83.30%
Satisfactory
Vivid Construction 21115
Proposed Repair of Road Damaged Pavement, Pres. Quirino Ave. (N/S Bound) and Osmeña Highway (N/S
Bound)
08/24/10 NCR 0.911 45 C 0.275 0.200 0.300 - - - 77.50 77.50% Unsatisfactory
VRF Construction 15301Repair/Rehab. of Pinagpanaan-Rizal-
Pantabangan Rd. Km.159+740 - Km.159+805
06/08/10 III 7.203 92 O 0.362 0.240 0.150 0.023 0.038 0.050 86.30 -
VRF Construction 15301
Repair/Restoration of Washed-out Overflow Bridge & Approaches
(Calaocan Brgidge) Bongabon-Rizal-Aurora Rd.
06/08/10 III 9.366 110 O 0.336 0.240 0.150 0.023 0.032 0.050 83.10 -
VRF Construction 15301Repair/Rehab. of Pinagpanaan-Rizal-
Pantabangan Rd. Km.159+740 - Km.159+805
08/25/10 III 7.203 92 C 0.380 0.200 0.300 - - - 88.00 86.98% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page410
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
VRF Construction 15301Repair/Restoration of Washed-Out Bridge & Approaches (Calaocan)
Bongabon-Rizal-Aurora Rd.08/25/10 III 9.366 110 C 0.422 0.161 0.300 - - - 88.30 85.18%
Satisfactory
VRP Builders Construction & Supply 25056 Restoration of Collapsed Slope
Protection Lian Bridge Km.099+048 08/25/10 IVA 4.820 90 C 0.400 0.200 0.300 - - - 90.00 90.00% V. Satisfactory
VRP Builders Construction & Supply 25056 Completion of MPB / Structure in
Brgy. Zone 9 09/05/09 IVA 0.983 40 C 0.463 0.133 0.300 - - - 89.60 *89.60% V. Satisfactory
VTJ Construction & Supply 11250 Impvt./Widening of Angono
Diversion Road, Pag-asa Sect. 04/15/11 IVA 9.603 180 C 0.324 0.200 0.300 - - - 82.40 82.58% Satisfactory
Vulcan Development Construction 19080 Const. of Pathway at Brgy.
Pinamogaan 08/26/09 V 0.472 120 C 0.402 0.133 0.300 - - - 83.50 *83.50% Satisfactory
Vulcan Development Construction 19080 Construction of Batuan Covered
Court (Phase III) 02/17/10 V 2.385 120 C 0.425 0.133 0.300 - - - 85.80 85.80% Satisfactory
VVER Construction 14122Const. of DPWH Siquijor District Engineering Office Building inc.
Quarters04/04/11 VII 5.300 285 C 0.418 0.200 0.300 - - - 91.80 73.46%
Poor
VVER Construction 14122 Repair/Rehab. of Barangay Rd. at Sitio Canghaling 09/07/09 VII 1.927 180 C 0.490 0.133 0.300 - - - 92.30 *92.30%
V. Satisfactory
VVER Construction 14122 Cons. of Multi-Purpose Building Poblacion 09/07/09 VII 1.929 150 C 0.374 0.133 0.300 - - - 80.70 85.32%
Satisfactory
VVER Construction 14122 Cons. of 1 Unit 1-CL School Building @ Bacong H/S 09/15/09 VII 0.486 70 C 0.404 0.133 0.300 - - - 83.70 *83.70%
Satisfactory
VVER Construction 14122 Const. of Level III Water System at Poblacion Norte Maria 06/07/10 VII 1.446 155 O 0.325 0.300 0.150 0.030 0.019 0.050 87.40 -
VVER Construction 14122 Const./Completion of MPB at Poblacion 06/07/10 VII 1.927 180 O 0.296 0.284 0.150 0.030 0.040 0.050 85.00 -
VVER Construction 14122 Const. of Drainage Canal in Brgy. San Isidro 06/10/10 VII 0.410 80 C 0.347 0.200 0.300 - - - 84.70 84.70%
Satisfactory
VVER Construction 14122 Rehab./Impvt. of Candaping-A Rd., Sta.0+000 - Sta.0+340 06/07/10 VII 0.998 120 C 0.375 0.163 0.300 - - - 83.80 83.80%
Satisfactory
VVER Construction 14122 Conc. of Brgy. Looc to Brgy. Okiot Road 09/02/10 VII 0.966 85 C 0.421 0.200 0.300 - - - 92.10 92.10%
V. Satisfactory
VVER Construction 14122 Const. of a Level III Water System at Poblacion Norte 08/31/10 VII 1.446 170 C 0.426 0.133 0.300 - - - 85.90 86.80%
Satisfactory
VVER Construction 14122 Const./Completion of MPB at Poblacion 08/31/10 VII 1.929 207 C 0.444 0.133 0.300 - - - 87.70 85.81%
Satisfactory
VVER Construction 14122
Repair/Rehab. of Brgy. Road, Cantaroc A-Cantugbas Sta. 0+000-
Sta. 0+620 (Segment I) & Sta. 1+020-Sta.1+400 (Segment II)
06/02/09 VII 1.927 180 C 0.490 0.163 0.300 - - - 95.30 *95.30% V. Satisfactory
VVER Construction 14122 Construction of Multi-Purpose Building, Campalanas 06/02/09 VII 2.392 150 C 0.491 0.133 0.300 - - - 92.40 *92.40%
V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page411
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
VVER Construction 14122 Repair/Rehab. of Brgy. Road at Bamban (Sta. 0+000-Sta. 0+260) 06/02/09 VII 0.963 120 C 0.433 0.163 0.300 - - - 89.60 *89.60%
V. Satisfactory
VVER Construction 14122 Concreting of Punta Beach Road (Sta. 0+690-Sta. 0+590), Poblacion 05/30/09 VII 1.836 222 C 0.486 0.133 0.300 - - - 91.90 87.82%
Satisfactory
VVER Construction 14122 Const. of Multi-Purpose Building at Brgy. Poblacion 06/02/09 VII 1.924 150 O 0.364 0.241 0.150 0.030 0.038 0.050 87.30 -
VVER Construction 14122 Repair/Rehab. of Punta Road, Poblacion 05/30/09 VII 1.832 35 C 0.451 0.148 0.000 - - - 59.90 74.72%
Poor
VVER Construction 14122 Construction of (1) unit School Building at Liloan Elem. School 03/10/09 VII 1.173 90 C 0.482 0.133 0.300 - - - 91.50 *91.50%
V. Satisfactory
VVER Construction 14122 Construction of Drainage Canal (Flood Control System), Brgy. Jawa 03/13/09 VII 0.420 70 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
VVER Construction 14122 Repair/Rehabilitation of Punta Road, Poblacion 03/13/09 VII 1.832 193 O 0.400 0.200 0.150 0.030 0.033 0.033 84.60 -
VVH Construction Corp. 32689 Conc. of Baligat Farm-to-Market Road 02/22/10 I 1.730 55 C 0.395 0.200 0.300 - - - 89.50 89.50%
V. Satisfactory
W B X Construction 28370 Rehab./Reconst./Upgrading at Tabang Service Road 03/03/10 III 9.639 88 C 0.448 0.133 0.300 - - - 88.10 90.14%
V. Satisfactory
W B X Construction 28370Const. of School Building for
Aeronautical School in Bulacan State University Bustos Campus
03/03/10 III 5.737 140 C 0.450 0.133 0.300 - - - 88.30 89.84% V. Satisfactory
W B X Construction 28370 Rehab. of Daang Maharlika Road, Plaridel Section 03/03/10 III 4.784 12 C 0.461 0.133 0.300 - - - 89.40 89.40%
V. Satisfactory
W B X Construction 28370Rehab./Rconst./Upgrading of
Damaged Paved National Road at Daang Maharlika Rd.
06/09/10 III 19.113 100 O 0.377 0.300 0.150 0.008 0.027 0.050 91.20 -
W B X Construction 28370Rehab./Reconst./Upgrading of Plaridel-Pulilan Diversion Rd.
(Pulilan Sect.)06/10/10 III 4.777 27 C 0.437 0.133 0.300 - - - 87.00 87.00%
Satisfactory
W B X Construction 28370 Rehab./Reconst./Upgrading of Plaridel Airport Rd. 06/09/10 III 6.211 15 C 0.429 0.133 0.300 - - - 86.20 86.20%
Satisfactory
W B X Construction 28370Rehab./Reconst./Upgrading of
Damaged Paved Nat'l. Rds. At Daang Maharlika Rd.
08/27/10 III 19.113 115 C 0.486 0.109 0.300 - - - 89.50 90.52% V. Satisfactory
W B X Construction 28370 Construction of Slope Protection along Bocaue River 05/29/09 III 9.543 60 O 0.376 0.240 0.150 0.030 0.038 0.050 88.40 -
W B X Construction 28370 Rehab/Reconst./Upgrading of at Pulilan RR Station Road 05/28/09 III 9.541 55 C 0.356 0.200 0.300 - - - 85.60 *85.60%
Satisfactory
W B X Construction 28370 Const. of Multi-Purpose Building at Senior Citizens Federation 03/06/09 III 0.473 12 O 0.368 0.284 0.150 0.030 0.020 0.017 86.90 -
W B X Construction 28370 Const. of Multi-Purpose Building at Senior Citizens Federation 09/04/09 III 0.474 12 C 0.472 0.133 0.300 - - - 90.50 87.98%
Satisfactory
W B X Construction 28370 Road Repair/Rehabilitation of Pritil 09/04/09 III 0.477 10 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
W B X Construction 28370Const. of Standard Two (2)
Classroom School Building Modified at F. De Jesus H/S
09/04/09 III 1.098 40 C 0.440 0.133 0.300 - - - 87.30 *87.30% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page412
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
W B X Construction 28370 Const. of Two (2) Storey Classroom School Building at Sta. Monica NHS 09/04/09 III 2.106 53 C 0.428 0.133 0.300 - - - 86.10 *86.10%
Satisfactory
W B X Construction 28370 Const. of Slope Protection along Bocaue River 09/05/09 III 9.543 60 C 0.391 0.133 0.300 - - - 82.40 86.00%
Satisfactory
W B X Construction 28370
Rehab./Reconst./Upgrading along East Service Rd. Inc. Drainage
System (Intermittent Section) from Polo-Novaliches Road to Polo Pugad
Baboy Road
05/27/09 NCR 9.503 120 C 0.360 0.200 0.300 - - - 86.00 *86.00% Satisfactory
W B X Construction 28370 Conc. of FMR, Brgy. Agnaya 04/13/11 III 0.966 16 C 0.439 0.000 0.300 - - - 73.90 *73.90% Poor
W.B Alagao Construction 15622Const. of Multi-Purpose Building (Student Center) Naval Institute of
Technology06/03/09 VIII 0.953 90 C 0.496 0.133 0.300 - - - 92.90 *92.90%
V. Satisfactory
W.C Doyola Construction 26044 Paguite CIS 10/6-10/08 PIO 833.488 45 C 0.339 0.175 0.300 - - - 81.35 81.35% V.Satisfactory
W.D Navarro Construction, Co. 14327
New Const./Completion/Continuation On-going Maxingal Bridge along
Cagayan Valley Rd.05/25/10 II 16.710 290 O 0.372 0.300 0.150 0.024 0.033 0.033 91.20 81.35%
V.Satisfactory
W.D Navarro Construction, Co. 14327
New Const./Completion/Continuation of On-going Maxingal Bridge along
Cagayan Valley Road08/17/10 II 16.710 290 O 0.342 0.300 0.042 0.020 0.004 0.000 70.80 -
W.D Navarro Construction, Co. 14327
Upgrading/Improvement of Manila North Road (Jct. Bangag-Paraddum
Section)09/09/09 II 9.445 251 C 0.425 0.133 0.300 - - - 85.80 86.58%
Satisfactory
W.D Navarro Construction, Co. 14327
Upgrading/Improvement of Manila North Road (JCt. Bangag-Paraddum
Section)05/20/09 II 9.445 251 O 0.354 0.240 0.150 0.030 0.047 0.050 87.10 -
W.D Navarro Construction, Co. 14327
Upgrading/Impvt. of Manila North Road (Jct. Bangag-Mabanguc-
Paruddun Section)05/21/09 II 20.258 300 C 0.472 0.133 0.300 - - - 90.50 83.00%
Satisfactory
W.D Navarro Construction, Co. 14327 Const. of Cagayan River Control 02/26/09 II 14.238 318 C 0.465 0.200 0.300 - - - 96.50 88.37%
Satisfactory
W.D. Navarro Construction Co. 14327
Widening/Upgrading/Rehab. of Access Road to Airports at Aparri
Airport Road, Maura - Buguey, Cagayan Section
04/01/11 II 21.694 240 O 0.363 0.288 0.150 0.015 0.038 0.033 88.70 -
W.D. Navarro Construction Co. 14327 Rehab./Reconst./Upgrading of
Damaged Paved (DSVR) 04/01/11 II 19.290 270 C 0.453 0.133 0.300 - - - 88.60 *88.60% Satisfactory
W.D. Navarro Construction Co. 14327 Rehab./Reconst./Upgrading of
Damaged Paved along DSVR 04/01/11 II 9.647 240 C 0.434 0.133 0.300 - - - 86.70 *86.70% Satisfactory
W.D. Navarro Construction Co. 14327
Widening/Upgrading/Rehab. of Access Road to Airports at Aparri
Airport Road04/01/11 II 19.295 240 O 0.296 0.277 0.150 0.030 0.038 0.033 82.40 -
W.J. Construction 19497 Widening of Sariaya-Lucena Junction (MSR) 04/01/11 IVA 14.470 150 C 0.340 0.200 0.300 - - - 84.00 *84.00%
SatisfactoryW.J.P Construction &
Supply 23192 Concreting of San Vicente to Poblacion West 03/05/09 I 2.893 37 C 0.371 0.200 0.300 - - - 87.10 *87.10%
SatisfactoryW.J.P. Construction and
Supply 23192 Rehab. of Balincanaway FMR, Balincanaway 04/14/11 I 9.647 150 C 0.428 0.133 0.300 - - - 86.10 *86.10%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page413
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
W.J.P. Construction and Supply 23192 Conc./Impv't. of Acop Brgy. Road 04/14/11 I 2.891 72 C 0.412 0.133 0.300 - - - 84.50 *84.50%
SatisfactoryW.M Salayog
Construction & General Merchadise
12851 Construction of Multi-Purpose Building, San Jacinto E/S 08/28/09 I 1.157 100 C 0.478 0.200 0.300 - - - 97.80 84.08%
Satisfactory
W.M. Salayog Construction and
General Merchandise12851 Repair & Rehab. of FMR connecting
Brgys. Navaluan and Osiem 04/12/11 I 1.157 30 C 0.388 0.133 0.300 - - - 82.10 *82.10% Satisfactory
W.T.G Construction and Development Corporation
7494 Const./Rehab. of River Control including Seawall at Tabajan 06/05/09 VII 9.363 300 O 0.226 0.300 0.150 0.030 0.047 0.033 78.60 -
W.T.G Construction and Development Corporation
7494 Const./Rehab. of River Control including Seawall at Tabajan 02/25/10 VII 9.363 315 C 0.350 0.133 0.300 - - - 78.30 78.48%
Unsatisfactory
Walter Ng Lao Construction 23739 Balingasag River Irrigation Project 09/26-27/11 NIA 199.249 515 O 0.350 0.240 0.000 0.024 0.056 0.017 68.68 -
Walter Ng Lao Construction 23739 Panansalan-Cartagena Communal
Irrigation System 10/6-10/08 NIA 5.787 148 O 0.370 0.160 0.070 0.015 0.053 0.200 86.72 -
Walter Ng Lao Construction 23739 Const. of Multi-Purpose Building
(Phase II) 06/03/09 X 4.820 120 O 0.309 0.240 0.150 0.030 0.013 0.050 79.20 -
Walter Ng Lao Construction 23739 Cluster 1-Repair/Rehab. of Various
Farm-to-Market Roads, Brgy. Lumbo 09/10/09 X 9.644 75 C 0.415 0.200 0.300 - - - 91.50 *91.50% V. Satisfactory
Walter Ng Lao Construction 23739 Construction of Multi-Purpose
Building (Phase II) 09/09/09 X 4.821 120 C 0.445 0.200 0.300 - - - 94.50 83.79% Satisfactory
Walter Ng Lao Construction 23739
Road Upgrading (Gravel to Paved) OroquietaCity-Calamba Mt. Road Km. 1760+400-Km. 1761+274 w/
exceptions
09/15/09 X 3.211 120 O 0.392 0.297 0.000 0.030 0.061 0.017 79.70 -
Wangjo Construction 29924
Asphalt Overlay/Conc. Reblocking along Nueva Vizcaya-Ifugao-Mt.
Province Bdry. Road Km. 324+000-Km.334+000
05/26/09 CAR 9.601 200 O 0.372 0.300 0.150 0.010 0.040 0.050 92.20 -
Wangjo Construction 29924
Asphalt Overlay/Conc. Reblocking along Nueva Vizcaya-Ifugao-Mt.
Province Bdry. Road Km. 324+000-Km.334+000
02/25/10 CAR 9.601 200 C 0.414 0.133 0.300 - - - 84.70 89.20% V. Satisfactory
Water Ng Lao Construction 23739 Construction of 3-Storey DOST
Region VII Regional Office Bldg. 11/25/10 DOST 24.758 347 C 0.488 0.20 0.30 - - - 98.80 87.53% Satisfactory
WCS Construction Inc. (Formerly: WCS Construction)
6516 Const./Conc. Of Lamba San Isidro Road 03/28/11 V 28.839 488 O 0.392 0.289 0.150 0.022 0.040 0.050 94.30 -
WCS Construction Inc. (Formerly: WCS Construction)
6516
Libmanan-Cabusao Embankment, Completion of the Upgrading of
existing Embankment (Sta.0+000 - Sta.7+274) and Const. of Manual
Sluice Gates
04/06/11 V 57.460 356 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory
WCS Construction Inc. (Formerly: WCS Construction)
6516 Opening of Rizal Brgy. 26 Victory Village Road, Rizal Street 03/28/11 V 9.596 179 O 0.334 0.300 0.150 0.022 0.035 0.033 87.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page414
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
WCS Construction Inc. (Formerly: WCS Construction)
6516 Conc. of Puro-Taysan Road 03/28/11 V 4.798 199 O 0.378 0.200 0.150 0.030 0.050 0.050 85.80 -
WCS Construction Inc. (Formerly: WCS Construction)
6516 Gainza Flood Control, Const./Impv't. of Flood Control Projects 04/05/11 V 38.497 243 C 0.419 0.133 0.300 - - - 85.20 85.20%
Satisfactory
WCS Construction, Inc. 6516Repair/Rehab. of Basey-Marabut-Pinamitinan Road, Km.928+000-
Km.953+110 @ random03/29/11 VIII 5.980 240 C 0.438 0.133 0.300 - - - 87.10 86.68%
Satisfactory
WCS Construction, Inc. 6516Conc. of San Juanico-Basey-Sohoton Road, Km.916+000 -
Km.918+000 (intermittent section)03/30/11 VIII 15.914 240 C 0.413 0.133 0.300 - - - 84.60 85.02%
Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Ext. of Seawall, Brgy. Buhatan 08/17/10 V 2.879 150 C 0.444 0.200 0.300 - - - 94.40 94.40% V. Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Completion of Padang Bridge, Sto. Domingo-Legazpi City Boundary 08/16/10 V 11.500 147 C 0.398 0.143 0.300 - - - 84.10 85.18%
Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Const. of Basud (Labanon Section) River Control 08/17/10 V 8.158 180 C 0.333 0.200 0.300 - - - 83.30 84.08%
Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Completion of Padang Bridge, Sto Domingo-Legaspi City Boundary 05/28/10 V 11.500 120 O 0.344 0.240 0.150 0.030 0.045 0.050 85.90 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Const. of Basud (Labanon Section) River Control 05/28/10 V 8.158 180 O 0.336 0.240 0.150 0.030 0.040 0.050 84.60 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516New Const./Completion/Continuation
of On-going Bridges, Cawayan Bridge along Maharlika Highway
08/31/10 V 61.593 210 C 0.433 0.133 0.300 - - - 86.60 86.60% Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516Rehab./Impvt. of Catbalogan North Road, Km. 801+000-Km. 802+000
with exception, 06/05/09 VIII 18.696 120 O 0.289 0.240 0.150 0.030 0.045 0.033 78.70 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516Road Conc. of San Juanico-Basey-Sohoton Road, Km. 908+890-Km.
910+14006/04/09 VIII 18.697 202 O 0.171 0.240 0.150 0.030 0.040 0.033 66.40 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516Repair/Rehab. of National Rd. along
Wright-Taft-Borongan Rd., Km.827+252 - Km.828+512
06/10/10 VIII 24.375 240 O 0.347 0.300 0.150 0.030 0.042 0.033 90.20 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516Repair/Rehab. of National Road
along Wright-Taft-Borongan Road, Km.827+252 - Km.828+512
09/03/10 VIII 24.335 185 C 0.453 0.133 0.300 - - - 88.60 89.56% V. Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516Repair/Rehab. of National Road
along San Juanico-Basey-Sohoton Road, Km.913+310 - Km.914+410
09/03/10 VIII 18.699 179 C 0.432 0.133 0.300 - - - 86.50 86.50% Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Land Development of Polangui Resettlement Project 7/21-25/08 SLB 23.994 150 O 0.332 0.243 0.000 0.030 0.065 0.033 70.29 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Construction of Bayandong Bridge 02/22/10 V 12.466 281 C 0.445 0.133 0.300 - - - 87.80 87.32% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page415
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Construction of Flood Control Higabu River 02/24/09 V 3.838 180 C 0.491 0.133 0.300 - - - 92.40 *92.40%
V. Satisfactory
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Construction of Comon Bridge 09/01/09 V 28.813 180 O 0.380 0.240 0.150 0.030 0.047 0.050 89.70 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Const. of Bayandong Bridge 09/01/09 V 12.466 233 O 0.353 0.240 0.150 0.030 0.047 0.050 87.00 -
WCS Construction, Inc. (Formerly: WCS Construction)
6516 Conc. of San Juanico-Basey-Sohotan Road 03/12/09 VIII 18.697 150 O 0.357 0.000 0.110 0.030 0.033 0.050 58.00 -
WCS Construction, Inc. / DSB Construction &
Supply Inc. (JV)JV-08-206 Construction of Calbayog Bridge,
Phase I, Calbayog 05/18/09 V 19.178 180 O 0.358 0.240 0.150 0.023 0.040 0.050 86.10 -
WCS Construction, Inc./DSB Construction &
Supply JV-08-206 Const. of Calbayog Bridge, Phase I 09/01/09 V 19.178 180 C 0.494 0.133 0.300 - - - 92.70 88.74%
Satisfactory
WCS Construction, Inc./Makapa Corporation
(JV)6516 Construction of Breakwater 08/24/09 V 23.763 145 O 0.333 0.300 0.150 0.030 0.051 0.033 89.70 -
WDM Construction & Supplies 18877 Construction of Bench Flume & Fab.
of Teruvian Grills 04/13-18/09 NIA 3.481 90 C 0.368 0.180 0.300 - - - 84.84 *84.84% Satisfactory
WDM Construction & Supplies 18877 Construction of Bench Flume, Sta.
0+477.50-Sta. 0+698.45 04/13-18/09 NIA 3.381 90 C 0.344 0.180 s - - - 52.36 *82.36% Satisfactory
WDM Construction & Supplies 18877 Const. of Multi-Purpose Building,
Brgy. Bulua 06/01/09 X 0.939 105 C 0.405 0.064 0.300 - - - 76.90 82.71% Satisfactory
WDM Construction & Supplies 18877 Conc. of FMR at South Poblacion 03/09/09 X 0.462 120 C 0.460 0.133 0.300 - - - 89.30 83.84%
SatisfactoryWDM Construction &
Supplies 18877 Const. of MPB 03/09/09 X 0.940 105 O 0.347 0.240 0.150 0.030 0.035 0.050 85.20 -
WDM Construction & Supplies 18877 Road Upgrading (Gravel to Concrete)
Medina By Pass Road 09/08/09 X 2.023 120 C 0.369 0.187 0.300 - - - 85.60 *85.60% Satisfactory
Wearr Enterprises & Development Corp. 14123 Cullat-Bongalon-Kidaco FMR 05/28/10 V 2.828 180 O 0.351 0.240 0.150 0.030 0.035 0.033 83.90 -
Wearr Enterprises & Development Corp. 14123 Const./Rehab. of Salog River Control 08/27/10 V 0.933 60 C 0.396 0.200 0.300 - - - 89.60 89.60%
V. SatisfactoryWearr Enterprises & Development Corp. 14123 Const. of Sampaloc Seawall 08/27/10 V 0.854 60 C 0.388 0.200 0.300 - - - 88.80 88.80%
SatisfactoryWearr Enterprises & Development Corp. 14123 Const./Rehab. of Balogo (Sitio
Mahingan) Seawall 08/27/10 V 0.832 60 C 0.365 0.200 0.300 - - - 86.50 86.50% Satisfactory
Wearr Enterprises & Development Corp. 14123 Const. of Cambulaga Seawall 08/27/10 V 0.854 60 C 0.341 0.200 0.300 - - - 84.10 84.10%
Satisfactory
Wearr Enterprises & Development Corp. 14123 Cullat-Bongalon-Kidaco FMR 08/18/10 V 2.828 180 C 0.405 0.200 0.300 - - - 90.50 86.54%
Satisfactory
Wearr Enterprises & Development Corp. 14123
Const. of 17-Units, 1-CL Modified Type School Building (7.00Mx7.00M) various Locations, Catbalogan I CES
06/05/09 VIII 0.441 124 O 0.336 0.240 0.150 0.030 0.035 0.050 84.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page416
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Wearr Enterprises & Development Corp. 14123
Const. of 1-Unit, 1-CL Modified Type Secondary S/B (7.00Mx9.00M) on
various locations, Hinabangan NHS 06/04/09 VIII 0.503 90 C 0.328 0.133 0.300 - - - 76.10 *76.10%
Unsatisfactory
Wearr Enterprises & Development Corp. 14123 Road Concreting of Dolongan-Basey
Road 06/05/09 VIII 9.347 249 C 0.414 0.133 0.300 - - - 84.70 73.42% Poor
Wearr Enterprises & Development Corp. 14123 Construction of Seawall Poblacion 03/02/10 VIII 9.348 362 C 0.390 0.192 0.300 - - - 88.20 87.84%
Satisfactory
Wearr Enterprises & Development Corp. 14123
Const. of 17-Units, 1-CL Modified Type Elementary School Building
(7.00m x 7.00m) on various locations03/02/10 VIII 0.442 124 C 0.377 0.150 0.300 - - - 82.70 83.68%
Satisfactory
Wearr Enterprises & Development Corp. 14123 Concreting of Muladbucad Road 05/22/09 V 0.950 200 C 0.429 0.133 0.300 - - - 86.20 *86.20%
SatisfactoryWearr Enterprises & Development Corp. 14123 Concreting of Milagrosa Road 08/24/09 V 0.474 200 C 0.406 0.200 0.300 - - - 90.60 89.88%
V. SatisfactoryWearr Enterprises &
Development Corporation
14123 Rehab./Impv't. of FTMR Pararao-Camangahan Road 04/06/11 V 19.081 98 C 0.427 0.124 0.300 - - - 85.10 86.00%
Satisfactory
Wee Builders 16375Concreting of Zamboanga City-
Labuan-Limpapa Road (Bangayan Section)
05/25/09 IX 18.887 185 O 0.343 0.240 0.150 0.030 0.056 0.050 86.90 -
Wee Builders 16375 Conc. of Zamboanga City-Labuan-Limpapa Road (Bangayan Section) 09/01/09 IX 18.887 185 O 0.192 0.300 0.150 0.030 0.050 0.033 75.50 -
Wee Eng Construction Inc. 16380
Conc. of Surigao-Davao Coastal Rd. (Cortes-Buenavista Subsection) along Cortes-Tandag-Marihatag
Section
03/02/10 XIII 244.651 510 O 0.362 0.300 0.150 0.030 0.051 0.050 94.30 -
Wee Eng Construction Inc. 16380
Rehab. of San Miguel Bridge & Approaches along Jct. Gamut-San
Miguel Road09/01/10 XIII 48.172 225 C 0.433 0.133 0.300 - - - 86.60 86.60%
Satisfactory
Wee Eng Construction Inc. 16380
Const. of SCDR Marihatag-Hinatuan-Bislig Road (Marihatag-San Agustin-
Lianga Sect)08/30/08 XIII 146.935 480 O 0.351 0.300 0.100 0.030 0.045 0.100 92.60 -
Wee Eng Construction Inc. 16380
Const. of SDCR (Lianga-Barobo Subsection) along Marihatag-
Hinatuan-Bislig Sect11/27/08 XIII 257.508 480 O 0.317 0.300 0.100 0.030 0.065 0.100 91.20 -
Wee Eng Construction Inc. 16380
Conc. of Surigao-Davao Coastal Rd.(Lianga-Borobo Subsection)along
Marihatag-Hinatuan-Bislig Sect.09/09/09 XIII 257.508 480 O 0.385 0.285 0.150 0.030 0.056 0.050 95.60 -
Wee Eng Construction Inc. 16380
Conc. of Surigao-Davao Coastal Rd.(Marihatag-San Agustin-Lianga,
Salvacion-Lianga Sect)09/09/09 XIII 373.799 405 O 0.392 0.300 0.124 0.030 0.065 0.033 94.40 -
Wee Eng Construction Inc. 16380
Imprv't./Conc. of SDCR Marihatag-Hinatuan-Bislig Rd. (Marihatag-San
Agustin-Lianga Sect.)09/09/09 XIII 146.938 480 C 0.447 0.200 0.300 - - - 94.70 93.44%
V.Satisfactory
Wee Eng Construction Inc. 16380
Conc. of Surigao-Davao Coastal Rd. (Cortes-Buenavista Subsection)
along Cortes-Tandag-Marihatag Sect.09/09/09 XIII 244.651 510 O 0.368 0.300 0.056 0.030 0.070 0.050 87.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page417
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Wee Eng Construction Inc. 16380
Concreting of SDCR (Marihatag-San Agustin-Lianga) Salvacion-Lianga
Sect.06/05/09 XIII 373.799 405 O 0.358 0.300 0.150 0.030 0.056 0.050 94.40 -
Wee Eng Construction Inc. 16380
Conc. of SDCR (Lianga-Barobo Subsection) along Marihatag-
Hinatuan-Bislig Sect.06/04/09 XIII 257.508 480 O 0.365 0.300 0.150 0.030 0.056 0.033 93.40 -
Wee Eng Construction Inc. 16380
Concreting of Surigao-Davao Coastal Road (Marihatag-San Agustin-
Lianga), Salvacion-Lianga Section Section
03/13/09 XIII 373.799 405 O 0.330 0.300 0.150 0.030 0.047 0.050 90.70 -
Wee Eng Construction, Inc. 16380
Rehab./Impvt. of SDCR: Marihatag-Hinatuan-Bislig Road (Diatagon-
Lianga Sect.)04/04/11 XIII 77.970 225 O 0.346 0.300 0.150 0.030 0.059 0.050 93.50 -
Wee Eng Construction, Inc. 16380
Rehab./Impvt. (Conc.) along Surigao-Davao Coastal Road, Tandag-Cortes-
Marihatag Sect.04/05/11 XIII 17.506 150 O 0.387 0.250 0.136 0.030 0.059 0.050 91.20 -
Wee Eng Construction, Inc. / Danvic
Construction Joint Venture
JV-10-030Completion/Impvt. of MPB at
University of Southeastern Phils. (USEP), Bo. Obrero
04/14/11 XI 28.342 331 O 0.335 0.300 0.150 0.030 0.058 0.050 92.30 -
Wee Eng Construction, Inc./P.L Sebastian Construction (JV)
JV-06-056 CP-3, Const./Impv't. of Maguindanao-
Sultan Kudarat-Bdry. Lebak-Kalamansig Road
03/11/09 XII 764.659 670 O 0.347 0.300 0.149 0.030 0.070 0.033 92.90 -
Welex Construction 9323 Land Dev't of Taysan Resettlement project 10/6-9/09 NHA 49.802 244 C 0.397 0.300 0.300 - - - 99.70 99.70%
Outstanding
Welex Construction 9323 Land Dev't. of Taysan Resettlement Project 9/16-18/08 SLBMO-
Region V 49.802 244 O 0.382 0.288 0.000 0.030 0.070 0.067 83.70 -
Welex Construction, Incorporated 9323
Impv't./Conc. of Access Rd. to Airport Rd., Southern Luzon
International Airport08/16/10 V 96.000 495 C 0.451 0.200 0.300 - - - 95.10 88.68%
Satisfactory
Werr Corp. (International) / K.D.C.M. Construction
(JV)JV-08-141
Conc. of Bontoc-Tabuk-Tuguegarao Road (Package BLT-16), Tinglayan
Boundary-Lubuagan-Tabuk Section II, Km. 483+500- Km 499+310 Balani-
Tulyao Section
09/04/09 CAR 93.305 310 O 0.347 0.240 0.150 0.030 0.060 0.033 86.00 -
Werr Corp. (International) / K.D.C.M. Construction
(JV)JV-08-143
Conc. of Bontoc-Tabuk-Tuguegarao Road (Package BLT-16), Tinglayan
Boundary-Lubuagan-Tabuk Section II, Km. 483+500- Km 499+310 Balani-
Tulyao Section
02/22/10 CAR 95.783 343 C 0.424 0.167 0.000 - - - 59.10 75.24% Unsatisfactory
Westmin Enterprises & Construction Services 20989 Const./Completion of MPB at JRMSC 06/13/10 IX 2.861 100 C 0.500 0.133 0.300 - - - 93.30 93.30%
V. SatisfactoryWestmin Enterprises & Construction Services 20989 Completion of Multi-Purpose
Building 03/09/10 IX 3.795 150 O 0.327 0.300 0.150 0.030 0.041 0.050 89.80 -
Westmin Enterprises & Construction Services 20989 Completion of MPB 08/30/10 IX 3.795 150 C 0.442 0.133 0.300 - - - 87.50 89.11%
V. SatisfactoryWestmin Enterprises & Construction Services 20989 Construction of Drainage Canal at
Brgy. Dawo 09/15/09 IX 4.770 180 C 0.455 0.200 0.300 - - - 95.50 89.44% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page418
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Westmin Enterprises & Construction Services 20989
Road Upgrading (Gravel to Concrete) Dipolog-Punta-Dansullan-Sergio
Osmeña, Zambo. Del Norte-Sur Bdry. Km.1871+500-Km.1872+000, Dilawa
Section
09/14/09 IX 9.322 120 C 0.456 0.200 0.300 - - - 95.60 89.18% V. Satisfactory
Westmin Enterprises & Construction Services 20989 Construction of Drainage Canal at
Brgy. Dawo 06/09/09 IX 4.770 180 O 0.347 0.240 0.150 0.030 0.037 0.050 85.40 -
Westmin Enterprises & Construction Services 20989 Const. of River Bank Protection
(Phase 1) 03/17/09 IX 4.771 165 C 0.446 0.200 0.300 - - - 94.60 *94.60% V. Satisfactory
Westmin Enterprises & Construction Services 20989 Const./Completion of Multi-Purpose
Building 03/17/09 IX 1.908 120 C 0.422 0.175 0.300 - - - 89.70 *89.70% V. Satisfactory
Westmin Enterprises and Construction Services 20989 Const. and Cementing of Road
No.12, Dawo 04/11/11 IX 9.627 150 C 0.468 0.133 0.300 - - - 90.10 83.80% Satisfactory
Westwalk Corporation 30650 Const. of MPB 11/25/08 NCR 2.101 90 C 0.369 0.200 0.300 - - - 86.90 *86.90% V. Satisfactory
WG & J Construction 26257 Repair/Restoration of Flood Control, Sta.000+200 - Sta.000+318 04/11/11 II 9.650 90 C 0.420 0.133 0.300 - - - 85.30 86.92%
Satisfactory
WG & J Construction 26257 Concreting of Burgos-Gen. Aguinaldo Road 05/28/09 II 2.700 90 C 0.424 0.133 0.300 - - - 85.70 *85.70%
Satisfactory
WG & J Construction 26257 Construction of Multi-Purpose Building, Divisoria E/S 03/05/09 II 0.479 120 C 0.336 0.200 0.300 - - - 83.60 *83.60%
Satisfactory
Wilkinson Construction 21422
Upgrading of Road (Gravel to Paved) along Bacolod City Bdry. Road,
Km.2+555 - Km.10+000 with exceptions
03/28/11 VI 11.286 208 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory
Wilkinson Construction / Trimluv Builders &
Supply (JV)JV-09-139 Rehab./Upgrading of Bacolod North
Road, Manapla Section 03/29/11 VI 37.747 220 C 0.397 0.200 0.300 - - - 89.70 85.71% Satisfactory
William Integrated Contractor 7669
Proposed Rehab./Impv't. of Baliwasan Seaside (Intermittent
Sect.)09/08/10 IX 9.104 162 O 0.335 0.228 0.150 0.023 0.035 0.050 82.10 -
Wilper Construction / Paula Mae Buhong Construction (JV)
JV-08-196Widening / Conc. of Bontoc-Banaue
Road View Point to Awan-Igid Section, Km. 345+828 - Km. 354+550
08/30/09 CAR 106.072 405 O 0.366 0.240 0.150 0.030 0.056 0.033 87.50 -
Wilper Construction / Paula Mae Buhong Construction (JV)
JV-08-179
Conc. of Bontoc-Tuguegarao Road, Bontoc-Tinglayan Bdry. Section I
Betwangan to Ampawile Sect. Km. 406+220-Km. 411+140 (with
exception)
08/30/09 CAR 130.727 420 O 0.384 0.240 0.000 0.030 0.056 0.017 72.70 -
Wilper Construction Inc. 1632 Const. of San Vicente-Gutan-Lubak-Anguib Road 02/19/10 II 96.100 360 O 0.336 0.240 0.150 0.030 0.053 0.033 84.20 -
Wilper Construction Inc. 1632 Conc. of San Carlos-Dumaguete Rd., Dumaguete City and Bais City 09/12/09 VII 47.369 373 O 0.366 0.240 0.150 0.030 0.037 0.050 87.30 -
Wilper Construction Inc. 1632 Conc. of San Carlos-Dumaguete Road Dumaguete City and Bais City 03/02/10 VII 47.369 370 O 0.204 0.292 0.000 0.030 0.045 0.050 62.10 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page419
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Wilper Construction Inc. 1632 Concreting of Guiuan Airport (Access Road) 06/07/09 VIII 12.865 120 O 0.296 0.300 0.150 0.030 0.045 0.033 85.40 -
Wilper Construction Inc. 1632 M'lang Airport Development Project 06/18/09 DOTC 21.143 180 C 0.408 0.200 0.300 - - - 90.80 90.80% V. Satisfactory
Wilper Construction Inc. 1632 M'lang Airport Development Project 03/13/09 DOTC 28.833 210 C 0.400 0.200 0.300 - - - 90.00 90.90% V. Satisfactory
Wilper Construction Inc. 1632Concreting of San Carlos-
Dumaguete Road, Dumaguete City & Bais City
03/12/09 VII 44.001 310 O 0.391 0.221 0.150 0.030 0.051 0.033 87.60 -
Wilper Construction Inc. 1632Concreting of San Carlos-
Dumaguete Road, Dumaguete City and Bais City
05/26/09 VII 44.001 310 O 0.380 0.243 0.148 0.030 0.056 0.033 89.00 -
Wilper Construction Inc. 1632 Concreting of Guiuan Airport (Access Road) 09/17/09 VIII 12.865 120 C 0.468 0.144 0.300 - - - 91.20 87.72%
Satisfactory
Wilper Construction Inc. 1632 Const. of TESDA Training Center Bldg. (Phase I) 05/29/09 X 4.741 120 O 0.326 0.265 0.150 0.030 0.027 0.033 83.10 -
Wilper Construction Inc. 1632Asphalt Overlay along Sayre
Highway Alae-Kisolon Road (Dalirig Section)
03/06/09 X 4.815 82 C 0.428 0.133 0.300 - - - 86.10 *86.10% Satisfactory
Wilper Construction Inc. 1632Asphalt Overlay along Sayre
Highway Alae-Kisolon Road (Maluko Section)
03/06/09 X 4.815 77 C 0.442 0.133 0.000 - - - 57.50 *57.50% Poor
Wilper Construction Inc. 1632 Const. of TESDA Training Center Building (Phase I) 09/04/09 X 4.741 120 C 0.468 0.052 0.300 - - - 82.00 82.77%
Satisfactory
Wilper Construction Inc. 1632 Impvt. (Concreting) of Access Road leading Dawis Port 05/29/09 XI 43.322 220 O 0.368 0.300 0.150 0.030 0.037 0.033 91.80 -
Wilper Construction Inc. 1632 Improvement (Concreting) of Access Road Leading to Dawis Port 09/05/09 XI 43.322 220 O 0.384 0.240 0.107 0.030 0.059 0.033 85.30 -
Wilper Construction Inc. / Wangjo Construction
(JV)JV-08-195
Widening / Conc. of Bontoc-Banaue Road Awan-Igid to Mt.polis Section,
Km.354+550 - Km.362+200 (IS)08/30/09 CAR 106.560 405 O 0.367 0.240 0.139 0.030 0.056 0.033 86.50 -
Wilper Construction Inc. / Z F Construction (JV) JV-09-111 Const. of Classroom, Aurora
National Science HS 04/09/11 III 15.192 180 C 0.481 0.135 0.300 - - - 91.60 88.34% Satisfactory
Wilper Construction Incorporated 1632 Talakag Irrigation Project 09/26-10/01/11 NIA 14.432 451 O 0.327 0.300 0.000 0.030 0.051 0.050 75.82 -
Wilper Construction, Inc. / So Construction (JV) JV-09-112 Rehab. of MPB Brgy. Suklayin 06/05/10 III 18.092 240 C 0.467 0.133 0.300 - - - 90.00 90.00%
V. Satisfactory
Wilper Construction, Inc./Wangjo Construction
(JV)JV-08-195
Widening/Conc. of Bontoc-Banaue Road, Awan-Igid to Mt. Polis Section,
Km.354+550 - Km.362+200 (IS)06/03/10 CAR 106.559 405 C 0.408 0.200 0.300 - - - 90.80 88.22%
Satisfactory
Wilper Construction/Paula Mae
Buhong Construction (JV)
JV-08-196Widening/Conc. of Bontoc-Banaue
Road, View Point to Awan-Igid Sect., Km.345+828 - Km.354+550
06/03/10 CAR 106.072 435 C 0.385 0.200 0.300 - - - 88.50 87.90% Satisfactory
Winces Construction & Supply 32341 Const. of H.E. Building, Santiago
NHS 06/16/10 VI 0.985 60 C 0.473 0.171 0.300 - - - 94.40 94.40% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page420
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Wismon Construction 33087 Conc. Of Jct. Nat'l Bitnong-Belance-N.V. Bdry. Rd. Teggep Sect. 04/15/11 II 18.045 180 C 0.416 0.133 0.300 - - - 84.90 86.28%
Satisfactory
Wismon Construction 33687
Rehab./Reconst./Upgrading of Damaged Paved National Rd. along Daang Maharlika San Luis-Isabela
Bdry. Sect. w/ exception
06/10/10 II 19.285 90 O 0.369 0.244 0.150 0.030 0.047 0.033 87.30 -
Wismon Construction 33087
Rehab./Reconst./Upgrading of Damaged Paved National Road along Daang Maharlika, (San Luis-Isabela
Bdry. Section)
09/02/10 II 19.285 120 C 0.438 0.200 0.300 - - - 93.80 89.90% V. Satisfactory
Wismon Construction 33087 Rehab./Reconst. of Jaen-San Antonio Rd. 08/19/10 III 14.382 120 C 0.33 0.200 0.300 - - - 83.00 83.00%
Satisfactory
Wismon Construction 33087Rehab. of Mambangnan-Poblacion
San Leonardo Flood Control & Drainage
09/04/09 III 7.165 150 C 0.436 0.133 0.300 - - - 86.90 84.08% Satisfactory
Wismon Construction / N.S. Gambito
Construction Services (JV)
Rehab./Reconst./Upgrading Daang Maharlika (Bugnay-San Luis Section) 04/12/11 II 19.280 110 C 0.369 0.133 0.300 - - - 80.20 84.40%
Satisfactory
Wizard Trading & Const. / Kyro Builders & Supply
(JV) JV-07-139 Rehab./Reconstruction (Asphalt
Overlay), San Jose-Lupao Road 03/03/09 III 37.449 150 C 0.405 0.200 0.300 - - - 90.50 *90.50%V. Satisfactory
Wizard Trading & Construction 21921 Upgrading of Muñoz-Lupao Road 06/07/10 III 4.899 30 O 0.338 0.240 0.150 0.030 0.054 0.050 86.20 -
Wizard Trading & Construction 21921
Restoration of Scoured Bridge Approach (Ganduz Bridge),
Pinagpanaan-Rizal-Pantabangan Rd. Brgy. Ganduz
06/08/10 III 4.681 30 C 0.422 0.133 0.300 - - - 85.50 85.50% Satisfactory
Wizard Trading & Construction 21921 Upgrading of Muños-Lupao Rd. 08/24/10 III 4.899 30 C 0.365 0.200 0.300 - - - 86.50 86.32%
SatisfactoryWizard Trading &
Construction 21921 Concreting of Brgy. Mangandingay Road 05/26/09 III 1.882 25 C 0.321 0.200 0.300 - - - 82.10 *82.10%
SatisfactoryWizard Trading and
Construction 21921 Const. of Bridge, Brgy. Palusapis 04/08/11 III 1.135 45 C 0.412 0.000 0.300 - - - 71.20 *71.20% Poor
WMLC Trading & Construction Supply 24535
Rehab./Reconst./Upgrading of Damaged Roads along Rosario-San
Juan Rd.06/07/10 IVA 4.820 90 O 0.400 0.225 0.150 0.023 0.040 0.050 88.80 -
WMLC Trading & Construction Supply 24535
Rehab./Reconst./Upgrading of Damaged Roads along Rosario-San
Juan Rd.08/19/10 IVA 4.819 90 C 0.283 0.200 0.300 - - - 78.30 84.60%
Satisfactory
WMLC Trading & Construction Supply 24535 Road Upgrading of Manila-Batangas
Road 09/09/09 IVA 14.472 75 C 0.322 0.200 0.300 - - - 82.20 82.24% Satisfactory
Woodland Construction & Supply 33522 Completion/Rehab. of MPB at Brgy.
Lipata 06/16/10 VI 0.952 60 C 0.424 0.134 0.300 - - - 85.80 85.80% Satisfactory
Worldwide Builders 31480 Improvement of Multi-Purpose Building, Brgy. Buhisan 06/08/09 VII 0.947 50 C 0.391 0.149 0.300 - - - 84.00 85.96%
Satisfactory
Worldwide Builders 31408 Improvement of Multi-Purpose Building 03/03/09 VII 0.948 50 O 0.342 0.277 0.150 0.030 0.019 0.050 86.80 -
Worldwide Builders 31408Const. of Flood Control and
Drainage System, La Guerta, Brgy. Lahug
09/15/09 VII 0.963 50 C 0.390 0.200 0.300 - - - 89.00 *89.00% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page421
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
WTG / MCDC (JV) JV-09-252Rehab./Impv't. of Dipolog-Punta-
Dansullan-Sergio Osmeña Rd. Poblacion Alto-San Juan Sect.
08/29/10 IX 159.929 750 O 0.347 0.235 0.150 0.023 0.033 0.033 82.10 -
WTG / MCDC Joint Venture JV-08-252
Rehab./Impvt. of Dipolog-Punta-Dansullan-Sergio Osmeña Rd. (Pob.
Alto-San Juan Sect.) 06/12/10 IX 159.929 750 O 0.329 0.240 0.150 0.030 0.040 0.050 83.90 -
WTG Construction And Development 7494 Talakag Irrigation Project 09/28-10/01/11 NIA 50.423 360 C 0.432 0.160 0.300 - - - 89.26 *89.26%
V. Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494Reconst. of Third Concrete Bridge along Marikina-Infanta Rd. (Marcos
Highway) Km.35+861 Brgy. San Jose06/08/10 IVA 56.621 180 O 0.362 0.300 0.150 0.030 0.047 0.050 93.90 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Rehab./Recons./Upgrading of Dumaguete North Rd. (Jct.
Kabankalan, Negros Occ. Boundary) Sta.39+000-Sta.42+000;Sta.47+180-Sta47+280;Canlargo-Talongon-Bais
City Rd. Sec.)
09/16/09 VII 48.070 270 O 0.347 0.240 0.150 0.030 0.037 0.033 83.70 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494Construction of Gov. Cuenco Flyover
along Gov. Cuenco Avenue, Junction A.S., Fortuna St.
06/10/09 VII 95.036 559 C 0.435 0.133 0.300 - - - 86.80 84.61% Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494 Rehab./Reconst. of Toledo-Tabuelan-San Remegio Road, Tuburan Section 05/29/09 VII 23.119 120 O 0.268 0.240 0.150 0.030 0.050 0.033 77.10 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Impvt./Rehab./Reconst. of Toledo-Tabuelan-San Remegio Road, Km.
48+806-Km. 55+361, Brgy. Dumhog-Sto. Niño
05/26/09 VII 8.428 90 O 0.217 0.225 0.150 0.022 0.050 0.050 71.40 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494Rehab./Reconst. of Toledo-Tabuelan-San Remegio Road, Km. 47+000-Km.
103+66705/27/09 VII 76.969 365 O 0.173 0.222 0.150 0.030 0.045 0.033 65.30 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494Rehab./Reconst. of Damaged Paved Nat. Rds.,Tagbilaran East Rd.(TER), (Loay-Guindulman) Intermittent Sec.
09/05/09 VII 9.363 200 C 0.482 0.133 0.300 - - - 91.50 88.38% Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Conc. of Jct.TER, Jagna-Sierra Bullones Rd. Km.62.5220-
Km.63.365;Km.72.812-Km.75.031;Km.75.250-Km.76.526, Canijulao-Boctol-Mayana-Jagna
09/04/09 VII 87.044 270 O 0.368 0.240 0.150 0.030 0.037 0.033 85.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page422
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Conc. of Jct. TER, Jagna-Sierra Bullones Road Km. 62.522-Km.
63.365; Km.72+812-Km. 75.031 & Km. 72.25-Km. 76.526, Canjulao-Boctol-
Mayana Section
02/23/10 VII 87.044 270 O 0.333 0.238 0.150 0.030 0.045 0.033 82.90 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Rehab./Reconst./Upgrading of Toledo-Pinamungajan-Aloguinsan-
Mantalongon Rd. Km.50+954 - Km.74+200 (w/ exception) Brgy.
Poblacion
06/12/10 VII 19.086 210 C 0.398 0.133 0.300 - - - 83.10 83.10% Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Rehab./Reconst./Upgrading (Conc.) of Toledo-Tabuelan-San Remegio Rd., Km.68+720 - Km.96+340 w/
exception
06/12/10 VII 40.903 210 O 0.289 0.240 0.150 0.030 0.050 0.050 80.90 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494Impvt./Conc. of Jct. Data-An, Sierra
Bullones-Carmen-Sagbayan-Bacane-Tubigon Road
08/26/10 VII 17.758 208 C 0.428 0.133 0.300 - - - 86.10 86.10% Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Conc. of Jct. T.E.R. Jagna-Sierra Bullones Road, Sta. 62.522-Km.
63.365; Km. 72.812-Km. 75.031 and Km. 75.250-Km. 76.526, Canjulao-
Boctol-Mayana Section
08/26/10 VII 87.098 360 C 0.369 0.200 0.300 - - - 86.90 85.90% Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Rehab./Recons./Upgrading of Dumaguete North Rd. (Jct.
Kabankalan, Negros Occ. Boundary) Sta.39+000-Sta.42+000;Sta.47+180-Sta47+280;Canlargo-Talongon-Bais
City Rd. Sec.)
03/02/10 VII 48.250 280 C 0.447 0.133 0.300 - - - 88.00 85.42% Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Rehab./Reconst. of Damaged Paved National Rd. at LIPATA Surigao Del Norte Davao City Highway through
Daang Maharlika Rd. (Agusan to Davao Rd.) Panacan Sect.
06/16/10 XI 19.289 115 O 0.393 0.240 0.150 0.030 0.042 0.050 90.50 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Rehab./Reconst. Of Damaged Paved National Rd. at Lipata (Surigao del Norte-Davao City Highway through Maharlika Rd., (Agusan to Davao
Rd.) Panacan Sect.
09/08/10 XI 19.290 152 C 0.469 0.133 0.300 - - - 90.20 90.38% V. Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494 Dapa-Cancohoy Rd., Cancohoy-Del Carmen 02/26/10 XIII 19.249 240 C 0.338 0.200 0.300 - - - 83.80 89.50%
V.Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page423
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494 Jct. Cancohoy-Pilar Rd., San Isidro Rd. Section 02/26/10 XIII 19.269 240 C 0.473 0.200 0.000 - - - 67.30 79.24%
Unsatisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494Reconst. of Third Concrete Bridge
along Marikina-Infanta Road (Marcos Highway), Km.35+861
08/19/10 IVA 56.261 180 C 0.367 0.162 0.300 - - - 82.90 89.50% V. Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494 Conc. of Toledo-Pinagmungajan-Aloguinsan-Mantalongon Road 03/11/09 VII 45.741 420 C 0.438 0.200 0.300 - - - 93.80 82.38%
Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494 Const. of Gov. Cuenco Flyover, Gov. Cuenco Ave. , Jct. A.S. Fortuna St. 03/02/09 VII 95.036 559 O 0.301 0.300 0.150 0.030 0.054 0.050 88.50 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494 Construction of Lambusan Bridge & Approaches 09/02/09 VII 24.989 469 C 0.497 0.133 0.300 - - - 93.00 *93.00%
V. Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Impvt./Rehab./Reconst. of Toledo-Tabuelan-San Remigio Road (Km.
48+806-Km. 55+361) Brgy. Dumhog-Sto. Nino
09/04/09 VII 8.427 90 C 0.464 0.200 0.300 - - - 96.40 81.40% Unsatisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494 Rehab./Reconst.n of Toledo-San Remigio Road, Tuburan Section 09/02/09 VII 23.119 120 C 0.369 0.200 0.300 - - - 86.90 81.20%
Unsatisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494Rehab./Reconst. of Toledo-Tabuelan-San Remegio Road (Km. 47.000-Km
103.667)09/04/09 VII 76.969 365 C 0.402 0.200 0.300 - - - 90.20 75.26%
Unsatisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Rehab./Reconst. of Damaged Paved National Roads Tagbilaran East Road (TER) (Loay-Guildulman)
Intermittent Secton
06/05/09 VII 9.363 200 O 0.299 0.300 0.150 0.030 0.051 0.033 86.30 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Rehab./Reconst./Upgrading (Concreting) of Toledo-Tabuelan-San
Remegio Road, Km. 68+720-Km. 96+340 w/ exceptions
08/26/10 VII 40.903 210 O 0.311 0.287 0.150 0.030 0.040 0.050 86.80 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page424
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494Const. of Pedestrian Overpass along Davao Diversion Road (Laverna Hills
Section)06/11/09 XI 4.710 120 O 0.350 0.300 0.150 0.030 0.056 0.050 93.60 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494
Rehab./Reconst./Upgrading of Damaged Paved National Roads @ Daang Maharlika (MN), Panacan-
Sasa Sec.
09/16/09 XI 19.284 210 C 0.475 0.133 0.300 - - - 90.80 *90.80% V. Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494Const. of Pedestrian Bridge along
Davao Diversion Road (Laverna Hills Section)
09/16/09 XI 4.711 166 C 0.490 0.166 0.300 - - - 95.60 94.40% V. Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494 Const. of Gov. Cuenco Flyover, Gov. Cuenco Ave. , Jct. A.S. Fortuna St. 09/03/08 VII 86.914 300 O 0.281 0.220 0.100 0.030 0.047 0.100 77.80 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494 Dapa-Cancohoy Rd., Cancohoy-Del Carmen 09/03/09 XIII 19.249 240 O 0.349 0.289 0.150 0.030 0.065 0.050 93.30 -
WTG Construction and Development
Corporation (Formerly: W.T.G Construction)
7494 Jct. Canchohoy-Pilar Rd., San Isidro Rd. Sect. 09/03/09 XIII 19.269 240 O 0.358 0.291 0.095 0.030 0.065 0.033 87.20 -
WTG Construction and Development
Corporation (Formerly: W.T.G. Construction)
7494Const. of Flyover at Jct. N. Bacalso
Ave.-C. Padilla St., Mambaling South Rd.
03/28/11 VII 110.975 330 C 0.438 0.200 0.300 - - - 93.80 94.28% V. Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G. Construction)
7494
Rehab./Reconst./Upgrading of Toledo-Pinamungajan-Aloguinsan-
Mantalongon Rd. Km.50+954 - Km.74+200 w/ exceptions
04/11/11 VII 47.714 210 C 0.366 0.200 0.300 - - - 86.60 87.68% Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G. Construction)
7494Rehab./Reconst./Upgrading of
Santander-Barili-Toledo Rd. (Alegria Section)
04/08/11 VII 18.776 45 C 0.340 0.200 0.300 - - - 84.00 *84.00% Satisfactory
WTG Construction and Development
Corporation (Formerly: W.T.G. Construction)
7494
Rehab./Reconst./Upgrading (Conc.) of Toledo-Tabuelan-San Remegio Rd., Km.68+720 - Km.96+340 w/
exceptions
04/12/11 VII 40.925 235 C 0.409 0.133 0.300 - - - 84.20 83.99% Satisfactory
WTG/MCDC (JV) JV-09-252Rehab./Impvt of Dipolog-Punta-
Dansullan-Sergio Osmeña Rd. Pob. Alto-San Juan Sect.
04/08/11 IX 161.816 780 O 0.364 0.240 0.150 0.022 0.045 0.033 85.40 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page425
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
WTG/MCDC (JV) JV-08-252Rehab./Impv't. Dipolog-Punta-
Dansullan-Sergio Osmena Road (Poblacion Alto-San Juan Section)
03/08/10 IX 159.929 750 O 0.322 0.281 0.150 0.030 0.047 0.033 86.30 -
WYNN Construction 19358 Impvt. of Drainage System 06/04/10 VII 2.177 138 C 0.375 0.154 0.300 - - - 82.90 -
WYNN Construction 19358 Impvt./Conc. of del Carmen Road, Purok 4 Poblacion 08/24/10 VII 0.671 60 C 0.447 0.145 0.300 - - - 89.20 89.20%
V. Satisfactory
WYNN Construction 19358 Rehab./Impvt. of FMR, dela Paz 08/24/10 VII 0.813 50 C 0.373 0.200 0.300 - - - 87.30 87.30% Satisfactory
WYNN Construction 19358 Bien Unido Port Development Project 03/27/09 DOTC 478.918 15 C 0.458 0.200 0.300 - - - 95.80 95.80%
V. Satisfactory
WYNN Construction 19358 Bien Unido Port Development Project 06/19/09 DOTC 2.884 90 C 0.361 0.200 0.300 - - - 86.10 86.10%
Satisfactory
WYNN Construction 19358 Tagbilaran Airport Development Project 03/27/09 DOTC 2.404 60 C 0.458 0.200 0.300 - - - 95.80 95.80%
V. Satisfactory
Wynn Construction 19358 Repair of RoRo Ramp 1 & 2, Pavement And Scoured Bulkhead 05/23-27/11 PPA 7.883 221 O 0.400 0.225 0.144 0.030 0.065 0.050 91.33 -
X.Y.Z Construction & Supplies 31816 Conc. of Road I n Brgy. Lumbang na
Matanda 02/24/10 IVA 0.482 45 C 0.399 0.200 0.300 - - - 89.90 89.90% V. Satisfactory
X.Y.Z Construction & Supplies 31816
Restoration of Collapsed Slope Protection along Palico-Balayan, Batangas Rd., Matingain Bridge,
Bukal
06/02/10 IVA 4.822 90 C 0.435 0.133 0.300 - - - 86.80 86.80% Satisfactory
X.Y.Z Construction & Supplies 31816 Conc. of Roads, Brgy. Bisaya 03/04/09 IV-A 0.954 60 C 0.435 0.133 0.300 - - - 86.80 *86.80%
Satisfactory
Y S Construction 11928 Const. of MPB (Balilihan Public Market) 02/24/10 VII 9.180 210 C 0.472 0.118 0.300 - - - 89.00 91.17%
V. Satisfactory
Yakal Construction 9685 Tacloban Airport Development Project 12/12/09 DOTC 72.202 310 O 0.389 0.300 0.000 0.030 0.056 0.050 82.50 -
Yakal Construction 9685Rehab. of Wright-Taft-Borongan
Road, including Layug Bridge, Km. 860+570-Km. 938+500
06/07/09 VIII 161.048 403 O 0.324 0.240 0.150 0.030 0.050 0.050 84.40 -
Yakal Construction 9685 Upgrading/Concreting of Taft-Borongan Road with exceptions 06/07/09 VIII 166.287 365 O 0.247 0.300 0.150 0.030 0.050 0.050 82.70 -
Yakal Construction 9685 Upgrading/Concreting of Borongan-MacArthur Road with exceptions 06/07/09 VIII 161.533 355 O 0.321 0.240 0.150 0.030 0.050 0.033 82.40 -
Yakal Construction 9685Asphalt Concrete Overlay @ Picas
San Jose DZR Airport Road Km.910+1575 - Km.913+722
09/09/10 VIII 48.226 240 O 0.312 0.300 0.150 0.030 0.025 0.050 86.70 -
Yakal Construction 9685Asphalt Concrete Overlay @ Apitong
Paterno Road Km.908+856 - Km.909+448
09/08/10 VIII 27.010 185 C 0.406 0.133 0.300 - - - 83.90 83.90% Satisfactory
Yakal Construction 9685 Masbate Airport Dev't Project (Extension of Runway) 4/13/2011 DOTC 19.232 150 C 0.416 0.200 0.300 - - - 91.60 91.60%
V. Satisfactory
Yakal Construction 9685 Conc. of Aroroy-Baleno-Lagta-Masbate Jct. Buenavista Road 02/20/10 V 95.080 533 C 0.438 0.133 0.300 - - - 87.10 87.10%
Satisfactory
Yakal Construction 9685Rehabilitation of Tagbilaran North Road, Clarin-Talibon Section, Km.
58.000-112.500 (w/ exception)03/05/09 VII 14.077 240 O 0.360 0.229 0.150 0.030 0.033 0.050 85.20 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page426
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Yakal Construction 9685 Rehab. of Borongan-Guiuan Road (Borongan-Maydolong Section) 09/17/09 VIII 43.348 241 C 0.432 0.200 0.300 - - - 93.20 *93.20%
V. Satisfactory
Yakal Construction 9685 Upgrading/Conc. of Taft-Borongan Road with exception 09/17/09 VIII 166.281 365 O 0.371 0.240 0.150 0.030 0.055 0.050 89.60 -
Yakal Construction 9685Asphalt Overlay along Tanauan-Dagami Road, Km. 922+643-Km.
929+896 09/08/10 VIII 48.194 210 O 0.360 0.200 0.150 0.030 0.047 0.050 83.70 -
Yakal Construction 9685 Ormoc Airport Development Project 09/07/11 DOTC 8.655 150 C 0.393 0.200 0.300 - - - 89.30 89.30% V. Satisfactory
Yap Mabuhay Enterprises, Incorporated 15540 Const. of Multi-Purpose Building @
Poblacion 09/12/09 XII 0.950 84 O 0.363 0.300 0.150 0.030 0.023 0.033 89.90 -
Yap Mabuhay Enterprises, Incorporated 15540 Construction of Multi-Purpose
Building @ Poblacion 09/12/09 XII 0.952 126 O 0.364 0.262 0.150 0.030 0.035 0.033 87.40 -
Yap Mabuhay Enterprises, Incorporated 15540 Construction of 2-CL School
Building @ San Vicente NHS 09/11/09 XII 1.297 105 O 0.329 0.280 0.150 0.030 0.041 0.033 86.30 -
YL Trading General Merchandising 22543 Conc. of San Remegio-Bugo Road 06/10/10 VI 9.479 100 O 0.339 0.300 0.150 0.015 0.033 0.033 87.00 -
YL Trading General Merchandising 22543 Concreting of Hamtic-Bia-an-Egana-
Sibalom Road (Catangan Section) 06/04/09 VI 19.259 300 C 0.438 0.200 0.300 - - - 93.80 87.38% Satisfactory
YL Trading General Merchandising 22543 Concreting of Road, Funda Dalipe-
San Pedro (San Jose) 06/04/09 VI 9.502 180 O 0.371 0.240 0.150 0.030 0.040 0.033 86.40 -
YL Trading General Merchandising 22543 Conc. of Hamtic-Bia-an-Egana-
Sibalom Road, Catungan Section 03/13/09 VI 19.259 300 O 0.280 0.294 0.150 0.024 0.050 0.033 83.10 -
YL Trading General Merchandising 22543 Conc. of Road, Funda Dalipe-San
Pedro (San Jose) 09/02/09 VI 9.502 180 C 0.398 0.133 0.300 - - - 83.10 85.08% Satisfactory
YL Trading General Merchandising 22543 Conc. of San Remegio-Bugo Road 09/02/10 VI 9.479 100 C 0.421 0.133 0.300 - - - 85.40 86.36%
Satisfactory
YL Trading/Settlers Builders (JV) JV-08-268 Conc. of Hamtic-Bia-an-Egaña-
Sibalom Road 09/03/09 VI 18.775 240 C 0.428 0.075 0.300 - - - 80.30 *80.30% Unsatisfactory
YL Trading/Settlers Builders(JV) JV-08-267 Impvt. (Conc.) of Access Road to
Antique Airport, Funda-Dalipe 09/03/09 VI 8.152 145 C 0.440 0.073 0.300 - - - 81.30 *81.30% Unsatisfactory
Young Builders Corporation 15807
Rehab. of Bulwang Curve Section-Lumbangan Section, Bais Mabinay
Road09/01/10 VII 57.809 240 O 0.360 0.300 0.150 0.030 0.047 0.033 92.00 -
Yoyen Enterprises 15541 Const. of Box culvert Brgy. Bonoy 02/25/10 VIII 1.247 100 C 0.463 0.139 0.300 - - - 90.20 90.20% V. Satisfactory
Yoyen Enterprises 15541 Road Upgrading of Libungao-Matag-ob-Palompon Rd. 06/04/10 VIII 18.227 225 O 0.372 0.240 0.150 0.030 0.042 0.050 88.40 -
Yoyen Enterprises 15541 Construction of 2-Classroom School Building Liloan National High School 03/10/09 VIII 0.808 263 C 0.351 0.200 0.300 - - - 85.10 *85.10%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page427
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Yoyen Enterprises 15541Conc. of Culaba-Caibiran National
Circumferential Road (Culaba-Looc Section)
09/03/09 VIII 3.742 160 C 0.451 0.200 0.300 - - - 95.10 89.22% V. Satisfactory
Yoyen Enterprises 15541Asphalt Overlay along Ormoc-
Baybay Southern Leyte Bdry. Road, Km. 1012+600-Km. 1014+196 w/
09/01/10 VIII 9.592 127 C 0.452 0.133 0.300 - - - 88.50 88.50% Satisfactory
Yoyen Enterprises 15541 Impvt. (Conc.) of Ormoc City Airport 09/01/10 VIII 18.244 225 C 0.447 0.133 0.300 - - - 88.00 88.00% Satisfactory
Yoyen Enterprises 15541 Road Upgrading of Libungao-Matag-ob-Palompon Road 08/31/10 VIII 18.227 225 C 0.435 0.133 0.300 - - - 86.80 87.76%
Satisfactory
Yoyen Enterprises 15541 Conc. of Culaba-Caibiran National Circ. Road, Culaba-Looc Section 11/18/08 VIII 3.742 160 O 0.320 0.281 0.100 0.015 0.037 0.100 85.30 -
Yoyen Enterprises 15541 Conc. of Dayhagan-Salvacion-Coob-Libertad Road 08/26/08 VIII 12.537 150 O 0.317 0.220 0.100 0.020 0.038 0.100 79.50 -
Yoyen Enterprises/Uy Construction & Dev't.
(JV)JV-08-263 Upgrading/Conc. of MacArthur-
Guiuan Road exception 09/17/09 VIII 90.226 300 O 0.367 0.240 0.150 0.030 0.050 0.050 88.70 -
YS Construction 11982 Widening/Concrete paving of Tubigon Port Access Rd. 09/01/09 VII 4.639 70 C 0.406 0.200 0.300 - - - 90.60 93.12%
V. Satisfactory
YS Construction 11928Const./Imprvt. Of Vallehermoso-Canlaon City-La Castellana Rd.
(VLCR)09/14/09 VII 20.753 260 O 0.386 0.240 0.150 0.030 0.037 0.050 89.30 -
YS Construction 11928 Imprv't./Conc. of Magtangtang-Carbon Rd. 09/09/09 VII 2.842 170 C 0.460 0.075 0.300 - - - 83.50 *83.50%
Satisfactory
YS Construction 11928Const./Imprvt. Of Vallehermoso-Canlaon City-La Castellana Rd.
(VLCR)03/05/10 VII 21.058 280 C 0.469 0.096 0.300 - - - 86.50 88.18%
Satisfactory
YS Construction 11928 Const. of MPB West Pob., Alburquerque 06/09/10 VII 0.148 80 C 0.388 0.200 0.300 - - - 88.80 88.80%
Satisfactory
YS Construction 11928 Widening/Concrete Paving of Tubigon Port Access Road 06/09/09 VII 4.639 91 O 0.375 0.296 0.150 0.030 0.047 0.050 94.80 -
YSL Builder 19516 Proposed Const. of Public Market (Phase II) 04/01/11 IX 4.813 205 C 0.353 0.200 0.300 - - - 85.30 *85.30%
Satisfactory
YSL Builder 19516Rehab./Impvt. of DPWH Zamboanga
del Norte 3rd DEO Office Bldg., Segabe, Piñan
04/11/11 IX 4.751 150 C 0.427 0.133 0.300 - - - 86.00 84.53% Satisfactory
YSL Builder 19516Road Upgrading (Gravel to Concrete)
Sindangan-Siayan-Dumingag-Mahayag Road (Buyos Section)
03/11/10 IX 16.364 275 C 0.407 0.200 0.300 - - - 90.70 88.18% V.Satisfactory
YSL Builder 19516 Conc. of Dipolog-Punta-Dansullan-Sergio Osmeña Rd. Cogon Sect. 06/15/10 IX 13.527 255 C 0.386 0.200 0.300 - - - 88.60 88.87%
Satisfactory
YSL Builder 19516Concreting of Dipolog-Punta-
Dansullan-Segio Osmeña Road, Cogon Section
06/10/09 IX 12.322 210 O 0.375 0.240 0.150 0.030 0.042 0.050 88.70 -
YSL Builder 19516Road Upgrading (Gravel to Concrete)
Sindangan-Siayan-Dumingag-Mahayag Road, Buyos Secion
06/11/09 IX 16.151 270 O 0.353 0.240 0.150 0.030 0.042 0.050 86.50 -
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page428
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
YSL Builder 19516Road Conc. along Dipolog-Punta-Dansullan-Sergio Osmeña Road,
Sangkol Section06/10/09 IX 12.319 210 O 0.352 0.240 0.150 0.030 0.037 0.050 85.90 -
YSL Builder 19516 Conc. of Dipolog-Dansullan-Sergio Osmeña Road, Cogon Section 09/17/09 IX 12.322 210 O 0.336 0.300 0.150 0.030 0.045 0.033 89.40 -
YSL Builder 19516 Road Conc. along Dipolog-Dansullan-Sergio Osmeña Road, Sangkol Sect. 09/17/09 IX 12.319 210 O 0.334 0.300 0.150 0.030 0.045 0.033 89.20 -
Yu Construction 10470 Const. of MPB (Municipal Building), Poblacion 03/31/11 VII 16.398 300 O 0.389 0.240 0.150 0.030 0.060 0.050 91.90 -
Yu Construction 10470
Widening/Concrete Paving of Jct. (TER) Dauis-Panglao Rd., Sta.12+710
- Sta.13+608.72 and Sta.16+896 - Sta.17+480
03/29/11 VII 18.710 210 C 0.345 0.200 0.300 - - - 84.50 84.32% Satisfactory
Yu Construction 10470 Rehab of Jct. (TER) Dauis-Panglao Rd., Sta.9+560.29 - Sta.10+560 03/29/11 VII 19.222 210 C 0.359 0.200 0.300 - - - 85.90 83.74%
Satisfactory
Yu Construction 10470 Const. of MPB (Trinidad Municipal Building), Poblacion 08/27/10 VII 0.786 60 C 0.417 0.133 0.300 - - - 85.00 85.00%
Satisfactory
Yu Construction 10470 Const. of MPB (Municipal Building), Poblacion 08/27/10 VII 9.530 240 C 0.398 0.133 0.300 - - - 83.10 83.10%
Satisfactory
Yu Construction 10470 Conc. of Tagbilaran-Corella-Sikatuna-Loboc Rd. Sta.19+800-Sta.21+520 09/03/09 VII 27.547 250 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Yu Construction 10470 Talibon Small Reservoir Irrigation Project
9/29/08 10/308 SRIP 14.630 373 O 0.322 0.177 0.100 0.030 0.047 0.200 87.60 -
Yu Construction 10470Concreting of Tagbilaran-Corella-
Sikatuna-Loboc Road, Sta 17+670 to Sta 19+800
03/04/09 VII 28.246 199 C 0.397 0.200 0.300 - - - 89.70 *89.70%V. Satisfactory
Yu Construction 10470Rehab./Const. of Damaged Paved National Road along TER (Loay-
Jagna)03/08/09 VII 15.052 320 C 0.437 0.133 0.300 - - - 87.00 87.06%
Satisfactory
Yu Construction / Arn Builders (JV) JV-08-049
Widening of Causeway & Const./Widening of Jacinto Borja
Bridge, Dauis-Panglao Road04/03/11 VII 96.662 730 C 0.387 0.200 0.300 - - - 88.70 86.00%
Satisfactory
Z & L Construction & Supplies 25322 Const. of 3-CL Sch. Bldg., Mohon
E/S 04/13/11 X 1.646 113 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfactory
Z & L Construction & Supplies 25322 Talakag IP 04/13-18/09 NIA 4.748 240 O 0.323 0.251 0.150 0.023 0.063 0.050 89.40 -
Z & L Construction & Supplies 25322
Const. of Multi-Purpose Bldg. @ Agusan Del Sur State College of
Agriculture and Technology06/08/09 XIII 2.799 135 O 0.349 0.300 0.150 0.030 0.032 0.033 89.40 -
Z & L Construction & Supplies 25322
Const. of Multi-Purpose Bldg. Agusan del Sur State College of
Agriculture and Technology09/12/09 XIII 2.799 135 C 0.478 0.133 0.300 - - - 91.10 89.91%
V.Satisfactory
Z F Construction 17676Road Upgrading (Gravel to Paved),
San Luis-Ma. Aurora-Castaneda Road
04/09/11 III 40.112 240 C 0.413 0.200 0.300 - - - 91.30 88.57% Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page429
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Z M Construction 9052
Package II: Improvement of Olongapo-Bugallon Road
1. Cabangan Section, Zambales2. Sta. Cruz Section, Zambales
05/26/09 III 28.676 30 C 0.427 0.200 0.300 - - - 92.70 *92.70%V. Satisfactory
Z M Construction 9052 Const. of Sheet Pile Revetment, Phase II, Sitio Buton 08/20/10 III 19.263 90 C 0.373 0.200 0.300 - - - 87.30 87.30%
Satisfactory
Z.A.S Construction 8971 Const. of Multi-Purpose Pavement Brgy. Campokpok 02/24/10 VIII 0.143 45 C 0.444 0.133 0.300 - - - 87.70 87.70%
Satisfactory
Z.A.S Construction 8971 Const. of Health Center, Brgy. Maybog 06/06/10 VIII 0.190 70 C 0.480 0.133 0.300 - - - 91.30 91.30%
V. Satisfactory
Z.A.S Construction 8971 Const./Rehab./Impvt. of Multi-Purpose Building (Phase II) 05/28/09 VIII 0.473 40 C 0.438 0.133 0.300 - - - 87.10 *87.10%
Satisfactory
Z.A.S. Construction 8971 Completion of MPB Villaba Pob. 04/09/11 VIII 0.947 60 C 0.495 0.133 0.300 - - - 92.80 *92.80% V. Satisfactory
Z.F Construction 17676 Road Upgrading (Gravel to Paved) San Luis-Ma.Aurora-Castaneda 08/21/10 III 40.112 240 O 0.341 0.272 0.150 0.030 0.037 0.033 86.30 -
Z.F Construction 17676Impvt./Conc. of San Luis-Ma. Aurora Rd., So. Hilltop-So. Gulugod Baboy,
Brgy. Dianawan11/26/08 III 18.346 300 C 0.318 0.300 0.300 - - - 91.80 *91.80%
Outstanding
Zabu Engineering 31104 Rehab. of Bulanao-Paracelis Road 04/05/11 CAR 19.972 160 C 0.457 0.133 0.300 - - - 89.00 84.86% Satisfactory
Zact Builders 33702 Riprapping of Lagarian Creek, Brgy. E. Rodriguez 03/31/11 NCR 2.837 75 C 0.470 0.078 0.300 - - - 84.80 *84.80%
Satisfactory
Zeus Trading & Construction 15420
Conc. Reblocking of Jct. Catanduanes Circumferential Rd.,
Virac Port08/18/10 V 1.020 109 C 0.404 0.200 0.300 - - - 90.40 90.40%
V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Rehab./Reconst./Upgrading of Sibonga-Dumanjug Road, Tubod-
Dugoan Section05/29/09 VII 14.175 75 O 0.383 0.240 0.150 0.030 0.055 0.050 90.80 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Road Upgrading (Gravel to Paved) along Dalaguete-Mantalongon-
Badian Road05/29/09 VII 18.895 75 C 0.394 0.195 0.300 - - - 88.90 *88.90%
Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Widening of H. Abellana Road 06/05/09 VII 4.656 320 O 0.343 0.240 0.150 0.030 0.047 0.050 86.00 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Conc. of Jct.(LIR) Dat-an,Carmen-S. Bullones-Pilar-Alicia Rd. Sta.90+290-
Sta.92+240(Alicia Sec.) with exception
09/04/09 VII 18.637 232 O 0.337 0.237 0.150 0.030 0.037 0.033 82.40 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Impv't./Conc. of Jct. (LIR) Dat-an, Carmen-Sierra Bullones-Pilar-Alicia
Rd.(Pilar Sec.)Km. 81+980-Km.82+890 with exemption
09/04/09 VII 18.386 224 O 0.340 0.237 0.144 0.030 0.037 0.033 82.10 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Completion of MPB (Municipal Hall) 06/02/10 VII 0.915 90 C 0.366 0.200 0.300 - - - 86.60 86.60%
Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page430
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Impvt./Conc. of Tagbilaran-Corella-
Sikatuna-Loboc Road 08/25/10 VII 14.557 148 O 0.342 0.300 0.150 0.030 0.047 0.033 90.20 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Completion of MPB, Agape 08/25/10 VII 1.416 107 O 0.347 0.300 0.150 0.030 0.032 0.033 89.20 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Const. of Two (2) Classroom School
Building at Manlapay E/S, Manlapay 09/08/09 VII 1.191 186 C 0.455 0.190 0.300 - - - 94.50 *94.50% V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Road Rehab./Reconst./Upgrading along Sibonga-Dumanjug Road,
Tubod-Dugoan Section09/08/09 VII 14.175 75 C 0.468 0.198 0.300 - - - 96.60 93.12%
V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Const. of Multi-Purpose Pavement,
Brgy. Apas 09/16/09 VII 0.482 50 C 0.471 0.133 0.300 - - - 90.40 *90.40% V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Const. of Multi-Purpose Pavement,
Brgy. Busay 09/16/09 VII 1.446 50 C 0.462 0.133 0.300 - - - 89.50 *89.50% V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Widening of H. Abellana Road 09/02/09 VII 4.657 348 C 0.452 0.133 0.300 - - - 88.50 88.50%
Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881 Widening of H. Abellena Road 03/05/09 VII 4.656 261 O 0.343 0.300 0.150 0.030 0.027 0.050 90.00 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Conc. of Jct. (LIR) Dat-an, Carmen-Sierra Bullones-Pilar-Alicia Road
(Sta. 90+290-Sta. 92+240 with exception), Alicia Section
06/05/09 VII 18.637 206 O 0.363 0.300 0.150 0.030 0.047 0.033 92.30 -
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Road Upgrading (Gravel to Paved) along Dalaguete Mantalongon-
Badian Road09/07/10 VII 18.341 107 C 0.405 0.200 0.300 - - - 90.50 90.50%
V. Satisfactory
Zion Construction (Formerly Masterpiece
Construction and Supply)14881
Access Road to Airport, RORO Ports, Declared Tourism Hubs &
Spokes Central Nautical Highway, Santander Port
09/03/10 VII 7.441 121 C 0.329 0.200 0.300 - - - 82.90 82.90% Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881 Rehab. of Brgy. Road, Brgy. Cagsing
to Brgy. Salamanca 04/08/11 VII 0.969 58 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page431
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881 Completion of MPB 04/02/11 VII 0.968 90 C 0.483 0.133 0.300 - - - 91.60 91.18%
V. Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881
Rehab./Reconst./Upgrading of Santander-Barili-Toledo Rd. (Other
Sections)04/08/11 VII 28.212 60 C 0.402 0.200 0.300 - - - 90.20 *90.20% V.
Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881 Completion of MPB 04/01/11 VII 1.417 121 C 0.491 0.133 0.300 - - - 92.40 90.16% V.
Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881
Reblocking along Tagbilaran East Road, Km. 177+400 - Km. 216+200
(with exception)04/01/11 VII 9.582 218 C 0.365 0.200 0.300 - - - 86.50 88.72%
Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881 Const./Rehab. of River Control,
Tabajan 04/01/11 VII 4.714 169 C 0.342 0.200 0.300 - - - 84.20 87.56% Satisfactory
Zion Construction (Formerly: Masterpiece
Construction and Supply)14881
Rehab./Reconst./Upgrading of Jct. Loay Interior Rd. Loboc Sect.
Km.194+240 - Km.194+517.45 (with exception)
04/01/11 VII 5.676 256 C 0.392 0.158 0.300 - - - 85.00 *85.00% Satisfactory
Zircon Builder 16158 Construction of 3-CL School Bldg. Toytoyan E/S 05/27/09 III 1.580 120 C 0.463 0.200 0.300 - - - 96.30 *96.30%
Outstanding
ZM / DMJ Construction (JV) JV-07-084
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan,
Bulacan to Mabalacat, Pampanga, Phase IV Package V City of San
Fernando, Pampanga & Mabalacat Section
03/11/09 III 93.521 270 C 0.452 0.200 0.300 - - - 95.20 *95.20%V. Satisfactory
ZM / DMJ Construction (JV) JV-08-056 Replacement of Bravo Bridge 03/03/09 III 42.820 180 O 0.382 0.300 0.150 0.030 0.033 0.050 94.50 -
ZM / VRF Construction (JV) JV-08-014
Construction of Bridge and Approaches
(Contact Package II)03/03/09 III 38.937 210 O 0.357 0.244 0.150 0.020 0.028 0.050 84.90 -
ZM Construction / R.Z. Roncal Construction and
Trading (JV)JV-09-142
Completion/Continuation of the Replacement of Bravo Bridge along
Palayan-Natividad Road04/12/11 III 129.731 260 C 0.487 0.200 0.300 - - - 98.70 93.12%
V. Satisfactory
ZM Construction /DMJ Construction (JV) JV-07-084
Impvt./Widening of McArthur Highway (Manila North Road) Phase
V Meycauayan Bulacan) to Mabalacat Pampanga Sect., (Angeles-Mabalacat
Section) CP1
08/28/09 III 85.883 240 O 0.392 0.240 0.150 0.030 0.050 0.033 89.50 -
ZM/DMJ Construction Joint Venture JV-08-056 Replacement of Bravo Bridge,
Palayan City-Natividad Road 06/02/09 III 42.820 180 C 0.408 0.200 0.300 - - - 90.80 93.02% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page432
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011
NAME OF CONSTRUCTOR
LICENSE NO. PROJECT DATE OF
EVALUATION
FINAL RATING/ QUALITATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDRSTATUSCPES VISIT
RATINGWMS MTL TIME FAC*IMPL.
AGENCY
Zoe Builders and Supplies Company 20991 Rehab./Reconst. of Calapan North
Road (Intermittent Section) 04/05/11 IVB 5.582 90 C 0.333 0.188 0.300 - - - 82.10 86.72% Satisfactory
Zoe Builders and Supplies Company 20991
Const. of MPB (2-Storey Brgy. Physical Fitness Center), Brgy.
Calima04/03/11 IVB 1.926 120 C 0.334 0.200 0.300 - - - 83.40 83.40%
Satisfactory
Zoe Builders and Supplies Company 20991 Conc. of Road at Brgy. Mabini 02/16/10 IVB 1.146 60 C 0.338 0.200 0.300 - - - 83.80 83.80%
SatisfactoryZoe Builders and
Supplies Company 20991 Const. of MPB at Brgy. Sapul 05/28/10 IVB 0.989 40 C 0.354 0.200 0.300 - - - 85.40 85.40% Satisfactory
Zoe Builders and Supplies Company 20991 Const. of MPB at Calapan (Phase I) 05/28/10 IVB 0.592 30 C 0.417 0.133 0.300 - - - 85.00 85.00%
SatisfactoryZoe Builders and
Supplies Company 20991 Concreting of Road @ Gulod 02/23/09 IV-B 1.443 50 C 0.395 0.133 0.300 - - - 82.80 *82.80% Satisfactory
Zoe Builders and Supplies Company 20911 Construction of Multi-Purpose
Building at Bayanan 05/25/09 IV-B 2.407 75 C 0.349 0.200 0.300 - - - 84.90 *84.90% Satisfactory
Zoniuq Enterprises 25223 Const. of Road, Brgy. Labuin 05/24/10 IVA 0.983 35 C 0.444 0.133 0.300 - - - 87.70 *84.90% Satisfactory
Zoniuq Enterprises 25223 Const. of MPB (Phase III), Brgy. Poblacion IV 02/23/10 IVA 0.297 30 C 0.397 0.200 0.300 - - - 89.70 89.70%
V. SatisfactoryZota Trading & Construction 32641 Conc. of Farm-to-Market Road at
Brgy. Maniboc 03/02/10 I 0.482 60 C 0.371 0.200 0.300 - - - 87.10 87.10% Satisfactory
Zota Trading & Construction 32641 Conc. of FMR at Brgy. Pangapisan
North 06/07/10 I 0.482 60 C 0.421 0.133 0.300 - - - 85.40 85.40% Satisfactory
Zota Trading & Construction 32641 Concreting of Farm-to-Market Road
at Various Barangay 03/09/09 I 4.799 60 C 0.362 0.200 0.300 - - - 86.20 *86.20%Satisfactory
ZPM General Merchandise 28726 Concreting of LR Sebastian Annex at
Brgy. Rosary Heigthts 11 02/24/10 XII 0.954 15 C 0.421 0.133 0.300 - - - 85.40 85.40% Satisfactory
ZPM General Merchandise 28726 Completion of Camp Siongco High
School Datu Odin Sinsuat 03/02/09 XII 2.491 95 C 0.458 0.133 0.300 - - - 89.10 *89.10% V. Satisfactory
* 1st/Final* For DPWH, only the region and PMO office are listed 14th CPES Release Page433