CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone County, KY Pre-Proposal Meeting Minutes 3/14/2019 The purpose of this meeting is to provide an overview of the entire project, discuss specific points included with the Instructions to Proposers (ITP), review the project schedule, and accept/answer Design Build Team (DBT) questions. Rob Franxman District 6 construction coordinator opened the meeting by welcoming the teams. He stated that the pre-proposal meeting is mandatory. A sign in sheet is provided and all teams must sign in before leaving. Contract ID 19-9001, State Project FD52 008 0275 006-010 Mike Bezold, District 6 TEBM for project development provided an overview of the preferred alternative. He notified the group that the Interchange Justification Study (IJS) for the preferred alternative has received FHWA approval. The approved IJS includes commitments to perform improvements to the existing I-275 / KY 237 (Exit 8). The conceptual improvements are depicted on the preferred alignment display. These improvements include added storage to the west bound exit ramp, Exit 8A, widening of KY 237 to provide dual left turn lanes for the westbound I-275 on ramp, and revised radius to the KY 237 to I-275 east bound on ramp. This project will also include a safety improvement project at the intersection of KY 20 / Fister Pl Blvd / Lauren Meadows Dr. An addendum to the ITP will include a complete description of this work. The IJS also required additional safety “spot” improvements along KY 20 to the west, but this will not be part of the scope of the design build contract. Mandatory, requirements from ITP were reviewed. Rob Franxman indicated that the proposed interstate widening is required to be concrete. The remaining areas may be bid as alternates. Each DBT must identify the type of pavement being proposed. Project is federally funded and will required DBE participation. Overview of Scope. The successful team shall provide all engineering services, design, construction plans, right of way plans, acquisition of right of way, relocation of utilities, construction. Reviewed design/construction standards listed in the ITP. The DBT must acquire all applicable manuals.
Transcript
Page 1: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone County, KY

Pre-Proposal Meeting Minutes 3/14/2019

The purpose of this meeting is to provide an overview of the entire project, discuss specific points included with the Instructions to Proposers (ITP), review the project schedule, and accept/answer Design Build Team (DBT) questions. Rob Franxman District 6 construction coordinator opened the meeting by welcoming the teams. He stated that the pre-proposal meeting is mandatory. A sign in sheet is provided and all teams must sign in before leaving. Contract ID 19-9001, State Project FD52 008 0275 006-010 Mike Bezold, District 6 TEBM for project development provided an overview of the preferred alternative. He notified the group that the Interchange Justification Study (IJS) for the preferred alternative has received FHWA approval. The approved IJS includes commitments to perform improvements to the existing I-275 / KY 237 (Exit 8). The conceptual improvements are depicted on the preferred alignment display. These improvements include added storage to the west bound exit ramp, Exit 8A, widening of KY 237 to provide dual left turn lanes for the westbound I-275 on ramp, and revised radius to the KY 237 to I-275 east bound on ramp. This project will also include a safety improvement project at the intersection of KY 20 / Fister Pl Blvd / Lauren Meadows Dr. An addendum to the ITP will include a complete description of this work. The IJS also required additional safety “spot” improvements along KY 20 to the west, but this will not be part of the scope of the design build contract. Mandatory, requirements from ITP were reviewed. Rob Franxman indicated that the proposed interstate widening is required to be concrete. The remaining areas may be bid as alternates. Each DBT must identify the type of pavement being proposed. Project is federally funded and will required DBE participation. Overview of Scope. The successful team shall provide all engineering services, design, construction plans, right of way plans, acquisition of right of way, relocation of utilities, construction. Reviewed design/construction standards listed in the ITP. The DBT must acquire all applicable manuals.

Page 2: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Environmental – Section 9 of the ITP, the “footprint” of the preferred alternate identified in the IJS has received National Environmental Policy Act (NEPA) clearance via a Categorical Exclusion Level 3 which was approved late February 2019. If the DBT chooses to pursue impacts outside of the approved area, it is their sole responsibility to conduct the necessary field work and complete any necessary coordination to obtain environmental clearances including updates to the previously approved document. KYTC is working to acquire Army Corps of Engineers ACOE permits for the approved footprint and KYTC intends to pay the “in-lieu” fees for this footprint. If DBT decides to go outside this boundary, it will be their responsibility for approvals and fees. Section 10, ROW. Stressed the need for DBT to review this segment. The DBT will be responsible for all services and costs to obtain right of way. The DBT will perform all negations etc. up to and including condemnation. KYTC will issue the check to the property owner. Section 11, Utilities – Stressed the need to review in detail. The DBT is responsible for all coordination with companies. Some utilities may require that relocation is completed by their own forces. KYTC has met with all companies in preparation for DBT. Specifics – MOT – the goal of the project is to keep the current number of lanes in service throughout the construction. Road closures along Graves Road will be permitted and a 1 week closure will be permitted along Worldwide Blvd. Access to all properties and Williams Road must be provided at all times. Refer to Section 12 for additional details. Section 12.2.2 interstate ramp design shall use KYTC common practices. Section 12.2.4 Basic design parameters have been established. Final design from the DBT must be equivalent or better than what was provided. Section 12.2.6 Dimensions of the typical sections are fixed. Special provisions are listed in Section 12.2.11, including items such as architectural treatments for vertical concrete surfaces, intelligent compaction of materials and e-ticketing for the delivery of some materials. Section 12.3 Structures – The DBT shall ultimately be responsible for final design and construction of the structure over I-275 according to all applicable standards. The DBT responsible for all geotechnical work required. Any slopes steeper than 3:1 shall be reinforced slopes due to the nature of the soils in the area. Section 12.4 – Traffic related items. Specifically, 12.4.2 provides guidance for perm signage including overhead signs for the interchange and auxiliary lanes.

Page 3: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Section 12.4.3 provides guidance for the four traffic signals required for the project. Section 12.4.4 provides guidance for lighting the interchange and roundabout at KY 237. Section 15 the DBT will be allowed to break the project into buildable units. The DBT shall be permitted to submit buildable units according to their own discretion. KYTC is offering the opportunity for short listed teams to develop Alternative Technical Concepts (ATC’s). This topic is covered in Section 6.1 of the ITP. ATC proposals must be equal to or better than baseline design. Bi weekly meeting will be held on Wednesdays to discus ATC’s. DBT must notify KYTC the Friday before the next meeting. Also, notify KYTC if a Subject Matter Expert (SME) is required at the next meeting. All information will be held confidential throughout the proposal process. Upon award of the project, unsuccessful teams that receive the stipend, will have their ATC’s become property of the KYTC. The last acceptable date for completion of the project is 8/1/22. Short-listed DBT’s shall submit an actual completion date during the proposal process and that date shall become the contractual completion date. Liquidated Damages shall be assessed at $5,000 per day if the project is not complete by the submitted completion date. General project schedule was reviewed, see Section 1.1. Key dates:

3/29/19 - Statement of qualifications. 4/12/19 - Announce short list of 3 teams. Any shortlisted team will be awarded

50k stipend if not successful. 8/2/19 – Technical Proposals Due 8/16/19 – Price Proposals Due

Background design information will be provided today. Flash drives are being provided with all preliminary designs. Will also be available on website. ** Update following Meeting** Due to the size and structure of the information contained on the flash drives, the information cannot be posted on the website. If copies of the information are needed please contact [email protected]. Addendums are being posted on the DB segment of the website. Each team will be notified when an addendum is issued. There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing specific website to address questions. When this is available there will be an addendum. ** Update following Meeting** Due to restrictions within the website structure, a website based Q&A system can’t be developed. Questions should still be directed to [email protected] and all questions and answers will be posted within a document on the design build page. All questions for this project should contain the subject “CID #: 19-9001 Graves Road Design Build – QUESTION”.

Page 4: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

The presentation and Pre-Proposal Meeting is not intended to cover every facet of the Instructions To Proposers for the project. Rather the presentation is intended to highlight some key points within the instructions. All Design Build Teams shall be aware that it is their responsibility to review the Instructions To Proposers, and any related or relevant information, in great detail for specific requirements. Presentation concluded. Questions: Kokosing Construction Company – Asked about guidelines acknowledging addendums. KYTC agreed that proposers will need to acknowledge addenda and questions when submitting a Statement of Qualifications. Such acknowledgement shall be conducted with “Form AOR” included in Appendix Q. An addendum will be posted requiring form AOR to be submitted with the SOQ. KYTC plans to list the minutes of today’s meeting and provide copies of presentation and sign in sheets. ** Update following Meeting** Form AOR may be submitted as an appendix to the SOQ. Form AOR will not count toward the page count for the SOQ. Kokosing Construction Company - Asked if Form “A” that is part of appendix A, can be included with the SOQ as an appendix, or will it count against the page count? KYTC will review. ** Update following Meeting** Form A may be submitted as an appendix to the SOQ. Form A will not count toward the page count for the SOQ. An addendum will be posted indicating that form A may be submitted as an appendix to the SOQ. Kokosing Construction Company - Asked if the $1 million incentive for partial completion was intended to be in 2021 instead of 2020? The date remains 2020. Meeting concluded.

Page 5: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Contractors and Consultants Potentially Eligible for Lead: *Note, this listing simply identifies companies who fulfilled the requirement of attending the mandatory pre-proposal meeting. All listed companies shall still meet any requirements identified in section 4.1 of the Instructions and the KY Standard Specifications for Road and Bridge Construction.

Contractors:

Superior Construction Walsh Construction Lawrence Construction & Leasing Prus Construction Eaton Asphalt Haydon Bridge John R. Jurgensen Kokosing Construction Lonkard Construction Louisville Paving Bluegrass Paving Inc. The WL Harper Company Bray Construction Judy Construction Spartan Construction Mac Constrution

Consultants:

Stantec GRW Michael Baker Beam Longest & Neff HDR Janssen & Spaans Eng. Burgess & Niple Woolpert Palmer American Engineers, Inc. Parsons TEC Engineering Terracon WSP Geotechnology Stupp Bridge

Page 6: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

The presentation and Pre‐Proposal Meeting is not intended to cover every facet of the Instructions To Proposers for the project. Rather the presentation is intended to highlight some key points within the instructions. All Design Build Teams shall be aware that it is their responsibility to review the Instructions To Proposers, and any related or relevant information, in great detail for specific requirements. 

 

   Kentucky Transportation Cabinet    Division of Construction 

     KYTC – District 6  ‐‐  CID #: 19‐9001 Pre‐Proposal Meeting 

Meeting Date: March 14, 2019

 

Agenda 

Introduction 

Project Description 

o Mandatory Requirements 

o DBE 

Highlights of General Scope 

o Environmental 

o Right of Way 

o Utilities 

Highlights of Project Specifics 

o MOT Items 

o Design Items 

o Special Provisions 

o Structures 

o Geotechnical 

o Traffic Items 

o Buildable Units 

Alternate Technical Concepts 

Completion Date 

Schedule 

Data Provided 

Questions 

Page 7: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing
Page 8: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Be Sure to SIGN IN

Page 9: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Project Description / Overview

Page 10: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Mandatory Requirements

Page 11: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

DBE

Page 12: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

General Scope

Page 13: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Environmental

Page 14: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Right of Way

Page 15: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Utilities

Page 16: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Specifics

Page 17: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Specifics

Page 18: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Specifics

Page 19: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Specifics

Page 20: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Specifics

Page 21: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

ATC

Page 22: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Completion DateSection 6

Section 13.1.2.1

Page 23: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Schedule

Page 24: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Overview of Data Provided

Page 25: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing

Be Sure to SIGN IN

QuestionsThe presentation and Pre‐Proposal Meeting is not intended to cover every facet of the Instructions To Proposers for the project. Rather the presentation is intended to highlight some key points within the instructions. All Design Build Teams shall be aware that it is their responsibility to review the Instructions To Proposers, and any related or relevant information, in great detail for specific requirements.

Page 26: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing
Page 27: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing
Page 28: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing
Page 29: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing
Page 30: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing
Page 31: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing
Page 32: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing
Page 33: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing
Page 34: CID #: 19-9001 -- I-275 Interchange @ Graves Road Boone ... · 14.03.2019  · There will be a new addendum to discuss questions asked during the Pre-Proposal Meeting. KYTC is developing