+ All Categories
Home > Government & Nonprofit > Citizens Tower Media Tour

Citizens Tower Media Tour

Date post: 12-Apr-2017
Category:
Upload: lubbockpublicinfo
View: 88 times
Download: 0 times
Share this document with a friend
10
HEADER MAIN TITLE SUBTITLE CITIZENS TOWER TOUR 08.29.2016 MEDIA PACKET
Transcript

HEADER

MAIN TITLESUBTITLE

8

CITIZENS TOWER TOUR08.29.2016

MEDIA PACKET

10

TOUR ROUTE

TIMELINE OF PROJECT

FINANCIAL OVERVIEW

FLOOR PLANS / RENDERINGS

DIGITAL IMAGE LIBRARY

2

3

4

5

9

IN THIS PACKET...

Indications on safety mea-

sures in the active construc-

tion site will be given by the

tour director.

10

TOUR ROUTE2

The tour will advance as follows:

1. Enter from south and walk down “Main Street”

2. Take stairs from 1st to 2nd floor

3. Take elevator from 2nd to 9th floor

4. Conclude tour on 9th floor with interview session

The tour director will touch on main points for each floor,

such as current stage of project.

There will be some time allotted for picture and video

recording on each floor. Questions will be addressed at the

end of the tour during the interview session that will take

place on the 9th floor.

10

TIMELINE

NOV 2014MAR 2015

JUNE 2015 AUG 2015

JAN 2016APR 2016DEC 2016APR 2017

OCT - DEC 2018DEC 2018 - FEB 2019

3

Purchased Citizens TowerAsbestos / Mold Consultant HiredA/E Firm Hired and Design Work Began Asbestos / Mold Abatements andDemolitions BeganConstruction Management Firm HiredAbatement CompletedEstimated Plans Ready to BidEstimated Construction Begins(18-24 months)Estimated Completion DateEstimated Move In Date

10

FINANCIALOVERVIEW

4

PURCHASED PRICE

TOTAL APPROPRIATIONCURRENT STAGE

ESTIMATEDCONSTRUCTION BUDGET

CURRENT TOTALWITH ESTIMATEDCOST INCLUDED

$1,200,000

$10,200,000MONEY SPENT / ENCUMBERED TO DATE $10,071,041*INCLUDES DESIGN OF POLICE DEPARTMENT AND OTHER FUNCTIONS

$48,700,000

$60,100,000

10

FLOOR PLANSRENDERINGS

5

COPIER

DN

COPIER

COPI

ER

UPUPUP

UPUPUPUPUPUP

UP

UP

UP

STORAGE

180 SF

STORAGE0117

STORAGE

RECEPTION

COUNCIL CHAMBERS

FIRE COMMAND ROOM

COUNCIL WORKROOM

PANTRY

MAIN STREET

MAIN LOBBY

LEVEL 1 LOBBY

MEP

PIO

OFFICE OFFICE

ON-AIR EQUIP/TV CTRL/EQ STOR

TV STUDIO

PRO RATA

BUILDING INSP.BUILDING INSP.

BUILDING INSP.BUILDING INSPECTION

SR. DEPUTY REG.

COORDINATORBREAK

VAULT STORAGE ROOM

HUDDLEPLANNING

PLANNING

PLANNING

PLANNING

HUDDLEHUDDLE

FAMILY RR

WOMENS

ELECTRICAL

MENS

CONFERENCE

DEVELOPMENT SERVICES

WAITING

VITAL STATS

OPEN OFFICE AREA

BLDGINSPECTION (4)

HRCODE PARKS

BLDG INSPECTION (4)

PRORATA

CODES

HR

PARKS

BUILDING INSPECTION

PLANNING

CITIZENS TOWERLEVEL 01

STAFF ENTRY

PUBLIC ENTRY

N>COUNCIL CHAMBERS / WORKROOM

PUBLIC INFO CUSTOMER SERVICE CENTER

VITAL STATISTICS

Plans subject to change

HEADER

13

MAIN LOBBY

14

CUSTOMER SERVICE CENTER

10

FLOOR PLANSRENDERINGS

6

10

FLOOR PLANSRENDERINGS

7

19

TOWER LAYOUTCITIZENS TOWER

STORAGE AREA [SF VARIES BY FLOOR]]

PRIVATE OFFICES WITH COLLABORATIVE SEATING

OPEN WORKSPACE

BREAK/COPY AREAMEDIUM CONFERENCE SPACE [10 PEOPLE]

PUBLIC LOBBY AREA

PUBLIC RESTROOMS

OPEN FILING ZONE WITH LAYOUT SPACE

Plans subject to change

10

FLOOR PLANSRENDERINGS

8

17

CITIZENS TOWER

The CD provided with this

packet contains pictures of

the project’s progress, renders

and floor plans presented in

the previous sections. It also

contains a PDF version of this

printed media packet.

10

DIGITALIMAGE LIBRARY

9


Recommended