City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 3-5 OCTOBER 2016 EMERALD RESORT AND CASINO Presented by : Stephen Delport, Chief Engineer: Metering and Tariffs Dr Johan Delport, EEMS
Transcript
Page 1: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

City of EkurhuleniCost of Electricity Supply Study

65th AMEU(SA) CONVENTION 2016

3-5 OCTOBER 2016

EMERALD RESORT AND CASINO

Presented by :

• Stephen Delport, Chief Engineer: Metering and Tariffs

• Dr Johan Delport, EEMS

Page 2: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

Contents

1. Background

2. Application of the P5 philosophy

3. Results

4. Lessons learnt

Page 3: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

OVERVIEW OF THE ENERGY DEPARTMENTELECTRICITY DISTRIBUTION IN THE CITY OF EKURHULENI

• Current replacement value of distribution network = R27 billion

• Value of bill paid to Eskom for July 2016 consumption > R1,35 billion.

• Number of Major Eskom Intake Points = 56

• CoE number of households 1 015 465

• Households with access to electricity – 82.2% (834 712)

Page 4: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

City of Ekurhuleni CoS Background

• This is not an exercise to “balance the books”• It is to determine the true cost of electricity supply and losses• NERSA’s “Cost of supply framework” was not used, but NRS 058 was used• NRS 058 (Cost of Supply Methodology for the application in the Electrical Distribution

industry) prescribes how to regulate energy prices to different customer classes whilst being fair and equitable and at the same time yielding the expected budgetary income per annum

• Head of Department Mark Wilson has decided to conduct a cost of supply study in accordance with NRS058 as this methodology has not been incorporated in its tariff base yet.

• The first study was in 2014, with an update in 2016. The effect of the results are not yet incorporated into the existing electricity tariffs

Page 5: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

Cost of Supply Methodology

Where Equals Description (c/kWh)

Total CoS Total Cost of Supply Total cost of supplying electricity

P1 Power All costs related to pay the supplier(s) costs for energy. Technical losses included

P2 Parts All costs related to the assets of the Electricity Department. Work with replacement value

P3 People All costs related to the people of the Electricity Department

P4 Pain Total cost of Non-technical losses

P5 Profit If expanded, the surplus can be included in the cost of supply study.

Page 6: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

P1 = Power [1/4]

• Construct a Supply load profile of all supply points:– add load profiles per point of delivery

– calculate diversity per month

• Construct a load profile per tariff group– with AMR data

• add load profiles per customer in the tariff group

• calculate diversity per month per tariff group

– with “similar load profile”• use a load profile and scale it to the monthly statistics

• Calculate the technical losses according to voltage levels and add to tariff group

Page 7: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

P1 = Power [2/4]

• Calculate – the difference between Supply and Tariff groups = Non-technical losses– each one’s contribution to the total electricity (power) cost.

• Remember– calculate the cost of each tariff group AND include the technical losses– the cost must be calculated using only the energy SOLD (less than energy sold and

technical losses)!!– this will give a c/kWh that is more than the c/kWh of all energy taken into account

• Calculate the c/kWh per tariff group and non-technical losses

Page 8: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

P1 = Disaggregated Load Profile [3/4]

-

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

20

14

/07

/21

00

:30

20

14

/07

/21

04

:30

20

14

/07

/21

08

:30

20

14

/07

/21

12

:30

20

14

/07

/21

16

:30

20

14

/07

/21

20

:30

20

14

/07

/22

00

:30

20

14

/07

/22

04

:30

20

14

/07

/22

08

:30

20

14

/07

/22

12

:30

20

14

/07

/22

16

:30

20

14

/07

/22

20

:30

20

14

/07

/23

00

:30

20

14

/07

/23

04

:30

20

14

/07

/23

08

:30

20

14

/07

/23

12

:30

20

14

/07

/23

16

:30

20

14

/07

/23

20

:30

20

14

/07

/24

00

:30

20

14

/07

/24

04

:30

20

14

/07

/24

08

:30

20

14

/07

/24

12

:30

20

14

/07

/24

16

:30

20

14

/07

/24

20

:30

20

14

/07

/25

00

:30

20

14

/07

/25

04

:30

20

14

/07

/25

08

:30

20

14

/07

/25

12

:30

20

14

/07

/25

16

:30

20

14

/07

/25

20

:30

20

14

/07

/26

00

:30

20

14

/07

/26

04

:30

20

14

/07

/26

08

:30

20

14

/07

/26

12

:30

20

14

/07

/26

16

:30

20

14

/07

/26

20

:30

20

14

/07

/27

00

:30

20

14

/07

/27

04

:30

20

14

/07

/27

08

:30

20

14

/07

/27

12

:30

20

14

/07

/27

16

:30

20

14

/07

/27

20

:30

kW

h S

tac

ke

d p

er

Ta

riff

Gro

up

Page 9: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

P1 = Losses [4/4]

-

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

-

50,000

100,000

150,000

200,000

250,000

20

14

/07

/21

00

:30

20

14

/07

/21

05

:00

20

14

/07

/21

09

:30

20

14

/07

/21

14

:00

20

14

/07

/21

18

:30

20

14

/07

/21

23

:00

20

14

/07

/22

03

:30

20

14

/07

/22

08

:00

20

14

/07

/22

12

:30

20

14

/07

/22

17

:00

20

14

/07

/22

21

:30

20

14

/07

/23

02

:00

20

14

/07

/23

06

:30

20

14

/07

/23

11

:00

20

14

/07

/23

15

:30

20

14

/07

/23

20

:00

20

14

/07

/24

00

:30

20

14

/07

/24

05

:00

20

14

/07

/24

09

:30

20

14

/07

/24

14

:00

20

14

/07

/24

18

:30

20

14

/07

/24

23

:00

20

14

/07

/25

03

:30

20

14

/07

/25

08

:00

20

14

/07

/25

12

:30

20

14

/07

/25

17

:00

20

14

/07

/25

21

:30

20

14

/07

/26

02

:00

20

14

/07

/26

06

:30

20

14

/07

/26

11

:00

20

14

/07

/26

15

:30

20

14

/07

/26

20

:00

20

14

/07

/27

00

:30

20

14

/07

/27

05

:00

20

14

/07

/27

09

:30

20

14

/07

/27

14

:00

20

14

/07

/27

18

:30

20

14

/07

/27

23

:00

kW

h E

sk

om

kW

h S

tac

ke

d p

er

Lo

ss

es

Technical Losses Non-technical losses Sum of P (kWh) Eskom Intakes (kWh)

Page 10: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

P2 = Parts

• According to NRS058, it is better to work with replacement cost of assets

• Get the asset information according to different voltage levels

• Normally linked to tariff groups

• Calculate the assets according to the tariff groups– the tariff group with the highest voltage will carry only the cost of those assets

necessary to supply them

– the tariff group with the lowest voltage will carry all the assets necessary to supply them

• Calculate the average cost in c/kWh per tariff group

Page 11: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

P3 = People

• The ideal situation is if records are kept of all maintenance, linked to a tariff group

• Normally, the higher the voltage the less maintenance

• Distribute the cost according to the voltage level

• Calculate the average cost in c/kWh per tariff group

Page 12: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

Total Cost of Supply - Extract

0

20

40

60

80

100

120

140

160

180

Ekur

hule

ni 1

3/14

Tarif

f E <

=11k

V

Ekur

hule

ni 1

4/15

Res

elle

rs <=

400

V

Ekur

hule

ni 1

4/15

Res

elle

rs >4

00V

Ekur

hule

ni 1

4/15

Tarif

f A B

us

Ekur

hule

ni 1

4/15

Tarif

f B B

us 1

00A

3P

Ekur

hule

ni 1

4/15

Tarif

f B B

us 1

00A

3P N

o …

Ekur

hule

ni 1

4/15

Tarif

f B B

us 1

25A

3P N

OF

Ekur

hule

ni 1

4/15

Tarif

f B B

us 1

50A

3P

Ekur

hule

ni 1

4/15

Tarif

f B B

us 1

50A

3P N

OF

Ekur

hule

ni 1

4/15

Tarif

f B B

us 1

60A

3P N

o …

Ekur

hule

ni 1

4/15

Tarif

f B B

us 2

00A

3P N

o …

Ekur

hule

ni 1

4/15

Tarif

f B B

us 4

0A 3

P

Ekur

hule

ni 1

4/15

Tarif

f B B

us 5

0A 3

P

Ekur

hule

ni 1

4/15

Tarif

f B B

us 6

0A 3

P

Ekur

hule

ni 1

4/15

Tarif

f B B

us 6

0A 3

P No

Onl

ine …

Ekur

hule

ni 1

4/15

Tar

iff B

Bus

70A

3P

Ekur

hule

ni 1

4/15

Tar

iff B

Bus

80A

3P

Ekur

hule

ni 1

4/15

Tarif

f B B

us 9

0A 3

P NO

F

Ekur

hule

ni 1

4/15

Tarif

f B R

es

Ekur

hule

ni 1

4/15

Tarif

f B R

es N

OF

Ekur

hule

ni 1

4/15

Tarif

f C <

=11k

V

Ekur

hule

ni 1

4/15

Tarif

f C <

=11k

V No

NAC

Ekur

hule

ni 1

4/15

Tarif

f C 4

00V

Ekur

hule

ni 1

4/15

Tarif

f C 4

00V

No

NAC

Ekur

hule

ni 1

4/15

Tarif

f C 4

00V

(Sub

stat

ion …

Ekur

hule

ni 1

4/15

Tarif

f C O

ff-Pe

ak 1

1kV

Ekur

hule

ni 1

4/15

Tarif

f C O

ff-Pe

ak 4

00V

Ekur

hule

ni 1

4/15

Tarif

f D <

=11k

V

Ekur

hule

ni 1

4/15

Tarif

f D >

11k

V

Ekur

hule

ni 1

4/15

Tarif

f D 4

00V

Ekur

hule

ni 1

4/15

Tarif

f D N

CP

Ekur

hule

ni 1

4/15

Tarif

f E <

=11k

V

Ekur

hule

ni 1

4/15

Tarif

f E >

11k

V

Ekur

hule

ni 1

4/15

Tarif

f E 4

00V

Ekur

hule

ni 1

4/15

Tarif

f E 4

00V

(Sub

stat

ion …

Ekur

hule

ni 1

4/15

Tarif

f E 4

00V

No N

AC

Ergo

Conv

Res

iden

tial

Conv

Com

mer

cial

ALL C

CC's

Stre

et &

Mas

ts Li

ghtin

g & Tr

aff L

Dept

emen

tal C

ivic C

entr

e etc

.

All C

CC's

Prep

aid

+FBE

c/kW

h

Power c/kWh Parts c/kWh People c/kWh PAIN (Non-technical losses) c/kWh Profit (Surplus) c/kWh

Page 13: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

P4 = PAIN

• Non-technical losses are not only theft!!!

• Also in the financial department

• The ideal situation is if check meters can report where the most non-technical losses are

• Calculate the total cost of non-technical losses (done under P1) and distribute it as a c/kWh to each tariff group.

Page 14: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

P5 = Profit (surplus)

• According to the philosophy of the Municipality, the profit (surplus) can be distributed to the tariff groups as a c/kWh

Page 15: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

CoS tariff results with Surplus (average for year)

Page 16: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

CoS tariff results with Surplus(monthly)

Page 17: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

CoS tariff results with Surplus (average for year)

Page 18: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

CoS tariff results with Surplus (average for year)

Page 19: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

Total Cost of Supply – Extract of various tariffs

Tariff Group Name Pow er c/kWh

Parts c/kWh

People c/kWh

PAIN (Non-

technical losses) c/kWh

Profit

(Surplus) c/kWh

Total c/kWh,

excluding surplus

Total c/kWh,

including surplus

Income in c/kWh

Tariff A Business 78.6853 21.6221 41.4915 7.9690 9.5788 149.7679 159.3467 159.2372

Tariff B Res 114.3747 21.6221 41.4915 7.9690 9.5788 185.4573 195.0361 141.0023

Tariff C <=11kV 74.2370 19.6406 37.5398 7.9690 9.5788 139.3864 148.9652 121.6891

Tariff C <=11kV No NAC

82.0122 19.6406 37.5398 7.9690 9.5788 147.1616 156.7404 118.124

Tariff C 400V 79.4773 21.6221 41.4915 7.9690 9.5788 150.5599 160.1387 125.3356

Tariff C 400V (Substation Supply)

75.8565 21.6221 41.4915 7.9690 9.5788 146.9391 156.5179 125.91

Tariff C Off-Peak

11kV 78.2243 19.6406 37.5398 7.9690 9.5788 143.3737 152.9525 148.5502

Tariff C Off-Peak 400V

87.8705 21.6221 41.4915 7.9690 9.5788 158.9531 168.5319 146.9479

Tariff D <=11kV 68.4470 19.6406 37.5398 7.9690 9.5788 133.5964 143.1752 95.7715

Tariff D > 11kV 64.1788 4.2077 6.1036 7.9690 9.5788 82.4591 92.0379 86.1888

Tariff D 400V (Substation Supply)

101.3359 21.6221 41.4915 7.9690 9.5788 172.4185 181.9973 141.0008

Tariff E <=11kV 72.3112 19.6406 37.5398 7.9690 9.5788 137.4606 147.0394 111.9694

Tariff E > 11kV 73.9145 4.2077 6.1036 7.9690 9.5788 92.1948 101.7736 114.2018

Tariff E 400V 78.7394 21.6221 41.4915 7.9690 9.5788 149.8220 159.4008 128.6043

Tariff E 400V (Substation supply)

75.7176 21.6221 41.4915 7.9690 9.5788 146.8002 156.3790 122.727

Tariff E 400V No

NAC 77.0634 21.6221 41.4915 7.9690 9.5788 148.1460 157.7248 176.2398

Res Resellers <=400V

79.2566 21.6221 41.4915 7.9690 9.5788 150.3392 159.9180 125.0775

Res Resellers >400V

76.2772 19.6406 37.5398 7.9690 9.5788 141.4266 151.0054 125.2634

Conv Residential 76.4706 21.6221 41.4915 7.9690 9.5788 147.5532 157.1320 164.4181

Conv Commercial 79.4517 21.6221 41.4915 7.9690 9.5788 150.5343 160.1131 163.3437

ALL COE Street and Masts and Traff ic Lighting

61.5041 21.6221 41.4915 7.9690 9.5788 132.5867 142.1655 130.9752

Departmental Civic

Centre etc. 79.2729 21.6221 41.4915 7.9690 9.5788 150.3555 159.9343 130.9752

All COE's Prepaid

and FBE 79.1639 21.6221 41.4915 7.9690 9.5788 150.2465 159.8253 90.7169

Non-technical losses

89.4247 - - - - 89.4247 89.4247 0

Page 20: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

Income vs Cost per tariff sorted from worst deficit to highest surplus

• Total Cost of Supply for all tariffs calculated

-100

-50

0

50

100

150

200

No

n-t

ec

hn

ica

l lo

sse

s

All

CC

C's

Pre

pa

id +

FBE

De

pte

me

nta

l C

ivic

Ce

ntr

e e

tc.

Ek

urh

ule

ni 1

4/1

5 T

ari

ff D

<=

11

kV

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Re

s

Ek

urh

ule

ni 1

4/1

5 R

ese

llers

<=

40

0V

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Re

s N

OF

Ek

urh

ule

ni 1

4/1

5 T

ari

ff E

40

0V

No

NA

C

Erg

o

Ek

urh

ule

ni 1

4/1

5 T

ari

ff E

40

0V

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 6

0A

3P

No

On

lin

e …

Co

nv

Re

sid

en

tia

l

AL

L C

CC

's S

tre

et

& M

ast

s L

igh

tin

g &

Tra

ff L

Ek

urh

ule

ni 1

4/1

5 R

ese

llers

>4

00

V

Ek

urh

ule

ni 1

4/1

5 T

ari

ff C

<=

11

kV

No

NA

C

Ek

urh

ule

ni 1

3/1

4 T

ari

ff E

<=

11

kV

Ek

urh

ule

ni 1

4/1

5 T

ari

ff E

40

0V

(S

ub

sta

tio

n …

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 9

0A

3P

NO

F

Ek

urh

ule

ni 1

4/1

5 T

ari

ff D

NC

P

Co

nv

Co

mm

erc

ial

Ek

urh

ule

ni 1

4/1

5 T

ari

ff C

40

0V

(S

ub

sta

tio

n …

Ek

urh

ule

ni 1

4/1

5 T

ari

ff E

<=

11

kV

Ek

urh

ule

ni 1

4/1

5 T

ari

ff D

40

0V

Ek

urh

ule

ni 1

4/1

5 T

ari

ff C

<=

11

kV

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 7

0A

3P

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 1

60

A 3

P N

o …

Ek

urh

ule

ni 1

4/1

5 T

ari

ff C

40

0V

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 1

50

A 3

P

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 1

00

A 3

P N

o …

Ek

urh

ule

ni 1

4/1

5 T

ari

ff D

> 1

1k

V

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 1

25

A 3

P N

OF

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 1

50

A 3

P N

OF

Ek

urh

ule

ni 1

4/1

5 T

ari

ff C

Off

-Pe

ak

40

0V

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 6

0A

3P

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 4

0A

3P

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 8

0A

3P

Ek

urh

ule

ni 1

4/1

5 T

ari

ff E

> 1

1k

V

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 1

00

A 3

P

Ek

urh

ule

ni 1

4/1

5 T

ari

ff C

Off

-Pe

ak

11

kV

Ek

urh

ule

ni 1

4/1

5 T

ari

ff A

Bu

s

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 2

00

A 3

P N

o …

Ek

urh

ule

ni 1

4/1

5 T

ari

ff B

Bu

s 5

0A

3P

Ek

urh

ule

ni 1

4/1

5 T

ari

ff C

40

0V

No

NA

C

c/k

Wh

Power c/kWh Parts c/kWh People c/kWh PAIN (Non-technical losses) c/kWh Difference in c/kWh cost and income

Page 21: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

CoE Resellers Tariff• Lessons learnt with regard to Resellers of Electricity

• With the information currently available, it is not possible to recommend what “discount” or “more favourable tariff” a Reseller is entitled to.

• It is proposed that a study be completed to quantify the actual cost per customer per tariff group to the Municipality.

• That will include things like meter reading (manual or AMR), bills, stamps, envelopes, chasing of payments, non-technical losses, etc.

• The outcomes of this study will help to quantify the benefits that could be passed on to the reseller segments, if any.

Page 22: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

Typical Domestic Resellers Profile

Page 23: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

Typical Electrification area ProfileIBT Tariff

Page 24: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)
Page 25: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

Do an Energy Balance “kWh”

• Purchases = Sales + Technical Losses + Non-Technical Losses + Admin Losses!

Page 26: City of Ekurhuleni Cost of Electricity Supply Study 20… ·  · 2016-10-07City of Ekurhuleni Cost of Electricity Supply Study 65th AMEU(SA) CONVENTION 2016 ... (Substation Supply)

Conclusion

• It is recommended that all municipalities execute a detailed CoS study. The good data records of the CoE assisted in making this study somewhat easier as far as that component goes, but the sheer size of a City made the study fairly complex.

• It is therefor recommended that:-

• A Municipality rather APPOINT an electricity tariff specialist to do a cost-of-supply study as guided by NRS 058.