+ All Categories
Home > Documents > City of Los Angeles CIP Update - construction-network.net

City of Los Angeles CIP Update - construction-network.net

Date post: 24-Jan-2022
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
20
City of Los Angeles Capital Program Update KENNETH REDD PE, DEPUTY CITY ENGINEER
Transcript

City of Los AngelesCapital Program Update

KENNETH REDD PE, DEPUTY CITY ENGINEER

• Make sure that company Profile Information is Correct• Admin Contact Info (Valid E-mail)• Admin Contact Preference (E-mail)• NAICS Codes Accurate Using Current

System

• Complete required subcontractor outreach (the system tells you status). If you are new to the process, read the guides and FAQ’s on the site. If you have a question, ask.

• Complete the outreach summary sheet by the due date

• Contractors – don’t forget to watch for RFQ’s for on-call lists. Some have missed opportunities because they were in the habit of only looking for bids.

BAVN TIPS

Notable Upcoming Projects

9 Stormwater Capture Projects in the Valley

East/West Valley Interceptor Sewer

Advanced Water Treatment Facilities at Hyperion and DC Tillman

Safe Clean Water Projects

Los Angels Street Civic Building

QUESTIONS


Recommended