Agenda
• Review of Macedonia Roads Conditions• Roads Repair Plans– Plans for Crack Sealing, Pot Hole Repair and
Preventative Maintenance– Alternative Road Repair Options and Costs
• Financial Planning for Road Maintenance and Repair
Review of Macedonia Roads Conditions
• Building and Engineering and Service Dept Review (Appendix A)– 185 Macedonia Roads (72.5 Miles) in List– Condition• 17% rated in Poor Condition• 70% rated in Fair Condition• 11% rated in Good Condition• 2% not rated
• Overview: Roads Are In State of Neglect
Westwood Drive – Poor Condition
Airlane Road – Poor Condition
Blueberry Road – Poor Condition
Ledgeview Road – Fair Condition
Berkshire Road – Fair Condition
Ledge Acres Road – Fair Condition
Roads Preventative Maintenance
• Service Department– 121 Roads in Fair Condition Will Need Crack
Sealing and Pothole Repair on Some Portion of the Road
– Description of Crack Sealing and Pothole Repair Techniques
– Annual Assessment and Plan Needed– Cost Estimation Algorithm?
Building and Engineering Department
• Repair of 12 Roads (37.5%) of 32 Roads Rated in Poor Condition– Recycle and Repave– Estimated Cost: $1,940,444
• No Cost Estimate for Remaining Roads– 20 Roads in Poor Condition– 121 Roads in Fair Condition
• Repair Options and Alternatives• Continuing Overall Plan for Maintenance and Repair
including Estimated Costs
Financial Planning for Road Maintenance and Repair
• Current Revenue Projections• Annual Roads Revenue and Spending – Fin Dir• Planning for Continuing Maintenance and
Repair Cycles– Road Assessment– Cost Estimation
• Dedicated Financing for Roads?• Financing Options
APPENDIX ASTREETS CONDITION ASSESSMENT