SHEET INDEX # SHEET TITLE 1 COVER SHEET 2 MATHEWS ST REMOVAL PLAN 3 FIRST ST REMOVAL PLAN 4 MATHEWS ST GENERAL PLAN OF STRUCTURE 5 FIRST ST GENERAL PLAN OF STRUCTURE 6 MATHEWS ST CROSS SECTIONS 7 FIRST ST CROSS SECTIONS 8 MATHEWS ST & FIRST ST SECTION DETAILS 9 MATHEWS ST DECK PLAN 10 FIRST ST DECK PLAN 11 MATHEWS ST & FIRST ST POST TENSIONING SYSTEM 12 FIRST ST DEADMEN PLAN 2020 BRIDGE REHABILITATION PROJECT MATHEWS ST OVER TAWAS RIVER CITY OF TAWAS CITY SEC 30, T22N, R8E TAWAS CITY IOSCO COUNTY, MICHIGAN MARCH 2020 2020 BRIDGE REHABILITATION PROJECT CONTRACT FOR: BRIDGE REHABILITATION AND RELATED APPROACH WORK CITY OF TAWAS CITY GUS OLIVER - DIRECTOR OF PUBLIC WORKS DATE BRADLEY A. LINK, P.E. REGISTERED PROFESSIONAL ENGINEER NO. 40060 DATE 310 W. FRONT STREET SUITE 224 TRAVERSE CITY, MI 49684 PHONE: (231) 499-9479 PREPARED UNDER THE SUPERVISION OF: PROJECT LOCATION Know what's below. before you dig. Call R DRAWN BY: CHECKED BY: JOB NO: DJS BAL 18113744.005 SHEET 1 OF 12 MICHIGAN GENERAL NOTES: EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS, OR IN THE PROPOSAL AND SUPPLEMENTAL SPECIFICATIONS, ALL MATERIALS AND WORKMANSHIP SHALL BE ACCORDING TO THE MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIFICATIONS FOR CONSTRUCTION 2012 EDITION. WORK SHALL COMPLY WITH SECTION 504 OF THE REHABILITATION ACT OF 1973 AND THE AMERICANS WITH DISABILITIES ACT OF 1990. DESIGN OF STRUCTURAL MEMBERS BASED ON STRUCTURAL STEEL: AASHTO M270, GRADE 50 f Y = 50,000 psi CONCRETE: GRADE S2 f' c = 3,000 psi TIMBER: SYP No.1 f b = 1,250 psi FOR PROTECTION OF UNDERGROUND UTILITIES AND IN CONFORMANCE WITH PUBLIC ACT 53 1974 AS AMENDED,THE CONTRACTOR SHALL CONTACT MISS DIG AT 800-482-7171 or on-line at https://www.missdig.org/ A MINIMUM OF THREE (3) WORKING DAYS (EXCLUDING SATURDAYS, SUNDAYS AND HOLIDAYS) PRIOR TO EXCAVATION ON-SITE. ALL”MISS DIG” PARTICIPATING MEMBERS WILL THUS BE NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING OWNERS WHO MAY NOT PARTICIPATE IN THE “MISS DIG” SYSTEM. ALSO, NOTIFY THE CITY OF TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER
Transcript
Page 1: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

SHEET INDEX

# SHEET TITLE

1 COVER SHEET

2 MATHEWS ST REMOVAL PLAN

3 FIRST ST REMOVAL PLAN

4 MATHEWS ST GENERAL PLAN OF STRUCTURE

5 FIRST ST GENERAL PLAN OF STRUCTURE

6 MATHEWS ST CROSS SECTIONS

7 FIRST ST CROSS SECTIONS

8 MATHEWS ST & FIRST ST SECTION DETAILS

9 MATHEWS ST DECK PLAN

10 FIRST ST DECK PLAN

11 MATHEWS ST & FIRST ST POST TENSIONING SYSTEM

12 FIRST ST DEADMEN PLAN

2020 B

RID

GE

R

EH

AB

IL

IT

AT

IO

N P

RO

JE

CT

MATHEWS ST OVER TAWAS RIVER

CITY OF TAWAS CITY

SEC 30, T22N, R8E

TAWAS CITY

IOSCO COUNTY, MICHIGAN

MARCH 2020

2020 BRIDGE REHABILITATION PROJECT

CONTRACT FOR: BRIDGE REHABILITATION AND RELATED APPROACH WORK

CITY OF TAWAS CITY

GUS OLIVER - DIRECTOR OF PUBLIC WORKS DATE

BRADLEY A. LINK, P.E.

REGISTERED PROFESSIONAL ENGINEER NO. 40060

DATE

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

PREPARED UNDER THE SUPERVISION OF:

PROJECT LOCATION

Know what's below.before you dig.Call

R

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

SHEET 1 OF 12

MICHIGAN

GENERAL NOTES:

EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS, OR IN THE

PROPOSAL AND SUPPLEMENTAL SPECIFICATIONS, ALL MATERIALS AND

WORKMANSHIP SHALL BE ACCORDING TO THE MICHIGAN DEPARTMENT OF

TRANSPORTATION SPECIFICATIONS FOR CONSTRUCTION 2012 EDITION.

WORK SHALL COMPLY WITH SECTION 504 OF THE REHABILITATION ACT OF

1973 AND THE AMERICANS WITH DISABILITIES ACT OF 1990.

DESIGN OF STRUCTURAL MEMBERS BASED ON

STRUCTURAL STEEL: AASHTO M270, GRADE 50 f

Y

= 50,000 psi

CONCRETE: GRADE S2 f'

c

= 3,000 psi

TIMBER: SYP No.1 f

b

= 1,250 psi

FOR PROTECTION OF UNDERGROUND UTILITIES AND IN CONFORMANCE WITH

PUBLIC ACT 53 1974 AS AMENDED,THE CONTRACTOR SHALL CONTACT MISS

DIG AT 800-482-7171 or on-line at https://www.missdig.org/ A MINIMUM OFTHREE (3) WORKING DAYS (EXCLUDING SATURDAYS, SUNDAYS ANDHOLIDAYS) PRIOR TO EXCAVATION ON-SITE. ALL”MISS DIG” PARTICIPATINGMEMBERS WILL THUS BE NOTIFIED. THIS DOES NOT RELIEVE THECONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING OWNERS WHO MAYNOT PARTICIPATE IN THE “MISS DIG” SYSTEM. ALSO, NOTIFY THE CITY OFTAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE.

FIRST ST OVER TAWAS RIVER

Linkeng
PE
Linkeng
Signature
Linkeng
Typewritten Text
3-19-2020
Page 2: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

MATHEWS ST

REMOVAL PLAN

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 2 OF 12

0

FEET

20 40

1'' = 20'

T

A

W

A

S

R

IV

E

R

F

L

O

W

M

A

T

H

E

W

S

S

T

Page 3: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

5

8

6

5

8

4

5

8

2

5

8

7

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

FIRST ST

REMOVAL PLAN

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 3 OF 12

0

FEET

20 40

1'' = 20'

T

A

W

A

S

R

IV

E

R

(W

S

E

=

5

8

1

.7

5

)

FLO

W

1ST ST

Page 4: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

SIDEWALK

TIMBER

RAIL

RE

F. P

T "A

"

RE

F. P

T "B

"

26' SPAN 26' SPAN

HMA, 13A

AGGREGATE BASE 22A, 6" MIN

PLACE 6A AGGREGATE WRAPPED IN

GEOTEXTILE TO 6 INCHES ABOVE STREAM ELEV.

PLACE GEOTEXTILE, KEEP IN

PLACE WHILE BACKFILLING

HEAVY LINE INDICATES LIMITS

OF "EXCAVATION, FDN" AND

HATCHED AREA INDICATES LIMITS

OF "BACKFILL, STRUCTURE, CIP"

1

3'-0"

± 8'-0"

EXISTING

STREAM BOTTOM

ELEV. 577.63'±

1

BACKFILL WITH EXCAVATION SPOIL. NO

SPOIL SHALL BE REMOVED FROM THE SITE

UNLESS DIRECTED BY THE ENGINEER

ELE

V. 587.50'

ELE

V. 587.63

WSE TAWAS RIVER

EL = 581.75 (9/8/2017)

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

MATHEWS ST

GENERAL PLAN OF STRUCTURE

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 4 OF 12

0

FEET

20 40

1'' = 20'

T

A

W

A

S

R

I

V

E

R

F

L

O

W

M

A

T

H

E

W

S

S

T

Page 5: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

5

8

6

5

8

4

5

8

2

5

8

7

SIDEWALK

TIMBER

RAIL

RE

F. P

T "A

"

RE

F. P

T "B

"

26' SPAN 26' SPAN

HMA, 13A

AGGREGATE BASE 22A, 6" MIN

PLACE 6A AGGREGATE WRAPPED IN

GEOTEXTILE TO 6 INCHES ABOVE STREAM ELEV.

PLACE GEOTEXTILE, KEEP IN

PLACE WHILE BACKFILLING

HEAVY LINE INDICATES LIMITS

OF "EXCAVATION, FDN" AND

HATCHED AREA INDICATES LIMITS

OF "BACKFILL, STRUCTURE, CIP"

1

3'-0"

± 8'-0"

EXISTING

STREAM BOTTOM

ELEV. 577.88'±

1

BACKFILL WITH EXCAVATION SPOIL. NO

SPOIL SHALL BE REMOVED FROM THE SITE

UNLESS DIRECTED BY THE ENGINEER

ELE

V. 587.68'

ELE

V. 587.88

WSE TAWAS RIVER

EL = 581.75 (9/8/2017)

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

FIRST ST

GENERAL PLAN OF STRUCTURE

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 5 OF 12

0

FEET

20 40

1'' = 20'

T

A

W

A

S

R

IV

E

R

(W

S

E

=

5

8

1

.7

5

)

FLO

W

1ST ST

Page 6: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

MATHEWS ST

CROSS SECTIONS

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 6 OF 12

Page 7: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

FIRST ST

CROSS SECTIONS

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 7 OF 12

Page 8: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

MATHEWS ST & FIRST ST

SECTION DETAILS

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 8 OF 12

Page 9: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

MATHEWS ST

DECK PLAN

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 9 OF 12

Page 10: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

FIRST ST

DECK PLAN

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 10 OF 12

Page 11: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

MATHEWS ST & FIRST ST

POST TENSIONING SYSTEM

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 11 OF 12

®

®

Page 12: CITY OF TAWAS CITY...TAWAS CITY AT 1 - (989) 362-2521 THREE WORKING DAYS PRIOR AS ABOVE. FIRST ST OVER TAWAS RIVER 3-19-2020 DRAWN BY:DJSCHECKED BY:BALJOB …

DRAWN BY: CHECKED BY: JOB NO:DJS BAL 18113744.005

FIRST ST

DEADMEN PLAN

2020 BRIDGE REHABILITATION PROJECT

CITY OF TAWAS CITY

310 W. FRONT STREET

SUITE 224

TRAVERSE CITY, MI 49684

PHONE: (231) 499-9479

SHEET 12 OF 12