GOVERNMENTAL CENTER 400 Boardman Avenue Traverse City, MI 49684 (231) 922-4440 (231) 922-4476 fax [email protected] Follow us on Facebook, Twitter, & Instagram CityofTC www.traversecitymi.gov City of Traverse City Office of the City Manager February 12, 2019 Bidder: The City of Traverse City will receive sealed bids in the Office of the City Manager, Second floor, Governmental Center, 400 Boardman Avenue, Traverse City, Michigan, 49684, until Thursday, March 7, 2019, at 2:00 PM for the following: PUMP REPAIR SERVICES & CHECK VALVE REPLACEMENTS AT THE WATER TREATMENT PLANT (specifications attached) If the specifications are obtained from the City’s website link at: http://www.traversecitymi.gov/bids_and_rfps.asp, it is the sole responsibility of the Bidder to check the website for updates and addenda prior to the bid being submitted. Bidder may also sign up to receive notifications when bids and RFPs are posted by sending an e-mail requesting same to [email protected] The City of Traverse City reserves the right to accept or reject any or all bids, waive irregularities, and to accept the bids either on an entire or individual basis that is in the best interest of the City. The City accepts no responsibility for any expense incurred by the Bidder in the preparation and presentation of a bid. Such expenses shall be borne exclusively by the Bidder. Only the successful Bidder will be notified. You must indicate on the outside of the sealed envelope that the bid is for the “Pump Repair and Check Valve Replacement.” You must submit TWO (2) SEALED COPIES of the bid to the City Manager’s Office prior to the above-indicated time and date or the bid will not be accepted. Telefaxed or E-Mail bids will not be accepted. Please note that if you have previously submitted an informal quote, you will still need to submit a sealed bid prior to the date and time specified above in order to be considered. Please ensure that all requirements listed in the specifications are met. If you have any questions, please contact Jacqueline Johnson, Water Plant Superintendent, at (231) 922-4920 before the bid is submitted.
Transcript
Page 1: City of Traverse City

GOVERNMENTAL CENTER

400 Boardman Avenue Traverse City, MI 49684 (231) 922-4440 (231) 922-4476 fax

[email protected]

Follow us on Facebook, Twitter, & Instagram CityofTC www.traversecitymi.gov

City of Traverse City

Office of the City Manager

February 12, 2019 Bidder: The City of Traverse City will receive sealed bids in the Office of the City Manager, Second floor, Governmental Center, 400 Boardman Avenue, Traverse City, Michigan, 49684, until Thursday, March 7, 2019, at 2:00 PM for the following:

PUMP REPAIR SERVICES &

CHECK VALVE REPLACEMENTS AT THE WATER TREATMENT PLANT

(specifications attached) If the specifications are obtained from the City’s website link at: http://www.traversecitymi.gov/bids_and_rfps.asp, it is the sole responsibility of the Bidder to check the website for updates and addenda prior to the bid being submitted. Bidder may also sign up to receive notifications when bids and RFPs are posted by sending an e-mail requesting same to [email protected] The City of Traverse City reserves the right to accept or reject any or all bids, waive irregularities, and to accept the bids either on an entire or individual basis that is in the best interest of the City. The City accepts no responsibility for any expense incurred by the Bidder in the preparation and presentation of a bid. Such expenses shall be borne exclusively by the Bidder. Only the successful Bidder will be notified. You must indicate on the outside of the sealed envelope that the bid is for the “Pump Repair and Check Valve Replacement.” You must submit TWO (2) SEALED COPIES of the bid to the City Manager’s Office prior to the above-indicated time and date or the bid will not be accepted. Telefaxed or E-Mail bids will not be accepted. Please note that if you have previously submitted an informal quote, you will still need to submit a sealed bid prior to the date and time specified above in order to be considered. Please ensure that all requirements listed in the specifications are met. If you have any questions, please contact Jacqueline Johnson, Water Plant Superintendent, at (231) 922-4920 before the bid is submitted.

Page 2: City of Traverse City

Page 2

PLEASE SUBMIT BID TO: Kim Sheridan, Purchasing Agent 400 Boardman Avenue, 2nd floor

Traverse City, MI 49684

SPECIFICATIONS

The City of Traverse City is seeking bids to furnish all labor, materials and equipment necessary to perform Pump Repair Services on three (3) vertical turbine pumps and replace three (3) check valves. All work will be verified to confirm proper operation. Two pumps, Low Service #3 and High Service Pump #1 will need to pulled and inspected. The motors shall be rewound inverter duty and variable frequency drives (VFDs) installed. Bidder will provide quote for all labor, materials and equipment to install VFDs into the Traverse City Water Plant motor control panels. VFDs, installation and programming may be performed by separate contractor as the City chooses. One pump, Huron Hills #2 is already inverter duty and has a VFD installed but will need to be pulled and inspected. Remove and replace three (3) 14” swing check valves at the Low Service Building. Old check valves will need to be removed and disposed of by the contractor. Bidder shall provide a licensed electrician at the site to properly disconnect and reconnect the wiring assembly for each pump. High Service Pump #1 may contain asbestos in the motor gaskets or insulation. If asbestos is present, all motor work must be performed using due care, handling and abatement practices as required by current applicable laws.

ONE (1) LOW SERVICE PUMP, LS#3

125 HP 3 Phase General Electric Motor Model # 5KS405DP6040P Worthington Pump Model # 18H500-1 Serial # 93-70-100921-1

Parts Estimate for Repair of Low Service Pump #3:

1 Suction bearing and seal 1 Bowl bearings and seal 1 Spyder bearing 1 Stuffing box Bearing, 2 bowl rings 1 New stainless steel shaft

Page 3: City of Traverse City

Page 3

2 Stainless steel line shaft couplings, 1 set of packing 1 Stuffing box gasket, 1 head gasket 2 Bowl gaskets 2 Motor bearings 1 Steady bushing 1 New Dresser coupling 1 Motor rewind (Inverter Duty) 1 Variable speed drive (Allen Bradley PowerFlex 753 Series)

Labor to include:

Remove pump at the Traverse City Water Plant Low Service Building, 2232 Eastern Avenue, Traverse City, MI, and transport to bidder's repair facility.

Disassemble complete pump and motor. Sandblast components and prep for inspection.

Dimensionally measure all operating clearances and record on inspection report. Machine all impeller rings front and rear to establish concentricity.

Install new bowl rings front and rear then lock in place. Machine bowl rings for proper operating clearances.

Remove existing flanged column pipe, blast and repaint inside and outside and replace dresser coupling.

Replace shaft with stainless steel shaft and couplings.

Assemble all rotating parts on shaft and place in balancing machine.

Verify T.I.R's then dynamically balance rotor to 10 grams or less at 1" radius. Install all new shaft sleeves then mechanically lock in place.

Install all new cutless bearings and lock in place. Measure and record all final operating clearances.

Rewind motor inverter duty windings.

Final assembly of pump and motor with new parts listed.

Check to insure proper lift and free rotation. Paint, then preserve pump for delivery.

Transport completed job to the Traverse City Water Plant, reinstall pump, install and program VFD, perform start-up, test run pump and clean up work area.

NOTE: All new paint materials that come in contact with water shall be NSF-60/61 certified for drinking water purposes. The intent of this scope of work is for Bidder to include all parts and labor necessary for a complete high quality pump repair whether specifically mentioned above or implied.

Page 4: City of Traverse City

Page 4

ONE (1) HIGH SERVICE PUMP, HS#1

125 HP US Motors Holloshaft Asbestos Protected Pump Motor Serial # 1358416 Worthington Pump Size 15HH34OW 6 Serial # VTP - 12527

Parts Estimate for Repair of High Service Pump #1:

1 Suction bearing and seal 2 Bowl bearing and seals 2 Spyder bearings 1 Stuffing box bearing, 2 bowl rings 1 New stainless steel shaft 3 New stainless steel line shaft couplings, 1 set of packing 1 Stuffing box gasket, 1 head gasket 3 Bowl gaskets 2 Motor bearings 1 Steady bushing 1 New flanged pump column pipe, painted inside and outside 1 New Dresser coupling 1 Motor rewind (Inverter Duty) 1 Variable speed drive (Allen Bradley PowerFlex 753 Series) Labor to include:

Remove pump at the Traverse City Water Plant, 2010 Eastern Avenue, Traverse City, MI, and transport to bidder's repair facility.

Disassemble complete pump and motor. Sandblast components and prep for inspection.

Dimensionally measure all operating clearances and record on inspection report. Machine all impeller rings front and rear to establish concentricity.

Install new bowl rings front and rear then lock in place. Machine bowl rings for proper operating clearances.

Rewind motor inverter duty windings. Prep new flanged column pipe, painted inside and outside, replace dresser coupling.

Replace shaft with stainless steel shaft and couplings.

Assemble all rotating parts on shaft and place in balancing machine.

Verify T.I.R.’s then dynamically balance rotor to 10 grams or less at 1" radius. Install all new shaft sleeves then mechanically lock in place.

Page 5: City of Traverse City

Page 5

Install all new cutless bearings and lock in place. Measure and record all final operating clearances.

Final assembly of pump and motor with new parts listed.

Check to insure proper lift and free rotation. Paint, then preserve pump for delivery.

Transport completed job to the Traverse City Water Plant, reinstall pump, perform start-up, test run pump and clean up work area.

NOTE: All new paint materials that come in contact with water shall be NSF-60/61 certified for drinking water purposes. The intent of this scope of work is for Bidder to include all parts and labor necessary for a complete high quality pump repair whether specifically mentioned above or implied.

ONE (1) HURON HILLS HIGH SERVICE, PUMP #2

60 HP U.S. Electrical Motors High Thrust Motor ID# 9103754-191 R2149804 NRR Layne Vertical Centrifugal Turbine-Type Pump Pump # 96609

Parts Estimate for Repair Huron Hills High Service Pump #2:

Suction bearing(s) and seal Bowl bearings and seals Spyder bearings Stuffing box bearing, bowl rings New stainless steel shaft New stainless steel line shaft couplings 1 set of packing Stuffing box gasket, head gasket Bowl gaskets Motor bearings and seals Steady bushing

Labor to include:

Remove pump at the Traverse City Water Plant, 2010 Eastern Avenue, Traverse City, MI, and transport to bidder's repair facility.

Disassemble complete pump and motor. Sandblast components and prep for inspection.

Check existing inverter duty windings and rewind if necessary.

Dimensionally measure all operating clearances and record on inspection report. Machine all impeller rings front and rear to establish concentricity.

Page 6: City of Traverse City

Page 6

Install new bowl rings front and rear then lock in place. Machine bowl rings for proper operating clearances.

Assemble all rotating parts on shaft and place in balancing machine.

Verify T.I.R.'s then dynamically balance rotor to 10 grams or less at 1" radius. Install all new shaft sleeves then mechanically lock in place.

Install all new cutless bearings and lock in place. Measure and record all final operating clearances.

Final assembly of pump and motor with new parts listed.

Check to insure proper lift and free rotation. Paint, then preserve pump for delivery.

Transport completed job to the Traverse City Water Plant, reinstall pump, perform start-up, test run pump and clean up work area.

NOTE: All new paint materials that come in contact with water shall be NSF-60/61 certified for drinking water purposes. The intent of this scope of work is for Bidder to include all parts and labor necessary for a complete high quality pump repair whether specifically mentioned above or implied.

THREE (3) LOW SERVICE CHECK VALVES

3 Val-Matic ANSI Class 125 and 250 Tilted Disc Check Valves

Parts Estimate for Replacement of Three (3) Low Service Check Valves:

3 Val-Matic Swing-Flex Check Valves (14”)

Labor to include:

Remove old check valves at the Traverse City Water Plant Low Service Building, 2232 Eastern Avenue, Traverse City, MI, and proper disposal.

Dimensionally measure all operating clearances and record on inspection report.

Final assembly of check valves with new parts listed.

Check to insure proper operation.

NOTE: All new paint materials that come in contact with water shall be NSF-60/61 certified for drinking water purposes. The intent of this scope of work is for Bidder to include all parts and labor necessary for a complete high quality check valve repair whether specifically mentioned above or implied. Replace one (1) check valve at a time in order to leave three (3) remaining check valves in working order at any given time.

Page 7: City of Traverse City

Page 7

Bidder - Please complete and return

BID SUMMARY TITLE: PUMP REPAIR SERVICES, CHECK VALVE REPLACEMENT AND ASSOCIATED PIPE WORK FOR THE WATER TREATMENT PLANT DUE DATE: Thursday, March 7, 2019 at 2:00 PM Having carefully examined the attached specifications and any other applicable information, the undersigned proposes to furnish all items necessary for and reasonably incidental to the proper completion of this bid. Bidder submits this bid and agrees to meet or exceed all requirements and specifications unless otherwise indicated in writing and attached hereto. Bidder certifies that as of the date of this bid the Company or he/she is not in arrears to the City of Traverse City for debt or contract and is in no way a defaulter as provided in Section 152, Chapter XVI of the Charter of the City of Traverse City. Bidder understands and agrees, if selected as the successful Bidder, to accept a Purchase Order / Service Order / Contract and to provide proof of the required insurance. Bidder submits this bid and agrees to meet or exceed all the City of Traverse City’s requirements and specifications unless otherwise indicated in writing and attached hereto. Bidder shall comply with all applicable federal, state, local and building codes, laws, rules and regulations and obtain any required permits for this work. The Bidder certifies that it is in compliance with the City’s Nondiscrimination Policy as set forth in Administrative Order No. 47 and Chapter 605 of the City’s Codified Ordinances. The Bidder certifies that none of the following circumstances have occurred with respect to the Bidder, an officer of the Bidder, or an owner of a 25% or more share in the Bidder's business, within 3 years prior to the bid:

(a) conviction of a criminal offense incident to the application for or performance of a contract;

(b) conviction of embezzlement, theft, forgery, bribery, falsification or destruction of

records, receiving stolen property, or any other offense which currently, seriously and directly reflects on the Bidder's business integrity;

(c) conviction under state or federal antitrust statutes; (d) attempting to influence a public employee to breach ethical conduct standards; or

(e) conviction of a criminal offense or other violation of other state, local, or federal law, as determined by a court of competent jurisdiction or an administrative

Page 8: City of Traverse City

Page 8

proceeding, which in the opinion of the City indicates that the bidder is unable to perform responsibility or which reflects a lack of integrity that could negatively impact or reflect upon the City of Traverse City, including but not limited to, any of the following offenses or violations of:

i. The Natural Resources and Environmental Protection Act.

ii. A persistent and knowing violation of the Michigan Consumer Protection Act.

iii. Willful or persistent violations of the Michigan Occupational Health and

Safety Act.

iv. A violation of federal, local, or state civil rights, equal rights, or non-discrimination laws, rules, or regulations.

v. Repeated or flagrant violations of laws related to the payment of wages

and fringe benefits.

(f) the loss of a license or the right to do business or practice a profession, the loss or suspension of which indicates dishonesty, a lack of integrity, or a failure or refusal to perform in accordance with the ethical standards of the business or profession in question.

Bidder understands that the City reserves the right to accept any or all bids in whole or part and to waive irregularities in any bid in the best interest of the City. The bid will be evaluated and awarded on the basis of the best value to the City. The criteria used by the City may include, but will not be limited to: ability, qualifications, timeframe, experience, price, type and amount of equipment, accessories, options, insurance, permits, licenses, other pertinent factors and overall capability to meet the needs of the City. The City is sales tax exempt – Government. Bidder agrees that the bid may not be withdrawn for a period of sixty (60) days from the actual date of the opening of the bid.

Page 9: City of Traverse City

Page 9

BID SHEET

ONE (1) LOW SERVICE PUMP, LS#3

Pump pulled, inspected, repaired and motor rewound

with inverter duty windings and scope of work as described

herein and implied for a high quality complete repair. $_______________

Provide VFD, installation, verification and integration into existing

SCADA system. $_______________

Estimated time for complete repair including materials delivery: ________________

ONE (1) HIGH SERVICE PUMP, HS#1

Pump pulled, inspected, repaired and motor rewound

with inverter duty windings and scope of work as described

herein and implied for a high quality complete repair. $_______________

Provide VFD, installation, verification and integration into existing

SCADA system. $_______________

Estimated time for complete repair including materials delivery: ________________

ONE (1) HURON HILLS HIGH SERVICE, PUMP #2

Pump pulled, inspected, repaired and motor rewound with inverter $_______________

duty windings (if needed) and scope of work as described herein and

implied for a high quality complete repair.

Page 10: City of Traverse City

Page 10

THREE (3) LOW SERVICE CHECK VALVES

Valves removed from premises, new valves provided and installed. $_______________

Estimated time for complete repair including materials delivery: ________________

Submitted by: ____________________________________ ___________________________________ Signature Company Name ____________________________________ ___________________________________ Name and Title (Print) Company Address ____________________________________ ___________________________________ Phone Fax City, State, Zip ___________________________________ EMAIL ADDRESS: Sole proprietorship/partnership/corporation ___________________________________ _______________________________ If corporation, state of corporation REFERENCES: (include name of organization, contact person, and daytime phone number). 1.____________________________________________________________________________ Contact Person: ____________________________________Telephone:___________________ 2.____________________________________________________________________________ Contact Person: ____________________________________Telephone:___________________ 3.____________________________________________________________________________ Contact Person: ____________________________________Telephone:___________________ SUBCONTRACTORS: (include name of organization, contact person, daytime phone number, and services to be performed). 1.____________________________________________________________________________

Page 11: City of Traverse City

Page 11

Contact Person: ____________________________________Telephone:___________________ Services to be Performed:_________________________________________________________ 2.____________________________________________________________________________ Contact Person: ____________________________________Telephone:___________________ Services to be Performed:_________________________________________________________ 3.____________________________________________________________________________ Contact Person: ____________________________________Telephone:___________________ Services to be Performed:_________________________________________________________

Page 12: City of Traverse City
Page 13: City of Traverse City
Page 14: City of Traverse City
Page 15: City of Traverse City
Page 16: City of Traverse City

nneclu INDUSTftlES

PUMPS I VALVES I REPAIRS I CONTROLS

P.O. Box 180 • 52900 Grand River New Hudson• Michigan 48165

Phone:(248)684-1200 • Fax: (248)684-6011 www.Kennedyind.com

CITY OF TRAVERSE CITY

HIGH AND LOW SERVICE PUMPS

MAINTENANCE COMPLETED NOVEMBER, 2014

TRAVERSE CITY CONTACT:

ARTHUR KRUEGER

(231) 922-4920

a kruege r@trave rscitymi .gov

REFERENCE KENNEDY INDUSTRIES JOB# 55882

Page 17: City of Traverse City

LOW SERVICE PUMPS

• Only pump 1 was running, while waiting for switch recorded vibes and temps

• Vibrations: inline bottom .21, inline top .25, axial .11, 90 bottom .14, 90 top .18 II vibes taken

/sec pk• Pu p 1 motor temps: lower 87

°, upper 84°, product 44°, stuffing box 45

°

• Rem ed coupling guard, cleaned up shaft• Pump s ft TIR .014", motor shaft TIR .010"• Lift was se at .050", removed packing gland, removed two piec• Packing is ha and brittle, tried to remove lantern ring, will t come out

• Reinstalled two ieces of new½" John Crane 1340 packin• Reinstalled packin gland, snugged gland nuts• Found lower motor a ring grease relief plugs are c roded and plugged• Tried to clean them ou still plugged• Reinstalled coupling guar , cleaned up arou pump

• Low service pump 1 has hig shaft runouts antern ring stuck in the stuffing box• The oil was last changed on 4 4/14

• The steading busing on motor is n djustable and is part of the motor rotor. It spins with the

motor when the jib key is remov

PUMP #2 • Removed coupling guard leaned up pum shaft• Motor shaft TIR .027" · ump shaft TIR .021"

• Uncoupled pump, I' set at .060", couple pump, removed packing gland• Heavy corrosio ·n and around stuffing box, remo d one piece of packing• Lantern ring uck in stuffing box, cleaned up stuffin ox• Reinstalle two pieces of½" packing, reinstalled packin gland, snugged gland• Found wer motor bearing grease relief plugs are corro d and plugged• Trie to clean them out, still plugged• w service pump 2 has high shaft TIR, lantern ring stuck in st• Oil last changed on 4/24/14

• The steading busing on motor is non-adjustable and is part of the m tor rotor. It spins with the

motor when the jib key is removed.

@.PUMP#3 • Coupling guard is broken• Removed coupling guard, cleaned up shaft• Motor shaft TIR - .003", pump shaft TIR - .003"• Removed packing gland, packing extremely hard and brittle• Once again, only able to remove the two pieces of packing above the lantern ring• Lantern ring corroded in place in the stuffing box, cleaned up stuffing box• Reinstalled two pieces of½" 1340 packing• Reinstalled packing gland with nuts snug• Reinstalled coupling guard, checked lift, found it was set at .057"• Pump rotates freely, cleaned up around pump 3• Motor is leaking oil from around upper bearing oil sight & drip cover. Needs to be further

investigated.

Page 18: City of Traverse City

p

• Removed lock from pump #3 and waited for operators to switch from pumps 1 &2 to pumps3&4

• Pump #3 does not have a grease relief port• Pump is in ok condition• Oil last changed on 4/24/14• No steady bushing

ed with low service pump #4. Locked out, removed co mg guard • ft TIR - .002", pump shaft TIR - .002"• Removed pac · gland, packing hard and brittle uld not remove lantern ring • Cleaned stuffing bo reinstalled 2 pieces ½" 1340 packing • Found lift set at .051", pu• Oil last changed on 4/24/14• Does not appear lower beari reased in a long time. Hard grease came out of

opposite relief port.• Put 10 shots of pol x in lower bearings• Reinstalled co mg guard, cleaned up around pump #4• Tried to c n them out, still plugged• Low rvice pump 4 lantern ring stuck in stuffing box, TIRS good• o steady bushing

HIGH SERVICE PUMPS

'PPUMP#l • Entered well, found that pump 1 dust collars and 1st stage impeller rings are sitting about 1"

higher than they should with where the pumps lifts are set, see pies• Pump 1 internals are relatively clean, well is also pretty clean• Removed coupling guards from pump 1, removed packing gland• Pump shaft TIR .015", motor shaft TIR .012"• Uncoupled pump 1, lift set at .100"• When inside well this pumps first stage impeller ring to case ring is almost out of the fit• Pump shaft does not spin so it is making face contact in one of the 6 stages, believe pump was

rebuilt incorrectly at some point in the past• Removed 2 pieces of 1/2" packing, this pumps lantern ring would also not come out, corroded

to stuffing box• Cleaned up stuffing box, reinstalled 2 pieces of john crane 1340 ½" packing• Pumped 5 shots of grease in stuffing box• Motor oil levels all correct and were also changed 4/22/14, reinstall coupling guards• Cleaned up around pump #1 and removed lock• Internal steady busing, motor would have to be taken apart to access

Page 19: City of Traverse City

Removed coupling guards, cleaned up shafts

ump shaft TIR .004", motor shaft TIR .004" • Re oved packing gland, could only remove two pieces of packing

• Lante ring would not come out of this pump either, reinstalled two new pieces ½" 1340

packing• Installed pac ·ng gland, nuts snug, put five shots of customer supplied gre e in stuffing box• Filled upper an ower motor bearings to proper levels• Motor has oil leaks om both upper and lower bearings {sights)• Reinstalled coupling g rds, cleaned up around pump #4• Removed lock from pump• Oil last changed on 4/22/14• No steady bushing

PUMP #5

• Pump 5 internals are relatively clean, II is so clean • Removed coupling guards, cleane p shaft, m r is leaking from upper and lower bearing drip

covers. Needs to be further inv tigated. • Removed packing gland, he y corrosion, could only r ove two pieces of packing• Lantern ring seized in p e• Reinstalled two ne 1eces of½" john crane 1340 packing, r · stalled packing gland, nuts snug • Filled upper and wer motor bearing housings back to their pro er levels• TIR on moto aft .004", pump shaft TIR .004", found lift set at .12 " • Cleaned• High rvice pump 5 is in OK condition, TIR on shafts are good, lantern rin ·s stuck in stuffing

b

No steady bushing

MISC • Delivered 20 gallons of Mobil DTE Light ISO 32 oil to the operators• On all of the pumps, with only being able to remove two pieces of packing, the pump shafts did

not show excessive wear• High service pump #3 should be the first pump to be removed for repair

• Pump #3 motor steady bushing has failed, pump is touching well floor, has high shaft runouts.

Lantern ring is stuck in the stuffing box. Significant gap between dust collar and tail bearing. First

stage impeller ring is almost out of case ring.

-->,. • High service pump #1 has high shaft runouts, lantern ring is stuck in the stuffing box. Significant

gap {lateral) between dust collar and tail bearing and between impeller ring and case ring

{lateral)• High.service pump #4 is in okay condition, motor has leaks from upper and lower bearings

{sights)• Pumps have not been rebuilt in many years, and all have high hours except high service pump 4


Recommended