PROJECT SUMMARY SHEET CITY PARK PLAYGROUND PROJECT BACKGROUND The City Park Playground is located just west of Ferril Lake in City Park. The playground was constructed in 1996, and is a highly utilized regional facility. Replacement of the existing playground is envisioned to be a regional ‘destination’ playground and fulfills the vision identified in the City’s Playground Master Plan. This 17,000 square foot playground has shown signs of wear for years and continues to put excessive burdens on Parks Operations. The safety surfacing has begun to crack and separate, and the decking throughout the structure is warped creating trip hazards. Due to the removal of play structure features, areas have been closed-off to reduce safety concerns. Overall, the playground is beyond it’s useful life and warrants the replacement. The playground is rated as poor in the park asset conditions report. The playground would remain in the same location but would be a complete replacement. PROJECT INFORMATION Location: 2795 E 17th Ave, Denver, CO 80206 District: 9 Neighborhood: City Park Elevate Denver Funded Amount: $2,000,000 Additional Park Funding Amount: $400,000 Designer: Mundus Bishop (Phase 1 and 2) Contractor: Haselden Construction (Phase 3) PROJECT BENEFITS A regional destination playground space Picnic area upgraded to Tier A standards Improved accessibility and circulations KEY MILESTONES PHASE 1 OUTREACH / CONCEPT COMPLETE PHASE 2 DESIGN COMPLETE PHASE 3 CONSTRUCTION FALL 2020 PROJECT COMPLETION LATE SPRING 2021 Learn more about the program and projects in your neighborhood at denvergov.org/ElevateDenver. MAY 2021
Transcript

PROJECT SUMMARY

SHEET

CITY PARK PLAYGROUNDPROJECT BACKGROUND

The City Park Playground is located just west of Ferril Lake in City Park. The playground was constructed in 1996, and is a highly utilized regional facility. Replacement of the existing playground is envisioned to be a regional ‘destination’ playground and fulfills the vision identified in the City’s Playground Master Plan.

This 17,000 square foot playground has shown signs of wear for years and continues to put excessive burdens on Parks Operations. The safety surfacing has begun to crack and separate, and the decking throughout the structure is warped creating trip hazards. Due to the removal of play structure features, areas have been closed-off to reduce safety concerns. Overall, the playground is beyond it’s useful life and warrants the replacement. The playground is rated as poor in the park asset conditions report. The playground would remain in the same location but would be a complete replacement.

PROJECT INFORMATION

Location: 2795 E 17th Ave, Denver, CO 80206

District: 9

Neighborhood: City Park

Elevate Denver Funded Amount: $2,000,000

Additional Park Funding Amount: $400,000

Designer: Mundus Bishop (Phase 1 and 2)

Contractor: Haselden Construction (Phase 3)

PROJECT BENEFITS

A regional destination playground space

Picnic area upgraded to Tier A standards

Improved accessibility and circulations

KEY MILESTONESPHASE 1OUTREACH / CONCEPT COMPLETE

PHASE 2DESIGN COMPLETE

PHASE 3CONSTRUCTION FALL 2020

PROJECTCOMPLETION LATE SPRING 2021

Learn more about the program and projects in your neighborhood at denvergov.org/ElevateDenver.

MAY 2021

PROJECT SUMMARY

SHEET

CITY PARK PLAYGROUND — PHASE 1COMMUNITY OUTREACH AND CONCEPT DESIGN

Phase 1 solicited community input on how the community envisions “play” in City Park and specifically what they hold dear about the existing playground space. This phase included an existing condition inventory / site analysis, and development of goals, objectives, conceptual alternatives, estimate of construction, and a preferred concept.

Community Outreach and Concept Design kicked off spring 2018 and concluded December 2018 with a Saturday Open House at Carla Madison Rec Center. The community outreach portion of this Phase included three informal “pop-ups”, three open houses, and three online questionnaire surveys that received over 340 responses.

Denver Parks and Recreation hosted a pop-up public event at the existing playground engaging with families that use the space in October 2018. Community members provided input on the design concept and reference imagery.

Dustin Redd / South Meadow - Summary Memorandum6

11

12

1

7

2

5 3

68

4

9

10

View

INCLUSIVE

FANTASY climbing

creating

scramble parkour

ADVENTURE

ARTFUL

13

2

86

N

10’ 20’0’

1112

SkywalkSpiral Hill

Legend1 Dragon Slide & Wave Run

7 Open Air Pavilion

2 Castle Tower & Slide

5 Under 5 Play Area

3 Gateway & Bridge

6 Parkour Course & Spinner

8 Towers & Rope Bridge

4 Trees & Dragon Egg Jumpers

9 Swings10 Scooter Track

1

Carousel13

13

East/West Walk

Bird’s Eye

View

DUSTIN REDD PREFERRED CONCEPT

Dustin Redd / South Meadow - Summary Memorandum6

11

12

1

7

2

5 3

68

4

9

10

View

INCLUSIVE

FANTASY climbing

creating

scramble parkour

ADVENTURE

ARTFUL

13

2

86

N

10’ 20’0’

1112

SkywalkSpiral Hill

Legend1 Dragon Slide & Wave Run

7 Open Air Pavilion

2 Castle Tower & Slide

5 Under 5 Play Area

3 Gateway & Bridge

6 Parkour Course & Spinner

8 Towers & Rope Bridge

4 Trees & Dragon Egg Jumpers

9 Swings10 Scooter Track

1

Carousel13

13

East/West Walk

Bird’s Eye

View

DUSTIN REDD PREFERRED CONCEPT

Illustration of the approved design concept for the playground renovation that was shared with community members at the final open house in December 2018.

MAY 2021

PROJECT SUMMARY

SHEET

CITY PARK PLAYGROUND — PHASE 1COMMUNITY OUTREACH AND CONCEPT DESIGN

Dustin Redd / South Meadow - Summary Memorandum 7

3

East / West Walk

1112

SkywalkSpiral Hill

Legend1 Dragon Slide & Wave Run

7 Open Air Pavilion

2 Castle Tower & Slide

5 Under 5 Play Area

3 Gateway & Bridge

6 Parkour Course & Spinner

8 Towers & Rope Bridge

4 Trees & Dragon Egg Jumpers

9 Swings10 Scooter Track

Carousel13

N

scooter track

10spinning 6

9

swinging

8

hanging out

ACTIVE

5

13 4 2

6

9

8

7

10

12

11

1

Section

View

balancing

DUSTIN REDD PREFERRED CONCEPT

As shown in the design illustration above, all elements of the playground will be completely replaced including equipment, pavement and landscaping. This conceptual design was shared with community members at an open house hosted at the nearby Carla Madison Recreation Center in December 2018.

Dustin Redd / South Meadow - Summary Memorandum6

11

12

1

7

2

5 3

68

4

9

10

View

INCLUSIVE

FANTASY climbing

creating

scramble parkour

ADVENTURE

ARTFUL

13

2

86

N

10’ 20’0’

1112

SkywalkSpiral Hill

Legend1 Dragon Slide & Wave Run

7 Open Air Pavilion

2 Castle Tower & Slide

5 Under 5 Play Area

3 Gateway & Bridge

6 Parkour Course & Spinner

8 Towers & Rope Bridge

4 Trees & Dragon Egg Jumpers

9 Swings10 Scooter Track

1

Carousel13

13

East/West Walk

Bird’s Eye

View

DUSTIN REDD PREFERRED CONCEPT The above play components were evaluated and preferred by the community during outreach events. These components have been incorporated into the final playground design.

MAY 2021

PROJECT SUMMARY

SHEET

CITY PARK PLAYGROUND — PHASE 2CONSTRUCTION DOCUMENTATIONU

WU

WU

WU

WU

WU

WU

WU

WU

WU

WU

W

UW UW UW UW UW

CO

CO

CO

CO

EJ

EJ

EJ

EJ

EJ

EJ

CO

LIMIT OF WORK

TREE PROTECTION ZONE (TPZ)

EX DECIDUOUS TREE

EX CONTOUR

EX WATER LINE

EX STORM PIPE

EX POWER LINE

EX EVERGREEN TREE

UW

SD

UE

EXPANSION JOINT

CONC PAVING

ENGINEERED WOOD FIBER

BOULDER

PIP RESILIENT SURFACING

PICNICTABLE

CONC CURB

CRUSHED STONE PAVING

UNDERDRAIN

BIKE RACK

GRILL

A B

EJ

CAFE TABLE

WOOD BRIDGE

COBBLE MULCH

CONC PLANTER WALL

FENCE

-100% CD 03/27/2020

30% CD

--------

Know what's belowbefore you dig.Call

R

1525 Raleigh Street, Suite 310 Denver, CO 80204

Tel: (303) 477-5244 Fax: (303) 477-5146

Dus

tin R

edd

Play

grou

nd a

nd P

erm

itted

Pic

nic

Area

City

Par

k, D

enve

r, C

O, 8

0205

Issues

DesignDrawnChecked

Sheet Title

Sheet No.

Revisions

RSJS/BSTB/RS

07/18/201960% CD 09/18/201990% CD 02/07/2020

PlaygroundMaterials Plan

L4.01PLAYGROUND MATERIALS PLAN1

3L6.12

PICNIC TABLE TYPE BTYP OF (4)

PAVILION ATPLAY AREA

2L6.11

CONCRETE PAVINGTYP

1L6.02

A

B

C

D

F

G

E

H IJ

KL

CAFE TABLETYP OF (6)

2L6.12

BIKE RACKTYP OF (4)

1L6.12

FENCE AT ENTRY MONUMENTTYP

1L6.07

WOOD BRIDGE1L6.08

8L6.03

PIP RESILIENT SURFACINGCOLOR 'A'

7L6.03

ENGINEERED WOOD FIBERTYP

MAT

CH

LIN

ER

E: L

5.01

MATERIALS LEGEND

PERMITTEDPICNIC AREARE: L3.01, L3.02

KEY PLAN

PLAYGROUNDRE: L4.01,L4.02, L4.04

ADD ALTERNATE #1RE: L8.01

MATERIAL NOTES:1. RE: SHEET L0.01 FOR GENERAL NOTES AND

ABBREVIATIONS.

2. RE: SHEET L2.01 FOR MATERIALS NOTES.

PLAY EQUIPMENT SCHEDULEA 3 BAY SWING: 2 BELT, 1 FRIENDSHIP, 2 TODDLERB WHEELCHAIR SWINGC CURVA SPINNERD VILLAGE TOWERS AND PARKOURE NET SPINNERF WE GO ROUND CAROUSELG BASKET SWINGH SADDLE SPINNERI DOUBLE BOBBLE RIDERJ 4-SEAT SEESAWK CASTLE TOWERL DRAGON CLIMBERM CASCATA BELLS

CONCRETE CURB AT PIPTYP

BOULDER WALL

1L6.10

M

COBBLE SWALE4L7.03

CONCRETE PAVINGTHICKENED EDGE

2L6.02

N

ENTRY MONUMENT2L6.06

UNDERDRAINTYPRE: CIVIL

5L6.03

CONCRETE CURB AT EWF

PLAYGROUNDENTRANCERE: L5.01, L5.02

INLETRE: CIVIL

2L6.10

6L6.03

CONCRETE PLANTER WALLTYP OF (3)

1L6.04

CONCRETE PAVINGWITH TURNDOWN EDGE

3L6.02

BOULDERS AT MOAT1L6.09

1L6.05

CONCRETE 'WAVY WALK'

CONCRETE CURBFLUSH

3L6.03

0 10 205

DRYWELLRE: CIVIL

8L6.03

PIP RESILIENT SURFACINGCOLOR 'B'

8L6.03

PIP RESILIENT SURFACINGCOLOR 'B'CONCRETE PAVING

WITH TURNDOWN EDGE3

L6.02

FENCE AT WHEELCHAIR SWING2L6.07

UNDERDRAIN, TYPRE: CIVIL

DRYWELLRE: CIVIL

LANDSCAPE BOULDERTYP

CRUSHED STONE PAVING2L6.03

CRUSHED STONE PAVING2L6.03

FENCE AT ENTRY MONUMENTTYP

1L6.07

CONCRETE CURBFLUSH

3L6.03

5L6.03

CONCRETE CURB AT EWF

Final construction plan of the playground renovation for City Park Playground. Construction is scheduled to begin in 2020.

PERSPECTIVE WITH [email protected] 08P

CITY PARK DUSTIN REDD - DENVER, CO

PROPERTY OF EARTHSCAPE

PROPERTY OF EARTHSCAPE

PROPERTY O

F EARTHSCAPE

PRO

PERT

Y O

F EA

RTHS

CAPE

CMDRAWN BY:

tel: 519.804.6854toll free: 1.877.269.2972fax: 519.669.5085 CHECKED BY: NS

CURRENT VERSION

v1.0Rendering of the custom dragon play feature designed to incorporate play elements desired by community members, such as fantasy, adventure, climbing and inclusivity.

This rendering shows the addition of a custom play tower that pays tribute to Gio Ponti, an Italian architect who designed the Martin Building of the Denver Art Museum Tower. The original playground included a Denver Cityscape mural that was beloved by all playground users. The custom tower is intended to renew this element from the original playground while continuing with the castle themes and concepts.

MAY 2021

The new playground design will eliminate safety concerns or potential hazards at existing playground such as cracked surface areas and warped decking that can cause injuries.


Recommended