+ All Categories
Home > Documents > Civil & Steel Structure Mechanical Work Electrical Work...

Civil & Steel Structure Mechanical Work Electrical Work...

Date post: 06-Mar-2018
Category:
Upload: dodan
View: 272 times
Download: 9 times
Share this document with a friend
50
PT MULTI KARYA ENGINEERING CONSTRUCTION & STEEL FABRICATION Civil & Steel Structure Blast & Paint Work Mechanical Work Electrical Work Engineering Insulation Piping
Transcript
Page 1: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERINGCONSTRUCTION & STEEL FABRICATION

Civil & Steel Structure

Blast & Paint Work

Mechanical Work

Electrical Work

Engineering

Insulation

Piping

Page 2: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

Factory :

Jln. Raya Trans Sumatera – Bakauheni

Km 27 Desa Pardasuka Kec. Katibung

Lampung Selatan – Lampung

Telp. : +62 – 721 – 370008, +62 – 721 – 370089

Fax. : +62 – 721 – 370099

Website : www.multikaryaengineering.com

E-mail : [email protected]

Head Office :

Synergy Building Lt.5 No.5 Jl. Jalur Sutera Barat No.17

Alam Sutera – Tanggerang

Telp. : +62 – 21 – 3044 8286

Fax. : +62 – 21 – 3044 8285

Website : www.multikaryaengineering.com

E-mail : [email protected]

PT MULTI KARYA ENGINEERINGCONSTRUCTION & STEEL FABRICATION

PT MULTI KARYA ENGINEERING

Page 3: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

CONTENT

INTRODUCTION

PERFORMANCE

EQUIPMENT & TOOLS

LEGALITY

PT MULTI KARYA ENGINEERING

Page 4: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

INTRODUCTION

1. Vision

To be the best fabrication and Engineering Contractor and remind to be

trusted

partner for successful EPC and solution Provider.

2. Mission

• To ensure that all jobs are carried out to the best of our quality.

• To ensure that all jobs are carried out to the best of schedule and team work.

• To ensure that all jobs are carried out to the best of our ability and

continuously develop our manpower and quality.

• To ensure our customer's satisfaction by accurately grasping their needs and

meet them by bringing the Company's unique intellectual capital and

operational assets to bear on these needs.

3. Coorporate Value

• Committed to work procedure, rule and regulation.

• Develop professional relationship, team work and proactive.

• Committed to timeline and through in works, accountable and

responsible.

• Being true and faithful, good conduct, best behavior and honesty.

• Strive for success and quality works and forward thinking.

• Customer satisfaction oriented.

PT MULTI KARYA ENGINEERING

Page 5: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

INTRODUCTION

Civil & Steel Structure

Mechanical Work

Electrical Work

Piping

Insulation

Engineering

Blast & Paint Work

Oil & Gas Petroch Industrial Power Plant

PT MULTI KARYA ENGINEERING

Page 6: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

Commercial

Division

Board

Of

Director

Project

Division

Project

ManagementQA / QC HSE MarketingHRGAFAD

Factory Electrical Mechanical Civil

INTRODUCTION

PT MULTI KARYA ENGINEERING

Page 7: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

INTRODUCTION

In Billion – IDR

CASH & OTHER 4,90

ACCOUNT

RECEIVABLE6,89

FIXED ASSET 18,42

30,21

LONG TERM LIABILITIES 2,80

SHORT TERM LIABILITES

SHORT TERM LIABILITES

3,41

3,02

E Q U I T Y 20,80

30,21

PT MULTI KARYA ENGINEERING

Page 8: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

INTRODUCTION

PT MULTI KARYA ENGINEERING

Head Office :

Jl. Synergy Building Lt.5 No.5 Jl. Jalur Sutera Barat

No.17

Alam Sutera – Tanggerang

Telp. : +62 – 21 – 3044 8286

Fax. : +62 – 21 – 3044 8285

Website : www.multikaryaengineering.com

E-mail : [email protected]

Factory :

Jln. Raya Trans Sumatera – Bakauheni

Km 12,5 Desa Pardasuka Kec. Katibung

Lampung Selatan – Lampung

Telp. : +62 – 721 – 370008, +62 – 721 –

370089

Fax. : +62 – 721 – 370099

Website : www.multikaryaengineering.com

E-mail : [email protected]

Page 9: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

No Project Name Client Working Various Working Item Project Roles Scope Of Works Duration

1. L Project SK Coorporation Lub Base Oil Plant Steel Structure Sub Contractor Blasting Painting2007 March – 2007

Oct

2. Storage Tank Project PT Tunas Baru Lampung Palm Oil Plant Storage Tank Sub Contractor Blasting Painting2007 Aug – 2007

Dec

3. Shot Room Construction PT Tekniko Indonesia Semi Automatic Shoot Room Mechanical & Electrical Main ContractorCivil,Fabrication,Mechanic

al & Electrical

2007 Nov – 2008

Feb

4. Oil Storage Tank Project PT Oil Tanking Merak Oil Processing Plant Piping Sub Contractor Blasting Painting2008 Sept – 2009

Jan

5. Pelindo Workshop Pelindo Palembang Workshop Steel Structure Main Contractor

Civil,Fabrication,Mechanic

al & Electrical2008 Sept – 2008

Dec

6.Palembang Asphalt Bulk

Terminal

PT Wahyu Bitumen

GrahaAsphalt Bulk Terminal Asphalt Storage Tank Main Contractor

Fabrication,Mechanical &

Electrical2008 Feb – 2008

Dec

7.Aceh Asphalt Bulk

TerminalPT Aspal Bangun Sarana Asphalt Bulk Terminal Asphalt Storage Tank Main Contractor

Fabrication,Mechanical &

Electrical

2008 Oct – 2009

March

8. SP-PSA RTGC PT Hanjung Indonesia Gantry Cane (TT Crane) Mechanical Sub Contractor Fabrication2008 Dec – 2009

March

9. Pasir Coal Project PT Cranetech Service Cnveyor, Chute & Coal Silo Steel Structure Sub Contractor Fabrication2008 Dec – 2009

May

10. Cirebon Power PlantPT Whisan Teknik

PerdanaChimney Platform Steel Structure Sub Contractor Fabrication & Erection

2009 Aug – 2010

March

11. Cirebon Power Plant PT Tekniko IndonesiaTransfer Tower For Coal

HandlingSteel Structure Sub Contractor Fabrication & Erection

2009 Sept – 2010

Sept

12. Cirebon Power Plant Doosan Heavy Industries Coal Fired Power Plant Electrical Sub Contractor Erection & Installation2009 Jan – 2010

Dec

13. PLTU 3 Bangka PT Teknik Lancar MandiriPlatform & Inner Flue

ChimneySteel Structure Sub Contractor Fabrication & Erection

2010 April – 2010

Sept

14. PLTU Lampung Doshion Veolia Co Ltd Water Treatment Plant Water Storage Tank Sub Contractor Fabrication & Erection2010 June – 2010

Nov

15.Medan Asphalt Bulk

TerminalPT Aspal Bangun Sarana Asphalt Bulk Terminal Asphalt Storage Tank Main Contractor

Fabrication,Mechanical &

Electrical

2010 Aug - 2011

March

16. PLTU Lampung PT Adhi Karya Shelter Building Steel Structure Sub Contractor Fabrication & Erection2010 Aug – 2010

Nov

17. PLTU Lampung PT Adhi Karya Ducting Steel Structure Sub Contractor Fabrication 2010 Sept – 2010

Dec

18. PLTU Lampung PT Adhi Karya Turbin Auxiliary Steel Structure Sub Contractor Fabrication & Erection2010 Oct – 2011

Jan

19. PLTU Sumbar PT Teknik Lancar MandiriPlatform & Inner Flue

ChimneySteel Structure Sub Contractor Fabrication & Erection

2010 Oct – 2011

Jan

20. PLTU 3 Bangka PT Truba Alam (TAME) Ducting Steel Structure Sub Contractor Fabrication & Erection2010 Oct - 2010

Dec

21. PLTU Lampung Doshion Veolia Co Ltd Water Treatment Plant M,E & Instrument Sub Contractor Erection & Installation2010 June – 2010

Sept

22. PLTU Lampung PT Adhi Karya Structure Shelter Steel Structure Sub Contractor Fabrication & Erection2010 Sept – 2010

Nov

23. PLTU Lampung PT Adhi Karya Ducting Steel Structure Sub Contractor Fabrication 2010 Sept – 2011

Jan

24. Cirebon Power Plant Doosan Heavy Industries Ship Unloader Electrical Sub Contractor Erection & Installation2010 Sept – 2011

Feb

PT MULTI KARYA ENGINEERING

PERFORMANCE

Page 10: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

No Project Name Clien Working Various Working Item Project Roles Scope Of Work Duration

25. Merak Power Plant Daewoo EngineeringTemporary

FacilitiesCivil Sub Contractor EPC 2010 Sept – 2011 Feb

26. Krakatau – Posco Project Posco E & CTemporary

FacilitiesElectrical Sub Contractor Installation 2011 Feb – 2011 March

27. HTM – Factory KS KMK Global Factory

Steel Structure, Civil

& Temporary

Facilities

Sub Contractor EPC 2011 June – 2011 May

28.Jembatan Jalur Khusus

Batubara

PT Nugraha Adi Taruna

Jo. PT Bakrie Metal

Industries

BridgeCivil & Steel

StructureSub Contractor PC 2011 June – 2011 Nov

29. PLTU LampungPT Gaka Karya

EngineeringInsulation Mechanical Sub Contractor Installation 2011 July – 2011 Sept

30. PLTU Lampung PT Adhi Karya Architecture Work Civil Sub Contractor Erection 2011 July – 2011 Oct

31. PLTU Lampung PT Adhi Karya Drainage System Civil Sub Contractor EPC 2011 July – 2011 Oct

32. Merak Power Plant PT Wijaya Karya Turbine Erection Steel Structure Sub Contractor Erection/Installation 2011 Aug – 2011 Nov

33. Merak Power Plant PT Wijaya Karya Coal Bunker Steel Structure Sub Contractor Erection/Installation 2011 Dec – 2012 Feb

34. POSCO KS Project POSCO Co. Ltd Conveyor Steel StructureJo. With Top

BridgeFabricatin & Erection 2012 Jan – 2012 Dec

35.Jembatan Khusus Jalur

BatubaraPT Servo Lintas Raya Bridge Steel Structure Sub Contractor Erection 2012 Jan – 2012 March

36.Simple Part Fabrication

WorkPT Tekniko Indonesia Fabrication Steel structure Sub Contractor Blashting Furnace Des 2012 – April 2013

37.Prepare Damage Part Of

Hana

PT Sejahtera Karunia

LinesOver Haul Steel structure Main contractor

Preparation, Demolition,

Fabrication & Install Work2013 Jan – 2013 Mar ch

38. Additional Mechanical WorkBut Posc Engineering

Co.Ltd

Fabrication

ErectionSteel Structure Main contractor

Modification site, touch-

up, Safety Equipment2013 Jan –2013 Mar ch

39. Building Workshop Seyoung E&C Co. Ltd Office & Workshop Civil Main contractorBuilding workshop &

include steam coil tank2012 Des –2013 Mar ch

40.

EPC of Tarahan Port

Expansion Phase 5

(Package 10-183) PT Bukit

Asam Tbk.

PT Krakatau Engineering

– China Huadian

Engineering Co .Ltd

Fabrication RCD

indexerSteel Structure Main contractor

Upper Structure RCD

Building (RCD 4)2013 Jan –2013 Mei

41.

Fabrikasi & Instalasi

Platform & inner Flue PLTU

Tenayan Riau

PT Teknik Lancar MandiriFabrication &

InstalationSteel Structure Sub Contractor

Fabrikasi & Instalasi

Platform & inner Flue2013 Jan –2013 Jul

42.

Job Creation Stair Tower

Handrail Fabrication Issue

Material

PT Tekniko Indonesia Fabrication Steel Structure Sub Contractor

Structural Steel, Stair

Stringer & Support,

Staired, Handrail, Grating

Material A36 - estimated

2013 Mar ch –2013 April

43.

EPC of Tarahan Port

Expansion Phase 5

(Package 10-183) PT Bukit

Asam Tbk.

PT Krakatau Engineering

– China Huadian

Engineering Co .Ltd

Fabrication Steel Structure Main contractorPengadaan SS Conveyor

& Mechanical2013 Mar ch – Juli 2013

44.

EPC of Tarahan Port

Expansion Phase 5

(Package 10-183) PT Bukit

Asam Tbk.

PT Krakatau Engineering

– China Huadian

Engineering Co .Ltd

Erection Steel Structure Main contractorErection SS Conveyor &

Mechanical2013 Mar ch –2013 May

PT MULTI KARYA ENGINEERING

PERFORMANCE

Page 11: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

Project Name : Cirebon Coal Steam Fired

Power Plant Project 1 x 660 MW

Item Work : Electrical (Construction)

Scope Of Work : Installation

Client : PT Doosan Indonesia

Location : PLTU Cirebon, West Java

Periode : 2009 June – 2011 Maret

PT MULTI KARYA ENGINEERING

Page 12: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

Project Name : Cirebon Coal Steam Fired

Power Plant Project 1 x 660 MW

Item Work : Chimney Mechanical

Cool Handling Tower

Scope Of Work : Fabrication & Installation

Client : PT Doosan Indonesia

Location : PLTU Cirebon, West Java

Periode : 2009 September – 2010 April

PT MULTI KARYA ENGINEERING

Page 13: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Cirebon Coal Steam Fired

Power Plant Project 1 x 660 MW

Item Work : Turbin & WTP Roofing & Siding

Scope Of Work : Installation (Construction)

Client : PT Doosan Indonesia

Location : PLTU Cirebon, West Java

Periode : 2010 September – 2012 March

Page 14: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

Project Name : Aceh Asphalt Bulk Terminal

Item Work : Civil, Mechanical & Electrical

Scope Of Work : Engineering, Procurement &

Cunstruction

Client : PT Aspal Bangun Sarana

Location : Aceh

Periode : 2008 October – 2009 March

PT MULTI KARYA ENGINEERING

Page 15: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

Project Name : PLTU Bangka Belitung 2 x 30 MV

Item Work : Chimney Mechanical

Scope Of Work : Fabrication & Installation

Client : PT Teknik Lancar Mandiri

Location : PLTU Bangka Belitung

Periode : 2010 April – 2010 September

PT MULTI KARYA ENGINEERING

Page 16: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

Project Name : SP-PSA RTGC

Item Work : Rubber Tired Gantry Crane

Scope Of Work : Fabrication

Client : PT Hanjung

Location : Lampung

Periode : 2008 December – 2009 March

PT MULTI KARYA ENGINEERING

Page 17: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

Project Name : PLTU Lampung 2 x 100 MW

Item Work : Water Treatment Plant Mechanical

Electrical & Instrument

Scope Of Work : Fabrication & Installation

Client : Doshin Veolia Water Solution PTE LTD

Location : PLTU Lampung

Periode : 2010 August – 2011 August

PT MULTI KARYA ENGINEERING

Page 18: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Asphalt Plant Project

Item Work : Civil, Mechanical & Electrical

Scope Of Work : Engineering, Procurement &

Construction

Client : PT Bitumen Graha

Location : Palembang, South Sumatera

Periode : 2008 February – 2008 November

Page 19: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Temporary Office & Facility

Item Work : Civil, Mechanical & Electrical

Scope Of Work : Engineering, Procurement &

Cuntruction

Client : PT ABS, PT Whisan, Daewoo

Engineering

Location : Aceh, PLTU Cirebon, PLTU

Merak

Periode : 2008 November – 2010 February

Page 20: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

Project Name : PLTU Lampung

2 x 110 MW

Item Work : Boiler & Chimney

Ducting

Scope Of Work : Fabrication

(Procurement)

Client : PT Adhi Karya

Location : PLTU Lampung

Periode : 2010 October –

2011 February

PT MULTI KARYA ENGINEERING

Page 21: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : PLTU Lampung

Item Work : BOP Shelter

Scope Of Work : Fabrication &

Installation

Client : PT Adhi Karya

Location : PLTU Lampung

Periode : 2010 October –

2011 January

Page 22: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

Project Name : HTM Factory Project-K5

Item Work : Civil & Architecture

Scope Of Work : Engineering, Procurement & Construction

Client : PT KMK Global Sport

Location : Tangerang

Periode : 2011 January – 2011 May

PT MULTI KARYA ENGINEERING

Page 23: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Indonesia Integrated Steel Mill Plant

Temporary Office

Item Work : Electrical

Scope Of Work : Procurement & Construction

Client : PT POSCO E & C

Location : Cilegon, Banten

Periode : 2011 February – 2011 March

Page 24: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Instalasi Jembatan Jalur Khusus Batubara

Item Work : Civil & Steel Structure

Scope Of Work : Installation & Construction

Client : PT Nugraha Adi Taruna Jo.

PT Bakrie Metal Industries

Location : Muara Enim, South Sumatera

Periode : 2011 June – 2011 November

Page 25: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : PLTU Lampung

Item Work : Insulation

Scope Of Work : Installation &

Construction

Client : PT Gaka Karya

Engineering

Location : PLTU Lampung

Periode : 2011 June –

2011 December

Page 26: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : PLTU Lampung

Item Work : Main Drainage System

Scope Of Work : Procurement & Construction

Client : PT Adhi Karya

Location : PLTU Lampung

Periode : 2011 June – 2011 December

Page 27: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Merak Power Plant 2 x 60 MW

Item Work : Turbin, Cool Bungker, BOP Structure

Scope Of Work : Installation ( Construction )

Client : PT Waskita Karya

Location : Merak, Banten

Periode : 2011 August – 2012 April

Page 28: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Indonesia Intergrated Steel Mill Plant,

Steel Making Plant & Continuos Casting Plant

Item Work : Steel Structure

Scope Of Work : Fabrication, Installation & Construction

Client : PT POSCO E&C Indonesia

Location : Cilegon, Banten

Periode : 2012 – Present

Page 29: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Indonesia Intergrated Steel Mill Plant,

Steel Making Plant & Continuos Casting Plant

Item Work : Steel Structure

Scope Of Work : Fabrication, Installation & Construction

Client : PT POSCO E&C Indonesia

Location : Cilegon, Banten

Periode : 2012 – Present

Page 30: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Indonesia Intergrated Steel Mill Plant,

Steel Making Plant & Continuos Casting Plant

Item Work : Raw Material Blasting & Painting

Scope Of Work : Blasting & Painting

Client : PT POSCO E&C Indonesia

Location : Cilegon, Banten

Periode : 2012 – Present

Page 31: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Biomas Carbonization Plant

Item Work : Mechanical

Scope Of Work : Fabrication

Client : PT Sico Techno

Location : Bandar Lamung

Periode : 2012 August – 2012 November

Page 32: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : PLTU Tenayan 2 x 110 MW Riau

Item Work : Chimney mechanical

Scope Of Work : Fabrication & Instalation

Client : PT. Teknik Lancar Mandiri

Location : Riau

Periode : 2013 Jan –2013 Juli

Page 33: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Tarahan Port Expansion Phase 5

(Package 10-183) PT Bukit Asam Tbk.

Item Work : Coal Handling transfer tower & Conveyor

Scope Of Work : Fabrication & Installation

Client : Join PT. Krakatau Engineering – China Huadian

Engineering CO.LTD

Location : Lampung

Periode : 2013 Jan –2013 Mei

Page 34: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Project Name : Indonesia Integrated steel Mill

Plant

Item Work : Small building of blast furnace

Scope Of Work : Fabrication

Client : PT. TEKNIKO INDONESIA

Location : Lampung

Periode : Des 2012 – April 2013

Page 35: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 36: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 37: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

No Equipment Name Qty Unit Model & Type

1 Compresor 100 Hp 2 Unit DRE 100, AT AIR CECCATO ARIA COMP. 7.5 Bar, 75 KW,400V

2 Tank Compressor 1 Unit Capacity 2000 liter, Working Pres 10 kg/CM2, Efficiency 0.85

3 Compressor 50 HP 1 Unit CSC 50, CECCATO ARIA COMP. 8 Bar, 37 KW, 00V, 110A

4 Enginee Compressor 2 Unit Capacity 75 HP

5 Tank Compressor 1 Unit Capacity 986 liter, Working Press 8 Bar, Press Max 12 Bar

6 Compressor 2 Hp 1 Unit Multipro, BC-200 DMBW, 2.0 HP, 1.5 KW K9.27, 24 L15.29, IP 4 SI

7 Tank Compressor 4 Set Standard Tank

8 Pot Blashting 6 Set A-BEC‖ 600 LBS Cap, with 1-1/4‖ Mattering Ball Valve Complete

9 Hemet 2 Set Astro PT Maribaya Part No. 0132-001/P

10 Helmet 4 Set Clemco‖ Apollo 100

11 Nozlle 6 Set ClemiteSXR – No.6

12 Hose 5 Unit Various

13 Airline Breathing Filter 1 Set Clemco Nova 2000

14 Airless 2 Set GRACO Airless XtremeKing 45:1 C/W, Silver Plus Gun Tip 517,

15 Pot Painting 6 Set Krisbow 20 Ltr / Agitator & 10 Ltr

16 Spray Gun 9 Set Star S-770

17 Electro Phisic 1 Ea KDLN

18 Infrared Thermometer 1 Ea Krisbow Merk

19 Minitest 1 Set 600 B

20 Elcometer 1 Ea Asia PTE.LTD

21 Hygro-Thermometer 1 Ea

Page 38: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 39: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 40: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

No Equipment Name Qty Unit Model & Type

1 Power Press 1 set Capacity 110 ton, 1200 mm x 900 mm

2 Hydraulic Press Break 1 set Capacity 50 ton

3 Hydraulic Roll Bending Machine 2 set Dia. 6-30 mm t. 2700 mm Bending lengt

4 Shearing Machine 1 set 25 mm t. 2550 mm Cutting Length

5 ARS Welding Machine / SMAW 20 set Capacity 400 A

6 DC Welding Machine / GTAW 5 set Capacity 500 A

7 CO2 Welding Machine 2 set Capacity 500 A

8 Generator 2 set Capacity 250 KW Caterpillar

9 Grending/DrillMachine 10 Unit Bosch Professional GWS 6—100

10 Drilling Machine 1 Unit Makita HP 1620

11 Hammer Drill 2 Unit Bosch Hammer GSH 388

12 Chain Block 20 set Various

13 Lever Blok 10 set Various

14 Cutting Torch 30 set Various

15 Heating Torch 20 set Various

16 Portable Grinder 10 set Various

17 Baby Grinder 6 set Small –Large

18 Expander Machine 5 set Various

19 Fork Lift 2 Unit Capacity 7.5 ton

20 Over Head Hoist Crane 5 set Capacity 7 ton& 5 ton

21 Hydraulic Truck Crane 1 Unit Capacity 50 ton

22 Loading Truck 1 Unit Capacity 20 ton

23 Wire Type Winch Machine 4 set Capacity 7 ton

24 Impact Machine 4 Unit Dia. 0.75 ―

25 SockrtWrench 6 set Size 40 -80 mm

26 Tool Box 10 set Various

Page 41: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

LEGALITY

Page 42: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 43: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 44: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 45: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 46: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 47: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 48: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 49: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERING

Page 50: Civil & Steel Structure Mechanical Work Electrical Work ...multikaryaengineering.com/download/company-profile-2013.pdf · Electrical Work Engineering Insulation Piping. ... Sub Contractor

PT MULTI KARYA ENGINEERINGCONSTRUCTION & STEEL FABRICATION


Recommended