SAP PS User manual Published by Team of SAP Consultants at SAPTOPJOBS Visit us at www.sap-topjobs.com Copyright 2008-10@SAPTOPJOBS All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS
Transcript
Page 1: CJ2D - Create Project v1

SAP PS User manual

Published by Team of

SAP Consultants at

SAPTOPJOBS

Visit us at www.sap-topjobs.com

Copyright 2008-10@SAPTOPJOBS

All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS

Page 2: CJ2D - Create Project v1

Create Project CJ2D

Definition:- There are different ways to create a project in PS. It can be created using

Project builder – CJ20N Project Planning board – CJ27 Structure planning – CJ2D Project Definition only – CJ06

Project contains Project definition, WBS element, Network and Activities. It is possible to create all at once or individually. Let us try to understand how to create project using CJ2D transaction code. Prerequisite:- Proper authorization to create project. Menu Path:- Logistics → Project system → Basic Data Project → Special Maintenance Functions Structure Planning

Create Project CJ2D Double click CJ2D

Page 3: CJ2D - Create Project v1

Click to find the next running number Enter the required series to find the next number in that series

Page 4: CJ2D - Create Project v1

Click

Page 5: CJ2D - Create Project v1

number proposed Click Enter project profile. Enter start and finish date Click

Page 6: CJ2D - Create Project v1

Click Enter project definition text. E.g.

Page 7: CJ2D - Create Project v1

Note:- this is same as explained already in other methods of project definition creation. Click Maintain the required data as per the project

Page 8: CJ2D - Create Project v1

Click and maintain detailed description if required. From the top of the menu goto WBS element

Page 9: CJ2D - Create Project v1

Maintain the WBS element as shown below

Page 10: CJ2D - Create Project v1

Select the row Click Enter start and finish date

Page 11: CJ2D - Create Project v1

Select the row and click at the bottom Maintain Basic data

Page 12: CJ2D - Create Project v1

Click Maintain the settlement rule asset as receiver.

Page 13: CJ2D - Create Project v1

Click Click and maintain entry as required

Page 14: CJ2D - Create Project v1

Click

Page 15: CJ2D - Create Project v1

Select the row Click Maintain scheduling

Page 16: CJ2D - Create Project v1

Click Click Maintain the data as shown below.

Page 17: CJ2D - Create Project v1

Click From the project definition using menu from the top as shown below, release the project

Page 18: CJ2D - Create Project v1

Click

Page 19: CJ2D - Create Project v1

SAP PS User manual

Published by Team of

SAP Consultants at

SAPTOPJOBS

Visit us at www.sap-topjobs.com

Copyright 2008-10@SAPTOPJOBS

All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS