27
57 QUAYSIDE SOPHIE MCLEAN, GRAHAM EVANS, BISWASH BANIYA
Transcript
Page 1: Ck21 presentation team 1

57 QUAYSIDESOPHIE MCLEAN, GRAHAM EVANS, BISWASH BANIYA

Page 2: Ck21 presentation team 1

INTRODUCTIONINTO PROJECT

Page 3: Ck21 presentation team 1
Page 4: Ck21 presentation team 1
Page 5: Ck21 presentation team 1
Page 6: Ck21 presentation team 1

DATA ACQUISITION

Page 7: Ck21 presentation team 1

Point Cloud Data from Laser Scanning to Revit Model

Page 8: Ck21 presentation team 1
Page 9: Ck21 presentation team 1
Page 10: Ck21 presentation team 1

DESIGN DEVELOPMENT

Page 11: Ck21 presentation team 1
Page 12: Ck21 presentation team 1
Page 13: Ck21 presentation team 1
Page 14: Ck21 presentation team 1
Page 15: Ck21 presentation team 1
Page 16: Ck21 presentation team 1

1. Basement Retaining Wall: Strip Foundations

Page 17: Ck21 presentation team 1

2. Piled Foundations

Page 18: Ck21 presentation team 1

3. Universal Columns

Page 19: Ck21 presentation team 1

4. Universal Beams 254 x 146 x 31

Page 20: Ck21 presentation team 1

5. Universal Beams 356 x 171 x 51

Page 21: Ck21 presentation team 1

6. Universal Beams 356 x 127 x 33

Page 22: Ck21 presentation team 1

7. Cross Bracing

Page 23: Ck21 presentation team 1

8. Basement Floor

Page 24: Ck21 presentation team 1

9. Upper Floors

Page 25: Ck21 presentation team 1

WHATS NEXT?

Page 26: Ck21 presentation team 1

Mezzanine Level

Page 27: Ck21 presentation team 1

Structure V ArchitectureFirst Clash Detection in Navisworks

Build MEP Model


Recommended