2002 2005
Side façade 2009
Battens: 75mm x 50mm horizontal treated timber at 600 centres.
Windows Rationel Aldus
Coping stones: Supreme Concrete once weathered precast concrete with weather drips on mortar bed with ledcore DPC and steel brackets
Insulation Knauf Universal Slab CS48 glass mineral wool Membrane: Rubbershield Pro Breather membrane.
Wood Cladding: Western Red Cedar cladding. 25 x 150 (2ex) sawn featheredge. Rother Valley Timber.
Materials Final Cost breakdown
windows 1900
insulation 1650
structural 4000
wood cladding 4310
scaffold 4200
fire treatment 1145
Total 17205