Date post: | 04-Mar-2016 |
Category: |
Documents |
Upload: | gglc-webmaster |
View: | 220 times |
Download: | 0 times |
Clark Freeport and
Philippines Special Economic Zone
Taiwan
Vietnam Thailand
Malaysia
Singapore
Brunei
China
Korea
Japan
Dubai
2
Clark is within 3 hours from major trading
points in the ASEAN Region.
It is also at the heart of Luzon Island, a 40
minute drive from Metro Manila or Subic.
Global Accessibility
• 4,400 has. consisting of
the civil aviation complex (2,490 has.), Industrial parks, tourism and leisure estates, and ICT zones
The Freeport Zone
The Special Economic Zone • 27,600 has. conducive for a Agro-
Industrial, Tourism-Related Projects, Industrial Estate & ICT parks
• 10,684 hectares has been master planned for development
Clark Master Plan
AVIATION / LOGISTICS
TOURISM
TECHNO INDUSTRIAL
TECHNO INDUSTRIAL
TECHNO INDUSTRIAL
Clark
Freeport
Zone
Master Development and Land Use Plan
TECHNO INDUSTRIAL
SPECIAL ECONOMIC ZONE
AVIATION / LOGISTICS
TOURISM
CLARK LOCATORS BY INDUSTRY
Industrial
25%
Agro Ind’l
2%
Commercial
13%
IT
12%
Service
30%
Aviation Related
3%
Tourism
6% Institutional
1% Utility
2% Housing
6%
Industrial
Agro Ind’l
Commercial
IT
Service
Aviation Related
Tourism
Institutional
Utility
Housing
Dutch, 1%
India, 1%
China, 2%
France, 2%
Hongkong, 3%
British Virgin Islands (BVI), 4%
United Kingdom, 4%
Taiwan, 5%
Australia, 8%
Japan, 17%
USA, 21%
Korea, 26%
Dutch
India
China
France
Hongkong
British Virgin Islands(BVI)United Kingdom
Taiwan
Australia
Japan
SUMMARY OF CFZ CONTRACTS SIGNED ACCORDING TO NATIONALITY
As of October 2012 590 CFZ Locators
Economic Indicators Clark’s
YEAR INVESTMENT EMPLOYMENT EXPORT
2009 PHP 77.35 Billion 58,023 US $ 1.03 Billion
2010 PHP 85.41 Billion 60,162 US $ 1.45 Billion
2011 PHP 106.44 Billion 64,055 US $ 3.91 Billion
As of February 2012, employment has reached to 70,097
SCTex
Spur Logistics
Interchange 2
Clark Logistics
Interchange
M.A. Roxas
Under Pass 1
Start of Project Clark-
Tarlac Package 2
Friendship Gate
Clark North
Interchange & Panday
Pira Access Road
Clark North 2 Bridge Exit
Clark North 3 Bridge Entry
Gil Puyat Under Pass
Spur Road
U-Turn Slot
Spur NLE Interchange
Airport
Angeles City
M.A
. Ro
xasA
ve
Omni Aviation
School
Mac Arth
ur Hig
wahy
Mac A
rthur H
igw
ahy
NLE
Spur R
oad
Mabalacat
Panday Pira Access
Road
Spur Logistics
Interchange 2
Clark Logistics
Interchange
M.A. Roxas
Under Pass 1
Start of Project Clark-
Tarlac Package 2
Friendship Gate
Clark North
Interchange & Panday
Pira Access Road
Clark North 2 Bridge Exit
Clark North 3 Bridge Entry
Gil Puyat Under Pass
Spur Road
U-Turn Slot
Spur NLE Interchange
Airport
Angeles City
M.A
. Ro
xasA
ve
Omni Aviation
School
Mac Arth
ur Hig
wahy
Mac A
rthur H
igw
ahy
NLE
Spur R
oad
Mabalacat
Panday Pira Access
Road
Logistics Interchange
North Luzon Expressway
Subic International Seaport
Infrastructure Support
Power:
Existing:
69KV line direct from Mexico Substation
3 Substations with a total of 98 MVA
CDC Projects:
Construction of 2 x 150 MVA, 230/69KV substations
Installation of dual 230KV Transmission line from Mexico to Clark to be loop to the existing Concepcion-
Clark 230 KV line.
CEDC Projects:
69 KV lines in loop within CFZ
Construction of an additional 33 MVA 69/13.8KV Substation
Power Rate: P 6.88 /kwh or US $ 0.17 kwh (as of November 2012)
($ 1 = P 40.91 – Dec. 7, 2012)
Water:
1,177,560 m3 / month available resource
23 deep wells
Current Production: 856,182 / month
Current Consumption: 747,610m3/ month
5 reservoirs with capacity of 2.9 Million Gallons
13.2kms piping network
Water with Sewer Fee: Residential: P 16.40/ m3
Commercial: P 38.15/ m3
Industrial: P 37.78/ m3
Telecoms Service
High Speed Fiber Optic Cabling and Redundant Fiber Optic Loop
Available
STM1 and Multiple STM1 Available Capacity / Bandwidth
Commercial USD 22.84/month
Residential USD 13.22/month
National USD 0.09/min.
International USD 0.36/min.
Utilities
Manpower and Wages 35,000 graduates annually
Number of Schools Offering ICT
Programs
94
Top Degree Programs BS Computer Engineering
BS Computer Science
BS Electrical & Communications Engineering
BS Information Technology
BS Medical Technology
BS Information Management
BS Aircraft Maintenance Technology
160 Colleges/Universities in the Region
Median Pay
*Regional Minimum Wage
is PhP302/day or
US$6.70/day
or US$175/month
Encoder/Transcriptionist $ 248/month
Customer Service Rep. $ 282/month
Team Leader /Technician $ 328/month
Analyst/ Software Developer $ 400/month
MIS/Systems Administrator $ 413/month
Manager/ Department Head $ 957/month
1. Preferential tax rate of 5% based on GIE provided that 70% of products are to be exported
2. Duty Free importation of capital equipment, raw materials and finished goods subject to 70% minimum export requirement
3. Zero Value added tax on local purchases
1. Specialized Investors and Workers Visa
2. Electronics Transit Admission Permit System (E-TAPS)
Other Incentives
Incentives
Lease Rates
Land: Starts at US$ 0.30 per square meter per month
depending on location
Building: Starts at US$ 2.00 per square meter per month
depending on condition of structure
• CARE System
• Simplified registration process
• Multi-modal connectivity
• 24/7 Warehousing
• 24/7 Customs/Logistics services
•Clark Trade System
(electronic, paperless
transaction of import/export
permits)
Investor Friendly Climate
MSK GROUP WORK CLARK, INC.
4.48 has. Area - Warehouse/ Factory Building
Units along Creek Side Road, CFZ
SUMMARY REPORT FOR FEDEX FLIGHTS
PARTICULAR
NO. OF NO. OF
INBOUND FLIGHTS OUTBOUND FLIGHTS
January 51 51
February 43 43
March 55 54
April 50 50
May 53 53
June 49 49
July 53 53
August 54 54
September 52 51
October 52 51
November 48 50
December 51 52
TOTAL 611 611
e-TAP Procedures 1. Registration with CDC; Preparation , Uploading of List of Importables.
2. Subscription with VASP
3. Enrollment (CDC-TRE) for Payment of Freeport Fees
4. Electronic filling of e-TAP
5. Release of Goods at Port of Discharge
6. Delivery of the Goods to the Zone/Locators’ premise
e-ED Procedures 1. Registration with CDC; Preparation , Uploading of List of Exportables.
2. Subscription with VASP
3. Electronic Filing of e-ED
4. Filing of the Authority to Load at BOC-OSEDC
5. Examination/Clearance of Goods at CCA
6. Exit of Goods and Transit to the Port of Loading
3.
Top 8 Overall
2012-2013
2012-2013
Finance
Learning
and
Growth
Customer
Core
Process
CDC Strategic Map VISION By 2020, CDC shall have established Clark as the premiere logistics, light industry, industrial, service and tourism center in Southeast Asia.
MISSION The CDC generates meaningful and gainful employment and catalyzes sustainable economic development by converting Clark into the preferred international civil aviation complex; modern industrial estate; tourism, trade and business center. All these are consistent with national goals and adhering to the highest standards of good governance.
Establish full control over non productive
CFZ land assets using balance of firm
enforcement and inclusive growth
Address future development requirements of the
Freeport and Metro Clark communities to be more
efficient and competitive
Secure targeted
investments through
aggressive marketing
Sign up identified
investors for specific
packaged high impact
themed projects
Provide efficient regulatory
and support services to
create a sound business
environment
Optimize assets through business
models and strategic partnerships that
create higher value
Robust economic development
Gainful employment
Financial sustainability
Profitable business ventures
Transform the organization into a responsive,
performance-based structure
Develop competencies of
strategic units
Provide accurate, real-time and
secure data for decision-
making, security, monitoring
and customer service
Clark
Freeport ….
Your ultimate
gateway to
Business and
Leisure.