    Waste

    Presented by: Armando Cepeda Tamez

    Monterrey, Mexico September 2010

    Anything that does not add value

    Value

    Unnecessary

    waste

    Necessary

    waste

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    2/29

    INCIDENTAL ACTIVITIES

    WASTE

    WORK

    Moving pallets.Check parts.Record production.Walk to next machine.Stock Audits.Making goods thatare not required.

    Assembling partsPackagingWeldingPaint and plate

    Machining

    Wait for partsWait for handlingBend to pick up from floorDefect or Rework partsCarrying partsCounting stockWait for paperwork

    ADD VALUE

    WASTE

    Waste is any activity that does not add value

    Waste

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    3/29

    Activities that absorb resources but add no value.

    Defined as:

    Muda = Waste

    Mura= Irregularity

    Muri= Difficulty

    Inconsistent methodsVarying lot sizeEquipment out of place

    Parts hard to fitPoor lightingHeavy lifting

    Waste

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    4/29

    New

    Lead Time

    Lean tools help us identify and eliminate waste fromour processes, leading to: Reduced costs Reduced lead time Faster response Improved quality Reduced inventory Reduced floor space Better predictability

    No sepuedemostrar la imagen en estemomento.

    Lead TimeWaste Waste

    The Ultimate Goal Eliminate Waste

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    5/29

    The Toyota 7 Wastes

    1 Over production

    2 Waiting

    3 Transport4 Over process

    5 Inventory

    6 Rework

    7 Motion

    Transport

    Inventory

    Motion

    Waiting

    Over production

    Over processing

    Defects

    TIMWOOD

    the wasteman

    Part moves long distance

    Stock cost, handling, loss, hide problems

    180 deg body turns, pick up from floor

    For; Materials, Handlers, Tools, etc.

    Work you cannot sell, extends lead-time

    Tighten & torque check,

    Strip and rebuild, NRFT

    7 Wastes

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    6/29

    Balance processes to TAKT where capacity exceedscustomer requirement, use MIN & MAX levels.

    Over production, making parts the customer will notpay for causes other wastes (waiting, motion,

    transportation, inventory, defects)

    Over Production

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    7/29

    Causes: Inventory is viewed as security (just in case)

    Process not capable or not reliable

    No standard practices, lack of adherence

    Poorly performing suppliers Long setup times

    Lack of workplace organisation

    Seasonal peaks and troughs in demand

    Poor forecasting and production planning/scheduling Producing to speculative demand (forecast)

    Departmental layouts

    Lack of training

    Overproduction = Extra inventory, Extra handling, Extra space to store it,Extra quality problems, Extra lead-time, Extra bins, Extra paperwork and Extracommunication

    Over Production

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    8/29

    Waiting is usually the easy waste to see

    Dont have operators waiting for machines, fit auto

    stops and andon to free operators for other work

    Waiting

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    9/29

    Idle time any idle time such as watching equipment, waitingfor inspection, waiting for raw material, waiting for maintenance,

    waiting for paper work Causes:

    - When two dependent activities are not fully synchronized

    - Insufficient storage containers

    - Poor layout- Poor work balance

    - Unreliable equipment

    - Resources stretched

    Waiting

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    10/29

    All forms of transportation are waste !

    Connect processes and eliminate material between.Deliver direct to point of use, no decant or double

    handling. U-shape cells close gap between ends.

    Transport

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    11/29

    Material movement and handling adds cost not

    value. Transportation, must be eliminated orminimised. Causes:

    - Poor layout / distance between operations

    - Layout in process specific work areas- Inflexible workforce

    - Batch processing

    - Large lots / long changeovers

    - Remote storage areas

    Transport

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    12/29

    Are we doing too much ?Task frequency ?Is touch-up or polish really necessary ?Are protectors really needed ?Do we need a stud & nut would a bolt be adequate?

    Is all that packaging necessary?

    Over processing

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    13/29

    Effort and enhancements which are invisible to thecustomer.

    Work which is made redundant by subsequent process.

    Causes:- Thats the way weve always done it- Improper fixtures, tools, jigs

    - No standard work- Temporary fix that becomes permanent- Mistakes in process- Excessive checking- Lack of training- Poor layout

    Over processing

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    14/29

    Turn product into CASH, reduce inventory,minimize buffers

    RentRates

    SecurityAuditHandlingDegradation

    Out of dateLoss

    Inventory

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    15/29

    Causes:

    Acceptance ofoverproduction

    Relying on MRPsystems/forecasting

    Inventory is comforting

    Long changeovers

    Buffer against downtime

    instead of addressing rootcause

    Excessive raw materials, WIP, or finished goods are waste.

    Inventory exist as :

    Buffer between processes of dissimilar cycle times or availability.

    Satisfy customer demand inside the lead-time to manufacture.

    Security against process/supply failures.

    Inventory

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    16/29

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    17/29

    REMEMBER INVENTORY

    HIDES PROBLEMS

    DEFECTSATTENDANCEMACHINE

    RELIABILITYMATERIAL

    AVAILABILITYSET UP

    TIME

    HIGH STOCK LEVEL

    AVAILABILITY

    HELLO

    RECENTFLOATATION

    Inventory

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    18/29

    Take the work to the operator notthe operator to the work

    Eliminate walking, use chutes and slides.Eliminate stretching, everything within reach, one by one.Eliminate bending, everything at working height.Eliminate fiddling, orientate parts for use.

    Motion

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    19/29

    Any movement of people, or machines, which does not addvalue to the product or service is waste and tiring. Typically,bending to pick up from floor level, turning to pick up frombehind.

    Causes:

    - Poor work arrangement

    - Poor work layout

    - Poor facilities

    - Lost items (searching)

    - Poor standards- Poor tool design

    Motion

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    20/29

    Right first time means prevent defects

    Prevent defects with pokayoke and source inspection.Detect problems early with self inspection, successiveinspection, informative inspection, pokayoke.

    Spend as much time eliminating root cause as on repairs

    Defects

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    21/29

    Scrap / Rework from a poorly running process, set-up scrap,repair of a product or service to meet customer requirements.Warranty, Customer returns

    Cause:

    - Poor methods

    - Damaged goods

    - Lost goods

    - Poor/no training- Misunderstandings

    - Storage concerns

    Defects

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    22/29

    Wastes

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    23/29

    Order Delivered

    Lead-time

    Order Start to make

    Start to make Packed

    Packed Delivered

    Manufacturing Lead-time

    Order Lead-time

    Delivery Lead-time

    Lead-time defined

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    24/29

    95-99% Waste 1-5% Added Value

    Traditionally focus is on reducing processing (value added) time

    Lean focus on the Waste

    Order Delivered

    Order Delivered

    Lead-time waste

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    25/29

    Manufacturing lead-time

    Processing Actual production time Transportation and Incidental work

    Stagnation Material Information

    Start to make Packed

    Manufacturing Lead-time

    Lead-time waste

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    26/29

    P = STACKED LEADTIME = Order + Manufacturing + Delivery

    6 wks

    D = CUSTOMER DEMAND (Often best in market)

    2 wks

    P:D Ratio = 6/2 = 3

    P:D ratio of 1 means the manufacturer has to build to forecast, and supply fromstock. This results in high inventories, a characteristic of traditional organisations.

    Use MIFA & Process Mapping techniques to understand what the

    lead-time (P) is composed of and to highlight areas of waste

    The P:D Ratio

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    27/29

    1

    8

    7

    6

    5 4

    2

    3

    SOBREPRODUCCION

    INVENTARIOS

    ESPERA

    MOVIMIENTOTRANSPORTE

    DEFECTO

    SOBREPROCESO

    Producir mas de lo que el cliente

    necesita en ese momento

    Todo inventario

    por encima del

    inventario minimo

    necesario para la

    produccion o

    distribucion

    Movimiento de

    los productos

    que no

    agregan valor

    Movimiento de

    de personas

    que no

    agregan valor

    Los tiempos en que una pieza debe

    esperar a otra para continuar su

    procesamiento. Tiempos que no

    agregan valor .

    La necesidad de

    eliminar o retrabajar

    partes en proceso o

    productos terminados

    Los errores en materia de diseo tanto

    de obra como de los procesos para su

    construccin originan fuertes costos

    producto del desarrollo de actividades

    sin valor agregado.

    TALENTO

    HUMANO

    No utilizar su creatividad e inteligencia. Por

    falta de capacitacin, perdiendo tiempo, ideas y

    oportunidades de mejora.

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    28/29

    Lean Status

    Value

    Unnecessarywaste

    Necessarywaste

    months

    dayshoursminutesseconds

    1 2 3 4 5

    Where do we are?

  • 7/28/2019 Clase 2 Monclova Los Siete Desperdicios (1)

    29/29

    Waste

    Any Questions ?