Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group Meeting – Harwell June 2011 Implementation Integrit y Integratio n Intelligence Ingenuity
Transcript
Page 1: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Classification of ProcessesOrder from Chaos

Version 2 – Post Harwell update

Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group Meeting – Harwell June 2011

Implementation

Integrity

Integration

Intelligence

Ingenuity

Page 2: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Copyright Notice

The author, Ian Dalling, owns the copyright of this presentation.

No part of this publication may be reproduced, stored in or introduced into a retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise), without prior written permission of Ian Dalling.

This presentation may be used freely for private study or research purposes.

Requests for permission to reproduce all or part of this document must be addressed to:

Mr Ian Dalling, Unified Management Ltd, 9 Little Lane, Alverstoke, Gosport, Hampshire PO12 2LA, United Kingdom.

Tel: +1695 728059 or +44 2392511043Email: [email protected]

www.UnifiedManagement.com

Page 3: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Presentation Contents FIRST PRINCIPLES

• Emergence of management• Essence of management• Structure and dynamics• Plan-do-check-act• Rule or map?• Principal process types

TAXONOMY PRINCIPLES• Classification examples• Why classify?• Taxonomy design principles

12 ELEMENT TAXONOMY• Circular format• Linear format• Synergy

APPLICATION TO MANAGEMENT SYSTEMS• Applicability potential• Stakeholder specific requirements• Overt and covert processes• Standards and regulations mapping• Variation in elements application

GENERAL APPLICATION• Potential universality across manage

ment instruments

SUMMARY AND CONCLUSIONS

ADDITIONAL SLIDES• Organisation Universal Model• Overall Process Types

June 2011 ©2011 Unified Management Solutions

Page 4: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

FIRST PRINCIPLES

June 2011 ©2011 Unified Management Solutions

Page 5: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Emergence of Management Systems

June 2011 ©2011 Unified Management Solutions

13,750,000,000 Years since big bang

Homo sapiens evolved between 400,000 and 250,000 years ago

Natu

ral S

yst

em

s and P

roce

sses

Eng

ineere

d S

yst

em

s and P

roce

sses

Managem

en

t Syst

em

s and P

roce

sses

Page 6: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Essence of Management

June 2011 ©2011 Unified Management Solutions

ManagerConsciousness

?

That whichis managed

Process ofmanaging

Page 7: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Structure and Dynamics

June 2011 ©2011 Unified Management Solutions

?

Process ofmanaging

That whichis managed

Structure Dynamicshosts

creates, maintains and destroys

Managerconsciousness

Page 8: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Structure and Dynamics

June 2011 ©2011 Unified Management Solutions

?

Process ofmanaging

That whichis managed

Managerconsciousness

Structure Dynamics

System Process

ManagementSystem

A

C

D

P

Page 9: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Structure and Dynamics

June 2011 ©2011 Unified Management Solutions

?

Process ofmanaging

That whichis managed

Managerconsciousness

Structure Dynamics

System Process

ManagementSystem

Management topic structure (taxonomy)

A

C

D

P

Page 10: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Application of Plan-Do-Check-Act

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

A

C

D

P

Task

Team

Project

MiddleManagement

Top Management‘Strategy’

Incr

easi

ng C

ycl

e F

requency

Incr

easi

ng C

oopera

tion &

Coord

inati

on

a stratified pyramid of plan-do-check-act cycles

Page 11: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Process Rule or Process Map?1

Structure and Process Justification

(Safety Case)

Permitted structures and processes

(operational envelope) (Operating Rules)

Mandatory maintenance,

inspection, and test requirements(MIT Schedule)

Possible Structures and Processes

Mandatory and permitted structures and processes

Non-permitted structures and processes

Known unsafe structures and processes

Structures and processes outside scope of ‘structure and process justification’

Risk Assessment

Page 12: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Process Rule or Process Map?2

Structure and Process Justification

(Safety Case)

Permitted structures and processes

(operational envelope) (Operating Rules)

Mandatory maintenance,

inspection, and test requirements(MIT Schedule)

Possible Structures and Processes

Mandatory and permitted structures and processes

Non-permitted structures and processes

Known unsafe structures and processes

Structures and processes outside scope of ‘structure and process justification’

Risk AssessmentGeneric Process Rule Only work to current

approved documents Retain record for 7

years

Process Map or Definition

References

management topic taxonomy

Page 13: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Principal Process Types

Supply (input)

Delivery (output)

CoreSupporting Contingency

Page 14: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

TAXONOMY PRINCIPLES(CLASSIFICATION)

June 2011 ©2011 Unified Management Solutions

Page 15: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Examples of classification

Structure and dynamics Species Periodic table of chemical elements Right wing and left wing politics Relationships (superior, peer and subordinate) Branches of knowledge and library books Supermarket products

Organisations (size, industry size etc) Alpha/numeric Mathematical set theory Human emotions Professions Age and gender Personnel fitness Risk (high, medium, low) Prioritisation (first, next, last) Processes???

Page 16: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Why do we classify?

Simplify and create orderliness (lower entropy)

Improve understanding:• Patterns• Group characteristics and synergy• Hierarchy

Improve communication• mutually understood conventions and

definitions Be able to manage more successfully

Page 17: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Taxonomy Design Principles

1. Hierarchical element structure2. Plan-Do-Check-Act embedded3. Reflect theory and practice4. Distinct non-replicated element characteristics5. Element clusters facilitate generic control and

guidance6. Elements facilitate simple interrelationships7. Inclusive element scopes8. Universal, concise and intuitive element titles9. Comprehensive - all organisational structures

and dynamics covered.

Page 18: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

12 ELEMENT MANAGEMENT TOPIC TAXONOMY

June 2011 ©2011 Unified Management Solutions

Page 19: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

ActElement 12

PlanElement 1

CheckElements 10 and 11

DoElements 2 to 9

Management Topic

Taxonomy

10

1211

1

2

3

4

567

8

9

Asse

ssm

ent

Cont

rols

and

Personnel

Commerce

Data

MatterandEnergy

Suppliers

Prod

uct

and

Serv

ice

Del

iver

y

Contingencie

s

Change

Reactive

Proactive

Monitoring

Monitoring

Review

Actionand

P

D

C

A

Planning & control

Leading KPI’s

Lagging KPI’sRoot causes

Immediate causes

Evidence

Structure & process

Corrective & preventiveStrategic

Project

Tracking

Vis

ion

& p

olic

yO

bjec

tives

& ta

rget

sLe

gisl

atio

n

Opp

ortu

nity

& R

isk

Just

ifica

tion

Tool

s &

tech

niqu

es

Review

Planning

Outputs

Org

anis

atio

nRes

pons

ibilit

ies

Interacti

ons

Employment li

fecycle

Structure

Control

DatabasesSecurity

ProcessingConventions

Organisation entity

Stakeholders

SelectionHandling & use

Processing

Waste & em

issions

Infrastructure

Maintenance,

inspection & testing

Approval

Specification &

ordering

Receipt

Perform

ance

Projec

ts

Plan

ningGen

eral

Testi

ng & tr

ainingEvents

Non

-aw

ard

Mar

ketin

g

Pro

posa

l

Impl

emen

tatio

n

Pos

t com

plet

ion

PlanElement 1

ActElement 12

DoElements 2 to 9

CheckElements 10 and 11

Finance

Page 20: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

12. Reviewand Action

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

10. ReactiveMonitoring11. ProactiveMonitoring

PLAN

DOCH

ECK

ACT

Twelve Element Structure

10

1211

1

2

3

4

567

8

9

Asse

ssm

ent

Cont

rols

and

Personnel

Commerce

Data

MatterandEnergy

Suppliers

Prod

uct

and

Serv

ice

Del

iver

y

Contingencie

s

Change

Reactive

Proactive

Monitoring

Monitoring

Review

Actionand

P

D

C

A

Planning & control

Leading KPI’s

Lagging KPI’sRoot causes

Immediate causes

Evidence

Structure & process

Corrective & preventiveStrategic

Project

Tracking

Vis

ion

& p

olic

yO

bjec

tives

& ta

rget

sLe

gisl

atio

n

Opp

ortu

nity

& R

isk

Just

ifica

tion

Tool

s &

tech

niqu

es

Review

Planning

Outputs

Org

anis

atio

nRes

pons

ibilit

ies

Interacti

ons

Employment li

fecycle

Structure

Control

DatabasesSecurity

ProcessingConventions

Organisation entity

Stakeholders

SelectionHandling & use

Processing

Waste & em

issions

Infrastructure

Maintenance,

inspection & testing

Approval

Specification &

ordering

Receipt

Perform

ance

Projec

ts

Plan

ningGen

eral

Testi

ng & tr

ainingEvents

Non

-aw

ard

Mar

ketin

g

Pro

posa

l

Impl

emen

tatio

n

Pos

t com

plet

ion

PlanElement 1

ActElement 12

DoElements 2 to 9

CheckElements 10 and 11

Finance

Page 21: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

1 Assessment and Controls1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Vision and Policy

Objectives and Targets

Legislation and Standards

Opportunity and Risk Assessment

Structure and Process Justification

Management Tools and Techniques

ReviewsSpecialist

PlanningGeneral

Review

MaintenanceReview

SelectionApplication

Identification

Evaluation

Identify potential harm

Identify stakeholders affected

Assess risks

Develop controls

Assess residual risks12. Reviewand Action

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

10. ReactiveMonitoring

11. ProactiveMonitoring

PLAN

DOCH

ECK

ACT

Page 22: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

3 Commerce1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Entity Maintenance

StakeholdersContracts

Interfaces

Licenses

Accreditations and Certifications

Registrations

Finance

Revenue

Payments

Cash

Page 23: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

4 Data1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Control

Databases

Access

Processing

Conventions

Structures

Accounting

Key Performance Indicators

Finance

?

Matter and Energy

Personnel

Infrastructure Condition

Energy

?CarbonWaste

Working Hours

Management System

External

InternalDocuments- company- project

Records

Filing

Numbering and Nomenclature

Library

Lifecycle

Literature and Web SiteNotice Boards

Signage

CreationRetentionDisposalComputer Software

Page 24: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

5 Matter and Energy1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Selection

Handling and Use

Processing

Maintenance, Inspection and Testing

Waste & Emissions

Infrastructure

Receipt

Storage

Transport

Work Environment

Estates

Facilities

Plant and Equipment

Personal Protective Equipment

Configuration

Page 25: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

6 Suppliers1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Approval

Specification and Ordering

Receipt

Performance Evaluation

Reconciliation and Payment

Vetting

Classification

Audit

Data Collection

12. Reviewand Action

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

10. ReactiveMonitoring

11. ProactiveMonitoring

PLAN

DOCH

ECK

ACT

Page 26: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

7 Service and Product Delivery1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Marketing

Pre-contract

Failure to Obtain Contract

Contract Implementation

Post Contract Completion Activities

Page 27: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

7 Service and Product Delivery+1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Marketing

Proposals

Contract Non-award Review

Contract Implementation

Post Completion Activities

Business Development

Preparation of Proposals

Contract Implementation

Lost Contract Evaluation

Post Contract Evaluation

12. Review and Action

Potential Contract Classification

Page 28: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

8 Contingencies1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

PlanningNonconformances

Succession Planning

Project Arrangements

Testing and Training

Insurance

Symptom Based Procedures

First Aid

General Arrangements

Emergencies, Crises and Disaster Recovery

Standard Procedures

EventsGeneral Management

Classification

Product Recall

Page 29: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

9 Change1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Corrective and Preventive

Strategic

Structure and Process

Project

Lifecycle

Markets

Product/Service Definitions

Vision and Policies

Organisation

Management System

Infrastructure

Classification

Registration

Approval

Review

Implementation

12.Management

Review

Page 30: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

10 Reactive Monitoring1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Evidence

Immediate Causes

Root Causes

Lagging Key Performance Indicators (KPI’s)

12. Management Review and

Action

9. Change

12. Reviewand Action

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

10. ReactiveMonitoring

11. ProactiveMonitoring

PLAN

DOCH

ECK

ACT

Page 31: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

11 Proactive Monitoring1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Planning and Control

Leading Key Performance Indicators (KPI’s)

Audits

Benchmarking

Inspections

Self Monitoring

Surveys

12. Reviewand Action

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

10. ReactiveMonitoring

11. ProactiveMonitoring

PLAN

DOCH

ECK

ACT

Page 32: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

11 Proactive Monitoring+1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Types

Leading Key Performance Indicators (KPI’s)

Audits

Benchmarking

Inspections

Self Monitoring

Surveys

12. Reviewand Action

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

10. ReactiveMonitoring

11. ProactiveMonitoring

PLAN

DOCH

ECK

ACT

April 2011 ©2011 Unified Management Solutions

incr

easi

ng f

orm

alit

y

incr

easi

ng f

requency

and d

eta

il

Each Shift

DailySupervisor Inspections

WeeklyManager Inspections

Yearly3rd Party Audits

Supplier Audits

Internal Audits

Self Monitoring

Continual

Monthly

Surveys

Benchmarking

What? When?

Page 33: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

12 Review and Action1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Planning

Review

Outputs

Agenda

Actions

Product/service delivery

Technological options

Vision and Strategy

New and changed aspects and hazards

Reactive monitoring

Stakeholder interactions, needs and expectations

Proactive monitoring

Use of management tools

12. Reviewand Action

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

10. ReactiveMonitoring

11. ProactiveMonitoring

PLAN

DOCH

ECK

ACT

Action Plan

Minutes

Meetings Schedule

Reports, Discussion and Decisions

Agenda Templates Legislation

Suppliers

Internal projects and change

Sales, marketing and prospects

Personnel

Objectives

Key Performance Indicators

Management System

Page 34: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Taxonomy Synergy1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Organisation failures have multiple contributing causes related to multiple taxonomy elements

Nearly all major loss events have an impact on total performance Quality Health and safety Environment Financial Reputation

Elements are like a chain

Page 35: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

APPLICATION OF TAXONOMY TO MANAGEMENT SYSTEMS

June 2011 ©2011 Unified Management Solutions

Page 36: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

IMS Taxonomy Application1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Applicable to any organisation, irrespective of type and size.

Applicable globally. Enables alignment throughout

supply and delivery chains.

Page 37: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

+ Stakeholder Specific Requirements

Stakeholder Specific Controls1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

+

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring

12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring

12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring

12. Reviewand Action

PLA

ND

OC

HEC

KA

CT

10. ReactiveMonitoring

Dedicated arrangements can be defined to comply with specific stakeholder requirements using the same twelve element taxonomy to complement the organisation’s generic twelve generic management procedures.

Page 38: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Overt and Covert Processes1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring

12. Reviewand Action

PLA

ND

OC

HEC

KA

CT

10. ReactiveMonitoring

Overt and covert processes can use the same twelve element taxonomy

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring

12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Page 39: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Standards and Management Regulations Mapping

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

???

ISO17025

OHSAS18001

ISO14001

ISO9001

Construction, Design and Management Regulations

Management of H&S at Work Regulations

???

Page 40: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Application Variation Across Taxonomy Elements

Others tend to vary considerably across organisations.

1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Some applications of taxonomy elements tend to vary very little across organisations.

Page 41: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

GENERAL APPLICATION OF TAXONOMY TO MANAGEMENT

INSTRUMENTS

June 2011 ©2011 Unified Management Solutions

Page 42: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Taxonomy Universal Application1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

Taxonomy has potential to be universally applied to the structuring of:

Management standards Legislation

overall structuring individual statutes and regulations

Licensing arrangements Databases Records Key performance indicators and dashboards Root cause analysis Audits and inspections Management review Problem-solving Education and training programs Knowledge structures Artificial management intelligence Research planning

Page 43: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Summary and Conclusion1. Assessmentand Controls

2. Personnel

3. Commerce

4. Data

5. Matter andEnergy

6. Suppliers

7. Service andProduct Delivery

8. Contingencies

9. Change

11. ProactiveMonitoring12. Reviewand Action

PLAN

DOCH

ECK

ACT

10. ReactiveMonitoring

All of an organisation’s processes can be controlled and guided via twelve management procedures

An organisation’s management system can be totally integrated with no residual fragmented parts

The taxonomy can be applied universally to a range of management instruments and processes

Potential to align and streamline management processes

Ian Dalling may be contacted via [email protected]

Page 44: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

ADDITIONAL SLIDES

June 2011 ©2011 Unified Management Solutions

Page 45: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

©2005 Unified Management Ltd

Organisation Universal Model

Per

form

ance

Internal Climate

Stakeholders

Consciousness

ManagementSystem

CompetenceBase

OrganisationCulture

Cor

pora

te

Lead

ersh

ip

(Top

Man

agem

ent)

Hum

an R

esou

rce

Dat

a,

Mat

ter,

Ene

rgy

etc

Processes

Delivery Chain

Supply Chain

Page 46: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

Overall Process Types

trigger

trigger

trigger

trigger

trigger

trigger

Per

form

ance

Internal Climate

Stakeholders

Consciousness

ManagementSystem

CompetenceBase

OrganisationCulture

Cor

pora

te

Lead

ersh

ip (T

op M

anag

emen

t)

Hum

an R

esou

rce

Dat

a, M

atte

r, E

nerg

y et

c

Processes

Delivery Chain

Supply Chain

Management Systems and Processes

Natural Systems and ProcessesEngineered Systems and Processes

Page 47: Classification of Processes Order from Chaos Version 2 – Post Harwell update Ian Dalling - Unified Management Solutions CQI Nuclear Special Interest Group.

The End

Feedback is always welcome and is used to drive continual improvement

for the good of everyone