Claudia Bozzonetti (BArch)Architectural Portfolio
Personal Statement and Letter of Intent
Part 1: University Work
First Year 1VaP0U[LY]LU[PVU!,MVYLZJLUJL
Second Year Guests - Engage Fire - Synapse Furniture Design - Chair
Third Year Commemorative Tower - Link Human Rights Museum - Freedom in Structure Des Baker Competition, Dialogue Box - Balance Three Castles Development Production Studio - Waves of Change
7HY[!>VYRPUH9LNPZ[LYLK(YJOP[LJ[Z6MJL*VOLUHUK.HYZVU
House SoutheyHouse RaimondoHouse Naidoo_ShahHouse Johnson_CarthyIfafa Housing DevelopmentUniversity of Mpumalanga Residences 3PIYHY`HUK,_LJ\[P]L6MJLZ
Part 3: Sketches
Sketches from WorkSketches from TravelFurniture Design Ideas
1
2-3
4-56-78-9
10-1112-1415-1617-19
202122-2324-2526-27
28-2930-35
36-3738-4445
Index
1Personal Statement and Letter of Intent
The Architecture of the new millennium is seeing more of a need to simply create spaces and does not concern itself with the beauty of the experience of a space. There is a preoccupation with rentable square footage and a loss of thought as to how someone might move within it. Architectural design of spaces should always be respectful of the site on which it is to be placed, and also of the heritage of the surrounding community. The aim should always be to avoid the creation of buildings that respond purely to the architects ego and becomes inappropriate for the area. One can do so by using locally sourced materials, researching the site and being civil in terms of scale. The creation should also touch quite lightly on the ground as the land is forever changing as well as the needs of people. Using lighter materials, columns and changing little of [OLZP[LJHUHJOPL]L[OPZ;OLZWH[PHSKLZPNUZOV\SKHSZVWVY[YH`HWLYZVUHSP[`ZWLJPJ[V[OLJYLH[VYHUKLTIVK`HUPKLU[P[`ZPTPSHY[VHZPNUH[\YL When designing spaces, the impact it will impose on the people within the space, at present and in the future, must be a frequent thought. One must also be conscious of the fact that a space ZOV\SKUV[ZPTWS`IL^HSSZHUKHVVYI\[YH[OLYHUL_WLYPLUJL0U[OLZHTL^H`HUHY[PZ[JHUPU]VRLJLY[HPULTV[PVUZMYVTH]PL^LY^P[OIY\ZOZ[YVRLZHUKJVSV\YZV[VVJHUHUHYJOP[LJ[^P[O[OLJHYLM\SWSHUUPUNVMHZWHJL[OL\ZLVM[L_[\YLZHUKTH[LYPHSP[ `SPNO[X\HSP[`HUKZJHSL+PMMLYLU[]VS\TLZHUKWLYMVYH[PVUZPU^HSSZJHUPU\LUJLOV^WLVWSLTV]L^P[OPU[OLZWHJL Spaces should also serve a function; in a world where the population is ever increasing; no space should remain dormant and unused. Function must have an attractive component be it through scale, materiality or lighting. Without one, the space becomes purely a structure without soul. Attention needs to be paid to the developing times. Designs should be current by remaining up-to-date with new discoveries in both the construction technology and active design worlds. By keeping up with the new developments, an architect can serve the spaces created, the surrounds and those who inhabit the space to the best of their ability. (UHYJOP[LJ[ZOV\SKHS^H`Z[OPURHIV\[OV^[OLPYI\PSKPUN^PSSILYLJLP]LKPU[OLM\[\YLHUKH]VPKHUL]LU[\HSS`KH[LKKLZPNU(YJOP[LJ[ZT\Z[UV[JYLH[LZWHJLZ[VVZWLJPJHSS`HZ[OLULLKZVM[OLWLVWSL^PSSJOHUNL;OLKLZPNUP[ZLSMHZ^LSSHZ[OLM\UJ[PVUZOV\SKILZVTL^OH[ZLSMZ\MJPLU[HUK^P[OZ[HUK[OL[LZ[VM[PTL;OLZWHJLZOV\SK\S[PTH[LS`IL[PTLSLZZHUKILHZSV^THPU[LUHUJLHZWVZZPISLWLY[OLIYPLM^OPJOJHUILHJOPL]LKI`TLHUZVMTH[LYPHSP[`HUKJVUZ[Y\J[PVU[LJOUVSVN `,ULYN`LMJPLUJ`PZUV^HTHQVYJVUJLYUMVYHSSHYJOP[LJ[ZHUKP[PZT`opinion that this must be achieved mostly through passive design.
I am returning to complete my honours degree in architecture because I feel that there is much more I need to learn about construction and design methods (both new and old) as well as tak-PUNHK]HU[HNLVM[OL]HS\HISLRUV^SLKNLVMT`M\[\YLSLJ[\YLYZ>OLU0Z[HY[T`JHYLLY0^HU[[VILHUHYJOP[LJ[[OH[^PSSOH]LHILULJPHSHUKSHZ[PUNPTWHJ[VU[OL^VYSKILJH\ZLHM[LYHSSP[PZour buildings that we leave behind as our legacies.
Like my predecessors, I would like to be someone who changed the way buildings were though out and planned, even if it is in a very small manor. I plan to research and experiment with the idea of a dynamic building. I am highly intrigued by the thought of a building being able to move and shift according to a persons needs and desires because I believe that we are not stag-nant in life. We are constantly growing into more developed beings, be it through technology or because of our surroundings, life is constantly changing for us and this leads to changes in V\YULLKZHUK^HU[Z)\PSKPUNZ[OH[HYLK`UHTPJHUKJ\Z[VTPHISLZLY]L[OPZPKLH]LY`^LSSVUL^V\SKUV[OH]L[VRLLWTV]PUNPUVYKLY[VUKHZOLS[LY[OH[KLSP]LYZ[OLYLX\PYLTLU[ZVM[OH[space in time. This is what I plan to develop and research in my following years of study and then ultimately to practice.
*VU[HJ[+L[HPSZ!
Claudia Bozzonetti [email protected] Tel: 076 177 7375 Achievements Golden Key International Honour Society - 2012 Faculty of Engineering and the Built Environment Deans List - 2012, 2013
Aluminium Federation of South Africa Prize Recipient - 2013
-LLS-YLL[V]PZP[T`VUSPULWVY[MVSPVMVYTVYLVU[OLZLWYVQLJ[Z http://claud576.wix.com/claudiabozzdesigns
2Part 1: University WorkFirst Year- Jozi InterventionEfflorescence 0UYZ[`LHY^L^LYLYLX\PYLK[VKLZPNUHUPU[LY]LU[PVUPU1VOHUULZI\YNthat would ultimately serve the public. We were also tasked with choosing our own site. I decided that the most appropriate site for my intervention was an empty plot along Oxford Road, across from The Zone in Rosebank. The reason I thought it was most appropriate is because my intervention serves as a waiting area for members of the public using the Gautrain. ;OLJVUJLW[^HZLMVYLZJLUJL^OPJOTLHUZ[OH[0^HU[LK[V[OLI\PSKPUNto look and feel like it was growing from the underground station, up to the street level.
This waiting areas structure is designed to be functional so that vendors can come set up a stall to sell their goods to those waiting, children could \ZL[OLMVYTHZHQ\UNSLN`THUKV[OLYZJHUUKHWSHJL[VZP[^VYRVYeven take a nap. There would also be direct access to the underground station from the structure.
Site Plan
Section A-A through Site Section B-B through Site
Ground Storey Plan
3Section A-A
Section B-B
West Elevation South Elevation
3D Sketch
4Second Year - GuestsEngage
;OLIYPLMMVY[OPZWYVQLJ[YLX\PYLK\Z[VKLZPNUHOV[LSPU[OL*)+VM1VOHU-nesburg. The hotel was to explore scale and proportion on a pedestrian SL]LS;OL.YV\UKVVYOHK[VPUJVYWVYH[LHW\ISPJM\UJ[PVUZ\JOHZMVYTHS[YHKPUNHUKJHMt;OPZ^HZV\YYZ[T\S[PZ[VY`I\PSKPUNHUKHZZ\JOV\YYZ[L_WLYPLUJL^P[OKPZ[YPI\[PUNZLY]PJLZV]LYTHU`VVYZ
The Concept behind my design is Engage. The meaning behind the con-cept comes from the idea of reaching out and connecting with the city and its people. The building must involve itself and participate with the city.
Engage aims to intertwine with the daily lives of city goers and the structure of the city. To make the hotel mesh with the structure of the city, [OLWSHUUPUNVM[OLOV[LSVULHJOVVYPZZVTL^OH[PUHNYPKMVYTH[;OLYLwas also an idea of letting the public bond with the structure of the building. The shops form a bridge between public and private, and allow these two worlds to engage with one another. The hotel is also aimed at attracting commuters from the BRT station in Rissick Street into the hotel . The Engage Hotel aims to not only impact the city, but in turn be impact-ed by the city. It forms a relationship with the people on the streets as well as the layout of the city.
Section B-B
Ground Floor Plan
North Elevation East Elevation
5
6Second Year - FireSynapse
;OPZWYVQLJ[HZRLKMVY[OLKLZPNUVMHYLZ[H[PVU^P[OHKKP[PVUHS\ZLZ[OH[respond to its context on an urban and programmatic level. The design of the building had to be integrated with the urban design approach devel-VWLKPU[OLW\ISPJWHY[VM[OLWYVQLJ[;OLWYVNYHTPUJS\KLK!(JP]PJJVT-T\UP[`JLU[YLJS\IW\ISPJZWHJLZJVTTLYJPHSZWHJLZVMJLZHWHY[-ments, parking for bikes only and urban design framework with focus on: pedestrian network, bicycle network and public transport network.
;OLHPTVM[OL-PYLWYVQLJ[PZ[VJVTIPUL]HYPV\ZWYVNYHTZZ\JJLZZM\SS`on one site and also incorporate the mixed-use plot into a new urban de-sign framework. We need to try and make the Rosebank area user-friendlier to all demographics. I think that one of the main components missing from the area of Rosebank is a connection. This is why my concept is The Synapse. In the human brain, messages are transmitted from brain to body by means of countless neurons. The ac-tions are sent in the form of neurotransmitters from one neuron to the next, the bridge between these neurons is called a synapse.
I would like my intervention on the site to improve the functioning of Rose-bank as a city-like area, where pedestrians, cyclists and motorists are able to travel; the surrounding sites become usable by the public and where [OLYLPZQ\Z[HNYLH[LYNLULYHSWYLZLUJLVMWLVWSLHUKJVTT\UP[ `
Ground Floor Plan
7Section B-B
North Elevations
8Second Year - Furniture DesignChair
0U[OPZZ\IQLJ[^L^LYLYLX\PYLK[V\ZL[OLIHZPJWYPUJPWHSZVMKLZPNUMYVTHUL_PZ[PUNJOHPYHUK[VYLKL-sign the chair such that it was still recognizable as a interpretation of the original. I chose the Boomerang Chair by Richard Neutra.
9
10
Third Year - Commemorative TowerLink
Students were to design a celebratory landmark structure to be built on the Library Lawns, Wits Braamfontein Campus. The structure is to mark the 100th year of the universities existence. It should be a place of orientation and a representation of contemporary architecture in South Africa. The tower must accommodate a student radio station studio, student affairs information centre, shaded seating, display walls, digital screen and a water feature.
0WSHU[VJYLH[LHSPURIL[^LLUKPMMLYLU[SHULZVM[YHMJHYV\UK[OLSPIYHY`SH^UZHSPURIL[^LLU[OLZ[PSSHUKX\PL[HY-LHZHUK[OLI\Z`SHULZVMWLKLZ[YPHU[YHMJHUKHSPURIL[^LLU[OLWHZZLYI`HUK[OLI\PSKPUN0^PSSJYLH[L[OLSPURto the building by making the facade of the building adaptable, one can moves the panels on tracks to personalize their space.
Ground Floor Plan First Floor Plan
11
Section B-B
Closed South and East Elevations
Open West and North Elevations
12
Ground Floor Plan
Third Year - Human Rights MuseumFreedom in Structure
;OLWYVQLJ[IYPLMYLX\PYLK\Z[VKLZPNUH/\THU9PNO[Z4\ZL\T(YJOP]LHUK9LZV\YJL*LU[YLPU1\[H:[YLL[)YHHTMVU[LPU1VOHUULZI\YN;OLKLZPNUOHK[VYLWYLZLU[[OLT\ZL\TZW\ISPJPTHNLKLUL[OLHuman Rights Commissions relationship with the people of the country as well as the immediate physical context within Braamfontein. It should represent the intricate complexity of our society.
>OLUHWWYVHJOPUN[OPZWYVQLJ[0^HZPTTLKPH[LS`Z[Y\JR^P[O[OL[OV\NO[[OH[HSSMYLLKVTT\Z[JVTL^P[OHcertain amount of structure to keep it balanced and fair.
This is what my concept became, trying to create a free and somewhat organic building through its structur-al skeleton and needs. I started then exploring how one can suggest organic shapes through the incremental movement of a structure.
:VPU[OLLUK0^V\SKILSVVRPUNH[KLZPNUPUNHI\PSKPUN[OH[^V\SKOH]LHJLY[HPU\PKX\HSP[`JYLH[LKthrough the structural design and elements. I would look at core design and also at having a void running the height of the building that would allow light to penetrate and illuminate the exhibition spaces, which will in turn illuminate people with knowledge.
Basement Level 1
First Floor Plan Fifth Floor Plan
Basement Level 2
13
South Elevation
North Elevation
West Elevation
Section B-B
Interior Night Render
14
Ground Floor Plan
15
16
17
Third Year - Three Castles Development Production StudioWaves of change>L^LYLYLX\PYLK[VKL]LSVWHI\PSKPUNMYVTHUL_PZ[PUNOLYP[HNLI\PSKPUNPU[OPZWYVQLJ[;OLOLYP[HNLI\PSKPUNwas the Three Castles Cigarette Factory on Marshall Street, Marshall Town Johannesburg. The brief stipulated that we design a production studio for Moon Dog Productions that would serve as a catalyst towards attracting U\TLYV\ZV[OLYSTHUKWYVK\J[PVUPUK\Z[Y`WSH`LYZ;OLI\PSKPUNZOV\SKYL]VS]LHYV\UKWYVK\J[PVUJYLH[P]Land imaginative spaces. The program includes: sound studios, a public theatre, media and cinematheque, stu-KPVZMVYLKP[PUNHUPTH[PVUQV\YUHSPZTHUKIYVHKJHZ[PUNYLJVYKPUNZ[\KPVZVMJLZHUKYLJYLH[PVUHSZWHJLZ
;OLJVUJLW[[OH[0[OV\NO[^HZTVZ[HWWYVWYPH[LMVY[OPZWYVQLJ[^HZ:V\UK^H]L;OL^H`[OH[H^H]LWYVWH-gates out from a source is how I would like my building to interact with the world. I plan to promote pedestrian activity, start a chain effect for the renovation of the existing buildings to allow for more public space, to intro-duce interaction between pedestrians and the building, to encourage urban regeneration, to decrease my inter-vention the closer to the street edge and to try and to create a response between building and the park across the road.
North Elevation East Elevation West Elevation
Ground Floor PlanBasement Plan First Floor Plan
18
Section A-A
Section B-B
19
20
Part 2: Work in a Registered Architects Office - Cohen and Garson Architects7YVQLJ[5HTL!/V\ZL:V\[OL`Students Responsibilities: Stair Detail Drawings
Section A-A Elevation D
Plan Elevation C Detail 1 Detail 2
*All Designs are Property of Cohen and Garson Architects
21
7YVQLJ[5HTL!/V\ZL9HPTVUKVStudents Responsibilities: Kitchen Renovation and New Studio Design Drawings
A
DiningRoom
Kitchen
A
Ground Floor PlanScale 1:50
FirePlace
Sink
Sink
Prep
B
B
FRDW
1290
2650
2005
820 710 800
Studio PlanScale 1:50
GardenShed
Studio
Toilet
WHB Shower
Sink
D D
E
E
3050
6020
Client
HOUSE RAIMONDO: ALTERATIONS AND ADDITIONSERF 383 / PARKTOWN NORTH
Drawing No.
Ground Floor Plan:Design Drawings
14RAI
HRAI_W100
Scale:
1:50
Description:
0 Issued for Approval 2014.02.14
31 Issued for Approval 2014.02.182 Issued for Approval 2014.02.28Mr. & Mrs. Raimondo 3 Issued for Approval 2014.03.13A
DiningRoom
Kitchen
A
Ground Floor PlanScale 1:50
FirePlace
Sink
Sink
Prep
B
B
FRDW
1290
2650
2005
820 710 800
Studio PlanScale 1:50
GardenShed
Studio
Toilet
WHB Shower
Sink
D D
E
E
3050
6020
Client
HOUSE RAIMONDO: ALTERATIONS AND ADDITIONSERF 383 / PARKTOWN NORTH
Drawing No.
Ground Floor Plan:Design Drawings
14RAI
HRAI_W100
Scale:
1:50
Description:
0 Issued for Approval 2014.02.14
31 Issued for Approval 2014.02.182 Issued for Approval 2014.02.28Mr. & Mrs. Raimondo 3 Issued for Approval 2014.03.13
South Elevation of KitchenScale 1:50
Section A - AScale 1:50
Sink
1300
Section B - BScale 1:50
Prep
Client
HOUSE RAIMONDO: ALTERATIONS AND ADDITIONSERF 383 / PARKTOWN NORTH
Drawing No.
Elevations and SectionsDesign Drawings
14RAI
HRAI_W101
Scale:
1:50
Description:
0 Issued for Approval 2014.02.14
31 Issued for Approval 2014.02.182 Issued for Approval 2014.02.28Mr. & Mrs. Raimondo 3 Issued for Approval 2014.03.13
South Elevation of KitchenScale 1:50
Section A - AScale 1:50
Sink
1300
Section B - BScale 1:50
Prep
Client
HOUSE RAIMONDO: ALTERATIONS AND ADDITIONSERF 383 / PARKTOWN NORTH
Drawing No.
Elevations and SectionsDesign Drawings
14RAI
HRAI_W101
Scale:
1:50
Description:
0 Issued for Approval 2014.02.14
31 Issued for Approval 2014.02.182 Issued for Approval 2014.02.28Mr. & Mrs. Raimondo 3 Issued for Approval 2014.03.13
South Elevation of KitchenScale 1:50
Section A - AScale 1:50
Sink
1300
Section B - BScale 1:50
Prep
Client
HOUSE RAIMONDO: ALTERATIONS AND ADDITIONSERF 383 / PARKTOWN NORTH
Drawing No.
Elevations and SectionsDesign Drawings
14RAI
HRAI_W101
Scale:
1:50
Description:
0 Issued for Approval 2014.02.14
31 Issued for Approval 2014.02.182 Issued for Approval 2014.02.28Mr. & Mrs. Raimondo 3 Issued for Approval 2014.03.134FDUJPO&&4DBMF4FDUJPO%%4DBMF
#BMVTUSBEF
%FDL5SBOTQBSFOU1MBTUJD
3PPG4IFFUJOH
8FTU&MFWBUJPOPG4UVEJP
4DBMF
/PSUI&MFWBUJPOPG4UVEJP
4DBMF&BTU&MFWBUJPOPG4UVEJP
4DBMF
Client
HOUSE RAIMONDO: ALTERATIONS AND ADDITIONSERF 383 / PARKTOWN NORTH
Drawing No.
Elevations and SectionsDesign Drawings
14RAI
HRAI_W101
Scale:
1:50
Description:
0 Issued for Approval 2014.02.14
31 Issued for Approval 2014.02.182 Issued for Approval 2014.02.28Mr. & Mrs. Raimondo 3 Issued for Approval 2014.03.13
4FDUJPO&&
4DBMF
4FDUJPO%%
4DBMF
#BMVTUSBEF
%FDL5SBOTQBSFOU1MBTUJD
3PPG4IFFUJOH
8FTU&MFWBUJPOPG4UVEJP
4DBMF
/PSUI&MFWBUJPOPG4UVEJP
4DBMF&BTU&MFWBUJPOPG4UVEJP
4DBMF
Client
HOUSE RAIMONDO: ALTERATIONS AND ADDITIONSERF 383 / PARKTOWN NORTH
Drawing No.
Elevations and SectionsDesign Drawings
14RAI
HRAI_W101
Scale:
1:50
Description:
0 Issued for Approval 2014.02.14
31 Issued for Approval 2014.02.182 Issued for Approval 2014.02.28Mr. & Mrs. Raimondo 3 Issued for Approval 2014.03.13
*All Designs are Property of Cohen and Garson Architects
Ground Floor Plan
Section D-D Section E-E
North Elevation of Studio
Studio Plan
South Elevation of Kitchen
Section A-A
Section B-B
22
7YVQLJ[5HTL!/V\ZL5HPKVVF:OHOStudents Responsibilities: Alterations and Additions: Design Drawings
Tyrwhitt Ave.
Main Bedroom
Guest RoomBathroom
Bedroom 2Bedroom 1
Kitchen 2
Kitchen
Play Room
A-A -
C-C
-
Skylight Above
Laundry
Study
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
J 1 : 100
2014/09/12 02:50:21 PM
House Naidoo_Shah: Alterations and Additions
Kuben Naidoo and Aarti Shah
Gr. Floor Plan
HNAI_D101 CB
Ground Floor PlanScale 1:100
REVISION NO. DESCRIPTION DATE ISSUED
1 Exisiting 2014.03.06A For Approval 2014.03.20B For Approval 2014.04.15C For Approval 2014.04.16D For Approval 2014.06.12E For Approval 2014.08.04F For Apporval 2014.09.08G For Approval 2014.09.10H For Approval 2014.09.11J For Approval 2014.09.12
Ground Floor Plan
*All Designs are Property of Cohen and Garson Architects
23
A-A -
C-C
-
Tyrwhitt Ave.
Garage GardenShed
Store
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
F 1 : 100
2014/09/12 02:51:29 PM
House Naidoo_Shah: Alterations and Additions
Kuben Naidoo and Aarti Shah
Basement Plan
HNAI_D100 CB
Basement PlanScale 1:100
REVISION NO. DESCRIPTION DATE ISSUED
1 Exisiting 2014.03.06A For Approval 2014.03.20B For Approval 2014.04.15C For Approval 2014.04.16D For Approval 2014.06.12E For Approval 2014.08.04F For Apporval 2014.09.08
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
J 1 : 100
2014/09/12 02:50:22 PM
House Naidoo_Shah: Alterations and Additions
Kuben Naidoo and Aarti Shah
Sections and 3D
HNAI_D200 CB
1 : 100Section A-A
1 : 100Section C-C
REVISION NO. DESCRIPTION DATE ISSUED
1 Exisiting 2014.03.06A For Approval 2014.03.20B For Approval 2014.04.15C For Approval 2014.04.16D For Approval 2014.06.12E For Approval 2014.08.04F For Apporval 2014.09.08G For Approval 2014.09.10H For Approval 2014.09.11J For Approval 2014.09.12
Section B-B
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
J 1 : 100
2014/09/12 02:50:22 PM
House Naidoo_Shah: Alterations and Additions
Kuben Naidoo and Aarti Shah
Sections and 3D
HNAI_D200 CB
1 : 100Section A-A
1 : 100Section C-C
REVISION NO. DESCRIPTION DATE ISSUED
1 Exisiting 2014.03.06A For Approval 2014.03.20B For Approval 2014.04.15C For Approval 2014.04.16D For Approval 2014.06.12E For Approval 2014.08.04F For Apporval 2014.09.08G For Approval 2014.09.10H For Approval 2014.09.11J For Approval 2014.09.12
Section B-BPROJECT
DRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
J 1 : 100
2014/09/12 02:50:22 PM
House Naidoo_Shah: Alterations and Additions
Kuben Naidoo and Aarti Shah
Sections and 3D
HNAI_D200 CB
1 : 100Section A-A
1 : 100Section C-C
REVISION NO. DESCRIPTION DATE ISSUED
1 Exisiting 2014.03.06A For Approval 2014.03.20B For Approval 2014.04.15C For Approval 2014.04.16D For Approval 2014.06.12E For Approval 2014.08.04F For Apporval 2014.09.08G For Approval 2014.09.10H For Approval 2014.09.11J For Approval 2014.09.12
Section B-B
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
J2014/09/12 02:50:23 PM
House Naidoo_Shah: Alterations and Additions
Kuben Naidoo and Aarti Shah
Elevations
HNAI_D300 CB
North Elevation
South Elevation
West Elevation East Elevation
REVISION NO. DESCRIPTION DATE ISSUED
1 Exisiting 2014.03.06A For Approval 2014.03.20B For Approval 2014.04.15C For Approval 2014.04.16D For Approval 2014.06.12E For Approval 2014.08.04F For Apporval 2014.09.08G For Approval 2014.09.10H For Approval 2014.09.11J For Approval 2014.09.12
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
J2014/09/12 02:50:23 PM
House Naidoo_Shah: Alterations and Additions
Kuben Naidoo and Aarti Shah
Elevations
HNAI_D300 CB
North Elevation
South Elevation
West Elevation East Elevation
REVISION NO. DESCRIPTION DATE ISSUED
1 Exisiting 2014.03.06A For Approval 2014.03.20B For Approval 2014.04.15C For Approval 2014.04.16D For Approval 2014.06.12E For Approval 2014.08.04F For Apporval 2014.09.08G For Approval 2014.09.10H For Approval 2014.09.11J For Approval 2014.09.12
Basement Plan
Section A-A
Section C-C
Section B-B
North Elevation East Elevation
*All Designs are Property of Cohen and Garson Architects
24
Project Name: House Johnson_CarthyStudents Responsibilities: Alterations and Additions: Design Drawings
8 7 6 5 4 3 2 1
2928272625242322212019181716151413121110
8765
9
8
7 6 5
9
8
7
6
5
4
3
2
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
D 1 : 100
2014/08/27 10:19:39 AM
House Joh_Car: Alterations and Additions
Erica Johnson and Craig Carthy
Gr. Floor Plan
D 100 Author
REVISION NO. DESCRIPTION DATE ISSUED
1 Existing Plans 2014.05.09A Issued for Approval 2014.06.23B Issued for Approval 2014.07.11C Issued for Approval 2014.07.18D Issued for Approval 2014.08.20
Ground Floor Plan
*All Designs are Property of Cohen and Garson Architects
25
30292827262524232221
20 19 18 17 16 15 14 13 12 11
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
D 1 : 100
2014/08/27 10:14:29 AM
House Joh_Car: Alterations and Additions
Erica Johnson and Craig Carthy
Mezzanine Plan
D 102 Author
REVISION NO. DESCRIPTION DATE ISSUED
1 Existing Plans 2014.05.09A Issued for Approval 2014.06.23B Issued for Approval 2014.07.11C Issued for Approval 2014.07.18D Issued for Approval 2014.08.20
20 19 18 17 16 15 14 13 12
30292827262524232221
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
D 1 : 100
2014/08/27 10:14:30 AM
House Joh_Car: Alterations and Additions
Erica Johnson and Craig Carthy
Sec. Floor Plan
D 103 Author
REVISION NO. DESCRIPTION DATE ISSUED
1 Existing Plans 2014.05.09A Issued for Approval 2014.06.23B Issued for Approval 2014.07.11C Issued for Approval 2014.07.18D Issued for Approval 2014.08.20
Mezzanine Plan First Floor Plan
1011
1213
1415
1617
1819
2021
2223
2425
2627
2829
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
123456789
12345678
11121314151617181920
9
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
D 1 : 100
27/10/2014 18:54:07
House Joh_Car: Alterations and Additions
Erica Johnson and Craig Carthy
Sections
D 200 Author
1 : 100Section A-A
1 : 100Section B-B
REVISION NO. DESCRIPTION DATE ISSUED
1 Existing Plans 2014.05.09A Issued for Approval 2014.06.23B Issued for Approval 2014.07.11C Issued for Approval 2014.07.18D Issued for Approval 2014.08.20
1011
1213
1415
1617
1819
2021
2223
2425
2627
2829
1112
1314
1516
1718
1920
2122
2324
2526
2728
2930
123456789
12345678
11121314151617181920
9
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
D 1 : 100
27/10/2014 18:54:07
House Joh_Car: Alterations and Additions
Erica Johnson and Craig Carthy
Sections
D 200 Author
1 : 100Section A-A
1 : 100Section B-B
REVISION NO. DESCRIPTION DATE ISSUED
1 Existing Plans 2014.05.09A Issued for Approval 2014.06.23B Issued for Approval 2014.07.11C Issued for Approval 2014.07.18D Issued for Approval 2014.08.20
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
D 1 : 100
27/10/2014 18:54:12
House Joh_Car: Alterations and Additions
Erica Johnson and Craig Carthy
Elevations
D 300 Author
1 : 100North Elevation
1 : 100East Elevation
REVISION NO. DESCRIPTION DATE ISSUED
1 Existing Plans 2014.05.09A Issued for Approval 2014.06.23B Issued for Approval 2014.07.11C Issued for Approval 2014.07.18D Issued for Approval 2014.08.20
PROJECTDRAWING NAME
DRAWING NO.CLIENT
SCALE
DRAWN BY CURRENT REVISION:
D 1 : 100
27/10/2014 18:54:12
House Joh_Car: Alterations and Additions
Erica Johnson and Craig Carthy
Elevations
D 300 Author
1 : 100North Elevation
1 : 100East Elevation
REVISION NO. DESCRIPTION DATE ISSUED
1 Existing Plans 2014.05.09A Issued for Approval 2014.06.23B Issued for Approval 2014.07.11C Issued for Approval 2014.07.18D Issued for Approval 2014.08.20
Section A-A Section B-B
North Elevation East Elevation*All Designs are Property of Cohen and Garson Architects
26
Project Name: Ifafa Housing DevelopmentStudents Responsibilities: Design Drawings for Proposed Modular Units
-BSHF4JOHMF4UPSZ'PPUQSJOUN
4DBMF/
Medium (Double Story Area: 152 Footprint: 76m )Scale 1:100
First Floor Plan
Ground Floor Plan
N
4NBMM4JOHMF4UPSZ'PPUQSJOUN
4DBMF/
Small Unit Ground Floor Medium Unit Ground Floor
Medium Unit First Floor Large Unit Ground Floor
3D Renders *All Designs are Property of Cohen and Garson Architects
27
3D Renders
*All Designs are Property of Cohen and Garson Architects
28
Project Name: New University for Mpumalanga Land parcel 1 - ResidencesStudents Responsibilities: Sketch Design Drawings for Proposed Residence Blocks
First Floor PlanScale 1:200
Section A
-A
Ground Floor PlanScale 1:200
Section A
-A
3m
cove
red walkw
ay / ve
rand
ah
mandatory build-to line
man
datory build-to
line
build
-to line
(flexible)
build-to line (flexible)
1st - 3rd floor balcony encroachment line
Section A-AScale 1:200
Ground Floor
First Floor
Second Floor
Third Floor
*All Designs are Property of Cohen and Garson Architects
Ground Floor Plan
Section A-A
First Floor Plan
29
Second Floor PlanScale 1:200
Section A
-A
Third Floor PlanScale 1:200
Section A
-A
*All Designs are Property of Cohen and Garson Architects
Third Floor PlanSecond Floor Plan
Design Exploration
30
Project Name: New University for Mpumalanga Land parcel 1 - ResidencesStudents Responsibilities: Sketch Design Drawings for Proposed Library and Executive Office Building
UP
UP
UP
UP
UP
DN
build
to
lin
e (!e
xible)
setback line (max 30% of facade)
mandatory build- to line
1st - 3rd !oor balcony encroachment line
3000
3000
30003000
cove
red w
alkw
ay/ v
eran
dah
man
dato
ry bu
ild to
lin
e
setb
ack l
ine
(max
30
% of
fac
ade)
1st -
3r
d !oo
r balc
ony e
ncro
achm
ent l
ine
1st - 3rd !oor balcony encroachment line
mandatory build- to- line
setback line (max 30% of facade)
1st-
3rd !
oor b
alcon
y enc
roac
hmen
t lin
e
pede
strian
w
alkw
ay
3000 3000
Courtyard
line
of exist
ing
fence
build
to
lin
e (!e
xible)
setback line (max 30% of facade)
mandatory build- to line
1st - 3rd !oor balcony encroachment line
3000
3000
30003000
cove
red w
alkw
ay/ v
eran
dah
man
dato
ry bu
ild to
lin
e
setb
ack l
ine
(max
30
% of
fac
ade)
1st -
3r
d !oo
r balc
ony e
ncro
achm
ent l
ine
1st - 3rd !oor balcony encroachment line
mandatory build- to- line
setback line (max 30% of facade)
1st-
3rd !
oor b
alcon
y enc
roac
hmen
t lin
e
pede
strian
w
alkw
ay
3000 3000
Sect
ion
A-
A
Sect
ion
B-
B
Section C-C
Section E-E
Courtyard
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of Mpumalanga Upper Gound Floor Plan
D 102 Author
1 : 20002 Upper Ground Floor plan
E4102.50.82noitamrofnI rof deussIE
UP
UP
UP
UP
UP
UP
UP
UP
UP
Courtyard
build
to
lin
e (!e
xible)
setback line (max 30% of facade)
mandatory build- to line
1st - 3rd !oor balcony encroachment line
3000
3000
30003000
cove
red w
alkw
ay/ v
eran
dah
man
dato
ry bu
ild to
lin
e
setb
ack l
ine
(max
30
% of
fac
ade)
1st -
3r
d !oo
r balc
ony e
ncro
achm
ent l
ine
1st - 3rd !oor balcony encroachment line
mandatory build- to- line
setback line (max 30% of facade)
1st-
3rd !
oor b
alcon
y enc
roac
hmen
t lin
e
pede
strian
w
alkw
ay
3000 3000
Courtyard
build
to
lin
e (!e
xible)
setback line (max 30% of facade)
mandatory build- to line
1st - 3rd !oor balcony encroachment line
3000
3000
30003000
cove
red w
alkw
ay/ v
eran
dah
man
dato
ry bu
ild to
lin
e
setb
ack l
ine
(max
30
% of
fac
ade)
1st -
3r
d !oo
r balc
ony e
ncro
achm
ent l
ine
1st - 3rd !oor balcony encroachment line
mandatory build- to- line
setback line (max 30% of facade)
1st-
3rd !
oor b
alcon
y enc
roac
hmen
t lin
e
pede
strian
w
alkw
ay
3000 3000
Sect
ion
A-
A
Sect
ion
B-
B
Section C-C
Section E-E
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of Mpumalanga Lower Ground Floor Plan
D 101 Author
1 : 20001 Lower Ground Floor Plan
E4102.50.82noitamrofnI rof deussIE
UP
UP
UP
UP
UP
build
to
lin
e (!e
xible)
setback line (max 30% of facade)
mandatory build- to line
1st - 3rd !oor balcony encroachment line
3000
3000
30003000
cove
red w
alkw
ay/ v
eran
dah
man
dato
ry bu
ild to
lin
e
setb
ack l
ine
(max
30
% of
fac
ade)
1st -
3r
d !oo
r balc
ony e
ncro
achm
ent l
ine
1st - 3rd !oor balcony encroachment line
mandatory build- to- line
setback line (max 30% of facade)
1st-
3rd !
oor b
alcon
y enc
roac
hmen
t lin
e
pede
strian
w
alkw
ay
3000 3000
build
to
lin
e (!e
xible)
setback line (max 30% of facade)
mandatory build- to line
1st - 3rd !oor balcony encroachment line
3000
3000
30003000
cove
red w
alkw
ay/ v
eran
dah
man
dato
ry bu
ild to
lin
e
setb
ack l
ine
(max
30
% of
fac
ade)
1st -
3r
d !oo
r balc
ony e
ncro
achm
ent l
ine
1st - 3rd !oor balcony encroachment line
mandatory build- to- line
setback line (max 30% of facade)
1st-
3rd !
oor b
alcon
y enc
roac
hmen
t lin
e
pede
strian
w
alkw
ay
3000 3000
Roof
Sect
ion
A-
A
Sect
ion
B-
B
Section C-C
Section E-E
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of Mpumalanga Mezzanine Floor Plan
D 103 Author
1 : 20003 Mezzanine Floor Plan
E4102.50.82noitamrofnI rof deussIE
02 Upper Ground Floor plan
8900
04 First Floor Plan
15900
00 Basement Level Plan
2200
01 Lower Ground Floor Plan
5700
03 Mezzanine Floor Plan
12400
05 Roof Plan
21500
02 Upper Ground Floor plan
8900
04 First Floor Plan
15900
00 Basement Level Plan
2200
01 Lower Ground Floor Plan
5700
03 Mezzanine Floor Plan
12400
01 North East Block LowerGround Floor Plan
2200
02 North East Block UpperGround Floor Plan
5700
03 North East Block MezzanineFloor Plan
9200
Level 4
12700
00 North East Block BasementLevel Plan
-1300
01 South West Block LowerGround Floor Plan
3950
02 South West Block UpperGround Floor Plan
7450
03 South West Block MezzanineFloor Plan
10950
Level 6
16050
00 South West Block BasementLevel Plan
450
RF LVL 0
-1300
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of Mpumalanga Sections
D200 Author
1 : 200Section A-A
1 : 200Section B-B
E4102.50.82noitamrofnI rof deussIE
02 Upper Ground Floor plan
8900
04 First Floor Plan
15900
01 Lower Ground Floor Plan
5700
03 Mezzanine Floor Plan
12400
05 Roof Plan
21500
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of Mpumalanga Sections
D201 Author
1 : 200Section C-C
1 : 200Section E-E
E4102.50.82noitamrofnI rof deussIE
*All Designs are Property of Cohen and Garson Architects
Lower Ground Floor Plan
Section A-A Section C-C
Upper Ground Floor Plan Mezzanine Floor Plan
31
02 Upper Ground Floor plan
8900
04 First Floor Plan
15900
00 Basement Level Plan
2200
01 Lower Ground Floor Plan
5700
03 Mezzanine Floor Plan
12400
05 Roof Plan
21500
02 Upper Ground Floor plan
8900
04 First Floor Plan
15900
00 Basement Level Plan
2200
01 Lower Ground Floor Plan
5700
03 Mezzanine Floor Plan
12400
01 North East Block LowerGround Floor Plan
2200
02 North East Block UpperGround Floor Plan
5700
03 North East Block MezzanineFloor Plan
9200
Level 4
12700
00 North East Block BasementLevel Plan
-1300
01 South West Block LowerGround Floor Plan
3950
02 South West Block UpperGround Floor Plan
7450
03 South West Block MezzanineFloor Plan
10950
Level 6
16050
00 South West Block BasementLevel Plan
450
RF LVL 0
-1300
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of Mpumalanga Sections
D200 Author
1 : 200Section A-A
1 : 200Section B-B
E4102.50.82noitamrofnI rof deussIE
02 Upper Ground Floor plan
8900
04 First Floor Plan
15900
01 Lower Ground Floor Plan
5700
03 Mezzanine Floor Plan
12400
05 Roof Plan
21500
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of Mpumalanga Sections
D201 Author
1 : 200Section C-C
1 : 200Section E-E
E4102.50.82noitamrofnI rof deussIE
DN
UP
UP
UP
UP
UP
UP
UP
2725
build
to
lin
e (!e
xible)
setback line (max 30% of facade)
mandatory build- to line
1st - 3rd !oor balcony encroachment line
3000
3000
30003000
cove
red w
alkw
ay/ v
eran
dah
man
dato
ry bu
ild to
lin
e
setb
ack l
ine
(max
30
% of
fac
ade)
1st -
3r
d !oo
r balc
ony e
ncro
achm
ent l
ine
1st - 3rd !oor balcony encroachment line
mandatory build- to- line
setback line (max 30% of facade)
1st-
3rd !
oor b
alcon
y enc
roac
hmen
t lin
e
pede
strian
w
alkw
ay
3000 3000
build
to
lin
e (!e
xible)
setback line (max 30% of facade)
mandatory build- to line
1st - 3rd !oor balcony encroachment line
3000
3000
30003000
cove
red w
alkw
ay/ v
eran
dah
man
dato
ry bu
ild to
lin
e
setb
ack l
ine
(max
30
% of
fac
ade)
1st -
3r
d !oo
r balc
ony e
ncro
achm
ent l
ine
1st - 3rd !oor balcony encroachment line
mandatory build- to- line
setback line (max 30% of facade)
1st-
3rd !
oor b
alcon
y enc
roac
hmen
t lin
e
pede
strian
w
alkw
ay
3000 3000
Sect
ion
A-
A
Sect
ion
B-
B
Section C-C
Section E-E
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of Mpumalanga Basement Level Plan
D 100 Author
1 : 20000 Basement Level Plan
E4102.50.82noitamrofnI rof deussIE
UP
UP
UP
UP
UP
build
to
lin
e (!e
xible)
setback line (max 30% of facade)
mandatory build- to line
1st - 3rd !oor balcony encroachment line
3000
3000
30003000
cove
red w
alkw
ay/ v
eran
dah
man
dato
ry bu
ild to
lin
e
setb
ack l
ine
(max
30
% of
fac
ade)
1st -
3r
d !oo
r balc
ony e
ncro
achm
ent l
ine
1st - 3rd !oor balcony encroachment line
mandatory build- to- line
setback line (max 30% of facade)
1st-
3rd !
oor b
alcon
y enc
roac
hmen
t lin
e
pede
strian
w
alkw
ay
3000 3000
Sect
ion
A-
A
Sect
ion
B-
B
Section C-C
Section E-E
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of Mpumalanga First Floor Plan
D 104 Author
1 : 20004 First Floor Plan
E4102.50.82noitamrofnI rof deussIE
02 Upper Ground Floor plan
8900
04 First Floor Plan
15900
03 Mezzanine Floor Plan
12400
05 Roof Plan
21500
NGL
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of MpumalangaElevations
D300 Author
1 : 200North East Elevation
1 : 200North West Elevation
E4102.50.82noitamrofnI rof deussIE
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of MpumalangaElevations
D301 Author
1 : 200South East Elevation
1 : 200South West Elevation
E4102.50.82noitamrofnI rof deussIE
build
to
lin
e (!e
xible)
setback line (max 30% of facade)
mandatory build- to line
1st - 3rd !oor balcony encroachment line
3000
3000
30003000
cove
red w
alkw
ay/ v
eran
dah
man
dato
ry bu
ild to
lin
e
setb
ack l
ine
(max
30
% of
fac
ade)
1st -
3r
d !oo
r balc
ony e
ncro
achm
ent l
ine
1st - 3rd !oor balcony encroachment line
mandatory build- to- line
setback line (max 30% of facade)
1st-
3rd !
oor b
alcon
y enc
roac
hmen
t lin
e
pede
strian
w
alkw
ay
3000 3000
Sect
ion
A-
A
Sect
ion
B-
B
Section C-C
Section E-E
PROJECTRevision no. Description Date Issued
DRAWING
DRAWING NO.
CLIENT SCALE
DRAWN BY REV.
1 : 200
UMP Package 1 - Land Parcel 1.2
University of Mpumalanga Roof Plan
D 105 Author
1 : 20005 Roof Plan
E4102.50.82noitamrofnI rof deussIE
*All Designs are Property of Cohen and Garson Architects
Basement Level Plan First Floor Plan Roof Plan
Render A
Render C
Section B-B Section E-E
South West ElevationNorth West Elevation
32
*All Designs are Property of Cohen and Garson Architects
Render B
33
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500
Foyer51.8 m
Plant Room36.95 m
Visitors Toilets6.05 m
Visitors Toilets6.05 m
Ground Floor PlanScale 1:100
A B C D E F G H J K L M N
A
A
B BTotalCirculation48.54 m
TotalCirculation197.14 m
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500
Council Chamber47.9 m
Breakaway Room33.43 m
Seminar Room64.82 m
Exhibition44.45 m
Kitchen8.15 m
First Floor PlanScale 1:100
A B C D E F G H J K L M N
A
A
B B
TotalCirculation88.2 m
Revisions
SERIES
Drawing TitleProject Name:
Dwg No.
Consultant Info:
Consultant Drawing No:
Contract Number:Project Number General NotesBuilding 2_ Exec. Offices SKETCH DESIGN
Sketch Design Plans
CB CB 1:100 @ A12014/08/18
00LD_100
REV. NO. DESCRIPTION DATE
COPYRIGHT NOTICECopyright 2013 xxxxxxxxxx Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive licence to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawinThis licence in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licences in respect of the copyright in this drawing to any other entity.This licence confers no ownership rightin the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Cohen and Garson Architects. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution.Requests and enquiries concerning this drawing and the rights subsisting therein should beaddressed to the copyright.
ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE ARCHITECT ACCEPTS NO RESPONSIBILITYFOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS. ALL WORK TO BE CARRIED OUT STRICTLY INACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS. ALL DIMENSIONS ARE GIVEN INMILLIMETERS. DO NOT SCALE THIS DRAWING.NOTE:ALL GLAZING TO COMPLY WITH PART N OF THE NBR PARTITIONING AND CEILINGS.Partitioning and suspended ceilings to be rodent-proofed in accordance with Govt. rodent-proofing regulations, ie. Section B of SABS testedmethod 419 for Class B rodent-proofing. Ceiling voids to be divided with fire baffles into areas not exceeding 300msqd.LLUMINATION:The minimum illumination leves in part "O" of the National Building Regulations will be maintained. In the event of power failure, lighting toescape routes, stairway, lobbies, etc. shall be maintained at a level not less than 20 lux.FIRE SERVICE:Hydraulic hose reels, each with 30 metres of 20mm rubber hose, fitted with 5mm shut-off nozzle, will be provided where shown with 2 fireextinguishers per hose reel. 100mm feed to be provided to 100 single pump connections at entrance to the building with 50mm riserrequirements.GENERAL: ALL WORK TO COMPLY WITH NATIONAL BUILDING REGULATIONS.2AB's to be built in over or beside all fanless doors and windows. 2AB's to all W.C.'s, bathrooms and kitchens. Habitable rooms to haveminimum 1,5% floor area cross ventilation. Hot and cold running water to be provided at all fittings. All heat generation to be electrical. VerticalD.P.C.'s to all changes in floor levels. All dimensions and levels to be checked on site before any work commences. This drawing is not to bescaled and only figured dimensions are to be taken. All work to be carried out in accordance with local authority
Building 2 HETC081
D_100
H Design Development 140724
J Design Development and LevelNames Updated
140731
A R P L S
K Design Development 140812L Design Development 140818
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500
Foyer51.8 m
Plant Room36.95 m
Visitors Toilets6.05 m
Visitors Toilets6.05 m
Ground Floor PlanScale 1:100
A B C D E F G H J K L M N
A
A
B BTotalCirculation48.54 m
TotalCirculation197.14 m
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500
Council Chamber47.9 m
Breakaway Room33.43 m
Seminar Room64.82 m
Exhibition44.45 m
Kitchen8.15 m
First Floor PlanScale 1:100
A B C D E F G H J K L M N
A
A
B B
TotalCirculation88.2 m
Revisions
SERIES
Drawing TitleProject Name:
Dwg No.
Consultant Info:
Consultant Drawing No:
Contract Number:Project Number General NotesBuilding 2_ Exec. Offices SKETCH DESIGN
Sketch Design Plans
CB CB 1:100 @ A12014/08/18
00LD_100
REV. NO. DESCRIPTION DATE
COPYRIGHT NOTICECopyright 2013 xxxxxxxxxx Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive licence to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawinThis licence in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licences in respect of the copyright in this drawing to any other entity.This licence confers no ownership rightin the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Cohen and Garson Architects. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution.Requests and enquiries concerning this drawing and the rights subsisting therein should beaddressed to the copyright.
ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE ARCHITECT ACCEPTS NO RESPONSIBILITYFOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS. ALL WORK TO BE CARRIED OUT STRICTLY INACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS. ALL DIMENSIONS ARE GIVEN INMILLIMETERS. DO NOT SCALE THIS DRAWING.NOTE:ALL GLAZING TO COMPLY WITH PART N OF THE NBR PARTITIONING AND CEILINGS.Partitioning and suspended ceilings to be rodent-proofed in accordance with Govt. rodent-proofing regulations, ie. Section B of SABS testedmethod 419 for Class B rodent-proofing. Ceiling voids to be divided with fire baffles into areas not exceeding 300msqd.LLUMINATION:The minimum illumination leves in part "O" of the National Building Regulations will be maintained. In the event of power failure, lighting toescape routes, stairway, lobbies, etc. shall be maintained at a level not less than 20 lux.FIRE SERVICE:Hydraulic hose reels, each with 30 metres of 20mm rubber hose, fitted with 5mm shut-off nozzle, will be provided where shown with 2 fireextinguishers per hose reel. 100mm feed to be provided to 100 single pump connections at entrance to the building with 50mm riserrequirements.GENERAL: ALL WORK TO COMPLY WITH NATIONAL BUILDING REGULATIONS.2AB's to be built in over or beside all fanless doors and windows. 2AB's to all W.C.'s, bathrooms and kitchens. Habitable rooms to haveminimum 1,5% floor area cross ventilation. Hot and cold running water to be provided at all fittings. All heat generation to be electrical. VerticalD.P.C.'s to all changes in floor levels. All dimensions and levels to be checked on site before any work commences. This drawing is not to bescaled and only figured dimensions are to be taken. All work to be carried out in accordance with local authority
Building 2 HETC081
D_100
H Design Development 140724
J Design Development and LevelNames Updated
140731
A R P L S
K Design Development 140812L Design Development 140818
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 35003500
Third Floor PlanScale 1:100
A B C D E F G H J K L M N
A
A
B B
Staff Toilets10.3m
Staff Kitchen4.41 m
Office14.3 m
Office14.63 m
Office14.63 m
Office14.63 m
Office13.68m
Seminar Room41.81 m
VC Office33.7 m
VC Office39.57 m
VC Office33.28 m
PA Office19.45 m
PA Office19.45 m
PA Office19.45 m
TotalCirculation91.04 m
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 35003500
Staff Toilets10.3m
Staff Kitchen4.41 m
Office14.3 m
Office14.63 m
Office14.63 m
Office14.63 m
Office13.68m
Seminar Room41.81 m
VC Office33.7 m
VC Office39.57 m
VC Office33.28 m
PA Office19.45 m
PA Office19.45 m
PA Office19.45 m
Second Floor PlanScale 1:100
A B C D E F G H J K L M N
A
A
B B
TotalCirculation91.04 m
Revisions
SERIES
Drawing TitleProject Name:
Dwg No.
Consultant Info:
Consultant Drawing No:
Contract Number:Project Number General NotesBuilding 2_ Exec. Offices SKETCH DESIGN
Sketch Design Plans
1:100 @ A1
D_101
REV. NO. DESCRIPTION DATE
COPYRIGHT NOTICECopyright 2013 xxxxxxxxxx Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive licence to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawinThis licence in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licences in respect of the copyright in this drawing to any other entity.This licence confers no ownership rightin the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Cohen and Garson Architects. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution.Requests and enquiries concerning this drawing and the rights subsisting therein should beaddressed to the copyright.
ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE ARCHITECT ACCEPTS NO RESPONSIBILITYFOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS. ALL WORK TO BE CARRIED OUT STRICTLY INACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS. ALL DIMENSIONS ARE GIVEN INMILLIMETERS. DO NOT SCALE THIS DRAWING.NOTE:ALL GLAZING TO COMPLY WITH PART N OF THE NBR PARTITIONING AND CEILINGS.Partitioning and suspended ceilings to be rodent-proofed in accordance with Govt. rodent-proofing regulations, ie. Section B of SABS testedmethod 419 for Class B rodent-proofing. Ceiling voids to be divided with fire baffles into areas not exceeding 300msqd.LLUMINATION:The minimum illumination leves in part "O" of the National Building Regulations will be maintained. In the event of power failure, lighting toescape routes, stairway, lobbies, etc. shall be maintained at a level not less than 20 lux.FIRE SERVICE:Hydraulic hose reels, each with 30 metres of 20mm rubber hose, fitted with 5mm shut-off nozzle, will be provided where shown with 2 fireextinguishers per hose reel. 100mm feed to be provided to 100 single pump connections at entrance to the building with 50mm riserrequirements.GENERAL: ALL WORK TO COMPLY WITH NATIONAL BUILDING REGULATIONS.2AB's to be built in over or beside all fanless doors and windows. 2AB's to all W.C.'s, bathrooms and kitchens. Habitable rooms to haveminimum 1,5% floor area cross ventilation. Hot and cold running water to be provided at all fittings. All heat generation to be electrical. VerticalD.P.C.'s to all changes in floor levels. All dimensions and levels to be checked on site before any work commences. This drawing is not to bescaled and only figured dimensions are to be taken. All work to be carried out in accordance with local authority
Building 2 HETC081
D_101
H Design Development 140724
J Design Development and LevelNames Updated
140731
A R P L S
CB CB
K Design Development 140812
2014/08/18
00L
L Design Development 140818
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 35003500
Third Floor PlanScale 1:100
A B C D E F G H J K L M N
A
A
B B
Staff Toilets10.3m
Staff Kitchen4.41 m
Office14.3 m
Office14.63 m
Office14.63 m
Office14.63 m
Office13.68m
Seminar Room41.81 m
VC Office33.7 m
VC Office39.57 m
VC Office33.28 m
PA Office19.45 m
PA Office19.45 m
PA Office19.45 m
TotalCirculation91.04 m
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 35003500
Staff Toilets10.3m
Staff Kitchen4.41 m
Office14.3 m
Office14.63 m
Office14.63 m
Office14.63 m
Office13.68m
Seminar Room41.81 m
VC Office33.7 m
VC Office39.57 m
VC Office33.28 m
PA Office19.45 m
PA Office19.45 m
PA Office19.45 m
Second Floor PlanScale 1:100
A B C D E F G H J K L M N
A
A
B B
TotalCirculation91.04 m
Revisions
SERIES
Drawing TitleProject Name:
Dwg No.
Consultant Info:
Consultant Drawing No:
Contract Number:Project Number General NotesBuilding 2_ Exec. Offices SKETCH DESIGN
Sketch Design Plans
1:100 @ A1
D_101
REV. NO. DESCRIPTION DATE
COPYRIGHT NOTICECopyright 2013 xxxxxxxxxx Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive licence to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawinThis licence in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licences in respect of the copyright in this drawing to any other entity.This licence confers no ownership rightin the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Cohen and Garson Architects. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution.Requests and enquiries concerning this drawing and the rights subsisting therein should beaddressed to the copyright.
ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE ARCHITECT ACCEPTS NO RESPONSIBILITYFOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS. ALL WORK TO BE CARRIED OUT STRICTLY INACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS. ALL DIMENSIONS ARE GIVEN INMILLIMETERS. DO NOT SCALE THIS DRAWING.NOTE:ALL GLAZING TO COMPLY WITH PART N OF THE NBR PARTITIONING AND CEILINGS.Partitioning and suspended ceilings to be rodent-proofed in accordance with Govt. rodent-proofing regulations, ie. Section B of SABS testedmethod 419 for Class B rodent-proofing. Ceiling voids to be divided with fire baffles into areas not exceeding 300msqd.LLUMINATION:The minimum illumination leves in part "O" of the National Building Regulations will be maintained. In the event of power failure, lighting toescape routes, stairway, lobbies, etc. shall be maintained at a level not less than 20 lux.FIRE SERVICE:Hydraulic hose reels, each with 30 metres of 20mm rubber hose, fitted with 5mm shut-off nozzle, will be provided where shown with 2 fireextinguishers per hose reel. 100mm feed to be provided to 100 single pump connections at entrance to the building with 50mm riserrequirements.GENERAL: ALL WORK TO COMPLY WITH NATIONAL BUILDING REGULATIONS.2AB's to be built in over or beside all fanless doors and windows. 2AB's to all W.C.'s, bathrooms and kitchens. Habitable rooms to haveminimum 1,5% floor area cross ventilation. Hot and cold running water to be provided at all fittings. All heat generation to be electrical. VerticalD.P.C.'s to all changes in floor levels. All dimensions and levels to be checked on site before any work commences. This drawing is not to bescaled and only figured dimensions are to be taken. All work to be carried out in accordance with local authority
Building 2 HETC081
D_101
H Design Development 140724
J Design Development and LevelNames Updated
140731
A R P L S
CB CB
K Design Development 140812
2014/08/18
00L
L Design Development 140818
35003500350035003500350035003500350035003500 3500
160
1360
1700
1700
1700
1700
1700
1000
1215
1700
1700
ABCDEFGHJKLMN
Datum: 689 000mm FFL 689 160mm
FFL 690 520mm
FFL 693 920mm
FFL 695 620mm
FFL 697 320mm
FFL 699 020mm
FFL 700 720mm
FFL 702 420mm
U/S Rafter 704 635mm
U/S Coping 703 420mm
Section B-BScale 1:100
FFL 692 220mm
160
1360
1700
1700
1700
1700
1700
1000
1215
1700
1700
Section A-AScale 1:100
Datum: 689 000mm FFL 689 160mm
FFL 690 520mm
FFL 693 920mm
FFL 695 620mm
FFL 697 320mm
FFL 699 020mm
FFL 700 720mm
FFL 702 420mm
NGL
U/S Rafter 704 635mm
FFL 692 220mm
Revisions
SERIES
Drawing TitleProject Name:
Dwg No.
Consultant Info:
Consultant Drawing No:
Contract Number:Project Number General NotesBuilding 2_ Exec. Offices SKETCH DESIGN
Sketch Design Sect. & Elev.
1:100 @ A1
D_200
REV. NO. DESCRIPTION DATE
COPYRIGHT NOTICECopyright 2013 xxxxxxxxxx Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive licence to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawinThis licence in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licences in respect of the copyright in this drawing to any other entity.This licence confers no ownership rightin the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Cohen and Garson Architects. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution.Requests and enquiries concerning this drawing and the rights subsisting therein should beaddressed to the copyright.
ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE ARCHITECT ACCEPTS NO RESPONSIBILITYFOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS. ALL WORK TO BE CARRIED OUT STRICTLY INACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS. ALL DIMENSIONS ARE GIVEN INMILLIMETERS. DO NOT SCALE THIS DRAWING.NOTE:ALL GLAZING TO COMPLY WITH PART N OF THE NBR PARTITIONING AND CEILINGS.Partitioning and suspended ceilings to be rodent-proofed in accordance with Govt. rodent-proofing regulations, ie. Section B of SABS testedmethod 419 for Class B rodent-proofing. Ceiling voids to be divided with fire baffles into areas not exceeding 300msqd.LLUMINATION:The minimum illumination leves in part "O" of the National Building Regulations will be maintained. In the event of power failure, lighting toescape routes, stairway, lobbies, etc. shall be maintained at a level not less than 20 lux.FIRE SERVICE:Hydraulic hose reels, each with 30 metres of 20mm rubber hose, fitted with 5mm shut-off nozzle, will be provided where shown with 2 fireextinguishers per hose reel. 100mm feed to be provided to 100 single pump connections at entrance to the building with 50mm riserrequirements.GENERAL: ALL WORK TO COMPLY WITH NATIONAL BUILDING REGULATIONS.2AB's to be built in over or beside all fanless doors and windows. 2AB's to all W.C.'s, bathrooms and kitchens. Habitable rooms to haveminimum 1,5% floor area cross ventilation. Hot and cold running water to be provided at all fittings. All heat generation to be electrical. VerticalD.P.C.'s to all changes in floor levels. All dimensions and levels to be checked on site before any work commences. This drawing is not to bescaled and only figured dimensions are to be taken. All work to be carried out in accordance with local authority
Building 2 HETC081
D_200
H Design Development 140724
J Design Development and LevelNames Updated
140731
A R E S S
CB CB
K Design Development 140812
2014/08/18
00L
L Design Development 140818
160
1360
1700
1700
1700
1700
1700
1000
1215
35003500350035003500350035003500350035003500 3500
1700
1700
North ElevationScale 1:100
Datum: 689 000mm FFL 689 160mm
FFL 690 520mm
FFL 693 920mm
FFL 695 620mm
FFL 697 320mm
FFL 699 020mm
FFL 700 720mm
FFL 702 420mm
U/S Rafter 704 635mm
U/S Coping 703 420mm
ABCDEFGHJKLMN
FFL 692 220mm
160
1360
1700
1700
1700
1700
1700
1000
1215
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500
1700
1700
South ElevationScale 1:100
Datum: 689 000mm FFL 689 160mm
FFL 690 520mm
FFL 693 920mm
FFL 695 620mm
FFL 697 320mm
FFL 699 020mm
FFL 700 720mm
FFL 702 420mm
U/S Rafter 704 635mm
U/S Coping 703 420mm
A B C D E F G H J K L M N
FFL 692 220mm
Revisions
SERIES
Drawing TitleProject Name:
Dwg No.
Consultant Info:
Consultant Drawing No:
Contract Number:Project Number General NotesBuilding 2_ Exec. Offices SKETCH DESIGN
Sketch Design Elevations
1:100 @ A1
D_300
REV. NO. DESCRIPTION DATE
COPYRIGHT NOTICECopyright 2013 xxxxxxxxxx Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive licence to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawinThis licence in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licences in respect of the copyright in this drawing to any other entity.This licence confers no ownership rightin the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Cohen and Garson Architects. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution.Requests and enquiries concerning this drawing and the rights subsisting therein should beaddressed to the copyright.
ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE ARCHITECT ACCEPTS NO RESPONSIBILITYFOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS. ALL WORK TO BE CARRIED OUT STRICTLY INACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS. ALL DIMENSIONS ARE GIVEN INMILLIMETERS. DO NOT SCALE THIS DRAWING.NOTE:ALL GLAZING TO COMPLY WITH PART N OF THE NBR PARTITIONING AND CEILINGS.Partitioning and suspended ceilings to be rodent-proofed in accordance with Govt. rodent-proofing regulations, ie. Section B of SABS testedmethod 419 for Class B rodent-proofing. Ceiling voids to be divided with fire baffles into areas not exceeding 300msqd.LLUMINATION:The minimum illumination leves in part "O" of the National Building Regulations will be maintained. In the event of power failure, lighting toescape routes, stairway, lobbies, etc. shall be maintained at a level not less than 20 lux.FIRE SERVICE:Hydraulic hose reels, each with 30 metres of 20mm rubber hose, fitted with 5mm shut-off nozzle, will be provided where shown with 2 fireextinguishers per hose reel. 100mm feed to be provided to 100 single pump connections at entrance to the building with 50mm riserrequirements.GENERAL: ALL WORK TO COMPLY WITH NATIONAL BUILDING REGULATIONS.2AB's to be built in over or beside all fanless doors and windows. 2AB's to all W.C.'s, bathrooms and kitchens. Habitable rooms to haveminimum 1,5% floor area cross ventilation. Hot and cold running water to be provided at all fittings. All heat generation to be electrical. VerticalD.P.C.'s to all changes in floor levels. All dimensions and levels to be checked on site before any work commences. This drawing is not to bescaled and only figured dimensions are to be taken. All work to be carried out in accordance with local authority
Building 2 HETC081
D_300
H Design Development 140724
J Design Development and LevelNames Updated
140731
A R E S S
CB CB
K Design Development 140812
2014/08/18
00L
L Design Development 140818
160
1360
1700
1700
1700
1700
1700
1000
1215
35003500350035003500350035003500350035003500 3500
1700
1700
North ElevationScale 1:100
Datum: 689 000mm FFL 689 160mm
FFL 690 520mm
FFL 693 920mm
FFL 695 620mm
FFL 697 320mm
FFL 699 020mm
FFL 700 720mm
FFL 702 420mm
U/S Rafter 704 635mm
U/S Coping 703 420mm
ABCDEFGHJKLMN
FFL 692 220mm
160
1360
1700
1700
1700
1700
1700
1000
1215
3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500 3500
1700
1700
South ElevationScale 1:100
Datum: 689 000mm FFL 689 160mm
FFL 690 520mm
FFL 693 920mm
FFL 695 620mm
FFL 697 320mm
FFL 699 020mm
FFL 700 720mm
FFL 702 420mm
U/S Rafter 704 635mm
U/S Coping 703 420mm
A B C D E F G H J K L M N
FFL 692 220mm
Revisions
SERIES
Drawing TitleProject Name:
Dwg No.
Consultant Info:
Consultant Drawing No:
Contract Number:Project Number General NotesBuilding 2_ Exec. Offices SKETCH DESIGN
Sketch Design Elevations
1:100 @ A1
D_300
REV. NO. DESCRIPTION DATE
COPYRIGHT NOTICECopyright 2013 xxxxxxxxxx Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive licence to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawinThis licence in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licences in respect of the copyright in this drawing to any other entity.This licence confers no ownership rightin the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Cohen and Garson Architects. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution.Requests and enquiries concerning this drawing and the rights subsisting therein should beaddressed to the copyright.
ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE ARCHITECT ACCEPTS NO RESPONSIBILITYFOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS. ALL WORK TO BE CARRIED OUT STRICTLY INACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS. ALL DIMENSIONS ARE GIVEN INMILLIMETERS. DO NOT SCALE THIS DRAWING.NOTE:ALL GLAZING TO COMPLY WITH PART N OF THE NBR PARTITIONING AND CEILINGS.Partitioning and suspended ceilings to be rodent-proofed in accordance with Govt. rodent-proofing regulations, ie. Section B of SABS testedmethod 419 for Class B rodent-proofing. Ceiling voids to be divided with fire baffles into areas not exceeding 300msqd.LLUMINATION:The minimum illumination leves in part "O" of the National Building Regulations will be maintained. In the event of power failure, lighting toescape routes, stairway, lobbies, etc. shall be maintained at a level not less than 20 lux.FIRE SERVICE:Hydraulic hose reels, each with 30 metres of 20mm rubber hose, fitted with 5mm shut-off nozzle, will be provided where shown with 2 fireextinguishers per hose reel. 100mm feed to be provided to 100 single pump connections at entrance to the building with 50mm riserrequirements.GENERAL: ALL WORK TO COMPLY WITH NATIONAL BUILDING REGULATIONS.2AB's to be built in over or beside all fanless doors and windows. 2AB's to all W.C.'s, bathrooms and kitchens. Habitable rooms to haveminimum 1,5% floor area cross ventilation. Hot and cold running water to be provided at all fittings. All heat generation to be electrical. VerticalD.P.C.'s to all changes in floor levels. All dimensions and levels to be checked on site before any work commences. This drawing is not to bescaled and only figured dimensions are to be taken. All work to be carried out in accordance with local authority
Building 2 HETC081
D_300
H Design Development 140724
J Design Development and LevelNames Updated
140731
A R E S S
CB CB
K Design Development 140812
2014/08/18
00L
L Design Development 140818
160
1360
1700
1700
1700
1700
1700
1000
1215
1700
1700
West ElevationScale 1:100
Datum: 689 000mm FFL 689 160mm
FFL 690 520mm
FFL 693 920mm
FFL 695 620mm
FFL 697 320mm
FFL 699 020mm
FFL:700 720mm
FFL 702 420mm
U/S Rafter 704 635mm
U/S Coping 703 420mm
NGL FFL 692 220mm
160
1360
1700
1700
1700
1700
1700
1000
1215
1700
1700
East ElevationScale 1:100
Datum: 689 000mm FFL 689 160mm
FFL 690 520mm
FFL 693 920mm
FFL 695 620mm
FFL 697 320mm
FFL 699 020mm
FFL 700 720mm
FFL 702 420mm
U/S Rafter 704 635mm
U/S Coping 703 420mm
NGL FFL 692 220mm
Revisions
SERIES
Drawing TitleProject Name:
Dwg No.
Consultant Info:
Consultant Drawing No:
Contract Number:Project Number General NotesBuilding 2_ Exec. Offices SKETCH DESIGN
Sketch Design Elevations
1:100 @ A1
D_301
REV. NO. DESCRIPTION DATE
COPYRIGHT NOTICECopyright 2013 xxxxxxxxxx Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive licence to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawinThis licence in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licences in respect of the copyright in this drawing to any other entity.This licence confers no ownership rightin the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Cohen and Garson Architects. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution.Requests and enquiries concerning this drawing and the rights subsisting therein should beaddressed to the copyright.
ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE ARCHITECT ACCEPTS NO RESPONSIBILITYFOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS. ALL WORK TO BE CARRIED OUT STRICTLY INACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS. ALL DIMENSIONS ARE GIVEN INMILLIMETERS. DO NOT SCALE THIS DRAWING.NOTE:ALL GLAZING TO COMPLY WITH PART N OF THE NBR PARTITIONING AND CEILINGS.Partitioning and suspended ceilings to be rodent-proofed in accordance with Govt. rodent-proofing regulations, ie. Section B of SABS testedmethod 419 for Class B rodent-proofing. Ceiling voids to be divided with fire baffles into areas not exceeding 300msqd.LLUMINATION:The minimum illumination leves in part "O" of the National Building Regulations will be maintained. In the event of power failure, lighting toescape routes, stairway, lobbies, etc. shall be maintained at a level not less than 20 lux.FIRE SERVICE:Hydraulic hose reels, each with 30 metres of 20mm rubber hose, fitted with 5mm shut-off nozzle, will be provided where shown with 2 fireextinguishers per hose reel. 100mm feed to be provided to 100 single pump connections at entrance to the building with 50mm riserrequirements.GENERAL: ALL WORK TO COMPLY WITH NATIONAL BUILDING REGULATIONS.2AB's to be built in over or beside all fanless doors and windows. 2AB's to all W.C.'s, bathrooms and kitchens. Habitable rooms to haveminimum 1,5% floor area cross ventilation. Hot and cold running water to be provided at all fittings. All heat generation to be electrical. VerticalD.P.C.'s to all changes in floor levels. All dimensions and levels to be checked on site before any work commences. This drawing is not to bescaled and only figured dimensions are to be taken. All work to be carried out in accordance with local authority
Building 2 HETC081
D_301
H Design Development 140724
J Design Development and LevelNames Updated
140731
A R E S S
CB CB
K Design Development 140812
2014/08/18
00L
L Design Development 140818
160
1360
1700
1700
1700
1700
1700
1000
1215
1700
1700
West ElevationScale 1:100
Datum: 689 000mm FFL 689 160mm
FFL 690 520mm
FFL 693 920mm
FFL 695 620mm
FFL 697 320mm
FFL 699 020mm
FFL:700 720mm
FFL 702 420mm
U/S Rafter 704 635mm
U/S Coping 703 420mm
NGL FFL 692 220mm
160
1360
1700
1700
1700
1700
1700
1000
1215
1700
1700
East ElevationScale 1:100
Datum: 689 000mm FFL 689 160mm
FFL 690 520mm
FFL 693 920mm
FFL 695 620mm
FFL 697 320mm
FFL 699 020mm
FFL 700 720mm
FFL 702 420mm
U/S Rafter 704 635mm
U/S Coping 703 420mm
NGL FFL 692 220mm
Revisions
SERIES
Drawing TitleProject Name:
Dwg No.
Consultant Info:
Consultant Drawing No:
Contract Number:Project Number General NotesBuilding 2_ Exec. Offices SKETCH DESIGN
Sketch Design Elevations
1:100 @ A1
D_301
REV. NO. DESCRIPTION DATE
COPYRIGHT NOTICECopyright 2013 xxxxxxxxxx Copyright subsists in this drawing. The person or entity whose name appears in the title block of this drawing is hereby granted a non-exclusive licence to use, display, print and/or reproduce this drawing to the extent necessary to carry out and complete the project described in the title block of this drawinThis licence in respect of the copyright is expressly limited as aforesaid and the person and/or entity referred to above shall not be entitled to grant sub-licences in respect of the copyright in this drawing to any other entity.This licence confers no ownership rightin the copyright vesting in the drawing and this drawing and the copyright subsisting therein will, at all times, remain the property of Cohen and Garson Architects. Any unauthorised reproduction, publication, transmission, adaptation and/or inclusion of this drawing in a cinematographic film or television broadcast is an act of copyright infringement which will render the doer of the act liable for civil copyright infringement and may in certain circumstances render the doer liable to criminal prosecution.Requests and enquiries concerning this drawing and the rights subsisting therein should beaddressed to the copyright.
ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE ARCHITECT ACCEPTS NO RESPONSIBILITYFOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS. ALL WORK TO BE CARRIED OUT STRICTLY INACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS. ALL DIMENSIONS ARE GIVEN INMILLIMETERS. DO NOT SCALE THIS DRAWING.NOTE:ALL GLAZING TO COMPLY WITH PART N OF THE NBR PARTITIONING AND CEILINGS.Partitioning and suspended ceilings to be rodent-proofed in accordance with Govt. rodent-proofing regulations, ie. Section B of SABS testedmethod 419 for Class B rodent-proofing. Ceiling voids to be divided with fire baffles into areas not exceeding 300msqd.LLUMINATION:The minimum illumination leves in part "O" of the National Building Regulations will be maintained. In the event of power failure, lighting toescape routes, stairway, lobbies, etc. shall be maintained at a level not less than 20 lux.FIRE SERVICE:Hydraulic hose reels, each with 30 metres of 20mm rubber hose, fitted with 5mm shut-off nozzle, will be provided where shown with 2 fireextinguishers per hose reel. 100mm feed to be provided to 100 single pump connections at entrance to the building with 50mm riserrequirements.GENERAL: ALL WORK TO COMPLY WITH NATIONAL BUILDING REGULATIONS.2AB's to be built in over or beside all fanless doors and windows. 2AB's to all W.C.'s, bathrooms and kitchens. Habitable rooms to haveminimum 1,5% floor area cross ventilation. Hot and cold running water to be provided at all fittings. All heat generation to be electrical. VerticalD.P.C.'s to all changes in floor levels. All dimensions and levels to be checked on site before any work commences. This drawing is not to bescaled and only figured dimensions are to be taken. All work to be carried out in accordance with local authority
Building 2 HETC081
D_301
H Design Development 140724
J Design Development and LevelNames Updated
140731
A R E S S
CB CB
K Design Development 140812
2014/08/18
00L
L Design Development 140818
*All Designs are Property of Cohen and Garson Architects
Ground Floor Plan First Floor Slab
Third Floor Slab
South Elevation West Elevation East Elevation North Elevation
Section A-A
Second Floor Slab
34
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
UPUP
UPUP
UPUP
10987654321
19 18 17 16 15 14 13 12 11
10
9
8
7
6
5
4
3
2