Cleanroom Upgrade in SM18 Optical Inspection bench. SPL internal meeting 6, 7 December. CR upgrade in SM18 & OI bench. High pressure rinsing Cleanroom layout: Existing facility Actual Updated Ultra Pure Water production Optical inspection: SPL01 Cu SPL01 Nb What’s next Conclusion. - PowerPoint PPT Presentation
Popular Tags:
17
Click to edit Master title style Cleanroom Upgrade in SM18 Optical Inspection bench SPL internal meeting 6, 7 December 07/12/2012 1 J. Chambrillon CERN-BE-RF
Transcript
Page 1: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 1

Cleanroom Upgrade in SM18Optical Inspection bench

SPL internal meeting6, 7 December

07/12/2012

Page 2: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 2

CR upgrade in SM18 & OI bench• High pressure rinsing• Cleanroom layout:– Existing facility– Actual– Updated

• Ultra Pure Water production• Optical inspection:– SPL01 Cu– SPL01 Nb– What’s next

• Conclusion

07/12/2012

Page 3: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 3

High Pressure Rinsing (HPR)

• HPR from SPEC (US).• HP pump (140 bar, 1.1 m3/h)

@ 3 stages to prevent vibration.• Rinsing cabinet with top wand

design (needed in SM18).• Cabinet should have a pass

trough design => load/unload fromdifferent class cleanrooms.

• Drying of the cavity by blowing hot N2.

• Rinsing nozzle to be designed.

07/12/2012

Page 4: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 4

Cleanroom layout (Existing facility in SM18)

Cleanroom facilityRF facilities

Magnet

Cryogenic

07/12/2012

SM18, plan

Page 5: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 5

Cleanroom layout (Actual)

07/12/2012

ISO 7 ISO 4

Air Box

Built in 1991.

Goals :• Increase cleanliness.• Create a rinsing room.• Get ride of the Air Box to gain space.

ISO 14644-1 FS 2094 105 1007 10 000

Page 6: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 6

Cleanroom layout (Updated)

07/12/2012

• Update should be done by Daldrop, initial builder of the facility.• Extension of the rinsing room.• Creation of a preparing room outside of the facility.

ISO 5 ISO 4

ISO 4

OpticalInspectio

n

ISO

5

Page 7: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 707/12/2012

Cleanroom layout (Updated)

Refurbishment of the filtering system with Fan Filter Unit (FFU).

Rinsing room extended to 4.5m high to held the HPR.

Preparing room based on softwall design.

Page 8: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 8

Cleanroom layout (Updated)

07/12/2012

ISO 5ISO 4

Rinsing room close up.

Sequence foreseen:•Cavity preparation for rinsing in ISO 5.•Rinsing of the outside.•Rinsing of the inside.•Pre-drying with Hot N2.•Final drying in ISO 4.•Assembly for RF test.

ISO 5

Page 9: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 9

Ultra Pure Water production

07/12/2012

•Pre-design of the installation, done by Veolia France•Production capacity of 1 m3/h.•UV lamp (185 nm) to prevent bacteria growing and decrease Total Organic Carbone (TOC):

CXHYOZ -> CO2 + H20 -> H2CO3 -> H+ + HCO3- HCO3- absorbed by polishing resin.

•Need to cool down the recirculation water due to the temperature in SM18.

Page 10: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 10

Optical Inspection (Kyoto/KEK)

Camera:3488 x 2616 pix@ 2.5 ips26.1 Mo/picture

Cavity can:– Slide– Rotate

Camera can:– Rotate over 180°

07/12/2012

Page 11: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 11

Optical Inspection

• Optical head in detail

07/12/2012

Page 12: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 12

Optical Inspection (SPL01 Cu)

• Use to perform the functional test of the bench and get experience.

• First picture of an equator welding.

• Easier illumination on copper.

07/12/2012

Page 13: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 13

Optical Inspection (SPL01 Nb)

• Resolution 2 µm/pix.• Image size = 6.9 mm X 5.2 mm.• Scratch or crack observed inside the cut off.• Inspection done by A. Benoit.

07/12/2012

Page 14: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 14

Optical Inspection (SPL01 Nb)

07/12/2012

Crack on SPL01 Nb cut off.

Nb structure close up SPL01.

Page 15: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 15

Optical Inspection, what’s next?

• Get a code to automate the inspection:– Autofocus– Step motion– Auto illumination

• Get a code to automate the analysis:– Colour correction– Image assembly– Contour detection to find defects

07/12/2012

Page 16: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 16

Conclusion

• Contracts should be signed for:– Cleanroom – High Pressure Rinsing– Ultra Pure Water

by the end of the year 2012.• Build a rinsing nozzle.• Develop a code to automate the optical bench

and gain experience with SPL01 Nb.• Optical Inspection is waiting for a quench.

07/12/2012

Page 17: Cleanroom Upgrade in SM18 Optical Inspection bench

Click to edit Master title style

J. Chambrillon CERN-BE-RF 17

Acknowledgment:K. Schirm

N. Valverde F. Pillon

M. Therasse A. Benoit

L. AbelThank you for your attention

07/12/2012