10th August 2016 © Copyright NZX Ltd. 2016 2
Agenda
• Welcomes and Introductions 2.00 - 2.30
• Clearing workshop 2.30 - 3.00
• Afternoon tea 3.00 - 3.30
• WITS Demo 3.30 - 3.45
• Reconciliation workshop 3.45 - 4.30
• Items from the floor 4.30 - 5.00
• Drinks 5.00 - 6.00
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 3
Welcome from NZX
Shane Dinnan Head of Energy Markets, NZX
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 4
Welcome from EA
Grant Benvenuti Manager Market Operations, EA
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 5
Development of the roles
The new MOSP contracts require NZX Energy to:
Assist the Authority give effect to its statutory objective
Continually plan and cater for the evolution of the services and seek to improve its
performance
This presentation talks about how we will achieve these goals:
The MOSP enhancement programme
Services road maps
Third party innovation
Steve Torrens
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 6
MOSP enhancement programme
Significant investment in each role’s system to:
Improve access to data by participants
Reduce complexity and improve usability
Increase security
Improve efficiency of back office processes
Steve Torrens
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 7
MOSP Enhancement Programme
The programme:
Will be delivered in 5 phases
First phase to be completed in October 2016
Fifth phase completed in September 2018
Major upgrade to the WITS front end
Upgrades to the other services focus on participant data accessibility and efficiency /
modernisation of back office systems
Get involved in UAT : We want your feedback!
Steve Torrens
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 8
Services road map
Each role will have a road map outlining our strategic vision and key initiatives for the
next 12 - 36 months
This will developed in the close collaboration with the Authority and with input from
participants
The road map for each role must be updated at least annually
Steve Torrens
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 9
Services road map inputs
The road map will:
Prioritise development work
Ensure that the services we provide remain fit for purpose
Inputs to the road map:
Authority market design work programme
Participant feedback - face to face meetings, user groups, surveys and informal
consultations
Initiatives to reduce cost and improve resiliency
Steve Torrens
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 10
Third party innovation
The new MOSP contracts also allow participants to fund specific role system features:
Contract directly with NZX
Must source data from the standard reporting available to all users
Two options for such features:
For the exclusive use of the funding participant for a six month period - feature
incorporated into the system proper
For the continued exclusive use of the funding participant - feature must be
independent from the main system
Steve Torrens
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 11
John Andrews
Clearing manager workshop
• Change to FTR methodology - Consultation in 2017 1
• New supporting files for participants 2
• Un-Offered Generation submission interface 3
• Planned changes for clearing manager’s systems 4
• Any comments - New participants, contacting the clearing analysts 5
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 12
Problem in methodology for FTR DSP for option products
Resolved with a change to be implemented in Dec 2016
Currently a reset to high DSPs is in place (16 DSPs reset in 2015)
New methodology has a factor to dilute the impact of the predictive model if it is far from
the market-set DSP. (Also handles issues around zero values in predictive model)
Clearing team happy to talk through the DSP methodology and the changes
John Andrews
Change to FTR methodology
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 13
Comments received during consultation on DSP for options
Reiterated by EA Board
Concerns:
Methodology is complicated and not transparent
Methodology does not appear to predict next price setting trade
Actions:
Exact details of the values used in the methodology calculation will be published
each day in the DSP extended CSV file
Analysis and discussion around methodology and possible changes shows
divergent opinions on purpose of DSP and need for model
John Andrews
DSP changes – consultation in 2017
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 14
New supporting files for participants
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 15
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 16
Five participants submit data weekly as allowed in the prudential methodology
Aim is to remove emails and manual processing
This step allows participants to upload the data themselves
Future is to have automatic upload from an FTP process
Clearing analyst still validates and runs the processing
Example of the changes the clearing team are making to reduce manual actions
John Andrews
Un-Offered Generation
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 17
John Andrews
Planned changes to clearing
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 18
Access to clearing documents (Prudential statements, DSP values, Invoices and
Statements) are currently on WITS and electricityclearing.co.nz
Please contact us if you would like to use electricityclearing.co.nz
Clearing manager team meeting with new participants almost every month
Happy to meet with you and your teams - easier to deal with people we know
Always open to feedback, questions and comments
Please use the [email protected] email to ensure team receives the email
John Andrews
Communication with the CM
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 19
WITS Demo
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 20
Reconciliation manager workshop
David Charlton
• Upcoming changes and enhancements 1
• MainPower balancing area re-configuration 2
• Trading Notifications 3
• Embedded network owners and balancing area naming 4
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 21
Upcoming changes
Unauthorised submissions
Agent/Client relationships
Testing during August/September
Production during September
Move away from emails and manual processes
Ad hoc reports available through the portal/SFTP (15.22)
NSP and grid changes via a web form
Volume disputes via a web form
Notifications to participants
System generated
Standardised formats
Likely emailed and published as news items
Participant feedback!
David Charlton
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 22
Mainpower balancing areas
Affecting 2 existing and creating 1 new balancing areas
Change coming into effect 1st October 2016
To assist traders in submissions, and reduce UFE, seasonal adjustment shapes will
be re-published
PRSHAPE (GR-020) and PRSEASL (GR-030) re-produced for 14 months prior to
change - as if change had been backdated.
Several reports made available on UAT mid-August
Publishing
One time publishing end of October?
Multiple publishing as washup completed?
David Charlton
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 23
Trade notifications 1
Original intent - Provision of trade notifications has always been a MARIA/EGR and now
Code requirement to ensure
profile has been approved and is current
profile use is authorised by profile owner (who may not be a participant)
that the person responsible for provision of the shape file is identified (may change also)
duplicate shape files are not provided to the reconciliation system
that the RM system is configured correctly and non delivery of shape file is identified prior to RM
commencing reconciliation cycle
David Charlton / Ron Beatty
15.3 Provision of trading information at point of connection to network
(1) Unless a notification under clause 15.13 is in force, a trader must give the reconciliation manager a notification that
complies with this clause at least 5 business days before the trader—
(a) commences trading electricity at a point of connection using a profile with a profile code other than HHR or RPS or UML or
EG1 or PV1; or
(b) ceases trading electricity at a point of connection using a profile with a profile code other than HHR or RPS or UML or EG1
or PV1.
(2) A person giving a notification must ensure that the notification complies with any procedures or other requirements
specified by the reconciliation manager.
(3) The reconciliation manager must give a copy of every notification to the clearing manager and system operator no later
than 1 business day after receiving the notification.
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 24
Trade notifications 2
Current usage
Must be submitted for every combination of:
Trader
Buy/sell
NHH/HHR
NSP
RM creates trade notifications for standard
profiles based off registry information at the
start of the month for most participants (days
2-4 switches may be missed)
NHHVOLS and HHRVOLS file validation
Manually updated via emails / PDF report
On average, 150 edits per month
David Charlton
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 25
Trade notifications 3 Minimum requirements of RM system, MUST have
GG and GD volume allocation (from NSP volumes)
SB incumbent volume allocation (from UFE)
Only owners/approved users can submit the respective profile shapes or volume
Options going forward
Must remain for GG/GD/SB’s
Keep authorisations for profile shapes
File validations on trade notifications optional
Could include field for profile code with expected submitter of profile shape
ensure obligations of 15.3 met
RM system change
Initially will be a significant effort for traders
Participant self management will be required from the portal
David Charlton
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 26
Embedded network owners
Use of embedded network owner participant identifiers
Balancing area naming conventions
aaaaaaaNNNNX where NNNN is the network owner
participant identifier
for embedded networks suggest change future
balancing area naming convention to replace network
owner participant identifier with EN gateway NSP
Minimise operational impacts of traders
increase in network owners, or changes in balancing
areas?
Ron Beatty
5
2
4
2
1
4
9
13
10
21
22
24
35
41
2010
2011
2012
2013
2014
2015
2016
Number of new NSP EN’s and owners by year
New EN's New EN owners
CM & RM User group meeting
10th August 2016 © Copyright NZX Ltd. 2016 27
Items from the floor