Brief summaryBrief summary
•• UK-DMC satellite, with Cisco routerUK-DMC satellite, with Cisco routeronboard, launched with other satellitesonboard, launched with other satellitesinto low Earth orbit, September 2003.into low Earth orbit, September 2003.
•• UK-DMC and sister satellites are basedUK-DMC and sister satellites are basedaround use of Internet Protocol (IP).around use of Internet Protocol (IP).
•• IP internetworking of satellite and routerIP internetworking of satellite and routertested and validated by internationaltested and validated by internationalcollaboration and demonstration atcollaboration and demonstration atVandenberg Air Force Base, June 2004.Vandenberg Air Force Base, June 2004.
•• IP works for satellite and payloadIP works for satellite and payloadcommunication and control.communication and control.
•• Cisco router works in orbit.Cisco router works in orbit.
2
3CLEO – Cisco router in Low Earth OrbitCisco Public
OverviewOverview
•• The Disaster Monitoring Constellation The Disaster Monitoring Constellation
•• Steps in extending the Internet into space Steps in extending the Internet into space
•• Cisco Cisco’’s mobile access routers mobile access router
•• The existing network environment for the DMC The existing network environment for the DMC
•• Router modifications and satellite integration Router modifications and satellite integration
•• Virtual Mission Operations Virtual Mission Operations CenterCenter
•• Vandenberg demonstration Vandenberg demonstration
•• Current status and future plans Current status and future plans
•• Awards won by this space payload work Awards won by this space payload workImages shared by other organisations are used with thanks.Images shared by other organisations are used with thanks.
4CLEO – Cisco router in Low Earth OrbitCisco Public
Disaster Monitoring Constellation (DMC)Disaster Monitoring Constellation (DMC)
Surrey Satellite TechnologySurrey Satellite Technology
Ltd (SSTL) built and helpLtd (SSTL) built and help
operate an internationaloperate an international
constellation of small sensorconstellation of small sensor
satellites.satellites.
fires in California, 28 Oct 2003 (UK-DMC)fires in California, 28 Oct 2003 (UK-DMC)
Government co-operation:Government co-operation:
Algeria, Nigeria, Turkey, UnitedAlgeria, Nigeria, Turkey, United
Kingdom, and China.Kingdom, and China.
Each government finances aEach government finances a
ground station in its country andground station in its country and
a satellite. Ground stations area satellite. Ground stations are
networked together.networked together.
The satellites share a sun-The satellites share a sun-
synchronous orbital planesynchronous orbital plane
for rapid daily large-areafor rapid daily large-area
imaging (640km swath widthimaging (640km swath width
with 32m resolution). Canwith 32m resolution). Can
observe effects of naturalobserve effects of natural
disasters.disasters.
www.dmcii.com
3
5CLEO – Cisco router in Low Earth OrbitCisco Public
DMC satellite constellation launchesDMC satellite constellation launches
Five satellites launched so far. SimilarFive satellites launched so far. Similar
base designs and subsystems, withbase designs and subsystems, with
custom modifications for each country.custom modifications for each country.
27 September 200327 September 2003
Satellites launched from Satellites launched from PlesetskPlesetsk in in
Siberia on affordable shared RussianSiberia on affordable shared Russian
Kosmos-3M launches:Kosmos-3M launches:
November 2002: AlSAT-1 (Algeria)November 2002: AlSAT-1 (Algeria)
September 2003: UK-DMC, NigeriaSAT-1September 2003: UK-DMC, NigeriaSAT-1
and and BilSatBilSat (Turkey) (Turkey)
October 2005: Beijing-1 (China)October 2005: Beijing-1 (China)
Satellites and ground stations in eachSatellites and ground stations in each
country use Internet Protocol (IP) tocountry use Internet Protocol (IP) to
communicate. Earth images delivered tocommunicate. Earth images delivered to
ground stations via UDP-based transfer.ground stations via UDP-based transfer.
SSTL migrated from AX.25, as used onSSTL migrated from AX.25, as used on
previous missions. Use of IP makes aprevious missions. Use of IP makes a
natural fit with Cisconatural fit with Cisco’’s IP router onboards IP router onboard
UK-DMC satellite.UK-DMC satellite.
6CLEO – Cisco router in Low Earth OrbitCisco Public
DMC can image anywhere on EarthDMC can image anywhere on Earth
Palm Island Resort, Dubai, 14 Dec 2003 (UK-DMC)Palm Island Resort, Dubai, 14 Dec 2003 (UK-DMC) Three Gorges Dam, China, July 2004 (UK-DMC)Three Gorges Dam, China, July 2004 (UK-DMC)
www.dmcii.com
4
7CLEO – Cisco router in Low Earth OrbitCisco Public
DMC put to use: after Hurricane Katrina, 2005DMC put to use: after Hurricane Katrina, 2005
In this false-In this false-colorcolor image, image,
dry land is red. Floodeddry land is red. Flooded
and damaged land isand damaged land is
shown as brown.shown as brown.
www.dmcii.com
DMC is working asDMC is working as
part of the Unitedpart of the United
Nations InternationalNations International
Charter for Space andCharter for Space and
Major Disasters.Major Disasters.
Small part of an imageSmall part of an image
taken by the Nigeriantaken by the Nigerian
DMC satellite on FridayDMC satellite on Friday
2 September, for the2 September, for the
US Geological Survey.US Geological Survey.
Imagery delivered byImagery delivered by
using Internetusing Internet
Protocol.Protocol.
8CLEO – Cisco router in Low Earth OrbitCisco Public
Extending the Internet into spaceExtending the Internet into space
•• NASA JPL gives NASA JPL gives DERADERA’’s s STRV-1b IP address (1996).STRV-1b IP address (1996).
•• NASA Goddard flies IP on NASA Goddard flies IP on SSTLSSTL’’s s UoSAT-12 (2000).UoSAT-12 (2000).
•• Cabletron router on Russian module of ISS. NASACabletron router on Russian module of ISS. NASA
uses IP in shuttle experiments, last being CANDOSuses IP in shuttle experiments, last being CANDOS
(tested onboard Columbia Jan 2003).(tested onboard Columbia Jan 2003).
•• NASA gets NASA gets SpaceDev SpaceDev to launch to launch CHIPSat CHIPSat (Jan 2003).(Jan 2003).
•• SSTL adopts IP with DMC (AlSAT-1 launched NovSSTL adopts IP with DMC (AlSAT-1 launched Nov
2002, UK-DMC et al. Sep 2003, Beijing-1 Oct 2005).2002, UK-DMC et al. Sep 2003, Beijing-1 Oct 2005).
•• Cisco and SSTL fit CLEO mobile access router onCisco and SSTL fit CLEO mobile access router on
UK-DMC satellite, alongside imaging payloads.UK-DMC satellite, alongside imaging payloads.
5
9CLEO – Cisco router in Low Earth OrbitCisco Public
What is the CLEO router?What is the CLEO router?
A Cisco 3251 Mobile Access Router (MAR).A Cisco 3251 Mobile Access Router (MAR).
The MAR is a commercial off-the-shelfThe MAR is a commercial off-the-shelf
(COTS) product family (COTS) product family –– 3251 and 3220 3251 and 3220
series. Runs Ciscoseries. Runs Cisco’’s IOS (s IOS (InternetworkInternetwork
Operating System) router code.Operating System) router code.
The 3251 MAR features:The 3251 MAR features:
•• 210MHz Motorola processor. 210MHz Motorola processor.
•• Built-in 100Mbps Ethernet. Built-in 100Mbps Ethernet.
•• PC/104-Plus interfaces and form factor. PC/104-Plus interfaces and form factor.
•• Additional stackable 90mm x 96mm cards Additional stackable 90mm x 96mm cards
(serial, Ethernet, power supply, (serial, Ethernet, power supply, WiFiWiFi, etc.), etc.)
The CLEO MAR is an experimental secondaryThe CLEO MAR is an experimental secondary
payload on the UK-DMC satellite.payload on the UK-DMC satellite.
Local environment and high-speed downlinkLocal environment and high-speed downlink
used by UK-DMC satellite dictate use of serialused by UK-DMC satellite dictate use of serial
interface card to connect with existing 8.1Mbpsinterface card to connect with existing 8.1Mbps
serial links used onboard.serial links used onboard.
10CLEO – Cisco router in Low Earth OrbitCisco Public
Other tests of Mobile Access RoutersOther tests of Mobile Access Routers
NASA Glenn Research NASA Glenn Research CenterCenter tested MAR on tested MAR on
NeahNeah Bay Bay icebreaker in Great Lakes. Mobile icebreaker in Great Lakes. Mobile
routing roamed seamlessly between wiredrouting roamed seamlessly between wired
link when docked, and long-range link when docked, and long-range WiFiWiFi and and
GlobalstarGlobalstar satellite links when sailing. satellite links when sailing.
CheeverCheever Racing put Racing put WiFiWiFi and and VoIPVoIP,,
for secure telemetry, voice, andfor secure telemetry, voice, and
video, in its cars, pit and garage.video, in its cars, pit and garage.
Two cars carrying Two cars carrying MARsMARs were raced were raced
in the 89in the 89thth Indianapolis 500. Indianapolis 500.
20022002 20052005
6
11CLEO – Cisco router in Low Earth OrbitCisco Public
Existing network environment for the DMCExisting network environment for the DMC
Satellite: each DMC satellite has multiple onboard computers.Satellite: each DMC satellite has multiple onboard computers.
For housekeeping (the On Board Computer, OBC), for imageFor housekeeping (the On Board Computer, OBC), for image
capture and capture and packetisedpacketised transmission (the Solid State Data transmission (the Solid State Data
Recorders, Recorders, SSDRsSSDRs), for redundancy and survival.), for redundancy and survival.
Interconnected by IP over 8.1Mbps serial links for data andInterconnected by IP over 8.1Mbps serial links for data and
slower slower CANbusCANbus for backup control; really a custom-built LAN. for backup control; really a custom-built LAN.
8.1Mbps8.1Mbps
downlinkdownlink9600bps uplink9600bps uplink
ground stationground station
LANLAN
CiscoCisco
26212621
Cisco MARCisco MAR
3251 on 3251 on
UK-DMCUK-DMC
CLEO: Cisco router was able to fit into UK-DMC satelliteCLEO: Cisco router was able to fit into UK-DMC satellite’’ss
onboard network by connecting to OBC and onboard network by connecting to OBC and SSDRsSSDRs using using
common serial interfaces.common serial interfaces.
Ground: Ground: SSTLSSTL’’ss design for its ground station LANs uses IP. design for its ground station LANs uses IP.
Satellites communicate with PCs on LAN via S-band radioSatellites communicate with PCs on LAN via S-band radio
space-ground link. IP over 8.1 Mbps serial stream fromspace-ground link. IP over 8.1 Mbps serial stream from
downlink commercial modem goes into a rack-mounteddownlink commercial modem goes into a rack-mounted
Cisco 2621 router, which forwards IP packets onto the LAN.Cisco 2621 router, which forwards IP packets onto the LAN.
SSTLSSTL’’ss ground station LAN is connected to and an integral ground station LAN is connected to and an integral
part of part of SSTLSSTL’’ss corporate IP network. corporate IP network.
12CLEO – Cisco router in Low Earth OrbitCisco Public
38.4kbps38.4kbps
for low-ratefor low-rate
telemetrytelemetry
SSDR 0SSDR 0PowerPCPowerPC
ImagingImaging
SSDR 1SSDR 1PowerPCPowerPC
ImagingImaging
SSDR 2SSDR 2StrongArmStrongArm
reflectometryreflectometry
On-BoardOn-Board
ComputerComputer
high-ratehigh-rate
TX0TX0high-ratehigh-rate
TX1TX1
low-ratelow-rateRX0RX0
low-ratelow-rateRX1RX1
9.6kbps9.6kbps
uplinkuplink
9600bps9600bps
8.1Mbps8.1Mbps
38400bps38400bps
low-ratelow-rateTXTX
8.1Mbps8.1Mbps
downlinkdownlink
38.4kbps38.4kbps
downlinkdownlink
CLEOCLEO
CA
Nb
us
CA
Nb
us
to
co
ns
ole
po
rt t
o c
on
so
le p
ort
SMICSMIC
serialserialMARCMARC
Pow erPCPow erPC
UK-DMC payloadsUK-DMC payloads…… connected to CLEO connected to CLEO
CANbusCANbus mesh mesh
not shownnot shown
Redundancy in dualRedundancy in dual
transmitters, dualtransmitters, dual
receivers, and dualreceivers, and dual
imaging computersimaging computers
CLEO uses availableCLEO uses available
‘‘sparespare’’ connections connections
to form a high-speedto form a high-speed
onboard networkonboard network
7
13CLEO – Cisco router in Low Earth OrbitCisco Public
Alterations to CLEO for launch and spaceAlterations to CLEO for launch and space
NoNo radiation hardening; low orbit radiation hardening; low orbit
environment is relatively benign.environment is relatively benign.
NoNo unique hardware design or unique hardware design or
software work done by Cisco.software work done by Cisco.
Minor physical modifications madeMinor physical modifications made
to router and serial card.to router and serial card.
•• Flow-soldered with lead-based Flow-soldered with lead-based
solder to avoid solder to avoid ‘‘tin whiskerstin whiskers’’..
•• Flat Flat heatsinkheatsink added to main added to main
processor to take heat to chassis.processor to take heat to chassis.
•• To avoid leakage in vacuum, wet To avoid leakage in vacuum, wet
electrolytic capacitors withelectrolytic capacitors with
pressure vents replaced with dry.pressure vents replaced with dry.
•• Unused components removed, Unused components removed,
including plastic sockets andincluding plastic sockets and
clock battery. Time set with NTP.clock battery. Time set with NTP.
Directly soldered wires are moreDirectly soldered wires are more
robust for vibration/thermalrobust for vibration/thermal
cyclingcycling
14CLEO – Cisco router in Low Earth OrbitCisco Public
CLEO integration 1 CLEO integration 1 –– the router assembly the router assembly
MAR processor card and serialMAR processor card and serial
card wired to card wired to ‘‘motherboardmotherboard’’
designed by SSTL.designed by SSTL.
‘‘MotherboardMotherboard’’ provides provides
physical mounting, power,physical mounting, power,
serial connections andserial connections and
serial/serial/CANbusCANbus interface for interface for
access to router console port.access to router console port.
Router console port was usedRouter console port was used
to to ‘‘bootstrapbootstrap’’ router router
configuration in orbit fromconfiguration in orbit from
nothing. After basicnothing. After basic
networking was configurednetworking was configured
during passes, telnet and during passes, telnet and sshssh
were then used.were then used.
MAR processor cardMAR processor card
MAR serial cardMAR serial card
SSTL-designedSSTL-designed
‘‘motherboardmotherboard’’
8
15CLEO – Cisco router in Low Earth OrbitCisco Public
CLEO integration 2 CLEO integration 2 –– the payload tray the payload tray
SSTLSSTL’’ss satellites are modular stacks of identical aluminium trays, screwed satellites are modular stacks of identical aluminium trays, screwed
together. Aluminium provides grounding, heat conduction, and structuraltogether. Aluminium provides grounding, heat conduction, and structural
rigidity. Satellites are built rigidity. Satellites are built rapidlyrapidly, using COTS parts, in under 18 months., using COTS parts, in under 18 months.
Router card assembly takes up half of stackable tray.Router card assembly takes up half of stackable tray.
copper copper heatsinkheatsink
16CLEO – Cisco router in Low Earth OrbitCisco Public
Satellite assembly, subsystems and router operated in partial vacuum ofSatellite assembly, subsystems and router operated in partial vacuum of
less than 1x10less than 1x10-5-5 torrtorr (1x10 (1x10-3-3 Pa), temperature range of -35 Pa), temperature range of -35ooCC up to +60 up to +60ooC.C.
Also vibration tested.Also vibration tested.
CLEO integration 3 CLEO integration 3 –– testing before launch testing before launch
in-house testingin-house testing
propellant tankpropellant tank
camerascameras
satellite assemblysatellite assembly vacuum chamber testingvacuum chamber testing
9
17CLEO – Cisco router in Low Earth OrbitCisco Public
Work before and after launchWork before and after launch
Before launch completed:Before launch completed:
-- low-level embedded software development low-level embedded software development
-- hardware integration hardware integration
After launch completed:After launch completed:
-- commissioning of all new satellites (UK-DMC, NigeriaSat-1, commissioning of all new satellites (UK-DMC, NigeriaSat-1, BilSatBilSat))
-- construction of ground-based construction of ground-based testbedtestbed for use by NASA Glenn, for use by NASA Glenn,
using engineering model of CLEO. using engineering model of CLEO.
-- development and upload of development and upload of ‘‘pass-throughpass-through’’ software to reconfigure software to reconfigure
onboard computer to pass frames from CLEO router out to downlink. onboard computer to pass frames from CLEO router out to downlink.
- as an experimental payload, CLEO is not- as an experimental payload, CLEO is not directly directly connected to downlinkconnected to downlink,,
although CLEO interconnects a number of onboard computers. although CLEO interconnects a number of onboard computers.
-- bringing up ground stations and distributed wide-area network. bringing up ground stations and distributed wide-area network.
Power-on test of the CLEO router on 15 October 2003 showed correctPower-on test of the CLEO router on 15 October 2003 showed correct
amount of power being drawn; temperatures measured indicated thatamount of power being drawn; temperatures measured indicated that
heatsinkheatsink was attached correctly. Then left dormant for over six was attached correctly. Then left dormant for over six
months.months.
18CLEO – Cisco router in Low Earth OrbitCisco Public
Work after launch: ground-based Work after launch: ground-based testbedtestbed
NASA Glenn needed to gainNASA Glenn needed to gain
familiarity with operating andfamiliarity with operating and
configuring router with configuring router with SSTLSSTL’’ss
onboard computers.onboard computers.
Ground-based Ground-based testbedtestbed allows allows
configuration changes to beconfiguration changes to be
tested on the ground at leisuretested on the ground at leisure
before being made to CLEObefore being made to CLEO
during a ten-minute pass over aduring a ten-minute pass over a
ground station.ground station.
Built rack-mounted ground-Built rack-mounted ground-
based based testbedtestbed ( (‘‘flatsatflatsat’’) from) from
SSDR and engineering model ofSSDR and engineering model of
mobile router, and networked itmobile router, and networked it
from NASA Glenn in Ohio.from NASA Glenn in Ohio.
Built Built testbedtestbed afterafter launch! launch!
Configured CLEO Configured CLEO afterafter launch! launch!
CLEO engineeringCLEO engineering
model assemblymodel assemblySSTLSSTL
SSDRSSDR
10
19CLEO – Cisco router in Low Earth OrbitCisco Public
Virtual Mission Operations Virtual Mission Operations Center Center (VMOC)(VMOC)
Software developed by General DynamicsSoftware developed by General Dynamics
intended to task satellites and provide imageryintended to task satellites and provide imagery
via a simple GUI interface for military users.via a simple GUI interface for military users.
VMOC was rated second out of 120 projects inVMOC was rated second out of 120 projects in
importance by the US Office of the Secretary ofimportance by the US Office of the Secretary of
DefenseDefense, Rapid Acquisition Incentive - Network, Rapid Acquisition Incentive - Network
Centric (RAI-NC) program. So became one ofCentric (RAI-NC) program. So became one of
four pilots receiving advance funding.four pilots receiving advance funding.
VMOC intended for use with TacSat-1, plannedVMOC intended for use with TacSat-1, planned
for launch in 2005, and later TacSat-2. UK-DMCfor launch in 2005, and later TacSat-2. UK-DMC
provides an early opportunity to test VMOC.provides an early opportunity to test VMOC.
VMOC requests images of ground from SSTLVMOC requests images of ground from SSTL
mission planning system for DMC satellites.mission planning system for DMC satellites.
Images are taken for VMOC by UK-DMC only.Images are taken for VMOC by UK-DMC only.
VMOC monitors UK-DMC satellite telemetry andVMOC monitors UK-DMC satellite telemetry and
accesses CLEO router.accesses CLEO router.
VMOC is simply an IP-based application forVMOC is simply an IP-based application for
satellites, using an available IP-based satellitesatellites, using an available IP-based satellite
infrastructure!infrastructure!
20CLEO – Cisco router in Low Earth OrbitCisco Public
CLEO and VMOC CLEO and VMOC –– meeting needs of participants meeting needs of participants
CommercialCommercialCisco SystemsCisco Systems
Show that a commercialShow that a commercial
COTS Internet router canCOTS Internet router can
work in space.work in space.
CivilCivilNASA GlennNASA Glenn
Demonstrate utility ofDemonstrate utility of
IP and mobile routingIP and mobile routing
for satellite TT&C.for satellite TT&C.
MilitaryMilitaryAir Force Space Air Force Space BattlelabBattlelab
Test the Virtual MissionTest the Virtual Mission
Operations Operations CenterCenter in the in the
field and task space asset.field and task space asset.
CLEO: Cisco router in Low Earth Orbit
placed on UK-DMC satellite by SSTL
Cisco gets its routerCisco gets its router
launched as secondarylaunched as secondary
experimental payload.experimental payload.
NASA Glenn uses routerNASA Glenn uses router
in space to test mobilein space to test mobile
routing for satellites.routing for satellites.
CLEO router works in space. VMOC works with space asset. Mission success!CLEO router works in space. VMOC works with space asset. Mission success!
VMOC is tested acrossVMOC is tested across
Internet fromInternet from
Vandenberg with CLEOVandenberg with CLEO
& UK-DMC.& UK-DMC.
11
21CLEO – Cisco router in Low Earth OrbitCisco Public
VMOC demo, Vandenberg Air Force BaseVMOC demo, Vandenberg Air Force Base
May-June 2004, VMOC, imageMay-June 2004, VMOC, image
request and access to onboardrequest and access to onboard
payload (router) were tested bypayload (router) were tested by
coalition of partners coalition of partners ‘‘in the fieldin the field’’ in in
tent and tent and HumveeHumvee at Vandenberg at Vandenberg
Air Force Base in California.Air Force Base in California.
Tested:Tested:
- requesting sensor data (imagery)- requesting sensor data (imagery)
from the UK-DMC satellite. from the UK-DMC satellite.
- use of IP for field operations.- use of IP for field operations.
- tasking a satellite payload (the- tasking a satellite payload (the
CLEO router, accessed using CLEO router, accessed using
mobile networking). mobile networking).
- failover between multiple - failover between multiple VMOCsVMOCs..
VMOC tent, VandenbergVMOC tent, Vandenberg
HumveeHumvee
Testing and demonstration wereTesting and demonstration were
successful. Ciscosuccessful. Cisco’’s CLEO routers CLEO router
in orbit shown to work by thirdin orbit shown to work by third
parties while testing a largerparties while testing a larger
integrated integrated ‘‘system of systemssystem of systems’’..
22CLEO – Cisco router in Low Earth OrbitCisco Public
VMOC demonstration network topologyVMOC demonstration network topology
mobile routingmobile routing
Home AgentHome Agent
(NASA Glenn)(NASA Glenn)
Segov ia
NOC
2nd Ground
Station
‘‘shadowshadow’’ backup backup
VMOC-2VMOC-2
(NASA Glenn)(NASA Glenn)
UK-DMC/CLEO routerUK-DMC/CLEO router
high-rate passes overhigh-rate passes over
SSTL ground stationSSTL ground station
(Guildford, England)(Guildford, England)
primary VMOC-1primary VMOC-1
Air Force Battle LabsAir Force Battle Labs
(CERES)(CERES)
Internet
mobile routermobile router
appears toappears to
reside onreside on
HomeHome
AgentAgent’’ss
network atnetwork at
NASA GlennNASA Glenn
secure Virtual
Private Network
tunnels (VPNs)
between VMOC
partners
‘‘battlefieldbattlefield
operationsoperations’’
(tent and (tent and HumveeHumvee,,
Vandenberg AFB)Vandenberg AFB)
low-rate UK-DMC passeslow-rate UK-DMC passes
over secondary groundover secondary ground
stationsstations
receiving telemetryreceiving telemetry
(Alaska, Colorado Springs)(Alaska, Colorado Springs)8.1Mbps downlink8.1Mbps downlink
9600bps uplink9600bps uplink
38400bps38400bps
downlinkdownlink
other satelliteother satellite
telemetry to VMOCtelemetry to VMOC
UK-DMCUK-DMC
satellitesatelliteCLEO onboard
mobile access
router
12
23CLEO – Cisco router in Low Earth OrbitCisco Public
VMOC/CLEO demonstrations to US militaryVMOC/CLEO demonstrations to US military
5 November 2004, VMOC5 November 2004, VMOC
imaging request operationsimaging request operations
were demonstrated at Airwere demonstrated at Air
Force Space CommandForce Space Command
Headquarters in ColoradoHeadquarters in Colorado
Springs to Gen. Lance Lord.Springs to Gen. Lance Lord.
18 November 2004, to Air18 November 2004, to Air
Force Space CommandForce Space Command
during its Commanders'during its Commanders'
Conference in Los Angeles.Conference in Los Angeles.
2 December 2004, to the2 December 2004, to the
leadership of the Airleadership of the Air
Staff and Joint Staff inStaff and Joint Staff in
the Washington, DC area.the Washington, DC area.Tasking to request an image of ColoradoTasking to request an image of Colorado
24CLEO – Cisco router in Low Earth OrbitCisco Public
Demonstration involved many organisationsDemonstration involved many organisations
13
25CLEO – Cisco router in Low Earth OrbitCisco Public
Some limitations of CLEOSome limitations of CLEO
As a secondary experimental payload, CLEO spends most of its timeAs a secondary experimental payload, CLEO spends most of its time
turned off. CLEO is only active when being tested during passes overturned off. CLEO is only active when being tested during passes over
ground stations, or when being used to transfer data between ground stations, or when being used to transfer data between SSDRsSSDRs..
The mobile router is a commercial product, not a space instrument.The mobile router is a commercial product, not a space instrument.
CLEO does CLEO does not not contain special instrumentation for the spacecontain special instrumentation for the space
environment. CLEO does environment. CLEO does not not measure cumulative radiation dosage.measure cumulative radiation dosage.
SSTL does have some additional thermal and power drawSSTL does have some additional thermal and power draw
instrumentation around the CLEO assembly motherboard.instrumentation around the CLEO assembly motherboard.
Available satellite power is a constraint Available satellite power is a constraint –– CLEO is powered up for ten CLEO is powered up for ten
minutes at a time during a daytime sunlit pass to communicate withminutes at a time during a daytime sunlit pass to communicate with
ground station using high-speed 8.1Mbps downlink. CLEO needsground station using high-speed 8.1Mbps downlink. CLEO needs
~10W. High-speed downlink needs ~10W. UK-DMC power budget is~10W. High-speed downlink needs ~10W. UK-DMC power budget is
only ~30W.only ~30W.
Onboard software cannot be easily upgraded Onboard software cannot be easily upgraded –– no plans to ever upload no plans to ever upload
6MB router IOS software over multiple passes via 9600bps uplink6MB router IOS software over multiple passes via 9600bps uplink
26CLEO – Cisco router in Low Earth OrbitCisco Public
Status of CLEOStatus of CLEO
CLEO remains operational. As a secondaryCLEO remains operational. As a secondary
experimental payload, use of CLEO is on aexperimental payload, use of CLEO is on a
best-effort basis, balanced against the otherbest-effort basis, balanced against the other
demands on the UK-DMC satellite. When notdemands on the UK-DMC satellite. When not
being tested, CLEO is simply switched off tobeing tested, CLEO is simply switched off to
conserve energy.conserve energy.
CLEO has spent over two years in orbit.CLEO has spent over two years in orbit.
Testing of CLEO has been carried out forTesting of CLEO has been carried out for
over a year. CLEO has been powered up forover a year. CLEO has been powered up for
use over fifty times.use over fifty times.
14
27CLEO – Cisco router in Low Earth OrbitCisco Public
Timeline of CLEO testing eventsTimeline of CLEO testing events
27 September 200327 September 2003
–– UK-DMC and sister satellites launched from UK-DMC and sister satellites launched from PlesetskPlesetsk..
15 October 200315 October 2003
–– CLEO router power cycled during satellite commissioning tests.CLEO router power cycled during satellite commissioning tests.
29 April 200429 April 2004
–– CLEO router activated and tested with console access. CLEO router activated and tested with console access.
May May –– June 2004 June 2004
–– Testing of VMOC and CLEO from Vandenberg Air Force Base. Testing of VMOC and CLEO from Vandenberg Air Force Base.
14-16 June 2004 14-16 June 2004
–– First public demonstration of VMOC and CLEO at Vandenberg. First public demonstration of VMOC and CLEO at Vandenberg.
10 May 200510 May 2005
–– Public demonstration to AFEI Net-Centric Operations Conference.Public demonstration to AFEI Net-Centric Operations Conference.
18-20 October 200518-20 October 2005
–– Public demonstration of CLEO and VMOC at IEEE MILCOM 2005. Public demonstration of CLEO and VMOC at IEEE MILCOM 2005.
28CLEO – Cisco router in Low Earth OrbitCisco Public
Beyond the success of CLEOBeyond the success of CLEO
The outcome of the CLEO project andThe outcome of the CLEO project and
testing has encouraged Cisco Systems totesting has encouraged Cisco Systems to
prototype and evaluate IOS softwareprototype and evaluate IOS software
running on radiation-hardened PowerPCrunning on radiation-hardened PowerPC
processors and hardware very differentprocessors and hardware very different
from this first CLEO demonstration.from this first CLEO demonstration.
Cisco Systems is interested in working withCisco Systems is interested in working with
others to take IP and routing functionality toothers to take IP and routing functionality to
new placesnew places…… including high altitude and including high altitude and
geostationary orbit.geostationary orbit.
15
29CLEO – Cisco router in Low Earth OrbitCisco Public
Other CLEO testing onboardOther CLEO testing onboard
GPSGPS –– UK-DMC satellite also has onboard a GPS UK-DMC satellite also has onboard a GPS reflectometryreflectometry
experiment. Moving data from the SSDR running that experiment toexperiment. Moving data from the SSDR running that experiment to
ground requires dedicating passes to that SSDR. Data can be movedground requires dedicating passes to that SSDR. Data can be moved
through the router to be stored on a primary imaging SSDR while thethrough the router to be stored on a primary imaging SSDR while the
satellite is not passing a ground station satellite is not passing a ground station –– uses router without using uses router without using
high-speed downlink, takes advantage of router being connected tohigh-speed downlink, takes advantage of router being connected to
all onboard computers in onboard LAN. First done October 2005.all onboard computers in onboard LAN. First done October 2005.
IPv6IPv6 –– CLEO and ground routers are IPv6-capable, but UK-DMC CLEO and ground routers are IPv6-capable, but UK-DMC
payloads and ground stations use IPv4 only. IPv6 is not yet enabled.payloads and ground stations use IPv4 only. IPv6 is not yet enabled.
IPsecIPsec –– CLEO and ground station routers can use this, and CLEO and ground station routers can use this, and
could secure unencrypted ground-space link by tunnelling IP trafficcould secure unencrypted ground-space link by tunnelling IP traffic
through the router. (through the router. (sshssh to CLEO is already configured, as is a to CLEO is already configured, as is a
passwordedpassworded web interface.) Could also use SNMP and web interface.) Could also use SNMP and MIBsMIBs to show to show
that a satellite payload can be managed just as you would manage athat a satellite payload can be managed just as you would manage a
terrestrial network asset.terrestrial network asset.
30CLEO – Cisco router in Low Earth OrbitCisco Public
Acknowledgment of success of CLEO and VMOCAcknowledgment of success of CLEO and VMOC
•• NASA Glenn NASA Glenn –– Computerworld Heroes finalists Computerworld Heroes finalists
•• Internal awards in Air Force, General DynamicsInternal awards in Air Force, General Dynamics
and NASA (and NASA (Turning Goals into RealityTurning Goals into Reality 2005) 2005)
•• Internal awards for project managementInternal awards for project management
Computerworld Heroes recognitionComputerworld Heroes recognition GD Technology AwardGD Technology Award
16
31CLEO – Cisco router in Low Earth OrbitCisco Public
further information:http://www.cisco.com/go/space
ftp://ftp-eng.cisco.com/lwood/cleo/README.html
Google for Google for ‘‘CLEO VMOCCLEO VMOC’’
Questions?Questions?thankyouthankyou
32CLEO – Cisco router in Low Earth OrbitCisco Public