Page 1: CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.

CLIC

Page 2: CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.

Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 2

Activities

CLIC

LAMBDA project (Laser Alignment Multi-Based Design Approach)Development of cam movers & mini cam movers

Dimensional control and fiducialisation

Feasability & technical design (absolute sensors, PACMAN project)

Integration and compatibility with other systems

Development and qualification of linear actuators

Knowledge of static geoid, development and validation of a deflectometer

MDI area

Page 3: CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.

Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 3

How?

• A strategy has been proposed for the Conceptual Design Report. Now we need to validate it experimentally:

Validation of sensors and actuators on dedicated test benches

Validation and improvement of strategy on dedicated mock-ups

Development of new test area over 500m in TZ32.

Test benches

Page 4: CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.

Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 4

How? Test mock-ups

Page 5: CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.

Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 5

Standard means

Page 6: CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.

Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 6

Schedule

Dependent from others concerning the two beam test setup, which has a direct impact:

Development of sensors (absolute sensors) Development of cam movers and mini cam movers Rad hard and magnetic tests for sensors and movers Development and improvement of fiducialisation means Alignment measurements on test setups

2 PhD thesis under progress:

Deflectometer Development of Lambda project

Collaboration with NIKHEF

Inter-comparison on long distances with cWPS in TT1 Inter-comparison on short distances on the two beam test setup

Page 7: CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.

Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 7

Responsibilities

LAMBDA project (Laser Alignment Multi-Based Design Approach)Development of cam movers & mini cam movers

Dimensional control and fiducialisation + alignment on test setups

Feasability & technical design (absolute sensors, PACMAN project)

Integration and compatibility with other systems

Development and qualification of linear actuators

Knowledge of static geoid, development and validation of a deflectometer

MDI area

Guillaume (PhD) 100%

Juha (fellow till end 2012) ?

Mathieu (fellow) 100%

Vivien (fellow) 100%, Mateusz, Hélène

Michail (PJAS) 100%

Mateusz, Jacek (PJAS)

Hélène

Mark, Mateusz, Jacek

Page 8: CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.

Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 8

Main problem

Page 9: CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.

Hélène MAINAUD DURAND| SU pendant LS1 day| 07.11.2012| INDICO 213914| page 9

Conclusion

• A lot of studies concerning CLIC are under progress

• With a significant number of urgent tasks

• Main problem: electronic workshop and calibration lab non available for CLIC studies during LS1 (and in a smaller proportion the mechanical workshop) for:

Training

Expertise

Prototypes

Calibration of sensors, temperature probes,...

Installation of alignment systems, acquisition systems, cables,...

Software

• More stable R&D team needed, not to lose expertise each time a fellow or project associate leaves. CLIC project is only a pretext, all the developments performed will be applied to ease the aligmnent of future machines.