c c AgAc ABU DHABJ JJRPORTS &O ' '"P»rf MidfieldTerminaiBuilding Abu DhabilnternationaiAirport Abu Dhabi Airports Company PJSC Abu Dhabi - UAE Method Statement for "Installation of Steel Structure for Single and Double Pavilions" olfi 1\ Construction A arabtec Midfield Termin al Jo i nt Ve nture TAV-CCC-ARABTEC Doc. No.: "MS-1093-llON" Wi th the signatures be lo w; TCAJ V certify that this submittal has been reviewed, checked, coo rdina ted, and approved for compliance with the Contr act Document s. -- -- - , .... --.., ........... , J1 YMzf/V .....j v 03/12/14 2 For Inf ormati on CLOISALL Y. A I M ousa H. Nasser ' R. Rice 13/ 09/14 1 For Info rmati on CLOISALL H. Nass er B. Coster R. Rice - 0 2/07/ 14 0 For Inf o rmati on CLOISALL Y. AI Mousa H. Nasser B. Coster R. Rice Date Rev. Descripti on Prepared By Rev iewed By Appr oved by
Transcript
Page 1: CLOISALL STEEL STRUCT PAVILLION.pdf

c

cAgAc oa;~~'J.Jf ,~,_w ABU DHABJ JJRPORTS &O' '"P»rf

MidfieldTerminaiBuilding Abu DhabilnternationaiAirport

Abu Dhabi Airports Company PJSC Abu Dhabi - UAE

Method Statement for "Installation of Steel Structure for Single and Double Pavilions"

olfi ~ 1\ Construction A arabtec

Midfield Terminal Jo int Venture

TAV-CCC-ARABTEC

Doc. No.: "MS-1093-llON"

With the signatures below; TCAJV certify that this submittal has been reviewed, checked, coordinated, and approved for compliance with the Contract Documents.

-- ---~ ,....--..,..........., ~ J1YMzf/V .....j v \L'-\:....-l.\C~

03/12/14 2 For Information CLOISALL Y. A I M ousa H. Nasser J~ter ' R. Rice

13/09/14 1 For Information CLOISALL Y.AIMou~~ H. Nasser B. Coster R. Rice -02/07/14 0 For Information CLOISALL Y. A I Mousa H. Nasser B. Coster R. Rice

Date Rev. Description Prepared By Reviewed By Approved by

Page 2: CLOISALL STEEL STRUCT PAVILLION.pdf

MidfieldTerminalBuilding Abu DhabiInternationalAirport

Abu Dhabi Airports Company PJSC Abu Dhabi - UAE

Method Statement for “Installation of Steel Structure for Single and Double Pavilions”

Midfield Terminal Joint Venture TAV-CCC-ARABTEC

Doc. No.: “MS-1093-110N”

With the signatures below, TCAJV certify that this submittal has been reviewed, checked, coordinated, and approved for compliance with the Contract Documents.

03/12/14 2 For Information CLOISALL Y. Al Mousa H. Nasser B. Coster R. Rice

13/09/14 1 For Information CLOISALL Y. Al Mousa H. Nasser B. Coster R. Rice

02/07/14 0 For Information CLOISALL Y. Al Mousa H. Nasser B. Coster R. Rice

Date Rev. Description Prepared By Reviewed By Approved by

Page 3: CLOISALL STEEL STRUCT PAVILLION.pdf

uiJI.b...U~'""I u,_w AIU ~ AIR'ORTS COIIMifW

Midfield Terminal Building Abu Dhabi International Airport

Abu Dhabi Airports Company PJSC Abu Dhabi - UAE

Method Statement for "Installation of Steel Structure for Single and Double Pavilions"

olfii Construction

I arabtec

Midfield Terminal Joint Venture TAV-CCC-ARABTEC

Doc. No.: MS-1093-llON Rev-O::Z(SS-8259)

With the signatures below, TCAJV certify that this submittal has been reviewed, checked,

coordinated, and approvf!.? for compliC?_'}_~_~ith the Contract Docu'!'ents. ---------------

~------~-----·-----------._ ____________ !

----- ------1---02

Date Rev. Description Prepared By Reviewed By Approved By

Page 4: CLOISALL STEEL STRUCT PAVILLION.pdf

' il- " ,.-,, ..... '"· .~· ·\ I' ,;,: ;_.:-' · ~:~ · . ~· o: •• IJ IL, ,JJ ,,_¥ ,~,i iL-;.J..ll' :,oiJ OliJ;Iil ~iorrmrs ~al.lfMI'I' DOC'UMENT SUBMITTAL

Contract No AUH.06.10.040l

Contruct Tide

From

To

Item'#

M,S-L093-llON

Rnised by..

1:!1 llf(f!(l~7 .. ,.,

TCA- Joint Venture r!l!j 0 O nr.r ~ .

Ml!lhotl StttttlllCllt for lnsrGIIiiii'On of St1:el Sh·.ucture & Solid Surlllce for l'lcra Single Md Doubl11 Pavilions

Coa!nl.otof8 AuthcN.cd Slgt\&tllte

DSNo DS/040ll3173

Rev. 01

Date 01!1 0/2014.

Rev Action Required

0.1 [nformation ·.

C~tra~tot's VcrilicHliun stamp

TCA Joint Venlilr<:'ce~tifics rhat the su!Jmittru hris bcei1 revicc;<ZI!d, 1ccke l!oordiuated and approved fqr comJlliance \Yi.lh the co}llr!U:t documtlllls. I _ L Contractors ProjtU Di~ecJor: Ali Haydar Ozak .... ~ - '"'k.... .A. Dote: r Ocr I "1:-

RR.r:: I MGR

...... -.:;::MAIP&D Comments

1- Refer to the comments attached 2- The contractor may proceed with the steel structure Installation taking in consideration obtaining the painting system approval

ELECTRONICALLY DISTRIBUTED

., -

'· .- i I I

-- ~· ..!....J --r-- -

i ·- - 1-1- -- - . _ _,~-++--··

,___. -- --1·- r-- -

.__ _ ________ ~f-. - ·

Cudc 1 -NO EXC1·:11'i-ION 'fAl<:EN: the work .clw~n:d by llu:: subnaillfllm:ty ~JfO~eutl pm.vicl~d it cpm1•lie~ wi.lh I he ~o.lllm<!t Doeum~IJI,.1 . Fiu~f ucc:cptnn~.e qflhc wO.rk will d~p~nd bnllml ,_,').l1Hp1U!f\C~ .

. Ciidc 2 · li:~CilL''rJONS' AS NOTIW RF.VIS.IT. ANn IUlSUIIMIT FOR ltEC()IW: Thc~ubmillofis ~wrovcd wflltunly minm couunenls ll~;llnco~s Ia bl: incn~mruii:d lmutllc ~~cunt~uls 1111~ i.ssued IP.~ )VQtic JU prott:clt In ~Omp~~fu_lct with lhc L"C!Hml.lt dm;ument <;:u(lc 3 • l!l·:v_tsli ANO RESUil[\'111': do. not l>nX~d 1vhh lho wurkcowr<:d by the sublllill•l fucludiu~ r•urel~•. llthri•-alfon, d~UI'CI)'. or other nclivilyi<Jr Ute product Sll~utirtcd . llcvlsc or Pl"!IG"' -" new Jl!luniltnl O!'W<dinJI IQ,\hll·liiiHf"at'•nl)(nJio "nn~ t Oircclfnol$ • · Co<i•ll - tt&.II:C'I'I\f); do hOt PlllC~od 1\•llh Hot, work crwar.•l·ht lite ~ijlJ II ntnl. ~1\.1'111~ IIIICI\' •nlllllillnl for 11 p•odltO!Ihol COIIIIlli<·s wnh lhu <~onlmc t Llllcl•n•IILS Ct><l• 5 · REVIEW NO"r ltt:QOIIIf:o: l1 oonJnio1$lnO..M,,Ii~nlltot clt>O~II~ I u<<:<,rsurlly '·"'l"h" Untlncars-nr~rull;li Cotlc 6 - ISI;(J ~O !'OR co;-r.rrmJ<.---rio~: only nMI sublllilln(J. ll•ll<rc "''l'ih<rl In nccofi1nuc~ IYiih lhc Comrncl, will\"" 11]1111llprin l~ """'~llcll "'CUltS. lit stamp by Ellgincer or liis R:prcs'culali\'C .shGtl hC U!l(d In c.uun.:QUQII \vitb c:o~l"lfU\liJan

Sta~ps Code I 1 2 I (3) I 4 s I ReViewed 8y ~ignat~re Date

H.Cheaib ~~~ 20/10/2014

~ Ai'ZY l'vri"II ·CLO-TCAJV • l'(lOtJ•I-0 I ."....,/' TCAJV hm11 No.: I' M-1 OQJ.(l{I2-00I

6

r unu I o( I

Page 5: CLOISALL STEEL STRUCT PAVILLION.pdf

CAfJAC .:.IJU:...o.Ll ~9-11 u~ ABU DHABI AiiiPoiiJS co.M't

MIDFIELD TERMINAL BUILDING PROJECT A: COM

0 QA ENGINEER 0 ELEMENT MANAGER 0 QAJQC MANAGER 0 SENIOR RE/PM ~ OTHER

TYPE OF SUBMITIAL: I Method Statement Submission

I Method Statement for Installation of Steel Structure and solid surface for pier-single and double pavilions I

1 1 General

HSE

- Submittal Review Ref.: /1. (

SUBMITIAL NO.: I Ds/040113173 Rev 01 ]

SUB. REVIEW REF. I

Page 1 of 1

TRANSMITTAL NO.: 1

1 I

Form I Template Doc. No: MRO-ACM-PJM-FRM-01 017 _00 Revision Date: 28-Aug-2012

Page 6: CLOISALL STEEL STRUCT PAVILLION.pdf

t\(DAC o!Jih.o.U ~!HI u;..J. ABU DHABI AfRPDRTS COMPANY

TCA-JV

Midfield Terminal Contractor

Review Comment Sheet

Submittal Title: Method Statement for Installation of Steel Structure for Single and Double Pavilions

Document No: MS-1093-110N Rev 02 (SS-8259)

Date on Submittal: 17 Nov 2014 Review Completed on:

No Section Reviewer Comment Reference

1 The contractor to attached the approved (BY ARUP) painting system material submittal

f---

2 The contractor to provide separate method statement for solid surface

f---

3 The contractor to provide the installer qualification from (Systempool Porcelanosa Grupo) as per the project specification

-

4 The contractor to provide PROTOTYPE mock up as per the project specification 1.5 C

,..- General

5 The contractor to follow the specification 066166 Rev 01

,..-

6 The contractor to ensure providing the lighting and hardware installation methodology

f---

7 The contractor to describe the fabrication and installation process of edges and corner

~ The contractor to clarify the minimum and the maximum curve radius of the

8 thermo-forming solid materials as per Systempool Porcelanosa Grupo) recommendation

1 HSE Separate Method Statement should be provided for lifting crane with another crane and identify the lifting points on equipment (Crane)

-

Dlfi ' Construction arabtec

Code:

Contractor Action Responded on:

Waiting for approval. .. Refer to Annexure D for the attached material submittal MS/0401/0228 with SS Number 8256

Noted ... Method Statement for "Mock-up Fabrication and Installation of Solid Surface at Pavilion" submitted separately

Not Required for the Installation of Steel Structure

Refer to Annexure E for the attached letter

Noted.

Not Cloisall Scope of work

Noted and Refer to our Method Statement "Mock-up Fabrication and Installation of Solid Surface at Pavilion"

Refer to our Method Statement "Mock-up Fabrication and Installation of Solid Surface at Pavil ion"

Noted. ---

Page 1 of 1

Page 7: CLOISALL STEEL STRUCT PAVILLION.pdf

olfi Construction

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for 111nstallation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 2 of 58

Table of Contents

1 SCOPE OF WORK ...................................................................................................... 3

2 OBJECTIVE ............................................................................ .... .................... ............. 3

3 REFERENCES ....................................................................... ... .. .. .. ......... ................ 4-5

4 ABBREVATION, TERMS & DEFINITION ................................................................ 5-6

5 RESPONSIBILITIES .................................................................................. .. ....... .. ... . 6-7

5.1Project Manager ....................................................................... ..... ..... .. ......... 7

5.2HSE Manager ................................................................................................. 8

5.3 OA/QC Manager ............................................... .... .... .. ................ .......... ........ 8

5.4 OA/QC Engineer ... ......................................... ... ....... ............... ................... 8-9

5.5 Site Engineer ........................................................................ ... ... ................... 9

5.6 Safety Officer ................................................................................................ 9

5.7 Surveyor ............................................................................................ ...... 9-10

6 PROCEDURES ................................................................... ... ...... .... .......................... 10

6.1 Plant and Equipment ........................................ .................................... 10-21

6.2 Materials ..................................................................... ............ .............. 22-23

6.3 Site Planning & Preparation .................................. .............. .................. 24-29

6.4 Sequence of Work ................................................................................ 30-53

7 ENVIRONMENTAL, SAFETY AND HEALTH ........................ ...................................... 54

7.1 Activity Risk Assessment.. .................................... ................................. 54-56

7.2 HSE General Precautions & General Mitigation

Measures/Controls ..................... ........ .................................................... 56-57

8 ATTACHMENTS .............................................................. .............. .. ..................... .... 57

8.1 Risk Assessment ......................... ...................... ... ........... ..... .............. ............. .

8.2 Lifting Operational Plan ............. ................................ ... ................................ ..

8.3 Safety Data Sheet for Jut on ....... .. ................................................................. ..

8.4 Annexure D- Material Submittal for Paint System -Protective Coating

for Steel Structure (Safety Data Sheet) ........................................................ ..

8.3 Annexure E -letter to TCA JV for the Requirement for Prototype .............. .

Page 8: CLOISALL STEEL STRUCT PAVILLION.pdf

odD Construction ' arabtec

Doc No: MS-1093-llON Rev 02

1 SCOPE OF WORK

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 3 of 58

The scope of work covered by this method statement is the construction and completion of Single Pier Pavilions for the Full Steel Structure while for the Double Pier Pavilions are 2"d Level Steel Structure. Also including Mock-ups for M31 Pavilion - C11 and E2 B- D12 Pavilion at Midfield Terminal Building, Abu Dhabi Airport, Abu Dhabi. The activities covered are material, fabrication, transportation and lifting, for Single and Double Pavilion (Full Structure). GSI as our sub-contractor will be working under Cloisall name. We are submitting this document as per the project specification 051200 clauses 1.5/G.3.

2 OBJECTIVE

The purpose of this method statement is to set out the procedures and controls to be implemented by TCAJV and our specialist Subcontractor Cloisall Co. LLC to ensure that all activities related to the construction and fabrication of Steel Structure for Pavilions (Single and Double pavilions) comply with approved material submissions and relevant specifications.

Page 9: CLOISALL STEEL STRUCT PAVILLION.pdf

odi Construction

Doc No: MS-1093-llON Rev 02

3 REFERENCES

TYPE

Specification

Shop Drawings

Material

Submittal

I arabtec

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 4 of 58

REQUIRED Y/N DOC REFERENCE

y Specification Section 066166 & 051200

PQP- Project Quality Plan (SS-8273)

HSE Plan (SS-8272)

y 401-CO-A-02-20-0.00-CL-SD-001 to 018

401-CO-A-02-20-1.00-CL-SD-001 to 002 401-CO-A-02-20-2.00-CL-SD-001 to 002

401-CO-A-02-20-3.00-CL-5D-001 to 004 401-CO-A-02-20-5.00-CL-SD-001 to 011

401-CO-A-05-20-0.00-CL-SD-001 to 018

401-CO-A-05-20-1.00-CL-SD-001 to 002

401-CO-A-05-20-3.00-CL-SD-001 to 004 401-CO-A-05-20-5.00-CL-SD-001 to 011

401-CO-A-05-20-9.00-CL-SD-001 to 002

401-CO-A-09-20-0.00-CL-SD-001 to 007

401-CO-A-09-20-5.00-CL-SD-001 to 008

401-CO-S-02-20-0.00-SF-SD-001 to 011

401-CO-S-02-20-1.00-SF-SD-001 to 014 401-CO-S-02-20-3.00-SF-SD-001 to 002

401-CO-S-02-20-5.00-SF-SD-001 to 007

401-CO-S-05-20-0.00-SF-SD-001 to 009 401-C0-5-05-20-1.00-SF-SD-001

401-C0-5-05-20-3.00-SF-SD-001 to 002

401-CO-S-05-20-5.00-SF-5D-001 to 008

401-CO-S-09-20-0.00-SF-SD-001 to 018

401-CO-S-09-20-1.00-SF-5D-001 to 002

401-CO-S-09-20-3.00-SF-SD-001 to 004

401-CO-S-09-20-5.00-SF-SD-001 to 011

y 5S-8252 Steel Raw Materials; SS-8253 Bolts, Nuts & Washers; SS-8254 Hilti Bolts; SS-8255 Hilti Chemical

Bolts; 5S-8256 Paint System; 5S-8257 Welding

Electrodes

Page 10: CLOISALL STEEL STRUCT PAVILLION.pdf

odD Construction

I arabtec

Doc No: MS·1093·110N Rev 02

ITP

WPS

Structural Calculation

y

y

y

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 5 of 58

TCAJV Form: ITP-1093-110-A (Steel Structure) via

document DS/401/2580 Rev 01 to be followed

Welding Procedure Specification (SS-8270)

Structural Calculation (SS-8276)

4. ABBREVATION, TERMS & DEFINITION

TCAJV TAV-CCC-ARABTEC- Joint Venture

Cloisall Cloisall Co.LLC

GSI GSI Steel Construction Contracting LLC

MS Method Statement

MTC Moving Tower Crane

cc Crawler Crane

MC Mobile Crane

WPS Welding Procedure Specification

ITP Inspection & Test Plan

RA Risk Assessment

IFC Issued For Construction

NDT Non Destructive Test

MTC Mill Test Certificate

HSE Health Safety & Environment

SSSP Site Specific Safety Plan

QA/QC Quality Assurance I Quality Control

ICE Independent Checking Engineer

Page 11: CLOISALL STEEL STRUCT PAVILLION.pdf

odii ' TAV-CCC-ARABTEC JOINT VENTURE

Construction arabtec Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 6 of 58

HAZ Heat Affected Zone

TPIA Third Party Inspection Agency

PTW Permit to Work

PQT Procedure Qualification Test

WIR Work Inspection Request

FOD Foreign Object Damage

5. RESPONSIBILITIES

It is the responsibility of all personnel involved in the works to implement this Method Statement and in accordance with the Risk Assessment, ITP, Contractor ES&H plan, and project safety rules and regulations.

a. CLOISALL Staff

Position Name Company Contact Number

Project Manager Mr. Roland Soliven Cloisall 056-4940816

Construction Mngr. Mr. Jatin Ledwani Cloisall 050-4586201

Construction Mngr. Mr. lhsan Luhaibi Cloisall 050-6503657

QA/QC Manager Mr. Roland Franco Cloisall 050-2029217

Site Engineer/s Mr. Roger Riberal Cloisall 050-7089903 Mr. Sudheer Nalakath 050-7560947 Mr. Makkan Singh 055-6881285 Mr. Arthur Jun

QA/QC Engineer/s Mr. Jafar Khan Cloisall 050-2050836 Mr. Abdul Rasheed 055-2830844 Ms. Sheila Panlilio 056-2448548 Ms. Juvy Villegas 050-9544118

HSE Manager Mr. Anwar Hashmi Cloisall 050-4517389

HSE Officer/s Mr. Manower Cloisall 055-5366749 Mr. Sayed K.K. 055-9869767 Mr. Sachin Fernandes 055-1759174

Page 12: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 7 of 58

Surveyor Mr. Abdulla Cloisall 055-5960616

Based on Primary information & subjected to change ... Please refer Site communication plan which will be submitted to the client before the actual site work get start.

5.1 Project Manager

• Implement and maintain the successful completion of work. • Communicate the Method Statement to his subordinates • Provide his subordinates with the information they need to carry out their

responsibilities. • Enforce the application of this document once it is approved. • Stop all unsafe work activities. • Ensure the health & safety of the personnel on the site. • Ensure that the requirements of the Project Specifications and relevant ITP is

followed and implemented during construction.

5.2 HSE Manager

• Ensure Site Specific Safety Plan {SSSP) is implemented and followed for each activity.

• Monitor in the implementation of this method statement. • Provide required training. • Regularly pay site visits to ensure that safety is being exercised at site as per

requirement. • Advise the Construction Manager for any infraction for safety procedures. • Verify field activities are following the MS/RA and any new risks not

previously identified are addressed and reflected in a revised/new MS/RA. • Stop all unsafe work activities.

5.3 QA/QC Manager

• Supervise of Quality Control activities involving all materials; undertake the more complex inspection and resolve technical and client issues on Quality Engineering.

• Assign QC Engineers and their monitoring all Site Inspection activities. • Interpret codes, standards and project specifications to ensure contract

requirements are met. • Liaise with internal and external concerned parties to co-ordinate presence at

inspections.

Page 13: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

odD Construction

I arabtec

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 8 of 58

• Carry out more complex Quality function activities, such as Procedure Qualification Test.

• Complete relevant forms and prepare reports on inspection undertaken for inclusion and maintenance of inspection records.

• Review and make recommendations for the continuing development and improvement of Inspection Test Plans and Quality Control Procedures I Method Statements specifically in relation to workmanship activities.

5.4 QA/QC Engineer

• Maintain all quality records properly documented. • Conduct inspections and monitor the required tests. • Determining and reporting any non-conformance to the TCAJV & Cloisall QC

Manager. • Checking compatibility between production processes, test procedures and

the applicable documentation through review and circulation of the technical and administration document related to the various activities.

• Ensuring that all personnel are fully aware with all the quality requirements and applications for all quality documents as relevant to their discipline.

• Ensuring appropriate supervision for all work activities enabling quality related operations to be effectively covered.

• Coordinate with the Independent laboratory representative so that all tests are carried out as required by the specifications and records as per the Contractors Quality Control Plan.

• Stop all unsafe and substandard work activities.

5.5 Site Engineer

• Assist the Project Manager in carrying out his responsibilities • Coordinate the work with the Supervisor I Foreman. • Directly monitor the construction activities at site. • Implement the relevant ITP. • Ensure that the quality of the works meets the requirements of the Project

Specification, ITPs and QCP's. • Ensure that working areas are properly covered with work permits. • Report on the spot any non-conformance to the section engineer. • Provide all necessary tools, equipment, and material required at site. • Ensure that safety awareness at site is continuously maintained through JSTI

and tool boxes talks. • Make sure that site personnel are adequately trained to do the job. • Stop all unsafe work activities.

Page 14: CLOISALL STEEL STRUCT PAVILLION.pdf

odi ' TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building - Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Construction arab tee

Doc No: MS-1093-llON Rev 02 Page 9 of 58

5.6 Safety Officer

• Ensure that toolbox talks are conducted as per SSSP plan. • Assist in the implementation of this Method Statement. • Provide the required training for the site personnel involved. • Monitor and advice to site supervisors all requirement for tools to maintain a

safe working environment. • Monitor the compliance with procedures with respect to equipment's and

related certification and permits. • Stop all unsafe work activities.

5. 7 Surveyor

• • • • • •

Execution of daily survey field tasks according the procedures of the Survey Department. Setting out and as-built of tasks provided by Senior Survey Engineer . Keeping the survey instruments and accessories in a good condition . Preparation of survey sketches and handing over of data . Handing over of set-out points or lines to responsible site engineer . Maintaining the Survey Monuments and Geodetic Network points . Control of subcontractor Surveyors' daily work and data .

6 PROCEDURES

6.1 Plant and Equipment

No.

1

2

3

4

The quantities of plant and equipment increase and decrease as per the actual need at site.

The following plant and equipment will be required:

Steel Structure Materials Tools I Machineries I Equipment

Equipment Qty. Remark

Mobile Crane 4

For Lifting and dropping the 7 Ton Crane, 140t equipments.

Mobile Crane SOt 4 For Lifting and Dropping the materials from Site

Laydown to the Pier Slab

Mobile Crane 7t 4 For Erection of Steel for the pier Pavilion .

Fork Lift l.St- 3t 4 For Shifting the materials on Pier Slab

Page 15: CLOISALL STEEL STRUCT PAVILLION.pdf

Dlfii Construction

I arab tee

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for 111nstallation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 10 of 58

No. Equipment Qty. Remark

5 Man lift 8 Varies

6 Scissor Lift 2 Varies

7 Vertical Lift 4 Varies

NO. Tools I Machineries Qty.

1 Lifting Belts As required

2 Total station As required

3 Chain hoist As required

4 Chain Block As Require

5 Shackle As required

6 Torque Wrench As required

7 Shear stud welding machine As required

8 Hand tools (Spanners, etc.) As required

9 Grinder As required

10 Hilti Drilling Machine As required

11 Laser Level As required

12 Surveying Equipment As required

13 Lever Block As required

Page 16: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 11 of 58

6.1.1 140t mobile crane parameter

[i] TEREX I DEMAG

AC 140 I All Terram Crane 140 t 'Lifting Capac~lty

Page 17: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

Dll1Jt<;; Yo l1tt rEdLi::>all oub1 g!J13r t.li1.!!8 on n;.~t.Bs t lhl:ijl;;:o!Bn rrtl t Y~rkUrzoor .i\1Js.1lllli:tllsls ;;tll1 .J\n1rag~ G3~<3WI~s •jo loo~!f·3 oaso rGdLI1" ~lr oormnn8

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building - Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 12 of 58

3230

CllO ll.ase S zzat!:rrl nt3 IIl iJS~atlll lll $U fi1Cfllr&l3 capac tow diJ carga co ooses <le apii)IJ I"QliXIItaS, dls~·~nlllles tlajrutemam:J

Page 18: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-110N Rev 02

o._. 01.0

'\a \I

0... o._7

o.,. ~ o ••

Oo Ou o,.

o.,, t;>u 0.,1

'\.1 Ou 0.,.

'\l Q4,8

Clt,1 o,.

\a oa. o._.

Ou Ou

0... o,, o,, ~

o,,~ q,.,

ou ot.r

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 13 of 58

0 o.,~~ 0 a... t,2 0

o,,. t.1 o1u 11,1

~,& 0 ~lA ~ 0.,. ~ .... 0 0.. ll

08,4 0 11.0 0, W,l Ou ,, 0 l1 0.., , ..

'\a a,,, 0 0;.,, 0 ~~tltA •tl;t a.,, "7.1 0 ... o.._.

0 0 u 01(.2 ~ f,8 ou ott.,

0.,. a,~ o,, i~U.l

" 01.1 oltool 0 o,,,, 'IIJI

~ ~ o~~,~

ou OIU of.' ~.7 OIU oo ~v

011J o U,in

~ .. c'JIU ll.S

c'Jit,S of1.4 c., o.,. 01U

ou ~ o,,,

oi.& O....o

021.1 t1e,s c.w,,

c., .. a. • .~~ olt.a

1\.t '\7 0.... 0zr,1 oorv

0.,. 0~ 0., 0 j•.iU

0 .. Ill.

a. ... o..,. O t . ~i,t

Oy,r o~~,~ ·' a,,,. ~ au

0..11 014,1 Cftt

01u

011,8

0101,,

'\.a o,, .. ~·

J

011,1 <\a ,a

(.liU

0 (_117,4 ~'

eu 011,1 ~ ..

o,t,t

Page 19: CLOISALL STEEL STRUCT PAVILLION.pdf

olfi Construction ' arabtec

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 14of 58

6.1.2 SOt mobile crane parameter

[

I ....

,_-- -- 1l18i)

Page 20: CLOISALL STEEL STRUCT PAVILLION.pdf

olfli Construction ' arabtec

Doc No: MS·1093·110N Rev 02

--~·

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 15 of 58

.. - - - - -··---

~ --

,., __

,. _

•J

-- ~ ---·--!----1

"

. /-:1 ( ,.

·=·

"

Jl,S m

- 2B.Om

- 22.1"'

~-

' !>

Page 21: CLOISALL STEEL STRUCT PAVILLION.pdf

odD Construction

I arabtec

Doc No: MS-1093-llON Rev 02

6.1.3 : 7 T Mobile Crane

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 16of 58

umt: mm

.. • • • • • • p

o : : ',', ', :~,· ::J ..... ·.=. ~ • • • • :•, I.·/': . . . ... ._ .·.· .:

·.· . . '• . . . .. . . ·,

..

• •• 0

•• • 0 .. •

:7- :.: ·. : . . · . .

·.

i .

. . .... ·.·. ; ·_ . . . .. :

.. . . . . .. ·:· •... . . ·.: •. : . . . : . · . . . .

:-. . · ........ -. : .·~~~,9 ~cr~ {mJ -,.-----· -· ..,_:. · .. . : · . . . . .. . ·.

•• • • • •• •• •• 0 •• : ;. .. ·

0 I J I 0 • , 0

. ";• . . ' .

Page 22: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 17 of 58

6.1.4: Manlift

JOHNSON ARABIA IJoboi: AI Qaozr.dmtrioJAmo s.--9, KMoo l'mDBrs

a.-m.,aa..,ll"J ... tolf!lbloZ.)OdRd Aballllobi Mm..&bloolooiDoiARaKaaoo-

~' POBoslll.OilliooO PO-J.l9SI.U..Illlobi

~ME

ID»Xoiip 1t~.M

la&.!.pptl~-

r • ....,_, DolloO(lN)~7 1908 FmdlabD(OI)W 7l"60 T<.,..,...,AIBilllobi(0!)5S4UII F""AIIoDWo< (02) 5S4Uil1 T~fbiOfti<o(lli).HOIIUI

FarH..IotrD(1)1)~J.Uil

c-.~:-;-...,

-IJoobo<Ol05lS!lUH 0l045911J910l0 451 J025 ---Qj()jj(lllM)

T....,... l•O..Mo!U 0506l7 I'll

JLG 450AJ- DIESEL ARTICULATING BOOM LIFT (4X4 RT) REACH SPECIFIC..\ TIOXS

13.72 m

15.71m

7.47m

360 de_grees minuous

ll1kg

DJ:\IEXSIO""AL OA A

0.91 mx 1.83m

2.08 m

Om

l.15m

6.53m

L98 m

36 CUI

7400kg

5.5k~'cnll

7.1 km h

45%

1.73 Ill

4.72m

33 x 1550xl6.5 Foam Filled

POWER SOU.RCE

llVDC

62.5 L

Deutz /Perkins 3 7kw

Automatic spring applied multiple discs

130 L

Page 23: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

6.1.5: Forklift

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 18 of 58

Engine powered forklift 1.5- 1.75 ton Truck t pecltrcatloO$ 02~FGF1 5 02-8FDF15 02~FGF18 02.-FDF18

11 Manufacturer TOYOTA TOYOTA TOYOTA TOYOTA

12 Model 02-8FGF15 02-8FDF15 02-8FGF18 02-8FDF18 c 1.3 Drille LPG Dresel LPG Diesel 0

~ 14 Opilrntor lype Rider seated Rider sealed Rider sealed Rider seated !Jii I 5 Load capacitylraled load Q kg 1500 1500 1750 1750 c • 3! 16 Load centre c mm 500 500 500 500

18 Load dis lance. ceo Ire of drive axle lo fork X mrn 410 410 410 4!0

1.9 ~ y mm 1435 1485 1485 1435

2! 2 1 Service 11-eighl kg 2450 2550 26JO 2730 ... 22 Alcle lo3<!, ~ load, fiOlllreat kg 34601•90 35101540 3820IS60 39401540 i 23 Axle load, wilhoulload. fronllrear kg 10-!011410 109011460 100011630 1120/ 1610

3.1 lyre- prreurnalic (P), pneumalic shaped cushion (SE).

SE SE SE SE sold rubber (R)

32 lyre SIZe. lronl 650-10 6 5o-10 6.50·10 650-10 I!! 3.3 Tyre size. rear 5.00-8 5.00-8 5.00-8 5.00-8 ~

3.5 Wheels. number fron~·rear (x=<frillen wheets) 2xl'2 :W2 2xi2 'hi2

36 Track width. front b,. mm 885 885 885 885

37 Track width. rear b,, mm !195 895 !195 895

41 Tit of maslllork carnage forwafdlbackward a.l~ deg 6/11 6/11 6111 6111

4 2 Heighl mast lov.-ered h, mrn 1995 1995 1995 1995

43 Free lilt It, mm 150 150 150 150

44 Lift h, mm 2960 2960 2960 2960

Liltlleif;ht h, rnrn 3000 3000 3000 3000

4 5 Height. mast extended h. mm 4250 4250 ~250 4250

47 Heigh! of ovemeacf guard (cab) h, rnm 2080 2080 2080 2000

48 Sea! height h, mm 1020 1020 1020 1020

4.1 2 Coupling height h,. mm 285 285 285 285

ii 4 19 Overall length I, rnm 3290 3290 33 15 3315 'li <: 420 Length to face oflorks I, mm 2290 2290 2315 2315 . -E 4 21 Overall width b, mm 1070 1070 1070 1()70 Ci

422 Fork dimensions slen mm 4018011000 4010011000 ~1000 4018011000

4.23 Fork carriage DIN 15 173. dassl'type A. B UA I lA I lA I lA

4 24 Fork-carriage width b, mm 920 920 920 920

4 31 Ground clearance. with load. belov.• mast n\ mm 60 BO 80 80

432 Ground clearance. centra ol wheelbase m, mm 95 95 95 95

433 Aisle width for palle1s 1000 x 1200 crossways A. mm 3600 3600 3620 3620

4.34 Aisle width for pallets 800 x 1200 lengthways A• mm 3800 3800 3820 3620

4 35 Turmng radius W, mm 1990 1990 20 10 2010

4.36 Internal turning radius b. mm 575 575 515 575

5.1 Travel speed wilhlwilllout load kmlh 18,5119.0 18.0118,5 18,5119.0 18,0118.5 .l! 52 Lift speed, withlwithoulload mls 0,67/0,68 0,6510,68 0,6711l.68 0.6510.68 .. ..., .. 53 Lowering speed. withlwilhout load mls 0 5010_55 0.5010.55 0.5010,55 0,5010.55 !!

56 Max drawbar pull. withlwrlhout load N 1750016300 1660017000 1750016300 1660018300 .. E l5 57 't:

Gradeab~ity, with load '" · % 41 42 40 37

~ 5.8 Max. gradeability. WllhfWilhout load" % 45/?? 451?? 441?0 411?0

5.10 Service brake H\•draulic Hydraulic Hydraulic Hydraulic

71 Engine manufacturer/type TOYOTA 4Y-ECS TOYOTA IDZ-111 TOYOTA 4Y-ECS TOYOTA IDZ-111 <: 0 72 Engine power ace. to ISO 1585 kW 38 36 38 36 ;ID

"'"' _a a. 73 Rated speed 1/mon 2570 2400 2570 2400

~~ 74 No of cylinders/dosplacemenl em' 412237 412486 412237 412486

7.5 Fuel consumption according to VDI 60 1/h - 2,7 - -I!! 82 Opera ling pressure for aMachments bar 118 118 118 118 .. 83 Oil volume for attachments If min 65max 64 max 65max 64max .c t)

84 Sound level at the driver's ear according to EN 12 053 dB( A) 77 79 77 79

Page 24: CLOISALL STEEL STRUCT PAVILLION.pdf

odii Construction

I arabtec

Doc No: MS-1093-llON Rev 02

6.1.6: Scissor Lift

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

c...,.cs 10 ax 10 fl

t;U ';t.

Page 19 of 58

•. ..;.;.=.....;.;;;~=;;._.-~~---~..;:;.;:::;.,;,2-1 5 as ! ~ngine 1 !:J ;:; h'l 24 8 ~lp

Page 25: CLOISALL STEEL STRUCT PAVILLION.pdf

odD Construction

Doc No: MS-1093-llON Rev 02

Eng1nc w

I arabtec

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 20 of 58

Page 26: CLOISALL STEEL STRUCT PAVILLION.pdf

odi Construction

Doc No: MS-1093-llON Rev 02

6.1. 7: Vertical Lift

'' arabtec

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 21 of 58

~ s,,.... kk_ t J'f/<MI

Ra®iiDifiC~m> Heavy - Duty

An upgrade In toughness and strength from the well proven LEONARDO Standard Version. the LEONARDO Heavy-Duty c<>mcs with all-steel chassis and canopies and mtegrated fol'l<.lifi pockets. It's designed to bG used in the harshest environments and features active pothole protection for an increased ground clearance, preferred in the contracting environment.

Tallor-made to t11e operator's and contractor's needs in the building Industry. the LEONARDO range of platforms eliminates the need for scaffolding. scissor 111\s and normal push-around units. No more ladders, no outriggers. no !lassies. One man can easily do a job safely. quickly and elffclenlly.

PORTABLE Wnh Leonardo HO, the user c;an travel all over the site with ease-through doorways. up access ramps and Into fight spaces-thanks to the extremely compact slze of lhls ptalform and 35% gradeabillty. Weighting only 508 Kg (1119 Lbs), Ills e<>mpact and light enough to enter most elevators to reach the top Ooors of high bulldlngs in no time at all. Drivable through standard doorways, without the operator leaving the platform.

SAFE Dnveable at its full4.9 mt (9.6') wol'l<.ing height with the maximum load and the platform completely extended at an automatic slow speed. No more exhausting mounUng on and off the platform or scaffold to push it into the right position! Unrestricted capacity 180 Kg (397 Lbs) reduce the need to climb up or down to load material. Built-in tilt sensor, flashing light, audible alarm and active pot-hole protection are all standard features

DURABLE Simple, trouble-free and cost effecUve, the Leonardo range of products Is the result of 1 5 years technical improvement. Maintenance-free lifting mast. carefully selected components and extremely simple desfgn make for low cost servicing: other than controlling the water level in the batteries, all our Leonardo models are virtually maintenance-free.

Page 27: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

odi Construction ' arabtec

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for 11lnstallation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02

c

~de !urni~J[ Radius Outsido Tumlng Radius ~radeablllly --­

Ralsellower S ed

9ontro~

Now able to worlr outdoo,.l

0

us 9116~ 1 ft3 in I

16ft

5ft8 in 3971bs

1.4 1n

B.y seleclfng 1t1e 'Leonardo Outdoor Edition' you can work outdoors In normal condllions expanding the use and increasihg appJIQE~t!ons . · The Leonardo Outdoor Edition model has an increased weight of 555 kgs (1 ,221 lbs).

Zero Inside Turning Radius and 1000 mm (39") Outside Turning Radius

Page 22 of 58

Wheel locking device allows you to drive forward and backward in a straight line when accessing narrow aisle. Dual Roll Out Decks-provide outreach at both ends without sacrificing any platform capacity. Swing entry gate with stainless steel hinges and removal of entry

toe-board allows easier access.

High cycle batteries allow 250 operation on one charge: enough duty cycle for even the hardest of worll days and more. Large LCD screen in the ground module to show system status and diagnostic.

An extremely rugged, ultra-compact Joystick wltlt ergonomically designed handle and trigger style safety switro-enables easier use with gloved

hands!

All-steel chassis design, with heavy-<tuty winch, tie down and lifting points-making life easier for Transportation! Built in tilt-sensor & active pothole protection for an increased ground clearance.

Wide drive and steer wheels-for reduced ground pressure and increased traction on tough job sites.

The revolutionary mast lifting system designed by BRAVI PLATFORMS for all its platfonms models represent a real change on Its sector! The mast made of a special extruded aluminium is 100% maintenance free! No more chains to be regularly inspected, no more grease or lubricant required, no maintenance: a real low cost ownership!

Page 28: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 23 of 58

6.2 Materials

• Steel Members- SS 8252 • Bolts & Nuts- SS 8253 • Hilti Bolts- SS 8254 • Hilti Chemical Bolts- SS 8255 • Welding Electrodes- SS 8257

6.2.1 Product Marking and Traceability

Project materials shall be sorted out by type on racks and those with traceability requirement shall be properly marked. Material inventory, incoming inspection and distribution records shall be updated timely.

Critical signage, such as safety signs on coordinate control points shall not be altered without approval from the manager in charge.

6.2.2 Storage and Protection

• Handling and storing of material and steel members shall follow relevant regulations and manufacturer's guidelines. Storage yard shall be kept organized, items and logos shall match with each other and consistent.

• The area of material storage will be segregated by barricading and provide adequate signage.

• The storage will have enough space so that equipment movement is available in the storage area for shifting.

6.2.3 Delivery and Transportation

• The steel member will be transported by trailer from factory (UAE) to Construction site.

Before start the of steel member's delivery, submit the Weekly Delivery Plan to main contractor for information and arrange the proper transportation time as per the traffic load records.

Long and extended materials will be transported after ensuring escorts from the security gate or from the lay down to the work area.

Gate passes for the delivery will be prepared before the delivery .

Page 29: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 24 of 58

6.2.4 Unloading and Storage at Site

• Material shall be delivered according to the fabrication schedule plan.

• Loose packing materials will be secured or removed.

• Storage will have enough space for movement for equipment's and vehicles for transportation.

• Adequate task lighting will be setup while unloading during night time.

• Lifting plans will be prepared for each lift.

Page 30: CLOISALL STEEL STRUCT PAVILLION.pdf

odi I TAV-CCC-ARABTEC JOINT VENTURE

Construction arabtec

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 25 of 58

6.3 Site Planning & Preparation

6.3.1 Site Planning, Equipment Access, Laydown Area & Preparation

SITE PLANNING. EQUIPMENT ACESS AND LAYDOWN AREA

Equipment/Shifting:

• The Mobile/Crawler Crane will be used for

shifting the 7 Ton Crane from the highlighted

Crane Location to the Pier Location.

• The Same activity will be carried out for lifting

the forklifts, scissor lifts and Man lifts.

• Note: The Crane and the Material Location to be

provided by TCA-JV.

>!·

MATERIAL LAYOOWN

CRANE LOCATION

Laydown Area/ Transportation Access:

• The Material stacked in Highlighted

Laydown area will be lifted up and

placed on the designated Piers.

The Materials will then be shifted with the help of Forklifts/Trolleys to the Erection Area on the piers.

Page 31: CLOISALL STEEL STRUCT PAVILLION.pdf

odD Construction

I arabtec

Doc No: MS-1093-llON Rev 02

6.3.2 Access Lay Out

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for 111nstallation of Steel Structure for Single & Double Pavilions"

Page 26 of 58

• 7 ton Mobile crane will be lifted to Level 2 slab by 140 ton mobile crane.

• Access and opening to be discussed with TCA-JV, Eversandai and external Logistics Team.

• Once mobile crane is lifted to the slab, it will be driven to the required erection point.

• The driving path of the 7T crane will be discussed with Johnson Arabia (crane Supplier), Cloisall and TCA-JV. A joint site inspection has to be carried out with the mentioned parties above to confirm driving path/access.

6.3.3 Electricity Plan (By Cloisall & TCA-JV)

• Distribution Board (DB) to be provided by Cloisall & TCA-JV in the Highlighted location as per erection schedule for each Zone.

• Use of 110 V for power tools

Page 32: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

olfi Construction

I arab tee

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 27 of 58

• -The power should be sufficient for the following machineries with a total requirement of 380V- 3 phase I 250KVA:

• Welding Machine- As required

• Grinder- As required

6.3.4 Survey Control

• Checking the axis and elevation/coordinates of embedded parts before commencement of the installation of columns, and control axis and elevation/coordinates of columns.

• The survey setting out points and datum levels shall be obtained from the Engineer. Transfer the points to the appropriate location nearest to the structures to be erected for regular checking and monitoring purpose.

• Our Subcontractor is also involved in drawings as build survey and bolt drilling.

6.3.5 Surveying and Correction Control

• The surveying control points provided by the JV shall be resurveyed by total station according to relevant requirements.

• Surveying grids shall be established for steel structure surveying prior to commencement of erection, and develop coordinate piles and horizontal which shall be properly protected from damages.

• During the erection, positioning of columns and beams, maximum tolerance permitted for them and others will follow the approved specification 051200.

6.3.6 High strength bolt installation

• The sequence of tighten bolt is from center to side by electric wrench, include the first twist and the final twist, the first twist torque is the 60-80% of the final torque, the final twist torque reach the 100% of the final torque.

• The faying surface for HSFG area will be protected from the corrosion until the final torque.

• The bolts shall be tightened using a torque wrench offering a suitable operating range. Hand or power operated wrenches may be used. Impact wrenches may be used for the first step of tightening for each bolt. The

Page 33: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev OZ

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 28 of 58

tightening torque shall be applied continuously and smoothly following steps refer to BS EN 1090:

• First tightening step: the wrench shall be set to a torque value of about 0.75 Torque Value as shown in table below. This first step shall be completed for all bolts in one connection;

• Second tightening step: the wrench shall be set to a torque value of 1.10 Torque Value.

Minimum Break Strength 784Mpa

Torque Value Remark Bolt Diameter ( mm) Nut dimension (mm)

(NM)

16 24 206 Grade 8.8

20 30 402 Grade 8.8

22 32 539 Grade 8.8

24 36 686 Grade 8.8

30 46 1225 Grade 8.8

39 60 2156 Grade 8.8

45 70 3136 Grade 8.8

6.3.7 Weld Construction (If Any)

• Check the dimension for steel plate after fit up of it and ensure the levels and alignment.

• Fix the back strip behind the groove (welding preparation area) as per requirement.

• Steel plate will be used for weld backing for internal steel member, and ceramic plate will be used for weld backing for Architect Expose steel member.

• Check the fit-up as per requirement and release for the welding. Ensure 50mm adjacent to welding paint is removed.

Page 34: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

olfi Construction

I arabtec

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 29 of 58

• Ensure welders are qualified as per BS 287.

• Site welding will be carried out as per approved WPS, strictly control the welding procedure and carry out proper pre-heating before thick plate welding, and prevent the steel members by temporary additional fixed plate to avoid the distorted by welding, in case the distorted happen, also can be corrected through the portion heating and checked by the total station, than fixed by temporary plate as per construction specification.

• Before welding previously deposit metal, slag shall be removed and the adjacent base metal shall be brushed clean.

• Weld Area shall be ground smooth and to be checked soundness.

• FCAW with external gas shielding shall not be used in draft or wind unless a shelter protects the weld. This shelter will be capable to reduce the wind velocity to a maximum of 8 km/hr.

• Excessive convexity I overlap shall be removed by grinding.

• Crater, undercuts, undersize, concavity shall be prepared and additional weld metal shall be deposited.

• Unacceptable porosity, slag inclusion, lack of fusion shall be removed & subjected for re-welding.

• Distortions shall be controlled by a sequence welding method.

• A permit to work for welding must be applied to TCAJV and welding has to be carried out by complying with the PTW (permit to work) requirements from TCAJV.

• After completion of welding the temporary fixture shall be removed, grinded and clean around the weld joints. NDT to be carried out for temporary weld cleat- removed area.

• After completion of cleaning the weld visual inspection carried out and release for NDT Testing.

• NOT shall be carried out the weld joint as per approved procedure and ITP.

• Completion of NDT testing those areas shall be dean/Power brush for painting touch up.

Page 35: CLOISALL STEEL STRUCT PAVILLION.pdf

olfi Construction ' arabtec

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 30 of 58

• Slag shall be removed from all completed repair welds. The welds and adjacent base metal shall be cleaned by brushing.

• While carrying out welding works, required quantity firewatchers must be appointed in the area.

• Avoid welding during blowing of wind in such a way that the welding flux has been restricted from flown to the adjacent areas.

• In case of an emergency situation while carrying out work on platform, liftable stretcher has to be used to take down the person under casualty. Crane can be used to lift the stretcher in case of an emergency.

• In case of an emergency due to burn for the operative the burned portion can be cooled by using cold packs or by cold water and the area of burn should be immediately covered by a sterile gauze pad for any contact with the infected area or atmosphere. The casualty should be taken to the site clinic immediately.

• Using flame trays and covering the area with fore blankets to protect welding safety

Page 36: CLOISALL STEEL STRUCT PAVILLION.pdf

olfi I TAV-CCC-ARABTEC JOINT VENTURE

Construction arabtec Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 31 of 58

6.4 Sequence of Work

6.4.1 Erection sequence (Steel Structure)

Step 1 : Placing Of the Mobile Crane near the Pier location

Equipment/ Activities:

• The Mobile Crane will be placed as per the Site Equipment and logistics layout.

• The crane will be used for lifting the 7 t Crane to the Pier Slab.

Inspection/Safety:

• The Rigging plan will be prepared by GSI and Cloisall for the Crane

• All the required permits will be issued.

Page 37: CLOISALL STEEL STRUCT PAVILLION.pdf

odD ' TAV-CCC-ARABTEC JOINT VENTURE

Construction arabtec Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 32 of 58

Step 2-A : Lifting of 7 Ton Crane on to the Pier Pavilion Slab

Equipment/ Activities:

• The crane will be lifted through the access point of Eversendai Steel openings and the opening will keep open as it for the crane loading and unloading from the slab:

• Responsibility of Crane operator Ensure the Method Statement is approved. Ensure the JSTI is done Ensure the Rigging plan is made Ensure the team is briefed for commencing works Ensure the lifting equipment's are third party certified and color coded Ensure the area barricading

Inspection/Safety:

• All the Lifting Belts and the related Shackles will be having the valid Third party Certificates.

• Proper Supervision will be present for the lifting.

• Detailed Calculation for checking the suspended slabs are able to take the loads from 7 Ton mobile crane at moving & lifting is mentioned for your review (6.4.1.1)

Page 38: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

olfi Construction ' arabtec

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02

Ensure the full PPE's to the team Check the Crane physically.

• Responsibility of Crane Operator: Ensure the Crane is having a valid third party certificates Ensure Daily Check list is filled and inspected physically Ensure that the Riggers have made aware to him, the task to be performed Check the rigging plan and sign Ensure the lifting gears are in usable manner Compare the load chart for the usage of work.

Page 33 of 58

Page 39: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 34 of 58

Step 2-B : Lifting of Forklift on to the Pier Pavilion Slab

Page 40: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 35 of 58

Step 2-C : Lifting of Man lift on to the Pier Pavilion Slab

Page 41: CLOISALL STEEL STRUCT PAVILLION.pdf

olfi I TAV-CCC-ARABTEC JOINT VENTURE

Construction arabtec Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 36 of 58

Step 3 : Lifting of Equipments and Material

Equipment/ Activities:

• Similarly the Equipments viz; Forklift, Man lift and the prioritized materials will be lifted and placed.

• Material will be shifted on the daily basis to the erection point to minimize the stacking of materials on slab and ensure that housekeeping is maintained at all times.

• Remove any obstruction on slab. • Start offloading the material using 50/80 ton crane. • Material will be shifted to level +2.0 slab using crane.

• Packing wood will be added to slab prior to offload the steel bundle.

Safety precaution:

• All the Lifting Belts and the related Shackles will be having the valid Third party Certificates.

• Proper Supervision will be present for the lifting.

• Arrange safety rail around the area will be used for storage the material.

Page 42: CLOISALL STEEL STRUCT PAVILLION.pdf

olfi I TAV-CCC-ARABTEC JOINT VENTURE

Construction arabtec Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02

• Steel Bundle will be offloaded to packing wood (refer to above sketch).

• Remove the slings and lifting belt. • Maximum 2 raws of materials will be stacked on one

location of the slab and will not exceed 300 kg/m2•

• Site Engineer/Rigger supervisor will ensure distributing the load on the slab and keep the majority of materials supported to slab beams/ribs as maximum as possible

• Forklift will be used for shifting the material inside the piers till lifting location or (Forklift will be used for distributing the material to erection area)- refer to above sketch

• After the travelling of the equipment to the erection area, then only the next equipment or material will be lifted and placed

Page 37 of 58

Step 4 : Erection of Single Pier Pavilion

Equipment/ Activities:

• The Erection of the Single pier pavilion will be started as per the priority area.

• The slab for the column location will be scanned, surveyed, leveled and inspected by Cloisall and GSI and marked as per the approved shop drawing.

• Holes on the slab to be marked and drilled as per the

Safety precaution:

• Survey team will be present with the construction team;

• The columns will be lined and levelled as per the required.

• The structure will be bolt

Page 43: CLOISALL STEEL STRUCT PAVILLION.pdf

olii '' TAV-CCC-ARABTEC JOINT VENTURE

Construction arabtec

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02

approved drawings using normal drill (in case of clashes with Rebars- Core drilling shall be used after Engineer's Approval).

• Hilti Chemical Anchors I Hilti Anchor Bolts shall be fixed & aligned

• The columns will be lifted and erected as per the designated area. Trifors will be used to support the steel structure column. (Refer to connection detail Diagram 1)

• The beams related to the columns will be fixed and thus the column and the beam structure will be stable.

• Similarly all the columns and beams will be erected and fixed.

• The sequence of the erection for the Single Pier Pavilion will be followed as shown in the below images and sequence.

Page 38of 58

• Vertical Lit will be used for tightening the bolts and fixing of purling

• Tightened, torqued and aligned as per the approved ITP.

Page 44: CLOISALL STEEL STRUCT PAVILLION.pdf

odD '' TAV-CCC-ARABTEC JOINT VENTURE

Construction arabtec Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 39 of 58

Diagram 1: Connection of Trifors to Steel Structure & Level 2 Slab

nt/ Activities:

• Drill the level 2 slab concrete to fix the Hilti Mechanical Hock.

• Fix the Trifors to the Hilti Hock and Steel Column.

• Start the alignment of columns using the Trifor gear box.

• Trifors will be removed after the installation of beams or bracing.

• Cut the Hilti hock usi inder.

• Ensure that the depth of the drilled hole will be as per the depth required to fix the Hilti Mechanical Hock.

• Make sure that the columns are straight/aligned properly prior to removal of trifors.

• Clean the area after the completion of work.

Page 45: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

II II

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building - Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page40 of 58

II II II

Page 46: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-110N Rev 02

II II

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 41 of 58

II II II Diagram 2: Scale drawing for the use of the 7 ton crane under envelope works

The Scale drawings clearly show that there is no clash between the other trades in using 7 ton crane for Pavilion Works.

Page 47: CLOISALL STEEL STRUCT PAVILLION.pdf

odii Construction

I arabtec

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 42 of 58

Page 48: CLOISALL STEEL STRUCT PAVILLION.pdf

odD Construction ' arabtec

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building - Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 43 of 58

Page 49: CLOISALL STEEL STRUCT PAVILLION.pdf

odi t l TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Construction ~~arabtec Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 I Page 44 of 58

Page 50: CLOISALL STEEL STRUCT PAVILLION.pdf

odi Construction

I arabtec

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 45 of 58

Page 51: CLOISALL STEEL STRUCT PAVILLION.pdf

odD Construction

Doc No: MS-1093-llON Rev 02

I arab tee

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 46 of 58

Completion of Single Pier Pavilion

Page 52: CLOISALL STEEL STRUCT PAVILLION.pdf

odD Construction

I arabtec

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building - Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page47 of 58

Typical Sequence Of Erection Of Double Pier Pavilion

Page 53: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 48 of 58

Page 54: CLOISALL STEEL STRUCT PAVILLION.pdf

olfii Construction

I arabtec

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page49 of 58

Page 55: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 50 of 58

Page 56: CLOISALL STEEL STRUCT PAVILLION.pdf

olfi Construction ' arabtec

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 51 of 58

Page 57: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 52 of 58

Page 58: CLOISALL STEEL STRUCT PAVILLION.pdf

orii I Construction arabtec

Doc No: MS-1093-llON Rev 02

6.4.1.1 Detailed Calculation

. "."

.. .. •• . .. ~. ~.

'•

KOBELCO RK70 OUTRIGGER LOAD

Radius (M) Weight (T) 75%

1 7 5.25

BOOM LENGTH 23.6M

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 53 of 58

... . ....... ....... ... t•

0.

Radius (M) Load (T) Weight (T) Front (T) Rear (T) Each Front Each Rear (T) (T)

5 3.33 8.58 5.66 2.92 2.83 1.46

9 1.4 6.65 4.39 2.26 2.19 1.13

Page 59: CLOISALL STEEL STRUCT PAVILLION.pdf

olfi Construction

I arabtec

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 54 of 58

Limitation on the Travel, Storage and Positioning of Outrigger will be required. Restriction includes the following:

1. A 2 meter zone I s to be applied to the RK70 Mobile crane during travel and storage, while on the level 2 pier concrete structure.

2. A 3meter exclusion zone is to be applied to the RK70 Mobile crane during lifting operations.

3. During lifting operations all additional plant and machinery to be one bay clear. One JLG 450AJ articulating boom may operate within the same bay while the RK70 is operating on beams spanning 15.7m (approx), however the 3m exclusion zone must be in effect.

4. Outriggers are to be positioned on 1.2m x 1.2m engineered outrigger pads.

5. RK70 outriggers are to be fully extended during lifting operations.

6. Outriggers to be located on beams where possible.

7. Where the areas are being on work the areas should be barricaded with RED net and shall be assisted with Safety Supervisor or Safety Engineer.

Remarks: Above mentioned calculations have been discussed and finalized with RBG (Third Party). Structural Calculation was resubmitted separately through submittal Referenc~ No. S. S. - 8276 Rev 02.

Page 60: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 55 of 58

7 EVIRONMENTAL, SAFETY AND HEALTH

7.1 Activity Risk Assessment

A risk assessment analyzing potential risks and their mitigation measures is attached to this method statement in Appendix 8.1

• Lifting Supervisor carry out the brief for • Safety officer carry out the brief for all all the workers who involve the lifting the workers who involve the lifting prior to lifting. rior to lifti

• HSE General Precautions & General Mitigation Measures/Controls.

• Activity to be adequately supervised by competent staff (both Construction & HSE).

• All Personnel/Workforce involved in the activity to be inducted, and received the required training/competencies BEFORE commencing the activity.

• Engineer/Supervisor/Foremen In-Charge to prepare and the JSTI (Job Safety Task Instructions) form, and discuss it with the workforce BEFORE commencing the activity (form and discussion to be in the language understood by the workforce).

• Required Permits/NOCs (including Permits to Work, as applicable) to be obtained ahead of time (BEFORE commencing the activity).

Page 61: CLOISALL STEEL STRUCT PAVILLION.pdf

Doc No: MS-1093-llON Rev 02

TAV-CCC-ARABTEC JOINT VENTURE

Midfield Terminal Building -Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Page 56 of 58

• All Plants/Machines/Vehicles/Equipment used in the activity to be pre-inspected and approved by the competent authorized personnel.

• HSE Procedures relevant/applicable to the activity to be reviewed by the Engineer/Supervisor In-Charge, and specific precautions to be conveyed to the Foreman/Charge-Hand and Workforce through JSTI and other forms of communications.

• All Personnel/Workforce involved in the activity to fully comply with PPE requirement (Personal Protective Equipment).

• Use adequate and visible HSE signage, posters and board to promote awareness

• Ensure adequate rest areas (welfare facilities) are accessible.

• Engineer/Supervisor/Foreman/Charge-Hand to be familiarized with Emergency Response Plan & Contact Numbers. Emergency contact numbers to be posted on site.

• Supply toilets and cool drinking water at the immediate area of the activities prior to commencement of works.

• A permit to work for welding must be applied to TCAJV and welding has to be carried out by complying with the PTW (permit to work) requirements from TCAJV.

• The lifting gears must be inspected every three months by the Abu Dhabi Municipality approved third party and suitable color coding as per TCAJV need to be followed.

• Isolate the area under any erections for preventing access by personnel.

• While carrying out welding works, two firewatchers must be appointed in the area.

• The area under the walkways has to be protected with overhead protection or completely restricting any access to that are while working on the structure.

• All lifting operations shall be carried out under the supervision of experienced persons.

• All certificates for lifting equipment must be available at site.

• Lifting plan shall be prepared by the competent supervisor for lifting the materials.

• Safe working load (SWL) shall be marked on lifting equipment's and they will not be overloaded in excess of its recommended SWL.

Page 62: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

odD Construction '' arabtec

Midfield Terminal Building- Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 57 of 58

• The respective foreman shall inspect all lifting tackles prior to use. Defective rigging equipment shall not be used and immediately removed from the site.

• Adequate protection shall be used on the edges of steel object to be lifted to avoid damage to the lifting tackles and any further occurrences (damaged old lifting belts shall be used as a layer around the lifting tackles and any further occurrences).

• Proper barricade shall be arranged around the crane working area.

• All tackles shall be checked for proper attachment with the material to be lifted.

• location and ground condition of the soil to be checked before moving the cranes to the erection location.

• lifting equipment shall be visually inspected by the authorized person on every month and recorded in the lifting gear log register.

• Rigging equipment will be properly stored and well maintained.

• Mark number will be re-checked before starting erection activities.

• Access ladder, working platform & Scaffolding shall be provided as required.

• Signage to be arranged around the lifting area.

7.2 HSE General Precautions & General Mitigation Measures/Controls

• Activity to be adequately supervised by competent staff (both Construction & HSE)

• All Personnel/Workforce involved in the activity to be inducted, and received the required training/competencies BEFORE commencing the activity

• Engineer/Supervisor/Foremen In-Charge to prepare and the JSTI (Job Safety Task Instructions) form, and discuss it with the workforce BEFORE commencing the activity (form and discussion to be in the language understood by the workforce)

• Required Permits/NOes (including Permits To Work, as applicable) to be obtained ahead of time (BEFORE commencing the activity)

• All Plants/Machines/Vehicles/Equipment used in the activity to be pre-inspected and approved by the competent authorized personnel

Page 63: CLOISALL STEEL STRUCT PAVILLION.pdf

TAV-CCC-ARABTEC JOINT VENTURE

olfi Construction

I arabtec

Midfield Terminal Building - Abu Dhabi International Airport

Method Statement for "Installation of Steel Structure for Single & Double Pavilions"

Doc No: MS-1093-llON Rev 02 Page 58 of 58

• HSE Procedures relevant/applicable to the activity to be reviewed by the Engineer/Supervisor In-Charge, and specific precautions to be conveyed to the Foreman/Charge-Hand and Workforce through JSTI and other forms of communications

• All Personnel/Workforce involved in the activity to fully comply with PPE requirement (Personal Protective Equipment)

• Use adequate and visible HSE signage, posters and board to promote awareness

• Ensure adequate rest areas (welfare facilities) are accessible

• Engineer/Supervisor/Foreman/Charge-Hand to be familiarized with Emergency Response Plan & Contact Numbers. Emergency contact numbers to be posted on site.

• Supply toilets and cool drinking water at the immediate area of the activities prior to commencement of works

8 ATIACHMENTS

8.1 Risk Assessment

8.2 Lifting Operation Plan

8.3 . Safety Data Sheet for Juton Paint

8.4 Annexure D - Material Submittal for Paint System -Protective Coating for Steel

Structure (Safety Data Sheet)

8.5 Annexure E- Letter to TCA JV for the requirements for prototype

Page 64: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 65: CLOISALL STEEL STRUCT PAVILLION.pdf

~J

\• \ .. . \ ; ' ~ ' -- _;~ \ .. . ""

'{·~ \ •• ' ;t.

l! ~ \ • •

' ~

'

Page 66: CLOISALL STEEL STRUCT PAVILLION.pdf

\ I •

' . . '. J

'• I

i' <1;> lol

ott/ .·.

~ l:

" ' _,.'

Page 67: CLOISALL STEEL STRUCT PAVILLION.pdf

~" 0/\C ..._,,) u,.....u ..,.._....,?-II u;.-W -.. DttAil~ ,,_rs c~~

ANNEXURE A

HSE It Risk Assessment

Page 68: CLOISALL STEEL STRUCT PAVILLION.pdf

Midfield Terminal Building- r"'neral Contractor .. ,~

A '' (Contract Number AUrJ . ./6.10.0401) Dl1ll MIDFIELD TERMINAL CONTRACTOR (TCA Joint Venture) Page 1 of22

Construction arabtec HSE&S Risk Assessment

Date: 10/11/14 Revision: 02

Main Activity: Installation of Steel Structure for Single and Double Pavilions Equipment: Mobile Crane, Man lifts, Fork Lift, Cherry picker, Vertical Lift, Torque Wrenches. Drill Machines, Jig Saw, Belt Sander Machine, Sanding Machine,

Tools I Equipment Total Stations, Chain Hoist, Chain Block, lever block, Tirfor, Welding Machine, Grinder,

Sr.

Material: Steel Material, Nut Bolt ETC. Location: ABU DHABI INTERNATIONAL AIRPORT- MIDFIELD TERMINAL BUILDING

MS Reference: MS-1093-110N Rev-02 (SS-8259)

Risk Rating - No Residu Actions Hazards Controls aJ ALARP

Effects ffhe potential to Consequence

Recommended Control Measures & Mitigations Risk(T Demonstr causehann) Ukelih Seve Outcome

ood rity (T/A/M/1)

Slight Minor or lnjwy. Serious

Injury Fu:st-Aid

LiRlihood 2 4

--Certain 10 20

Ver)' Lil-ely 8

P. Likely 6

--

:\by Happen 4 8

Unlikely 2

J ft. 8 J Trivial Risk

No further improvcmenlo;; necessary provided conlrolrrEasures are maintained

I 11 ~- -~ Adequately Controlled Risk

Risk is tolerable when control measures i·dentified are implemented.

~-erity

I Major Injury. Lost

Time > 3days

I 6

(Jtl- wo ---

~~ uility.

Pennant Dis®ility

8

Multiple Fatalities

10

/A/M/1 J

Madera~£ ly Controlled Risk

ated(Y/N)

Further Risk Reduction Measures shou ld be considered.

Intolerable Risk

Seek spe ci :ilis t ;ufv ice/support.

By

I

I r I

'

I

I I I

1

Page 69: CLOISALL STEEL STRUCT PAVILLION.pdf

Midfield Terminal Building- G~neral Contractor I

... ,'"

A '' (Contract Number AUf. i10.0401)

I DBll MIDFIELD TERMINAL CONTRACTOR (TCA Joint Venture) Page 2 of22 Construction arabtec HSE&S Risk Assessment

Date: 10/11/14 I Revision: 02

Main Activi!)': Installation of Steel Structure for Single and Double Pavilions I Equipment: Mobile Crane, Man lifts, Fork Lift, Cherry picker, Vertical Lift, Torque Wrenches. Drill Machines, Jig Saw, Belt Sander Machine, Sanding Machine,

Tools I Equipment Total Stat ions, Chain Hoist, Chain Block, lever block, Tirfor, Welding Machine, Grinder, Material: Steel Material, Nut Bolt ETC.

Location: ABU DHABI INTERNATIONAL AIRPORT- MIDFIELD TERMINAL BUILDING I MS Reference: MS-1093-llON Rev-02 (SS-8259) I

Risk Rating- No Residu Hazards Controls al ALARP Actions

Effects Sr. (The potential to

Consequence Recommended Control Measures & Mitigations Risk(T Demonstr

cause harm) Ukelih Seve Outcome /A/M/1 ated(Y/N) By ood rity (T/A/M/J) )

1 GENERAL SITE HAZARDS

• All personnel in the Project are to be HSE Inducted as per the procedures. • Method Statements and Risk Assessments (MS/ RA) are to be briefed to all

employees who are part of the job activity. • Compliance with the PPE requirements shall be enforced by the Supervisors. • Task Briefings shall be conducted prior to commencement of the activities. • Toolbox talks shall be conducted to all the employees at regular intervals. • Only authorized and certified equipment's shall be in use. Procedure to induct

plant equipment by the Main Contractor if any shall be complied prior to

• Personal injuries, mobilization of the equipment.

• property Damages • All equipment shall be operated by licensed and competent operators only

• Delay in • All equipment shall undergo regular maintenance and servicing. Supervis

General Site • Emergency procedures shall be informed to all personnel and emergency 1.1 Emergency 6 6 36{M) A y or/

Hazards response actions

contact numbers shall be placed at prominent locations. Foremen

• Spillage of • Smoking shall be permitted only at designated smoking areas.

chemicals and oils • Fire prevention measures shall be provided near the work site and fire

hazardous areas. • Welfare arrangements shall be provided adjacent to work area. • Chemicals and oils should be kept in designated areas only. And must provide

Dip trays for avoiding chemical spillages. Area should be properly barricaded and display appropriate warming signage. Only authorized persons to handle the chemical handlings.

• Should provide Dip Trays and spill kits for air compressor and portable generators if in use.

- -

Page 70: CLOISALL STEEL STRUCT PAVILLION.pdf

Midfield Terminal Building- f.<>neral Contractor I l.a'e

A. '' (Contract Number AUh. .J.10.0401)

Dl1l1 MIDFIELD TERMINAL CONTRACTOR (TCA Joint Venture) Page 3 of22

Construction arabtec HSE&S Risk Assessment

Date: 10/11/14 I Revision: 02

Main Activity: Installation of Steel Structure for Single and Double Pavilions I

Equipment: Mobile Crane, Man lifts, Fork Lift, Cherry picker, Vertical Lift, Torque Wrenches. Drill Machines, Jig Saw, Belt Sander Machine, Sanding Machine, Tools j Equipment Total Stations, Chain Hoist, Chain Block, lever block, Tirfor, Welding Machine, Grinder,

Material: Steel Material, Nut Bolt ETC. Location: ABU DHABI INTERNATIONAL AIRPORT- MIDFIELD TERMINAL BUILDING ..

MS Reference: MS-1093-110N Rev-02 (SS-8259) I Risk Rating- No Residu

Hazards Controls al ALARP Actions Effects

Sr. (The potential to Consequence

Recommended Control Measures & Mitigations Risk(T Demonstr causehann) Ukelib Seve Outcome /A/M/1 ated (Y/N) By ood rity (T/A/M/fJ )

2 TRANSPORTATION OF MATERIAL (Loading & Offloading) AND EMPLOYEES • Selection of the transportation measures shall be controlled by the

Construction Manager in conjunction with Plant Manager considering the load, weight, height restrictions on the route, transportation route conditions, permitting requirements, load restraining measures etc.

Inappropriate Personal Injuries • All trailers and vehicles must be legally compliant with traffic police and Supervis

2.1 selection of Property Damage

6 6 36(M) TCAJV Inspection requirements.

A y or/ transportation Public nuisance such • Equipment Induction procedure by main contractor shall be adhered to. Foremen

measures, as traffic congestion • Should provide Defensive driving training for all drivers as per standard and requirements of TCA JV.

• During night shift material loading & offloading, the area should have adequate light and trained bank man/flag man must be control the activity and must need proper supervision.

• All load on the trailers shall be suitably tied I restrained prior to delivery • Loose stacking of the material shall not be permitted.

Inadequate • Loads shall be limited to the confines of the trailers' fencings and shall not

load protrude outside.

restraining Personal Injuries,

• Trailers and vehicles shall not be overloaded above the safe limits prescribed Supervis measures

Property Damage by manufacturer. or/

2.2 & Fall from 6 6 36(M) • Ensure trucks are selected according to the actual weight of the material to be A y Public nuisance such Foremen

height while as traffic congestion

transported. &HSE offloading • Ladders should preferably be fixed to the vehicle and be continuous from

material from bumper height to the top of the vehicle or to the height required for the task. trailer • Side rails/hand holds shall be continuous and extend to the highest level

required to maintain a 3 point hand/foot position.

-

Page 71: CLOISALL STEEL STRUCT PAVILLION.pdf

01111 Construction

Date: Revision:

Main Activity:

Tools j Equipment

Location:

MS Reference:

Sr.

2.3

Hazards (The potential to

cause harm)

Oversized cargo/

Material transportation

~

10/11[1 4 02

' ' arabtec

Midfield Terminal Building- f'"neral Contractor (Contract Number AUH.~ J.10.0401)

MIDFIELD TERMINAL CONTRACTOR (TCA Joint Venture) HSE&S Risk Assessment

Installation of Steel Structure for Single and Double Pavilions

Page 4 of22

Equipment: Mobile Crane, Man lifts, Fork Lift, Cherry picker, Vertical Lift, Torque Wrenches. Drill Machines, Jig Saw, Belt Sander Machine, Sanding Machine, Total Stations, Chain Hoist, Chain Block, lever block, Tirfor, Welding Machine, Grinder, Material: Steel Material, Nut Bolt ETC. ABU DHABI INTERNATIONAL AIRPORT - MIDFIELD TERMINAL BUILDING

MS-1093-110N Rev-02 (SS-8259)

Effects

Risk Rating - No Controls ALARP Actions

I

Consequence Likelih I Seve I Outcome ood rity (T/A/Mffj

Recommended Control Measures & Mitigations

Residu al

Risk(T /A/M/1 ~

Demonstr ated (Y/N) By I

Traffic congestion.

Failure of transportation vehicle. Struck with other vehicle or people

6 6 36(M)

• Steps shall be spaced away from the vehicle to allow placement of feet to the heel and provide a flat, non-skid surface.

• Walking surfaces on vehicle are required to be fixed in place and be constructed of material providing a continuous non-slip surface.

• The width shall be sufficient to allow worker movement without loss of balance. A width of 40cm and more will normally be sufficient.

• Where there is a risk of falling, working platforms shall be equipped with a fixed or the platform collapsible handrails on the outside edge if the platform is safely below the top of the vehicle, or both side, if the platform is on top of the vehicle .

• Retractable lifeline should be used for anchoring the full body safety harness and it should be connected to crane hook. Worker will fix the yoyo to himself before going up to crane . Yoyo will be released after going down from the crane. Lifting will start once the worker unattached from yoyo.

• Proper rated lashing belt or chain shall be used to secure the load. Center of the weight will be marked by rigging supervisor prior to lifting.

• The slinging should be done as per centre of gravity. • Tag lines should be used for lifting loads.

• Permits for transportation of heavy cargo have to be obtained from RTA and Police.

• Logistics department of TCAJV has to be informed prior to the entry to the site.

• Ensure that escorts are provided from gate to the site to ensure safe transport.

A y

Logistics

departm ent Site

Engineer

Page 72: CLOISALL STEEL STRUCT PAVILLION.pdf

DBD Construction

Date: Revision:

Main Activ!_ty:

Tools I Equipment

Location:

MS Reference:

Sr.

2.4 I

Hazards (The potential to

cause harm)

Inadvertent weather

conditions such as fog, sand storm

etc.

~

10/11/14 02

' arabtec

Midfield Terminal Building- r "neral Contractor (Contract Number AUh.~ J.10.0401)

MIDFIELD TERMINAL CONTRACTOR (TCA Joint Venture) HSE&S Risk Assessment

Installation of Steel Structure for Single and Double Pavilions

Page 5 of22

Equipment: Mobile Crane, Man lifts, Fork Lift, Cherry picker, Vertical Lift, Torque Wrenches. Drill Machines, Jig Saw, Belt Sander Machine, Sanding Machine, Total Stations, Chain Hoist, Chain Block, lever block, Tirfor, Welding Machine, Grinder, Material: Steel Material, Nut Bolt ETC. ABU DHABI INTERNATIONAL AIRPORT - MIDFIELD TERMINAL BUILDING

MS-1093-110N Rev-02 (SS-8259)

Effects Consequence

Road traffic accidents leading to

Risk Rating - No Controls

Likelih I Seve I Outcome ood rlty [T I A/M/1)

6 6 36(M)

Recommended Control Measures & Mitigations

• Weather forecast from the reliable sources shall be monitored • Drivers shall be informed about the weather forecast. • Start the journey only in case of clear and suitable weather conditions for

travel and unloading activities.

Residu al

Risk(T /A/M/1

)

A

ALARP Demonstr ated (Y/N)

y

Actions

By

Supervis or/

_I

I

personal injuries, property damages. • Cranes will be stopped over 38km/h wind speed. Foremen

• Anemometer should be used in the crane to monitor the wind speed.

3 LIFTING OPERATIONS

• All lifting equipment (Cranes, slings, clamps, shackles etc.) to be third party inspected and approved prior to placement on site .

• Lifting plan should be prepared and to be briefed to all employees who are part of the lifting activity.

• Adequately trained and competent workers only to be deployed under 100% adequate and competent supervision.

• Competent operators, riggers and banks man should be deployed and must Supervis

have relevant valid UAE license and TCA JV approved third party certification or/

3.1 1 Equipment I Over turn or

I 6 I 8 I 48(M) I and this is to be verified. A y Foreman

Failure Collapse of Crane • Crane shall be erected only on clear firm and level ground with adequate HSE access and space for its movement. Crane shall be capable of the job it is Dept. required.

• Prior to lifting the area must be cleared off from any infringing objects and maintain area tidy.

• Ensure that all the people from the lifting area and other areas where the load is travelling is cleared off prior to lifting.

Page 73: CLOISALL STEEL STRUCT PAVILLION.pdf

Midfield Terminal Building - GPneral Contractor I Aa:.r.

A '' (Contract Number AUH. .10.0401)

I Dl1ll MIDFIELD TERMINAL CONTRACTOR (TCA Joint Venture) Page 6 of22 Construction arab tee HSE&S Risk Assessment

I Date: 10/11 /14

Revision: 02 Main Activity: Installation of Steel Structure for Sin gle and Double Pavilions

Equipment: Mobile Crane, Man lifts, Fork Lift, Cherry picker, Vertical Lift, Torque Wrenches. Drill Machines, Jig Saw, Belt Sander Machine, Sanding Machine, Tools j Equipment Total Stations, Chain Hoist, Chain Block, lever block, Tirfor, Welding Machine, Grinder,

Material: Steel Material, Nut Bolt ETC. Location: ABU DHABI INTERNATIONAL AIRPORT- MIDFIELD TERMINAL BUILDING

MS Reference: MS-1093-110N Rev-02 (SS-8259)

Risk Rating- No Residu

Hazards Controls al ALARP Actions Effects

Sr. (The potential to Consequence Recommended Control Measures & Mitigations Risk(T Demonstr

cause harm) Like lib Seve Outcome /A/M/1 ated (Y/N) By I ood rity [T/A/M/f} )

: • Regular maintenance and yearly I half yearly inspection shall be carried out for crane I all lifting gears .

• Ensure daily inspection for the cranes and the daily checklists has to be maintained.

• Visual inspection to be carried out on daily basis of all loose lifting gears and equipment and records ahs to be maintained .

• Lifting gears and equipment's to be used only by a competent person. RiggingS

Unsafe lifting Personal injuries, • Ensure regular thorough inspection carried out by Abu Dhabi municipality upervisor

approved 3rd party on all lifting gear I 3.2 equipment, property Damages 6 8 48{M)

• Ensure automatic load indicators are working properly A y

Foremen lifting gea rs Production delays

• SWL is marked properly HSE

• Ensure physical inspections before and after each shift Dept.

• All lifting tackles must be stored in a proper, suitable place away from substances/atmosphere which can cause corrosion, rust or damage.

• Warning signs of heavy lifting should be provided in prominent areas. • Wind speed has to be monitored regularly. Over 38kmh all lifting operations

will be stopped .

• Crane operators shall be UAE licensed and shall have competency Certificate

Incompetent • Personal injuries, issued by third party approved by Abu Dhabi Municipality.

personnel • property • All riggers shall be trained and possess Competency Certificate. Supervis

3.3 involved in the Damages 6 6 36{M) • All others involved in the activity shall be task briefed on each shift and A y or/

Lifting • Production records of attendance shall be maintained. Foremen

operation delays • Area of lifting operations shall be cordoned off and sign posted to avoid others

inadvertently entering to the area .

-

Page 74: CLOISALL STEEL STRUCT PAVILLION.pdf

I.

Dll Construction

Date: Revision:

Main Activity:

Tools I Equipment

Location:

MS Reference:

Sr.

3.4 I

Hazards (The potential to

cause harm)

General Hazards involved in the

Lifting operations

~

10/11[ 14 02

' arab tee

Midfield Terminal Building- Goneral Contractor (Contract Number AUH. . _.10.0401)

MID FIELD TERMINAL CONTRACTOR (TCA Joint Venture) HSE&S Risk Assessment

Installation of Steel Structure fo r Single and Double Paviljons

Page 7 of22

I I l

Equipment: Mobile Crane, Man lifts, Fork Lift, Cherry picker, Vertical Lift, Torque Wrenches. Drill Machines, Jig Saw, Belt Sander Machine, Sanding Machine, Total Stations, Chain Hoist, Chain Block, lever block, Tirfor, Welding Machine, Grinder, Material: Steel Material, Nut Bolt ETC. ABU DHABI INTERNATIONAL AIRPORT- MIDFIELD TERMINAL BUILDING

MS-1093-110N Rev-02 (SS-8259)

Effects Consequence

• Personal injuries, • property

Damages I

• Production delays

Risk Rating - No Controls

Ukelib I Seve I Outcome ood rity rr I A/M/f}

6 I 6 I 36(M)

Recommended Control Measures & Mitigations

• Never swing load overhead people • Area of lifting activity to be free from electrical lines or any existing utilities. • Never exceed the marked safe working loads (SWL). • Position the crane on a well compacted, leveled ground. • Outriggers must be fully extended and adequately supported. • If possible, the load must be visible to operator. • If visibility of the load and rigger is not feasible, proper communications

facilities must be provided. • Fire extinguishers must be in the cabin of the operator. • Ensure use of tag line to control the load. • All lifting operations must be controlled by a competent person who will take

overall responsibility and possess a method statement for the work activities. • Lifting plan will be prepared prior to every lift at site. • Loosed materials must be carried in boxes I containers. • Lifting operation shall be suspended during inadvertent weather conditions. • Use of proper PPE 's. safety glass, boots, helmet, vest, gloves, harness. • All lifting gears should be certified from Abu Dhabi municipality approved third

party in every 3 months. • All lifting equipment's should be color coded as per client requirements.

Residu al

Risk(T /A/M/1 ~

A

ALARP Demonstr ated (Y/N)

y

Actions I

By I

Rigging Supervis

or/ Foremen

4 I USE OF HYDRAULIC JACKS

4.1 Failure of hydraulics

• Personal injuries • Property damage

6 6 36(M)

• The load bearing capacity of the jack must suit the load of the material placed on it.

• Hydraulic jacks to be inspected and certified by Abu DhabiMunicipality approved third party.

• Ensure the lift using jack is sufficient for the intended operation.

A y

Site Engineer/ Construct

ion Manager

Page 75: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 76: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 77: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 78: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 79: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 80: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 81: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 82: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 83: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 84: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 85: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 86: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 87: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 88: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 89: CLOISALL STEEL STRUCT PAVILLION.pdf

() ')

A Midfield Terminal Building - General Contractor

l"!'CK J.\.1,

' ' (Contract Number AUH.06.10.0401) DBD MIDFIELD TERMINAL CONTRACTOR (TCA Joint Venture) Page 22 of 22 Construction arabtec HSE&S Risk Assessment

Date: 10/11/14 Revision: 02

Main Activity: Installation of Steel Structure for Single and Double Pavilions Equipment: Mobile Crane, Man lifts, Fork Lift, Cherry picker, Vertical Lift, Torque Wrenches. Drill Machines, Jig Saw, Belt Sander Machine, Sanding Machine,

Tools I Equipment Total Stations, Chain Hoist, Chain Block, lever block, Tirfor, Welding Machine, Grinder, Material: Steel Material, Nut Bolt ETC.

Location: ABU DHABI INTERNATIONAL AIRPORT- MIDFIELD TERMINAL BUILDING

MS Reference: MS-1093·110N Rev-02 (SS-8259)

Risk Rating • No Resfdu Actions Hazards Effects Controls al ALARP

Sr. (The potendal to Consequence Recommended Control Measures & Mitigations Risk(T Demonstr cause harm) Llkellh Seve Outcome /A/M/1 ated (Y/N) By

I ood rlty rrtA/M/1) l

13. House Keeping

13.1 Contact with Multiple injuries, 6 6 36[M) • All appropriate PPE's to be worn i.e., hand glove (heavy duty). dust mask A y Site sharp edge of back pain, minor safety goggles, Hard Hat and Safety Shoes Engineer scrap while cut, serious sprain, . • Training to be provided for manual handling and safety during handling waste Supervis waste come in contact to all operatives evolved in housekeeping activities. or/ Forem collecting and with steel structure • Site supervisor has to ensure that the areas are clean and tidy before and an removing, materials after activity. dust, Manual • Segregated accordingly in a skip/area provided by the TCAJV and follow the Handling of waste management system of TCAJV. waste • Supervisors /team leaders need to be monitor about waste management and

disposer only in designated areas or skips

Name: Yousef AI Mousa Name: Barry Coster Name: Raymond Rice Position: Construction Su Position: TCA JV Proiect Position: Construction Support Manager Signature: Signature: Signature:~

~"--\;.

Page 90: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 91: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 92: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 93: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 94: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 95: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 96: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 97: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 98: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 99: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 100: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 101: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 102: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 103: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 104: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 105: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 106: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 107: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 108: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 109: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 110: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 111: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 112: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 113: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 114: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 115: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 116: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 117: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 118: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 119: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 120: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 121: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 122: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 123: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 124: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 125: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 126: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 127: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 128: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 129: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 130: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 131: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 132: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 133: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 134: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 135: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 136: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 137: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 138: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 139: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 140: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 141: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 142: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 143: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 144: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 145: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 146: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 147: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 148: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 149: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 150: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 151: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 152: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 153: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 154: CLOISALL STEEL STRUCT PAVILLION.pdf
Page 155: CLOISALL STEEL STRUCT PAVILLION.pdf

Recommended