23
Transcript
iellan
Typewriter
Close

The

Team

Mr. M. Ramkumar Vice President & Head – HCP

(Pipelines)

Mr. A. Radharaman Vice President & Head – HCP (Process Plant Construction)

Mr. T CHINNAPPA Executive Vice President &

Head-HCP (Domestic)

B Puhazhendi General Manager-HCP

(Process Plant Construction)

C Chokkalingam General Manager-HCP

(Pipelines)

` `

In House Faculty Co-ordinators

K. N. Sen Head-HSE

K.Rajeevan Head-Engineering

Ravi Shanmugam Head-

Information Systems

P. Nageswara Rao Task Force Leader-

Mangalore Projects

S Murali Head-Finance &

Accounts

J Joseph Amalraj Head-QM & QA

Manjit Singh Head-P&M

Pradip P Gandhi Head-Operations

(Process Plant Construction)

C S Sundaram Head-Human

Resources

P Vellaipandi Head-Materials

Raghunath Rautray Head-Site

Administration

Index

DEC’12

OCT’12 NOV’12

JAN’13

FEB’13 MAR’13

EIP 2010

- Supply Chain Management

OBJECTIVE

Enhanced understanding of the EIP

BROAD CONTENTS/ COVERAGE

EIP 2010 – Introduction SCM – Pre-Requisite of Parameters SCM – Full Cycle of Operation in EIP SCM – e-Document Flow in EIP SCM – Discussion (Issues &

Resolution)

VENUE

Chennai-HQ

FACULTY CO-ORDINATOR

Ravi Shanmugam

TARGET GROUP

Store Keepers & Store Managers

DURATION

1 Day

e-ALPS-Equipment Quantity Surveying and Execution Planning

OBJECTIVE

To create awareness about the newly

developed e-ALPS Equipment Module,

which will enable the user to plan, execute

and reconcile easily through IT enablement

Introduction to e-ALPS system

Overview of existing system EASYTRACK – Equipment

module

Overview of e-ALPS Equipment Module

Importance of IT data flow from other disciplines

(Civil, Structural and Piping)

Execution Planning

Quantity Survey : Client Invoicing and S/C Billing

Report generation for planning and billing

through system

MRN, MRIR, MIV, MRV through e-ALPS & Practical session

on usage e-ALPS

BROAD CONTENTS / COVERAGE

DURATION

2 days

FACULTY CO-ORDINATOR

Sainath Kusumanchi

TARGET GROUP

All Equipment Engineers VENUE

HQ-Chennai

OBJECTIVE

To identify as well as ascertain root causes of any incidents and effective methods to prevent the same.

BROAD CONTENTS / COVERAGE

Myths of Incident Investigation

Tools for Root cause analysis

Prevention of Incidents

Post Incident Management

TARGET GROUP

HSE (S-1 and Above)

VENUE

WRO

DURATION

2 Days

FACULTY CO-ORDINATOR

K. N.Sen

OBJECTIVE

BROAD CONTENTS / COVERAGE

VENUE

HQ-Chennai

TARGET GROUP Civil & Mechanical

(O2 to M1C)

DURATION

3 days

FACULTY CO-ORDINATOR

Yamini Kanta Tripathy

Costing & Cost Control Systems

To enhance the Costing and Cost Control skills of

Costing Engineers

Cost Estimation fundamentals for Civil, Mechanical and IDC Heads

ACE/JCR Preparation

Use of EIP for Costing and Cost Control and

Revenue Ledger Reconciliation

Leadership and learning are indispensable to each other.

-John F. Kennedy -Politician

Surface Preparation & Protection

OBJECTIVE

BROAD CONTENTS / COVERAGE

To impart knowledge on Surface preparation & Painting per codes and standards

Surface Preparation Methods, Painting applications and Inspection methods

TARGET GROUP

S2 to M1B (Mechanical)

VENUE

WRO

DURATION

2 days

FACULTY CO-ORDINATOR

J.Joseph Amalraj

Effective Communication Skills

OBJECTIVE

Impart techniques/tools for improved &

Effective communication

BROAD CONTENTS / COVERAGE

Understanding communication/types &

dimensions of Communication

TARGET GROUP

All Disciplines

O-1 to M1-C

VENUE

ERO

DURATION

2 Days

FACULTY CO-ORDINATOR

Shovan Kumar Ghosh

Change is the end result of all true learning -Leo Buscaglia -Author/Speaker

Integrated Project Planning & Control (I-EPC)

OBJECTIVE

BROAD CONTENTS / COVERAGE

TARGET GROUP

Civil, Mechanical -

Site exposure (at least

one year)

(O-1 to M1-A)

VENUE

HQ-Chennai

DURATION

5 days

Create an awareness about I-EPC

Concept & planning Tool i.e.

Primavera

Introduction to I-EPC concept,

e-ALPS,IPMS, P&M & Resource

Planner

Case Study & discussion on

outputs

Discussion on Subcontract

Management

Primavera Training

FACULTY CO-ORDINATOR

R Swapnil Nashikkar

e-ALPS-Civil Quantity Surveying and Execution Planning

Create awareness about Quantity Surveying and Execution planning through e-ALPS-Civil.

Overview-Quantity Surveying and Estimation Overview -I-EPC planning Overview -Execution planning Overview -Tekla Software and its usage. It enablement on Quantity Estimation/CADSRC Software Site facilities planning Subcontracts strategy/Constructability Study e-ALPS-Civil introduction and usage as Execution planning

tool. Hands on e-ALPS Civil, Tekla, Quantity Surveying Software

VENUE

HQ-Chennai/Vadodara

TARGET GROUP

Civil (O1 to M1A)

DURATION

4 days

FACULTY CO-ORDINATOR

Rahul Singh

OBJECTIVE

BROAD CONTENTS / COVERAGE

January

Anyone who stops learning is old,

whether at twenty or eighty. Anyone who keeps learning stays young.

The greatest thing in life is to keep your mind young.

-Henry Ford -Industrialist

e-ALPS-Piping Quantity Surveying and Execution Planning

Create awareness about Quantity Surveying and Execution planning through e-ALPS-Piping

OBJECTIVE

BROAD CONTENTS / COVERAGE

e-ALPS Enhancement Drawing/Material flow Workpack allocation/easyTRACK, AutoSpool (Joint Marking) Stores Management, Master Setup, Quantity Survey, Milestone

Management, Activity planning fabrication, Activity planning

erection

February

Learn from yesterday, live for today, hope for tomorrow. The important thing is not to stop questioning. - Albert Einstein Physicist/Mathematician

Indirect Taxation

BROAD CONTENTS /COVERAGE

Compliance requirement under VAT and Service tax

OBJECTIVE

VENUE

HQ-Chennai

TARGET GROUP

Site Accountants/Tendering Team/

BU Coordinators

DURATION

1 day

FACULTY CO-ORDINATOR

P.Ravi Kumar

To explain the documentation and

calculation methodology

March

Our greatest weakness lies in giving up. The most certain way to succeed is

always to try just one more time -Thomas Edison

- Inventor

TARGET

GROUP

TA/CA , S1-O2

VENUE

Job

Sites/Depots

DURATION

2 days

FACULTY

COORDINATOR

Manjit Singh

CRAWLER CRANES- OPERATION/MAINTENANCE &

REPAIR

OBJECTIVE

To give exposure on Crawler cranes operation,

maintenance and repair

BROAD CONTENTS /COVERAGE

Hydraulic Crawler cranes

i)Maintenance ,Trouble

Shooting & Operation

procedure

ii)Safe usage of cranes

iii)Safe rigging procedure

OBJECTIVE

Enhanced understanding of the EIP

BROAD CONTENTS/ COVERAGE

EIP 2010 – Introduction CRM – Pre-Requisite of Parameters CRM – Full Cycle of Operation in EIP CRM – e-Document Flow in EIP CRM – Discussion (Issues & Resolution) EPM – Provision / ETC JCM - Cost Processing

DURATION

1 Day

FACULTY CO-ORDINATOR

Ravi Shanmugam

TARGET GROUP

Planning & Billing Engineers

VENUE

Chennai-HQ

EIP 2010 -

Customer Relation Management & EPM

Learning & Development L&T Hydrocarbon

Construction & Pipelines Larsen & Toubro Limited, Mount Poonamallee Road, Manapakkam